West Rail Line Update FasTracks Bike Jeffco. September 13, 2011

Size: px
Start display at page:

Download "West Rail Line Update FasTracks Bike Jeffco. September 13, 2011"

Transcription

1 West Rail Line Update FasTracks Bike Jeffco September 13, 2011

2 Bike route along the West Rail Line

3 West Rail Line Bike Paths West Rail Line is a bike and pedestrian friendly project The bike path will be both an on-street and off-street configuration, running parallel to the West Rail Line for the majority of the alignment More than half of the bike path in Lakewood will be a dedicated path, separate from the street Elevated crossings on bridges adjacent to the light rail: Kipling and Wadsworth Signage will be placed for the street portion of the bike path, but they will need to share the road with automobiles All light rail stations will feature bicycle parking using bike racks and/or bike lockers Bicycles are allowed on RTD buses and light rail trains

4 Sidewalks and Safety Federal and Sheridan Bridges (over light rail) feature widened sidewalks, increasing safety for pedestrians and bicyclists traveling on these roadways Pedestrian warning signs will be provided at all crossings Pedestrian tunnel built under elevated guideway just east of Kipling Street Tunnel serves the Lakewood community by providing a safe alternative for students going to and from Eiber Elementary School (north) adjacent to the guideway Concrete tunnel is 14 feet long, 8 feet wide, 9 feet tall and includes lighting for added safety Pedestrian Tunnel The pedestrian tunnel will open in early 2012

5 Sidewalks and Safety (continued) Design team has worked to eliminate as many bicycle crossings as possible. However, there are still four locations where bikes must cross the light rail tracks Harlan Street Estes Street Garrison Street Oak Street Oak Street Bike Crossing At each crossing, the bike path will cross the tracks at street level, adjacent to automobile traffic Throughout the year, bike path maintenance, including snow removal, crack filling and other general maintenance, will be done by the city where the bike path is located

6 Safety: At-Grade Crossings RTD is committed to funding grade crossing improvements to mitigate noise and safety impacts as required by federal guidelines RTD working with the Public Utilities Commission regarding the at-grade crossings in the community neighborhoods RTD has always included the following safety measures, which are still in place: Quad gates or Medians Flashing lights Pavement Markings Signage Perry Street

7 Safety: Quiet Crossing Quiet crossings on the West Rail Line 11 RTD has approval to run quiet through the crossings (no horns, no train level bells on gates) Required: a pedestrian specific, low-level audible signal on the crossings to alert pedestrians of approaching trains Train horn will sound for safety reasons When maintenance crews are along the tracks Emergency situations such as pedestrians along the tracks or vehicles rushing the gates Each Quiet crossing requires installation and maintenance of active grade crossing warning devices: flashing lights and gates at public crossings, advance warning signs, and constant warning time devices

8 Current bike path schedule: Area 1 Earl Johnson Road September (2 nd week)

9 Jeffco Center Bike Path: August 2011

10 Jeffco Center Bike Path: September 2011

11 Current bike path schedule: Area 2 Kipling Garrison Wadsworth Vance Concrete Fine Grade Marshall Harlan Fine Grade Concrete Finish Edges Harlan Depew Fine Grade Concrete Finish Edges September (1 st week) September (2 nd week) September (3 rd week) September (2 nd week) September (3 rd week) September (3 rd week) September (2 nd week) September (last week) September (last week)

12 Kipling Bridge Bike Path Kipling Independence: August 2011 Looking east from Kipling Street Looking west from Independence Street

13 Kipling Bridge Pedestrian Tunnel: August 2011

14 Bike Path west of Garrison: August 2011 Garrison to Independence Looking west from Garrison Street

15 At Carr Street looking east to Wadsworth Boulevard: Aug. Sept August 2011 September 2011

16 Wadsworth Bike Bridge to Carr Street: September 2011 Looking west from Wadsworth Boulevard

17 Wadsworth Bridge Bike Path: July September 2011 July 2011 September 2011

18 Bike path west of Lamar Street: August 2011 Lamar Newland

19 Bike path east of Lamar Street: August 2011 Lamar Harlan

20 Sheridan Bridge: 2007 June Sheridan Boulevard Bridge with widened sidewalks to increase pedestrian and bicyclist safety June 2011

21 Current bike path schedule: Area 3 Raleigh Perry Station October (2 nd week) Perry Knox September (2 nd week)

22 Bike path along Lakewood Dry Gulch Tennyson Ped Bridge: July 2011

23 Bike path west of Federal Boulevard: August 2011

24 Federal Boulevard Bridge: August 2010

25 Federal Blvd. Final Configuration: August 15, 2011 Federal Boulevard Bridge with widened sidewalks to increase pedestrian and bicyclist safety

26 Bike path between Federal & Decatur: August 2011

27 Bike path east of Decatur Bridge: August 2011

28 Bike path along South Platte River: August 2011

29 Contact Information For construction information - Kathy Berumen office cell kberumen@dtcgjv.com For RTD information - Brenda Tierney office brenda.tierney@rtd-denver.com West Rail website

CHAPTER 3.0: TRANSPORTATION IMPACTS

CHAPTER 3.0: TRANSPORTATION IMPACTS CHAPTER 3.0: TRANSPORTATION IMPACTS Chapter 4.0 of the Final Environmental Impact Statement (FEIS) provided information about transportation impacts of the Light Trail Transit (LRT) alternative, including:

More information

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017 RiNo Railroad Crossing Connectivity Analysis Stakeholder Workshop June 29, 2017 Ideas and Considerations Presented at Stakeholder Workshop Primary Focus: 38 th Street (between Walnut & Wynkoop) 1 Basic

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

Designing for Pedestrian Safety

Designing for Pedestrian Safety Designing for Pedestrian Safety Road Diets Presented by: Peter Lagerwey Senior Planner, Toole Design Group November 3, 2010 Before After Learning Objectives At the end of this module, you will be able

More information

Golden s Plan. For the Highway 6 & 93 Corridor

Golden s Plan. For the Highway 6 & 93 Corridor Golden s Plan For the Highway 6 & 93 Corridor Purpose of the Study Accommodate regional traffic needs on Highways 6 and 93, as defined by the Northwest Quadrant Feasibility Study. Find a solution that

More information

Chapter 6 Transportation Plan

Chapter 6 Transportation Plan Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North

More information

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia TRAFFIC CALMING TOOLBOX For the residents of the City of Decatur, Georgia 2 City of Decatur Traffic Calming Toolbox Public Works Department 2635 Talley Street Decatur, GA 30030 404.377.5571 3 Welcome to

More information

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Improvements Infrastructure Gap Assessment and Improvements Street Striping Infrastructure Project Proposal The federal-aid Safe Routes to School program funds infrastructure/engineering projects that fall into two categories: Design (available only to School Development Authority

More information

Any time is train time

Any time is train time Any time is train time 2 Stay safe, remain behind the safety strip 3 Mind the gap 4 Emergency phones are for your safety 5 Video surveillance throughout ETS facilities and vehicles 6 Be TraXSafe, stay

More information

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Nathan Roseberry, Senior Engineer Pam Broviak, Project Manager July 24, 2014 Agenda Project Goals Existing Roadway Conditions Traffic

More information

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego

More information

City of Madison: 2017 Capital Budget Capital Improvement Plan

City of Madison: 2017 Capital Budget Capital Improvement Plan Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

City of Richmond Bicycle Master Plan

City of Richmond Bicycle Master Plan City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with Eisen Letunic City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

1. In Reach 3, Perry, Knox, Lowell, and Hooker have crossings identified. What are these?

1. In Reach 3, Perry, Knox, Lowell, and Hooker have crossings identified. What are these? Round 3 Integration Plan Integration Plan Public Meeting Denver Urban Waterways Study Meeting Date: Location: Hosted by: Attendees: August 30 2016, 5:30-7:30pm Barnum Recreation Center City and County

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Glossary of Terms. ABANDONMENT The permanent cessation of rail activity on a given line of railroad.

Glossary of Terms. ABANDONMENT The permanent cessation of rail activity on a given line of railroad. Glossary of Terms AAR/DOT CROSSING NUMBER A uniform numbering system in which a unique designation is assigned to every highway-rail grade crossing in the nation. It consists of a six digit number followed

More information

CHAPTER 9: SAFETY 9.1 TRAFFIC SAFETY INTERSECTION COLLISIONS

CHAPTER 9: SAFETY 9.1 TRAFFIC SAFETY INTERSECTION COLLISIONS CHAPTER 9: SAFETY 9.1 TRAFFIC SAFETY Creating a transportation network that is not only efficient but also safe is a key objective of the General Plan and the WBCMP. To assess the current safety conditions

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

APPENDIX E GRADE CROSSING LOCATIONS

APPENDIX E GRADE CROSSING LOCATIONS APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Lakewood will support connectivity through a variety of transportation options and inspire residents to utilize multiple transportation modes.

Lakewood will support connectivity through a variety of transportation options and inspire residents to utilize multiple transportation modes. Chapter 6 Lakewood will support connectivity through a variety of transportation options and inspire residents to utilize multiple transportation modes. Lakewood 2025: Moving Forward Together Multi-Modal

More information

Chapter 3 DESIGN SPECIFICATIONS

Chapter 3 DESIGN SPECIFICATIONS Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically

More information

City Snapshot September 27, 2018

City Snapshot September 27, 2018 1 City Snapshot September 27, 2018 Respondent Introduction Thank you for providing data for the PlacesForBikes City Rating program! The information you provide will be used to understand the progress your

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City

More information

Section 1 - North Lamar: Tech Ridge to US 183

Section 1 - North Lamar: Tech Ridge to US 183 Section 1 - North Lamar: to US 183 Segment is part of 2016 Mobility Bond Program Segment is owned by TxDOT ALIGNMENT AND CONNECTIVITY Further study for connection between P&R and N Lamar Blvd Section 1

More information

RE: Park Plaza Walgreens (P12-016)

RE: Park Plaza Walgreens (P12-016) 12/5/2014 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 RE: Park Plaza Walgreens (P12-016) Dear Mr. Hung:

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists Cyclists and Bikeways: What s your match? guide to bikeway options for a variety of cyclists The workshop and this resource were made possible by funding from the Province of Ontario via the Ministry of

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures.

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures. Before After ROAD DIETS MODULE 10 1 of 9 Safety Proven Countermeasures http://safety.fhwa.dot.gov/provencountermeasures/fhwa_sa_12_013.htm Learning Objectives At the end of this module, you will be able

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle

More information

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements Harbor Mixed Use CHAPTER Transit Corridor 4: Mobility Plan 4 MOBILITY PLAN Mobility Plan Objectives The Harbor Corridor Plan seeks to expand and improve the ways that people move along and through the

More information

How to Drive Near Trains

How to Drive Near Trains How to Drive Near Trains Approximate facilitation time: 20-30 minutes Materials How to Drive Safely Near Trains Video Test Your Train Safety Savvy Worksheets - enough copies for all students (& Master

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access The replacement of the George Washington Bridge suspender ropes is part of the

More information

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments! MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions

More information

Implementing the Three Es of School Zone Traffic Calming

Implementing the Three Es of School Zone Traffic Calming Implementing the Three Es of School Zone Traffic Calming Use this evaluation tool as a guide to analyze the specific safety needs of your school. SCHOOL PROFILE School Name: School District: Address: Phone

More information

BOLAND DRIVE PATH PROJECT. Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson

BOLAND DRIVE PATH PROJECT. Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson BOLAND DRIVE PATH PROJECT Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson INTRODUCTION TO PROJECT The purpose: to construct a multi-purpose path, which will connect two existing bike

More information

Monroe Street Reconstruction

Monroe Street Reconstruction Total participants: 45+ Monroe Street Reconstruction Cross Section Workshop Notes September 29, 2016, Wingra School Workshop Orientation, Technical and Functional Considerations: The workshop began with

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

5/31/2016 VIA  . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 5/31/2016 VIA EMAIL Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: El Pollo Loco (P16-028) Dear Ms. Wacht: WALKSacramento has reviewed

More information

9/21/2016 VIA . RE: The Knot (DR16-270)

9/21/2016 VIA  . RE: The Knot (DR16-270) 9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:

More information

Road Diets and Roundabouts

Road Diets and Roundabouts Road Diets and Roundabouts Paul Zykofsky, AICP Local Government Commission Sacramento, CA Classic Road Diet 4 to 3 lanes San Antonio TX On-street parking Median Bike Lanes Center Turn-Lane Seattle WA Road

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan 5 System Components Wakefield Street Photo Simulation showing Sharrows Introduction The Master Plan identifies various system components that, together, create a comprehensive greenway system. These components

More information

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018 MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018 AGENDA Introductions Project Benefits Progress to Date Schedule for Remaining Work Phase 3 Activities, Impacts & Traffic Detours Phase 4 Activities

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

R o s s l y n, A r l i n g t o n C o u n t y, V i r g i n i a. S i t e P l a n R e v i e w C o m m i t t e e M e e t i n g # 5

R o s s l y n, A r l i n g t o n C o u n t y, V i r g i n i a. S i t e P l a n R e v i e w C o m m i t t e e M e e t i n g # 5 1 4 0 1 W i l s o n B o u l e v a r d & 1 4 0 0 K e y B o u l e v a r d R o s s l y n, A r l i n g t o n C o u n t y, V i r g i n i a S i t e P l a n R e v i e w C o m m i t t e e M e e t i n g # 5 1 2.

More information

See Figure 38, Existing Nonmotorized Connections.

See Figure 38, Existing Nonmotorized Connections. Nonmotorized Connections Existing Nonmotorized Connections Pedestrian, vehicle and bike traffic access and movements are confined primarily to Penny Drive on campus. Due to the steep slope along the length

More information

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed

More information

F L E T C H E R A V E N U E

F L E T C H E R A V E N U E Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are

More information

WEST CAMPUS COGENERATION FACILITY CONSTRUCTION TRAFFIC PLAN. Madison, Wisconsin 53726

WEST CAMPUS COGENERATION FACILITY CONSTRUCTION TRAFFIC PLAN. Madison, Wisconsin 53726 WEST CAMPUS COGENERATION FACILITY CONSTRUCTION TRAFFIC PLAN The West Campus Cogeneration Facility (WCCF) Construction Traffic Plan covers work associated with the WCCF project. This work includes: WCCF

More information

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014 Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3

More information

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

10/8/2014 VIA  . RE: CVS Pharmacy (P13-002) Revised August 2014 10/8/2014 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: CVS Pharmacy

More information

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

6/14/2013 VIA  . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814 6/14/2013 VIA EMAIL Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd RE: Sacramento Natural Foods Co-Op (P13-025) Dear Mr. Compton: WALKSacramento appreciates

More information

COMPLETE STREETS DURING CONSTRUCTION

COMPLETE STREETS DURING CONSTRUCTION COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

More information

Sharrows and Elephants and Bike Boxes!, s, Oh My!

Sharrows and Elephants and Bike Boxes!, s, Oh My! Sharrows and Elephants and Bike Boxes!, s, Oh My! New Traffic Control Devices on Vancouver s Bike Routes David Rawsthorne, P.Eng. City of Vancouver Engineering g Services CITE Quad Conference, May 2009

More information

Chapter 7 Nonmotorized Facilities

Chapter 7 Nonmotorized Facilities Chapter 7 Nonmotorized Facilities What is in this chapter? This chapter discusses existing and proposed pedestrian and bicycle facilities referred to as nonmotorized facilities along the SR 520 corridor.

More information

Doull Elementary School

Doull Elementary School Doull Elementary School Safe Routes to School Walking Audit and Recommendations WalkDenver Fall 2013 Doull Elementary School (ECE grade 5) 2520 South Utica Street, Denver 80219 This project was supported

More information

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations. The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible

More information

Long Island Rail Road Expansion Project Floral Park to Hicksville

Long Island Rail Road Expansion Project Floral Park to Hicksville Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

Pedestrian Road Safety Audit

Pedestrian Road Safety Audit Pedestrian Road Safety Audit Middlebrook Road From Father Hurley Boulevard to Waring Station Road December 2017 Montgomery County Department of Transportation Table of Contents 1. Introduction... 1 1.1

More information

Blair/Williamson Intersection Expressed Needs

Blair/Williamson Intersection Expressed Needs Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Lewelling Boulevard Improvements Response to Questions/Comments From October 9, 2001 Community Meeting

Lewelling Boulevard Improvements Response to Questions/Comments From October 9, 2001 Community Meeting Lewelling Boulevard Improvements Response to Questions/Comments From October 9, 2001 Community Meeting Group 1 Questions/Comments (Topic: Impact to Properties) How many residential/business properties

More information

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid Short-Term Enhancements Improvements to keep Austin moving Long-Term Investments Projects to support our future Mobility Hubs MetroRapid MetroRail MetroExpress Commuters Connectors Circulators Project

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

STATION #3 INITIAL ALTERNATIVES

STATION #3 INITIAL ALTERNATIVES www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way

More information

Public Meeting #1 Comment Summary

Public Meeting #1 Comment Summary Public Meeting #1 Comment Summary October 2017 The Westerly Creek to Toll Gate Creek Trail Connector project s first public meeting was held on October 17, 2017 at EcoTech Institute in Aurora. This meeting

More information

Small Town & Rural Multimodal Networks

Small Town & Rural Multimodal Networks Small Town & Rural Multimodal Networks Fred Young, PLA Andrea Clinkscales, AICP, PMP Alta Planning + Design Funding Partners Project Team Existing Design Guidance AASHTO Flexibility Guide 2004 AASHTO Bike

More information

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2732 SUMMARY

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2732 SUMMARY Sponsored by Representative BUCKLEY th OREGON LEGISLATIVE ASSEMBLY--0 Regular Session House Bill SUMMARY The following summary is not prepared by the sponsors of the measure and is not a part of the body

More information

10/30/2012 VIA

10/30/2012 VIA 10/30/2012 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: The Cannery On-Site

More information

8 th Annual Spring Transportation. April 9, 2010

8 th Annual Spring Transportation. April 9, 2010 Railroad Quiet Zones Case Studies in Colorado 8 th Annual Spring Transportation Symposium April 9, 2010 Railroad Quiet Zones What is a Quiet Zone? A section of a rail line that contains one or more consecutive

More information

Pavement Rehabilitation & Buffered Bike Lane

Pavement Rehabilitation & Buffered Bike Lane Pembina Highway from Grant Avenue to Osborne Street Pavement Rehabilitation & Buffered Bike Lane Welcome April 21, 2016 Please complete and submit a comment sheet prior to leaving or complete it online

More information

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:

More information

Bicycle Facilities Planning

Bicycle Facilities Planning Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists

More information

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city

More information

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs

More information

Community Task Force November 15, 2017

Community Task Force November 15, 2017 Community Task Force November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

Hennepin County Bicycle and Pedestrian Planning

Hennepin County Bicycle and Pedestrian Planning Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion

More information