Tank Tie off Report for Pipes Albuquerque 1/3
|
|
- Alexis Pierce
- 6 years ago
- Views:
Transcription
1 Tank Tie off Report for Pipes Albuquerque 1/3 Summary: The following report contains an analysis created by Core Engineering LLC for NuStar Energy. This report was commissioned to analyze anchor points on the roofs of storage tanks at the NuStar Albuquerque location. All pipes with supplied information were checked for their ability to function as tie off points. All pipes checked have some capability of use as a tie off point. Table 1 shows the data for each pipe tested and the amount of people it can support at a given time. Introduction: Storage tanks have pipes and protrusions on their roof. These protrusions can be used as an anchor so that they can serve as fall protection. In order for them to be used as anchors, they must meet the requirements laid out by OSHA. Figure 1: Pipe Nozzle Pictures [1] 1
2 Figure 2: Nozzle Locations [2] The piping is attached to the tank via a solid weld around the circumference in contact with the tank. Figure 2 shows an example of a nozzle attached to the tank roof and its relative location on the roof. Failure Modes: There are two failure modes that may affect the anchor points. The anchor points may fail in shear from the applied load or they may fail due to bending stress where the pipe is welded to the tank. Both of these failure modes will be examined to determine the loading necessary to cause failure to the pipe. The lowest force found to cause failure in either mode will then be compared to the OSHA standards to determine the tie off feasibility of the pipes. The pipes will also be checked for deflection according to OSHA standard. Analysis: The first step in the analysis will be to check for failure due to deflection caused by a 2,250 pound load. The nozzle can be treated as a cantilever anchored at one end. We will assume that the 2,250 pound load is applied at the maximum distance from the anchor such that it will cause the greatest deflection. Figure 3 shows an equivalent free body diagram of the analysis. Figure 3: Free Body Diagram 2
3 The governing equation for deflection is of a cantilever beam with a load applied at the maximum distance is: Displacement = Force Length3 3EI (1) The next test will be for shear failure of the pipe. Shear failure can occur in single and double shear. In the case of these anchors, single shear would be the method of failure and therefore it will be analyzed. For shear failure to occur, the load applied to the pipe must create a stress greater than the yield stress of the pipe (35 ksi). Since the cross sectional area is known for all anchors, simply multiplying the yield stress by the cross sectional area will give the required load to cause shear failure. Comparing this to the OSHA requirements of 5,000 pounds per person and using a safety factor of two leads to the number of people that can be supported by the anchor. The final method of failure would be at the weld due to bending stresses. A force applied at a distance from the anchor will cause a moment at the anchor point. This moment can cause the anchor to tear off the tank. The governing equation for bending stress of a cantilever beam with a load applied at the maximum distance is: σ = Force Length Z (2) Where Z is the section modulus of a pipe: Z = 0.78(R O 4 R I 4 ) R O (3) Now that the governing equations are known along with the necessary input data, an excel spreadsheet can be created to achieve the answers. The maximum bending stress and shear stress will be calculated after applying a factor of safety to the applied force. The higher of the two stresses will then be compared to the yield stress. The ratio between the higher of the two stresses and the yield stress will determine the number of people that can be supported by each anchor. 3
4 Figure 4: Excel Sheet for data output Results: The pipe was tested for multiple failure modes and the requirements set forth by OSHA standards. The table below lists the Tank, support description and viability of each pipe based on the calculated data. A factor of safety of two was used in the calculations. Name Table 1: Results 3M1 5M1 5M1 10M1 10M1 55M1 55M2 Center Vent- Manway Vent- Manway Center Center Post Flange Flange Post Post Diameter Height # of people supportable Conclusion: In conclusion, all pipes tested to be used as fall protection anchors are able to support workers. Only the pipes shown in table 1 were tested in the analysis. Failure within the roof panels is analyzed in a separate report. The number of people supportable by each anchor does not take into account the possibility of stress concentrations caused by multiple restraints on the same anchor point or corrosion damage. Multiple people attached to the same anchor point can also cause a hazardous work environment if the anchor ropes become tangled during work procedures. 4
5 References: [1] 3m-1_5m-1_10m-1 PowerPoint provided by NuStar [2] TK-3M1 Final PDF provided by NuStar and created by ROSEN USA [3] R.C. Hibbeler, Mechanics of Materials 8th Edition, January 11, 2011 [4] OSHA Regulations Standards 29 CFR, Standard Number App C 5
Study to Establish Relations for the Relative Strength of API 650 Cone Roof Roof-to-Shell and Shell-to- Bottom Joints
Thunderhead Engineering Consultants I N C O R P O R A T E D 1006 Poyntz Ave. Manhattan, KS 66502-5459 785-770-8511 www. thunderheadeng.com Study to Establish Relations for the Relative Strength of API
More informationFall Protection Refresher Orientation. Fall Protection Refresher Orientation 1
Fall Protection Refresher Orientation Fall Protection Refresher Orientation 1 Course Objectives! Understand the definitions of fall prevention, fall restraint, and fall arrest.! Understand the requirements
More informationVessels subject to External Pressure
Basic principles of compressive force Vessels subject to External Pressure Before After The result of just air pressure! Presented by: Ray Delaforce Basic principles of compressive force Consider For a
More informationDesign and Finite Element Analysis of Fabricated Panama chock with 225T capacity
LOWER HULL TOP DEC K EL. 3 1 ' - 2 " AB L [ 9 5 0 0 ] ( E) AIR DUC T ( INB D) ( E) B HD 1 4 m m `AH' ( E) PL. 1 2 m m `AH' ( E) L 1 5 0 x9 0 x1 2 m m `AH' - DO- - DO- SMIT BRACKET PANAMA CHOCK International
More informationASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel
1.0 Introduction ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel Katherine Wilson 28 May 2007 To minimize the hazards associated with vacuum and pressure
More informationSECTION FACILITY FALL PROTECTION PART I - GENERAL
SECTION 11 24 29 - FACILITY FALL PROTECTION PART I - GENERAL 1.1 The Illinois Department of Labor (IDOL) regulates fall protection for general industry and construction in the public sector under the Illinois
More informationOPENINGS AND REINFORCEMENTS 26
ASME BPVC.VIII.1-2015 UG-35.2 UG-36 (4) It is recognized that it is impractical to write requirements to cover the multiplicity of devices used for quick access, or to prevent negligent operation or the
More informationDesign Project 2 Sizing of a Bicycle Chain Ring Bolt Set ENGR 0135 Sangyeop Lee November 16, 2016 Jordan Gittleman Noah Sargent Seth Strayer Desmond
1 Design Project 2 Sizing of a Bicycle Chain Ring Bolt Set ENGR 0135 Sangyeop Lee November 16, 2016 Jordan Gittleman Noah Sargent Seth Strayer Desmond Zheng 2 Abstract This report will analyze our calculations,
More informationσ = force / surface area force act upon In the image above, the surface area would be (Face height) * (Face width).
Aortic Root Inflation Introduction You have already learned about the mechanical properties of materials in the cantilever beam experiment. In that experiment you used bending forces to determine the Young
More informationTutorial on Flange Qualification using CAEPIPE
Tutorial on Flange Qualification using CAEPIPE This document explains the procedure on performing Flange Qualification using CAEPIPE. General Flange joints are essential components in all pressurized systems;
More informationMaintenance and Troubleshooting of Pneumatic Conveying Systems for Sand in a Foundry
Maintenance and Troubleshooting of Pneumatic Conveying Systems for Sand in a Foundry Article Takeaways: Chris Doerschlag President ALB Klein Technology Group www.albkleinco.com 1. Troubleshooting Guide
More informationTECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:
Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:22.05.2014 Related Requirement: UR S27 (Rev.6 June 2013) Subject: Retroactive Application for Strength Requirements for Fore Deck Fittings and Equipment
More informationSHEAR PERFORMANCE OF RC FOOTING BEAMS BY CAP-TIE SYSTEM USING WELDED STIRRUPS
The 7th International Conference of Asian Concrete Federation SUSTAINABLE CONCRETE FOR NOW AND THE FUTURE 3 Oct 2 Nov, 216, Hanoi, Vietnam www.acf216.vn SHEAR PERFORMANCE OF RC FOOTING BEAMS BY CAP-TIE
More informationFall Hazards at Walking and Working Surfaces What You Need to Know. Presented by PENTA Engineering Group, Inc. August 2017
Fall Hazards at Walking and Working Surfaces What You Need to Know Presented by PENTA Engineering Group, Inc. August 2017 Presenters Christopher M. Everett, PE President ceverett@pentaeng.com Michael J.
More informationProduct Identification
Product Identification All SCAFCO products have a four part identification code which identifies the size (both depth and flange width), style, and material thickness of each member. Example: Member Depth:
More informationDrop Weight Testing on Sandwich Panels with a Novel Thermoplastic Core Material
University of Nebraska at Omaha DigitalCommons@UNO Civil Engineering Faculty Publications Department of Civil Engineering 5-212 Drop Weight Testing on Sandwich Panels with a Novel Thermoplastic Core Material
More informationfor Cold-Formed Steel Framing Products
Technical Guide for Cold-Formed Steel Framing Products The data in this guide is based upon the 2007 American Iron and Steel Institute s S00-07 North American Specification for the Design of Cold-Formed
More informationFall Hazards, Anchor Points and Fall Clearances OSH-2 August 7, 0900
Fall Hazards, Anchor Points and Fall Clearances OSH-2 August 7, 2017 @ 0900 Phil Fincher, CIH, CSP Overview ANSI & OSHA Fall Protection Standards Definitions, Roles, & Responsibilities of Authorized, Competent,
More informationAt the end of this presentation you should know the difference between fall prevention, fall restraint, and fall arrest.
0 At the end of this presentation you should know the difference between fall prevention, fall restraint, and fall arrest. We will review the hazards associated with fall protection and how to mitigate
More informationSummit Anchor Company, Inc.
Summit Anchor Company, Inc. Safety From The Top Down Roof and Wall Safety/Tie-Back Anchors Suspended Access Systems and Fall Protection Overview United States and Canadian national safety standards require
More informationEDEXCEL NATIONALS UNIT 6 MECHANICAL PRINCIPLES and APPLICATIONS. ASSIGNMENT No. 4
EDEXCEL NATIONALS UNIT 6 MECHANICAL PRINCIPLES and APPLICATIONS ASSIGNMENT No. 4 NAME: I agree to the assessment as contained in this assignment. I confirm that the work submitted is my own work. Signature
More informationFatigue Life Evaluation of Cross Tubes of Helicopter Skid Landing Gear System
IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 04, 2015 ISSN (online): 2321-0613 Fatigue Life Evaluation of Cross Tubes of Helicopter Skid Landing Gear System Madhu S
More informationME311 Machine Design
E311 achine Design Lecture 6: Fluctuating Fatigue and the Goodman Diagram; Impact W Dornfeld 19Oct17 Fairfield University chool of Engineering Fluctuating Fatigue o far we have discussed loading that ernately
More informationINTRODUCTION. Disclaimer
3 INTRODUCTION The Steel Framing Industry Association (SFIA) was formed with the objective of assisting companies having interests in the cold-formed steel framing industry to be more successful by unifying
More informationOSHA s new walking working surfaces standards
OSHA s new walking working surfaces standards changes and new requirements Inspection of walking working surfaces 1910.22(d) Regularly and as needed and correct, repair, or guard against hazardous conditions;
More informationLiquid Level Measurement
Technical Article Liquid Level Measurement A pressure transmitter can be used to determine the liquid level in a tank, well, river or other body of liquid. The pressure at the bottom of a liquid filled
More informationfor Cold-Formed Steel Framing Products
Technical Guide for Cold-Formed Steel Framing Products Technical Data in this publication is applicable to the following SFIA Member Company: For a complete directory of SFIA Members who are certified
More informationPresented to the International Technical Rescue Symposium, November Abstract
Presented to the International Technical Rescue Symposium, November 21 Presented by: Chuck Weber, PMI Quality Manager Abstract This paper presents the results of 162 individual drop tests performed at
More informationAPI HPHT 6BX Flange Design, Verification & Capabilities: Example use of Methodology
API HPHT 6BX Flange Design, Verification & Capabilities: Example use of Methodology January 22 nd, 2018 Summary 1. Determine the suitability of the existing BX gaskets for 20K 2. Use Robert Eichenberg
More informationStress evaluation of a bicycle crank arm connection using BEM
Stress evaluation of a bicycle crank arm connection using BEM C. J. Hoff, R. E. Dippery & 3. Knapp Department of Mechanical Engineering Kettering University, USA Abstract An interesting problem encountered
More informationEvaluating the Design Safety of Highway Structural Supports
Evaluating the Design Safety of Highway Structural Supports by Fouad H. Fouad and Elizabeth A. Calvert Department of Civil and Environmental Engineering The University of Alabama at Birmingham Birmingham,
More information2.1 Introduction to pressure vessels
2.1 Introduction to pressure vessels Pressure vessels in the form of cylinders and tanks are used for storing variety of liquids and gasses at different temperatures and pressures. Some of the substances
More informationStandard Operating and Maintenance Instructions for Pumping System Model PS-150
Standard Operating and Maintenance Instructions for Pumping System Model PS-150 High Pressure Equipment Company, LLC 2955 West 17th Street, Suite 6 PO Box 8248 Erie, PA 16505 USA 814-838-2028 (phone) 814-838-6075
More informationThis information has been developed by an OSHA Compliance Assistance Specialist and is intended to assist employers, workers, and others as they
New Walking-Working Surfaces and PPE (Fall Protection) Rule Disclaimer This information has been developed by an OSHA Compliance Assistance Specialist and is intended to assist employers, workers, and
More informationTresca s or Mises Yield Condition in Pressure Vessel Design
Tresca s or Mises Yield Condition in Pressure Vessel Design Franz Rauscher Institute for Pressure Vessels and Plant Technology Vienna University of Technology Austria Why using Tresca s yield condition
More informationENGINEERING DESIGN GUIDE. D-M-E Hydraulic Unscrewing Device
ENGINEERING DESIGN GUIDE D-M-E Hydraulic Unscrewing Device ENGINEERING DESIGN GUIDE D-M-E Hydraulic Unscrewing Device Hydraulic Unscrewing Device Without guiding thread with cam Safety Considerations Mold
More informationMini Channel & Fittings
Our mini channels and fittings provide for an economical method of supporting light load requirements on a strut system. Channel Channels are cold formed on our modern rolling mills from 18 Ga. (1.2 mm)
More informationUse equation for the cylindrical section and equation or for the ends.
Solution 13.1 See section 13.3.4, equations 13.7 to 13.18 Solution 13.2 Use equation 13.34. (a) rigid constant C = 0.43 (b) free to rotate, C = 0.56 Solution 13.3 See section 13.5.1 Use equation 13.39
More informationFEA case Study: Rubber expansion joint for piping systems
FEA case Study: Rubber expansion joint for piping systems Introduction The FEA Toolbox of Taniq makes it possible to simulate the behavior of a pipe expansion joint accurately under several load cases.
More informationSTRUCTURAL ANALYSIS OF THE VACUUM VESSEL FOR THE LHCb VERTEX LOCATOR (VELO)
National Institute for Nuclear Physics and High Energy Physics Kruislaan 409 1098 SJ Amsterdam The Netherlands NIKHEF Reference no.: MT-VELO 04-1 EDMS no: 432626 OF THE VACUUM VESSEL FOR THE LHCb VERTEX
More informationSense Element Pump Ripple Fatigue
white paper Sense Element Pump Ripple Fatigue Providing and analyzing solutions to protect sensitive components in aircraft hydraulic systems from prolonged exposure to pump ripple. 2 CONTENTS Sense Element
More informationPatient Positioning Aid Design 2
Patient Positioning Aid Design 2 Team 10: Andrew Harris Bhavin Patel Ashley Reeners Christen Thomsen Design Two Objectives: The objectives for Design 2 are to design a low-cost, versatile, easy-to-store,
More informationREPORT HOLDER: FRAMECAD LICENSING LTD. POST OFFICE BOX 1292 AUCKLAND 1140 NEW ZEALAND EVALUATION SUBJECT: COLD FORMED STEEL C SHAPES AND TRACKS
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2361 Reissued 05/2017 This report is subject to renewal 05/2019. DIVISION: 05 00
More informationMAE 322 Machine Design Lecture 5 Fatigue - 2. Dr. Hodge Jenkins Mercer University
MAE 322 Machine Design Lecture 5 Fatigue - 2 Dr. Hodge Jenkins Mercer University Returning to Stress-Life Fatigue Modeling Fatigue Stress-Life: S f -N Diagram for steels Stress levels below S e (Endurance
More informationMade in the USA. For Fall Protection Only. SafeLok Part Description
Operations and Instruction Manual SafeLok Anchorage - Model # 4011 IM-0051 REV A Portable Concrete and Steel Anchorage Connector ANSI Z359.1-07 5,000 lbs / 22kn Made in the USA The 3/4 Fall Protection
More informationb
Empirically Derived Breaking Strengths for Basket Hitches and Wrap Three Pull Two Webbing Anchors Thomas Evans a and Aaron Stavens b a Montana State University, Department of Earth Sciences, PO Box 173480,
More informationFall Protection Checklist. Guardrail System
Fall Protection Checklist Location/Department: Date of Inspection: Inspectors: Corrective Actions: Work order/memos were issued: Yes No Date issued: In accordance with the MIOSHA and OSHA standards the
More information25 year warranty! Columns Are Available in Common Sizes: Widths: 3-1/2, 5-7/16, 5-1/2 and 7 Depths: 3-1/2, 5-1/2 and 7
The OUTSIDER TM the finest pressure-treated glulam beams and columns engineered for building outdoors The Outsider beams and columns are made of Southern Yellow Pine and then pressure treated to resist
More informationVISIMIX TURBULENT. MECHANICAL CALCULATIONS OF A CONSOLE SHAFT
VISIMIX TURBULENT. MECHANICAL CALCULATIONS OF A CONSOLE SHAFT This example shows how to perform mechanical calculations required to check the shaft reliability, including mechanical strength and vibration
More informationCURI Pierside Stainless Diesel Tank
Mechanical Integrity Report for the CURI Pierside Stainless Diesel Tank at 208 North Palmetto Boulevard Clemson, South Carolina 29631 Inspection: 26 September 2012 Prepared by: George E. Matthews, E.I.T.
More informationMODEL WEIGH MODULE
MODEL 65082 WEIGH MODULE INSTALLATION & OPERATING MANUAL P.O. Box 775 - Farmington, NH 03835 Tel: 603-755-3885 email: cands_nh@msn.com www.candscontrols.com Model 65023 Cantilever Beam Transducer Nickel-Plated
More informationFigure 1 FSM 250 roof anchor system
Report No.: 15111045 Date: 27.11.15 Engineers Report FSM 250 Roof Anchor Overview Methodology AS/NZS 1891.4:2009 Loading Anchorage Application Analysis Parameters Acceptance Criteria Results Conclusions
More informationDesign and Optimization of Weld Neck Flange for Pressure Vessel
V th International Symposium on Fusion of Science & Technology, New Delhi, India, January 18-22, 2016 ID: 2016-ISFT-430 Design and Optimization of Weld Neck Flange for Pressure Vessel Vinod Kumar 1, Vivek
More informationProceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011
Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands Proceedings of the ASME 2011 30th International
More informationAncholt Bolt Design With Tension and Shear Using Anchor Reinforcement
Page 1 of 8 ANCHOR BOLT DESIGN Combined Tension and Shear Result Summary Anchor Rod Embedment, Spacing and Edge Distance OK Min Rquired Anchor Reinft. Development Length ratio = 0.87 OK Overall ratio =
More informationWhat is fall protection?
Fall Protection Training Objective After the lecture, attendees will be able to identify fall protection equipment by understanding the ABC principle to a satisfactory level. What is fall protection? Fall
More informationAES Raptor, LLC Raptor R1000 Instruction Manual
AES Raptor, LLC Raptor R1000 Instruction Manual Published by AES Raptor, LLC, North Kansas City, MO AES RAPTOR COMPLETE MOBILE FALL PROTECTION SYSTEM is a registered trademark of Architectural Exterior
More informationWELCOME to CAUx Local India 2018
WELCOME to CAUx Local India 2018 Flange Design In Detail Prepared by Sachin Pol and Fauzan Badiwale Some Typical Flange Images 3 Some Typical Gasket Images 4 Flange Design As Per ASME Sec.VIII Div.1 Mandatory
More informationB31.3 Piping Checklist and Rules of Thumb March 1, 2008 Program Version Paulin Research Group s
Paulin Research Group s PRG B31.3 Piping Checklist and Rules of Thumb Program User Guidelines Contents 1.0 Program Objective 2.0 Summary 3.0 Getting Started 4.0 Main Topics Addressed 5.0 Report Discussion
More information2001 AASHTO Training Manual
2001 AASHTO Training Manual December 2004 MSC4014 12/04 Table of Contents I. 2001 AASHTO General Overview 1 General Overview 2 II. Wind and Allowable Stress Design 3 Three Second Gust vs. Fastest Mile
More informationRidwan Hossain Graduate Student Memorial University of Newfoundland
IDENTIFICATION OF THE SIZE AND LOCATION OF A CRACK, USING STATICAL DEFORMATIONS OF A MARINE ROTOR SHAFT WITH A PROPELLER AT THE OVERHANGING END Ridwan B. HOSSAIN, Rangaswamy SESHADRI & Arisi S.J. SWAMIDAS
More informationb
Empirically Derived Breaking Strengths for Basket Hitches and Wrap Three Pull Two Webbing Anchors Thomas Evans a and Aaron Stavens b a Montana State University, Department of Earth Sciences, PO Box 173480,
More informationFall Protection. Fall Speed vs. Reaction Time. Good body reaction time = 0.5 seconds Travel distance in 0.5 seconds = 4 feet (1.21mts.
Fall Protection Fall Speed vs. Reaction Time Good body reaction time = 0.5 seconds Travel distance in 0.5 seconds = 4 feet (1.21mts.) In 1 second your body will fall 16 feet (4.8 mts.) By the time you
More informationFall Speed vs. Reaction Time
Fall Protection Fall Speed vs. Reaction Time Good body reaction time = 0.5 seconds Travel distance in 0.5 seconds = 4 feet (1.21mts.) In 1 second your body will fall 16 feet (4.8 mts.) By the time you
More informationDesign of a Solid Wall Transonic Wind Tunnel
Design of a Solid Wall Transonic Wind Tunnel David Wall * Auburn University, Auburn, Alabama, 36849 A solid wall transonic wind tunnel was designed with optical access from three sides to allow for flow
More informationINTRODUCTION TABLE OF CONTENTS
2 INTRODUCTION Thank you for choosing Servometer to design and manufacture your unique, new electrodeposited bellows for your particular application. The definitions, formulas and design parameters inside
More informationLevel 3 Cambridge Technical in Engineering 05822/05823/05824/05825/05873 Unit 3: Principles of mechanical engineering
Level 3 Cambridge Technical in Engineering 05822/05823/05824/05825/05873 Unit 3: Principles of mechanical engineering Monday 16 January 2017 Afternoon Time allowed: 1 hour 30 minutes You must have: the
More informationDesign and Analysis of Pressure Safety Release Valve by using Finite Element Analysis
Design and Analysis of Pressure Safety Release Valve by using Finite Element Analysis Mr.V.D.Rathod* 1, Prof.G.A.Kadam* 2, Mr.V. G. Patil* 3 * 1 M.E. Design (Pursuing), SKN Sinhgad Institute of Technology&
More informationThe Industrial Accident Resulted from the Failure of Bolt
The Industrial Accident Resulted from the Failure of Bolt Hyun Wook YEO 1, Jae Min LEE 2 and Sang Won CHOI 1, * 1 Occupational Safety and Health Research Institute, Korea Occupational Safety and Health
More informationNow with SUPREME FRAMING SYSTEM! PRODUCT TECHNICAL GUIDE. Steel Stud Manufacturers Association
Now with SUPREME FRAMING SYSTEM! PRODUCT TECHNICAL GUIDE Steel Stud Manufacturers Association 2507 3064P Product Identification "S" and "SFS" - C-STUD/JOIST S and SFS-SECTIONS* * For "S" and "SFS" members,
More informationLiquefied gas cargo tanks and process pressure vessels
.1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant
More informationOPERATION AND INSTRUCTION MANUAL
OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: SWS100N-316-CTS Patent US # 8,424,638 WARNING: ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT
More informationRing-Loc System Technical Manual
FORMWORK & SCAFFOLDING Ring-Loc System Technical Manual Canada: CAN/CSA S269.2 M87 USA: ANSI/ASSE A10.8-2001 Ring-Loc System Technical Manual 2015 United Scaffold Supply Company Inc info@unitedscaffold.ca
More informationOPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: SWY100N
OPERATION AND INSTRUCTION MANUAL Swivel Anchor Model: SWY100N IMPORTANT!!! ALL PERSONS USING THIS EQUIPMENT MUST READ AND UNDERSTAND ALL INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS INJURY OR DEATH.
More informationPractical Steel Connection Software Design Using AISC 2010 Standard
Practical Steel Connection Software Design Using AISC 2010 Standard Including: Practical Advice for Reviewing Software Generated Connection Designs Steve Ashton, P.E., SECB Limit States that Changed 2
More informationAppendix M Structural Analysis of the Macondo #252 Work String. Appendix M Structural Analysis of the Macondo #252 Work String
Appendix M Structural Analysis of the Macondo #252 Work String Appendix M Structural Analysis of the Macondo #252 Work String Structural Analysis of the Macondo #252 Work String SES Document No.: 1101190-ST-RP-0003
More informationServing. Petrochemicals Power Semiconductor Waste Treatment Oil & Gas Transmission Lines Bulk Gas Plants
Serving Petrochemicals Power Semiconductor Waste Treatment Oil & Gas Transmission Lines ulk Gas Plants Mining & Metals Pharmaceuticals Pulp & Paper Mills Sugar Mills Nuclear Desalinization Plants NOTES:
More informationBuoyancy Control Calculated Cost Allowance for 1 Year Study Cost Estimate
Prepared for Millennium Project Revision A 21 March 2005 by Greg Lamberson Record of Revisions Prepared Rev Date Description By A 21 Mar 05 Buoyancy Control Study Report FGL Checked By Client Accept Approved
More informationInternational Journal of Scientific & Engineering Research, Volume 6, Issue 9, September-2015 ISSN
827 MEMS PRESSURE RELIEF VALVE: DESIGN, MODEL AND STATIC ANALYSIS Anand M. Shelke, Amit Cherian, Sandesh A. Ghate Guided by Prof. DRS Raghuraman M.Tech (Mechatronics) School of Mechanical and Building
More informationServing. Petrochemicals Power Semiconductor Waste Treatment Oil & Gas Transmission Lines Bulk Gas Plants
Serving Petrochemicals Power Semiconductor Waste Treatment Oil & Gas Transmission Lines ulk Gas Plants Mining & Metals Pharmaceuticals Pulp & Paper Mills Sugar Mills Nuclear Desalinization Plants NOTES:
More informationDREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)
PURPOSE The objective of this policy & guideline is to eliminate the potential for injuries and fatalities to employees and contractors resulting from falls from elevated work areas at Drew University
More informationVessel Weighing. Load Cells and Weigh Modules VPG TRANSDUCERS. Technical Note VPGT-06. Scope. Accuracy. Mode of Operation. Mechanical Considerations
VPG TRANSDUCERS Load Cells and Weigh Modules Technical Note VPGT-06 Scope Load cells may be used to weigh vessels in various installation configurations. The installation of load cells into a practical
More informationSeries 8500 Expansion Compensators. Catalog 674H
Series 8500 Expansion Compensators Catalog 674H 500 Laminated Bellows Expansion J Series 8500 on Joints Expansion Compensators Sizes 3/4" through 4" Threaded, welded, flanged and grooved steel pipe joints
More informationCompetent Person - Fall Protection Presented by Turner Safety- your instructor is Steve Turner
Competent Person - Fall Protection Presented by Turner Safety- your instructor is Steve Turner 1 Falls in Construction Falls are the leading cause of deaths in the construction industry. Most fatalities
More informationThe Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd
The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer
More informationDesign and Structural Analysis of Cylindrical Shell
Design and Structural Analysis of Cylindrical Shell Lokesha 1, Chandan R 2, Byregowda K C 3 1 Department of Mechanical Engineering, Dr. Ambedkar Institute of Technology Bangalore, India 2,3 Assistant Prof.
More informationAir Operated Hydraulic Pumping Systems to 50,000 psi
High Pressure Equipment Air Operated Hydraulic Pumping Systems to 50,000 psi PS-10: 10,000 psi PS-20: 20,000 psi PS-30: 30,000 psi PS-40: 40,000 psi PS-50: 50,000 psi PS-90: 90,000 psi High Pressure air
More informationSalad Tutorial 3 - Acoustically Induced Vibration in Piping
Rev B July 2010 1.0 Introduction This tutorial discusses using Salad software to check your piping system for Acoustically Induced Vibration (AIV). It does not present a comprehensive overview of the phenomenom;
More informationDoc #: 1000-AD Revision: - FALL PROTECTION PLAN SOP. Author(s): T. Lavoie/ M. Saucedo/ J. Dunlop/ Mtn. Supervisor
Doc #: 1000-AD-015-0003 Revision: - FALL PROTECTION PLAN SOP Author(s): T. Lavoie/ M. Saucedo/ J. Dunlop/ Mtn. Supervisor TABLE OF CONTENTS REVISION HISTORY... 3 1.0 INTRODUCTION... 4 2.0 PROGRAM DESCRIPTION...
More informationDESIGN AND DEVELOPMENT OF A RIG FOR THE PRESSURE TESTING OF WEAK VESSELS AND SUBSEQUENT WORK RELATING TO THE STRENGTH OF FLAT PLATES
DESIGN AND DEVELOPMENT OF A RIG FOR THE PRESSURE TESTING OF WEAK VESSELS AND SUBSEQUENT WORK RELATING TO THE STRENGTH OF FLAT PLATES D.F. Pilkington Ph.D. B.Sc(Eng)*, G Piatt B.Sc.*, G. Norton B.Sc.**
More informationISO INTERNATIONAL STANDARD. Small craft Hull construction and scantlings Part 8: Rudders
INTERNATIONAL STANDARD ISO 12215-8 First edition 2009-05-15 Small craft Hull construction and scantlings Part 8: Rudders Petits navires Construction de coques et échantillonnage Partie 8: Gouvernails Reference
More informationOn the Use of Pickets and Flukes as Snow Anchors
On the Use of Pickets and Flukes as Snow Anchors ART FORTINI Sierra Madre Search & Rescue International Technical Rescue Symposium Denver, CO November 2002 Pickets Placements Traditional vertical Horizontal
More informationFall Protection- Part 2
Optional Information Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: Fall Protection- Part 2 Self Inspection Checklist Instructions: This checklist covers fall
More informationINSTRUCTIONS FOR USE
INSTRUCTIONS FOR USE 714XXX Series Lanyard Extender Complies with the current ANSI Z359.1-2007 and all applicable OSHA regulations and requirements. Reliance Industries P.O. Box 2046 Deer Park, TX 77536
More informationI. CHEM. E. SYMPOSIUM SERIES NO. 85
FIRE SURVIVAL OF PROCESS VESSELS CONTAINING GAS J. Nylund * The present work is a theoretical evaluation of the ability of process vessels to survive hydrocarbon fires when the vessels are designed and
More informationFall Protection PPT-SM-FALLPROT V.A.0.0
Fall Protection 1 Introduction to Fall Protection Falls account for 13% of fatal injuries 11% of these fatal falls were to a lower level Workers may be required to perform tasks at great heights which
More informationRules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations
VI Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations 6 Guidelines for the Construction, Equipment and Testing of Closed Fuel Oil Overflow Systems Edition
More informationBlast Damage Consideratons for Horizontal Pressure Vessel and Potential for Domino Effects
A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 26, 2012 Guest Editors: Valerio Cozzani, Eddy De Rademaeker Copyright 2012, AIDIC Servizi S.r.l., ISBN 978-88-95608-17-4; ISSN 1974-9791 The Italian
More informationPUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG
PUNE TECHTROL PVT LTD Instruction and Maintenance Manual for and Tape Gauge FTG INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR FLOAT AND TAPE GAUGE FTG 1 Introduction : It is used to measure and indicate
More informationA Study on the Eccentric Loading of K Node of Steel Tube Tower
International Conference on Advances in Energy, Environment and Chemical Engineering (AEECE-2015) A Study on the Eccentric Loading of K Node of Steel Tube Tower LIU Haifeng a Wang Fei b Han Junke b Hu
More information