NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/05/2005

Size: px
Start display at page:

Download "NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/05/2005"

Transcription

1 TIFICATION OF ADDENDUM ADDENDUM. 2 DATED 10/05/2005 Control Project Highway County , ETC. CPM , ETC. BS 6-R, ETC. BRAZOS, ETC. Ladies/Gentlemen: Attached please find an addendum on the above captioned project. Included in the attachment is an adendum notification which details the changes the respective proposal pages which were added / or changed. Except for new bid insert pages, it is unnecessary to return any of the pages attached. Bid insert pages must be returned with the bid proposal submitted to the Department, unless your firm is submitting a bid using a computer print out. The computer print out must be changed to reflect the new bid item information. Contractors material suppliers, etc. who have previously been furnished informational proposals are not being furnished a copy of the addendum. If you have a subcontractor on the above project, please advise them of this addendum. Acknowledgment of this addendum is not requested if your company has been issued a proposal stamped This Proposal Issued for Informational Purposes. You are required to acknowledge receipt of this addendum by entering the date, which appears at the top of this letter on the Addendum Acknowledgement Form, contained in your bid proposal. Failure to Acknowledge receipt of this addendum in your bid proposal will result in your bid not being read. 04/99

2 SUBJECT: PLANS AND PROPOSAL ADDENDUMS PROJECT: CPM CONTROL: COUNTY: BRAZOS LETTING: 10/07/2005 REFERENCE : 1004 PROPOSAL ADDENDUMS _ PROPOSAL COVER X BID INSERTS (SH..: 3-8 THROUGH 8-8 ) _ GENERAL TES (SH..: ) _ SPEC LIST (SH..: ) _ SPECIAL PROVISIONS: ADDED: DELETED: _ SPECIAL SPECIFICATIONS: ADDED: DELETED: X OTHER: PLAN SHEETS RIPTION OF ABOVE CHANGES (INCLUDING PLANS SHEET CHANGES) BID INSERTS- ************ REMOVED THAT DID T HAVE AN ERNATE BID AND INCREASED THE QUANTITY OF THAT HAS AN ERNATE BID TO 2366 CY. SHEETS 4-8 THROUGH 8-8 SHIFTED DUE TO ABOVE CHANGE. PLAN SHEETS- ************ SHEET 15 CHANGED DUE TO THE ABOVE CHANGES. 1-1

3 PROPOSAL SHEET. BID PRICE ASPH (AC-20-5TR) ASPH (CRS-2P) AGGR(TY-PB GR-4 SAC-B)(021) AGGR(TY-PB GR-4 SAC-B)(026) AGGR(TY-PB GR-4 SAC-B)(082) AGGR(TY-PB GR-4 SAC-B)(094) AGGR(TY-PB GR-4 SAC-B)(145) AGGR(TY-PB GR-4 SAC-B)(166) AGGR(TY-PB GR-4 SAC-B)(198) AGGR(TY-PB GR-4 SAC-B)(236) AGGR(TY-PB GR-4 SAC-B)(239) GAL 1,748, GAL 482, CY 4, CY 3, CY CY 1, CY 1, CY CY CY CY

4 . BID PRICE AGGR(TY-PB GR-4 SAC-A)(026) AGGR(TY-PB GR-4 SAC-A)(082) AGGR(TY-PB GR-4 SAC-A)(094) AGGR(TY-PB GR-4 SAC-A)(145) AGGR(TY-PB GR-4 SAC-A)(166) AGGR(TY-PB GR-4 SAC-A)(198) AGGR(TY-PB GR-4 SAC-A)(236) AGGR(TY-PB GR-4 SAC-A)(239) AGGR(TY-B GR-4 SAC-B)(145) AGGR(TY-L GR-4 SAC-B)(145) AGGR(TY-PL GR-4 SAC-A)(198) CY CY 6, CY 3, CY 1, CY 1, CY CY 1, CY 4, CY CY CY 1,

5 . BID PRICE AGGR(TY-B GR-4 SAC-B)(198) AGGR(TY-PL GR-4 SAC-A)(236) AGGR(TY-B GR-4 SAC-B)(145) AGGR(TY-B GR-4 SAC-B)(154) AGGR(TY-B GR 4 SAC-A)(154) AGGR(TY-B GR-4 SAC-A)(198) AGGR(TY-PL GR-4 SAC-B)(236) MOBILIZATION CY CY 1, CY CY 2, CY 3, CY CY LS BARRICADES, SIGNS AND TRAFFIC HAN- DLING MO INTERSECTIONS (SURF TREAT) EA

6 . BID PRICE DRIVEWAYS (SURF TREAT) TURUTS (SURF TREAT) EA 2, EA WK ZN PAV MRK SHT TERM (TAB) TY W WK ZN PAV MRK SHT TERM (TAB) TY Y REFL PAV MRK TY I (W) 4" (BRK)(100MIL) REFL PAV MRK TY I (W) 4" (SLD)(100MIL) REFL PAV MRK TY I (W) 8" (SLD)(100MIL) REFL PAV MRK TY I (W) 12"(SLD)(100MIL) REFL PAV MRK TY I (W) 18"(SLD)(100MIL) REFL PAV MRK TY I (W) 24"(SLD)(100MIL) REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) EA 9, EA 56, LF 42, LF 2,864, LF 7, LF LF LF 7, LF 246,

7 . BID PRICE REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) REFL PAV MRK TY I (Y) 24"(SLD)(100MIL) PREFAB PAV MRK TY C (W) (ARROW) PREFAB PAV MRK TY C (W) (DBL ARROW) PREFAB PAV MRK TY C (W) (RR XING) PREFAB PAV MRK TY C (W) (WORD) LF 2,060, LF 3, EA EA EA EA REFL PAV MRKR TY I-A REFL PAV MRKR TY I-C REFL PAV MRKR TY II-A-A REFL PAV MRKR TY II-C-R AGGR (TY B OR L GR-5 SAC B) EA 30, EA 1, EA 36, EA CY

8 . BID PRICE. ERNATE. 1A AGGR(TY-PL GR-4 SAC-B)(021) AGGR(TY-PL GR-4 SAC-B)(026) AGGR(TY-PL GR-4 SAC-A)(082) AGGR(TY-PL GR-4 SAC-B)(082) AGGR(TY-PL GR-4 SAC-A)(094) AGGR(TY-PL GR-4 SAC-B)(094) AGGR(TY-PL GR-4 SAC-A)(145) AGGR(TY-L GR-4 SAC-B)(145) AGGR(TY-PL GR-4 SAC-A)(166) AGGR(TY-PL GR-4 SAC-B)(166) CY 4, CY 3, CY 6, CY CY 3, CY 1, CY 1, CY CY 1, CY

9 . BID PRICE AGGR(TY-PL GR-4 SAC-A)(198) AGGR(TY-PL GR-4 SAC-B)(198) AGGR(TY-L GR-4 SAC-B)(198) AGGR(TY-PL GR-4 SAC-A)(236) AGGR(TY-PL GR-4 SAC-A)(239) AGGR(TY-PL GR-4 SAC-B)(239) AGGR(TY-PL GR-4 SAC-A)(026) AGGR(TY-PL GR-4 SAC-B)(145) AGGR(TY-L GR-4 SAC-A)(154) AGGR(TY-L GR-4 SAC-B)(154) AGGR(TY-L GR-4 SAC-A)(198) CY CY CY CY 1, CY 4, CY CY CY 1, CY 3, CY 2, CY

10 . BID PRICE AGGR(TY-PL GR-4 SAC-B)(236) CY

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/27/16 HIGHWAY: COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/27/16 HIGHWAY: COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 565,853.54 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 1/27/16 62 CONTRACT ID: 6277661 : RMC - 6277661 CONTRACT: 121449 AWARD : $4,436,834.21 ED : $4,436,834.21 ADJ. ED : $5,2,687.75 CONTRACT: CONTRACTOR:

More information

PROPOSAL. PROPOSAL OF, a corporation a

PROPOSAL. PROPOSAL OF, a corporation a PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No (WED)

CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No (WED) CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No. 2016 003 (WED) Sealed bids for the construction of the Street Lighting Pole and Traffic Signal Pole Painting

More information

STATEWIDE ITEM AVG. (JULY SEPTEMBER 2009) LOWEST BID HIGHEST BID AVERAGE BID PRICE ITEM USED USED LT MEASURE

STATEWIDE ITEM AVG. (JULY SEPTEMBER 2009) LOWEST BID HIGHEST BID AVERAGE BID PRICE ITEM USED USED LT MEASURE STATEWIDE ITEM AVG. (JULY 2009 - SEPTEMBER 2009) Obs ITEM UNIT OF 1 01002001 AC PREPARING ROW $1,000.00 $70,000.00 $16,642.90 14 N 2 01002002 STA PREPARING ROW $62.71 $35,000.00 $1,337.34 97 N 3 01002003

More information

Tabulation of Bids. Counties: Project(s):

Tabulation of Bids. Counties: Project(s): Page: 1 14 ROTE 94, ROTE 46 TO OLD COACH RD Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 154003P MOBILIZATION 0007 157004M CONSTRCTION LAYOT 0012

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE R. J. Noble Company Orange, CA 92856 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 190101 ROADWAY EXCAVATION CY 8,500 16.00 136,000.00 9.50 80,750.00

More information

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid City of Conway Mayor s Office 1201 Oak Street Conway, AR 72032 www.cityofconway.org Invitation and Bid 2010-25 INVITATION TO THE VENDOR ADDRESSED: Bidders are invited to furnish the items listed herein

More information

Artistic Bike Racks and Traffic Modification for Bike Lanes

Artistic Bike Racks and Traffic Modification for Bike Lanes Community Development Department Engineering Division Artistic Bike Racks and Traffic Modification for Bike Lanes Project #: 2017-03 Bid Date: June 6, 2017 1. Notice Inviting Bids 2. Bid Schedule 3. Addendums

More information

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60) Company Name Base Bid Schedule A Base Bid Schedule B Total COUNTY'S ESTIMATE 367,150.00 328,300.00 $695,450.00 1 All American Asphalt 481,360.00 108,180.00 $589,540.00 2 PTM General Eng Services, Inc.

More information

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514 Page 1 of 17 18 HNTERDON ROTE 202,ALEXAKEN CREEK ROAD TO RT 179/CR514 Quantity and nits nit Price nit Price nit Price SECTION: 0001 ROADWAY 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB)

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB) NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB) Aryabhata Block, C.R. Rao Advanced Institute of Mathematics, Statistics and Computer Science (AIMSCS), UoH Campus, Gachibowli, Hyderabad-500 046 TENDER

More information

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m. Welcome Welcome to the Transportation Master Plan Addendum December 4, 2012 6:00 p.m. to 8:00 p.m. Please sign-in Background PIC#1 Public Information Centre #1 (PIC#1) was held on June 25, 2012. Feedback

More information

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1 WHITE EPOXY REFLECTORIZED PAVEMENT STRIPES, 20 MILS ITEM 685.11 (FT) CL STATION ALIGN FROM TO SIDE DESCRIPTION FACTOR LENGTH (FT) E 18+62 62 18+79.19 RT STOP BAR 6 16.6 99.4 E 18+55 00 20+08.00 LT B KE

More information

Members & Firms

Members & Firms Members & Firms 2016-2017 PAGE l 43 Members & Firms 2016-2017 PAGE l 44 Members & Firms 2016-2017 PAGE l 45 Members & Firms 2016-2017 PAGE l 46 Members & Firms 2016-2017 PAGE l 47 Members & Firms 2016-2017

More information

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court 46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND

More information

SAN ANTONIO WATER SYSTEM I.H. 10 Ground Storage Tank Rehabilitation and Painting Project SAWS Job No Solicitation No.

SAN ANTONIO WATER SYSTEM I.H. 10 Ground Storage Tank Rehabilitation and Painting Project SAWS Job No Solicitation No. SAN ANTONIO WATER SYSTEM I.H. 10 Ground Storage Tank Rehabilitation and Painting Project SAWS Job No. 13-0118 Solicitation No. B-16-014-GC September 1, 2016 TO BIDDER OF RECORD: The following changes,

More information

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER DESIGN DESIGNATION A.A.D.T - = V = M.P.H MISSOURI AND TRANSPORTATION PLANS FOR PROPOSED HIGHWAY INDE OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET --------------------------- 1 TYPICAL SECTIONS (TS) (1

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 16 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 153011M TRAINEES 0007 154003P MOBILIZATION 0010 157004M CONSTRCTION LAYOT

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way

More information

"Emul Asph (SS-1HP) Tack".

Emul Asph (SS-1HP) Tack. Page 1 of 25 Application of Emulsified Asphalt, (fog seal 2-lane section). Using a distributor, uniformly apply fog seal to the rumble strip with two passes of the distributor, one in each direction of

More information

Revisions to Larimer County Urban Area Street Standards (2016 Update)

Revisions to Larimer County Urban Area Street Standards (2016 Update) 1.9.2 B 1-18 Street Construction Policy 1.14 (new) 1-29 Complete Streets in Fort Collins 4.1.1 04-01 General 4.1.3 04-01 Capacity and Safety Issues 4.1.3 B 04-02 Pedestrian Traffic Considerations 4.1.4

More information

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213

More information

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 RECOMMENDED ACTION: Consider HSIP Candidate Projects for the FY2019-2022 TIP as Being Consistent

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

2016 BICYCLE PAVEMENT MARKINGS CONTRACT DOCUMENTS. General Construction

2016 BICYCLE PAVEMENT MARKINGS CONTRACT DOCUMENTS. General Construction 2016 BICYCLE PAVEMENT MARKINGS CONTRACT DOCUMENTS General Construction CITY COUNCIL AND CITY OFFICIALS ROBERT M. ESCHBACH... MAYOR DANIEL F. AUSSEM... COMMISSIONER THOMAS G. GANIERE... COMMISSIONER WAYNE

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

Transportation Advisory Board

Transportation Advisory Board C I T Y O F WEATHERFORD Transportation Advisory Board AGENDA REPORT Meeting Date: October 15,2015 Staff Contact: Manny Palacios Jr. Phone: E-mail: 817-598-4296 mpalacios@weatherfordtx.gov SUBJECT: Discuss

More information

Request for Bid Group 1 CIPP Addendum No. 1 to RFB No. 401712.71.0403 April 1, 2019 The following information encompasses Addendum No. 1 for the above referenced RFB. Bidders shall fully consider and acknowledge

More information

September Reporting on Work Plan 95-R-15 Final Report. Prepared by: Reviewed by:

September Reporting on Work Plan 95-R-15 Final Report. Prepared by: Reviewed by: Recessed Thermoplastic Pavement Markings Montpelier, Vermont September 2002 Reporting on Work Plan 95-R-15 Final Report State of Vermont Agency oftransportation Materials and Research Prepared by: Theresa

More information

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS 1.0 INTRODUCTION 1.1 Purpose The Southern California Regional Rail Authority (SCRRA) is the designated track owner of the Metrolink

More information

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max: Page 1 of 11 518061 AMINO BROTHERS SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025200 REMOVAL OF EXISTING STRUCTURES 5 070580 FLAGGER

More information

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. Financial Project ID: 409870-1-52-01 LAKE COUNTY DESIGN ALTERNATIVE STUDY FOR MULTI-USE PATH Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION District

More information

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS 'HYHORSPHQW (QJLQHHULQJ 5LFKDUGV %OYG UG )ORRU 6DFUDPHQWR &$ Phone: 916-808-8300 Fax: 916-808-1984 (QJLQHHULQJ 6HUYLFHV 'LYLVLRQ CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

More information

0 CITY OF SANTA ANA 0

0 CITY OF SANTA ANA 0 : A traffic control plan (Plan) is required whenever work is to be performed within the public right-of-way and is deemed necessary by the City of Santa Ana's (City) Traffic Engineer. Work cannot start

More information

Northside School Class I Bike Path, Cool, CA Application Attachments

Northside School Class I Bike Path, Cool, CA Application Attachments PLHD Grant Application, 12/9/2011 County of El Dorado Department of Transportation Northside School Class I Bike Path, Cool, CA Application Attachments 1. Project Site Map 2. Auburn State Recreation Area

More information

The first lift, mainline, shall be placed using a spray paver.

The first lift, mainline, shall be placed using a spray paver. Page 1 of 15 The first lift, mainline, shall be placed using a spray paver. No patches shall be left open without proper traffic control. 11. The contractor shall be responsible for noting the location

More information

Procurement Plan-Goods. Draft Bid Documents, including specs and quantities, draft SPN. Notice Advert. Noobjection. Prep & Submis sion by Ex Agency

Procurement Plan-Goods. Draft Bid Documents, including specs and quantities, draft SPN. Notice Advert. Noobjection. Prep & Submis sion by Ex Agency Public Disclosure Authorized Procurement Plan-Goods Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country/Organisation: Project/Programme: MONTHS) Loan #: CR Description*

More information

A D D E N D U M. DATE: March 28, 2018 BID NUMBER: ADDENDUM NUMBER: 001. BID TOPIC: Paint and Supplies Yearly Contract

A D D E N D U M. DATE: March 28, 2018 BID NUMBER: ADDENDUM NUMBER: 001. BID TOPIC: Paint and Supplies Yearly Contract A D D E N D U M CHESAPEAKE PUBLIC SCHOOLS Purchasing Department 312 Cedar Road Chesapeake, Virginia 23322 (757) 547-0265 (757) 547-0279 (Fax) DATE: March 28, 2018 BID NUMBER: 45-1718 ADDENDUM NUMBER: 001

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT

More information

Tabulation of Bids. ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, SALEM Letting Date: Counties:

Tabulation of Bids. ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, SALEM Letting Date: Counties: Page 1 of 13 Long Life Pavement Markings Contract, South-2016, DP (1) ZONE STRIPING INC (2) TRAFFIC LINES INC (3) ACCENT STRIPE INC nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT

More information

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work. APPENDIX G TRAFFIC CONTROL GUIDELINES FOR UTILITY WORK WITHIN ROADWAY RIGHTS- OF-WAY JUNE 2001 Scope of Guidelines These traffic control guidelines cover work performed by utility companies and/or their

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

Taylor Road Resurfacing Project

Taylor Road Resurfacing Project Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY

More information

Members of HKASA affiliated clubs applying for registration as HKASA athletes should have their applications endorsed by their club.

Members of HKASA affiliated clubs applying for registration as HKASA athletes should have their applications endorsed by their club. HKASA 2005/06 HKASA 2005/06 - - - - - - - Registration of Athletes Members of HKASA affiliated clubs applying for registration as HKASA athletes should have their applications endorsed by their club. Only

More information

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin within the Vendor Self Service portal at wvoasis.gov.

More information

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan

BID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan PROJECT PH3512 - Otsego Township - On 21st Street, 102nd Avenue (west) to 101st Avenue, then east on 101st & 102nd Avenue to 16th Street - 2.96 miles Michigan Paving & Materials Reith-Riley PH3512 HMA

More information

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to:

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to: Welcome Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to: Review the circulation plan concept Give us your input Why a circulation plan? During

More information

Overland Traffic Consultants, Inc. October 15, Mr. Bruce McBride Project Delivery Analysts, LLC Shawnee Street Moorpark, CA 93021

Overland Traffic Consultants, Inc. October 15, Mr. Bruce McBride Project Delivery Analysts, LLC Shawnee Street Moorpark, CA 93021 Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach, CA 90266 Phone (661) 799-8423 E-mail: otc@overlandtraffic.com October 15, 2015 Mr. Bruce McBride Project Delivery

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS DESCRIPTION TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES (QU) (1 SHEET)--------

More information

T E N D E R Tender # T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT

T E N D E R Tender # T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT T E N D E R Tender # 2011-424002T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT Sealed tenders addressed to the Purchasing Agent, c/o Materials and Fleet Management, 2 nd Floor, 175 Rothesay

More information

City of Hope, Idaho Transportation Plan

City of Hope, Idaho Transportation Plan Tate Engineering & Surveying 1103 N. 4 th Street Coeur D Alene, Idaho 83814 Phone: 208.676.8708 Fax: 208.667.2129 City of Hope, Idaho Transportation Plan Assembled By: Nathan D. Herbst, E.I.T. Reviewed

More information

Bid Document/Request for Proposal. For

Bid Document/Request for Proposal. For Pakistan Telecommunication Company Limited Tender No. RFQ/NW-Ops LHR/Frame Contract/DG-Filters/2018-2019 Bid Document/Request for Proposal For Frame Contract of Unit Based Rates of Different Types of DG

More information

Sample Procurement Specifications for Aluminum Traffic Control Signs and Components

Sample Procurement Specifications for Aluminum Traffic Control Signs and Components Sample Procurement Specifications for Aluminum Traffic Control Signs and Components These sample procurement Specifications were prepared by the American Traffic Safety Services Association (ATSSA) Sign

More information

PROPOSAL FOR PROCESS/PRODUCT CHANGE

PROPOSAL FOR PROCESS/PRODUCT CHANGE Honeywell Sensing and Control (JMO) CUSTOMER NOTIFICATION Confirmation of Customer Receipt: Date: 06/27/2017 Customer tified: 06/27/2017 Title of change: HPN 74858 / 79506 / 77185 O-rings (switch component)

More information

REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO Park Hill School District Grandstand Installation

REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO Park Hill School District Grandstand Installation REQUEST FOR PROPOSAL 7703 NW Barry Road Kansas City, MO 64153 2019 Park Hill School District Grandstand Installation Park Hill High School Park Hill South High School Detailed Proposal Information is Available

More information

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION A draft traffic control plan, consistent with the following applicable conditions, must be included in every permit application submitted to the City of

More information

BOONE COUNTY, MISSOURI. Request for Bid #12-22MAR Chip Seal Pavement Preservation for Boone and Callaway Counties and the City of Columbia

BOONE COUNTY, MISSOURI. Request for Bid #12-22MAR Chip Seal Pavement Preservation for Boone and Callaway Counties and the City of Columbia BOONE COUNTY, MISSOURI Request for Bid #12-22MAR18 2018 Chip Seal Pavement Preservation for Boone and Callaway Counties and the City of Columbia ADDENDUM # 1 - Issued March 19, 2018 This addendum is issued

More information

Act 47 Exception Application Process (Permitting Bicycle Travel on Freeways)

Act 47 Exception Application Process (Permitting Bicycle Travel on Freeways) Act 47 Exception Application Process (Permitting Bicycle Travel on Freeways) Attached is a revised application process to permit Pedalcycle travel on the shoulders of freeways within the Commonwealth.

More information

SR-714 (Monterey Road) Martin County, Florida

SR-714 (Monterey Road) Martin County, Florida S-714 (Monterey oad) Martin County, Florida Financial Project ID:228861-1-21-01 Work Program Item No. (Old):4116331 Federal Project ID:FL62-033 Grade Separation Feasibility at Dixie Highway and FEC ailroad

More information

Warfield Neighbourhood Plan: 4.4 Infrastructure

Warfield Neighbourhood Plan: 4.4 Infrastructure Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy

More information

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, :30 PM Conference Room A

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, :30 PM Conference Room A BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, 2016-5:30 PM Conference Room A The meeting location is accessible to persons with disabilities. A request for an interpreter for the hearing

More information

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Sponsor St Peters Project No. RB19-000022 Project Type Other TOTAL FUNDING Total County Sponsor Federal $1,177,251.00 $238,179.00 $59,546.00 $879,526.00

More information

Bradford Fire Department. Seeks Bids for the Purchase of Self Contained Breathing Apparatus and Related Equipment GENERAL SPECIFICATIONS WARRANTY

Bradford Fire Department. Seeks Bids for the Purchase of Self Contained Breathing Apparatus and Related Equipment GENERAL SPECIFICATIONS WARRANTY Bradford Fire Department Seeks Bids for the Purchase of Self Contained Breathing Apparatus and Related Equipment The Bradford Fire Department seeks Bids to purchase 17 Air-Pak Self Contained Breathing

More information

SUMMARY COSTS: (Please attach a detailed budget including all sources of recipient funding)

SUMMARY COSTS: (Please attach a detailed budget including all sources of recipient funding) VIRGINIA SALTWATER RECREATIONAL FISHING DEVELOPMENT FUND SUMMARY PROJECT APPLICATION Please complete all fields. This page should be used as a coversheet for a detailed application. NAME AND ADDRESS OF

More information

Scope of Work for Traffic Signal and Interconnect Design Services for Santa Rosa Road

Scope of Work for Traffic Signal and Interconnect Design Services for Santa Rosa Road Scope of Work for Traffic Signal and Interconnect Design Services for Santa Rosa Road Background As part of a broader study concerning safety issues on Santa Rosa Road, the firm of Katz Okitsu was requested

More information

CITY OF FERNANDINA BEACH, FLORIDA

CITY OF FERNANDINA BEACH, FLORIDA CITY OF FERNANDINA BEACH, FLORIDA ADDENDUM ONE FOR INVITATION TO BID ITB #16-02 EGANS CREEK FISHING PIER AND KAYAK LAUNCH Prepared By: City of Fernandina Beach 204 Ash Street Fernandina Beach, FL 32034

More information

Environmental Review Binder Documentation McGilchrist Street SE: 12th Street SE to 25th Street SE Project City of Salem, Marion County, Oregon

Environmental Review Binder Documentation McGilchrist Street SE: 12th Street SE to 25th Street SE Project City of Salem, Marion County, Oregon Environmental Review Binder Documentation McGilchrist Street SE: 12th Street SE to 25th Street SE Project City of Salem, Marion County, Oregon Updated Project Information (as of August 11, 2017) STIP Project

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas

More information

A-A June 2000 SUPERSEDING BB-N-411C 3 January 1973 COMMERCIAL ITEM DESCRIPTION NITROGEN, TECHNICAL

A-A June 2000 SUPERSEDING BB-N-411C 3 January 1973 COMMERCIAL ITEM DESCRIPTION NITROGEN, TECHNICAL METRIC 1 June 2000 SUPERSEDING BB-N-411C 3 January 1973 COMMERCIAL ITEM DESCRIPTION NITROGEN, TECHNICAL The General Service Administration has authorized the use of this commercial item description by

More information

NFPA 1124, Code for the Manufacture, Transportation, Storage, and Retail Sales of Fireworks and pyrotechnic Articles, 2006 edition.

NFPA 1124, Code for the Manufacture, Transportation, Storage, and Retail Sales of Fireworks and pyrotechnic Articles, 2006 edition. NFPA 5000-2012 and Proposed 2015 Edition Building Construction and Safety Code TIA Log No. 1139 Reference: Various Comment Closing Date: May 16, 2014 Submitters: Gary Keith, FM Global TIA language for

More information

SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL

SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL 32940 6601 ITB #11 016/BM Bleacher and Backstop Repair and Motorization 6 Month Extension VENDORS RECOMMENDED

More information

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,

More information

South Portland City Council Position Paper of the City Manager

South Portland City Council Position Paper of the City Manager Agenda Item #19 Meeting of May 16, 2016 South Portland City Council Position Paper of the City Manager Subject: ORDER #153-15/16 Appropriating $24,985 from the Sewer User Reserve Account and award of Bid

More information

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes

More information

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number Michigan Department of Transportation 2004 Traffic and Safety Notes Cross Reference between the Old Note Number and the New Note Number OLD NEW Number Number Title (Prior to 2004) 1.1.1 101-Series General

More information

Roadway Construction Defects: Hydroplaning and Other Dangerous Conditions

Roadway Construction Defects: Hydroplaning and Other Dangerous Conditions Roadway Construction Defects: Hydroplaning and Other Dangerous Conditions Or Presented By Richard A. Rice, PE Whose Doors Should You Be Knocking On When You Get a Claim/File Involving a Roadway Incident?

More information

TYPE OF ORDER NUMBER/SERIES ISSUE DATE EFFECTIVE DATE General Order /12/2015 6/14/2015

TYPE OF ORDER NUMBER/SERIES ISSUE DATE EFFECTIVE DATE General Order /12/2015 6/14/2015 TYPE OF ORDER NUMBER/SERIES ISSUE DATE EFFECTIVE DATE General Order 350.03 6/12/2015 6/14/2015 SUBJECT TITLE PREVIOUSLY ISSUED DATES Traffic Direction and Control 5/3/2012 REFERENCE RE-EVALUATION DATE

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR VERTICAL SHORES PARTS AND SERVICE ADDENDUM 1

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR VERTICAL SHORES PARTS AND SERVICE ADDENDUM 1 SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: Joseph Ramon Date Issued: July 29, 2014 BID NO.: 14-2065 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR VERTICAL SHORES PARTS AND SERVICE ADDENDUM

More information

IC Chapter 3. Traffic Control Signals

IC Chapter 3. Traffic Control Signals IC 9-21-3 Chapter 3. Traffic Control Signals IC 9-21-3-0.5 "Pedestrian hybrid beacon" Sec. 0.5. As used in this chapter, "pedestrian hybrid beacon" means a traffic control signal used to warn and control

More information

ZUMIEZ WIN EVERYTHING IN THE CATALOG SWEEPSTAKES. Official Rules. Dates 7/6/16 9/6/16

ZUMIEZ WIN EVERYTHING IN THE CATALOG SWEEPSTAKES. Official Rules. Dates 7/6/16 9/6/16 ZUMIEZ WIN EVERYTHING IN THE CATALOG SWEEPSTAKES Official Rules Dates 7/6/16 9/6/16 1. NO PURCHASE NECESSARY. Zumiez Win Everything in the Catalog Sweepstakes (the Sweepstakes ) begins at 12:01 a.m., July

More information

Address: City: State: Zip:

Address: City: State: Zip: Permit Application MONUMENT SIGNS Installation Address: Applicant: Tenant/Business: Phone No.: SIGN COMPANY Company Name: Contact Name: Address: City: State: Zip: Phone No.: Email: Fax: ELECTRICAL CONTRACTOR

More information

November 15, 2017 ADDENDUM #3 Northbrook Park District 2018 Staff and Participant Apparel Bid #2138

November 15, 2017 ADDENDUM #3 Northbrook Park District 2018 Staff and Participant Apparel Bid #2138 Joe Doud Administration Building 545 Academy Drive Northbrook, IL 60062 847 291 2960 nbparks.org November 15, 2017 ADDENDUM #3 Northbrook Park District 2018 Staff and Participant Apparel Bid #2138 This

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices Attachment No.: 2 Item # 18B-RW-02 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TECHNICAL

More information

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR MEMORANDUM TO: FROM: BY: CITY COUNCIL TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR MATTHEW DOWNING, PLANNING MANAGER SUBJECT: CONSIDERATION OF TEMPORARY USE PERMIT CASE NO. 18-015; AUTHORIZING THE VILLAGE

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN RM 12 Centreline Marking using a Line Protection Vehicle Traffic Plan Reference Organisation Contractor Insert Contractor Name For Office Use Only Client Insert Client Name Contract

More information

Invitation Letter to tender for Live Track System of 2017 ICF Canoe Ocean Racing World Championships

Invitation Letter to tender for Live Track System of 2017 ICF Canoe Ocean Racing World Championships Invitation Letter to tender for Live Track System of 2017 ICF Canoe Ocean Racing World Championships You are hereby invited to submit a tender for the provision of live track system of 2017 ICF Canoe Ocean

More information

MID-AMERICA REGIONAL COUNCIL 600 BROADWAY SUITE 200 KANSAS CITY MO

MID-AMERICA REGIONAL COUNCIL 600 BROADWAY SUITE 200 KANSAS CITY MO MID-AMERICA REGIONAL COUNCIL 600 BROADWAY SUITE 200 KANSAS CITY MO 64105-1659 ADDENDUM: 1 IFB: Yearly Contract for Medical Gases Bid #74 ISSUE DATE: May 29, 2015 The original bid issued on May 15, 2015,

More information

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers. SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS 1 SCOPE This specification shall apply to the installation of raised pavement markers. 2 DEFINITIONS Type A Marker - Retroreflective raised pavement

More information

Q7354 Classroom Notebooks

Q7354 Classroom Notebooks Instructions: Des Moines Independent Community School District Division of Purchasing 1915 Prospect Road Suite 1200 We do not guarantee the required quantities as these are estimates only; based on an

More information

Last Updated: 09/29/16 Page 1 of 11

Last Updated: 09/29/16 Page 1 of 11 A SUBSTITUTE ORDINANCE BY COUNCILMEMBER FELICIA A. MOORE TO AMEND CHAPTER 2 (ADMINISTRATION), ARTICLE X (PROCUREMENT AND REAL ESTATE CODE), DIVISION 4 (SOURCE SELECTION AND CONTRACT FORMATION) OF THE CITY

More information

WHANGAREI IMPROVEMENTS

WHANGAREI IMPROVEMENTS WHANGAREI IMPROVEMENTS PROJECT OVERVIEW The NZ Transport Agency (NZTA) is working with Whangarei District Council (WDC) to improve the state highway through Whangarei. In addition to the recently completed

More information

CHAPTER 313 Traffic Control Devices

CHAPTER 313 Traffic Control Devices 31 CHAPTER 313 Traffic Control Devices 313.01 Obedience to traffic control 313.07 Unauthorized signs and devices. signals, hiding from view, 313.02 Through streets; stop and advertising. yield right-of-way

More information

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

DYNAMIC LANES FOR AUCKLAND

DYNAMIC LANES FOR AUCKLAND Dynamic Lanes for Auckland MENEZES M. and INMAN R. Page 1 DYNAMIC LANES FOR AUCKLAND Authors: INMAN, Robert BA (Hons) Previously Auckland Transport Senior Traffic Engineer Now Aurecon Robert.Inman@aurecongroup.com

More information

March 12, 2018 ADDENDUM #1 Northbrook Park District Request for Architectural Services Golf Course & Clubhouse Renovation

March 12, 2018 ADDENDUM #1 Northbrook Park District Request for Architectural Services Golf Course & Clubhouse Renovation Joe Doud Administration Building 545 Academy Drive Northbrook, IL 60062 847 291 2960 nbparks.org March 12, 2018 ADDENDUM #1 Northbrook Park District Request for Architectural Services Golf Course & Clubhouse

More information

IC Chapter 3. Traffic Control Signals

IC Chapter 3. Traffic Control Signals IC 9-21-3 Chapter 3. Traffic Control Signals IC 9-21-3-0.5 "Pedestrian hybrid beacon" Sec. 0.5. As used in this chapter, "pedestrian hybrid beacon" means a traffic control signal used to warn and control

More information