STATEWIDE ITEM AVG. (JULY SEPTEMBER 2009) LOWEST BID HIGHEST BID AVERAGE BID PRICE ITEM USED USED LT MEASURE
|
|
- Lewis Merritt
- 5 years ago
- Views:
Transcription
1 STATEWIDE ITEM AVG. (JULY SEPTEMBER 2009) Obs ITEM UNIT OF AC PREPARING ROW $1, $70, $16, N STA PREPARING ROW $62.71 $35, $1, N EA PREPARING ROW(TREE)(5" TO 12" DIA) $17.71 $ $ N EA PREPARING ROW(TREE)(12" TO 24" DIA) $25.29 $1, $ N EA PREP ROW (TREE)(LESS THAN 24" DIA) $60.00 $ $ N EA PREP ROW (TREE)(GREATER THAN 24" DIA) $ $2, $ N EA PREPARING ROW (TREE) (0" TO 6" DIA) $93.15 $ $ Y EA PREPARING ROW (TREE) (6" TO 24" DIA) $ $ $ N EA PREPARING ROW (TREE)(10" TO 48" DIA) $ $ $ Y EA PREPARING ROW(TREE)(24" TO 36" DIA.) $1, $1, $1, Y EA PREPARING ROW (TREE) (36" TO 48" DIA) $29.76 $ $ Y EA DISPOSAL OF WATER WELLS $3, $3, $3, Y SY REMOVING CONC (PAV) $1.15 $ $ N SY REMOVING CONC (RIPRAP) $1.00 $50.00 $ N CY REMOVING CONC (RIPRAP) $10.00 $ $ Y SY REMOVING CONC (MEDIANS) $3.16 $ $ N CY REMOVING CONC (MEDIANS) $12.12 $12.12 $ Y SY REMOVING CONC (FOUNDATIONS) $2.00 $17.00 $ Y CY REMOVING CONC (FOUNDATIONS) $ $ $ Y SY REMOVING CONC (SIDEWALKS) $1.35 $88.00 $ N SY REMOVING CONC (DRIVEWAYS) $2.00 $50.00 $ N LF REMOVING CONC (CURB) $1.00 $15.00 $ N LF REMOVING CONC (CURB AND GUTTER) $1.66 $22.35 $ N LF REMOVING CONC (CTB) $2.25 $24.11 $ N SY REMOVING CONC (RETAINING WALLS) $10.00 $60.00 $ N CY REMOVE CONC (WINGWALL) $55.00 $ $ N LF REMOVE CONC (GUTTER) $0.50 $5.00 $ N SY REMOVING CONC (APPR SLAB) $4.62 $42.25 $ N SY REMOVING CONC (MISC) $2.75 $36.00 $ N LF REMOVING CONC (CURB OR CURB & GUTTER) $1.30 $6.50 $ N SY REMOVING CONC (WHEELCHAIR RAMP) $5.00 $90.00 $ N SY REMOVING CONC (DRAIN) $10.00 $28.33 $ Y SY REMOVING CONC (SIDEWALK OR RAMP) $3.30 $15.00 $ N LF REMOVE CONC (RAIL) $4.00 $15.00 $ N TxDOT 1 of 115
2 CY REMOVE CONC (ABUTMENT BACKWALL) $ $ $ Y SY REMOVING CONC (PAVERS) $1.75 $43.00 $ N EA REMOVING CONC (GND BOX W/ APRON) $ $ $ Y SY REMOVING CONC (FLUME) $6.00 $6.00 $ Y EA REMOVE CONC (MISC) $10, $10, $10, Y SY REMOVING STAB BASE AND ASPH PAV (2") $0.10 $6.55 $ N SY REMOVING STAB BASE AND ASPH PAV (3") $1.50 $2.76 $ Y SY REMOVING STAB BASE AND ASPH PAV (6") $1.15 $10.00 $ N STA REMOVING STAB BASE AND ASPH PAV (2"-6") $1, $1, $1, Y SY REMOVING STAB BASE AND ASPH PAV (2"-6") $0.88 $10.00 $ N SY REMOVING STAB BASE & ASPH PAV (9") $2.50 $2.50 $ Y SY REMOVING STAB BASE & ASPH PAV (7"-12") $2.65 $4.00 $ N SY REMOVING STAB BASE & ASPH PAV (8"-10") $1.75 $8.50 $ Y SY REMOVING STAB BASE & ASPH PAV(16") $6.00 $8.00 $ Y SY REMOVING STAB BASE AND ASPH PAV (7") $6.00 $6.00 $ Y SY REMOVING STAB BASE & ASPH PAV(14") $0.50 $6.38 $ N SY REMOVING STAB BASE & ASPH PAV (12") $2.00 $4.00 $ Y SY REMOVING STAB BASE AND ASPH PAV (13") $3.10 $6.00 $ N SY REMOVING STAB BASE AND ASPH PAV (5") $4.00 $4.00 $ Y SY REMOVING STAB BASE & ASPH PAV (8"-14") $5.30 $5.30 $ Y SY REMOVING STAB BASE AND ASPH PAV(1"-9") $1.95 $1.95 $ Y SY REMOVING STAB BASE AND ASPH PAV (11") $18.00 $18.00 $ Y SY REMOVE STAB BASE AND ASPH PAV (6"-20") $4.35 $4.35 $ Y SY REMOVING STAB BASE AND ASPH PAV(4.5") $2.00 $2.00 $ Y SY REMOVING STAB BASE AND ASPH PAV(8") $3.25 $3.25 $ Y SY REMOVING STAB BASE & ASPH PAV (0"-10") $4.00 $5.20 $ Y SY REMOVING STAB BASE & ASPH PAV (1.5") $4.99 $4.99 $ Y SY REMOVING STAB BASE & ASPH PAV (4"-22") $3.00 $3.00 $ Y SY REMOVING STAB BASE & ASPH PAV (18") $41.00 $41.00 $ Y SY REMOVING STAB BASE AND ASPH PAV(9"-14") $5.65 $5.65 $ Y SY REMOVING STAB BASE & ASPH PAV(13"-18") $3.42 $10.11 $ N SY REMOVE STAB BASE AND ASPH PAV (1"-3") $15.00 $15.00 $ Y SY REMOVING STAB BASE AND ASPH PAV (10") $5.50 $5.50 $ Y SY REMOVING STAB BASE & ASPH PAV (4" - 6") $4.00 $4.00 $ Y SY REMOVING STAB BASE & ASPH PAV (6" - 8") $3.45 $3.45 $ Y SY REMOV STAB BASE AND ASPH PAV (22") $7.76 $7.76 $ Y TxDOT 2 of 115
3 SY REMOVING STAB BASE AND ASPH PAV (4") $2.00 $4.00 $ N SY REMOV STAB BASE AND ASPH PAV (10"-18") $4.00 $4.00 $ Y SY REMOVE STAB BASE & ASPH PAV (24"-38") $5.00 $5.00 $ Y SY REMOVING STAB BASE & ASPH PV(10 TO 16") $2.10 $2.10 $ Y STA OBLITERATING ABANDONED ROAD $79.00 $1, $ N SY OBLITERATING ABANDONED ROAD $6.50 $6.50 $ Y CY EXCAVATION (ROADWAY) $1.00 $55.00 $ N CY EXCAVATION (CHANNEL) $1.55 $62.00 $ N CY EXCAVATION (SPECIAL) $4.50 $38.50 $ N CY EXCAVATION (ROADWAY AND CHANNEL) $2.23 $10.20 $ N STA SUBGRADE WIDENING (ORD COMP) $48.89 $1, $ N STA SUBGRADE WIDENING (DENS CONT) $75.00 $1, $ N CY EMBANKMENT (FINAL)(ORD COMP)(TY A) $8.00 $32.00 $ N CY EMBANKMENT (FINAL)(DENS CONT)(TY A) $7.00 $17.00 $ N CY EMBANKMENT (FINAL)(ORD COMP)(TY B) $2.27 $60.00 $ N CY EMBANKMENT (FINAL)(DENS CONT)(TY B) $1.87 $19.00 $ N CY EMBANKMENT (FINAL)(ORD COMP)(TY C) $3.50 $21.00 $ N CY EMBANKMENT (FINAL)(DENS CONT)(TY C) $0.00 $75.00 $ N CY EMBANKMENT (FINAL)(ORD COMP)(TY D) $1.15 $1.15 $ Y CY EMBANKMENT (FINAL)(DENS CONT)(TY D) $3.00 $15.00 $ N CY EMBANKMENT (ORIGINAL)(ORD COMP)(TY A) $12.00 $12.00 $ Y CY EMBANKMENT (ORIGINAL)(ORD COMP)(TY C) $23.00 $28.00 $ Y CY EMBANKMENT (ORIGINAL)(DENS CONT)(TY C) $3.67 $3.67 $ Y CY EMBANKMENT (ORIGINAL)(ORD COMP)(TY D) $15.00 $15.00 $ Y CY EMBANKMENT (VEHICLE)(ORD COMP)(TY B) $3.25 $10.00 $ N CY EMBANKMENT (VEHICLE)(DENS CONT)(TY B) $0.01 $6.42 $ Y CY EMBANKMENT (VEHICLE)(ORD COMP)(TY C) $5.00 $25.00 $ N CY EMBANKMENT (VEHICLE)(DENS CONT)(TY C) $15.00 $15.00 $ Y CY EMBANKMENT (FINAL) (DENS CONT) (TY C1) $4.40 $16.00 $ N CY EMBANKMENT (FINAL) (DENS CONT) (TY C2) $2.00 $20.00 $ N CY EMBANK (FINAL)(DC)(TY C) CSBE $23.75 $49.31 $ N CY EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPR) $25.00 $32.00 $ N CY EMB(FINAL)(DC)(TYC)(CSBE)(EMB FND IMPR) $25.00 $30.00 $ Y STA BACKFILL (TY A) $20.61 $ $ N STA BACKFILL (TY B) $30.00 $1, $ N STA BACKFILL (TY C) $ $ $ Y TxDOT 3 of 115
4 STA BACKFILL (TY A OR B) $20.00 $ $ N CY BACKFILL (TY A OR B) $67.00 $67.00 $ Y STA BLADING $19.00 $ $ N HR BLADING $1.00 $ $ N STA ROAD GRADER WORK (ORD COMP) $60.00 $85.00 $ Y STA ROAD GRADER WORK (DENS CONT) $ $ $ Y HR BULLDOZER WORK $33.93 $61.00 $ Y HR SPEC EXCAV WORK (BACKHOE) $20.00 $25.00 $ Y HR SPEC EXCAV WORK (HYD EXCAVATOR) $ $ $ Y STA FURNISHING AND PLACING TOPSOIL (4") $10.05 $10.05 $ Y SY FURNISHING AND PLACING TOPSOIL (4") $0.20 $5.00 $ N SY FURNISHING AND PLACING TOPSOIL (6") $1.00 $1.00 $ Y CY FURNISHING AND PLACING TOPSOIL $9.00 $ $ N SY FURNISHING AND PLACING TOPSOIL (3") $0.25 $10.00 $ Y SY COMPOST MANUF TOPSOIL (BOS) (4") $0.52 $3.00 $ N CY COMPOST MANUF TOPSOIL (BOS) $26.32 $26.32 $ Y SY COMPOST MANUF TOPSOIL (PB) (4") $0.70 $8.00 $ N CY COMPOST MANUF TOPSOIL (PB) $22.30 $22.30 $ Y SY EROSION CONTROL COMPOST (2") $0.75 $0.75 $ Y CY EROSION CONTROL COMPOST $26.46 $35.00 $ N CY GENERAL USE COMPOST $26.12 $32.00 $ N SY COMPOST MANUF TOPSOIL (BOS OR PB) (4") $0.64 $2.00 $ N SY COMPOST MANUF TOPSOIL (BIP) (4") $0.59 $1.15 $ N SY GENERAL USE COMPOST (4") $2.00 $3.25 $ N SY COMPOST MANUF TOPSOIL (BOS OR PB) (6") $2.50 $6.30 $ Y SY EROSION CONTROL COMPOST (3") $2.50 $2.50 $ Y SY BLOCK SODDING $1.60 $10.60 $ N SY STRAW OR HAY MULCH $0.04 $0.65 $ N CY MULCH SODDING $7.00 $27.44 $ N SY BROADCAST SEED (PERM) (RURAL) (SANDY) $0.05 $3.68 $ N SY BROADCAST SEED (PERM) (RURAL) (CLAY) $0.04 $0.75 $ N AC BROADCAST SEED (PERM) (RURAL) (CLAY) $4, $4, $4, Y SY BROADCAST SEED (PERM) (URBAN) (CLAY) $0.15 $30.00 $ N SY BROADCAST SEED (TEMP) (WARM) $0.03 $0.50 $ N AC BROADCAST SEED (TEMP) (WARM) $0.10 $3, $ N SY BROADCAST SEED (TEMP) (COOL) $0.03 $0.42 $ N TxDOT 4 of 115
5 AC BROADCAST SEED (TEMP) (COOL) $0.10 $3, $ N SY STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY) $0.18 $2.78 $ N SY STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY) $0.22 $0.32 $ N SY STRAW/HAY MLCH SEED(PERM)(URBAN)(CLAY) $0.25 $0.25 $ Y SY CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) $0.16 $0.35 $ N AC CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) $16.30 $2, $ N SY CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) $0.15 $2.00 $ N AC CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) $ $1, $ Y SY CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) $0.10 $0.50 $ N AC CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) $1, $1, $1, Y SY CELL FBR MLCH SEED(TEMP)(WARM) $0.08 $0.50 $ N AC CELL FBR MLCH SEED(TEMP)(WARM) $ $1, $ N SY CELL FBR MLCH SEED(TEMP)(COOL) $0.10 $0.50 $ N AC CELL FBR MLCH SEED(TEMP)(COOL) $8.20 $1, $ N SY DRILL SEEDING (PERM) (RURAL) (SANDY) $0.06 $0.25 $ N SY DRILL SEEDING (PERM) (RURAL) (CLAY) $0.04 $0.65 $ N AC DRILL SEEDING (PERM) (RURAL) (CLAY) $ $11, $ N SY DRILL SEEDING (PERM) (URBAN) (SANDY) $0.08 $0.25 $ N SY DRILL SEEDING (PERM) (URBAN) (CLAY) $0.05 $1.00 $ Y SY DRILL SEEDING (TEMP) (WARM) $0.01 $0.14 $ N AC DRILL SEEDING (TEMP) (WARM) $ $11, $ N SY DRILL SEEDING (TEMP) (COOL) $0.03 $0.25 $ N AC DRILL SEEDING (TEMP) (COOL) $ $11, $ N SY STRAW OR HAY MULCHING $0.15 $0.15 $ Y AC STRAW OR HAY MULCHING $ $ $ Y SY STRAW/HAY MLCH SEED(TEMP)(WARM) $0.14 $0.14 $ Y SY STRAW/HAY MLCH SEED(TEMP)(COOL) $0.10 $0.10 $ Y SY DRILL SEED (TEMP)(WARM OR COOL) $0.05 $0.65 $ N SY BROADCAST SEED (PERM)(SPECIAL MIX) $0.10 $0.10 $ Y SY BOND FBR MTRX SEED (PERM)(RURAL)(SAND) $0.75 $0.75 $ Y SY CELL FBR MLCH SEED(PERM)(SPECIAL MIX) $0.59 $0.59 $ Y AC FERTILIZER $ $2, $ N TON FERTILIZER $ $ $ N MG VEGETATIVE WATERING $0.01 $10, $ N SY SOIL RETENTION BLANKETS (CL 1) (TY A) $0.70 $2.00 $ N SY SOIL RETENTION BLANKETS (CL 1) (TY B) $0.75 $2.00 $ N TxDOT 5 of 115
6 SY SOIL RETENTION BLANKETS (CL 1) (TY C) $0.90 $1.70 $ N SY SOIL RETENTION BLANKETS (CL 1) (TY D) $0.75 $2.00 $ N SY SOIL RETENTION BLANKETS (CL 2) (TY E) $2.65 $5.00 $ Y SY SOIL RETENTION BLANKETS (CL 2) (TY F) $0.86 $1.40 $ N LS IRRIGATION SYSTEM $8, $130, $42, N LS IRRIGATION SYSTEM (TY II) $20, $44, $32, Y LS IRRIGATION SYSTEM (TY IV) $15, $15, $15, Y AC WILDFLOWER SEEDING $ $1, $ Y AC WILDFLOWER SEEDING (MIX 1) $2, $2, $2, Y EA PLANT MATERIAL (4" CNTR) $0.65 $2.56 $ N EA PLANT MATERIAL (1-GAL) $1.47 $11.97 $ N EA PLANT MATERIAL (3-GAL) $6.00 $23.92 $ N EA PLANT MATERIAL (5-GAL) $5.00 $37.09 $ N EA PLANT MATERIAL (15-GAL) $22.00 $90.00 $ N EA PLANT MATERIAL (30-GAL) $47.00 $ $ Y EA PLANT MATERIAL (45-GAL) $ $ $ Y CY MULCH $30.00 $37.44 $ N SY MULCH $1.25 $3.25 $ N LF LANDSCAPE EDGE $1.20 $6.00 $ Y SY PLANT BED PREPARATION $1.00 $10.00 $ N SY VEGETATION BARRIER $1.34 $1.34 $ Y EA PLANT MATERIAL (SEEDLING) $0.68 $0.68 $ Y EA PLANT MATERIAL (15 GAL) (TREE) $33.75 $ $ N EA PLANT MATERIAL (30 GAL) (TREE) $72.15 $ $ N EA PLANT MATERIAL (45 GAL) (TREE) $ $ $ N EA PLANT MATERIAL (65 GAL) (TREE) $ $ $ Y EA PLANT MATERIAL (100 GAL) (TREE) $ $1, $ N EA PLANT MATERIAL (1 GAL) (SHRUB) $3.63 $8.00 $ N EA PLANT MATERIAL (3 GAL) (SHRUB) $15.00 $21.00 $ Y EA PLANT MATERIAL (5 GAL) (SHRUB) $15.95 $ $ N EA PLANT MATERIAL (10 GAL) (SHRUB) $74.77 $ $ Y EA PLANT MATERIAL (15 GAL) (SHRUB) $25.00 $ $ N EA PLANT MATERIAL (MIN 3 1/2" CAL) (B&B) $1, $1, $1, Y EA PLANT MATERIAL (MIN 6' TRNK HT) (PALM) $ $ $ Y EA PLANT MATERIAL (MIN 10' TRNK HT) (PALM) $ $ $ Y EA PLANT MATERIAL (20 GAL)(TREE) $ $ $ Y TxDOT 6 of 115
7 SY PLANT BED PREP (TYPE I) $1.50 $1.50 $ Y SY PLANT BED PREP (TYPE II) $0.09 $2.00 $ N SY PLANT BED PREP (TYPE III) $1.10 $2.00 $ N EA PLANT MATERIAL (MIN 3' HT)(PALM) $ $ $ Y EA PLANT MATERIAL (200 GAL) (TREE) $ $ $ Y MO PLANT MAINTENANCE $ $3, $1, N CYC PLANT MAINTENANCE $1, $38, $26, Y EA PLANT REPLACEMENT (1-GAL) $15.00 $15.00 $ Y EA PLANT REPLACEMENT (5-GAL) $28.00 $28.00 $ Y MG VEGETATIVE WATERING $20.00 $20.00 $ Y MO IRRIGATION SYSTEM OPER AND MAINT $ $ $ N EA PLANT REPLACEMENT (4" POT) $3.50 $3.50 $ Y EA PLANT REPLACEMENT (15 GAL) $ $ $ Y EA PLANT REPLACEMENT (30 GAL) $ $ $ Y MO PLANT MAINTENANCE (SCH A) $3, $3, $3, Y MO PLANT MAINTENANCE (SCH B) $1, $1, $1, Y MO IRRIG SYS OPER AND MAINT (SCH A) $1, $1, $1, Y MO IRRIG SYS OPER AND MAINT (SCH B) $1, $1, $1, Y MG SPRINKLING (DUST CONTROL) $0.01 $ $ N HR PROOF ROLLING $1.00 $ $ N CY FL BS (CMP IN PLACE)(TY A GR 4)(IN VEH) $16.44 $16.44 $ Y CY FL BS (CMP IN PLC)(TY A GR 1)(FNAL POS) $0.00 $53.42 $ N CY FL BS (CMP IN PLC)(TY A GR 2)(FNAL POS) $23.50 $23.50 $ Y CY FL BS (CMP IN PLC)(TY A GR 3)(FNAL POS) $53.31 $53.31 $ Y CY FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS) $0.00 $55.00 $ N CY FL BS (CMP IN PLC)(TY D GR 1)(FNAL POS) $30.00 $30.00 $ Y CY FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS) $40.40 $40.40 $ Y CY FL BS (CMP IN PLC)(TY E GR 1)(FNAL POS) $7.50 $7.50 $ Y CY FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS) $0.00 $34.58 $ N SY FL BS (CMP IN PLC)(TY A GR 1) (6") $8.00 $ $ N SY FL BS (CMP IN PLC)(TY A GR 2) (6") $4.31 $6.00 $ N SY FL BS (CMP IN PLC)(TY A GR 4) (6") $12.00 $25.00 $ N SY FL BS (CMP IN PLC)(TY B GR 1) (6") $8.00 $8.00 $ Y SY FL BS (CMP IN PLC)(TY E GR 2) (6") $5.47 $8.99 $ Y TON FL BS (CMP IN PLC)(TY A GR 4) $12.71 $65.00 $ Y CY FL BS (RDWY DEL) (TY E GR 3) (IN VEH) $8.00 $8.00 $ Y TxDOT 7 of 115
8 CY FL BS (RDWY DEL) (TY E GR 4) (IN VEH) $14.10 $14.10 $ Y TON FL BS (RDWY DEL) (TY A GR 2) $12.00 $12.00 $ Y SY FL BS (CMP IN PLC) (TY A GR 4) (8") $6.50 $6.50 $ Y SY FL BS (CMP IN PLACE)(TY E GR 4)(4") $7.20 $7.20 $ Y SY FL BS (CMP IN PLC)(TY A GR 4)(10") $9.95 $9.95 $ Y SY FL BS (CMP IN PLC)(TY A OR B GR4)(15") $14.00 $14.00 $ Y CY FL BS (RDWY DEL)(TY E GR 4)(FNAL POS) $11.95 $48.42 $ N SY FL BS (CMP IN PLC)(TY A OR B GR 4)(8") $9.85 $9.85 $ Y SY FL BS (CMP IN PLACE)(TY A GR 1)(8") $10.53 $25.00 $ N SY FL BS (CMP IN PLACE)(TY A GR 1)(10") $12.98 $12.98 $ Y CY FL BS (RDWY DEL)(TY A GR 1)(FNAL POS) $0.00 $0.00 $ N SY FL BS (CMP IN PLC)(TY A OR B GR 4)(6") $7.10 $10.00 $ N SY FL BS (CMP IN PLC)(TY A GR 4)(12") $10.15 $10.15 $ Y SY FL BS (CMP IN PLACE)(TY A GR 2)(12") $11.00 $11.00 $ Y SY FL BS (CMP IN PLACE)(TY A GR 2)(14") $10.19 $10.19 $ Y SY FL BS (CMP IN PLC)(TY E GR 4)(10") $7.28 $16.00 $ Y SY FL BS (CMP IN PLACE) (TY D GR 1) (15") $20.00 $20.00 $ Y CY FL BS (RDWY DEL)(TY A GR 4)(FNL POS) $31.25 $45.00 $ Y SY FL BS (CMP IN PLC)(TY D GR1)(12") $25.00 $25.00 $ Y SY FL BS (CMP IN PLC)(TY E GR 2) (7") $6.20 $6.20 $ Y CY FL BS (RDWY DEL)(TY E GR 1)(FNL POS) $34.60 $34.60 $ Y SY FL BS (CMP IN PLC)(TY E GR 2) (4") $3.00 $3.00 $ Y CY FL BS (RDWY DEL)(TY B GR 2)(FNAL POS) $30.00 $30.00 $ Y SY FL BS (CMP IN PLC)(TY A GR 2)(10") $10.50 $10.50 $ Y SY FL BS (CMP IN PLACE)(TY A GR 2)(8") $5.88 $5.88 $ Y SY FL BS (CMP IN PLACE)(TY D GR 4)(12") $12.33 $12.33 $ Y SY FL BS (CMP IN PLC)(TY E GR 2)(14") $12.00 $12.00 $ Y SY FL BS(CMP IN PLC)(TY E GR 2)(8.5") $7.00 $7.00 $ Y SY FL BS(CMP IN PLC)(TY A OR B GR 4)(14") $9.47 $9.47 $ Y CY FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) $17.50 $75.00 $ Y CY FL BS (CMP IN PLC)(TY E GR 5)(FNL POS) $65.00 $77.00 $ Y CY FL BS(CMP IN PLC)(TYA GR 2 OR 4)FNL POS $21.42 $28.22 $ N STA REWORK BS MTL (TY B) (6") (ORD COMP) $ $ $ Y STA REWORK BS MTL (TY D) (6") (ORD COMP) $ $ $ Y STA REWORK BS MTL (TY D) (6") (DENS CONT) $ $ $ Y SY REWORK BS MTL (TY B) (6") (ORD COMP) $40.00 $40.00 $ Y TxDOT 8 of 115
9 SY REWORK BS MTL (TY C) (8") (ORD COMP) $0.74 $4.99 $ N SY REWORK BS MTL (TY D) (8") (ORD COMP) $2.45 $2.45 $ Y SY REWORK BS MTL (TY D) (6") (DENS CONT) $5.33 $5.33 $ Y SY REWORK BS MTL (TY D) (8") (DENS CONT) $0.24 $5.25 $ N SY REWORK BS MTL (TY E) (6") (ORD COMP) $8.00 $8.00 $ Y SY REWORK BS MTL (TY E) (8") (ORD COMP) $1.28 $1.28 $ Y CY RWRK BS MTL(TY B)(6")(DEN CNT)(ORG POS) $5.00 $5.00 $ Y SY REWORK BS MTL (TY C)(12")(ORD COMP) $2.55 $2.55 $ Y SY REWORK BS MTL (TY B)(12")(DENS CONT) $2.85 $2.85 $ Y SY REWORK BS MTL (TY A) (12")(ORD COMP) $1.99 $1.99 $ Y CY RWRK BS MTL(TYB)(11"-19")(DC)(ORG POS) $3.55 $3.55 $ Y CY REWORK BS MTL (TY C)(12")(DC)(ORG POS) $7.00 $7.00 $ Y SY REWORK BS MTL (TY C)(4")(ORD COMP) $3.25 $3.25 $ Y SY REWORK BS MAT (TY C)(8"-10")(ORIG POS) $7.15 $7.15 $ Y SY REWORK BS MTL (TY C)(6") $2.15 $6.00 $ Y SY REWORK BS MATL (TY C)(10") (ORD COMP) $1.16 $3.50 $ Y SY REWORK BS MTL (TY C) (6") (ORD COMP) $23.83 $23.83 $ Y CY RWRK BS MTL(TY B)(12")(DC)(ORG POS) $7.20 $7.20 $ Y CY RWRK BS MTL(TY D)(9")(DEN CON)(ORG POS) $4.50 $4.50 $ Y SY REWORK BS MTL (TY C)(11")(OC) $1.50 $1.50 $ Y SY REWORK BS MTL (TY A) (10") (ORD COMP) $2.50 $2.50 $ Y SY REWORK BS MTL (TY D) (9") (DENS CONT) $0.67 $0.67 $ Y CY REWORK BS MATL(TY B)(9.5")(DC)(ORG POS) $3.89 $3.89 $ Y SY REWORK BS MTL(TY B)(5"-14")(DENS CONT) $1.04 $1.04 $ Y SY REWORK BS MAT (TY C) (6") (ORIG POS) $1.95 $1.95 $ Y SY REWORK BS MTL(TY B)(22")(DENS CONTROL) $2.24 $2.24 $ Y CY RWRK BS MTL(TY C)(STKPL)(6"-15")(OC) $4.69 $4.69 $ Y SY REWORK BS MATL(TY B)(11")(DC)(ORG POS) $2.10 $2.10 $ Y TON LIME (HYDRATED LIME (DRY)) $ $ $ Y TON LIME (HYDRATED LIME (SLURRY)) $ $ $ N TON LIME (COMMERCIAL LIME SLURRY) $ $ $ Y TON LIME (QUICKLIME (DRY)) $ $ $ N SY LIME TRT (EXST MATL) (6") $1.17 $9.00 $ N SY LIME TRT (NEW BASE) (6") $1.00 $2.60 $ Y SY LIME TRT (EXST MATL)(10") $0.00 $18.00 $ Y SY LIME TRT (NEW BASE)(12") $1.64 $3.47 $ N TxDOT 9 of 115
10 SY LIME TRT (EXST MATL) (12") $0.90 $4.00 $ N TON LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) $ $ $ N SY LIME TRT (SUBGR)(DC)(6") $1.22 $3.60 $ N SY LIME TRT (NEW BASE)(8") $0.87 $8.00 $ N TON LIME (HYD, COM, OR QK(SLURRY)) $ $ $ N SY LIME TRT(MIX EXST MATL & NEW BASE)(8") $1.03 $2.00 $ Y SY LIME TRT (EXST MATL)(4") $0.00 $0.00 $ Y SY LIME TRT (EXIST MATL)(18") $1.50 $6.50 $ N SY LIME TRT (EXIST MATL)(36") $7.27 $7.27 $ Y SY LIME TRT (EXIST MATL)(9") $0.00 $1.50 $ Y SY LIME TRT (EXIST MATL)(24") $4.05 $4.05 $ Y SY LIME TRT (EXST MATL)(8") $0.70 $4.50 $ N SY LIME TRT (EXST MATL)(8") $3.02 $3.02 $ Y SY LIME TRT (MIX EXST MATL&NEW BASE(12") $1.50 $1.50 $ Y SY LIME TRT (EXST MATL)(21") $4.50 $4.50 $ Y TON LIME (HYD, COM OR QK)(SLURRY) $0.00 $ $ N SY LIME TRT(MIX EXST MATL & NEW BASE)(18") $2.60 $2.60 $ Y SY LIME TRT(MIX EXST MATL & NEW BASE)(14") $1.50 $1.50 $ Y TON LIME (COM OR QK)(SLURRY) $ $ $ Y SY LIME TRT (EXIST MATL) (7") $2.73 $2.73 $ Y SY LIME TRT (NEW BASE)(10") $0.50 $1.90 $ Y SY LIME TREAT (EXIST MATL) (14") $2.40 $2.40 $ Y SY LIME TRT (EXST MATL) (33") $5.50 $5.50 $ Y SY LIME TRT (NEW BASE) (11") $0.01 $4.00 $ Y SY LIME TRT(MIX EXST MATL & NEW BASE)(13") $2.25 $2.25 $ Y CY LIME TRT(PLNT MIX)(TY E)(GR 4)(FNL POS) $18.50 $18.50 $ Y TON LIME (HYDRATED (SLURRY)) $ $ $ Y TON FLY ASH (CLASS CS) $57.50 $60.00 $ Y TON FLY ASH (CLASS FS) $58.00 $58.00 $ Y SY FA TREAT FOR BASE CRS (EXST BASE) (6") $1.05 $1.05 $ Y SY LFA TREAT SUBGRADE (8") $1.50 $1.50 $ Y SY FA TRT FOR BS CRS(NEW & EXST BASE)(9") $1.25 $1.25 $ Y TON CEMENT $77.81 $ $ N SY CEMENT TREAT (EXIST MATL) (6") $0.56 $6.50 $ N SY CEMENT TREAT (NEW BASE) (6") $2.00 $2.00 $ Y SY CEMENT TREAT (EXIST MATL)(12") $0.95 $13.50 $ N TxDOT 10 of 115
11 SY CEMENT TREAT (SUBGRADE) (8") $2.00 $2.00 $ Y SY CEMENT TREAT(EXIST MATL)(8") $0.64 $3.75 $ N SY CEMENT TREAT (EXIST MATL) (7") $0.52 $0.52 $ Y SY CEMENT TREAT (NEW BASE)(36") $16.00 $16.00 $ Y SY CEMENT TREAT (SUBGRADE)(6") $1.00 $2.00 $ N SY CEMENT TREAT (MX EXST MTL & NW BS)(9") $6.60 $6.60 $ Y SY CEMENT TREAT (EXIST MATL) (5") $1.30 $1.30 $ Y SY CEMENT TREAT (NEW BASE) (10") $2.50 $22.00 $ Y SY CEMENT TREAT (NEW BASE)(12") $1.00 $1.00 $ Y SY CEMENT TREAT (EXIST MATL)(DC)(8") $0.85 $0.85 $ Y SY CEMENT TREAT (NEW BASE 14") $1.80 $1.80 $ Y SY CEM TRT (MX EXT MTL/NW BASE)(DC)(10") $2.00 $2.00 $ Y SY CEM TRT (MX EXST & NW BS MTL)(DC)(8") $0.85 $0.85 $ Y SY CEMENT TREAT (NEW BASE)(6")(DC) $0.90 $0.90 $ Y SY CEM TRT(PLNT MX) (CL N)(TY A)(GR 4)(6") $10.50 $10.50 $ Y SY CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6") $4.36 $11.55 $ N SY CEM TRT (PLNT MX)(CL N)(TY A)(GR 1)(8") $5.89 $5.89 $ Y SY CEM TRT(PLNT MX)(CL N)(TY A)(GR 1)(10") $20.00 $20.00 $ Y SY CEM TRT(PLNT MX)(CL N)(TY A)(GR 1)(14") $14.00 $14.00 $ Y SY CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(10") $32.19 $32.19 $ Y SY CEM TRT(PLNT MX) (CL L)(TY A)(GR 1)(8") $22.00 $22.00 $ Y SY CEM TRT(PLNT MX)(CL N)(TY A)(GR 2)(12") $28.50 $28.50 $ Y TON ASPHALT STAB BASE (GR 1)(PG 64) $0.00 $ $ N TON ASPHALT STAB BASE (GR 2)(PG 64) $6.00 $89.00 $ N TON ASPHALT STAB BASE (GR 3)(PG 58) $75.00 $75.00 $ Y TON ASPHALT STAB BASE (GR 4)(PG 64) $56.50 $ $ N TON ASPHALT STAB BASE (GR 4)(PG 70) $99.00 $99.00 $ Y CY SALV, HAUL & STKPL RECLM ASPH PAV $10.80 $71.17 $ N SY SALV, HAUL & STKPL RCL APH PV (0 TO 2") $0.95 $6.00 $ N SY SALV, HAUL & STKPL RCL APH PV (2 TO 4") $0.66 $1.90 $ N SY SALV, HAUL & STKPL RCL APH PV (6 TO 8") $10.00 $10.00 $ Y SY SALV, HAUL & STKPL RCL APH PV (4 TO 8") $1.95 $1.95 $ Y SY SALV,HAUL& STKPL RCL APH PV(VAR DEPTH) $1.00 $3.00 $ Y SY SALV, HAUL & STKPL RCL APH PV (3") $0.66 $40.63 $ N SY SALV, HAUL & STKPL RCL APH PV (3 1/2") $1.00 $3.00 $ Y SY SALV,HAUL & STKPL RCL APH PV (2") $0.85 $4.00 $ N TxDOT 11 of 115
12 SY SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2") $0.01 $0.01 $ Y SY SALV, HAUL & STKPL RCL APH PV (4") $1.70 $2.68 $ N SY SALV,HAUL & STKPL RCL ASPH PV (5") $1.25 $1.25 $ Y SY SALV,HAUL & STKPL RCL APH PV (12"TO18") $3.00 $3.00 $ Y SY SALV, HAUL & STKPL RCL ASH PV (12") $3.50 $3.50 $ Y SY SALV HAUL & STKPL RCL APH PV (6") $1.45 $3.00 $ Y SY SALV, HAUL & STKPL RCL APH PV (5"-7") $1.87 $1.87 $ Y SY SALV, HAUL & STKPL RCL ASPH PV (10") $5.00 $5.00 $ Y SY SALV, HAUL & STKPL RCL APH PV (5 TO 6") $1.00 $1.00 $ Y GAL PRIME COAT (MC-30) $0.00 $15.00 $ N GAL PRIME COAT (AE-P) $2.75 $5.50 $ N GAL PRIME COAT (MC-30 OR AE-P) $2.75 $5.75 $ N GAL PRIME COAT & BLOTTER (MC-30) $3.75 $4.00 $ Y GAL PRIME COAT & BLOTTER (AE-P) $2.79 $3.00 $ Y GAL PRIME COAT (RC-250) $3.07 $4.09 $ N GAL PRIME COAT (SS-1) $3.35 $5.00 $ N GAL EMULS ASPH(BS-SUBGR TRT)(SS- OR CSS-1H) $1.52 $1.52 $ Y GAL EMULS ASPH(BS-SUBGR TRT)(SS-1 OR MS-2) $3.00 $3.80 $ Y GAL EMULS ASPH (EROSN CONT)(SS-1) $3.98 $3.98 $ Y GAL FOG SEAL (SS-1) $3.80 $3.80 $ Y GAL ASPH (AC-5) $3.00 $3.54 $ Y GAL ASPH (AC-10) $2.04 $3.60 $ N GAL ASPH (AC-15P) $0.00 $6.50 $ N GAL ASPH (AC-20-5TR) $3.00 $6.15 $ N GAL ASPH (HFRS-2P) $3.40 $3.40 $ Y GAL ASPH (CRS-2) $2.00 $2.85 $ N GAL ASPH (CRS-2H) $0.00 $0.00 $ Y GAL ASPH (CRS-1P) $1.90 $1.90 $ Y GAL ASPH (RC-250) $2.87 $10.17 $ N GAL ASPH (CRS-2P OR CRS-1P) $0.00 $3.13 $ Y GAL ASPH (CRS-2 OR CRS-2H) $2.83 $2.83 $ Y GAL ASPH(AC-5 OR 10,CRS/HFRS-2,RS/CRS-1P) $3.75 $3.75 $ Y TON ASPH (AC-20-5TR) $ $ $ Y TON ASPH (CRS-2P) $ $ $ N TON ASPH (CRS-2P OR CRS-1P) $1.00 $1.00 $ Y CY AGGR(TY-B GR-3 SAC-A) $ $ $ Y TxDOT 12 of 115
13 CY AGGR(TY-B GR-4 SAC-A) $43.08 $55.89 $ Y CY AGGR(TY-B GR-5 SAC-A) $46.08 $46.08 $ Y CY AGGR(TY-PB GR-4 SAC-A) $62.00 $62.00 $ Y CY AGGR(TY-A GR-3 SAC-B) $55.00 $55.00 $ Y CY AGGR(TY-B GR-3 SAC-B) $0.00 $0.00 $ Y CY AGGR(TY-B GR-4 SAC-B) $26.00 $ $ N CY AGGR(TY-B GR-5 SAC-B) $29.00 $ $ N CY AGGR(TY-D GR-4 SAC-B) $60.00 $86.00 $ N CY AGGR(TY-D GR-5 SAC-B) $35.61 $35.61 $ Y CY AGGR(TY-E GR-5 SAC-B) $64.10 $ $ Y CY AGGR(TY-PB GR-3 SAC-B) $38.48 $ $ N CY AGGR(TY-PB GR-4 SAC-B) $50.00 $ $ N CY AGGR(TY-PD GR-4 SAC-B) $67.40 $ $ N CY AGGR(TY-PE GR-3 SAC-B) $44.49 $64.60 $ Y CY AGGR(TY-PE GR-4 SAC-B) $0.00 $ $ N CY AGGR(TY-PE GR-5 SAC-B) $47.95 $ $ N GAL ASPH (AC-20-5TR OR CRS-1P) $3.56 $3.56 $ Y CY AGGR (TY PB GR 4)OR(TY PB GR 4 MOD) $51.50 $51.50 $ Y GAL ASPH (AC-20XP) $2.75 $2.75 $ Y CY AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B) $74.00 $ $ Y CY AGGREGATE (TY B GR 4) $35.00 $35.00 $ Y GAL ASPH (AC-15P OR CRS-2P) $2.96 $5.60 $ N CY AGGR (TY PB GR 4 MOD) $99.38 $99.38 $ Y CY AGGR (TY-PB GR-4S) $ $ $ Y TON ASPH (AC-20XP) $ $ $ Y CY AGGR (TY-D GR-4 OR TY-L GR-4)(SAC-B) $40.00 $ $ Y CY AGGR (TY A OR B GR 3 SAC-B) $63.90 $63.90 $ Y GAL ASPH (AC-10 OR HFRS-2) $2.67 $2.67 $ Y GAL ASPH (AC-20-5TR OR AC-12-5TR) $3.50 $3.50 $ Y GAL ASPH (AC-5, AC-10, CRS-2, OR HFRS-2) $1.86 $5.00 $ N GAL ASPH (AC-15P, HFRS-2P, OR CRS-2P) $2.65 $2.75 $ Y GAL ASPH (CHFRS-2P) $3.10 $3.60 $ N CY AGGR (TY-B GR-5 OR TY-L GR-5 SAC-B) $50.00 $ $ N GAL ASPH(AC-3 OR AC-5) $2.62 $2.62 $ Y TON ASPH (CRS-2,CRS-2H, OR CRS-1P) $ $ $ Y CY AGGR (TY-B OR L GR-4 SAC-B) $36.00 $ $ N TxDOT 13 of 115
14 CY AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A) $53.00 $ $ N CY AGGR (TY-D GR-4) $55.00 $55.00 $ Y GAL ASPH(AC-5 OR AC-10)LATEX OR CRS-1P/2P $3.00 $3.83 $ Y GAL ASPH (AC-10 OR HFRS-2P) $2.45 $5.00 $ N GAL ASPH (AC-15P, CRS-2P OR CRS-1P) $2.76 $2.76 $ Y CY AGGR(TY-E OR TY-L GR-4) $0.00 $ $ N GAL ASPH (CRS-2, CRS-2H, OR CRS-1P) $3.40 $3.40 $ Y CY AGGR(TY-B GR-4 OR TY-L GR-4 SAC-B) $47.00 $54.61 $ Y GAL ASPH (AC-20XP OR AC-20-5TR) $0.00 $0.00 $ Y GAL ASPH (AC-12-5TR) $4.00 $4.00 $ Y TON ASPH(AC-20-5TR OR AC-20XP) $1.00 $ $ Y CY AGGR (TY-PD GR-3 OR TYL-PL GR-3) $70.00 $81.00 $ Y CY AGGR (TY-PD OR TY-PL GR-3 SAC-B) $75.00 $75.00 $ Y CY AGGR TY-B OR TY-L GR-3 SAC-B $36.00 $36.00 $ Y GAL ASPH(AC-20-5TR OR AC-20XP) $2.95 $2.95 $ Y CY AGGR (TY-PB GR-4 MOD SAC-B) $50.00 $50.00 $ Y CY AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-B) $53.00 $ $ N CY AGGR (TY-PB GR-3) $ $ $ Y GAL ASPH (AC10-2TR) $3.75 $3.75 $ Y GAL ASPH (AC-15P OR AC-10-2TR OR CRS-2P) $0.00 $15.00 $ N GAL ASPH(AC-15P OR20-5TR OR20XP OR10-2TR) $2.90 $3.90 $ Y CY AGGR (TY-PE GR4 OR TY-PE GR4S) SAC-B $44.49 $ $ Y GAL ASPH (AC-10-2TR OR AC-15P) $3.00 $3.00 $ Y GAL ASPH (AC-15P, AC-20XP OR AC-12-5TR) $2.80 $4.65 $ N CY AGGR(TY PB GR 4 OR TY PB GR 4S)SAC-B $52.00 $ $ N GAL ASPH (AC-10-2TR OR AC-12-5TR) $4.00 $4.00 $ Y CY AGGR(TY-PB GR-3 OR TY-PB GR-3S)SAC-B $52.90 $69.95 $ Y CY AGGR (TY D GR-3 OR TY L GR-3)(SAC B) $64.32 $64.32 $ Y GAL ASPH(AC-15P,AC-20XP,AC-10-2TR,CHFRS-2P) $2.75 $2.75 $ Y CY AGGR (TY-PE GR-3) $56.25 $ $ Y CY AGGR (TY-PE GR-4) $52.42 $52.42 $ Y GAL ASPH (AC20-XP, AC12-5TR OR AC20-5TR) $3.00 $3.00 $ Y CY AGGR(TY-B GR-3 OR TY-L GR-3) $54.61 $54.61 $ Y GAL ASPH (AC/10-2TR,20-5TR,20XP,OR 12-5TR) $2.95 $8.80 $ N GAL ASPH (AC-15P OR AC-20-5TR OR CRS-2P) $3.60 $3.60 $ Y GAL ASPH (INTER) (CRS-1P) $2.00 $2.00 $ Y TxDOT 14 of 115
15 CY AGGR (INTER) TY-B (GR4 SAC-B) $45.00 $45.00 $ Y TON A-R BINDER (TYPE II) $0.00 $1, $ N TON A-R BINDER (TYPE III) $0.00 $2, $ N CY AGGR(TY-PB GR-3 SAC-A) $71.00 $71.00 $ Y CY AGGR(TY-PB GR-4 SAC-A) $71.00 $71.00 $ Y CY AGGR(TY-PB GR-4S SAC-B) $73.00 $ $ N CY AGGR(TY-PB GR-4 SAC-B) $0.00 $0.00 $ Y CY AGGR (TY PB GR 4 OR TY PB GR 4S)SAC-B $0.00 $0.00 $ N TON LRA PAV TY-I GR-AA $66.00 $78.46 $ Y TON LRA PAV TY-I GR-C $71.40 $71.40 $ Y TON LRA PAV TY-I GR-CC $56.50 $84.54 $ Y TON LRA PAV TY-II GR-CS SAC-A $95.54 $95.54 $ Y TON LRA PAV TY-II GR-CS SAC-B $50.40 $50.40 $ Y TON LRA PAV TY-II GR-DS $ $ $ Y TON LRA PAV TY-1 GR-A OR TY-1 GR-AA $0.00 $0.00 $ Y TON HMCL ACP TY-F SAC-B AES-300 $15.00 $15.00 $ Y TON D-GR HMA(METH) TY-A PG64-22 $37.72 $44.48 $ Y TON D-GR HMA(METH) TY-B PG64-22 $0.00 $ $ N TON D-GR HMA(METH) TY-B PG70-22 $50.16 $58.00 $ Y TON D-GR HMA(METH) TY-C SAC-B PG64-22 $44.82 $98.00 $ N TON D-GR HMA(METH) TY-C PG64-22 $60.00 $ $ N TON D-GR HMA(METH) TY-C SAC-A PG70-22 $96.00 $96.00 $ Y TON D-GR HMA(METH) TY-C SAC-B PG70-22 $43.47 $87.00 $ N TON D-GR HMA(METH) TY-C PG70-22 $50.78 $51.20 $ Y TON D-GR HMA(METH) TY-C SAC-A PG76-22 $80.00 $ $ N TON D-GR HMA(METH) TY-C SAC-B PG76-22 $59.87 $74.87 $ Y TON D-GR HMA(METH) TY-D SAC-A PG64-22 $ $ $ Y TON D-GR HMA(METH) TY-D SAC-B PG64-22 $53.50 $ $ N TON D-GR HMA(METH) TY-D PG64-22 $58.52 $ $ N TON D-GR HMA(METH) TY-D SAC-B PG70-22 $80.40 $ $ N TON D-GR HMA(METH) TY-D PG70-22 $76.00 $ $ N TON D-GR HMA(METH) TY-D SAC-A PG76-22 $70.00 $ $ N TON D-GR HMA(METH) TY-D SAC-B PG76-22 $64.68 $64.68 $ Y TON D-GR HMA (METH) TYC PG70-22 (LEVEL-UP) $54.00 $54.00 $ Y TON D-GR HMA(QCQA) TY-A PG64-22 $57.81 $89.00 $ Y TON D-GR HMA(QCQA) TY-A PG70-22 $62.00 $62.00 $ Y TxDOT 15 of 115
16 TON D-GR HMA(QCQA) TY-B PG64-22 $0.00 $72.30 $ N TON D-GR HMA(QCQA) TY-B PG70-22 $0.00 $94.00 $ N TON D-GR HMA(QCQA) TY-C SAC-B PG64-22 $53.15 $63.00 $ Y TON D-GR HMA(QCQA) TY-C PG64-22 $45.78 $ $ N TON D-GR HMA(QCQA) TY-C SAC-A PG70-22 $50.51 $95.00 $ N TON D-GR HMA(QCQA) TY-C SAC-B PG70-22 $0.00 $93.00 $ N TON D-GR HMA(QCQA) TY-C PG70-22 $57.50 $79.79 $ N TON D-GR HMA(QCQA) TY-C SAC-B PG76-22 $50.00 $69.47 $ N TON D-GR HMA(QCQA) TY-C PG76-22 $62.50 $62.50 $ Y TON D-GR HMA(QCQA) TY-D SAC-A PG64-22 $50.00 $78.34 $ Y TON D-GR HMA(QCQA) TY-D SAC-B PG64-22 $44.38 $ $ N TON D-GR HMA(QCQA) TY-D PG64-22 $52.00 $84.75 $ N TON D-GR HMA(QCQA) TY-D SAC-A PG70-22 $54.00 $ $ N TON D-GR HMA(QCQA) TY-D SAC-B PG70-22 $44.50 $ $ N TON D-GR HMA(QCQA) TY-D PG70-22 $56.00 $82.65 $ N TON D-GR HMA(QCQA) TY-D SAC-B PG70-28 $75.00 $81.40 $ Y TON D-GR HMA(QCQA) TY-D SAC-A PG76-22 $56.25 $81.16 $ N TON D-GR HMA(QCQA) TY-D SAC-B PG76-22 $50.68 $98.38 $ N TON D-GR HMA(QCQA) TY-D PG76-22 $85.00 $85.00 $ Y TON D-GR HMA(QCQA) TY-F SAC-A PG76-22 $80.00 $80.00 $ Y TON D-GR HMA(QCQA) TY-B SAC-B PG76-22 $48.00 $55.10 $ N TON D-GR HMA(QCQA) TY-C PG76-22 (LEVEL-UP) $63.93 $63.93 $ Y TON D-GR HMA(QCQA) TY-D PG64-22(LEVEL-UP) $43.00 $81.88 $ N TON D-GR HMA(QCQA) TY-D PG (LEVEL-UP) $ $ $ Y TON D-GR HMA(QCQA) TY-B PG76-22 $55.22 $55.22 $ Y TON D-GR HMA(QCQA) TY-B SAC-B PG64-22 $0.00 $ $ N TON PFC (ASPHALT) PG76-22 $0.00 $ $ N TON PFC (ASPHALT) A-R-BNDR $0.00 $0.00 $ Y TON PFC (AGGREGATE)(PG76 MIX) SAC-A $0.00 $81.63 $ N TON PFC (AGGREGATE)(PG76 MIX) SAC-B $68.00 $81.30 $ Y TON PFC (AGGREGATE)(A-R MIX) SAC-B $0.00 $0.00 $ Y TON PFC (ASPHALT) PG TR $ $ $ Y TON PRF-DSGN-MX SP-B PG64-22 $72.43 $72.43 $ Y TON PRF-DSGN-MX SP-C PG70-22 $72.00 $72.00 $ Y TON PRF-DSGN-MX SP-C SAC-A PG76-22 $59.00 $59.00 $ Y TON PRF-DSGN-MX SP-D SAC-B PG70-22 $66.00 $81.10 $ Y TxDOT 16 of 115
17 TON PRF-DSGN-MX CMHB-F SAC-A PG70-22 $82.50 $82.50 $ Y TON STONE-MTRX-ASPH SMA-C SAC-A PG76-22 $77.38 $77.38 $ Y TON STONE-MTRX-ASPH SMA-F SAC-A PG76-22 $82.00 $ $ Y TON MICROSURFACING $ $ $ Y SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") $23.98 $50.00 $ N SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") $3.90 $69.00 $ N SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(9") $15.00 $63.00 $ N SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") $25.30 $27.70 $ Y SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") $30.00 $76.30 $ N SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(14") $33.10 $ $ Y SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(16") $82.00 $82.00 $ Y SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") $14.00 $50.00 $ N SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(13") $53.00 $53.00 $ Y SY FLEXIBLE PAV STRUCTURE REPAIR (1.5") $19.70 $19.70 $ Y SY FLEX PAVE STRUCTURE REPAIR (8"-10") $15.00 $15.00 $ Y SY FLEXIBLE PAVEMENT STRUCTURE REPAIR(19") $35.00 $35.00 $ Y SY PLAN & TEXT ASPH CONC PAV(0" TO 2") $0.20 $6.58 $ N SY PLAN & TEXT ASPH CONC PAV(0" TO 3") $2.00 $8.00 $ Y SY PLAN & TEXT ASPH CONC PAV(2" TO 4") $1.51 $1.51 $ Y SY PLAN & TEXT ASPH CONC PAV(0" TO 6") $2.50 $2.50 $ Y SY PLAN & TEXT CONC PAV(0" TO 1") $3.50 $3.50 $ Y SY PLAN & TEXT CONC PAV(0" TO 1-1/2") $8.00 $18.10 $ Y SY PLANE ASPH CONC PAV(0" TO 1") $1.50 $1.50 $ Y SY PLANE ASPH CONC PAV(0" TO 2") $0.60 $7.50 $ N SY PLANE ASPH CONC PAV(0" TO 3") $0.77 $6.57 $ Y SY PLANE ASPH CONC PAV(2" TO 4") $1.36 $1.75 $ Y SY PLANE ASPH CONC PAV(0" TO 6") $0.30 $0.30 $ Y SY PLANE ASPH CONC PAV(0" TO 12") $1.50 $1.50 $ Y SY PLANE CONC PAV(0" TO 2") $2.64 $6.00 $ Y SY PLANE CONC PAV(0" TO 3") $1.26 $5.00 $ Y SY PLANE ASPH CONC PAV (1.5") $0.51 $6.30 $ N SY PLANE ASPH CONC PAV (8") $2.26 $2.26 $ Y SY PLANE ASPH CONC PAV (1") $1.06 $1.06 $ Y SY PLANE ASPH CONC PAV (2") $0.77 $4.55 $ N SY PLANE ASPH CONC PAV (2 1/2"-3") $1.04 $1.04 $ Y SY PLANE ASPH CONC PAV (3") $1.10 $1.25 $ Y TxDOT 17 of 115
18 SY PLANE ASPH CONC PAV (6") $1.17 $1.33 $ Y SY PLANE ASPH CONC PAV (0" TO 1 1/2") $0.64 $10.00 $ N SY PLANE ASPH CONC PAV (1 1/4") $1.00 $1.00 $ Y SY PLANE ASPH CONC PAV (4") $2.00 $2.00 $ Y SY PLANE ASPH CONC PAV (1" TO 3") $1.00 $1.00 $ Y SY PLANE ASPH CONC PAV (2 1/2") $1.06 $7.00 $ Y SY PLAN ASPH CONC PAV(0" TO 2.25") $4.50 $4.50 $ Y SY PLANE ASPH CONC PAV (2"-3") $0.60 $0.60 $ Y SY PLANE ASPH CONC PAV (0"- 2 1/2") $2.30 $2.30 $ Y SY PLANE ASPH CONC PAV (10") $2.40 $2.40 $ Y SY PLANE ASPH CONC PAV (1/2") $0.56 $0.56 $ Y SY PLANE ASPH CONC PAV(4.5") $1.20 $1.20 $ Y SY PLANE ASPH CONC PAV (2" TO 6") $0.87 $0.87 $ Y SY PLANE ASPH CONC PAV (2" TO 2.5") $1.00 $1.00 $ Y SY PLAN & TEXT ASPH CONC PAV (1.5") $2.10 $2.75 $ Y SY PLANE & TEXT ASPH CONC PAV (3") $3.45 $3.45 $ Y GAL ASPH BINDER(PG 64-22) $1.75 $6.00 $ N SY FABRIC $0.50 $2.00 $ N LF PAV JT UNDERSEAL (24") $6.00 $23.00 $ Y SY CONC PVMT (CONT REINF-CRCP)(8") $0.00 $ $ N SY CONC PVMT (CONT REINF-CRCP)(9") $29.63 $62.00 $ N SY CONC PVMT (CONT REINF-CRCP)(10") $25.00 $60.00 $ N SY CONC PVMT (CONT REINF-CRCP)(11") $35.00 $95.00 $ N SY CONC PVMT (CONT REINF-CRCP)(12") $0.00 $66.30 $ N SY CONC PVMT (CONT REINF-CRCP)(13") $30.00 $30.00 $ Y SY CONC PVMT (CONT REINF-CRCP)(15") $45.00 $53.90 $ N SY CONC PVMT (JOINTED-CPCD)(8") $46.00 $58.00 $ Y SY CONC PVMT (JOINTED-CPCD)(9") $28.61 $75.00 $ Y LF CURB (TYPE I) $1.00 $12.00 $ Y LF CURB (TYPE II) $0.52 $16.00 $ N SY CONC PVMT (CONT REINF-CRCP)(6") $34.85 $34.85 $ Y SY CONC PAV (JOINT REINF) (6") $65.00 $65.00 $ Y SY CONC PAV (JOINT REINF)(8") $43.21 $43.21 $ Y SY CONC PVMT (JOINTED) (SPL) (8") $43.54 $43.54 $ Y LF CURB (TYPE II-B) $50.00 $50.00 $ Y LF CURB (TYPE II-C) $40.00 $40.00 $ Y TxDOT 18 of 115
19 SY CONC PVMT (CONT REINF-CRCP)(HES)(8") $42.00 $68.00 $ Y SY CONC PVMT (CONT REINF-CRCP)(HES)(10") $35.00 $67.50 $ Y SY CONC PAV (CONT REINF CRCP)(9")(CL HES) $53.50 $72.00 $ Y SY CONC PVMT (JOINTED-CPCD)(10") MOD $37.85 $37.85 $ Y SY CONC PVMT (JOINTED-CPCD)(13")(CL HES) $54.95 $54.95 $ Y SY CONC PVMT (CONT REINF) (4") $25.45 $25.45 $ Y SY CONC PVMT (JOINTED)(15IN) $41.00 $41.00 $ Y SY FULL-DEPTH REPAIR CRCP (8") $ $ $ Y SY FULL-DEPTH REPAIR CRCP (9") $ $ $ Y SY FULL-DEPTH REPAIR CRCP (10") $ $ $ Y SY FULL-DEPTH REPAIR CRCP (11") $ $ $ Y SY FULL-DEPTH REPAIR CRCP (13") $ $ $ Y SY FULL-DEPTH REPAIR CRCP (15") $ $ $ Y SY FULL-DEPTH REPAIR CPCD (9") $ $ $ Y SY FULL-DEPTH REPAIR CPJR (15") $ $ $ Y SY FULL-DEPTH REPAIR CRCP (8"-14") $ $ $ Y SY FULL-DEPTH REPAIR CRCP (6") HES $50.00 $50.00 $ Y LF WIDE FLANGE PAVEMENT TERMINALS $ $ $ N LF ANCHOR LUGS PAVEMENT TERMINALS $0.00 $80.00 $ N LF JUNCTION TRANSITION TERMINALS $ $ $ Y CY STRUCT EXCAV $0.80 $9.00 $ N CY STRUCT EXCAV (BOX) $10.00 $16.71 $ N CY STRUCT EXCAV (PIPE) $1.03 $48.00 $ N CY STRUCT EXCAV (BRIDGE) $22.00 $23.00 $ Y CY CEM STABIL BKFL $0.00 $ $ N SY CUT & RESTORING PAV $20.45 $ $ N CY STRUCT EXCAV (SPECIAL) $12.50 $45.00 $ N SY CUT & RESTORING PAV (ASPH) $27.22 $54.00 $ N SY CUT & RESTORING PAV (CONC) $25.00 $52.00 $ N CY FLOWABLE BACKFILL $60.00 $ $ N CY FLOWABLE BACKFILL (MEDIAN) $ $ $ Y LF TRENCH EXCAVATION PROTECTION $0.01 $ $ N SF TEMPORARY SPL SHORING $0.10 $55.00 $ N SF SHEET PILING (PZ-27) $28.60 $28.60 $ Y LF STL H-PILING (HP 14 X 73) $79.00 $79.00 $ Y LF PRESTR CONC PIL (16 IN SQ) $40.00 $ $ N TxDOT 19 of 115
20 LF PRESTR CONC PIL (18 IN SQ) $44.85 $88.00 $ N LF PRESTR CONC PIL (20 IN SQ) $55.00 $55.00 $ Y LF PRESTR CONC PIL (16" SQ)(INSTALL ONLY) $40.00 $40.00 $ Y LF DRILL SHAFT (18 IN) $29.50 $ $ N LF DRILL SHAFT (24 IN) $43.45 $ $ N LF DRILL SHAFT (30 IN) $61.11 $ $ N LF DRILL SHAFT (36 IN) $84.31 $ $ N LF DRILL SHAFT (42 IN) $0.00 $ $ N LF DRILL SHAFT (48 IN) $ $ $ N LF DRILL SHAFT (60 IN) $ $ $ Y LF DRILL SHAFT (66 IN) $ $ $ Y LF DRILL SHAFT (72 IN) $ $ $ Y LF DRILL SHAFT (78 IN) $ $ $ Y LF DRILL SHAFT (NON-REINFORCED)(12 IN) $1.00 $80.00 $ N LF DRILL SHAFT (SIGN MTS)(12 IN) $47.85 $74.31 $ N LF DRILL SHAFT (SIGN MTS)(24 IN) $62.15 $ $ N LF DRILL SHAFT (SIGN MTS)(36 IN) $ $ $ Y LF DRILL SHAFT (SIGN MTS)(42 IN) $ $ $ Y LF DRILL SHAFT (SIGN MTS)(48 IN) $ $ $ N LF DRILL SHAFT (SIGN MTS)(54 IN) $ $ $ Y LF DRILL SHAFT (HIGH MAST POLE)(60 IN) $ $ $ Y LF DRILL SHAFT (HIGH MAST POLE)(66 IN) $ $ $ Y LF DRILL SHAFT (RDWY ILL POLE) (30 IN) $69.40 $ $ N LF DRILL SHAFT (TRF SIG POLE) (24 IN) $43.59 $ $ N LF DRILL SHAFT (TRF SIG POLE) (30 IN) $47.50 $ $ N LF DRILL SHAFT (TRF SIG POLE) (36 IN) $65.34 $ $ N LF DRILL SHAFT (TRF SIG POLE) (42 IN) $ $ $ N LF DRILL SHAFT (TRF SIG POLE) (48 IN) $ $ $ N LF DRILL SHAFT (144 IN) $1, $1, $1, Y LF DRILL SHAFT (120 IN) $1, $1, $1, Y LF DRILLED SHAFT (12 IN) $ $ $ Y CY CL A CONC (MISC) $ $1, $ N CY CL B CONC (FLUME) $ $ $ N CY CL C CONC (ABUT) $0.00 $2, $ N CY CL C CONC (BENT) $ $1, $ N CY CL C CONC (FOOTING) $ $ $ N TxDOT 20 of 115
Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)
General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND
More informationBids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)
General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS
More informationFederal Project No.: STP-007-8(154)
Schedule of Items Page: 2 Oversight/State Project : (NFO)0616-007-450, M501 Federal Project : STP-007-8(154) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 301 00110
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/05/2005
TIFICATION OF ADDENDUM ADDENDUM. 2 DATED 10/05/2005 Control Project Highway County 0049-09-064, ETC. CPM 49-9-64, ETC. BS 6-R, ETC. BRAZOS, ETC. Ladies/Gentlemen: Attached please find an addendum on the
More informationCITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court
46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND
More informationPROPOSAL. PROPOSAL OF, a corporation a
PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned
More informationSR 44 from US 441 / SR 500 to SR 44 / Orange Ave.
SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. Financial Project ID: 409870-1-52-01 LAKE COUNTY DESIGN ALTERNATIVE STUDY FOR MULTI-USE PATH Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION District
More informationTabulation of Bids. Counties:
Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT
More informationName Roads Station Distance Miles
Name Roads Station Distance Miles Saw Mill to San Mateo 62+00 to 135+00 1.382575758 San Mateo to Alamo 135+00 to 261+50 2.395833333 Alamo to NM 599 261+50 to 305+00 0.823863636 Sidewalk and Curb Only Rabbit
More informationAPPENDIX E Activity Defect Assignment
APPENDIX E Activity Defect Assignment Activity Defect Pct Applicable 2010-ML - SHALLOW PATCHING (STN - 2010-TL - SHALLOW PATCHING (STN - 2020-ML - DEEP PATCHING (STN - 2020-TL - DEEP PATCHING (STN - 2030-ML
More informationCOTTER MILL SITE SUMMARY - RML
COTTER MILL SITE SUMMARY - RML NRC Code Totals Estimated Cost Reference/ Index Table No. in table N/A GRAND TOTAL RML SURETY RML TOTAL $20,401,841 N/A N/A N/A GRAND TOTAL RAP SURETY RAP TOTAL $2,891,319
More informationEast Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study
East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092
More informationCITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS
001-099 100-199 200-299 Stormwater 300-399 400-499 500-599 600-699 700-799 800-899 Miscellaneous Sewers and Drains Streets Water Structures Earthwork Street Lighting and Traffic Signals Landscape and Irrigation
More information***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***
General Info Number: PROJECT NO. 43-16-03 Description: Deadline: BRIDGE DECK REPLACEMENT AND REHABILITATION, CLIFTON-GUNN ROAD OVER OHIO TURNPIKE M.P. 21.4, RUEGER-SHETLER ROAD OVER OHIO TURNPIKE M.P.
More informationRiverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)
Company Name Base Bid Schedule A Base Bid Schedule B Total COUNTY'S ESTIMATE 367,150.00 328,300.00 $695,450.00 1 All American Asphalt 481,360.00 108,180.00 $589,540.00 2 PTM General Eng Services, Inc.
More information2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS
CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use
More information4 GENERIC COST ESTIMATING TOOL
4 GENERIC COST ESTIMATING TOOL Table 4-1 presents a generic cost estimating tools that can serve as a conceptual planning tool for local jurisdictions to estimate the costs of pedestrian improvements.
More informationRiverside County Transportation Department Summary of Bids
COUNTY'S ESTIMATE R. J. Noble Company Orange, CA 92856 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 190101 ROADWAY EXCAVATION CY 8,500 16.00 136,000.00 9.50 80,750.00
More informationKansas Department of Transportation. Tabulation of Bids
Page 1 of 17 SECTION: 1 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020100 CONTRACTOR CONSTRUCTION STAKING 4 025600 FIELD OFFICE AND LABORATORY (TYPE A) 5 071554 CONCRETE FOR SEAL
More informationSECTION VII ROADWAY AND SITE IMPROVEMENTS
SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical
More informationMid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)
Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Sponsor St Peters Project No. RB19-000022 Project Type Other TOTAL FUNDING Total County Sponsor Federal $1,177,251.00 $238,179.00 $59,546.00 $879,526.00
More informationPAL Material Listing by Company. Material for Joints 1057
Material for Joints 1057 Dowel Bar Epoxy Ctd Gr80 1 1/2 Reporting Unit = each Nov 1, 2020 12:00:00 AM Formed Waterstop Plastic Waterstop Joint Material Reporting Unit = feet Nov 1, 2020 12:00:00 AM Concrete
More informationSept 23, 2014 LAB MANUAL
Sept 23, 2014 LAB MANUAL 1000.0 1000 STANDARD PRACTICES 1000.1 CALCULATIONS and FORMS Throughout this manual there are test calculation procedures. These calculations are provided so that a technician
More informationTabulation of Bids. Counties: Project(s):
Page: 1 14 ROTE 94, ROTE 46 TO OLD COACH RD Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 154003P MOBILIZATION 0007 157004M CONSTRCTION LAYOT 0012
More informationCORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology
Appendix F Technical Report on Cost Estimation Methodology This page is intentionally left blank. Technical Report on Cost Estimation Methodology The total costs of the projects in the Non-motorized Transportation
More informationOLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD
STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213
More informationTabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514
Page 1 of 17 18 HNTERDON ROTE 202,ALEXAKEN CREEK ROAD TO RT 179/CR514 Quantity and nits nit Price nit Price nit Price SECTION: 0001 ROADWAY 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS
More informationEXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016
EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE I. CONTRACTOR MOBILIZATION Golf Course Master Plan Implementation Date: December 1, 2016 Includes the contractor mobilizing on-site with equipment, materials
More informationCity of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate
City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate Project ID Project Category Project Name Qty/Len(Mi) Cost Estimate BB 1 Bike boulevard Jefferson Street or
More informationMPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017
MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 RECOMMENDED ACTION: Consider HSIP Candidate Projects for the FY2019-2022 TIP as Being Consistent
More informationTabulation of Bids. Counties:
Page 1 of 16 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 153011M TRAINEES 0007 154003P MOBILIZATION 0010 157004M CONSTRCTION LAYOT
More informationBID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT
CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,
More informationMNDOT PAVEMENT DESIGN MANUAL
MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -
More informationCDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.
CDBG HANDICAP RAMPS PROJECT NO. 1 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION 1 TITLE SHEET 2 SUMMARY OF QUANTITIES 3-4 DETAS 5-23
More informationBID TABULATION - WEDNESDAY, March 28, 2018, - PRIMARY ROAD SURFACING Allegan County Road Commission 1308 Lincoln Road Allegan, Michigan
PROJECT PH3512 - Otsego Township - On 21st Street, 102nd Avenue (west) to 101st Avenue, then east on 101st & 102nd Avenue to 16th Street - 2.96 miles Michigan Paving & Materials Reith-Riley PH3512 HMA
More informationStudy. Prepared for: Prepared by: 2335 American. River Drive, Suite 100
Watt Avenue at Rosevillee Road Pedestrian and Bicycle Access Feasibility Study Prepared for: Sacramento County Municipal Services Agency Department of Transportation Prepared by: 2335 American River Drive,
More informationODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
More informationRoad Usage Permit Application Form
15/06/2012 Road Usage Permit Application Form City Yards 1495 Hardy Street Kelowna, BC V1Y 7W9 Tel: (250) 469-8600 Fax: (250) 862-3330 PERMITS WILL BE APPROVED OR DECLINED WITHIN 5 BUSINESS DAYS. WORK
More informationTYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK
CURB EXPANSION JOINTS (TYP) BOULEVARD 5 t /4 TOOLED EDGES EXPANSION JOINTS (TYP) CONTRACTION JOINTS (TYP) 2 m (TYP) BOULEVARD CURB EXPANSION JOINTS (TYP) EVERY 6 m PLAN TYPICAL CONTRACTION JOINT CURB 12
More informationGENERAL LEGEND 12"CMP
PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET
More informationNorthside School Class I Bike Path, Cool, CA Application Attachments
PLHD Grant Application, 12/9/2011 County of El Dorado Department of Transportation Northside School Class I Bike Path, Cool, CA Application Attachments 1. Project Site Map 2. Auburn State Recreation Area
More informationADA Training Standard Plans
ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY
More informationJAP Additional Information Sheet
JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide
More information2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016
2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 27A34 81(ENCHANTED LANE) over CHANNEL DISTRICT: Metro COUNTY: Hennepin CITY/TOWNSHIP: Shorewood STATE: Minnesota Date of Inspection: Equipment Used: 09/07/2016
More informationS TREET (TO DADE ) BE IMPROVED. 96.3' - -, I I i---- , so. a - - r- - r - so. o, LOT 1 LOT 2 POND T.O.B (() I 100.0' I I LOT 3 !
- F - r-=-::--;;m11s.. THTHESE DRAWNGS CONSTRUCTON OTE: TD SOllE BE CONS DETAllS TYPCAL DH PlANS. AND NLY - NTT FOR PERMT OR El NOT BE R :tt eecce lll""' FAMLAR,_ EASBLJTY O.,."',_"'.,.. "' CTRONA DRVE
More informationCITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS
CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut
More informationCITY OF ROSEVILLE DESIGN STANDARDS
CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR
More informationRio Intersection Traffic Restrictions Begin Monday
May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September
More informationHospital Link Project Project Update November 2017
Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationLa Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle
La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas Mark Coyle Corpus Christi Navigation Channel PCCA La Quinta Expansion Project History Corpus Christi Ship Channel Improvement Projects
More informationReplace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00
30) Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 Quantity Unit Price Extension Section 1: Sanitary Manhole Rebilitation $581,301.80 100 Replace sanitary manhole casting (CITY
More informationReserve Study Navigation Options
Reserve Study Navigation Options Each of these buttons will navigate you to the corresponding sheet. On each sheet, there is a corresponding button to return to this sheet. Data Pages Reports and Graphs
More informationHigh Performance Racetracks
High Performance Racetracks Good for a Racetrack, Good for a Highway? 38 th Annual Rocky Mountain Asphalt Conference and Equipment Show Brian D. Prowell, Ph.D., P.E. Road Courses Advanced Materials Services
More informationPresented to: Louisiana Transportation Conference February 26, Presenter: Corey Zollinger, P.E
Presented to: Louisiana Transportation Conference February 26, 2018 Presenter: Corey Zollinger, P.E. - 1 - AGENDA What is Roller Compacted Concrete, Where has it Been Used, and Why? RCC Construction Process
More information2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 10 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency
2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 75501 CSAH 10 over POMME DE TERRE RIVER DISTRICT: District 4 COUNTY: Stevens CITY/TOWNSHIP: DARNEN STATE: Minnesota Date of Inspection: Equipment Used:
More informationSECTION 14: LANDSCAPING AND BEAUTIFICATION
SECTION 14: LANDSCAPING AND BEAUTIFICATION RULE 14.1 GENERAL PROVISIONS 14.1.1 The rules and guidelines contained in this section have been established to provide proper guidelines for the beautification
More informationNew Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007
New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way
More informationKansas Department of Transportation DISTRICT 1. Project(s): Max: Min:
Page 1 of 10 SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 070580 FLAGGER (SET PRICE) (1) LS (1) LS 1.000 HOUR 86,800.00000 86,800.00 3,375.50000
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66546 MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY SEPTEMBER 13, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationFGM ARCHITECTS Estimate of Probable Construction Cost Jun 14, 2016 PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#:
PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#: 16-2186.01 1.0 SITE DEVELOPMENT 1.1 Site Demolition 1 allowance 7,000 1.2492 8,745 1.2 Stormwater System exist impervious, volume control re 1 allowance
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationDownloaded from Downloaded from /1
VI SEMESTER FINAL EXAMINATION-2003 Q. [1] [a] Draw a right angle four-arm intersection of two roads and show various conflicts points if [a] both roads are with way movements, and [b] one road is with
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationGeneral Notes. Project No /15/2018 Page 1 of 1
5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationADOT Maintenance Data Collection Guide
ADOT Maintenance Data Collection Guide January 1, 2009 Prepared for Arizona Department of Transportation Prepared by Jani Demaree and Cambridge Systematics, Inc. 100 CambridgePark Drive, Suite 400 ADOT
More informationTEACHER. Days: 200 Days: 200. Placement Full Time Part Time
TEACHER Pay Table D Pay Table T0 Days: 200 Days: 200 0 44,491 42,485 1 44,936 42,910 2 45,385 43,340 3 45,843 43,925 4 46,463 44,517 5 47,092 45,141 6 47,751 45,840 7 48,492 46,551 8 49,244 47,273 9 50,007
More informationVICINITY MAP LONE TREE SELF STORAGE PARK MEADOWS FILING NO. 2, 21ST AMENDMENT, LOT 14E5A-3 WESTBROOK SPORTS AND ENTERTAINMENT DISTRICT PLANNED DEVELOP
VICINITY MAP PARK MEADOWS FILING NO. 2, 21ST AMENDMENT, LOT 14E5A-3 WESTBROOK SPORTS AND ENTERTAINMENT DISTRICT PLANNED DEVELOPMENT PLANNING AREA 7A 2.827 ACRES SIP #16-33 ITEM GROSS SITE AREA % OF GROSS
More informationTABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1
WHITE EPOXY REFLECTORIZED PAVEMENT STRIPES, 20 MILS ITEM 685.11 (FT) CL STATION ALIGN FROM TO SIDE DESCRIPTION FACTOR LENGTH (FT) E 18+62 62 18+79.19 RT STOP BAR 6 16.6 99.4 E 18+55 00 20+08.00 LT B KE
More informationDuke Street (Route 236) Over I Bridge Plan & Elevation
Duke Street (Route 236) Over I-395 - ridge Plan & Elevation ity of Alexandria Exist. sign structure supports on bridge fascia to be removed in 395 express lanes project Abutment A Sta. 102+03.02 E 41-1"
More informationUse of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA
Use of Roller Compacted Concrete By GDOT Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA First Use of RCC By Georgia DOT I-285 Atlanta, GA 2005 Traffic:
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationAccess requests to County streets and roadways are processed through one of the following methods:
13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.
More information2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency
2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 91725 CR 52 over CALDWELL BROOK DISTRICT: District 1 COUNTY: Koochiching CITY/TOWNSHIP: T - 151 R - 27 STATE: Minnesota Date of Inspection: Equipment Used:
More informationLake Waterford Community Association Meeting. November 15, 2016
Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements
More informationYAVAPAI COUNTY PUBLIC WORKS
YAVAPAI COUNTY PUBLIC WORKS PROVIDES ENGINEERING, ROADWAY MAINTENANCE, SOLID WASTE, AIRPORTS AND EMERGENCY MANAGEMENT SERVICES FLOOD CONTROL DISTRICT, SPECIAL DISTRICTS (EXCEPT ROAD IMPROVEMENT DISTRICTS)
More information"Emul Asph (SS-1HP) Tack".
Page 1 of 25 Application of Emulsified Asphalt, (fog seal 2-lane section). Using a distributor, uniformly apply fog seal to the rumble strip with two passes of the distributor, one in each direction of
More informationNew Mexico Transportation Funding Challenges
New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES
More informationCITY OF MEMPHIS, TENNESSEE
CITY OF MEMPHIS, TENNESSEE SEWER ASSESSMENT & REHABILITATION PROGRAM (SAR OLD LOOSAHATCHIE SANITARY SEWER INTERCEPTOR DIVERS 61 51 ELVIS PRESLEY BLVD. 240 JACKSON AVE. LAMAR AVE. 385 51 14 SUMMER AVE.
More informationR A M P U P! - City of Tacoma's Curb Ramp Installation Matrix
R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &
More informationDistrict Construction Projects
District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage
More informationDistrict 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID
77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20
More informationSpan-Wire Intersections Study SPAN-WIRE INTERSECTIONS STUDY. City of Naples Streets & Stormwater Department 1
SPAN-WIRE INTERSECTIONS STUDY City of Naples Streets & Stormwater Department 1 Intersection Traffic Control and Design Feasibility Analysis a.k.a Span-Wire Intersections Study Streets & Stormwater Department
More informationEmerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)
Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Presented to: APWA Nor Cal November 3 rd, 2016 Presenters: Jason Shykowsi, P.E., T.E. City of Roseville Debbie Haldeman RCC Council
More informationAPPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES
APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES 092775000 Carson City ADA Transition Plan 2015-03-25 Carson City ADA Transition Plan.docx March 2015 APPENDIX This page intentionally left blank.
More informationSUMMARY COSTS: (Please attach a detailed budget including all sources of recipient funding)
VIRGINIA SALTWATER RECREATIONAL FISHING DEVELOPMENT FUND SUMMARY PROJECT APPLICATION Please complete all fields. This page should be used as a coversheet for a detailed application. NAME AND ADDRESS OF
More informationInspector MUST Sign and Date Each Inspection
Work Area: Applicant: Mercer County Department of Transportation - Highways Division Application and Permit for Road Work in Mercer County, New Jersey NO. East Windsor Ewing Hamilton Hopewell Lawrence
More information1.3 Pedestrian Environments
SECTION 1: COMMERCIAL DEVELOPMENT 1.3 Pedestrian Environments Design Principle The quality of the pedestrian environment often defines the overall success of a commercial project. Attention to the development
More informationExisting conditions of each bridge and repair plan are presented in Table
2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road
More informationThis Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.
4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification
More informationPED (OLD TWNS RD) over OTTER TAIL RIVER
2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # L0885 PED (OLD TWS RD) over OTTER TAIL RIVER DISTRICT: District 4 COUTY: Otter Tail CITY/TOWSHIP: MAIE STATE: Minnesota Date of Inspection: Equipment Used:
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationTacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force
1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria
More informationWORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES
WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents
More informationJuly 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007
July 2007 NO. 0707 UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 Tex-207-F, Determining Density of Compacted Bituminous Mixtures. is now on-line at the TxDOT website. This test procedure was implemented effective
More information