Work Activity (e.g. Road Work): Work Location:.

Size: px
Start display at page:

Download "Work Activity (e.g. Road Work): Work Location:."

Transcription

1 Operate Tractor SAFE WORK METHOD STATEMENT Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN Ph: All personnel conducting this work MUST be made aware of these methods of control at toolbox meetings and/or prestart meetings before work commences, with on-site enforcement by the Site Supervisor. Person responsible for ensuring Phone Name Signature compliance with SWMS Person in Charge of Work Site Manager s Name Foot Protection Hearing Protection High Visibility Sun Protection Eye Protection Hand Protection Protective Clothing Respirator Risk Assessment To be completed by person in charge of worksite to determine overall level of Risk for Work Activity, once controls being put in place. Overall Work Activity Risk Assessment Likelihood Consequences Risk Score Warning: Under no circumstances are any other authorities (owners) utility services (electricity, gas, telephone, water, waste water etc) to be interfered with or moved without the authorities written consent. This SWMS Incorporates the Risks and Controls for working adjacent to a road or railway 1

2 CONTROLS AND IMPLEMENTATION (What are the hazards and Pre-Start Staff unaware of potential hazards/controls of job Plant damage Unservicable plant Untrained or unauthorised operators Lack of information provided to workers which may result in injury or illness Perform pre-start briefing to ensure all staff are fully aware of the scope of work before work commences. Ensure all persons have undertaken General Construction Industry induction (Blue/White Card). Ensure all equipment and/or Plant is maintained (prestart checks, log books etc) All lifting gear is checked and current tagged. Ensure lifting gear is adequately load rated. SAFE WORK METHOD STATEMENT Ensure all employees and contractors are trained and competent for the tasks to be completed. Ensure all persons have undertaken HSC and Site WH&S induction. Operators and Drivers hold relevant licence for Plant/Vehicle to be operated Add others (if necessary):. Hazard identification Hazards not identified or adequately assessed. Supervisor or person in control of work site will assess worksite in order to identify hazards. Supervisor or person in control of work site will identify any unusual or specific hazards associated with the work, such as other workers or people in the immediate vicinity Site occupancy restrictions and conditions, including access and egress, work schedules and emergency management arrangements, including emergency communication and evacuation plans will be identified. Hazards have been assessed Control measures implemented. If in doubt as to safety for the task, a second opinion may be required with an experienced operator, safety representative or WHS personnel. 2

3 (What are the hazards and General Site Safety Personal injury. Trauma. Struck by. Damage to plant and equipment. Noise Dust Lack of Vision Blind Spots All site personnel understand any safety zone or exclusion zone that applies. Personnel are not to approach the mobile plant while it is operating. Persons other than the operator do NOT ride on the mobile plant. Mobile plant is operated at appropriate speeds for the terrain. Blades and attachments are lowered before the operator leaves the mobile plant. Operator is alert to other plant and equipment movements on the site. Speed is reduced before brakes are applied. All persons to wear high visibility clothing when on site. Water truck to damp down work area when excess dust generated Hearing protection to be worn where necessary (be careful not to over-protect). Operator must be aware that there is restricted visibility to the rear of mobile plant due to height of cabin, engine size, air cleaner and exhaust location. Spotters to be used to monitor blind spots Ensure the P.P.E is rated or capable of the environment. Public Safety / Pedestrians Public may be at risk from injury or death from work. Injury or death from contact with moving plant/vehicles Keep unauthorised person out of the site. Pedestrian signage is to be installed. Install safety barriers where necessary. Instigate traffic management plans if necessary. Reduce vehicle speed around the work site. Where required, clearly signed alternative safe laneways shall be made available for pedestrians. Laneways crossing kerb and channelling shall have non slip ramps suitable for wheelchairs, baby strollers, pedestrian scooters and aged or disabled persons. Plan and use safe vehicle access. Schedule working hours so as to limit exposure to the public. 3

4 (What are the hazards and Unloading Mobile Plant from Low loader Loading mobile plant onto Low loader Uncontrolled plant movement, Low loader/trailer to park on level, firm surface, Wheels to be chocked on Low loader/trailer Mobile Plant to be secured on low loader/trailer using correct load restraint methods Refer to Load Restraint Guidelines Spotter to guide mobile plant off Low loader/trailer Risk Assessment (JSA) Working near Underground Power/Service s Damage to underground services electrocution Burns Use SWMS Working near electrical services Working near overhead powerlines Electrocution, Damage to infrastructure Use SWMS Working on or near energised electrical installations or services. Working mobile plant on embankments or sloping ground Rollover Stability of slope Mobile plant unable to move under own power Deposit spoil uphill, If possible work directly up and down slope, use a low gear, Supervisor or person in control of the work site to assess the degree of risk by considering: the work activity gradient of the slope the weather (if raining bank will most likely be very slippery Inspect work site for soft ground or sink holes Drive to conditions, avoid soft ground, leave till ground dries out Follow HSC recovery Procedure Spills Spoil not contained within work area, Noise, dust, spillage of Hazardous substances Containment devices may be necessary, Water trucks &/or spill kit at worksite (as appropriate), PPE 4

5 (What are the hazards and Servicing mobile plant Nips, pinch, crush Isolation procedures to be implemented, Safety observer required during servicing if machine operation is required, Communication (hand held radios/hand signals) All servicing to be carried out by competent person. Hazardous Substances used in mobile plant (Refuelling) Emergency Procedures Using mobile plant with attachments Using quick hitch on mobile plant Inhalation, ingestion, spills, Personal Injury: Attachments are not made secure, Operator accidentally releases quick hitch control, Safety pins are not inserted into locking pin Attachments are not made secure, Operator accidentally releases quick hitch control, Safety pins are not inserted into locking pin Operators must read and understand requirements of MSDS and be instructed in refuelling practices. Spill kit available. Develop and implement an emergency response plan for the site. Include assembly points communication responsible persons emergency contacts Ensure first aid equipment is provided Attachments are made secure with the use of safety pins. Operator is to check and ensure pin is installed correctly by placing the cutting edge of the bucket on the ground and crowding the bucket back and forth. Quick hitch control switch cover is locked in place Attachments are made secure with the use of safety pins Quick hitch control switch cover is locked in place. Operator is to check to ensure pin is installed correctly by placing the cutting edge of the bucket on the ground and crowding the bucket back and forth. 5

6 Driving to and from work site (What are the hazards and Vehicle Interaction Loose or unrestrained loads Equipment Damage Comply with QLD Road Rules Ensure all loads are restrained as per Load Restraint Guidelines Ensure windscreens and all glass is clean and there are no obstructions to vision Ensure the slasher and other attachments are at maximum height when travelling at road speed as the slasher could strike the road or other objects and cause the tractor to veer off course. Any power transmission equipment attached to a tractor for the purpose of driving another machine and every joint by which such equipment is linked, MUST be fitted with guards. Equipment Setup Equipment Damage Flying Machine Parts Severe Bodily Injury Sprains and Strains Sit in the seat and familiarise yourself with the controls Ensure that no people or obstacles are in the path of travel Secure or remove loose items from the cabin. Always disable/isolate hydraulics when disembarking from tractor Pre start check - complete prestart checklist and ensure that: Slasher and other attachments are checked prior to use and are in good working condition. Check the oil level and top up if necessary. Check the blade, skid plates, safety chains, etc. Ensure that all parts are safely secured to prevent them coming loose and striking the operator or other people. Check PTO (Power Take Off) cover and replace if damaged to prevent operator s clothing becoming caught Ensure PTO shaft and universal joints are in good condition (universal joints could collapse and PTO shaft break and parts strike operator). All spur and other toothed friction gearing of machinery must be effectively guarded so as to prevent danger or must be situated safely, as if it were guarded. Any transmission machinery, wheel or pulley, must be effectively guarded or be situated safely, as if it were guarded. Use correct manual handling techniques, team lifting or mechanical aids. 6

7 (What are the hazards and Undertake Slashing Operations Eye Injury Bodily Injury Tip Over/ Risk of Being Crushed Cuts/ Gashes Fire Hearing Damage Flying Debris Cuts\ Gashes Burns Slipping Sprains and Strains Survey the area to be slashed. Clear the area to be slashed of any obvious hazards, eg large stones, large twigs/ boughs from trees, wire. Select the correct height adjustment for the slasher for the task at hand. Fasten the seat belt Before starting motor, ensure transmission is in neutral and check throttle for proper operation. Ensure that all attachments are at a safe travelling height - NEVER move off with the bucket raised above eye level. Make another visual check to ensure that no people or obstacles are in the path of travel. Check the slope of the land, if applicable Check that all gauges, indicators and warning lights are operational. Sound the horn. Select the correct gear and move off. Proceed at a safe speed. A collision or rollover can occur quickly - even during routine manoeuvres such as turning and driving on hills or over obstacles In difficult terrain, ensure 4WD is engaged prior to moving off and that all equipment is at the lowest possible setting and the tractor is in the most appropriate gear. If hilly, the terrain must be traversed carefully. Proceed up and down and not across the side of the hill unless necessary. Where the tractor is only 2WD, brakes should NOT be applied when going down steep, slippery hills, as a rollover can occur. Should wire or other objects become caught in the blades - apply the brakes to tractor and switch off the motor. When the slasher is lifted to remove objects around blades, tractor motor must be off and slasher supported by jacks or stands Continually perform visual checks of the area and the slasher throughout the entire operation, as there could be a possibility of starting a fire. Use correct manual Handling Techniques, Team Lifting, and Mechanical Aids. 7

8 Working Adjacent to a Road or Railway Motor Vehicle Traffic Compliance with Manual of Uniform Traffic Control Devices (What are the hazards and Risk of injury or death from contact with motor vehicles. Risk of injury or death from contact with cranes or loads. Injury or death from contact with moving plant. Risk of injury or death from contact with motor vehicles. Risk of injury or death from being struck by rail traffic. Risk of injury or death from unauthorised traffic control. All work will comply with the Manual of Traffic Control Devices some of but not all are listed below SAFE WORK METHOD STATEMENT Ensure any control device applied does not become a potential hazard to workers or pedestrians or vehicles. Correct signage will be identified and displayed before work begins. Signage devices will be set up at correct distances. Signage devices will be set up at correct heights. Signage devices shall be clean and in good condition. Local speed shall be reduced to the required level (40 kph when clearance to traffic is less than 1.2m). Vehicle travelled path shall be clearly indicated Only accredited traffic controllers shall be used for traffic control. Traffic controllers shall have their tickets available on site. Traffic controllers shall be given 15 minute break every 2 hours. Only trained persons will be given responsibility for worksite signage. A Traffic Management Level 2 person shall authorise the site signage. Records should be kept for all work site signing and delineation identified and maintained. 8

9 (What are the hazards and Park vehicle clear of roadway. Vehicle warning device displayed (sight distance to device: >150m 60km/h or lower, > 250m elsewhere) Workers to wear Hi-Vis clothing. Observe safe manual handling techniques. Placement/ Removal /maintenance of signs Risk of injury or death from contact with motor vehicles. Face oncoming traffic, spotter should be used when necessary. Survey area for hazards: Bites/stings, slips/trips, weather Utilize footpaths/verges. Two-way communication utilised when necessary. No crossing of roads when carrying signage. Place signs as per MUTCD Part 3, in sequence, one side at a time. Supervisors monitor safe placement/removal of signs. Poor light, Long term works. Risk of injury or death from contact with motor vehicles Where long-term works exist (more than one shift) correct suitable delineation (e.g. Flashing lights or reflecting bollards) shall be installed and checked by a responsible person at the end of each shift. Workers operating in poor / low light conditions shall wear high visibility day / night garments. 9

10 (What are the hazards and Correct Clothing P.P.E. Risk of injury or death from contact with motor vehicles. Risk of injury or death from being struck by rail traffic. All workers shall wear high visibility garments that comply with the Manual for Uniform Traffic Control Devices. (Persons with faded garments shall wear reflective vests). Vests shall be correctly secured when worn. P.P.E. shall be identified and worn Inspections & On-going monitoring Other (please state) Ineffective control measures Control measures not being followed Changes to procedures substances used etc Any other Hazard/Risk not identified above. Random inspections are to be conducted by WHS personnel, WHSR, Site Supervisor or, the Project Officer. Ongoing risk assessments will be conducted during the project and discussed at toolbox meetings. The Site Supervisor is to hold regular Toolbox meetings to discuss changes to the workplace or identification of new hazards. 10

11 High Risk Construction Work SAFE WORK METHOD STATEMENT A separate Safe High Risk Construction Work that: Work Method Involves a risk of a person falling more than 2 metres Statement that Is carried out on a telecommunication tower identifies the Involves demolition of an element of a structure that is load bearing or otherwise task hazards, related to physical integrity of the structure. risks and the Involves, or is likely to involve, the disturbance of Asbestos. methods to Involves structural alterations or repairs that require temporary support to prevent control the risks collapse. is attached for Is carried out in or near a confined space. the work ticked Is carried out in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel. Involves the use of explosives. Is carried out on or near pressurised gas distribution mains or piping. Is carried out on or near chemical, fuel or refrigerant lines. Is carried out on or near energised electrical installations or services. Is carried out in an area that may have a contaminated or flammable atmosphere. Involves tilt-up precast concrete Is carried on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is used by traffic other than pedestrians. Is carried out in a workplace in which there is any movement of powered mobile plant. Is carried out in an area where there are artificial extremes of temperature Is carried out in or near water or other liquid that involves a risk of drowning. Involves diving work Other (please state) Review Hazard /Risk This SWMS has been reviewed for this particular construction project. Date of review:./ /. FURTHER ON-SITE CONTROLS Methods of Control Related Documents Work Health & Safety Act 2011 Work Health & Safety Regulation 2011 Manual of Traffic Control Devices (Part 3 work on roads) Traffic Management for Construction or Maintenance Work Code of Practice 2008 MUTCD Load Restraint Guidelines nd Edition QLD Driving Guide Have workers been consulted about this Safe Work Method Statement Y/ N 11

12 I/we will ensure the items listed in this Safe Work Method Statement will be put in place and complied with. Person/people responsible signature/s Name (Please print) Signature Date I have been consulted about this Safe Work Method Statement. Please Privacy Notice: In using this form you are providing personal information such as your name, initials, signature, certificate number and contact number. This information will be used for the purpose of acknowledgement of the Work Method Statement as required under the Work Health and Safety Regulations Your information may be given to other directorates or departments within Council and may be given to other Government agencies for activities which may be conducted as part of a workers compensation claim or as part of an investigation or audit. Your information is handled in accordance with the Information Privacy Act

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

Temporary load-bearing support for structural alterations or repairs

Temporary load-bearing support for structural alterations or repairs CRITICAL NOTE This document only becomes a Safe Work Method Statement where the High Risk Construction Work section of this document is completed Company: ABN: Contact Person: Ph: Project/Site: Principal

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

Safe Work Method Statement

Safe Work Method Statement Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

SAFE WORK METHOD STATEMENT SWMS No Version

SAFE WORK METHOD STATEMENT SWMS No Version SAFE WORK METHOD STATEMENT SWMS No Version Company Name: Hunter Readymixed Concrete Pty Ltd 00 004 Location: Thornton Cessnock Tea Gardens Gateshead ABN: 6 076 08 695 SWMS Developed By: Duane Harrison

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph: PCBU: ALL TRADES ABSEILING ABN: 42 137 576 035 PO Box 774 NEWPORT NSW 2106 LIC: 123517C P: 0412 227 578 Principal Contractor (PC): Date SWMS provided to PC: Work activity: Workplace location: High risk

More information

Appendix 4C - Sample SWMS Trenching

Appendix 4C - Sample SWMS Trenching Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :

More information

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015 Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039 Name Date Signature Author Jarred Hearle 27/11/2015 Reviewed FMG Site Team 27/11/2015 ---------- Approved Geoff Selfe 27/11/2015

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Operate Diesel Road Saw This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd

More information

BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control Learning Guide

BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control Learning Guide BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control BSB41412 Certificate IV in Work Health and Safety BSB41412-Learning-Guide-Sample-V2 BSB41412-Learning-Guide-Sample-V2

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Dogging of Crane General Loading and Unloading SWMS No. 20 Authorized

More information

WORK METHOD STATEMENT STRUCTURAL STEEL

WORK METHOD STATEMENT STRUCTURAL STEEL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH 07 3265 6537 M 0411 756 719 ABN 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-30

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT LOADING AND UNLOADING VEHICLES Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST Windmill Hazard Inspection Checklist WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST Authorised by: LOCATION OF INSPECTION...... Inspected By (1)........... (2)..... PRINT PRINT Signature (1):. (2)....

More information

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs Personnel Involved Manager Project Operators Assistant Notes re Operator/Off-Sider Training Allan McConnell In situ testing is a niche business with very few rigs in Australia. There are no specific training

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Traineeship Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE: DATE: / /

More information

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2

RISK ASSESSMENT. Bobcat Excavator. Models , (Series D & G) For. Version 1.2 PO Box 50, Hornsby, NSW 2077 Phone: 1800 643 853 Web: www.bobcat.com.au RISK ASSESSMENT For Bobcat Excavator Models 322 341, (Series D & G) CONTENTS Applicability Standards referenced in the preparation

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2

RISK ASSESSMENT. Bobcat Skid Steer Loader. Series F & G (incl. S Models) For. SSL Version 2 PO Box 50, Hornsby, NSW 2077 Phone: 1800 643 853 Web: www.bobcat.com.au RISK ASSESSMENT For Bobcat Skid Steer Loader Series F & G (incl. S Models) CONTENTS Applicability Standards referenced in the preparation

More information

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0 EF26 Risk Assessment Kubota U35-4 s Requiring Attention: AS AT Friday, 1 April 2016 0 Next Review Saturday, 1 April 2017 Total s Recorded 43 Critical Risk s 0 High Risk s 0 Moderate Risk s 10 Low Risk

More information

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT Personal Protective Equipment Foot Hearing High Visibility Head Eye Day Operations Normal Requirements: Safety footwear, hearing protection,

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible) Page 1 of 6 How to use the Assessment Charts 1. Determine the Likelihood on the Qualitative Assessment Process Chart (pick a letter applicable to the task). 2. Determine the Consequence on the Qualitative

More information

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS) WHS 017 - WHS 017 Hazard Register - Version 5.0 April 20 Doc No: WHS 017 Effective Date: 04/04/20 1 WORKING WITH EARTHMOVING PLANT/ TRUCKS/SITE VEHICLES COLLISIONS OTHER PLANT EQUIPMENT SITE VEHICLES PERSONNELL

More information

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0 EF26 Risk Assessment CAT Excavator Hazards Requiring Attention: AS AT Friday, 29 January 2016 0 Next Review Saturday, 28 January 2017 Total Hazards Recorded 39 Critical Risk Hazards 0 High Risk Hazards

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

Bogo Operations Pollution Incident Response Management Plan

Bogo Operations Pollution Incident Response Management Plan Bogo Operations Pollution Incident Response Management Plan Rhyolite Hard Rock Aggregate Quarry 134 Paynes Road BOOKHAM NSW 2582 PO Box 426 COWRA NSW 2794 p: 02 6227 7260 p: 02 6345 4253 e: info@bogoquarry.com.au

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

LEARNER GUIDE. Asphalt Paver (AP) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

LEARNER GUIDE. Asphalt Paver (AP) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396 LEARNER GUIDE Asphalt Paver (AP) PO Box 06 Mountain Gate VIC 3156 p: 03 9763 5449 ABN: 37 106 951 900 RTO: 1396 Asphalt Paver Safety Part One PERFORMANCE ASSESSMENT Unit 1 Conduct Routine Checks: 1. Routine

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT ACN: 141 20 591 ABN: 41 149 34 727 P: 07 3843 149 F: 07 3395 2083 A: U15, 8 Metroplex Avenue Murarrie Qld 4172 This SWMS has been prepared and authorised by Eagle Alliance Earthmoving Pty Ltd Date: Last

More information

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010) (Ref. SOP QMS-080; EHS-010) Form-445 Inspected by: Date of inspection Date of Report Report # Pages Area Manager: Area Inspected: General This EHS Workplace Inspection was conducted by: Scope of the Inspection:

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Working at eight SWMS No. 16 Authorized and email Signed by the (Managing

More information

Safe Work Method Statement (SWMS)

Safe Work Method Statement (SWMS) Safe Work Method Statement (SWMS) Organisation Details : Organisation Name Northern Plumbing Contact ABN 17 15 41 4 Position Director Address 47 Thomas Street Edgeworth 85 Phone Number 0411 10 4 Project

More information

LEARNER GUIDE. Trencher TS. PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

LEARNER GUIDE. Trencher TS. PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396 LEARNER GUIDE Trencher TS PO Box 2026 Mountain Gate VIC 3156 p: 03 9763 5449 ABN: 37 106 951 900 RTO: 21396 National Guidelines for OHS Competency Standards Trencher Safety PERFORMANCE ASSESSMENT Assessor

More information

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA RECOMMENDED ADDITIONAL CONTROLS TASK / ACTIVITY/ EQUIPMENT/ FACILITY HAZARDS UNWANTED EVENT MINIMUM CONTROLS REQUIRED RISK NO. LIKELI-HOOD CONSE-QUENCE RISK VALUE Project Risk Assessment Page 1 of 16 All

More information

Safe Work Method Statement Tasks

Safe Work Method Statement Tasks Safe Work Method Statement Tasks SWMS Venue: Date Created: Address: Contact: Adelaide and surrounding suburbs 23 rd August 2017 27 Valetta Rd Kidman Park SA 5025 Daniel Renshaw CONTROLLED DOCUMENT Page

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT ACN: 141 20 591 ABN: 41 149 34 727 P: 07 3843 149 F: 07 3395 2083 A: U15, 8 Metroplex Avenue Murarrie Qld 4172 This SWMS has been prepared and authorised by Eagle Alliance Earthmoving Pty Ltd Date: Last

More information

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK ConstructSafe Project Team March 2018 Version 1.3 1 Table of Contents 1. Introduction... 3 2. Candidate minimum required knowledge... 3

More information

Removing Frozen Clips

Removing Frozen Clips Removing Frozen Clips Warning You cannot undertake this activity in the rail corridor unless you have completed a pre work brief and work site protection plan. Reference should also be made to the Protocol

More information

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018 Contractor Company Details: BUILDSAFE SAFE WORK METHOD STATEMENT 0002 (Void Platform Stairs) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities & SWMS 0002 Void Platform) Additional

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

LEARNER GUIDE. Transporter Safety (TRO) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396

LEARNER GUIDE. Transporter Safety (TRO) PO Box 2026 Mountain Gate VIC 3156 p: ABN: RTO: 21396 LEARNER GUIDE Transporter Safety (TRO) PO Box 2026 Mountain Gate VIC 3156 p: 03 9763 5449 ABN: 37 106 951 900 RTO: 21396 ASSESSOR GUIDELINES GENERAL 1. Introduction 1.1 Scope As the Assessment Instruments

More information

SAFE WORK METHOD STATEMENTS

SAFE WORK METHOD STATEMENTS Recips 11/56 Norcal Road Nunawading Vic. 11 ABN: 48 04 075 70 Contact Person: Dean Spicer Contact Number: 9878 9006 SAFE WORK METHOD STATEMENTS for Format 1 Various Service Clients for Service work and

More information

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4

SWMS No 009 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 4 Samark North Qld Pty Ltd SWMS Manual SWMS No 009 Samark North Qld Pty Ltd ABN : 99 082 98 87 Electrical Contractors License C72 Page 2 of Safe Work Method Statement Title: SWMS:009 Confined Space Work

More information

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/ Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041 Name Date Signature Author Geoff Selfe 25/01/2016 Reviewed Solomon Site 25/01/2016 ----- Approved Michael Garkaklis 25/01/2016 Key Safety Acts Complete

More information

Risk Assessment Form (Qualitative)

Risk Assessment Form (Qualitative) Assessment Form (Qualitative) Project / ocation:..d.a.s WATERS Contract No: RA & Issue No: 008 Prepared by:.r.smit Date: 10/10/16 Signature: ACTIVITY DESCRIPTION: Person (s) at risk: General Ground works

More information

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process: Initiators of JSEAs are responsible for consulting the Project Supervisor,

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS Project: (insert Client) Replacement/ Repair of high level light units/ high

More information

SAFE WORK METHOD STATEMENT Part B

SAFE WORK METHOD STATEMENT Part B SAFE WORK METHOD STATEMENT Part B SWMS No.: 01 WORK ACTIVITY DESCRIPTION: Door Installation All FORESEEABLE OHS & ENVIRONMENTAL HAZARDS & RISKS ASSOSSIATED WITH THE WORKS MUST BE ASSESSED & ALLOCATED CONTROLS

More information

GOLDEN SAFETY RULES AFT DR

GOLDEN SAFETY RULES AFT DR GOLDEN SAFETY RULES The Golden Safety Rules exist to keep you safe Your safety and the safety of your workmates is paramount. The Golden Safety Rules exist, above all else, to keep you safe. Since we adopted

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Use of a Mobile Elevated Work Platform (MEWP) Boom SWMS No. 19 Authorized

More information

Our commitment to safety

Our commitment to safety 2 Our commitment to safety At South East Water, we have an absolute commitment to achieving and maintaining a safe and healthy workplace for our people, including our contractors and stakeholders which

More information

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details. SAFE WORK METHOD STATEMENT Part 1 Company Details Company Name: ABN: Contact Name, Position and Phone number: Address: Project details Project: Area: Job Address: Job Description: Activity: Installation

More information

Buchanan. Approved: John Downes

Buchanan. Approved: John Downes Severity Site triio Activity Vacuum Excavator Persons conducting assessment SHEQ DEPT Assessment No triio 21 Review Date 11/01/2021 Revision No. 10 Name: Paul Disley/Ian Buchanan Signature Date: 11/01/2019

More information

Minimum Safety Requirements for Contractors Working on Railway Property

Minimum Safety Requirements for Contractors Working on Railway Property Minimum Safety Requirements for Contractors Working on Railway Property Effective_ April 1, 2007 Introduction Canadian Pacific is committed to provide a Safe and Healthy working environment for all Railway

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Entanglement Hired From All Master Hire Stores Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

Potential risk of injury to staff

Potential risk of injury to staff Register Fire, Earthquake - other Emergencies Manual Handling and Repetitive Work Repetitive, Forceful Work Poor Housekeeping Not Wearing PPE (Personal Protective Equipment) Potential risk of injury to

More information

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6 Samark North Qld Pty Ltd SWMS SWMS No 0 Samark North Qld Pty Ltd ABN : 99 08 98 87 Electrical Contractors License C37 Page of 6 Safe Work Method Statement Title: SWMS:0 INSTALLING LIGHT POLES Work Method

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

Contractor OHS Induction. AOHS-05-GUI September 2016

Contractor OHS Induction. AOHS-05-GUI September 2016 Contractor OHS Induction AOHS-05-GUI-002 8 September 2016 1 About AQWEST AQWEST is a Government Trading Enterprise responsible for supplying drinking water to Bunbury. Formed in 1906 as the Bunbury Water

More information

SAFE WORK METHOD STATEMENT CARPENTER

SAFE WORK METHOD STATEMENT CARPENTER HOST EMPLOYER DECLARATION I declare the worker/s named on this work authority have been provided with a site specific safety induction that complies with the requirements of the Workplace Health & Safety

More information

WORK METHOD STATEMENT CARPET LAYING

WORK METHOD STATEMENT CARPET LAYING ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

TLILIC2001 Licence to Operate a Forklift Truck

TLILIC2001 Licence to Operate a Forklift Truck Learner Name: Learner ID: Learner Contact Number: Learner Email Address: Date Training Commenced: This Book Contains: Course Information. Review Questions. The following review questions are to be completed

More information

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147

Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147 Safety Audit / Risk Assessment Of Hino 2 Tonne Dutro Tipper Kennards Hire Building I, 22 Powers Road Seven Hills. NSW 2147 Mark Zimmer Unit 3, 16 Herbert St, Equipment manager Artarmon. NSW 2064 Ph: (02)

More information

University College Dublin Machinery/Equipment Risk Assessment Template

University College Dublin Machinery/Equipment Risk Assessment Template 1. General Information Name of Person(s) carrying out assessment and their position Principal Investigator / Supervisor / Head of School or Unit (Person responsible for ensuring safety) Date of assessment

More information

Safety Checklist for Events Held at Hillbrook

Safety Checklist for Events Held at Hillbrook Safety Checklist for Events Held at Hillbrook Hazards/ Issues or Tasks 1. EVENT ACCESS AND EGRESS Entry / Exit areas are kept clear and accessible. For an evening event, that you have appropriate Lighting.

More information

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide RIIWMG203D Drain and Dewater Civil Construction Site Table of Contents 1.1 Introduction... 3 1.1.1 Drainage and Dewatering... 3 1.2 Site Policies and Procedures... 5 1.3 Work Instructions... 6 1.3.1 Reading

More information

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE. TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Using Angle Grinders SWMS No. 8 Authorized and email Signed by the

More information

The Sample Company Pty Ltd

The Sample Company Pty Ltd Job Safety and Environmental Analysis (JSEA) / Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process Initiators of SWMSs are responsible for consulting the Project Supervisor,

More information

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014

Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028. Name Date Signature. Author Jarred Hearle 30/11/2014. Reviewed John Nulty 30/11/2014 Garbex Drum Crusher Safe Work Procedure PTES_HSE_SWP_028 Name Date Signature Author Jarred Hearle 30/11/2014 Reviewed John Nulty 30/11/2014 Approved Geoff Selfe 01/12/2014 Key Safety Acts Complete a 5

More information

Material Lift Risk and Hazard Management

Material Lift Risk and Hazard Management Material Lift Risk and Hazard Management Models GH 3.8 Safe 136 kg Maximum 3.80 m GH5.6 Working 113 kg Lifting 5.60 m LL Load (kg) 91 kg Height (m) 1.70 m GL-4 227 kg 1.80 m GL-8 181 kg 3.06 m GL-10 159

More information

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING Personal Protective Equipment Foot Hearing High Visibility Head Eye Face Hand Protective Clothing Breathing Normal Requirements: Safety footwear, hearing

More information

ANSI A Work Zone Safety for Highway Construction. Scott Schneider, CIH and Travis Parsons Laborers Health and Safety Fund of North America

ANSI A Work Zone Safety for Highway Construction. Scott Schneider, CIH and Travis Parsons Laborers Health and Safety Fund of North America ANSI A10.47-2009 Work Zone Safety for Highway Construction Scott Schneider, CIH and Travis Parsons Laborers Health and Safety Fund of North America Agenda Introductions History Overview of the Standard

More information

Construction Site Safety

Construction Site Safety Construction Site Safety May 17, 2017 Robert Balsavich MNOSH Compliance Principal Safety Investigator Minnesota OSHA MNOSHA Mission Statement: To assure that every worker in the state of Minnesota has

More information

Isolation Lockout and Tagging

Isolation Lockout and Tagging PURPOSE To define the minimum system requirements for isolation of plant and equipment from hazardous substances, mechanical, electrical or other energy sources to protect all workers from personal injury

More information

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG 4034 ABN 45 081 359 613 Phone: 07 3265 6537 Mobile: 0411 756 719 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS

More information

Safe Work Method Statement

Safe Work Method Statement ABN 4 65110 0 BERWICK VIC 06 Mob: 044 6 45 Date: Principal Contractor: Project Name: Project Address/Location: Commencement Date: Duration of Work: Scope of Work (Outlines the scope of the work that is

More information

Potential hazards People at risk and how? Actions already in place Further action required Action by

Potential hazards People at risk and how? Actions already in place Further action required Action by Risk Assessment Flat Roof Repair Prepared by Oracle Managed Services For: BAM FM On: 24/02/2017 Review date: N/A Potential hazards People at risk and how? Actions already in place Further action required

More information

Static, Hazard & Risk Assessment of Mobile Plant

Static, Hazard & Risk Assessment of Mobile Plant Static, Hazard & Risk Assessment of Mobile Plant Company Name ELITE ROADS Make / Model SAKAI TS160-2 Meter Reading: 477 Multi-Wheel Roller Plant Registration or ID. OU-047 Assessed by GREG CORNELL 03 9763

More information

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA)

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA) Matrix Assessment Date: 15.2.2011 Consequences Likelihood or Probability Plant Type: CRANE Plant Make: TADANO Plant Model: TL250E Fleet: 281 Plant Serial No. 335347 Assessment Facilitated by: A WHEELER

More information

Plant Hazard Identification and Risk Assessment

Plant Hazard Identification and Risk Assessment Plant information Plant item: Water Truck Plant identification details (asset/plant no.): Project: Competency required to operate the plant: MR/HR Licence / VOC List all legislation, codes of practice

More information

Control of Energy - Isolation Process

Control of Energy - Isolation Process Issue Date: 24/03/17 Last Reviewed: 24/03/17 Next Review Date: 24/03/18 Authorised By: Mike Muir Safe Operating Procedure Control of Energy - Isolation Process Purpose: This SOP is based on a Generic 12-step

More information

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry 1 of 8 level: 3 credit: 7 planned review date: October 2006 sub-field: purpose: Civil Works and Services This unit standard is a component of the selfregulation system for operations in the civil infrastructure.

More information

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with? 1. What is the top priority when working on Canadian Pacific (CP) property? A. Production B. Safety C. Quality D. Project deadline 2. When working on CP property what must all Contractors comply with?

More information

Suitability of Work Equipment

Suitability of Work Equipment These regulations came into effect on the 5th December 1998 and replace PUWER 1992. They cover almost all equipment used at work, including tool box tools such as hammers, knives etc. They also cover machinery

More information

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

Cranes and Hoists. Elevating Work Platforms ASSESSMENT Cranes and Hoists Elevating Work Platforms ASSESSMENT Part 1 Part 2 Performance Oral/Written June 1995 Contents Page Assessor guidelines general guidelines for Schedule B i Part one Performance Assessment

More information

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT Prepared for:- Date:- Work Scheduled:- SCOPE OF WORK Carry out installation of flow meters / pressure sensors. Installation of flow meter procedure

More information

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE Office of Environmental Health & Safety CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE LOCK OUT/TAG OUT OSHA 29 CFR 1910.147 rev. 3 2014 Director of Environmental Health & Safety Control of Hazardous Energy

More information

Revision 4. Review Date 1 Septrmber 2014

Revision 4. Review Date 1 Septrmber 2014 SERIES Page 1 of 9 Description: Toyota Series Skid Steer Loader. SDK, SDK5, SDK8 and SDK10. Material Structure: A steel framed, internal combustion powered / hydraulic boom arm which allows the driver

More information