1 North Buckhead Civic Association Recommendations For Wieuca Road October 7, 2009

2 Blank Page Page 2 of 16

3 Table of Contents 1. BACKGROUND 4 2. TRAFFIC SIGNALS AND ALL WAY STOPS 5 3. SPEED LIMITS AND SPEED ENFORCEMENT 7 4. SIDEWALKS 8 5. CROSSWALKS OTHER SCHOOL SAFETY AND TRAFFIC CALMING CHANGES DECISION FOR SUPPORT OF STUDENT PEDESTRIANS AT LORIDANS DRIVE SUMMARY AND PRIORITY 15 Related Documents EXHIBIT A. NBCA Traffic Committee Student Pedestrian Analysis, 8/28/09. This document identifies the student population living within one mile of the school and contains maps showing their walking path to the school under several different scenarios. EXHIBIT B. NBCA Wieuca Road Survey, 9/27/09. This 130-page report analyzes 336 resident responses to survey questions about Wieuca Road. The report documents substantial neighborhood support for a number of improvements along the road needed to provide safe use of the new school campus. Note: Referenced exhibits are available on-line at IMPORTANT NOTE In this report, items needed for safe initial school operation, including sufficient speed calming, are shown in this shade of dark red. Page 3 of 16

4 1. BACKGROUND Wieuca Road is a 2 mile road, generally running in a SSE NNW direction with significant curves and some hills. Alternative routes are Roswell Road and Peachtree Dunwoody Road. All intersections are 3 way. No traffic signals or stop signs currently exist in the two mile stretch between Roswell Road and Phipps Boulevard. The road between Phipps Boulevard and Roswell Road is entirely residential (single family and low rise condominiums) except for several hundred feet near Roswell Road. The campus is close to GA 400 but there are no ramps in this area. Traffic volumes are heavy since Wieuca is a cut through for business traffic and is the preferred street for many area North Buckhead residents who commute to and from the neighborhood. No MARTA service is in place on Wieuca Road. The campus area is situated in a curvy part of Wieuca Road and sight distances are limited. Traffic speeds in the campus area are problematic and effective enforcement is required. Wieuca Road (green highlight) and important intersecting streets. Page 4 of 16

5 2. TRAFFIC SIGNALS AND ALL WAY STOPS Overall Traffic Flow Plan for Wieuca Campus Area #1 & #2: Synchronized traffic signals on Wieuca at Whittington Drive and at Ivy Road. ALTERNATIVE #A: In lieu of Needs #1 and #2, buy right of way for dedicated left turn lane on southeast bound Wieuca Road and install a single pedestrian traffic signal and crosswalks at the school driveway. This alternative would also require a railing along the sidewalk on the west side of Wieuca Road because of steep terrain. The new school s driveway is quite long and traffic backups into Wieuca Road due to insufficient stacking space on the driveway should be uncommon. We understand a decision has been made by the City not to buy additional property that a dedicated turn lane would require. So traffic will not be able to turn left into the new school s driveway; otherwise Wieuca would be routinely blocked by left turning school traffic. Accordingly, traffic needing to reach the school from the northwest must loop around so they can approach the school from the southeast. The loop will involve a right turn at Whittington Drive, a left turn at a stop sign onto Ivy Road. Because of the limited sight distances at the Wieuca/Ivy intersection, a traffic signal will be required. The signal should be triggered by traffic on Ivy Road and by pedestrian buttons and should be synchronized with a corresponding signal at Whittington. Once traffic leaves the school, it will turn right only during high traffic hours since no signal will be located at the driveway. So, traffic needing to travel southeast on Wieuca will also need to loop on Whittington to Ivy to Wieuca. In order turn left from Wieuca onto Whittington, the traffic signal mentioned above will be required. The Whittington signal should also be pedestrian actuated. Without this pair of synchronized traffic signals, pedestrian traffic will not be safe and vehicle traffic will be gridlocked. Flow into the campus requires pedestrian/traffic-actuated signals Flow out of new campus requires pedestrian/traffic-actuated signals Page 5 of 16

6 Pedestrian/vehicle needs at Loridans Drive #3: Vehicle and pedestrian actuated traffic signal on Wieuca at Loridans. Traffic flow at Wieuca and Loridans is problematic. Traffic accidents are fairly frequent, though seldom serious. The flow on Wieuca is much heavier than on Loridans, so a traffic signal is preferred over an all way stop. Pedestrians have no safe way to cross Wieuca since sight distance is limited in both directions and speeding is common. Pedestrian/vehicle needs at West Wieuca Road #4: 3 way stop signs at Wieuca and West Wieuca. Every afternoon, significant stacking of traffic occurs on southeast bound West Wieuca. There is limited pedestrian traffic today, but when the sidewalk is extended on the east side of Wieuca, pedestrians will need assistance. Consideration should be given to providing a yield sign for right turning West Wieuca bound traffic on westbound Wieuca. Page 6 of 16

7 3. SPEED LIMITS AND SPEED ENFORCEMENT Wieuca Road #5: Increase the speed limit from 25 MPH to 30 MPH on Wieuca Road from Peachtree Road to Roswell Road. The current speed limit is 25 MPH and speed enforcement is blocked by the GDOT. The GDOT will not permit radar enforcement of the speed limit since it believes the road s design speed is considerably higher. Since speeding is seen as a threat to the safety of pedestrians, especially student pedestrians, and is a nuisance to Wieuca Road residents. West Wieuca Road #6: Decrease the speed limit from 35 MPH to 30 MPH on West Wieuca Road from Wieuca Road to Roswell Road. The current speed limit is 35 MPH. This is the only non urban surface street internal to North Buckhead that has a limit that high. Since it leads from Roswell to Wieuca, it sets expectations that speed limits will stay high and will undermine attempts to calm traffic. Speed limits for connecting roads in similar environments should be consistent. Page 7 of 16

8 4. SIDEWALKS Upgrade/repair existing sidewalks on west side of Wieuca Road. #7: Provide wide pedestrian assembly area along the street at the Wieuca Road/Whittington Drive intersection on a west corner adjacent to the crosswalk. A fence along Wieuca should be considered adjacent to assembly area. The assembly area is needed at Whittington Drive for students to assemble before crossing Wieuca Road when the signal changes. A fence should be considered to keep children from being shoved from the crowded area into the street. #8: Provide wide pedestrian assembly area along the street at the Wieuca Road/Ivy Road intersection on a west corner adjacent to the crosswalk. A fence along Wieuca should be considered adjacent to assembly area. The assembly area is needed at Ivy Road for students to assemble before crossing Wieuca Road when the signal changes. A fence should be considered to keep children from being shoved from the crowded area into the street. #9: Provide safe pedestrian passage on west side of Wieuca Road at Little Nancy Creek (between Mountain Way and Loridans Drive). This improvement is necessary for many students to be able to walk to school. Options: pedestrian bridge or barrier on street to protect pedestrians. A specific solution must be found for a safe pedestrian path crossing over Little Nancy Creek on the west side of Wieuca Road in the area just north of the Mountain Way intersection. Currently, pedestrians have no sidewalk at the creek and must walk in the street with vehicles moving by just inches away. This is unacceptable, especially for young children. This is a path a number of students identified in Exhibit A (NBCA Traffic Committee Student Pedestrian Analysis) will need to follow. Bridge over Little Nancy Creek has NO sidewalk on west side VERY DANGEROUS! Page 8 of 16

9 #10: Provide safe pedestrian passage on west side of Wieuca Road at Nancy Creek (between Wieuca Overlook and West Wieuca Road). Options: pedestrian bridge or barrier in street to protect pedestrians. A specific solution must be found for a safe pedestrian path crossing over Little Nancy Creek on the west side of Wieuca Road in the area just north of the Mountain Way intersection. Currently, pedestrians have no sidewalk at the creek and must walk in the street with vehicles moving by just inches away. This is unacceptable, especially for young children. This is a path a number of students identified in Exhibit A (NBCA Traffic Committee Student Pedestrian Analysis) will need to follow. Bridge over Nancy Creek has NO sidewalk. Dangerous for student pedestrians and wheelchairs. #11: Repair broken sidewalks on the west side of Wieuca Road from Phipps Boulevard to Roswell Road. (Several locations.) #12: Eliminate gaps where sidewalks have not been built on the west side of Wieuca Road. (Several locations.) #13: Much of the existing sidewalk on the west side of Wieuca Road has no 18 vegetated buffer strip. Install fences or safety barriers at the pavement on the west side of Wieuca Road between Herrington Drive and Whittington Drive and between GA 400 and Statewood Road. New sidewalks of east side of Wieuca Road #14: New sidewalk on east side of Wieuca Road from Wieuca Terrace to the Pinecrest Road alignment with at least 18 (preferably much wider) vegetated safety buffer. Existing sidewalks, including the segment between Statewood Road and GA 400, with no vegetated buffer or areas adjacent to leftbearing traffic (North Ivy Road area, Mountain Way to Loridans area) must have fence or safety barrier. (Please consider a solution that: i) provides space for pedestrians and bikes by narrowing Wieuca Road pavement, ii) combines existing bike lanes to off pavement, extra wide sidewalk/bike path, and iii) has a 5+ foot wide vegetated buffer with a vehicle barrier or fence.) See RED on map. #15: New sidewalk on east side of Wieuca Road from Phipps Boulevard to Wieuca Terrace and from West Wieuca Road to Roswell Road with at Page 9 of 16 Sidewalks needed on the east side of Wieuca

10 least 18 (preferably much wider) vegetated safety buffer. Existing sidewalks with no vegetated buffer must have fence or safety barrier. (Please consider a solution that: i) provides space for pedestrians and bikes by narrowing Wieuca Road pavement, ii) combines existing bike lanes to offpavement, extra wide sidewalk/bike path, and iii) has a 5+ foot wide vegetated buffer with a vehicle barrier or fence.) See BLUE on map. #16: Evaluate the feasibility of new sidewalks in the area with challenging topography on east side of Wieuca Road from Mountain Way to West Wieuca Road with at least 18 (preferably much wider) vegetated safety buffer. Existing sidewalks with no vegetated buffer must have fence or safety barrier. (Please consider a solution that: i) provides space for pedestrians and bikes by narrowing Wieuca Road pavement, ii) combines existing bike lanes to off pavement, extra wide sidewalk/bike path, and iii) has a 5+ foot wide vegetated buffer with a vehicle barrier or fence.) See GREEN on map. There is substantial neighborhood support that sidewalks should be erected on the east side of Wieuca Road as necessary to provide continuous sidewalks from Peachtree Road to Roswell Road. Expedited completion of sidewalks is required from Wieuca Terrace on the south to Loridans Drive on the north is needed to facilitate student access to the new school campus. Because of the proximity of the traffic moving along Wieuca Road, all sidewalks should include a wide vegetated strip and/or a fence of other barrier to increase the safety of pedestrians, especially young children. #17: Repair broken sidewalks on the east side of Wieuca Road from Phipps Boulevard to Roswell Road, especially around the GA 400 bridge. Page 10 of 16

11 5. CROSSWALKS Crosswalks needed on Wieuca Road for operation of the new campus: #18: Marked crosswalk across Wieuca Road at the northwest side of the Wieuca Road/Whittington Drive intersection. #19: Marked crosswalk across Wieuca Road at the southeast side of the Wieuca Road/Ivy Road intersection. These crosswalks are needed as part of the pedestrian flow for students walking to the new school campus. #20: Marked crosswalk (shown in black) across Wieuca Road at the northern side of the Wieuca Road/Loridans intersection. This crosswalk is needed for the school if sidewalks are not available from Loridans to the school on the east side of Wieuca Road. #21: Marked crosswalk (shown in green) across Loridans Drive at the eastern side of Wieuca Road at the Wieuca Road/Loridans intersection when sidewalks are built from Loridans to Mountain Way. This item should be implemented only with #16. These crosswalks are needed for the new school since a large number of students who may be denied bus service live on or off of Loridans Drive. Other students walk from Rickenbacker Way. Crosswalk needed on side street (Lakemoore Drive): #22: Marked crosswalk on Lakemoore Drive at Wieuca. This is a very difficult intersection and the pedestrians need the protection of a marked crosswalk. Page 11 of 16

12 Crosswalks needed for convenience of adult pedestrians and traffic calming: #23: Marked crosswalk at North Stratford Road. #24: Marked crosswalk at North Ivy Road. #25: Marked crosswalk at Pinecrest Road. #26: Marked crosswalk at West Wieuca Road. The installation of new painted crosswalks at the following Wieuca intersections: North Stratford Road (southern intersection), North Ivy Road, and Pinecrest Road. These crosswalks would be in areas of adequate sight distance in both directions and are needed as a traffic calming feature and adult pedestrian convenience, and are not needed by or intended for elementary school student pedestrians. Such crosswalks will convey to passing motorists that the area being traveled through is a neighborhood with enough pedestrians that caution is warranted. NBCA believes that these crosswalks will be extensively used by adult pedestrians, while not significantly impeding traffic flow. Being a readily visible traffic calming measure, these crosswalks will also help to alleviate the high levels of anxiety that exists among many citizens who live along Wieuca. These residents are concerned that while the City is increasing the speed limit to enable speed enforcement, the City is unwilling to take other reasonable and effective measures to calm traffic and average speeds will just go up. Page 12 of 16

13 6. OTHER SCHOOL SAFETY AND TRAFFIC CALMING CHANGES #27: Radar smart signs approaching school zone. #28: School zone signs #29: Update speed limit signs to show the revised speed limit. Please add Speed limit strictly enforced signs under signs at the perimeter of the neighborhood. Page 13 of 16

14 7. DECISION FOR SUPPORT OF STUDENT PEDESTRIANS AT LORIDANS DRIVE There is a choice which must be made. Referring to page 9 of 14 of Exhibit A, NBCA Traffic Committee Student Pedestrian Analysis, 8/28/09: This page shows that 18 student pedestrians seeking to get to the new campus may arrive at the east side of the Loridans Drive/Wieuca Road intersection and that may arrive, mainly from Rickenbacker Way, at the west side of the Loridans Drive/Wieuca Road intersection. This totals to 25.5 students who have to come down one side of Wieuca or the other, between Loridans Drive and Mountain Way. Both sides are challenging. On the west side is the Little Nancy Creek bridge, which has no sidewalk and is unacceptably dangerous to pedestrian children this can be solved by performing item #9, described on page 6 of this report. If the pedestrian bridge or sidewalk is built on the west side of Wieuca, the 18 children arriving at Loridans would have to cross Wieuca to reach the school on the sidewalks on the west side of Wieuca Road. Note: This option is assumed in the prioritycolor coding of the following two pages. On the east side is a usable and safe sidewalk across the Little Nancy Creek bridge, but challenging terrain to build sidewalks this can be solved by performing the new sidewalks in #16 and the new crosswalk in #21. If these new sidewalks are built on the east side of Wieuca, the 7.5 children arriving on the west side of the Lordians intersection would cross Wieuca to the east side of the street and join the 18 children from the east side and walk down the new sidewalks. 1 How do you get half a student? These numbers are for the student population at Sarah Smith in the 2008/9 term, divided by two, since roughly half we be attending the new campus, half the old. Since this analysis deals with a typical year s attendance, the total population, an odd number, is divided by 2. Page 14 of 16

15 8. SUMMARY AND PRIORITY Important note: Items for safe initial school operation, including speed calming are shown below in dark red. TRAFFIC SIGNALS AND ALL WAY STOPS #1 & #2: Synchronized traffic signals on Wieuca at Whittington Drive and at Ivy Road. ALTERNATIVE #A: In lieu of #1 and #2, buy right of way for dedicated left turn lane on southeastbound Wieuca Road and install a single pedestrian traffic signal and crosswalks at the school driveway. This alternative would also require of a railing along the sidewalk on the west side of Wieuca Road because of steep terrain. #3: Vehicle and pedestrian actuated traffic signal on Wieuca at Loridans. #4: 3 way stop signs at Wieuca and West Wieuca. SPEED LIMITS AND SPEED ENFORCEMENT #5: Increase the speed limit from 25 MPH to 30 MPH on Wieuca Road from Peachtree Road to Roswell Road. #6: Decrease the speed limit from 35 MPH to 30 MPH on West Wieuca Road from Wieuca Road to Roswell Road. SIDEWALKS #7: Provide wide pedestrian assembly area along the street at the Wieuca Road/Whittington Drive intersection on a west corner adjacent to the crosswalk. A fence along Wieuca should be considered adjacent to assembly area. #8: Provide wide pedestrian assembly area along the street at the Wieuca Road/Ivy Road intersection on a west corner adjacent to the crosswalk. A fence along Wieuca should be considered adjacent to assembly area. #9: Provide safe pedestrian passage on west side of Wieuca Road at Little Nancy Creek (between Mountain Way and Loridans Drive). This improvement is necessary for many students to be able to walk to school. Options: pedestrian bridge or barrier on street to protect pedestrians. #10: Provide safe pedestrian passage on west side of Wieuca Road at Nancy Creek (between Wieuca Overlook and West Wieuca Road). Options: pedestrian bridge or barrier in street to protect pedestrians. #11: Repair broken sidewalks on the west side of Wieuca Road from Phipps Boulevard to Roswell Road. #12: Eliminate gaps where sidewalks have not been built on the west side of Wieuca Road. #13: Much of the existing sidewalk on the west side of Wieuca Road has no 18 vegetated buffer strip. Install fences or safety barriers at the pavement on the west side of Wieuca Road between Herrington Drive and Whittington Drive and between GA 400 and Statewood Road. #14: New sidewalk on east side of Wieuca Road from Wieuca Terrace to the Pinecrest Road alignment with at least 18 (preferably much wider) vegetated safety buffer. Existing sidewalks, including the segment between Statewood Road and GA 400, with no vegetated buffer or areas adjacent to left bearing traffic (North Ivy Road area, Mountain Way to Loridans area) must have fence or safety barrier. 2 2 Please consider a solution that: i) provides space for pedestrians and bikes by narrowing Wieuca Road pavement, ii) combines existing bike lanes to off pavement, extra wide sidewalk/bike path, and iii) has a 5+ foot wide vegetated buffer with a vehicle barrier or fence. Page 15 of 16

16 #15: New sidewalk on east side of Wieuca Road from Phipps Boulevard to Wieuca Terrace and from West Wieuca Road to Roswell Road with at least 18 (preferably much wider) vegetated safety buffer. Existing sidewalks with no vegetated buffer must have fence or safety barrier. 1 #16: Evaluate the feasibility of new sidewalks in the area with challenging topography on east side of Wieuca Road from Mountain Way to West Wieuca Road with at least 18 (preferably much wider) vegetated safety buffer. Existing sidewalks with no vegetated buffer must have fence or safety barrier. 1 #17: Repair broken sidewalks on the east side of Wieuca Road from Phipps Boulevard to Roswell Road, especially around the GA 400 bridge. CROSSWALKS #18: Marked crosswalk across Wieuca Road at the northwest side of the Wieuca Road/Whittington Drive intersection. #19: Marked crosswalk across Wieuca Road at the southeast side of the Wieuca Road/Ivy Road intersection. #20: Marked crosswalk across Wieuca Road at the northern side of the Wieuca Road/Loridans intersection. This crosswalk is needed for the school if sidewalks are not available from Loridans to the school on the east side of Wieuca Road. #21: Marked crosswalk across Loridans Drive at the eastern side of Wieuca Road at the Wieuca Road/Loridans intersection when sidewalks are built from Loridans to Mountain Way. This item should be implemented only with #16. #22: Marked crosswalk on Lakemoore Drive at Wieuca. This is a very difficult intersection and the pedestrians need the protection of a marked crosswalk. #23: Marked crosswalk at North Stratford Road. #24: Marked crosswalk at North Ivy Road. #25: Marked crosswalk at Pinecrest Road. #26: Marked crosswalk at West Wieuca Road. OTHER SCHOOL SAFETY AND TRAFFIC CALMING CHANGES #27: Radar smart signs approaching school zone. #28: School zone signs. #29: Update speed limit signs to show the revised speed limit. Please add Speed limit strictly enforced signs under signs at the perimeter of the neighborhood. Page 16 of 16

Chapter 4.3 Enterprise Elementary. Volusia County MPO. March Page 7.0

Chapter 4.3 Enterprise Elementary. Volusia County MPO. March Page 7.0 Chapter 4.3 Enterprise Elementary Enterprise, FL Volusia County MPO March 2008 Page 7.0 Volusia County MPO Bicycle and Pedestrian School Safety Review Study Introduction Enterprise Elementary School is

More information

GA 400 Trail Follow up Survey. Contents

GA 400 Trail Follow up Survey. Contents GA 400 Trail Follow up Survey (Related to December 2012 North Buckhead Newsletter) Contents Page Section 1 Report from survey software 2 8 Section 2 Free text responses by survey takers 9 15 Section 3

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Coweta Community Overview Coweta Coweta, a residential community located in Wagoner County, is a suburb of Tulsa situated southeast of the metropolitan area

More information

North Avenue Rail Station Accessibility Assessment

North Avenue Rail Station Accessibility Assessment North Avenue Rail Station Accessibility Assessment Joel Anders, Arnaud Huguet, and Alex Poznanski 30 July 2012 Table of Contents EXECUTIVE SUMMARY... 1 MISSION STATEMENT... 2 INTRODUCTION... 2 CROSSWALKS

More information

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA June 13, 2016 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 959811 RE: Fire Station 14 (DR16-128) Dear Mr.

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

Wieuca Road Survey. Narrative Comments

Wieuca Road Survey. Narrative Comments Wieuca Road Survey Narrative Comments Contents Description Length Page # Question: 4 Narrative Responses Comments 4 pages 2 Question: 5 Narrative Responses Comments 4 pages 6 Question: 9 Narrative Responses

More information

10/30/2012 VIA

10/30/2012 VIA 10/30/2012 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: The Cannery On-Site

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report July 5, 2017 Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report 1 Walkabout Report Introduction On April 28, 2017, City, School, and SAWMPO staff met to conduct a Safe Routes

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering

More information

LTAC: Katie Mencarini, Central & Hampton Roads streets and a fifteen minute debrief to discuss the findings. Participants walked along Mill Road

LTAC: Katie Mencarini, Central & Hampton Roads streets and a fifteen minute debrief to discuss the findings. Participants walked along Mill Road Walkabout Summary On June 3, 2013, five participants met at Glen Allen Elementary School in Glen Allen, Virginia to take a closer look at the walking and biking network around the school. In addition to

More information

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_ AGENDA ITEM SUMMARY AGENCY: City Council MEETING DATE: June 25, 2012 DEPARTMENT: Community Dev PREPARED BY: T Spade DEPT. DIR. APPROVAL: MJ CITY MGR. APPROVAL: LR PRESENTED BY: T Spade TITLE: RECEIVE REPORT

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 8, 2006 Date: June 29, 2006 SUBJECT: Approval of Spring Traffic-Calming Projects C. M. RECOMMENDATION: 1. Approve traffic-calming projects

More information

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations

More information

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

8/31/2016 VIA  . RE: Freeport Arco Fuel Station (P16-039) 8/31/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Freeport Arco Fuel Station (P16-039)

More information

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the

More information

9/21/2016 VIA . RE: The Knot (DR16-270)

9/21/2016 VIA  . RE: The Knot (DR16-270) 9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:

More information

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013 Sunnybrae Elementary School Walking and Bicycling Audit JUNE 2013 San Mateo-Foster City School District C/CAG City/County Association of Governments of San Mateo County SUNNYBRAE ELEMENTARY SCHOOL WALKING

More information

MEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive

MEMORANDUM. Discussion of the planned crosswalk improvement on Mount Vernon Road near Stratham Drive MEMORANDUM To: From: Mayor and City Council Michael Smith, Public Works Director Date: August 24, 2015 Subject: Discussion of the Mount Vernon Road Crosswalk Improvement ITEM DESCRIPTION Discussion of

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/7/2013 VIA  . RE: University Village Safeway Expansion (P13-019) 5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

Pedestrian Road Safety Audit

Pedestrian Road Safety Audit Pedestrian Road Safety Audit Middlebrook Road From Father Hurley Boulevard to Waring Station Road December 2017 Montgomery County Department of Transportation Table of Contents 1. Introduction... 1 1.1

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Glenpool Community Overview Glenpool Glenpool is a city of nearly 12,000 residents located in Tulsa County southwest of Tulsa and Jenks. The city is growing

More information

5 Transit & Traffic. Overview

5 Transit & Traffic. Overview 5 Transit & Traffic Overview Montgomery Place s roadways and overall traffic circulation are unique in the city due to the narrow streets and avenues with boulevards; however, no sidewalks or curbs in

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

City of Vallejo Traffic Calming Toolbox

City of Vallejo Traffic Calming Toolbox City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1) Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

Neighborhood Pedestrian Safety and Traffic Calming Study

Neighborhood Pedestrian Safety and Traffic Calming Study Neighborhood Pedestrian Safety and Traffic Calming Study for the area bounded by Foster Avenue, Bedford Avenue, Farragut Road and Ocean Avenue Flatbush, Brooklyn, New York prepared by Michael King, miking@trafficcalmer.com

More information

TRAFFIC ACTION PLAN. North Shoreview Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. North Shoreview Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN North Shoreview Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations

More information

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug 2017 Crosswalk Guidelines Warrants for Uncontrolled Crosswalk Locations Crosswalks at Midblock Locations

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer 10A DATE: October 5, 2016 TO: PREPARED BY: SUBJECT: Pedestrian and Bicycle Advisory Committee Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer Discussion and Provide Comments, Associated

More information

Summary of Comments Public Information Meeting Wieuca Road at Phipps Boulevard Intersection Improvements June 7, 2017

Summary of Comments Public Information Meeting Wieuca Road at Phipps Boulevard Intersection Improvements June 7, 2017 The Public Meeting for the Wieuca Road at Phipps Boulevard Intersection Improvement project was held on at the Wieuca Road Baptist Church, located at 3626 Peachtree Road, Atlanta, GA 30326. There were

More information

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Chapter 3.9 Timbercrest Elementary School. Volusia County MPO. November 2008

Chapter 3.9 Timbercrest Elementary School. Volusia County MPO. November 2008 Chapter 3.9 Timbercrest Elementary School Deltona, FL Volusia County MPO November 2008 Volusia County MPO School Bicycle and Pedestrian Review Study, Phase 3B School Summary Timbercrest Elementary School

More information

San Rafael School District. Task Force Meeting Notes. November 5, 2012

San Rafael School District. Task Force Meeting Notes. November 5, 2012 San Rafael School District Task Force Meeting Notes November 5, 2012 Attendees (8) Wendi Kallins Program Director for Safe Routes to Schools; Laura Kelly Volunteer Liaison for Safe Routes to Schools; Leslie

More information

11/28/2016 VIA

11/28/2016 VIA 11/28/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, Ca 95811 RE: Natomas Corporate Center Commercial Building

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

Improvements Infrastructure Gap Assessment and Improvements Street Striping

Improvements Infrastructure Gap Assessment and Improvements Street Striping Infrastructure Project Proposal The federal-aid Safe Routes to School program funds infrastructure/engineering projects that fall into two categories: Design (available only to School Development Authority

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives. TECHNICAL MEMORANDUM Albany - Washington Avenue Traffic Calming Evaluation Matrix of Conceptual Alternatives Date: May 17, 2017 Project #: 17356 To: Aleida Andrino-Chavez From: Laurence Lewis, Sara Muse,

More information

Midtown Rail Station Accessibility Assessment N4

Midtown Rail Station Accessibility Assessment N4 Midtown Rail Station Accessibility Assessment N4 Joel Anders, Arnaud Huguet, and Alex Poznanski 15 August 2012 Table of Contents EXECUTIVE SUMMARY... 1 MISSION STATEMENT... 2 INTRODUCTION... 2 CROSSWALKS

More information

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

3/10/2016 VIA th Street, Suite 203 Sacramento, CA 3/10/2016 VIA EMAIL Arwen Wacht, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Natomas Fountains (P16-012) Dear Ms. Wacht:

More information

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

11/3/2014 VIA  . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the 11/3/2014 VIA EMAIL Antonio Ablog Planning Department City of Sacramento 300 Richards Boulevard Sacramento, CA 95811 RE: Design Review for Stockton and T Mixed-Use (P14-042) Dear Mr. Ablog: WALKSacramento

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive Byron Avenue Traffic Calming Design Sherbourne Road to Island Park Drive Public Meeting Thursday June 16, 2016 Our Lady of Fatima Parish 153 Woodroffe Avenue 6 9pm 1 Project Summary Area Projects Background

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

3.1 TRAFFIC CALMING PROCESS SUMMARY

3.1 TRAFFIC CALMING PROCESS SUMMARY SECTION 3 3.0 TRAFFIC CALMING 3.1 TRAFFIC CALMING PROCESS SUMMARY Traffic calming is a means in which to reduce speeds and minimize vehicular traffic on local neighborhood streets. Citizen involvement

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

DEPARTMENT OF PUBLIC WORKS Carroll County, Maryland

DEPARTMENT OF PUBLIC WORKS Carroll County, Maryland DEPARTMENT OF PUBLIC WORKS Carroll County, Maryland Prepared by the Bureau of Engineering 225 North Center Street, Room 221, Westminster, MD 21157 (410) 386-2157 e-mail: trafficcalming@ccg.carr.org http://ccgovernment.carr.org/trafficcalming

More information

Arts Center Rail Station Accessibility Assessment

Arts Center Rail Station Accessibility Assessment Arts Center Rail Station Accessibility Assessment Joel Anders, Arnaud Huguet, and Alex Poznanski 25 July 2012 Table of Contents EXECUTIVE SUMMARY... 1 MISSION STATEMENT... 2 OVERVIEW... 2 CROSSWALKS AND

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

180 Grand Avenue, Suite x117 Dowling Associates, Inc. 180 Grand Avenue, Suite 250 510.839.1742 x117 Oakland, CA 94612 510.839.0871 fax www.dowlinginc.com mbowman@dowlinginc.com Dowling Associates, Inc. Date: Memorandum To: CC: From: Ms. Leah Greenblat City

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Study Area April 9 Public Meeting Comments Summary Pedestrian Safety - A Walking Neighborhood Pedestrian traffic is very difficult A need

More information

3.1 TRAFFIC CALMING PROCESS SUMMARY

3.1 TRAFFIC CALMING PROCESS SUMMARY SECTION 3 3.0 TRAFFIC CALMING 3.1 TRAFFIC CALMING PROCESS SUMMARY Traffic calming is a means in which to reduce speeds and minimize vehicular traffic on local neighborhood streets. Citizen involvement

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

SAFE ROUTES TO SCHOOL

SAFE ROUTES TO SCHOOL SAFE ROUTES TO SCHOOL Forest Ridge Elementary School Existing Conditions and ACTION PLAN > Oak Creek - Franklin Joint School District Table of Contents CONTEXT Enrollment Boundaries

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

6/14/2013 VIA  . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814 6/14/2013 VIA EMAIL Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd RE: Sacramento Natural Foods Co-Op (P13-025) Dear Mr. Compton: WALKSacramento appreciates

More information

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC

More information

9/22/2014 VIA . RE: Butano Apartments Pre App (PAMP )

9/22/2014 VIA  . RE: Butano Apartments Pre App (PAMP ) 9/22/2014 VIA EMAIL Surinder Singh, Senior Planner Planning and Environmental Review Division Sacramento County 827 7th Street, Second Floor RE: Butano Apartments Pre App (PAMP2014-00012) Dear Mr. Singh:

More information

POLICY FOR NEIGHBORHOOD TRAFFIC CALMING

POLICY FOR NEIGHBORHOOD TRAFFIC CALMING POLICY FOR NEIGHBORHOOD TRAFFIC CALMING I. STATEMENT OF PURPOSE This policy provides a procedure for the consideration, evaluation and implementation of requests for traffic calming measures. II. DEFINITIONS

More information

Community Transportation Plan

Community Transportation Plan Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The

More information

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

5/31/2016 VIA  . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 5/31/2016 VIA EMAIL Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: El Pollo Loco (P16-028) Dear Ms. Wacht: WALKSacramento has reviewed

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Traffic Signal Phasing Study Summary & Staff Recommendations

Traffic Signal Phasing Study Summary & Staff Recommendations Traffic Signal Phasing Study Summary & Staff Recommendations Consultant Study by Skipper Consulting, Inc. Staff Committee Recommendations by Randy Pewitt, Executive Director of Emergency Mgt. and Safety

More information

Monroe Street Reconstruction

Monroe Street Reconstruction Total participants: 45+ Monroe Street Reconstruction Cross Section Workshop Notes September 29, 2016, Wingra School Workshop Orientation, Technical and Functional Considerations: The workshop began with

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

3.9 Recreational Trails and Natural Areas

3.9 Recreational Trails and Natural Areas 3.9 Recreational Trails and Natural Areas 3.9.1 Introduction Parks and other recreational facilities such as trails, bicycle routes, and open space are important community resources. This section discusses

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

James Williams Middle School 915 Acacia Lane

James Williams Middle School 915 Acacia Lane James Williams Middle School 915 Acacia Lane Grades Served: 6 th -8 th Student Geography According to an address analysis of students, 36.7% of students attending JWMS live within 2 miles of school (see

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

10/8/2014 VIA  . RE: CVS Pharmacy (P13-002) Revised August 2014 10/8/2014 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: CVS Pharmacy

More information