1 Gregory Gendron (RPIO) Wednesday, October 11 th 2018
2 2 The team provides approval to ensure that effective traffic management solutions are implemented to minimise disruption of planned events and major capital works.
3 3 Clint Cooper RPI Manager Bruce King - RPI Co-Ordinator, North Andrew Reilly RPI Officer Tim Lam RPI Officer Matt Barnsley RPI Officer Michael Priest RPI Co-Ordinator, South and Perth Stadium Event Management Gregory Gendron RPI Officer Brett Robson RPI Officer
4 4 Any of the following scenarios: Alteration to the traffic signal display e.g. masking of signals, flashing yellow etc.; Closure of a traffic lane within 30m of a signalised intersection
5 5 Closure of any part of a signalised dedicated turning lane; or Impacts to the signalised pedestrian crossings Variations to Standards or Codes of Practice (on Main Roads) See section of the Code of Practice for more information
6 6 Site specific traffic management plan RTM endorsement Local Government Agency review with acceptance or approval Variations signed by appropriate body which may be the LGA if they are the road authority RPI review does not commence until all of the above criteria are satisfied All submissions shall be submitted to
7 7 Have the necessary approvals/endorsements been obtained? Is the proposed solution reasonable with respect to timing/volumes and signal operation? Is it likely that manual modifications to the signals will be required (signal phasing/timing changes)? Are signal loops likely to be damaged? Are there any conflicts between banned turning movements and signalised right/left turn lanterns? Does the TMP contain any proposed detours that will impact upon the wider network? What are the impacts of the aftercare treatment on the operation of the traffic signals?
8 8 Timeframes for approval: State Controlled roads 15 business days prior to works commencing. Local Government roads through traffic signals 15 days prior to the work commencing. TMP s sent to Main Roads shall have RTM endorsement and be authorised by the relevant Local Government. See section of the Code of Practice for more information Complex projects/events will require additional time
9 9 Indicates first cone on the road not complete setup
10 10 Provide advice and feedback to stakeholders Issue approved LM drawings Consult with SCATS Team Inform Main Roads Communications Team Relay closure information to the Traffic Signal Operators Provide support to the Road Network Operations Centre (RNOC) Control Room staff Arrange audits of high risk/impact work activities Check for conflicting work Investigate non-compliance or underperformance of companies registered with the TMCRS
11 11 RPI administers the Traffic Management Company Registration Scheme The main objectives of the registration scheme are to: Improve the quality and consistency of traffic management on site Increase the safety of the public and road workers Raise industry standards and improve industry image Establish feedback mechanisms and tangible consequences for companies that fail to implement correct traffic management.
12 12 Each company is issued with a unique registration number Permits TM implementation on Main Roads controlled assets Portfolios are kept to highlight performance issues There are consequences for substandard performance Please explain requests Face to face meetings with company officers Suspension or deregistration are possible Remember that the company implementing the controls bears the responsibility!
13 13 Registered Companies* 3% 1% 24% 39% Traffic Management Contractor Local Government State Government Main Roads ISA 33% * As of September 17, 2018
14 14 Size of signs/readability Traffic assessments Accuracy More than TFD/SCATS data in Appendix Timing of work 9:00am-3:00pm Variations Notes in title blocks Staging of work
15 15 Sign sizes must be large enough to be read so that they can be effectively implemented.
16 16 7am 8am = 379 vehicles Missed 616 vehicles! Assume a lane closure of one of the 2 NB lanes on approach to the signals
17 17 Beware of turning lanes without detectors when conducting a traffic flow assessments.
18 18
19 19
20 20
21 21 Quality of risk assessments TMP Templates care of use Dates of work no 4 week windows for a 2 day job Complete submissions all required approvals/documents Mobile Works vs. Static Worksites RapidPlan sign libraries Neatness counts - Perception Accuracy Correct times, dates 24 Hour Clock
22 22 Secure facility located at 2 Victoria Ave Phone number remains Should be retired addresses have changed
23 23 Road works Projects Signal Reviews North LGA s South LGA s Main Roads Totals:
24 24 Sector Number of Projects Infrastructure Delivery Directorate - Main Roads 91 Metropolitan Region - Main Roads 63 Local Government Agencies 153 Public Transport Authority 18 Utility Service Providers 188 Other Roadworks 113 General Construction 138
25 25 Events Events Examples Optus Stadium 41 AFL, Cricket, Concerts, etc. General 66 Australia Day, ANZAC Day, Run for a Reason, City to Surf, Christmas Pageant Totals: 107
26 26 1. Wanneroo Rd Widening Joondalup Dr to Flynn Dr 2. Wanneroo Rd and Joondalup Dr Interchange 3. Wanneroo Rd and Ocean Reef Rd Interchange 4. Mitchell Fwy NB Widening Hutton St to Karrinyup Rd 5. Mitchell Fwy SB Widening Cedric St to Vincent St 6. New Lord St Project 7. Northlink Stages 1, 2 and 3 8. Reid Hwy Widening Altone Rd to West Swan Rd
27 27 1. Murdoch Dr Connection 2. Kwinana Fwy NB Widening Bolderwood to Farrington Rd 3. Karel Ave Upgrade 4. Smart Freeways Kwinana Fwy NB 5. Kwinana Fwy NB Widening Russell Rd to Bolderwood Res 6. Armadale Rd to North Lake Rd Bridge Project 7. Metronet Thornlie to Cockburn Link 8. Armadale Rd Upgrade Tapper Rd to Anstey Rd 9. Kwinana Fwy SB On-ramp from Manning Rd
28 28 1. Cedric St Bridge Work 2. Karrinyup Shopping Centre Redevelopment 3. Innaloo Shopping Centre Redevelopment 4. Mount St Pedestrian Bridge Concrete Mast Replacement 5. Ashton Ave Bridge Replacement 6. Wildflower Capital Initiative 7. Causeway Closure Waterbank Development
29 29 If the activity is within 30m of traffic signals RPI approval is required Submissions must be complete prior to being assessed Sufficient time to process the plan and provide necessary notifications (minimum 15 working days) is imperative to the success of the process Significant events or work will require additional approval time
30 Thank You Any Questions?
31 31 Will the activity have an impact upon pedestrian movements? Conversely, will pedestrian movements impact upon traffic movements? For example: The entire traffic stream has been reduced to one lane on approach to the traffic signals, and; there is a fully protected pedestrian crossing which under the temporary traffic control arrangement will result in the entire stream being delayed for 12 seconds. If there are impacts to the signalised pedestrian crossings, have safe pedestrian detours been provided?
32 32
gaf traffic 2015 capability statement
gaf traffic 2015 capability statement www.gaftraffic.com.au INTRODUCING GAF TRAFFIC GAF Traffic is a people-centred traffic engineering consultancy serving new and existing projects in Western Australia.
More informationCity of Perth Cycle Plan 2029
Bicycling Western Australia s response City of Perth Cycle Plan 2029 2012-2021 More People Cycling More Often ABOUT BICYCLING WESTERN AUSTRALIA Bicycling Western Australia is a community based, not-for-profit
More informationTraffic Control Inspection Checklist Segment:
Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager
More informationBerwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria
Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria August 2018 CONTENTS 1 Executive summary... 1 2 Summary of the amendment... 2 3 Submission...
More information2017 Temporary traffic control guidelines for pedestrians. v.2
2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered
More informationBus and Transit Lane Review Update
Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive
More informationCITY OF SASKATOON COUNCIL POLICY
ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,
More informationPublic Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha
To: NDOR Environmental From: Randy McCart, HDR Date: 4 April 2017 RE: Public Involvement Summary Report, HSIP-5003(12) 132 nd and West Center Road, Omaha; C.N. 22629 Public Involvement Outreach Requirements
More informationThe procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.
APPENDIX G TRAFFIC CONTROL GUIDELINES FOR UTILITY WORK WITHIN ROADWAY RIGHTS- OF-WAY JUNE 2001 Scope of Guidelines These traffic control guidelines cover work performed by utility companies and/or their
More informationResponse to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)
21 Pitt Street PO Box 6345, Auckland 1141, New Zealand T: +64 9 300 9000 // F: +64 9 300 9300 E: info@beca.com // www.beca.com Auckland Council Private Bag 92300 Victoria Street West Auckland 1142 15 August
More informationWelcome! San Jose Avenue Open House August 25, 2015
Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an
More informationWelcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.
BRIDGE REHABILITATION Welcome 53 Avenue Overpass over Whitemud Drive Rehabilitation Public Information Session Wednesday, March 9, 2016 4:30-8:00 p.m. Tonight you can: Learn about the 53 Avenue Overpass
More informationPAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT
Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT COMMITTEE 6 DECEMBER 2011 Meeting Status: Public Purpose of Report: For Decision PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION
More informationH8 Signs, Supports and Poles
Alberta Infrastructure and Transportation Roadside Design Guide November 2007 H8 Signs, Supports and Poles H8.1 Introduction This section identifies the appropriate roadside safety treatment for signs,
More informationGeneric Safe Method for placing TTM on MM-ALR
Summary 1. This paper describes a generic safe method for setting up and taking down Temporary Traffic Management (TTM) on Managed Motorway All Lane Running (MM-ALR) schemes. 2. An understanding of how
More informationPRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET
PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. MARKET I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT JANUARY 23, 2017 Public Meeting & Open House #2 TODAY S MEETING Purpose:
More information1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02
1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationWELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.
WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm
More informationWELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017
WELCOME FM 2818 (Harvey Mitchell Parkway) Open House Tuesday, Nov. 14, 2017 Why am I here? Review the planned improvements Provide comments on the proposed project The environmental review, consultation,
More informationA partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving
A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving DRAFT: Transport Efficiency and Impact Guide April 2018 GUIDELINE DEVELOPMENT
More informationInterstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017
EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses
More informationAiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012
Aiming for Zero Road Worker Safety Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 1. Road Worker Safety Strategy. RWS Strategic Target No. 1: achieve a substantial
More information0 CITY OF SANTA ANA 0
: A traffic control plan (Plan) is required whenever work is to be performed within the public right-of-way and is deemed necessary by the City of Santa Ana's (City) Traffic Engineer. Work cannot start
More informationECONOMY PEOPLE ENVIRONMENT
Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements
More informationProposed: Temporary Traffic Management Design Guidance
Current Temporary Traffic Management Guidance Structure: Chapter 8 Traffic Signs Manual First published in 1996, updated 2007 Addendum in 2010 Guidance for the Control and Management of Traffic at Road
More informationBD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1
BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner
More informationFrascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation
Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian
More informationREVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE
Development Engineering 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 Engineering Services Division REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Phone: 916-808-8300 Fax: 916-808-1984 Preparation
More informationMUTCD Part 6G: Type of Temporary Traffic Control Zone Activities
MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,
More informationQLDC Council 29 October Report for Agenda Item: 3
QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options
More informationTRAFF IC CALMING POLICY
TRAFF IC CALMING POLICY Policy No: 45396 Approved by Council 28 May 2008 C11/05/08 Further amendment by Council 22 June 2011 vide c08/06/11 Contents 1 Problem Statement 1 2 Desired Outcomes 2 3 Strategic
More informationWhy invest in the 1 Street S.W. Corridor?
Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with
More informationBicycling Routes on Provincial Roads Policy
Bicycling Routes on Provincial Roads Policy Policy Statement Rationale To support bicycling in Nova Scotia, the Department of Transportation and Infrastructure Renewal (TIR) may designate some portions
More informationFAQ s Walsh Road / Ferguson Road Pilot Scheme
FAQ s Walsh Road / Ferguson Road Pilot Scheme What is happening? Traffic calming measures are being installed as a pilot. Temporary Bollards will be installed to the east of 1 Ferguson Road and a Temporary
More informationWanaka Community Board 16 November Report for Agenda Item: 1. Temporary Road Closure - Challenge Wanaka Triathlon Event 2017
Wanaka Community Board 16 November 2016 Department: Property & Infrastructure Report for Agenda Item: 1 Temporary Road Closure - Challenge Wanaka Triathlon Event 2017 Purpose 1 The purpose of this report
More informationWORKSITE TRAFFIC MANAGEMENT
SECTION 3 It is the intention of this section of the Fieldworkers Handbook to provide high level traffic management guidance to employees and contractors of Victorian electrical distributions companies
More informationWDA response to O'Brien summary of recommendations dated 4 September 2017
WDA response to O'Brien summary of recommendations dated 4 September 2017 O'Brien recommendation 1. Incorporate sustainable solutions such as travel demand management, active traffic management, multimodal
More information14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE
165 14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE General Manager responsible: General Manager City Environment, DDI 941-8528 Officer responsible: Transport and Greenspace Unit Manager
More informationProgress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016
Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 1. Introduction The concept of the Sustainable Movement Corridor (hereafter the SMC ) was first developed
More informationSerious Crash Intersections Perth Metropolitan Area
Micro-Analysis of the Top 20 Serious Crash Intersections Perth Metropolitan Area About Micro-Analysis Micro-Analysis was identified as a project that would address the principles of the Towards Zero Road
More informationUpdate June 2018 OUR 2017 PUBLIC ENGAGEMENT
Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationFrome Street Bicycle Route
The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationAn evaluation of pedestrian countdown timers in the Sydney CBD
An evaluation of pedestrian countdown timers in the Sydney CBD Cleaver, M. A., Hislop, J., de Roos, M. P., Fernandes, R., Prendergast, M. (NSW Centre for Road Safety) Brisbane, G., Levasseur, M., McTiernan,
More informationWEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS
Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd
More informationRhebogue Neighbourhood Greenway. Road Safety Audit Stage 2
Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:
More informationTraffic Management Plan
Traffic Management Plan Traffic Group Australia ABN 49 143 304 796 Prepared for: World Cup Polo Pty Ltd c/- Incognitus Craig Lovett 0411 183 939 Craigl@incognitus.com Traffic Management Plan World Polo
More informationCycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design
Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy
More information5.0 Roadway System Plan
Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,
More informationOperational Ranking of Intersections: A Novel Prioritization Methodology
Operational Ranking of Intersections: A Novel Prioritization Methodology Reza Omrani, Ph.D. Transportation Engineer CIMA+ 3027 Harvester Road, Suite 400 Burlington, ON L7N 3G7 Reza.Omrani@cima.ca Pedram
More informationIntersection Control Evaluation Report Project: Alternative: Location: Evaluator:
Report Project: Alternative: Location: Evaluator: Franklin/Interstate-15 Interchange City of Lake Elsinore, 33 40'13.08"N 117 18'34.30"W Jeffrey Hsu 1 Introduction Policy Directive 13-02 calls for the
More informationCITY MANUALS AND STANDARDS REVIEW
GEORGETOWN SIDEWALK MASTER PLAN CITY MANUALS AND STANDARDS REVIEW RESOURCES AND STANDARDS As part of the Master Plan process, a review and evaluation of current City documents and policies relevant to
More informationPublic Information Meeting
Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special
More informationTRAFFIC SIGNAL WARRANT STUDY
TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION
More informationCITY OF KINGSTON REPORT TO COUNCIL. Report No.:
CITY OF KINGSTON REPORT TO COUNCIL Report No.: 13-072 TO: FROM: RESOURCE STAFF: Mayor and Members of Council Jim Keech, President and CEO, Utilities Kingston Mark Van Buren, Director of Engineering DATE
More informationto the Public Information Centre for the Downtown Traffic Study
to the Public Information Centre for the Downtown Traffic Study City of Sault Ste. Marie July 25, 2018 Purpose of Study Determine if changes to one-way corridors can enhance downtown s character and spaces
More informationThe Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).
Welcome The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass). The M1 is a vital part of the strategic road network, connecting
More information11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT
11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments
More informationAustralian Standard. Manual of uniform traffic control devices. Part 3: Traffic control for works on roads AS AS 1742.
AS 1742.3 2009 AS 1742.3 2009 Australian Standard Manual of uniform traffic control devices Part 3: Traffic control for works on roads This Australian Standard was prepared by Committee MS-012, Road Signs
More informationI-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT
I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate
More informationCasablanca Boulevard & GO Station Access
Casablanca Boulevard & GO Station Access Class Environmental Assessment STAKEHOLDER WORKSHOP Thursday September 27th, 2018 5:30PM 8:00PM 1 WORKSHOP PURPOSE Provide an overview of the Design Alternatives
More informationMANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION
2011 Edition Page I-1 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION 01 Traffic control devices shall be defined as all signs, signals, markings, and other devices used to regulate, warn, or guide
More informationMYTH-BUSTING IN MELBOURNE Left-turn Vehicle vs. Pedestrian Crashes At Signalised Intersections
MYTH-BUSTING IN MELBOURNE Left-turn Vehicle vs. Pedestrian Crashes At Signalised Intersections Presentation by Mark O Brien AITPM Thursday 21 September 2017 Assumed Common Wisdom Our study commenced over
More informationOlympics 2012: Understanding and Managing the Challenges. Summer /06/2012 p. 1
Olympics 2012: Understanding and Managing the Challenges Summer 2012 12/06/2012 p. 1 Overview The aim of this presentation is to provide our stakeholders with information about the impact that the London
More informationCity of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY
4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after
More informationGUIDE TO TRAFFIC MANAGEMENT FOR CAR RALLIES IN VICTORIAN FORESTS
GUIDE TO TRAFFIC MANAGEMENT FOR CAR RALLIES IN VICTORIAN FORESTS REVISION 3 JANUARY 2018 CONTENTS 1. Introduction....1 2. Implementation..2 3. Public Information Measures...3 4. Detours and Deviations
More informationD.13 Transportation and Traffic
This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationTemporary Vehicle Restraint System Policy
Temporary Vehicle Restraint System Policy Prepared By; J Wilkinson H&S Manager, Civils Prepared for: Installation of TVRS on all triio highways projects including JV s. Page 1 of 8 Contents 1.0 Introduction
More informationTraffic Calming Policy
Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationCity of Moorhead Committee of the Whole Meeting
City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: January 28, 2014 SUBJECT: IMPROVING PEDESTRIAN SAFETY AND CUSTOMER JOURNEY TIMES: TRANSIT STOPS ACTION ITEM RECOMMENDATIONS It is recommended
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationBuilding Great Neighbourhoods QUEEN ALEXANDRA
Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationHIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015
HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer
More information12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)
12 RECOMMENDATIONS Recommendations are based on the technical analysis of existing and future road and active transportation conditions, the results of the review of existing City policies and public feedback.
More informationAbstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection
ITE 2015 Western District Annual Meeting Ada County Highway District s Flashing Yellow Arrow Initiative Primary Author: Tim Curns, PE Ada County Highway District Traffic Engineer Author: Andrew Cibor,
More information// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015
// RoWSaF Making roads safer for road workers rowsaf.org.uk Working in partnership with clients, industry and key stakeholders to improve worker safety Often working close to live traffic, activities conducted
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationRoad Planning and Design Manual. 2nd edition. Queensland Practice. November Volume 3 Guide to Road Design
Road Planning and Design Manual 2nd edition Queensland Practice November 2014 Volume 3 Guide to Road Design Copyright http://creativecommons.org/licenses/by/3.0/au/ State of Queensland (Department of Transport
More informationMajor Grady Carrick Florida Highway Patrol PROCEDURES FOR
Major Grady Carrick Florida Highway Patrol PROCEDURES FOR ROLLING ROADBLOCKS ROLLING ROADBLOCKS Objectives Review the need for safety Identify applications Establish planning and resource requirements
More informationMemorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning
Memorandum To: Smart Growth From: Bruce Robinson, Transport Advisor, Infrastructure Planning Subject: Te Tumu Transportation Assessment: Stage 1 Sensitivity Analysis Date: 1 June 2016 INTRODUCTION This
More informationHighway 111 Corridor Study
Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,
More informationTrans-Canada Highway 1 RW Bruhn Bridge Replacement
Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the
More informationTerwillegar Drive Expressway Draft Concept Plan
Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction
More informationSan Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation
San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San
More informationAustralian Asphalt & Queensland Department and Pavement Association of Transport & Main Roads
Australian Asphalt & Queensland Department and Pavement Association of Transport & Main Roads STRATEGIC ALLIANCE SAFETY PROJECT DRAFT REPORT for Industry Review 4 December 2013 Prepared by Dan Sullivan
More informationInterstate 66 Tier 1 Environmental Impact Statement (EIS)
WELCOME Welcome to the second Citizen Information Meeting for the Tier 1 Environmental Impact Statement (EIS). As an integral part in the environmental study process, the study team is seeking your comments
More informationThe Safe System Approach
There are very few areas of public discussion and sentiment which generate as much consensus as road safety. Everyone wants safer roads for all users, and road safety is a key priority for governments,
More informationLOOP 360 IMPROVEMENT STUDY
LOOP 360 IMPROVEMENT STUDY Overview and Preliminary Analysis August 2015 1 STUDY PROCESS 2 Study Background Loop 360 serves a wide range of users, including residents, businesses, bicyclists, and commuters
More informationMUTCD Part 6: Temporary Traffic Control
MUTCD Part 6: Temporary Traffic Control OMUTCD English units are preferred. OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES TABLE OF CONTENTS PREFACE INTRODUCTION TABLE OF CONTENTS PART 1. GENERAL Chapter
More informationDiagonal cycle crossing for signalised intersection. Axel Wilke ViaStrada Matthew Hinton Maunsell Daniel Newcombe Auckland City Council
Diagonal cycle crossing for signalised intersection Axel Wilke ViaStrada Matthew Hinton Maunsell Daniel Newcombe Auckland City Council Introduction New intersection at end of SH20 New cycleway also ends
More informationIntersection Control Evaluation Report. This report conforms to the Caltrans Traffic Operations Policy Directive
Intersection Control Evaluation Report This report conforms to the Caltrans Traffic Operations Policy Directive 13-02. Intersection Control Evaluation (ICE) is a directive issued by the California Department
More informationM-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016
M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has
More informationNORTH TURNAROUND. Recommended Design: Expand the existing transit terminal
NORTH TURNAROUND Recommended Design: Expand the existing transit terminal Feedback from stakeholders and the public: Make it easy to transfer between local and Rapid Transit service Why is this design
More informationTRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES
TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Flagpersons play an important role in the high level of traffic safety expected through work zones on Saskatchewan highway projects. Flagpersons are
More information