1 City of Bellevue s Adaptive Left Turn Phasing Presented by : Mark Poch, PE, PTOE City of Bellevue, WA May 1, 2015

2 130,000 pop. 197 signals

3 The Challenge Protected Only Turns

4 The Challenge Protected Only Turns Set up to run 24/7/365 No Permissive turns during light hours with gaps

5 The Challenge Protected/Permissive

6 The Challenge Protected/Permissive Conflicts with Pedestrians No Protected ONLY turns during heavy hrs

7 The Challenge How to provide the right LT phasing at the right time?

8 The Response Develop new tools SCATS Traffic Adaptive Signal System Utilize Flashing Yellow Arrow (FYA) display Pro Only vs. Pro/Per by Time of Day (TOD)

9 Flashing Yellow Arrow (FYA)

10 Protected Left Turn From 24/7/365 to TOD Systematically evaluate all Protected left turn locations citywide

11 Protected Left Turn From 24/7/365 to TOD 175 of 197 signalized intersections evaluated 88 protected only left turns converted to pro/per with FYA by TOD

12 Good strategy Protected Left Turn To Pro/Per by TOD Has shortcomings Can t respond to real time traffic and/or pedestrian conditions

13 Next Step From TOD to Adaptive Left Turn Control Strategy

14 Adaptive LT Control Strategy To replace TOD scheduling of protected vs. protected/permissive LT with a better methodology Will look at five strategies in this presentation

15 Adaptive LT Control Strategy 1. Opposing traffic conditions How? SCATS simple logic to disable/enable FYA Cycle length threshold Congestion level of opposing traffic SCATS - Degree of Saturation (DS) Ratio of the effective green time to the total available green time on the approach/lane Check DS of opposing thru traffic

16 Adaptive LT Control Strategy 1. Opposing traffic conditions 2. Resolve Pedestrian conflict with permissive portion of pro/per

17 Adaptive LT Control Strategy Resolve pedestrian vs. left conflict A recent controversial study by Oregon State University examined driver behavior in permissive left turns has identified about 4-9 % of the time, drivers don't even bother to look and see if there are people in the way.

18 Adaptive LT Control Strategy Resolve pedestrian vs. left conflict A recent controversial study by Oregon State University examined driver behavior in permissive left turns has identified about 4-9 % of the time, drivers don't even bother to look and see if there are people in the way.

19 Adaptive LT Control Strategy Resolve pedestrian vs. left conflict How? SCATS Ped Minus Left Feature Omit permissive portion of pro/per when the crosswalk has a walk or flashing don t walk indication.

20 Adaptive LT Control Strategy Resolve pedestrian vs. left conflict How? SCATS Ped Minus Left Feature Example

21 SCATS Ped Minus Left Feature No Ped - In FYA (Don t Walk)

22 Adaptive LT Control Strategy Ped Waiting Red (Don t Walk)

23 SCATS Ped Minus Left Feature Ped Crossing Red (Walk and FDW)

24 SCATS Ped Minus Left Feature After FDW FYA (Don t Walk)

25 Adaptive LT Control Strategy 1. Opposing traffic conditions 2. Resolve pedestrian vs. left conflict 3. Reduce accident caused by poor sight distance

26 Adaptive LT Control Strategy 1. Opposing traffic conditions 2. Resolve pedestrian vs. left conflict 3. Reduce accident caused by poor sight distance Blocking Queue

27 Adaptive LT Control Strategy 1. Opposing traffic volume 2. Resolve pedestrian vs. left conflict 3. Reduce accident caused by poor sight distance How? SCATS special logic to disable/enable FYA Measuring the congestion level of the inside lane

28 SCATS special logic to disable/enable FYA Example Opposing far side lane DS > 43 DS Detector

29 SBLT at Coal Creek Parkway/124 th Ave SE May 15, PM DS > 43 DS < 43

30 SBLT at Coal Creek Parkway/124 th Ave SE Disable FYA At 16:37 DS > 43 Disable FYA At 16:37

31 SBLT at Coal Creek Parkway/124 th Ave SE Disable FYA At 16:37 DS > 43 Protected Left Turn Disable FYA At 16:37 Protected Left Turn

32 SBLT at Coal Creek Parkway/124 th Ave SE Disable FYA At 16:37 DS > 43 Enable FYA At 18:09 Protected Left Turn Disable FYA At 16:37 Protected Left Turn Enable FYA At 18:09

33 Adaptive LT Control Strategy 1. Opposing traffic conditions 2. Resolve pedestrian vs. left conflict 3. Reduce accident caused by poor sight distance 4. Manage freeway ramp left turn traffic

34 Adaptive LT Control Strategy 1. Opposing traffic conditions 2. Resolve pedestrian vs. left conflict 3. Reduce accident caused by poor sight distance 4. Manage freeway ramp left turn traffic 5. Manage lagging LT phase for progression Checking DS of concurrent thru phase

35 Time of Day Adaptive Memorial Day Week Example

36 Memorial Day Memorial Day Coal Creek and 124th PM EBLT TOD PM Fri Mo Tue We Thu Fri 3:30 3:30 3:35 3:40 3:35 3:40 3:45 3:45 3:50 3:55 3:50 3:55 4:00 4:00 4:05 4:10 4:05 4:10 4:15 4:15 4:20 4:20 4:25 4:25 4:30 4:30 4:35 4:35 4:40 4:40 4:45 4:45 4:50 4:50 4:55 4:55 5:00 5:00 5:05 5:05 5:10 5:10 5:15 5:15 5:20 5:20 5:25 5:25 5:30 5:30 5:35 5:35 5:40 5:40 5:45 5:45 5:50 5:50 5:55 5:55 6:00 6:00 6:05 6:05 6:10 6:10 6:15 6:15 6:20 6:25 6:20 6:25 6:30 6:30 6:35 6:35 6:40 6:40 6:45 6:50 6:45 6:50 6:55 7:00 6:55 7:00 PM Fri Mo Tue We Thu Fri FYALT Enabled FYALT Disabled (Protected Left turn only)

37 Memorial Day Memorial Day Coal Creek and 124th PM EBLT TOD PM Fri Mo Tue We Thu Fri VS. 3:30 3:30 3:35 3:40 3:35 3:40 3:45 3:45 3:50 3:55 3:50 3:55 4:00 4:00 4:05 4:10 4:05 4:10 4:15 4:15 4:20 4:20 4:25 4:25 4:30 4:30 4:35 4:35 4:40 4:40 4:45 4:45 4:50 4:50 4:55 4:55 5:00 5:00 5:05 5:05 5:10 5:10 5:15 5:15 5:20 5:20 5:25 5:25 5:30 5:30 5:35 5:35 5:40 5:40 5:45 5:45 5:50 5:50 5:55 5:55 6:00 6:00 6:05 6:05 6:10 6:10 6:15 6:15 6:20 6:25 6:20 6:25 6:30 6:30 6:35 6:35 6:40 6:40 6:45 6:50 6:45 6:50 6:55 7:00 6:55 7:00 Adaptive PM Fri Mo Tue We Thu Fri FYALT Enabled FYALT Disabled (Protected Left turn only)

38 From Protected Only to Pro/Per Cost Savings from Reduced Delay Simulation models Value of time = $15/hr

39 Cost Savings per year From Protected 24/7 to TOD/Adaptive Cost Savings from Reduced Delay Simulation models Value of time = $15/hr $3,000,000 Public Cost Savings ($) Reduced Left-turn Delay Adjusted for accidents $2,700,000 Estimated $3,000,000 Estimated $2,200,000 $2,000,000 $1,300,000 $1,000,000 $600,000 $0 Phase 1 Thru Phase 2 Thru Phase 3 Thru Phase 4 Thru Phase 5

40 Adaptive Left turn phasing Benefits

41 Adaptive Left turn phasing Benefits Can respond to real time traffic congestion

42 Adaptive Left turn phasing Benefits Can respond to real time traffic congestion Can handle pedestrian/bike conflicts

43 Adaptive Left turn phasing Benefits Can respond to real time traffic congestion Can handle pedestrian/bike conflicts Can protect LT with limited sight distance

44 Adaptive Left turn phasing Benefits Can respond to real time traffic congestion Can handle pedestrian/bike conflicts Can protect LT with limited sight distance Can improve freeway ramp metering traffic

45 Adaptive Left turn phasing Benefits Can respond to real time traffic congestion Can handle pedestrian/bike conflicts Can protect LT with limited sight distance Can improve freeway ramp metering traffic Can provide better coordination as needed

46 Adaptive Left turn phasing Benefits Can respond to real time traffic congestion Can handle pedestrian/bike conflicts Can protect LT with limited sight distance Can improve freeway ramp metering traffic Can provide better coordination as needed Can lessen drivers frustrations

47 Adaptive Left turn phasing Benefits Can respond to real time traffic congestion Can handle pedestrian/bike conflicts Can protect LT with limited sight distance Can improve freeway ramp metering traffic Can provide better coordination as needed Can lessen drivers frustrations Can deliver compelling value to public

48 Final Thoughts WHY?? BELLEVUE INTELLIGENT TRANSPORTATION SYSTEM Net Left Turn Improvement Benefit = $3 million/yr Net SCATS traffic adaptive Benefit = $6-$9 million/yr SCATS Project Cost = $5.5 million (one time) Systematic/Signal Improvements have HIGH VALUE compared to Road Widening

49 Bellevue s Adaptive Left Turn Phasing Presented by Mark Poch

New in the MUTCD: The Flashing Yellow Arrow Presented at the 57 th Annual Traffic and Safety Conference May 17, 2006

New in the MUTCD: The Flashing Yellow Arrow Presented at the 57 th Annual Traffic and Safety Conference May 17, 2006 New in the MUTCD: The Flashing Yellow Arrow Presented at the 57 th Annual Traffic and Safety Conference May 17, 2006 David A. Noyce, Ph.D., P.E. University of Wisconsin - Madison The FYA Story Research

More information

Strategies to Re capture Lost Arterial Traffic Carrying Capacities

Strategies to Re capture Lost Arterial Traffic Carrying Capacities Strategies to Re capture Lost Arterial Traffic Carrying Capacities Chalap K. Sadam, P.E. and Albert L. Grover, P.E. Over the years, many arterials that were initially designed to carry tens of thousands

More information

Pedestrian Timing Strategies at Large Signalized Intersections

Pedestrian Timing Strategies at Large Signalized Intersections Pedestrian Timing Strategies at Large Signalized Intersections Zong Tian, Ph.D., P.E. Department of Civil & Environmental Engineering University of Nevada Reno Reno, NV 89557 OVERVIEW Safety Efficiency

More information

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 This page left intentionally blank. Table of Contents 1.0 Introduction... 1 1.1 Crash

More information

Abstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection

Abstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection ITE 2015 Western District Annual Meeting Ada County Highway District s Flashing Yellow Arrow Initiative Primary Author: Tim Curns, PE Ada County Highway District Traffic Engineer Author: Andrew Cibor,

More information

TRAFFIC AND SAFETY CONFERENCE October 18, 2017 FLASHING YELLOW ARROWS

TRAFFIC AND SAFETY CONFERENCE October 18, 2017 FLASHING YELLOW ARROWS TRAFFIC AND SAFETY CONFERENCE October 18, 2017 FLASHING YELLOW ARROWS FLASHING YELLOW ARROWS LEFT TURN YIELD ON FLASHIN G ARROW How did it get started Early Research Our projects Outreach Construction

More information

Driver Behavior in the Presence of Pedestrians at Signalized Intersections Operating the Flashing Yellow Arrow

Driver Behavior in the Presence of Pedestrians at Signalized Intersections Operating the Flashing Yellow Arrow Portland State University PDXScholar Civil and Environmental Engineering Faculty Publications and Presentations Civil and Environmental Engineering 2-2013 Driver Behavior in the Presence of Pedestrians

More information

2016 THE Short Course

2016 THE Short Course 2016 THE Short Course Flashing Yellow Arrows Mike Dolde, PE, PTOE CBB Randy Laninga - IDOT SHORT COURSE OBJECTIVES History Operation Planning Design Implementation Evaluation Lessons Learned HISTORY OF

More information

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks Adrian George Manager Network Improvements Anthony Fitts Manager Signal Design Melbourne s transport demands are growing 5m people

More information

Unit 7 Speed, Travel Time and Delay Studies

Unit 7 Speed, Travel Time and Delay Studies Unit 7 Speed, Travel Time and Delay Studies Introduction Speed, travel time and delay are all related measures that are common used as indicators of performance for traffic facilities Measure of Effectiveness

More information

INTRODUCTION TO SIGNAL TIMING & TRAFFIC CONTROL

INTRODUCTION TO SIGNAL TIMING & TRAFFIC CONTROL INTRODUCTION TO SIGNAL TIMING & TRAFFIC CONTROL 1 WHO ARE WE? 2 WHAT ARE WE GOING TO DO TODAY? Learn about transportation engineering and careers offered. Introduce essential concepts about signal timing.

More information

Flashing Yellow Left Turn Arrows: Scottsdale Experience

Flashing Yellow Left Turn Arrows: Scottsdale Experience Flashing Yellow Left Turn Arrows: Scottsdale Experience 2011 Arizona Spring Conference AZITE/IMSA March 9, 2011 Paul Porell, P.E. Traffic Engineering Manager Innovation Demonstration Project: Presentation

More information

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Intersections are the physical component of the roadways where two highways intersect. They are the most complex element of roadways, since it requires more

More information

Flashing Yellow Left Turn Arrows Scottsdale s Experience

Flashing Yellow Left Turn Arrows Scottsdale s Experience Flashing Yellow Left Turn Arrows Scottsdale s Experience 2013 ITE Western District Conference July 16, 2013 Todd Taylor, P.E., PTOE City of Scottsdale Senior Traffic Engineer FYLTA Review Question NCHRP

More information

Going Green by Flashing Yellow

Going Green by Flashing Yellow Going Green by Flashing Yellow Transportation Education Series Southeast Florida Presented by: Shaun Quayle, P.E. Shing Tsoi, P.E. Presentation Overview Introduction Background of Flashing Yellow Arrow

More information

Optimizing The Operations of Closely Spaced Traffic Signals. Gordon E. Meth, P.E., PTOE ITE District 1 Annual Meeting May 21, 2004

Optimizing The Operations of Closely Spaced Traffic Signals. Gordon E. Meth, P.E., PTOE ITE District 1 Annual Meeting May 21, 2004 Optimizing The Operations of Closely Spaced Traffic Signals Gordon E. Meth, P.E., PTOE ITE District 1 Annual Meeting May 21, 2004 Closely Spaced Signals - The Challenges According to many sources, minimum

More information

HIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY. James A. Bonneson, Ph.D., P.E.

HIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY. James A. Bonneson, Ph.D., P.E. HIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY James A. Bonneson, Ph.D., P.E. Texas Transportation ti Institute t Housekeeping 2 All participant phone lines are muted to avoid distractions

More information

Synchro Studio 8. Overview. By Ioannis Psarros

Synchro Studio 8. Overview. By Ioannis Psarros Synchro Studio 8 Overview By Ioannis Psarros What is Synchro? Software for signal optimization Developed by Trafficware Optimization can be applied to: Cycle lengths Splits Offsets Source: http://bikewalklee.blogspot.com

More information

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017 WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND

More information

Traffic Signal Design

Traffic Signal Design Traffic Signal Design Instructor: S. M. Mahdi Amiripour m.amiripour@gmail.com 2 Introduction Intersection is an area shared by two or more roads Designated for the vehicles to turn to different directions

More information

Signal Timing Design CIVL 4162/6162

Signal Timing Design CIVL 4162/6162 Signal Timing Design CIVL 4162/6162 Summary of Signal Design Signal Phase Plans Treatment of Left Turns General Considerations Phase and Ring Diagrams Common Phase Plans and Their Use Vehicular Needs Change

More information

Conversion of One-Way Couplet Streets to Two-Way

Conversion of One-Way Couplet Streets to Two-Way Conversion of One-Way Couplet Streets to Two-Way May 5, 2016 Oklahoma Traffic Engineers Association 2016 Spring Meeting, Tulsa, OK Kevin St. Jacques, P.E., PTOE, PTP Freese and Nichols Overview Initial

More information

6. signalized Intersections

6. signalized Intersections 6. signalized Intersections 1 References 1. HCM 2000, chapter 16 2. safety.fhwa.dot.gov/intersection/signalized/sig_int_pps051508 /short/sigint_short.ppt 3. mason.gmu.edu/~aflaner/ceie_360/signalized%20intersectio

More information

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Michael Wallwork, Roundabout Expert, Orange Park, Florida Tom Bertulis (MS, PE, PTOE),

More information

PART 4 HIGHWAY TRAFFIC SIGNALS

PART 4 HIGHWAY TRAFFIC SIGNALS 2016 Edition Page 111 PART 4 HIGHWAY TRAFFIC SIGNALS CHAPTER 4A. GENERAL [This is a new section. There is no corresponding section in the MUTCD.] Section 4A.100 Traffic Control Device Alternatives for

More information

Actuated Signal Timing Design CIVL 4162/6162

Actuated Signal Timing Design CIVL 4162/6162 Actuated Signal Timing Design CIVL 4162/6162 Session Objective Explain terms related to actuated signals Explain why and where actuated signals are used Determine detector locations given traffic conditions

More information

Introduction to Traffic Signal Timing

Introduction to Traffic Signal Timing Introduction to Traffic Signal Timing Course No: C-7 Credit: PDH Jeffrey W. Buckholz, Ph.D., P.E., PTOE Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 98 P: (877) -58

More information

Self-Organizing Signals: A Better Framework for Transit Signal Priority

Self-Organizing Signals: A Better Framework for Transit Signal Priority Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 3-13-2015 Self-Organizing Signals: A Better Framework for Transit Signal Priority Peter

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,

More information

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

180 Grand Avenue, Suite x117 Dowling Associates, Inc. 180 Grand Avenue, Suite 250 510.839.1742 x117 Oakland, CA 94612 510.839.0871 fax www.dowlinginc.com mbowman@dowlinginc.com Dowling Associates, Inc. Date: Memorandum To: CC: From: Ms. Leah Greenblat City

More information

SCOPE Application, Design, Operations,

SCOPE Application, Design, Operations, SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges

More information

PBIC Crash Types Series Left-Turn Crashes Involving Pedestrians

PBIC Crash Types Series Left-Turn Crashes Involving Pedestrians PBIC Crash Types Series Left-Turn Crashes Involving Pedestrians Libby Thomas UNC Highway Safety Research Center David Hurwitz Oregon State University Chris Monsere Portland State University Bradley Topol

More information

Arterial Traffic Analysis Actuated Signal Control

Arterial Traffic Analysis Actuated Signal Control Arterial Traffic Analysis Actuated Signal Control Dr. Gang-Len Chang Professor and Director of Traffic Safety and Operations Lab. University of Maryland-College Park Actuated Signal Control Fully Actuated

More information

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate INNOVATIVE INTERSECTION SOLUTIONS Jay Bockisch, PE, PTOE Senior Associate INNOVATIVE INTERSECTION SOLUTIONS Innovative intersection overview Case studies Continuous flow intersection Modern roundabouts

More information

Road Diets FDOT Process

Road Diets FDOT Process Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local

More information

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24

More information

Defining Purpose and Need

Defining Purpose and Need Advanced Design Flexibility Pilot Workshop Session 4 Jack Broz, PE, HR Green May 5-6, 2010 Defining Purpose and Need In your agency s project development process, when do design engineers typically get

More information

Ram Jagannathan, Joe Bared, Warren Hughes August 15th, 2006

Ram Jagannathan, Joe Bared, Warren Hughes August 15th, 2006 Traffic Performance Comparison of New Jersey Jughandle Intersections (NJJI) and Conventional Intersections Ram Jagannathan, Joe Bared, Warren Hughes August 15th, 2006 STUDY OBJECTIVE To analyze the differences

More information

Retrofitting Urban Arterials into Complete Streets

Retrofitting Urban Arterials into Complete Streets Retrofitting Urban Arterials into Complete Streets John N. LaPlante, P.E., P.T.O.E., T.Y. Lin International Prepared for: Illinois Traffic Engineering & Safety Conference Urbana, Illinois October 18, 2007

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

Yellow and Red Intervals It s Just a Matter of Time. 58 th Annual Alabama Transportation Conference February 9, 2015

Yellow and Red Intervals It s Just a Matter of Time. 58 th Annual Alabama Transportation Conference February 9, 2015 Yellow and Red Intervals It s Just a Matter of Time 58 th Annual Alabama Transportation Conference February 9, 2015 Presentation Content Background on Timing Methodology Findings and Recommendations from

More information

Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions

Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions Tom Mathew IIT Bombay Outline 1. Heterogeneous traffic 2. Traffic Simulation 3. Traffic Signal control 4. Adaptive

More information

Pedestrian Safety at Interchanges

Pedestrian Safety at Interchanges Countermeasure Strategies for Pedestrian Safety Pedestrian Safety at Interchanges Meghan Mitman Fehr and Peers December 10, 2015 Today s Presentation Introduction and housekeeping Audio issues? Dial into

More information

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS FAMPO Policy Committee Briefing June 18, 2018 I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS WHAT IS THE STARS PROGRAM? Program to develop solutions to reduce crashes and congestion bottlenecks

More information

Indiana Traffic Signal Hi Resolution Data Logger Enumerations

Indiana Traffic Signal Hi Resolution Data Logger Enumerations Purdue University Purdue e-pubs JTRP Data Papers 11-2012 Indiana Traffic Signal Hi Resolution Data Logger Enumerations James R. Sturdevant INDOT, jsturdevant@indot.in.gov Timothy Overman INDOT Eric Raamot

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Analysis of Signalized Intersections

Analysis of Signalized Intersections Analysis of Signalized Intersections What is Intersection analysis Inverse application of the signal timing design In signal timing design, green times are estimated to provide necessary capacity In intersection

More information

INTERCHANGES. Module 7

INTERCHANGES. Module 7 INTERCHANGES Module 7 Learning Outcomes 7-2 At the end of this module, you will be able to: Identify how land uses around freeway interchanges create pedestrian trips Explain how and why pedestrian crashes

More information

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS A. Volume, Demand, and Capacity 2-1 B. Performance Measures 2-7 C. Critical Lane Volume Analysis 2-9 3. DATA COLLECTION 4. SIGNAL PHASING

More information

Pedestrian Safety Guide for Transit Agencies

Pedestrian Safety Guide for Transit Agencies Pedestrian Safety Guide for Transit Agencies FDOT/FTPA/CUTR Professional Development Workshop June 15, 2010 1 Purpose Presentation Overview Bus Stop Location and Design Process/Partnership 2 Purpose Every

More information

Community Advisory Committee

Community Advisory Committee Community Advisory Committee Meeting #1 November 19, 2014 Presentation Team Matt Fulda, Greater Bridgeport Regional Council Chris Granatini, P.E., Tighe & Bond Craig Yannes, P.E., PE PTOE, Tighe & Bond

More information

NCHRP Project Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities UNC-CH CH Highway Safety Res

NCHRP Project Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities UNC-CH CH Highway Safety Res An Overview: NCHRP Project 3-783 Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities: R. G. Hughes, Ph.D. and R. Srinivasan,, Ph.D. UNC Highway Safety

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

CONNECTED VEHICLE PILOT DEPLOYMENT PROGRAM

CONNECTED VEHICLE PILOT DEPLOYMENT PROGRAM CONNECTED VEHICLE PILOT DEPLOYMENT PROGRAM August 2, 2016 Presentation Concept Pilot Location Deployment Characteristics Use Cases Application Overview 2 Concept Demonstrate and measure the impact of Connected

More information

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation Chapter 37 Capacity and LOS Analysis of a Signalized I/S 37.1 Overview The Highway Capacity Manual defines the capacity as the maximum howdy rate at which persons or vehicle can be reasonably expected

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

INTERSECTIONS AT GRADE INTERSECTIONS

INTERSECTIONS AT GRADE INTERSECTIONS INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.

More information

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay Whether unsignalized or signalized, isolated or coordinated, you can use TransModeler to simulate intersections with greater detail and accuracy than any other microsimulation software. TransModeler allows

More information

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3 Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study April 11, 2013 Steering Committee Meeting #3 Meeting Agenda Welcome & Introductions Review Project Purpose & Needs Results

More information

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016 Colchester/Riverside/Barrett/ Mill Intersection Study PAC Meeting #3 September 22, 2016 Tonight s Agenda Review Project Purpose and Need Describe short term and long improvements and changes since public

More information

Mark Malone, P.E. SD DOT

Mark Malone, P.E. SD DOT Mark Malone, P.E. SD DOT SD10 Grading & Surfacing From 8 th Ave W to 8 th Ave E 1 mile plus transition lengths Complete Urban Reconstruction Grading, C&G, Storm Sewer, Sidewalk, Concrete Surfacing Railroad

More information

Safety and Operations Guidance for Using Timeof-Day Protected-Permissive Left-Turn Phasing Using Flashing Yellow Arrows

Safety and Operations Guidance for Using Timeof-Day Protected-Permissive Left-Turn Phasing Using Flashing Yellow Arrows Safety and Operations Guidance for Using Timeof-Day Protected-Permissive Left-Turn Phasing Using Flashing Yellow Arrows http://www.virginiadot.org/vtrc/main/online_reports/pdf/19-r10.pdf F. ADAM KING Engineer

More information

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014 MOBILITY WORKSHOP Joint City Council and Transportation Commission May 5, 2014 Review of General Plan M-1 Develop world-class transit system M-3 Maintain/enhance pedestrian-oriented City M-4 Create comprehensive

More information

Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions. SiMTraM & CosCiCost2G

Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions. SiMTraM & CosCiCost2G Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions SiMTraM & CosCiCost2G Tom Mathew IIT Bombay Outline 1. Heterogeneous traffic 2. Traffic Simulation 3. Traffic

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

ARGYLE TRAFFIC STUDY Summary of Recommendations

ARGYLE TRAFFIC STUDY Summary of Recommendations ARGYLE TRAFFIC STUDY Summary of Recommendations 2011 Westport Road Ricker Road Blanding Boulevard Youngerm an Circle Argyle Forest Boulevard Co ARGYLE FOREST IS A HIGHLY CONGESTED AREA IN SOUTHWESTERN

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015 Implementing Complete Streets in Ottawa October 1, 2015 The Essentials Complete Streets Implementation Framework will become part of the routine delivery of City transportation projects Approach uses every

More information

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions CONTENTS (MODULE 3) Introduction...1 Purpose...1 Goals and Learning Outcomes...1 Organization

More information

Analysis of Unsignalized Intersection

Analysis of Unsignalized Intersection International Journal of Constructive Research in Civil Engineering (IJCRCE) Volume 2, Issue 1, 2016, PP 30-36 ISSN 2454-8693 (Online) www.arcjournals.org Analysis of Unsignalized Intersection B.Ramkumar

More information

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way

More information

Chapter V TRAFFIC CONTROLS. Tewodros N.

Chapter V TRAFFIC CONTROLS. Tewodros N. Chapter V TRAFFIC CONTROLS www.tnigatu.wordpress.com tedynihe@gmail.com Lecture Overview Traffic markings Longitudinal markings Transverse markings Object markers and delineator Traffic signs Regulatory

More information

A number of inferences have been drawn from the observations, each of which is discussed below.

A number of inferences have been drawn from the observations, each of which is discussed below. Technical Memo To: Steve Gramm, Study Advisory Team From: Rick Laughlin Project: I-190/Silver St. CC: Date: 4/4/2011 Job No: RE: Special event observation HDR conducted an observation of special event

More information

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB FAQ/RULES OF THUMB HCS intersection analysis criteria See LDM Figure 401-14aE Cycle lengths between 60 to 120 seconds No impractical phases, i.e., 1 second green time Yellow + All Red must be no less than

More information

FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report

FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report August 2, 2010 Table of Contents Preface... 1 Problem Statement... 1 Study Objectives... 2 Data Collection Methods...

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

TABLE OF CONTENTS. 1 Overview Introduction Timing Goals Review of Signal Timing

TABLE OF CONTENTS. 1 Overview Introduction Timing Goals Review of Signal Timing June 2015 TABLE OF CONTENTS 1 Overview... 1 1 1.1 Introduction... 1 1 1.2 Timing Goals... 1 1 Review of Signal Timing... 1 1 2 Data Collection and Information Needed... 2 1 2.1 Data Collection... 2 1

More information

Transit Signal Preemption and Priority Treatments

Transit Signal Preemption and Priority Treatments Transit Signal Preemption and Priority Treatments Peter Koonce, PE Portland, OR Today s Message Transit signal priority presents an opportunity to partner with an agency that isn t always recognized as

More information

PENNSYLVANIA IMPLEMENTATION OF FLASHING YELLOW ARROW

PENNSYLVANIA IMPLEMENTATION OF FLASHING YELLOW ARROW PENNSYLVANIA IMPLEMENTATION OF FLASHING YELLOW ARROW RECOMMENDED PRACTICE LAST REVISED: MARCH 7, 2017 CONTENTS Introduction... 2 What is Flashing Yellow Arrow?... 2 History of Left-Turn Signals... 3 Background...

More information

Regional Applications

Regional Applications Regional Applications Richmond Regional Transportation Planning Organization September 1, 2016 Barbara Nelson Sarah Rhodes Richmond Regional Transportation Planning Organization Action Smart Scale Regional

More information

Citywide Sidewalk and Crosswalk Programs

Citywide Sidewalk and Crosswalk Programs Citywide Sidewalk and Crosswalk Programs Council Meeting October 20, 2015 Presented by Rita Hu and Jamal Mahmoud Program Goals Implement the City s comprehensive plan. Provide pedestrian with safe walking

More information

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000)

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000) Methodology for analysing capacity and level of service for signalized intersections (HCM 2000) Ivana Nedevska 1, Slobodan Ognjenović 2,* and Elena Gusakova 3 1 GEING Krebs und Kiefer-Skopje, Macedonia

More information

HIGHWAY CAPACITY MANUAL

HIGHWAY CAPACITY MANUAL HISTORY OF THE HIGHWAY CAPACITY MANUAL TexITE - Houston Chapter November 10, 2010 Michael Y. Ereti City of Houston Department of Public Works & Engineering THE NEW GUY (Michael Ereti) Consultant (10 years)

More information

Central Freeway and Octavia Circulation Study

Central Freeway and Octavia Circulation Study Central Freeway and Octavia Circulation Study Final Report Plans and Programs Committee San Francisco County Transportation Authority September 18, 2012 Presentation Outline Background and Study Purpose

More information

Traffic Signals. Part I

Traffic Signals. Part I Traffic Signals Part I Part I The Islamic University of Gaza Civil Engineering Department Traffic Engineering (Optional Course) ECIV 5332 Instructor: Dr. Yahya Sarraj Associate Prof. in Transportation

More information

Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor)

Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor) Onondaga County Department of Transportation Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor) Prepared for: Syracuse Metropolitan Transportation Council 126 North Salina

More information

Flashing Yellow Arrows (A different left turn option) ASCE Meeting June 9, 2015 Kerry C. NeSmith, PE Deputy State Maintenance Engineer

Flashing Yellow Arrows (A different left turn option) ASCE Meeting June 9, 2015 Kerry C. NeSmith, PE Deputy State Maintenance Engineer Flashing Yellow Arrows (A different left turn option) ASCE Meeting June 9, 2015 Kerry C. NeSmith, PE Deputy State Maintenance Engineer What IS the flashing yellow arrow??? Traditional left turn signal

More information

Observations of Pedestrian Behavior and Facilities at Diverging Diamond Interchanges

Observations of Pedestrian Behavior and Facilities at Diverging Diamond Interchanges Institute for Transportation Research and Education N.C. State University Observations of Pedestrian Behavior and Facilities at Diverging Diamond Interchanges Bastian Schroeder, Ph.D., P.E. Director of

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

FINAL REPORT. Prepared for National Cooperative Highway Research Program Transportation Research Board of The National Academies

FINAL REPORT. Prepared for National Cooperative Highway Research Program Transportation Research Board of The National Academies Project No. 20-07 / Task 283 COPY NO. Evaluation of the Flashing Yellow Arrow (FYA) Permissive Left-Turn and Yellow Arrow Change Indications in Protected/Permissive Left-Turn Control: The Impact of Separate

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

University of California, Davis Transit Signal Priority Implementation Study

University of California, Davis Transit Signal Priority Implementation Study Proposal University of California, Davis Transit Signal Priority Implementation Study Prepared for: Prepared by: University of California, Davis 2990 Lava Ridge Court Suite 200 Roseville, CA 95661 November

More information

DESIGN CRITERIA MANUAL CHAPTER 6 TRAFFIC CONTROL

DESIGN CRITERIA MANUAL CHAPTER 6 TRAFFIC CONTROL DESIGN CRITERIA MANUAL CHAPTER 6 TRAFFIC CONTROL MUNICIPALITY OF ANCHORAGE PROJECT MANAGEMENT & ENGINEERING DEPARTMENT AND TRAFFIC DEPARTMENT JANUARY 2007 DESIGN CRITERIA MANUAL REVISION LOG Chapter 6

More information

Right turns at signalised intersections: Can they be standardised?

Right turns at signalised intersections: Can they be standardised? Right turns at signalised intersections: Can they be standardised? By : S Dumakude Why standardise right turning movements at signalised intersections? Are there any benefits to standardising right turns?

More information

2014 FHWA Aging Road User Handbook. Recommendations to Accommodate Aging Pedestrians. Lifesaver National Conference. What is the Handbook?

2014 FHWA Aging Road User Handbook. Recommendations to Accommodate Aging Pedestrians. Lifesaver National Conference. What is the Handbook? 2014 FHWA Aging Road User Handbook Recommendations to Accommodate Aging Pedestrians Lifesaver National Conference March 17, 2015 Revised June 2014 1 What is the Handbook? 1998 1st Edition 2001 2nd Edition

More information

Congestion Protection for Transit: Lessons from Europe and Application to MBTA Route 66

Congestion Protection for Transit: Lessons from Europe and Application to MBTA Route 66 Congestion Protection for Transit: Lessons from Europe and Application to MBTA Route 66 Peter G. Furth Chris Boll 1 Break the Vicious Cycle more people use cars congested streets slower transit X X congestion