CAMPO 2040 Regional Transportation Plan

Size: px
Start display at page:

Download "CAMPO 2040 Regional Transportation Plan"

Transcription

1 TxDOT Bastrop US Mile East of FM Miles East of FM 696 Widen to a 4-lane divided $50,303, TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and seal coat $1,441, TxDOT Bastrop US 290 FM 2104 Lee County Line Widen to 4-Lane Divided 2018 $29,872, TxDOT Bastrop SH Miles West of SH Miles West of SH 95 Construct Bridges, Main Lanes, and Frontage Roads $24,838, TxDOT Bastrop SH MI W of SH MI W of SH 95 Construct Frontage Roads and Bridge $37,660, City of Smithville Bastrop SH 95 Smithville High School LP 230 at Fawcett Street Widen SH $3,800, Bastrop County Bastrop SH 21 SH 71 Caldwell County Line Construct MAD-4 or Super $5,646, TxDOT Bastrop SH 71 west of Colorado River east of Loop 150 E Construct 4-lane freeway with 3-lane frontage roads 2015 $45,400, Smithville Bastrop SH 95 Loop 230 Smithville High School Add continuous turn lane and sidewalks (both sides) 2015 $4,200, Elgin Bastrop FM 1100 Travis County Line SH 95 Construct MAD $24,200,000.00

2 City of Bastrop Bastrop Blakely Lane Extension Blakely Lane Jessica Place Plan alignment and construct extension of Blakely Lane east of Burleson Crossing to connect to Jessica Place in Riverside Grove between Hawthorne City of Bastrop Bastrop Hasler Boulevard Marie Street Hwy 304. Plan alignment and construct extension of Hasler Boulevard west of Marie Street to connect to Hwy 304 at Hunters Point Drive. Curb and gutter City of Bastrop Bastrop Mesquite Street Mesquite Street Reids Bend (CR 41) Re-construct Mesquite Street west to connect to Reids Bend (CR 41) 2021 $1,200, $2,900, $2,900, Bastrop County Bastrop Arterial Street Improvement Program. - $5,100, City of Bastrop Bastrop Arterial Street Improvement Program. - $25,900, Smithville Bastrop Arterial Street Improvement Program. - $4,600, TxDOT Bastrop SH 71 Intersection at FM 1209 Construct overpass $26,000, TxDOT Bastrop SH 71 Intersection at Pope Bend Road Construct overpass $26,000, TxDOT Bastrop FM 812 Travis County Line SH 21 Improve 2-lane roadway to MAD $10,000, TxDOT Bastrop SH 71 Intersection at Tucker Hill Lane Construct overpass $24,000,000.00

3 Bastrop County Bastrop FM 1704 FM 969 TX 71 Extend FM 1704 south of FM 969 and connect to Colorado Dr. via a new bridge across the Colorado River; upgrade Colorado Dr. to an arterial 2040 $1,225, Bastrop County/City of Bastrop Bastrop SH 304 SH 304 at Shiloh Rd. Lovers Lane 0.3 Miles South of SH 71 Construct new road connecting SH 304/ Shiloh Rd intersection with Lovers Lane via a new bridge across the Colorado River - includes a connection 2040 $8,400, Bastrop County Bastop Old Lexington Road/ FM Miles West of Racoon Road FM 696 Realign Old Lexington Rd. and upgrade to minor arterial; extend Old Lexington Rd. to FM 696 to the east 2040 $3,406, Bastrop County Bastrop New Road Miles East of Wolf Lane SH Miles West of SH 304 Construct a new arterial road connecting SH 71 to Pearce Lane/FM $9,111, Bastrop County/City of Bastrop Bastrop Shiloh Rd SH 20 SH 304 Upgrade Shiloh Rd. to a collector from SH 20 to SH $1,382, TxDOT Bastrop SH 21 Caldwell County Line SH 71 PROVIDE SUPER 2 PASSING LANES 2018 $4,656, TxDOT Bastrop US Miles East of FM Miles East of FM 696 Reconstruct existing 4-Lane undivided roadway to a 4-Lanen divided roadway 2019 $44,456, TxDOT Bastrop US 290 FM 2104 Lee C/L Reconstruct existing 4-Lane undivided roadway to a 4-Lanen divided roadway 2019 $29,000, TxDOT Bastrop US Miles East of FM Miles East of FM 696 Reconstruct existing 4-Lane undivided roadway to a 4-Lanen divided roadway 2019 $2,119, TxDOT Bastrop SH 71 At FM 1209 Construct 2-Lane Overpass 2021 $46,381,883.25

4 TxDOT Bastrop SH 71 At Pope Bend Rd. Construct 2-Lane Overpass 2020 $33,293, TxDOT Bastrop SH 71 Travis / Bastrop County Line.65 Miles East of Tucker Hill Lane Construct Overpass And Add 2 Lane One-Way Eastbound And Westbound Frontage Roads 2020 $24,535, TxDOT Bastrop SH Miles West of SH Miles West of SH 95 Convert Existing 2-Lane 2-Way Frontage Roads To 2-Lane One-Way Frontage Roads Over Colorado River 2019 $30,179, TxDOT Bastrop SH Miles West of SH Miles West of SH 95 Convert Existing 2-Lane Two-Way Frontage Roads To 2-Lane One Way Frontage Roads 2019 $17,475, City of Bastrop Bastrop CS Bastrop State Park Chestnut Street at Loop 150 Construct Multi-Use Path 2020 $1,628, City of Smithville Bastrop SL 230 SH 95 to Olive Street Bluebonnet Circle to Webb Street ADA sidewalks $591, City of Bastrop Bastrop CS Bastrop State Park LP 150 at Chestnut Street Construct multi-use path $1,450, TxDOT Burnet US 281 RM 2147 East.466 Mi North of SH 71 Add Center Left Turn Lane and Shoulders 2018 $9,502, Burnet County Burnet Arterial Street Improvement Program. - $87,700, City of Burnet Burnet Arterial Street Improvement Program. - $11,800,000.00

5 Marble Falls Burnet Arterial Street Improvement Program. - $12,000, TxDOT Burnet US 281 Intersection at SH 71 Reconstruct interchange $55,000, Hays County Caldwell SH 80 CR Mi E of CR 266 Install left turn lane 2019 $932, Caldwell County Caldwell CS SH 142 Clear Fork Street Engineering for a 4-lane roadway $200, TxDOT Caldwell SH 80 SH 21 FM 1984 Complete gap in shoulder for bicycle travel $5,400, Caldwell Caldwell SH 21 Hays County Line SH 130 Widen to 4 lanes 2025 $12,500, Caldwell Caldwell SH 80 FM 1979 SH 130 Widen to 4 lanes 2025 $55,900, Caldwell Caldwell SH 80 County Line Road FM 1979 Widen to 6 lanes with raised median 2035 $100,400, Caldwell Caldwell SH 142 SH 80 Yarrington Road Extension Widen to 4 lanes 2025 $8,800, Caldwell Caldwell SH 142 Yarrington Road Extension FM 150 Extension Widen to 4 lanes 2025 $40,300,000.00

6 Caldwell Caldwell SH 142 FM 150 Extension SH 130 MAD $104,000, Lockhart Caldwell FM 2001 Expansion / Silent Valley Rd.14 Miles south of SH 142 Silent Valley Rd Northward extension of City Line Road from a point.14 miles south of SH 142 to intersect Silent Valley Road 2040 $1,200, Lockhart Caldwell City Line Road Extend City Line Rd from Clear Fork St FM 20 Construct new roadway 2035 $7,800, Lockhart Caldwell City Line Road Extend City Line Rd south and southeast from FM 20 to and along MLK Jr Industrial Blvd US 183 Construct new 4-lane arterial 2035 $5,600, Lockhart Caldwell City Line Road SH 142 Clear Fork Rd Rehab and widen to 4 lanes 2035 $3,600, Lockhart Caldwell CR 214 / Graham Road Connect CR 215 US 183 via CR 214 Alternate to New Roadway $5,600, Lockhart Caldwell E MLK Jr Industrial Blvd Extend E MLK Jr Industrial Blvd FM1322 New MAU $2,200, Lockhart Caldwell N Mockingbird Lane Extend Mockingbird Ln Silent Valley Rd. New MAU $10,800, Lockhart Caldwell New Roadway 30 US 183 flood events Proposed alternative to FM $11,700, Lockhart Caldwell New Roadway 34 FM 1322 CR 203. Construct new roadway 2035 $3,800,000.00

7 Lockhart Caldwell New Roadway 46 CR 215 CR 213/Robin Ranch Rd Construct new roadway 2035 $3,500, Lockhart Caldwell New Roadway 47 CR 221 SH 130 at Plum Creek U- turn bridge Construct new roadway 2035 $10,900, Lockhart Caldwell San Jacinto Street FM 20 MLK Jr Industrial Blvd Construct new roadway 2035 $7,700, Caldwell Caldwell Arterial Street Improvement Program. - $8,900, Lockhart Caldwell Arterial Street Improvement Program. - $6,600, TxDOT Caldwell SH 21 Hays County Line Bastrop County Line Provide super 2 passing lanes $14,900, TxDOT Caldwell SH 21 Hays County Line Bastrop County Line PROVIDE SUPER 2 PASSING LANES 2018 $4,889, Caldwell County Caldwell VA Various In Caldwell County Set-Aside For Projects Caldwell County STPMM Set-Aside 2019 $2,554, Hays County, TxDOT Caldwell FM 110 SH 80 SH 21 Construct Two Lanes And Shoulders 2019 $29,964, Hays County, TxDOT Caldwell FM 110 Hays County Line SH 80 Construct Two Lanes And Shoulders 2019 $7,903,525.37

8 Caldwell County Caldwell US 183 US 183 North of Luling US 183/SH 80 South of Luling Alternatives analysis for relief route $225, Travis Travis IH 35 Yarrington Road RM 150 Mill, Seal, and TOM 2017 $1,811, Hays County Hays IH Miles N. of Posey Road Comal County Line Replace Bridges and Approaches 2020 $30,806, TxDOT Hays IH 35 River Ridge Parkway FM 150 Mill, Seal, and Tom 2017 $1,403, TxDOT Hays RM Mi N of Robert S Light.141 Mi S of Robert S Light Add Left Turn Lane and Shoulders 2019 $567, City of Wimberley/Hays County Hays RM Miles North of RM Miles South of RM 3237 Engineering, design, and ROW purchase to add turn lanes and pedestrian crossing $246, Hays County Hays SH Mi W of CR 266 CR 266 Install left turn lane 2019 $932, TxDOT Hays SH Mi West of FM 2001 Caldwell County Line Repair, Level-up, Widen and Overlay 2017 $5,387, City of Wimberley/Hays County Hays RM 3237 RM Miles East of RM 12 Engineering, Design, and ROW purchase to add turn lanes and ped crossing 2019 $246, City of San Marcos Hays CS LP 82 Commanche Street Intersection, signal, and bicycle and pedestrian improvements $2,603,345.00

9 Hays County Hays Robert S Light RM 967 at Robert S. Light Blvd. FM 1626 Construct new roadway 2019 $21,257, Hays County Hays FM Miles South of SL Miles South of SL 4 Add left turn lane and shoulders $1,138, CTRMA/TxDOT Hays SH 45 Travis County Line FM 1626 Construction of a 4-lane tolled freeway (Project may be phased) 2017 $41,500, Hays County Hays FM 2001 IH 35 SH 21 Widen to a 4-lane divided roadway by add two lanes and shoulders $34,626, TxDOT Hays SH 123 IH 35 DeZavalla Construct Sidewalks 2018 $815, City of San Marcos Hays CS Hopkins Street from Moore Street Bishop Street Reconstruct Hopkins Street from Bishop Street to Moore Street per the City's Complete Streets Policy $3,050, City of San Marcos Hays CS Hopkins Street from CM Allen Pkwy Thorpe Road Design and construct multi-use bike/ped facility that connects existing Crosstown hike and bike trails to existing facility $2,800, City of Kyle Hays Dorman Lane At FM 1626 Feasibility study for proposed improvements at the intersection $150, TxDOT Hays IH-35 - Hays County SH 45 SE Posey Rd. IH-35 Improvement Projects 2020 $1,500,000, Buda Hays IH-35 / OSR Connector Old San Antonio Rd IH-35 New 2-lane undivided 2018 $100,000.00

10 Hays Hays US 290 W Blanco County Line RM 165 MAD $25,900, Hays Hays US 290 W RM 165 NF 2. MAD $25,900, Hays Hays US 290 W RM 12 Nutty Brown Rd MAD $21,800, San Marcos Hays Loop 82 LBJ Dr IH-35 (Two way) MAD $1,200, San Marcos Hays Loop 82 (Phase 1) Guadalupe St/Grove St LBJ Dr (One way) MAD $200, San Marcos Hays Loop 82 / Aquarena Springs Dr IH-35 Sessom Dr. MAD $5,100, San Marcos Hays Loop 82 / Guadalupe University Dr Grove St (One way SB) MAD $3,800, San Marcos Hays Loop 82 / LBJ University Dr Grove St (One way NB) MAD $2,400, San Marcos Hays Loop 82 / University Dr Sessom Dr Guadalupe St. MAD $2,000, Hays Hays SH 21 Caldwell County Line CR 159 (Yarrington) MAD $40,400,000.00

11 Hays Hays SH 21 CR 159 (Yarrington) SH 80 MAD $32,200, Hays Hays SH 80 SH 21 Caldwell County Line MAD $2,100, San Marcos Hays SH 80 IH-35 SH 21. MAD $3,600, San Marcos Hays SH 80 / E Hopkins Moore St Loop 82. MAD $1,200, San Marcos Hays SH 80 / E Hopkins Loop 82 CM Allen. MAD $500, San Marcos Hays SH 80 / E Hopkins CM Allen IH-35. MAD $3,800, San Marcos Hays SH 80 / Old RR 12 RM 12/Wonder World Dr Holland St MAD $7,200, San Marcos Hays SH 80 / Old RR 12 Holland St Lindsey. MAD $2,200, San Marcos Hays SH 80 / Old RR 12 / Moore St Lindsey Hopkins. MAD $700, Hays Hays SH 80 at Old Bastrop Hwy (CR 266) East of Old Bastrop Hwy (CR 266) East of Old Bastrop Hwy (CR 266) Construct center left-turn lanes 2016 $1,500,000.00

12 Hays Hays SH 123 Wonder World Dr Guadalupe County Line MAD $10,000, San Marcos Hays SH 123 IH-35 FM 621. MAD $6,600, San Marcos Hays SH 123 FM 621 Wonder World Dr MAD $700, Hays Hays FM 110 E - Phase 1 Interim IH-35 N SH 123. MAD $61,500, Hays Hays FM 110 E - Phase 2 Ultimate IH-35 N Turnersville Rd Extension (NF 1) MAD $4,500, Hays Hays FM 110 E - Phase 2 Ultimate Turnersville Rd Extension (NF1) SH 123 MAD $26,600, Hays Hays FM 150 Extension / NF 17 (Kyle) FM 150 Kyle Loop. MAD $10,400, Hays Hays FM 150 W RM 12 RM MAD $5,700, Hays Hays FM 150 W RM 1826 FM MAD $15,600, Hays Hays FM 150 W FM 3237 Kyle Loop SW MAD $12,500,000.00

13 Hays Hays FM 150 W Kyle Loop SW FM 2770 MAD $3,100, Kyle Hays FM 150 W / Center St Rebel Dr IH-35. MAD $11,000, Hays Hays FM 165 US 290 Blanco County Line MAU $23,100, Hays Hays FM 621 / Staples Rd SH 123 Guadalupe Line. MAU $14,800, Hays Hays FM 967 FM 1626 Main St. MAD $13,800, Hays Hays FM 967 FM 1826 FM MAU $17,400, Hays Hays FM 967 / S. Loop 4 / S. Main St Main St W Goforth. MAU $1,700, Hays Hays FM 967 / S. Loop 4 / S. Main St W Goforth IH-35. MAU $700, Buda Hays FM FM 967 Widen to 4-lane divided 2013 $49,300, Hays Hays FM 1626 FM 967 FM MAD $40,000,000.00

14 Hays Hays FM 1626 SH 45 SW IH-35. MAD $49,800, Hays Hays FM 2439 / Hunter Rd Bishop RM 12/Wonder World Dr MAD $3,600, San Marcos Hays FM 2439 / Hunter Rd SH 80 Bishop. MNR $4,400, Hays Hays FM 2439 / Hunter Rd Centerpoint Rd Comal County Line MAD $5,200, Buda Hays FM 2770 FM 1626 Main St. Widen to 4-lane undivided 2024 $20,400, Kyle Hays FM 2770 FM 1626 FM 150. MAD $20,500, Hays Hays RM 12 FM 150 W Winters Mill Pkwy MAD $61,000, Hays Hays RM 12 FM 3237 RM 32. MAD $24,500, Hays Hays RM 12 Fitzhugh Rd FM 150 W MAD $5,800, Hays Hays RM 12 FM 2439/Hunter Rd SH 123 MAD $4,500,000.00

15 Hays Hays RM 12 Winters Mill FM MAD-2; designate as BR $11,700, Hays Hays RM 12 RM 32 Old RR 12/SH 80 PKWY $96,200, Wimberley Hays RM 12 and FM 3237 Intersection Improvement RM 12 - north and south of FM FM 3237 east of RM 12 Engineering, design and right-of-way purchase to add turn lanes and pedestrian crossings 2016 $400, Hays Hays RM 32 Comal County Line RM 12 MAD $25,900, Buda Hays RM 967 Goforth Rd IH-35. Widen to 4-lane undivided 2017 $17,300, Hays Hays RM 1826* SH 45 SW Nutty Brown Rd Improve to MAD $13,600, Hays Hays RM 1826 Nutty Brown Darden Hill. MAD $5,800, Hays Hays RM 1826 Darden Hill Rd FM 150 (W) MAD $5,800, Hays Hays RM 2325 Blanco County Jacob's Well. MAD $39,600, Hays Hays RM 2325 Jacob's Well Wimberley City Limits MAD $12,100,000.00

16 Hays Hays RM 3237 RM 12 Flite Acres Rd MAD $2,800, Hays Hays RM 3237 Flite Acres Winters Mill. MAD $3,100, Hays Hays RM 3237 Winters Mill FM 150. MAD $2,100, Hays Hays Bebee Rd IH-35 SH 21 Improve to MAD $36,600, Kyle Hays Bunton/Goforth Road IH-35 Frontage Road Lehman Road Construct 3-lane road with continuous left turn lane up to 900' west of Brandi Circle. From 900' west of Brandi Circle transition to existing $5,000, Kyle Hays Burleson Road Miller Street IH-35 Frontage at new connecting location Construct 3-lane road with continuous left turn lane. Sidewalk along one side of the road $8,800, Buda Hays Cabela's Dr Main St Manchaca Springs Rd New 2-lane undivided 2024 $4,000, Kyle Hays Center St Old Stagecoach FM 150. Widen to 4 lanes 2035 $7,900, Hays Hays Centerpoint Rd RM 12 FM New MAD $14,500, Hays Hays Centerpoint Rd / CR 234 IH-35 Old Bastrop Hwy. Improve to MAD $3,500,000.00

17 Hays Hays Centerpoint Rd / CR 234 FM 2439 IH-35. Improve to MAD-4, dedicate right-ofway for railroad overpass 2025 $2,900, Hays Hays Centerpoint Rd / CR 234 Old Bastrop Beback Inn Rd MAD $2,700, Hays Hays Craddock Ave / NF 8 N LBJ Dr. Lime Kiln/River Ridge MAU $9,800, Buda Hays Dacy Ln Hillside Terrace Bebee Rd. MAU $11,400, Hays Hays Dacy Ln / Goforth Rd Bebee IH-35. MAU $11,400, Hays Hays Darden Hill Rd / CR 162 FM 150 FM Improve to MAD $24,800, San Marcos Hays E River Ridge Pkwy IH-35 SH 21. MAD $16,800, Hays Hays Elder Hill Rd / CR 170 RM 12 FM 150. Improve to MAU $7,800, Hays Hays Fitzhugh Rd / CR 101 RM 12 Travis County Line Improve to MAU $5,500, Buda Hays Garison Road Main St. Manchaca Springs Rd. Reconstruct/extend 2-lane undivided with sidewalks 2025 $6,500,000.00

18 Buda Hays Garlic Creek Dr (new N/S) SH 45 RM 967. New 4-lane divided 2025 $26,800, Kyle Hays Goforth Road Brent Boulevard Bunton Creek Road Construct 4-lane road. Sidewalk along one side of the road $10,100, Kyle Hays Goforth Road IH-35 Frontage Road Brent Boulevard Construct 3-lane road with continuous left turn lane. Sidewalk along one side of the road $10,100, Buda Hays Hillside Terrace IH-35 Old Goforth Rd.. Widen to 4-lane divided, add sidewalks 2020 $3,600, Buda Hays Hillside Terrace Old Goforth Rd FM 2001 Widen to 4-lane divided, add sidewalks 2020 $6,400, San Marcos Hays Hopkins Street Reconstruction Moore Street Bishop Street. Reconstruct Hopkins Street from Moore Street to Bishop Street to the City's Complete Street policy. Reconstruct the street, multi-use path, sidewalks, curb $9,000, Hays Hays Jacobs Well Rd / NF 25 FM 2325 Wayside Dr. New MAU $13,800, Hays Hays Kohlers Xing FM 2770 IH-35. New MAD $5,500, Hays Hays Kyle Loop W NF 17 Old Stagecoach Rd MAD $15,500, Hays Hays Kyle Loop W Old Stagecoach Rd IH-35. MAD $4,100,000.00

19 Hays Hays Kyle Loop W FM 1626 NF 17. MAD $10,000, Kyle Hays Kyle Marketplace North Burleson Street, east Frontage Road Reliever of the Union Pacific RR City Lights Drive Construct 3-lane road. Sidewalk along one side of the road $4,100, Hays Hays Kyle Parkway IH-35 at FM 1626 SH 21 MAD $15,800, Kyle Hays Lehman Road E RM 150 Goforth Road Construct 2-lane road with dedicated left turn lanes at cross streets and widen to 4 lanes at the Goforth Rd. intersection. Sidewalk along one side Buda Hays Main St Sequoyah St Sequoyah St. Traffic signal warrant and potential signal 2016 $8,300, $100, Buda Hays Main St IH-35 Turnersville Rd. New 4-lane divided 2020 $2,400, Buda Hays Main St IH-35 Firecracker Dr. Widen to 6-lane divided 2025 $31,700, Buda Hays Main St Cabela's Dr IH-35. Widen to 6-lane divided 2027 $1,200, Buda Hays Manchaca Springs Rd RM 967 IH-35 at Turnersville New 4-lane divided 2025 $61,100, Hays Hays Marketplace Ave FM 967 IH-35 at Burleson Rd New MAD $6,500,000.00

20 Hays Hays McCarty Ln / CR 233 FM 2439/Hunter Rd IH 35 Improve to MAD $2,300, Hays Hays NF 2 (Dripping Springs) US 290 W US 290 Bypass MAU $8,300, Hays Hays NF 6 (San Marcos) RM 12 FM New MAD $18,300, Hays Hays NF 10 (Dripping Springs) RM 12 US 290 SE Bypass MAU $3,000, Hays Hays NF 12 (Driftwood) Elder Hill Rd FM 150 at RM 1826 New MAD $15,300, Hays Hays NF 18 / Roger Hanks Ext. US 290 W RM 12 New MAD $5,100, Hays Hays Nutty Brown Rd / CR 163 US 290 RM Improve to MAD $8,600, Buda Hays Old FM 2001 FM 2001 Old Goforth Rd. Reconstruct with TWLTL and sidewalks 2018 $1,800, Kyle Hays Old Stagecoach Post Rd FM 150. MAU $13,700, Hays Hays Posey Rd / CR 235 FM 2439 IH-35. Improve to MAD $1,500,000.00

21 Hays Hays Posey Rd / CR 235 IH-35 Old Bastrop Hwy. Improve to MAD $2,500, Hays Hays Post Rd / CR 140 IH-35 Aquarena Springs Rd. Improve to MAU $17,400, San Marcos Hays River Ridge Pkwy Lime Kiln Rd Post Rd MAU $10,200, San Marcos Hays River Ridge Pkwy Post Rd IH-35. MAD $8,600, San Marcos Hays River Road RR Overpass & Road Wal-Mart Aquarena Springs Dr. Construct RR overpass to replace existing underpass and construct 4- lane section 2015 $14,000, Buda Hays Robert Light Blvd FM 2770 Main St/FM 967 New 4-lane divided with railroad overpass 2015 $16,800, Buda Hays Robert Light Blvd FM 1626 FM New 4-lane divided 2018 $27,100, Hays Hays Robert S. Light Blvd. Phase 1 Interim FM 1626 FM 967. Construct new MAD-2 with RR overpass 2020 $13,100, Hays Hays Robert S. Light Blvd. Phase 2 Ultimate FM 1626 FM 967. MAD $18,800, Hays Hays Sawyer Ranch Rd / CR 164 US 290 Darden Hill Rd Improve to MAD $36,000,000.00

22 Hays Hays Shadow Creek Blvd Hillside Terrace Bebee Rd. New MAD $35,900, Hays Hays Turnersville Rd Extension SH 45 SE FM 2001 New MAD $11,300, Hays Hays Turnersville Rd Extension FM 2001 FM 110. MAD $15,500, Hays Hays Windy Hill Rd IH-35 Turnersville Rd extension. Improve to MAD $24,100, Hays Hays Winter's Mill Parkway RM 12 FM MAU $3,900, Hays Hays Yarrington Rd / CR 159 FM 110 SH 21. Improve to MAD $7,900, Buda Hays Arterial Street Improvement Program. - $700, Hays Hays Arterial Street Improvement Program. - $13,600, Kyle Hays Arterial Street Improvement Program. - $23,700, San Marcos Hays Arterial Street Improvement Program. - $677,200,000.00

23 TxDOT Hays RM 150 IH 35 RM 150 at Arroyo Ranch Road Realign Roadway (MAD-4) on new location $200,000, TxDOT Hays SH 21 Caldwell County Line SH 71 Provide super 2 passing lanes $5,377, TxDOT Hays SH 21 SH 80 Caldwell County Line Provide super 2 passing lanes $185,900, City of Kyle Hays Blanco-Nance Bridge Cypress Road Hillard Road Multi-lane span bridge with pedestrian/bike lane, starting at the elevated western Blanco River bank to a new road connecting to Hilliard TxDOT Hays IH 35 At SH 123 ADD SHLDS, AUX LNS, RAMP IMPRVMTS, PVMT REHAB, FRTG RD INTER SECT IMPROVMT, BIKE & PED IMPRVMTS 2025 $30,000, $99,874, TxDOT Hays SH 21 SH 80 Caldwell County Line PROVIDE SUPER 2 PASSING LANES 2018 $8,265, TxDOT Hays IH 35 Loop 82 South of Loop 82 Reconstruct Ramps 2020 $2,011, TxDOT Hays IH 35 South of SH 80 North of RM 12 Add Shlds, Aux Lns, Ramp Imprvmts, Pvmt Rehab, Frtg Rd Inter 2021 $96,504, TxDOT, Hays County Hays RM Miles North of Robert S Light Miles South of Robert S Light Add Left Turn Lane And Shoulders 2019 $709, TxDOT Hays SH 123 IH 35 Dezavalla Dr Construct Sidewalks 2020 $87,677.85

24 TxDOT, Hays County Hays CR RM 967 at Robert S. Light Blvd. FM 1626 Construct A Single-Lane Two Way Roadway And A Grade-Separated Crossing With The Union Pacific Railroad 2019 $18,763, City of San Marcos Hays CS Moore Street Bishop Street Reconstuct Roadway With Multi-Use Path, Sidewalks, And Curb And Gutter 2019 $11,912, City of San Marcos Hays CS CM Allen Parkway Thorpe Rd. Construct Multi-Use Bike/Ped. Facility 2020 $2,513, City of San Marcos Hays VA Nine Intersections On_Guadalupe, Hopkins, Gary & LBJ Streets Downtown San Marcos Pedestrian Improvements 2019 $209, City of San Marcos Hays VA East of Hopkins St. West of IH 35 SBFR San Marcos River Shared Use Path 2019 $2,739, City of Dripping Springs Hays CS US 290 Mighty Tiger Trl. Construct 6-foot sidewalk on Sportsplex Drive 2019 $440, Hays County, TxDOT Hays FM 2001 IH 35 SH 21 Widen To 4-Lane Divided Roadway By Adding Two Lanes And Shoulders 2019 $48,410, Hays County, TxDOT Hays FM 110 SH ' East Of Ih 35 Nbfr Construct Two Lanes And Shoulders 2019 $28,562, Hays County, TxDOT Hays FM 110 SH 123 CR 245 (Redwood Road) Construct Two Lanes And Shoulders 2019 $10,981, Hays County, TxDOT Hays FM 110 FM 621 Caldwell County Line Construct Two Lanes And Shoulders 2019 $13,922,512.62

25 Hays County, TxDOT Hays FM 110 CR 245 (Redwood Road) FM 621 Construct Two Lanes And Shoulders 2019 $3,894, City of San Marcos Hays CS San Marcos Visitors Center Aquarena Spring Drive Reconstruct an existing pedestrian path into a shared use path to accommodate bicycles $2,793, CTRMA Travis SL 1 US 183 RM 2222 Add direct connectors with transitions 2019 $167,385, TxDOT/CTRMA Travis US 183 N Williamson County Line SL 1 Widen from 3 to 4 general purposes lanes 2019 $69,262, CTRMA Travis US 183 N Williamson County Line SL 1 Add two express lanes in each direction 2019 $135,639, TxDOT Travis IH 35 At Wells Branch Pkwy Operational improvements-interchange 2020 $38,273, TxDOT Travis IH 35 At Williams Drive Reconstruct interchange 2020 $61,853, TxDOT Travis SH 71 At Ross Road & At Kellam Road Construct overpass 2020 $64,034, TxDOT Travis SH 130 US 290 SH 71 Add one lane in each direction 2018 $121,537, TxDOT Travis SH 130 SH 45 US 290 Add one lane in each direction 2018 $90,576,967.00

26 TxDOT Travis SL 1 North of Slaughter South of LaCrosse Grade Separation of Main Lanes with 2 through-lanes in each direction $77,897, TxDOT Travis IH 35 South of Holly Street North of Oltorf Add CDs, Aux Lanes, ramp improvements, pavement rehab 2018 $204,605, TxDOT Travis IH 35 At Parmer Lane Reconstruct intersection $38,768, TxDOT Travis IH 35 Rundberg Lane US 183 Add shoulders, auxiliary lanes, ramp improvements 2017 $187,176, TxDOT Travis IH 35 US 183 US 290 East Operational Improvements to Ramps and Direct Connectors 2017 $86,798, CTRMA/TxDOT Travis VA Various Locations in MPO Area Operation of the Highway Emergency Response Operator (HERO) patrol service 2017 $5,750, City of Elgin Travis VA Various Locations in the City of Elgin in Travis and Bastrop Counties Construct Sidewalks 2017 $1,498, City of Rollingwood Travis VA Various streets in Rollingwood Add bike striping and construct walking trail 2017 $150, City of Austin Travis CS North Lamar at Palmer Lane US 183 Construct sidewalks 2017 $1,770, City of Austin Travis CS East 7th Street East 4th Street Construct Sabine Street Pedestrian and Bicycle Promenade 2017 $3,370,000.00

27 City of Austin Travis CS 200' South of East 12th Street MLK Station Widen trail, install new bridge, and improve crossing for bikes and pedestrians $1,490, City of Lago Vista Travis VA Bar K Ranch Road at FM 1431 Frontier Cove Construct sidewalks and traffic calming $558, City of Austin Travis VA Various Locations Install pedestrian safety devices citywide $2,997, Travis County Travis FM 969 FM 3177 FM 973 Widen FM 969, an existing 4-lane undivided arterial, to provide for a continuous left-turn lane, shoulders, and a sidewalk on one side of the Travis County Travis FM 969 FM 973 Hunters Bend Road Widen FM 969, an existing 2-lane undivided arterial, to provide for two additional travel lanes, a continuous left turn lane, shoulders, and a CTRMA/TxDOT Travis SH 45 Hays County Line Loop 1 Construction of a 4-lane tolled freeway (Project may be phased) 2019 $18,128, $10,917, $67,420, CTRMA/TxDOT Travis US 183 At Colorado River Construct a bicycle and pedestrian path $4,800, CARTS Travis VA Travis-Hays County Purchase of 6 heavy duty 30-foot buses $2,100, TxDOT Travis FM 969 Tannehill Lane FM 3177/Decker Lane Pedestrian facility $1,034, Travis County Travis FM 1626 West of Brodie Lane FM 2304 Reconstruct to 4-lanes with continuous left turn lane $12,223,300.00

28 TxDOT Travis FM 974 Samsung Blvd..02 Miles East of Harris Ranch Reconstruct Roadway 2018 $5,978, Travis County Travis VA Various Locations Construct new sidewalk on both sides of Elroy Road within SH 130 right-ofway and a shared use path on FM 973 from Moores Bridge Road to 2019 $1,278, City of Austin Travis CS Northern Walnut Creek Trail West of Lamar Blvd. to IH 35 Construct bike/ped trail $2,466, Travis County Travis VA Proposed Wildhorse Connector Travis County East Metro Park Construct Shared Use Path $3,176, City of Pflugerville Travis Rowe Lane SH 130 Martin Lane Widen existing two-lane roadway to include turn lanes, additional shoulders, and drainage improvements $ City of Pflugerville Travis Weiss Lane Cele Road Cameron Road Reconstruct from MUD2 to MAD4 from Cele Road to Wilbarger Creek. South of Wilbarger Creek will be improved MUD Travis County Travis FM 2304 FM 1626 Ravencroft Drive Construct four-lane, divided arterial with bicycle lanes and sidewalks $542, $12,000, CTRMA Travis US 290 At SH 130 Develop and construct two tolled direct connectors at the US 290/SH 130 interchange 2018 $88,900, TxDOT Travis US 290 At SH 130 Develop and construct one Central Texas Turnpike System direct connector at the US 290/SH 130 Interchange 2018 $41,100, TxDOT Travis IH-35 - Travis County SH 45 N SH 45 SE IH-35 Improvement Projects 2020 $1,940,000,000.00

29 CTRMA Travis US 183 N Loop 1 N RM Express Lanes in each direction 2019 $225,700, CTRMA Travis US 183 S US 290 Boggy Creek. Completion of environmental document, traffic and revenue studies, final engineering, ROW acquisition, utility relocation and construction for CTRMA Travis US 183 S Boggy Creek SH 71. Completion of environmental document, traffic and revenue studies, final engineering, ROW acquisition, utility relocation and construction for CTRMA Travis US 290 W West of RM 1826 Loop 1 Construct 6-lane tolled turnpike with frontage roads 2016 $332,300, $319,700, $529,000, Travis Travis US 290 W RM 1826 Nutty Brown Rd Widen to MAD $17,500, CTRMA Travis Loop 1 Cesar Chavez Slaughter. 2 Express Lanes in each direction - MoPac South 2020 $352,800, CTRMA Travis SH 71 W Silvermine Dr. to US 290 Silvermine Dr. to US 290. Construct tolled lanes and frontage road 2018 $200,000, Travis Travis FM 812 FM 973 N Maha Loop Rd Improve to MAD $28,000, Travis Travis FM 812 Maha Loop Rd Travis County Line Widen to MAD $11,300, Travis Travis FM 969 FM 3177 Hunters Bend. Improve to MAD $18,000,000.00

30 Travis Travis FM 969 Hunters Bend Webberville City Limit Improve to MAD $49,700, Travis Travis FM 973 FM 973 Relocation SH 71 E Widen to MAD $61,200, Travis Travis FM 973 SH 71 E FM 812 Widen to MAD $26,500, Travis Travis FM 973 FM 812 US 183. Widen to MAD $16,200, Travis Travis FM 973 Relocation US 290 FM 973. New MAD-4/Improve to MAD $20,500, Travis Travis FM 973 to Blake Manor Rd. Connector FM 973 Blake Manor Rd New MAD $12,000, Travis Travis FM 1626 Manchaca Rd 0.2 miles south of Brodie Ln Improve to MAD $12,200, Travis Travis FM 1626 IH-35 Manchaca Road. Widen to MAD $15,300, Travis Travis FM 3238 (Hamilton Pool Rd) east side of Pedernales River RM 12 Improve to MAD $23,100, Travis Travis FM 3238 (Hamilton Pool Rd) RM 12 SH 71 W Improve to MAD $40,000,000.00

31 Travis Travis RM 620 Anderson Mill Rd. SH 71 W Widen to MAD $52,000, Travis Travis RM 620 Bypass 620 RR lanes, 2-lane west, 1 east 2020 $8,000, Travis Travis RM 1826 US 290 W Slaughter Lane Improve to MAD $7,900, Travis Travis RM 1826* Slaughter Lane SH 45 SW Improve to MAD $17,200, Travis Travis RM 2222 McNeil 620 Bypass. Widen to MAD $12,000, Travis Travis RM 2244 Walsh Tarlton Redbud Trail. Widen to MAD $6,000, Austin Travis Arterial A US 290 Samsung Blvd. New MAD-4, new alignment 2020 $25,500, Travis Travis Arterial B FM 969 Harold Green Rd New 2-lane minor arterial 2022 $11,400, Travis Travis Arterial C FM 969 Deaf Smith Blvd New 2-lane minor arterial 2022 $7,100, Travis Travis Bee Creek Rd Highlands Blvd SH 71 Improve to MAD $9,500,000.00

32 Austin Travis Berkman Dr 51st St E Manor Rd New MND-2 and Widen to MND $2,900, Travis Travis Blake-Manor Rd FM 973 Taylor Ln. Improve to MAD $13,800, Travis Travis Blake-Manor Rd Taylor Ln Burleson-Manor Rd Improve to MAD $13,500, Travis Travis Braker Ln FM 973 Taylor Ln New MAD $20,000, Travis Travis Braker Ln FM 3177 SH 130 New MAD $36,000, Travis Travis Braker Ln 1 mile east of Dessau Rd Harris Branch Pkwy New MAD-4 / Improve Blue Goose to MAD $20,800, Travis Travis Braker Ln Taylor Ln Burleson-Manor Rd. New MAD $12,300, Travis Travis Burleson-Manor Rd Blake-Manor Rd FM 969 Widen to 4 lanes 2038 $25,500, Travis Travis Burleson-Manor Rd FM 969 SH 71 New 2-lane minor arterial undivided 2038 $53,200, Travis Travis Cameron Rd Gregg-Manor Rd Gregg Ln. New MAD-4 / Improve to MAD $18,400,000.00

33 Travis Travis Cameron Rd Pflugerville East Rd Gregg-Manor Rd Widen to 4 lanes 2018 $17,600, Austin Travis Congress Ave North Bluff Dr South Boggy Creek Improve to MAD $12,600, Travis Travis CR 137 / Arterial A (Pflugerville) CR 138 Rowe Ln. Widen to 4 lanes 2030 $9,700, Travis Travis Deaf Smith Blvd Arterial C Northbound frontage of SH 130 New 2-lane minor arterial 2023 $9,500, Travis Travis Decker Ln Williamson County Line Pecan St Widen to MAD $39,800, Travis Travis Decker Ln Pecan St. Wells Branch Pkwy Widen to MAD $6,800, Travis Travis Decker Ln Wells Branch Pkwy Gregg Manor Rd New MAD-4 and Widen to MAD $10,600, Travis Travis Dessau Rd Northtown/Wells Branch FM 734. Widen to 6 lanes 2038 $30,800, Travis Travis Dunlap Rd. FM 969 S Dunlap Road Improve to MAD $9,600, Pflugerville Travis E Pflugerville Pkwy Colorado Sand Weiss Ln, SH 130 underpass 2 lane minor arterial undivided 2017 $7,300,000.00

34 Travis Travis Elroy Rd Ross Rd Fagerquist Rd. Improve to MAD $17,500, Travis Travis Fagerquist Rd Elroy Rd Four Daughters Rd Improve to MAD $13,100, Travis Travis Ferguson Ln Rundberg Ln Arterial A. New MAD-4 / Improve to MAD $16,800, Travis Travis Fitzhugh Rd US 290 W County Line Improve to MAD $12,200, Travis Travis Flint Rock Road City of Lakeway Jack Nicklaus Drive Widen to MAD $2,500, Travis Travis Flint Rock Road Jack Nicklaus Drive Serene Hills Drive Expand roadway to meet county 2016 $5,100, standards for MNR Travis Travis Four Daughters Road SH 71 E FM 812 New MAD $66,000, Travis Travis Frate Barker Rd Brodie Ln Manchaca Rd. Widen to MAD $8,500, Travis Travis Grand Ave Pkwy Greenlawn Blvd Bratton Lane. New MAD-4 / Improve to MAD $4,500, Travis Travis Greenlawn Blvd IH-35 N Anderson Mill Rd New MAD-4 and widen to MAD $5,400,000.00

35 Travis Travis Gregg-Manor Rd SH 130 US 290 E New MAD-4 / improve to MAD $24,900, Austin Travis Grove Blvd Montopolis Hogan Ave. New MAD $7,600, Pflugerville Travis Heatherwilde Blvd / Wilke Ln SH 45 Wilke Ln. MAD $8,300, Travis Travis Hewitt Ln Frate Barker Rd FM 1626 Improve to MNR $5,500, Travis Travis Hidden Lake Blvd Kelly Ln Pflugerville Rd. New MAD $18,100, Travis Travis Hodde Ln Rowe Ln Cele Rd. Improve to MAD $18,700, Travis Travis Howard Ln Cameron Rd SH 130. New MAD $19,000, Austin Travis Howard Ln McNeil Rd Loop 1 N Improve to MAD $18,600, Travis Travis Jake's Hill Rd Rowe Ln Kelly Ln. New MAD $15,700, Travis Travis Jesse Bohls Rd Weiss Ln Cameron Rd. New MAD-4 / Improve to MAD $23,900,000.00

36 Pflugerville Travis Kelly Ln Moorlynch Ave Weiss Ln. Widen to 4-lane divided major arterial with bicycle and pedestrian accommodations 2015 $7,700, Travis Travis Kelly Ln Weiss Lane FM 973. New MAD-4 and Widen to MAD $25,100, Travis Travis Lohman Ford Rd FM 1431 Sylvester Ford Rd Widen to MAD $28,500, Travis Travis Lohman Ford Rd Sylvester Ford Rd Point Venture Widen to MNR $16,600, Travis Travis Maha Loop Rd SH 71 Pearce Ln (Phase 1) New MAD $15,000, Travis Travis Maha Loop Rd SH 71 Pearce Ln (Phase 2) Improve to MAD $12,000, Travis Travis Maha Loop Rd Pearce Ln FM 812. New MAD-4/Improve to MAD $37,600, Travis Travis Maha Loop Rd FM 812 Slaughter Ln (Moore Rd) New MAD-4 and Widen to MAD $7,100, Travis Travis Maha Loop Rd Slaughter Ln (Moore Rd) Maha Loop Rd New MAD-4 and Widen to MAD $15,100, Travis Travis McKinney Falls Pkwy William Cannon Dr Slaughter Ln New MAD-4 and widen to MAD $5,900,000.00

37 Travis Travis McKinney Falls Pkwy (Palmer Rd) SH 45 Turnersville Rd. Widen to MAD $4,000, Austin Travis McNeil Dr US 183 Howard Ln. Widen to 6 lanes 2030 $29,300, Austin Travis McNeil Rd 700' north of SH 45 McNeil Dr/Howard Ln Improve to MAD $26,100, Travis Travis Melber Ln Kelly Ln Cameron Rd. New MAD $33,700, Travis Travis Moore Rd (Slaughter) FM 973 Maha Loop Rd Improve to MAD $25,000, Travis Travis Old Kimbro Rd US 290 E Littig Rd Improve to MAD $12,800, Travis Travis Palmer Rd FM 1327 SH 45. Improve to MAD $5,200, Travis Travis Parmer Lane US 290 E Braker. New MAD $14,700, Travis Travis Parsons Rd Littig Rd Lockwood Rd. New MAD-4 / Improve to MAD $18,700, Travis Travis Pearce Ln FM 973 Maha Loop Rd Improve to MAD $28,990,000.00

38 Travis Travis Pearce Ln Maha Loop Rd Wolf Ln Improve to MAD $28,880, Pflugerville Travis Pflugerville East Rd (Pecan Street) SH 130 Weiss Ln. MAD $4,600, Travis Travis Pflugerville Rd Weiss Ln Cameron Rd. Widen to 4 lanes 2023 $3,200, Austin Travis Pleasant Valley Rd Onion Creek Dr CR 105/Turnersville Rd New MAD-4 / Improve to MAD $46,700, Austin Travis Pleasant Valley Rd Existing Pleasant Valley Rd SH 71 New MAD $4,000, Travis Travis Puryear Rd 1 mile west of IH-35 IH-35 New MAD $10,500, Travis Travis Reimers Peacock SH 71 Hamilton Pool Rd New 2-lane minor arterial undivided 2019 $10,000, Travis Travis Ross Rd SH 71 Elroy Rd. Widen to 4 lanes 2038 $29,700, Travis Travis Ross Rd Elroy Rd McAngus. New 2-lane minor arterial divided 2038 $5,500, Pflugerville Travis Rowe Ln SH 130 CR lane minor arterial undivided 2017 $2,100,000.00

39 Travis Travis Rowe Ln City of Pflugerville Hodde Ln Widen to MAD $15,200, Travis Travis Rowe Ln Hodde Ln Decker Ln. New MAD-4 and Widen to MAD $1,300, Austin Travis Rundberg Ln FM 1325 Metric Blvd. New MAD $27,000, Travis Travis Slaughter Ln Pleasant Valley Rd McKinney Falls Pkwy New MAD $16,100, Travis Travis Slaughter Ln McKinney Falls Pkwy FM 973 New MAD $32,500, Travis Travis Taylor Ln Lockwood Rd FM 969. Improve to MAD $39,200, Travis Travis Thaxton Rd Slaughter Lane FM Improve to MAD $36,500, Pflugerville Travis Weiss Lane Cele Road Kelly Ln. 2 lane minor arterial undivided 2017 $3,700, Travis Travis Weiss Lane Cele Road Cameron Rd. New MAD-4 / Improve to MAD $36,700, Travis Travis Wells Branch Pkwy Immanuel Cameron. New MAD-4 / Improve to MAD $10,000,000.00

40 Travis Travis Wells Branch Pkwy Cameron SH 130. New MAD $7,400, Travis Travis Wells Branch Pkwy SH 130 Fuchs Grove Rd New MAD $17,800, Austin Travis Westgate Blvd Cohoba Dr Cameron Loop. New MAD $4,000, Travis Travis Wild Horse Connector FM 973 Parmer LN. New MAD $16,000, Austin Travis William Cannon Dr Running Water Dr McKinney Falls Pkwy Improve to MAD $7,400, Travis Travis William Cannon Dr McKinney Falls Pkwy US 183 S New MAD $9,500, Austin Travis William Cannon Dr Pleasant Valley Rd.5 miles east Widen to MAD $8,600, Travis Travis William Cannon Dr / FM 812 US 183 S FM 812 New MAD $15,800, Austin Travis Arterial Street Improvement Program. - $2,647,400, Bee Cave Travis Arterial Street Improvement Program. - $4,500,000.00

41 Lakeway Travis Arterial Street Improvement Program. - $14,600, Manor Travis Arterial Street Improvement Program. - $7,900, Pflugerville Travis Arterial Street Improvement Program. - $216,400, Travis Travis Arterial Street Improvement Program. - $95,900, Westlake Hills Travis Arterial Street Improvement Program. - $20,500, Travis County Travis FM 1625 McKenzie Road Intersection with 183 Realign Roadway and Relocate Highway Intersection $1,000, TxDOT Travis SH 130 SH 71 SH 45 SE Operational improvements $10,000, Travis County Travis SH 71 Intersection at Navarro Creek Extend Westbound Left Turn Lane $190, TxDOT Travis SH 71 Ross Road Kellam Road Construct overpass $64,000, TxDOT Travis IH 35 Onion Creek Parkway SH 45 E Ramp Reversal 2019 $7,665,756.00

42 CARTS Travis Eastside Bus Plaza At 101 Shady Lane, Austin TX Design and construction of Eastside Bus Plaza 2019 $5,000, TxDOT Travis IH 35 Grand Ave Parkway SH 45N Reverse NB Ramps and Add Auxilary Lanes 2020 $8,867, TxDOT Travis IH 35 At Wells Branch Pkwy Operational Improvements-Interchange 2020 $45,693, TxDOT Travis IH 35 At Parmer Lane Reconstruct Intersection 2019 $30,371, TxDOT Travis US 290 West of RM 1826 SL 1 Construct 6-Lane Turnpike With Frontage Roads_(Toll) 2022 $477,561, TxDOT Travis SH 71 East of Riverside Dr. US 183 Construct Frontage Road And Ramp 2022 $3,741, TxDOT, City of Austin Travis SL 360 At Westlake Drive Grade Separate Intersection 2022 $66,804, TxDOT, City of Austin Travis SL 360 At Spicewood Springs Road Grade Separate Intersection 2022 $62,628, TxDOT Travis US 183 Williamson County Line SL 1 Widen From 3 To 4 General Purpose Lanes 2019 $72,346, CTRMA, TxDOT Travis US 183 Williamson County Line SL 1 Add 2 Express Lanes In Each Direction 2019 $141,678,012.28

43 TxDOT Travis SH 71 SH 71/US 183 Interchange Presidential Blvd. Construct Frontage Road, Ramps And Direct Connects 2021 $36,580, TxDOT Travis US Miles South of Thompson Ln 0.07 Miles SW of Airport Commerce Dr Construct New Frontage Road 2021 $6,244, TxDOT Travis SH 71 At Ross Road and Kellam Road Construct 2-Lane Overpass 2020 $66,319, TxDOT Travis SH Miles West ef Tucker Hill Lane Travis / Bastrop County Line Construct Overpass and Add 2 Lane One-Way Eastbounb And Westbound Frontage Roads 2021 $14,204, TxDOT Travis SH 71 US 290 West Silvermine Dr Construct Tolled Lanes & Frontage Roads 2022 $14,071, City of Austin Travis CS Northern Walnut Creek Trail Ph 2: West of Lamar Blvd to IH 35 Const Bike/Ped Trail West Of Lamar To Ih $2,294, Travis County Travis Blake Manor Road Proposed Wildhorse Connector Travis County East Metro Park Construct a new shared use path 2019 $3,176, Travis County Travis FM Miles South of Mckenzie Road US 183 & Mckenzie Rd. Intersection Realign Roadway And Relocate Highway Intersection 2019 $1,383, Travis County, TxDOT Travis FM Miles South of Brodie Ln. East of FM 2304 Reconstruct an existing 2-lane arterial to a 4 lane arterial with a continuous left turn lane with 5 foot wide shoulders and 6 foot wide sidewalks 2020 $12,223, TxDOT, City of Austin Travis RM 2222 RM 620 Bonaventure Dr. Operational improvements and new 3 lane connector road (2 westbound lane and 1 eastbound lane) 2019 $13,867,798.46

44 Travis County Travis FM 2304 Ravenscroft Drive FM 1626 Reconstruct an existing 2-lane divided arterial to a four lane divided arterial with bicycle lanes and sidewalks $12,177, CTRMA Travis SL 1 US 183 RM 2222 Add 1 Lane Direct Connectors With Transitions 2019 $174,836, City of Cedar Park Williamson Bell Blvd. North of Cypress Creek Road South of Cedar Park Drive Realign 0.8 mile section of US 183 (Bell Boulevard) onto the Old Highway 183 alignment 2018 $20,000, CTRMA/TxDOT Williamson 183A Phase III Hero Way SH 29 Construct 4-lane tolled expressway 2018 $179,000, TxDOT/CTRMA Williamson US 183 N RM 620/SH 45 Travis County Line Widen from 3 to 4 general purposes lanes 2019 $69,262, CTRMA Williamson US 183 N RM 620/SH 45 Travis County Line Add two express lanes in each direction 2019 $146,883, TxDOT Williamson IH 35 At FM 3406 Bridge replacement and intersection improvements 2017 $21,046, TxDOT Williamson IH 35 SH 45 Westinghouse Mill, Seal, and Inlay 2017 $7,555, Williamson Williamson RM 620 Wyoming Springs Drive Deep Wood Drive Reconstruct existing 4-lane roadway to a 6-lane divided roadway 2017 $7,294, City of Hutto Williamson CS Limmer Loop at FM 1660 Cottonwood Creek Elementary Construct sidewalks $841,928.00

CAMPO 2040 Regional Transportation Plan

CAMPO 2040 Regional Transportation Plan 11-00001-00 TxDOT Bastrop US 290 1 Mile East of FM 696 8.864 Miles East of FM 696 Widen to a 4-lane divided. 2018 $50,303,707.00 11-00002-00 TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and

More information

CAMPO 2040 Regional Transportation Plan

CAMPO 2040 Regional Transportation Plan 11-00001-00 TxDOT Bastrop US 290 1 Mile East of FM 696 8.864 Miles East of FM 696 Widen to a 4-lane divided. 2018 $50,303,707.00 11-00002-00 TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road. CAMPO Plan Priority Project List: Regionally Funded Projects (Projects may be funded by Federal, State or Local funding) AS AMENDED: 1/10/2011, 3/11/2011, 10/10/2011, 4/9/2012, and 10/8/2012 I. Roadway

More information

DRAFT INVESTMENT CORRIDORS

DRAFT INVESTMENT CORRIDORS DRAFT INVESTMENT CORRIDORS Mode Studied ID CORRIDOR / ROADWAY FROM TO EXISTING CMTA ROUTES CORRIDOR TYPE PRIORITY STREET COMMUTER ELECTRIC EXPRESS LIGHT METRO RAPID RIGHT-OF-WAY PRESERVATION SHUTTLE STREETCAR

More information

Capital Area Metropolitan Planning Organization Project Call

Capital Area Metropolitan Planning Organization Project Call Capital Area Metropolitan Planning Organization 2019-2022 Project Call Project Evaluation and Recommendation Report April 2018 Table of Contents Table of Contents... 2 Overview... 3 Scoring Process...

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

Proposed Action, Purpose and Need Technical Memorandum

Proposed Action, Purpose and Need Technical Memorandum Proposed Action, Purpose and Need Technical Memorandum MoPac (State Loop 1) Intersections, Austin District From North of Slaughter Lane to South of La Crosse Avenue CSJ: 3136-01-015 Travis County, Texas

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2045 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Bexar Alamo

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER 2013 14:19 Thursday, June 13, 2013 1 ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR 0034-01-124 US 83 C 34-1-124 5 3.2 P14BM $2,112,500 $3,721,952

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program Project Number Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AAMPO Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AAMPO Alamo Area Commute Solutions

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

TECHNICAL ADVISORY COMMITTEE MEETING Monday, March 26, 2018 University Park, Suite N. IH 35, Austin, Texas :00 p.m.

TECHNICAL ADVISORY COMMITTEE MEETING Monday, March 26, 2018 University Park, Suite N. IH 35, Austin, Texas :00 p.m. TECHNICAL ADVISORY COMMITTEE MEETING Monday, March 26, 2018 University Park, Suite 300 3300 N. IH 35, Austin, Texas 78705 2:00 p.m. AGENDA ACTION: 1. Certification of Quorum Quorum requirement is 13 members......chair

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,

More information

City of Buda. Transportation Master Plan Update. June 2012

City of Buda. Transportation Master Plan Update. June 2012 City of Buda Transportation Master Plan Update June 2012 Transportation Master Plan Update Prepared for: February 2013 Prepared By: TBPE Firm No. 2614 Traffic & Planning Team 400 West Hopkins. Suite 203

More information

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT January 25, 2017 RM 620/2222 BYPASS - INTRODUCTION Because of the enormous traffic demand at the RM 620/2222 intersection, TxDOT searched for a way to relieve

More information

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009. Value from &! M East HOU M East HOU M East HOU &! M East HOU &! M East HOU IH 45 0271-14-217 0271-14-218 0271-14-213 0271-14-228 0500-03-462 0500-03-550 0500-03-565 Reconstruct US /IH 610 IC. Construct

More information

"Mobility 2040" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2040 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Alamo Area

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

2016 MOBILITY BOND PROGRAM

2016 MOBILITY BOND PROGRAM February 22, 2017 2016 MOBILITY BOND PROGRAM $720 million bond proposition for transportation and mobility improvements including planning, designing, engineering, constructing, reconstructing, renovating

More information

RM 620 FEASIBILITY STUDY

RM 620 FEASIBILITY STUDY RM 620 FEASIBILITY STUDY Sections 5 & 6 December 7, 2015 STUDY PROCESS Study Purpose and Goals The RM 620 Feasibility Study was launched by the Texas Department of Transportation (TxDOT) to analyze transportation

More information

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7. TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

2017 Austin Middle School Rankings

2017 Austin Middle School Rankings 1 2017 Austin Middle School Rankings CANYON VISTA MIDDLE ROUND ROCK ISD WILLIAMSON COUNTY 4 1 A+ JAMES GARLAND WALSH MIDDLE ROUND ROCK ISD WILLIAMSON COUNTY 6 2 A+ CEDAR VALLEY MIDDLE ROUND ROCK ISD WILLIAMSON

More information

a 20 year period. separate phases of development with staggered years)

a 20 year period. separate phases of development with staggered years) Proposed: Approximately 2,000 acres located at along SH 130 at FM 973 Mixed Use project consisting of : Residential i Approximately 2,800 single family detached units Approximately 2,000 attached units

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

AVAILABLE AVAILABILITY OVERVIEW

AVAILABLE AVAILABILITY OVERVIEW AVAILABLE OVERVIEW Riata Corporate Park 2-9 is a 688,100 square foot Class A office complex located on 51 wooded acres in the Northwest submarket of Austin, and is part of Austin s Technology Corridor.

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St 2040 Metropolitan Transportation Plan Project Listing Short Range Funded (2014-2023) Projects with Allocated as of June 2017 and Listed in the Transportation Improvement Program (TIP) CATEGORY 7 PROJECTS

More information

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS I- COMAL COUNTY OPERATIONAL IMPROVEMENTS OPEN HOUSE The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been,

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080 Selected for $2 Billion Allocation Safety SLRTP Rural priority IH 35 Corridor Border and Port Trade 100 most congested Ports to Plains Corridor IH 69 Corridor Rural System Preservation Other High Corridors

More information

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028 Collin 54005 2351 01 017 FM 2478 FM 1461 to US 380 Collin 54005.1 2351 02 014 FM 2478 Collin 55038 2679 03 015 FM 2514 FM 1461 to North of FM 1461 East of Lavon Parkway to North of Drain Drive Widen two

More information

AVAILABLE AVAILABILITY OVERVIEW

AVAILABLE AVAILABILITY OVERVIEW AVAILABLE OVERVIEW Riata Corporate Park 2-9 is a 688,100 square foot Class A office complex located on 51 wooded acres in the Northwest submarket of Austin, and is part of Austin s Technology Corridor.

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

Section 1 - North Lamar: Tech Ridge to US 183

Section 1 - North Lamar: Tech Ridge to US 183 Section 1 - North Lamar: to US 183 Segment is part of 2016 Mobility Bond Program Segment is owned by TxDOT ALIGNMENT AND CONNECTIVITY Further study for connection between P&R and N Lamar Blvd Section 1

More information

February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program

February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program Excellence - Integrity - Service - Creativity - Communication TRANSPORTATION BOND PROGRAM

More information

I also hope you can maintain easy access to my property through the construction process.

I also hope you can maintain easy access to my property through the construction process. Mobility35: I-35 at SH 123 Open House Comment/Response Matrix # Last Name First Name Date Method Comment (Verbatim) Response 1 Anderson Ross 11/8/2016 VOH Thank you for the opportunity to comment. I am

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

TXDOT LAUNCHES PEDESTRIAN SAFETY CAMPAIGN TO ADDRESS PEDESTRIAN FATALITIES AND INJURIES IN AUSTIN

TXDOT LAUNCHES PEDESTRIAN SAFETY CAMPAIGN TO ADDRESS PEDESTRIAN FATALITIES AND INJURIES IN AUSTIN DECEMBER 2017 E-NEWSLETTER A monthly e-newsletter providing information about Mobility35, a regionwide effort to improve safety and mobility along I-35 in Williamson, Travis, and Hays counties. TXDOT LAUNCHES

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities. Table of Contents 3.1. Interim vs. Ultimate Configuration for the Remaining Segments of NTE... 1 3.2. Characteristics of Project Segments... 3 3.2.1. All Segments... 5 3.2.2. Segment 2E... 8 3.2.3. Segment

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 July 2007 NO. 0707 UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 Tex-207-F, Determining Density of Compacted Bituminous Mixtures. is now on-line at the TxDOT website. This test procedure was implemented effective

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Southwestern RPO Prioritization Local Input Points for Division Needs Funding H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid Short-Term Enhancements Improvements to keep Austin moving Long-Term Investments Projects to support our future Mobility Hubs MetroRapid MetroRail MetroExpress Commuters Connectors Circulators Project

More information

Regional Goals. Goal 1: Reduce congestion and impact of incidents on I-81 and I-64.

Regional Goals. Goal 1: Reduce congestion and impact of incidents on I-81 and I-64. Regional Goals Goal : Reduce congestion and impact of incidents on I- and I-. Goal : Strengthen transportation linkages between the Valley and the surrounding regions (Alleghany Highlands, New River Valley,

More information

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018 BOERNE/KENDALL COUNTY TRANSPORTATION FORUM March 22, 2018 Frontage Road Operational Improvements 2 Frontage Roads Under Construction Fair Oaks Pkwy to Dominion I-10 - Fair Oaks Pkwy to FM 3351 Scope: Convert

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

connections 2040 the waco metropolitan transportation plan amendment 2

connections 2040 the waco metropolitan transportation plan amendment 2 connections 2040 the waco metropolitan transportation plan amendment 2 developed by the waco metropolitan planning organization in cooperation with the following agencies: Adopted December 14, 2017 amendment

More information

GENERAL DESCRIPTION. Page 1 of 5

GENERAL DESCRIPTION. Page 1 of 5 38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,

More information

Regional Transportation Committee (RTC) 10-Year Project Milestone Policy. Transportation and Trinity River Project Committee October 26, 2015

Regional Transportation Committee (RTC) 10-Year Project Milestone Policy. Transportation and Trinity River Project Committee October 26, 2015 Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015 Purpose of Briefing Brief the Transportation and Trinity River

More information

183 North Mobility Project Community Survey Report

183 North Mobility Project Community Survey Report 183 North Mobility Project Community Survey Report Conducted in conjunction with the Open House #3 March, 1, 8 p.m. Westwood High School During the Open House and concurrent Virtual Open House, the study

More information

Current Roadway Projects Wednesday, September 03, 2014

Current Roadway Projects Wednesday, September 03, 2014 Current Roadway Projects Wednesday, September 03, 2014 Restore our Roads Projects 1 US 72 East at Moores Mill Road Additional lane WB from Moores Mill to Sparkman Drive and intersection improvements at

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

State Route 160 (Blue Diamond Highway)

State Route 160 (Blue Diamond Highway) State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek, INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north

More information

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. B0060 1.10 BALLARD US 60 3.700 INCLUDES KEVIL BYPASS.

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME.

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. 1 PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. - SANDRA GREEN, CITY SECRETARY FARMERSVILLE CITY COUNCIL MEETING February

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION The City of Starke is currently a bottleneck for traffic traveling along U.S. 301 in Bradford County. Local urban traffic combined with increasing

More information

Agenda Item No. 6C ATTACHMENT 1

Agenda Item No. 6C ATTACHMENT 1 ATTACHMENT District Bike Plan Proposed s Hillside Ln Livermore D TAC

More information

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Pedestrian Improvements Kemp Blvd Wichita Falls (Midwestern Pkwy to Southwest Pkwy)

Pedestrian Improvements Kemp Blvd Wichita Falls (Midwestern Pkwy to Southwest Pkwy) EXHIBIT A TRANSPORTATION ALTERNATIVES PROGRAM (TAP) PROJECTS SELECTED FOR FUNDING SMALL URBAN AREAS (POPULATION 5,001 200,000) Nominating Entity TAP Project Name Federal Funds Bryan South College Phase

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments! MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

4.0 Recommended Transportation Plan

4.0 Recommended Transportation Plan 4.0 Recommended Transportation Plan The Town wants to provide a multi modal transportation system for its residents in order to provide them with options when making trips. The automobile has always been

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

OKI Awards More Than $41 Million to Transportation Projects Across the Region

OKI Awards More Than $41 Million to Transportation Projects Across the Region FOR IMMEDIATE RELEASE October 11, 2018 Contact: Ashley Patrick apatrick@oki.org (330) 573-4932 m. OKI Awards More Than $41 Million to Transportation Projects Across the Region Cincinnati, Ohio Ohio-Kentucky-Indiana

More information