DRAFT 2035 LRTP Unfunded Projects w/ No New Revenue

Size: px
Start display at page:

Download "DRAFT 2035 LRTP Unfunded Projects w/ No New Revenue"

Transcription

1 The following projects were nominated for inclusion in the. If no additional revenue is assumed to be generated, none of the projects listed below can be included in the LRTP Eastern Circumferential Road Idlewild Road to US 74 Widening (4)/New (4), Median, Bike Lanes Equity Char/Matt Independence Boulevard (US 74) NC 51 to I-485 Expressway (6 Lanes +HOV or Busway) Equity Matthews R-2632AB NC 73 East NC 115 to Davidson-Concord Rd. Widening (4), Median Equity Corn/Hunt Old Charlotte Highway Wesley Chapel-Stouts Road to Rocky River Rd. Widening (upgrade 4-lane), Bike Lanes, Sidewalks Equity Union Roosevelt Blvd. (US 74) Hanover Drive to western Monroe Corp. Limits Widen (6), Median, Bike Lanes, Sidewalks Equity Union Chestnut Lane/US 74 Connector Old Monroe Road to US 74 New Road (4), Median Equity Union Hambright Road Extension Everette Keith Rd. to Eastfield Rd. (limits changed) New Road (4), Median, Bike Lanes Equity Huntersville U-4714 Old Monroe Road Indian Trail Rd. to Wesley Chapel-Stouts Rd. Widening (4), Median, Bike Lanes, Sidewalks Equity Union Statesville Road (US 21) Gilead Rd. to Holly Point Drive Widening (4) Median, wosl Equity Huntersville Church St. Extension McCord Rd. to Mayes Rd. New Road (2) (34'FF) Local Huntersville Potts-Sloan Connector NC 115 to Griffith St 2-lane, undivided, bike lanes roundabouts Local Davidson Verhoeff Drive East NC 115 Connector to Meacham Farm Drive Railroad Overpass Local Huntersville University City Boulevard (NC 49) N. Tryon St. (US 29) to I-485 Widening (6), Bike Lanes Equity Charlotte Billy Graham Parkway Josh Birmingham Pkwy. to I-85 Widening (6) Equity Charlotte Old Statesville Rd. (NC 115) 4th St. Ext. to Bailey Rd. Widening (4) Median, Bike Lanes Equity Corn/Hunt Park Road Johnston Road to NC 51 Widen(4), Median, Bike Lanes Equity Pineville R-2632AB NC 73 West W. Catawba Ave. to Northcross Dr. Widening (4-6), Median Equity Huntersville Huntersville-Concord Road NC 115 to Asbury Chapel relocation Widening (2), Bike Lanes Equity Huntersville Poplar Tent Church Road Hwy 73 to Huntersville-Concord Widening (4), Median Equity Huntersville Airport Entrance Road I-85 to Charlotte-Douglas Int'l Airport New Expressway (4) (Interchange w/ US-29/74) Equity Charlotte NC 73 East Davidson-Concord Rd. to Cabarrus County Line Widening (4), Median Equity Dav/Hunt Billy Graham Parkway/NC 160 (West Blvd.) Interchange New Interchange Equity Charlotte Old Statesville Rd. (NC 115) Hambright Rd. to Mt Holly-Huntersville Rd. Widening (4) Median, Bike Lanes Equity Huntersville Davidson Eastside Connector Davidson-Concord Rd. to NC 115 New Road (2), Bike Lanes Equity Davidson McKee Road Extension Campus Ridge Road to Stevens Mill Road New Road (4), Median, Bike Lanes Equity Matt/Union Charlotte Avenue Dickerson Blvd. to Rocky River Road Widening (4), Median, Bike Lanes, Sidewalks Equity Union Church St. Extension Ramah Ch. Rd. to McCord Rd. New Road (2), Widening, Bike Lanes (34'FF) Local Huntersville Hambright Road McCoy Rd. to Mt. Holly-Huntersville Rd. Widening (2), Median, Bike Lanes Equity Huntersville Hambright Road Mt. Holly-Huntersville Rd. to NC 115 Widening (4), Median, Bike Lanes Equity Huntersville Huntersville-Concord Road Asbury Chapel relocation to County Line Widening (2), Bike Lanes Equity Huntersville U-4913 Idlewild Road Meck./Union Co. Line to Indian-Trail/Fairview Rd Widening (4), Median, Bike Lanes Equity Union Lawyers Road I-485 to Stevens Mill Road Widening (4), Median, Bike Lanes Equity Mint/Union Ballantyne Commons Parkway Annalexa Ln. to Williams Pond Ln. Widening (4), Bike Lanes Equity Charlotte U-213 Charlotte Avenue Church St. to Concord Avenue Widening (4), Median, Bike Lanes, Sidewalks Equity Union R-3802 Providence Road (NC 16) Rea Road Ext. to Cuthbertson Road Widening (4), Median, Bike Lanes Equity Union Rocky River Road (Charlotte) Grier Rd. to Eastern Circumferential Widening (4), Bike Lanes Local Charlotte Church St. Extension Huntersville-Concord Rd. to Ramah Ch. Rd. Widening, Bike Lanes (34'FF) Local Huntersville Zion Ave. Extension/Improvement Catawba Ave. to South St. (Davidson) Widening (2)/New Road (2) (34' cross-section) Local Corn/Dav Zion Ave. Extension/Improvement Mayes Rd. to Catawba Ave. Widening (2)/New Road (2) (34' cross-section) Local Cornelius Krefeld Drive/Independence Pointe Parkway Crownpoint Exec. Dr. to Sam Newell Rd. New Road (2), Median, Bike Lanes Local Char/Matt U-3467C Weddington Road (NC 84) NC 84 Relocation to Waxhaw-Indian Trail Rd. Widening (4), Median, Bike Lanes Equity Union Lawyers Road McAlpine Creek to NC 51 Widening (4), Median, Bike Lanes Equity Mint Hill 8/5/2009 Page 1 of 6

2 John Street Trade Street to I-485 Widening (4), Bike Lanes Equity Matthews Lawyers Road NC 51 to Bain School Road Widening (4), Median, Bike Lanes Equity Mint Hill Mount Holly-Huntersville Road Hambright Rd. to Alexanderana Rd. Widening (4) Median, Wide Outside Lanes Equity Huntersville Mount Holly-Huntersville Rd. Mt. Holly-Huntersville Rd./NC 16 Interchange Equity Charlotte Bailey Rd. NC 115 to Barnhardt Rd. Widening (3), New Road, Bike Lanes Local Corn/Dav Charlotte Avenue Seymour St. to Dickerson Blvd. Widening (4), Median, Bike Lanes, Sidewalks Equity Union Rocky River Road (Monroe) Old Charlotte Hwy. to US 74 Widening (4), Median, Sidewalks Equity Union Weddington Road (NC 84) Waxhaw-Indian Trail Road to Airport Road Widening (4), Median, Bike Lanes Equity Union Church St. Extension Hambright Rd to Verhoeff Drive Ext. New Road (2) (34' cross-section) Local Huntersville Eastfield Road Alexanderana Rd. to Prosperity Church Rd. Widening (4), Median, Bike Lanes Equity Char/Hunt Faith Church Road Extension US 74 to Monroe Road New Road (2),(24', 4' paved shoulders) Equity Union I-77 HOV Project (North) W. Fifth St. to I-277 (Brookshire Frwy.) Southbound HOV Lane Equity Charlotte I-77/Griffith Street Griffith Street Interchange Interchange Modification Equity Davidson I-77 at NC 73 Modification to Interchange Modified Interchange Equity Huntersville Mount Holly-Huntersville Road US 21 to Hambright Rd. Widening (2), Bike Lanes Equity Huntersville Carolina Place Parkway Extension/Dorman Road Lancaster Hwy to SC State Line New Road (4) in 4 Ln ROW, Bike Lanes Equity Pineville Church St. Extension Verhoeff Drive Ext. to Huntersville-Concord Rd. (limits changed) New Road (2), Widening, Bike Lanes (34'FF) Local Huntersville Lawyers Road Albemarle Rd. to McAlpine Creek Widening (4), Bike Lanes Local Charlotte Verhoeff Drive West US 21 to Mt. Holly-Huntersville Rd. New Road (2), Bike Lanes Equity Huntersville Mallard Creek Road Prosperity Church Rd. to I-485 Widening (4), Bike Lanes Equity Charlotte Potter Road Old Monroe Road to Chestnut Ln. Widening (2), Median, Bike Lanes Equity Union Rocky River Road (Charlotte) Eastern Circumferential to I-485 Widening (4), Bike Lanes Local Charlotte U-3467A/B Rea Road Extension (NC 84 Relocation) NC 16 to NC 84 New Road (2) in 4-lane ROW, Median, Bike Lanes Equity Union Independence Pointe Parkway Matthews-Mint Hill Road to Campus Ridge Road New Road (2), Median, Bike Lanes (4-lane bridge) Equity Matthews U-4713B McKee Road Extension John Street to Campus Ridge Road New Road (4), Median, Bike Lanes Equity Matthews Wesley Chapel-Stouts Road US 74 to Old Charlotte Hwy. Widening (4), Median, Bike Lanes Equity Union Eastern Circumferential Road Pence Rd. (existing) to Albemarle Rd. New Road (4), Bike Lanes Local Charlotte Bailey Road Poole Place Dr. to NC 115 Widening (3), Bike Lanes Equity Cornelius Matthews-Indian Trail Road Campus Ridge Road to Indian Trail Road Widening (4), w/ Sidewalks & Bike Lanes Equity Union I-77 HOV Project (North) W. Fifth St. to I-85 Northbound HOV Lane Equity Charlotte U-3850 I-277 (Belk Freeway)/I-77 Interchange (WB Bridge over I-77) Add 3rd WB lane on I-277 Equity Charlotte Hucks Road Extension Prosperity Church Rd. to Sugar Creek Rd. New Road (4), Bike Lanes Local Charlotte Harris Boulevard (NC 24) N. Tryon St. (US 29) to Univ. City Blvd. (NC 49) Widening (6), (include sidewalk) Equity Charlotte Idlewild Road NC 51 to Stallings Road Widening (4), Median, Bike Lanes Equity Matt/Mint Sugar Creek Road Graham St. to NC 115-Sugar Creek Rd. Connector Widening (4), Bike Lanes Local Charlotte Carowinds Boulevard Extension South Tryon St. to Steele Creek Road New Road & Widening (4), Bike Lanes Local Charlotte Sam Wilson Road Extension Moore's Chapel Rd. to Belmeade Dr. New Road (2), Bike Lanes Local Charlotte Lawyers Road Stevens Mill Road to Mill Grove Road Widening (4), Median, Bike Lanes Equity Union Potter Road NC 84 to Wesley Chapel-Stouts Road Widening (3), Two-Way Center Turn Lane, Bike L Equity Union I-77 North NC 73 (exit 25) to Griffith St (exit 30) Widening (6) Local Hunt/Corn Auten Road Extension Chesapeake Dr. to McAllister Dr. New Road (2), Median, Bike Lanes Local Charlotte Alexanderana Road Mt. Holly-Huntersville Rd. to NC 115 Widen (4), Median, Bike Lane Equity Char/Hunt Bryant Farms Road Community House Road to Rea Road New Road (4), Widen (4), Bike Lanes Local Charlotte Old Statesville Rd. (NC 115) Harris Blvd. to I-485 Widening (4), Bike Lanes Equity Charlotte 8/5/2009 Page 2 of 6

3 Wesley Chapel-Stouts Road Old Charlotte Hwy. to Potter Road Widening (4), Median, Bike Lanes Equity Union Beatties Ford Road Sunset Rd. to Lakeview Rd. Widening (4), Bike Lanes Local Charlotte Fairview Road (NC 218) (Mint Hill/Union County) Brief Road to US 601 Widening (4), Median, Bike Lanes Equity Mint/Union Idlewild Road Drifter Dr. to Margaret Wallace Rd. Widening (4), Bike Lanes Local Charlotte NC 51 (Pineville-Matthews Road) Sardis Road to Monroe Road Widening (6), Median, Wide Outside Lanes Equity Matthews North Main St. (Wingate) US 74 to Monroe Bypass Widening (4), Parking, wide sidewalks Equity Union U-4024 Concord Highway (US 601) US 74 (Roosevelt Blvd.) to Monroe Bypass Widening (4), Median, Bike Lanes Equity Union Steele Creek Road (NC 160) I-485 to York Rd. (NC 49) Widening (4) Bike Lanes Equity Charlotte McKee Road Tilley Morris Road to Weddington Road Widening (4), Median, Bike Lanes Local Char/Matt Mount Holly Road (NC 27) Rhyne Rd. to Belmeade Dr. Widening (4), Bike Lanes Equity Charlotte NC 73 West Catawba River to Vance Rd. Ext. Widening (4-6), Median Equity Huntersville Tilley Morris Road McKee Road to Matthews-Weddington Road Widening (2), Median, Bike Lanes Equity Charlotte S. Tryon Street (NC 49) I-77 to Yorkmont Rd. Widening (6), Bike Lanes Equity Charlotte U-3619 Secrest Ave. Extension Secrest Ave. to Olive Branch Road New Road (5), Median, Bike Lanes Equity Union R-3802 Providence Road (NC 16) Cuthbertson Road to Waxhaw Bypass Widening (4), Median, Bike Lanes Equity Union Beatties Ford Road French St. to Dixon St. Widening (4), 44'LL Local Charlotte Beaty Street Griffith St to NC lane, divided, bike lanes Local Davidson Krefeld Drive Extension McAlpine Creek to Sardis Rd. North New Road (2), Bike Lanes Local Charlotte Statesville Road (US 21) Boat House Court to Catawba Ave Widening (4) Median, wosl Equity Cornelius Rocky River Road (Monroe) US 74 to Monroe Bypass/Connector Widen (4), Median, Sidewalks Equity Union Eastern Circumferential Road Lawyers Road to Idlewild Road Widening (4)/New (4), Median, Bike Lanes Equity Mint Hill Harris Boulevard (NC 24) I-485 to Mt Holly-Huntersville Rd. Widening (4), Bike Lanes Equity Charlotte Idlewild Road/Secrest Short Cut Road Indian Trail/Fairview Rd to Faith Church Road Widening (4), Median, Bike Lanes Equity Union Blair Road (NC 51) NC 218 to Albemarle Road (NC 24/27) Widening (4), Median, Bike Lanes Equity Mint Hill NC 73 West Vance Rd. Ext. to W. Catawba Ave. Widening (4-6), Median Equity Huntersville Ridge Road Extension Prosperity Church Rd. to Eastfield Rd. New Road (4), Bike Lanes Local Charlotte N. Tryon Street (US 29) University City Blvd. (NC 49) to I-485 Widening (6), Bike Lanes Equity Charlotte I-77 South Woodlawn Rd. to Nations Ford Rd. Widening (10) & HOV Equity Charlotte Harris Boulevard (NC 24) University City Blvd. (NC 49) to The Plaza Widening (6), Bike Lanes Equity Charlotte I-77 South Nations Ford Rd. to I-485 Widening (8) & HOV Equity Charlotte U-2549 Monroe Northern Loop 601 North to Southern Loop New Road (4), Median, Bike Lanes Equity Union Independence Pointe Parkway Windsor Square Dr. to NC 51 New Road (2), Median, Bike Lanes Equity Matthews Stumptown Road Hugh Torance Pkwy. to NC 115 Widening (2) (30' xross-section) Bike Lanes, roundabout Equity Huntersville Brief Road NC 218 to Union County Line Improved 2 lanes Equity Mint Hill Eastern Circumferential Road Rocky River Rd. to Pence Rd. (existing) New Road (4), Bike Lanes Local Char/Mint Davidson-Concord Road Davidson Eastside Connector to Bailey Road Widening (4), Median, Bike Lanes Equity Davidson Bryant Farms Road Johnston Rd. to Community House Rd. New Road (4), Widen (4), Bike Lanes Local Charlotte Charlotte Avenue Concord Avenue to Seymour St. Widening (4), Median, Bike Lanes Equity Union Fairview Road (NC 218) (Mint Hill) NC 51 to Jefferson Colony Dr. Widening (4), Median, Bike Lanes Equity Mint Hill Prosperity Church Road (northern leg) Prosperity Ridge Road to Eastfield Road Widening (4), Median, Bike Lanes Local Charlotte Prosperity Church Road (western leg) I-485 to Prosperity Ridge Rd. Widening (2)/New Road (2), (40'FF), Bike Lanes Local Charlotte Fred D. Alexander Boulevard Sunset Rd. to Harris Blvd. New Road (4), Bike Lanes Local Charlotte Pleasant Plains Road McKee Road to Old Monroe Road Widening (2), Median, Bike Lanes Equity Char/Matt/Union Sam Wilson Road I-85 to Moores Chapel Rd. Widening (4), Bike Lanes Local Charlotte 8/5/2009 Page 3 of 6

4 U-2549 Monroe Northern Loop Dickerson Blvd. to US 601 North New Road (4), Median, Bike Lanes Equity Union N. Tryon Street (US 29/NC 49) Dalton Ave. to 32nd St. Widening (5) Equity Charlotte Mount Holly-Huntersville Road Callabridge Ct. to Oakdale Rd. Widening (4), Bike Lanes Local Charlotte Thirty Sixth Street Atando Ave to N. Tryon St. New Road (2), Bike Lanes Local Charlotte IBM Drive-N. Tryon Street Connector IBM Dr. to N. Tryon St. New Road (2), Bike Lanes Local Charlotte NC 115-Sugar Creek Road Connector Old Statesville Rd.(NC 115) to Sugar Creek Rd. New Road (2), Bike Lanes Local Charlotte Mallard Creek Road Odell School Rd. to Salome Church Rd. Widening (4), Bike Lanes Local Charlotte Albemarle Road/Harris Boulevard (NC 24/27) Convert to Interchange New Interchange Equity Charlotte I-77 South I-277 (Belk Fwy.) to Woodlawn Road Widening (10) & HOV Equity Charlotte Pineville-Matthews Road (NC 51) I-485 to Rea Rd. Widening (6), Bike Lanes Equity Pine/Char McKee Road Weddington Rd. to Pleasant Plains Rd. Widening (4), Bike Lanes Equity Char/Matt Waxhaw Parkway NC 75 E. of Town to NC 75 W. of Town New Road (4), Median, Bike Lanes, Sidewalks Equity Union I-77 South I-485 to South Carolina Line Widening (8) & HOV Equity Charlotte Davidson-Concord Road Bailey Road to NC 73 Widening (4) Median, Bike Lanes Equity Davidson Harris Boulevard (NC 24) Reames Rd. to I-485 Widening (6), Bike Lanes Equity Charlotte Tyvola Road S. Tryon St. to I-77 Add median, bike lanes, and sidewalks Local Charlotte Wilgrove-Mint Hill Road NC 51 to Albemarle Road (NC 24-27) Widening (3), Bike Lanes Equity Mint Hill Gribble Road Stallings Road to Indian Trail Road Widening (3) Equity Union Harrisburg Road Eastern Circumferential to I-485 Widening (4), Bike Lanes Equity Charlotte Hucks Road Extension Sugar Creek Rd. to Old Statesville Rd. (NC 115) New Road (4), Bike Lanes Local Charlotte Sardis Road Sardis Road North to NC 51 Widening (4), Median, Bike Lanes Local Char/Matt Ardrey Kell Road Extension Providence Rd (NC 16) to Tilley Morris Rd. New Road (2), Median, Bike Lanes Local Charlotte Eastern Circumferential Road Lawyers Road to NC 24/27 New Road (4), Median, Bike Lanes Equity Char/Mint Grier Road W.T. Harris Blvd. to Rocky River Rd. Widening (4), Bike Lanes Local Charlotte Ridge Road Prosperity Church Rd. to Beard Rd. Widening (4), Bike Lanes Local Charlotte Seventh Street Charlottetowne Av. to Laurel Av. Widening (4) 10' lanes Local Charlotte I-77 South/Nations Ford Road Nations Ford Rd. Interchange Upgrade Interchange Equity Charlotte I-77 HOV Project (South) I-277 (Belk Frwy.) to W. Fourth St. Add HOV Equity Charlotte Harris Boulevard Albemarle Rd. to Idlewild Rd. Median Local Charlotte Beatties Ford Road Mt. Holly-Huntersville Road to NC 73 Widen (2), Bike Accommodations Equity Huntersville Dixie River Road/Old Dowd Connector Dixie River Road N. to Old Dowd Rd. New Road (4), Bike Lanes Local Charlotte Eastfield Road Prosperity Church Rd. to Cabarrus County Line Widening (4), Median, Bike Lanes Equity Char/Hunt Idlewild Road Margaret Wallace Road to NC 51 Widening (4), Median, Bike Lanes Equity Matt/Mint Mount Holly-Huntersville Road Mount Holly Rd. to Couloak Dr. Widening (4), Bike Lanes Local Charlotte Mount Holly-Huntersville Road Beatties Ford Rd. to Alexanderana Rd. Widening (4), Bike Lanes Equity Char/Hunt Statesville Road (US 21) Sunset Rd. to Harris Blvd. Widening (4) Bike Lanes Equity Charlotte Bryant Farms Road Rea Road to Ardrey Kell New Road (2), Bike Lanes Local Charlotte Chestnut Lane Matthews-Weddington Rd. to Old Monroe Rd. New Road (4), Widening (4), Bike Lanes Equity Union Nevin Road Ext. Black Walnut Ln. to IBM Dr. New road (3), Bike Lanes Local Charlotte Stallings Road US 74 to County Line Widening (4), Median, Bike Lanes Equity Union Nations Ford Road Tyvola Rd. to I-77 Widening (4), Bike Lanes Local Charlotte Nations Ford Road Arrowood Rd. to Hebron St. Widening (4), Bike Lanes Local Charlotte Euclid Avenue Extension E. Morehead St. to Stonewall St. New Road (2), Bike Lanes Local Charlotte Brookshire Boulevard (NC 16) Idaho Dr. to I-85 Convert to Expressway Equity Charlotte 8/5/2009 Page 4 of 6

5 Monroe Road Sharon Amity Rd. to Rama Rd. Median Local Charlotte Providence Road (NC 16) Queens Rd. to Briar Creek Median Local Charlotte Shopton Road West Extension South Tryon St. to Zoar Rd. New Road (2), Bike Lanes Local Charlotte Freedom Drive / Mt. Holly Road (NC 27) Fred D. Alexander Blvd. to Tom Sadler Rd. Widening (4)/ New Road (4), Bike Lanes Equity Charlotte Steele Creek Road (NC 160) York Road (NC 49) to South Carolina Line Widening (4) Bike Lanes Equity Charlotte U-4713A McKee Road Extension Pleasant Plains Road to John Street New (4), Median, Bike Lanes Equity Matthews Mount Holly-Huntersville Road Oakdale Rd. to Beatties Ford Rd. Widening (4), Bike Lanes Local Char/Hunt Shearer Road Ext. NC 73 to E. Rocky River 4-lane, median divided, bike lanes Equity Davidson Freedom Drive Toddville Rd. to Fred D. Alexander Blvd. Widening (4), Bike Lanes Local Charlotte Sardis Ch. Rd./Unionville-Indian Trail Rd. Secrest Shortcut Road to US 74 Widening (4), Median, Bike Lanes Equity Union Stevens Mill Road US 74 to Idlewild Road Widening (4), Median, Bike Lanes Equity Union Sugar Creek Road NC 115-Sugar Creek Rd. Connector to Harris Blvd. Widening (4), Bike Lanes Local Charlotte Garrison Road Dixie River Road N. to Dixie River Road S. Widening (2), New Road (2), Bike Lanes Local Charlotte Nations Ford Road Tryon St. to Tyvola Rd. Widening (4), Bike Lanes Local Charlotte Old Concord Road W.T. Harris Blvd. East to University City Blvd. Widening (4), Bike Lanes Local Charlotte Tyvola Road West Blvd. To Yorkmont Rd. Widening (4), Bike Lanes Local Charlotte Park Road Selwyn Av. to Fairview Rd. Widening (5), add northbound lane Local Charlotte Vance Rd. Extension Mt. Holly-Huntersville Rd. to Hambright Rd. New Road (4), Median, Bike Lanes Equity Huntersville Sharon Amity Road Providence Rd. to Water Oak Rd. Median Local Charlotte South Boulevard Sharon Rd. West to Westinghouse Blvd. Median, Bike Lanes Local Charlotte The Plaza Parkwood Ave. to Matheson Ave. Median Local Charlotte Brookshire Freeway (NC 16) I-77 to Beatties Ford Rd. NB Ramps Add westbound auxiliary lane Equity Charlotte Wilkinson Boulevard (US 29/74) Moore's Chapel Rd. to NC 7 (Gaston County) Replace Catawba River Bridge (6) Equity Charlotte Hucks Road Extension Statesville Rd. to Northlake Center Pkwy. New Road (4), Bike Lanes Local Charlotte Asbury Chapel Rd. Eastfield Rd. to Ramah Church Rd. Widen (2), New Location, Bike Lane Equity Huntersville Hugh Torance Parkway Ext. Wynfield Creek Pkwy. to Beatties Ford Rd. New Road (2), Bike Lanes Equity Huntersville M. L. King Jr. Boulevard Extension NC 200 to Southern Loop New Road (4), Median, Bike Lanes Equity Union Pence Road Relocation Pence Rd. to Harrisburg Rd. New Road (2), Bike Lanes Local Charlotte Vance Rd. Extension Gilead Rd. to NC 73 New Road (4), Median, Bike Lanes Equity Huntersville Wilgrove-Mint Hill Road Extension Albemarle Rd. to Harrisburg Rd. New Road (2), Bike Lanes Local Charlotte Wilkinson Blvd./Billy Graham Pkwy.(US 29/74) NW Quadrant Ramp & connection to Service Road Equity Charlotte Stumptown Road Ext. NC 115 to Ramah Church Rd. New (2) Median, Bike Lanes Equity Huntersville Blair Road Extension Albemarle Rd. to Rocky River Church Rd. New Road (2), Bike Lanes Local Charlotte Concord Highway (US 601) Ridge Road to Lawyers Road Widening (4), Median, Bike Lanes Equity Union Lebanon Road Eastern Circumferential to NC 51 Widening (2), Bike Lanes, Curb & Gutter Equity Mint Hill Brevard Street Fifth St. to Twelfth St. Convert to two-way traffic Local Charlotte Caldwell Street Fifth St. to Twelfth St. Convert to two-way traffic Local Charlotte Carowinds Boulevard Extension Shopton Road West to Steele Creek Road New Road & Widening (2), Bike Lanes Local Charlotte Fifth Street Extension McDowell St. to Kings Dr. Extend lane from 5th St. ramp to Kings Dr. Local Charlotte South Boulevard Tyvola Rd. to Archdale Dr. Median Local Charlotte I-277/Mint Street Interchange Revise interchange Equity Charlotte I-85 / Billy Graham Parkway Interchange Convert to Urban Diamond Equity Charlotte Mission Hills Road Extension Crosswinds Rd. to Lawyers Rd. New Road (2), Bike Lanes Local Charlotte Northeast Huntersville Minor Thoroughfare Hunterville-Concord Rd. to Davidson-Concord Rd. New Road (2), Bike Lanes Equity Huntersville 8/5/2009 Page 5 of 6

6 Mount Holly North Loop (NC 27) Mt. Holly-Huntersville Rd. to Catawba River New Road (4), Bike Lanes Equity Charlotte Stevens Mill Road Idlewild Road to Lawyers Road Widening (4), Median, Bike Lanes Equity Union Wilkinson Boulevard (US 29/74) Little Rock Rd. to I-485 Widening (6) Equity Charlotte Rogers Road Old Charlotte Hwy.to Wesley Chapel -Stouts Rd. Widening (upgrade 2-lane), Med., Bk Lns, Sdwalks Equity Union Nations Ford Road Westinghouse Blvd. to South Carolina Line Widening (4), Bike Lanes Equity Charlotte Verhoeff Drive Old Verhoeff Drive to NC 115 Widening (2)/New Road (2) (34' cross-section), Bike Lanes Local Huntersville Brevard Street Stonewall St. to Trade St. Convert to two-way traffic Local Charlotte I-3311E I-77 North I-277 to I-85 Widen SB lanes to std. width Equity Charlotte South Boulevard Woodlawn Rd. to Tyvola Rd. Median Local Charlotte Shearer Road Ext. E. Rocky River to Grey Rd. 2-lane, bike accomodation Equity Davidson Monroe Southern Loop Rocky River Road to Stack Road New Road (4), Median, Bike Lanes Equity Union Monroe Southern Loop Stack Road to US 74 East New Road (4), Median Equity Union Fred D. Alexander Boulevard Brookshire Blvd. (NC 16) to Sunset Rd. New Road (4), Bike Lanes Local Charlotte Providence Road (NC 16) Fairview Rd. to Old Providence Rd. Widening (6), Bike Lanes Equity Charlotte Archdale Dr.-Shopton Rd. Connector Nations Ford Rd. to South Tryon St. New Road (2), Bike Lanes Local Charlotte Sam Wilson Road Old Dowd Rd. to I-85 Widening (4), Bike Lanes Local Charlotte Hovis Road Rozzelles Ferry Rd. to NC 16 Improvement 26'LL Local Charlotte Fairview Road (Charlotte) Carmel Rd. to NC 16 (Providence Rd.) Widening (6), Bike Lanes Local Charlotte Vance Rd. Extension Hambright Rd. to Gilead Rd. New Road (4), Median, Bike Lanes Equity Huntersville Prosperity Church Road Ext. Eastfield Road to Davidson-Concord Road New Road (4), Median, Bike Lanes Equity Huntersville Harrisburg Road I-485 to Cabarrus County line Widening (4), Bike Lanes Equity Charlotte Odell School Road I-485 to Cabarrus County Line Widening (6), Bike Lanes Equity Charlotte Washam-Potts Road Westmoreland Rd. to NC 115 Widening (4), Bike Lanes Equity Cornelius Church Street Stonewall St. to I-277 WB Ramp Widening (4), Bike Lane (1) Local Charlotte Concord Highway (US 601) Lawyers Road to Cabarrus County Line Widening (4), Median, Bike Lanes Equity Union I-277/N. Tryon Street/N. Caldwell Street Interchange Revise interchange Local Charlotte Eastway Drive Kilborne Dr. to Sugar Creek Rd. Widening (6), Bike Lanes Local Charlotte Randolph Road Colonial Av. to Laurel Av. Widening to 4 10-ft. lanes Local Charlotte Graham Street (NC 49/US 29) Tenth St. to Sixth St. Widen to 10" lanes Equity Charlotte Albemarle Road (NC 27) Central Av. to Harris Blvd. Widen Median Equity Charlotte Remount Road Extension Greenland Av. to Camp Green St. New Road (2), Bike Lanes Local Charlotte Arlington Church Road Brief Road to NC 218 New Road (2), Bike Lanes Equity Mint Hill Faith Church Road Extension Monroe Road to Potter Road New Road (2), (24', 4' paved shoulders) Equity Union I-277/Fourth Street Interchange Revise interchange Local Charlotte Arlington Church Road Albemarle Rd. to Rocky River Ch. Rd. New Road (2), Bike Lanes Equity Charlotte Fairview Road (NC 218) (Union County) US 601 to NC 205 Widening (4), Median, Bike Lanes Equity Union 8/5/2009 Page 6 of 6

DRAFT HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaze Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex

DRAFT HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaze Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex E119 Charlotte Hwy U-6037 E109 I-77 / Cornelius Rd I-5962 E123 NC 115 / Faith Rd-Campus Ln C-5529 E111 River Hwy / W Plaza Dr R-2307B E102 I-40 / I-77 I-3819B E104 Wilkesboro Hwy U-5779 & Statesville &

More information

HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaza Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex

HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaza Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex ROADWAY S ID NAME TIP NO. JURISDICTION COUNTY E119 Charlotte Hwy U-6037 E109 I-77 / Cornelius Rd I-5962 E123 NC 115 / Faith Rd-Campus Ln C-5529 E111 River Hwy / W Plaza Dr R-2307B E102 I-40 / I-77 I-3819B

More information

HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaze Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex

HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaze Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex ROADWAY S E119 Charlotte Hwy U-6037 E109 I-77 / Cornelius Rd I-5962 E123 NC 115 / Faith Rd-Campus Ln C-5529 E111 River Hwy / W Plaza Dr R-2307B E102 I-40 / I-77 I-3819B E104 Wilkesboro Hwy U-5779 & Statesville

More information

HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaza Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex

HORIZON YEAR 2025 IMP. TYPE. Iredell US 21 W Plaza Dr (NC 150) Medical Park Rd 2.7 Div-12. Iredell NC 115 N/A Ex ROADWAY S ID NAME TIP NO. JURISDICTION COUNTY E119 Charlotte Hwy U-6037 E109 I-77 / Cornelius Rd I-5962 E123 NC 115 / Faith Rd-Campus Ln C-5529 E111 River Hwy / W Plaza Dr R-2307B E102 I-40 / I-77 I-3819B

More information

Review of DRAFT STIP. January 18, 2017 MPO Meeting

Review of DRAFT STIP. January 18, 2017 MPO Meeting Review of DRAFT 2018-2027 STIP January 18, 2017 MPO Meeting Presentation Notes Initial staff review since STIP was released on January 4 Not a complete assessment of all projects and programs will be a

More information

Review of DRAFT STIP. January 5, 2017 TCC Meeting

Review of DRAFT STIP. January 5, 2017 TCC Meeting Review of DRAFT 2018-2027 STIP January 5, 2017 TCC Meeting Presentation Notes Initial staff review since STIP was released on January 4 Not a complete assessment of all projects and programs will be a

More information

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009 Road Projects Project Project Description TIP # Location NC 51 SC state line to Downs Circle U-3447 Pineville NC 218 I-485 to US 74 R-5114 Meck/Union/Anson Little Rock Road Intersection improvement U-5116

More information

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013) B-4579 Oakdale Bridge Replace bridge-mcintyre Creek Additional time needed for design and to acquire ROW November 16, 2011 2011 2012 $300,000 B-4651 Poplin Bridge Replace bridge-south Fork Crooked Creek

More information

Appendix D: Lists of Roadway and Transit Projects within Maintenance Areas

Appendix D: Lists of Roadway and Transit Projects within Maintenance Areas Appendix D: Lists of Roadway and Transit Projects within Maintenance Areas 40 268 Table 7- Transportation (2036- Horizon) CRMPO 2036 TO HORIZON YEAR DIV. # Index # Tier TIP # FACILITY FROM TO LENGTH TIP

More information

FINAL CORRIDOR SCREENING REPORT

FINAL CORRIDOR SCREENING REPORT Technical Memorandum Task.5 FINAL CORRIDOR SCREENING REPORT February 5, 2008 Table of Contents.0. INTRODUCTION..... STUDY CORRIDOR... 2.0. EVALUATION METHODOLOGY...5 2.. SCREENING PROCESS...5 2.2. SCREENING

More information

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare

More information

A Step-by-Step Guide to Complete Streets Implementation. Mark A. Cole, PE Charlotte Department of Transportation

A Step-by-Step Guide to Complete Streets Implementation. Mark A. Cole, PE Charlotte Department of Transportation A Step-by-Step Guide to Complete Streets Implementation Mark A. Cole, PE Charlotte Department of Transportation tcat Complete Streets Forum April 23, 2010 Speaking Points Complete Streets Implementation

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Southwestern RPO Prioritization Local Input Points for Division Needs Funding H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern

More information

BIKE!CORNELIUS BICYCLE MASTER PLAN. Cornelius, North Carolina EXECUTIVE SUMMARY PREPARED AUGUST 2015 FOR PREPARED BY EXISTING CONDITIONS

BIKE!CORNELIUS BICYCLE MASTER PLAN. Cornelius, North Carolina EXECUTIVE SUMMARY PREPARED AUGUST 2015 FOR PREPARED BY EXISTING CONDITIONS EXISTING CONDITIONS BICYCLE MASTER PLAN Cornelius, North Carolina EXECUTIVE SUMMARY PREPARED vi AUGUST 201 FOR PREPARED BY PLANNING PROCESS Bike!Cornelius, the Bicycle Master Plan of Cornelius is made

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

Segment 9: Coddle Creek Reservoir to I-85 OPTION 1: Linked Centers

Segment 9: Coddle Creek Reservoir to I-85 OPTION 1: Linked Centers Segment 9: Coddle Creek Reservoir to I-85 OPTION 1: Linked Centers A. Harris Road B. Odell School Road C. Barr Road D. Westside Bypass E. Macedonia Church Road F. Trinity Church Road G. I-85 F E C Industrial/Retail

More information

An Easier Commute. Learn how to use I-77 Express to save you time.

An Easier Commute. Learn how to use I-77 Express to save you time. An Easier Commute Learn how to use I-77 Express to save you time PUBLIC-PRIVATE PARTNERSHIP I-77 Express is the first-ever toll lane public-private partnership with NCDOT I-77 Mobility Partners is financing,

More information

Planned Improvements from Sector & Area Plans that have been added to the MTP

Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle

More information

A: PLANNED P ROJECTS PROJECTS

A: PLANNED P ROJECTS PROJECTS Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

To Description County Division. US 25/US 70 - Widening (Marshall) from North Main Street (US 25/US70 Bus) to Brush Creek Rd (SR 1143)

To Description County Division. US 25/US 70 - Widening (Marshall) from North Main Street (US 25/US70 Bus) to Brush Creek Rd (SR 1143) nt Name Rank B150857 Bike and Ped improvement s to include Signal and Crossing treatments US 25 US 25/70 SR 1601 Deringer Drive/US 25/US70/Stu dent Dropoff Way improvements to include Signal - Crosswalk

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

Appendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP

Appendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P (Version 2) Bikeway Projects in Currently Approved Plans Key: Removals Scope Changes Question Keep this in plan? = Included on map O = Not Included on map Planned Improvements from Sector &

More information

Current Roadway Projects Wednesday, September 03, 2014

Current Roadway Projects Wednesday, September 03, 2014 Current Roadway Projects Wednesday, September 03, 2014 Restore our Roads Projects 1 US 72 East at Moores Mill Road Additional lane WB from Moores Mill to Sparkman Drive and intersection improvements at

More information

INTERSTATE 540 IMPROVEMENT STUDY

INTERSTATE 540 IMPROVEMENT STUDY INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Toll Rate Public Hearing

Toll Rate Public Hearing Toll Rate Public Hearing I-77 Express Toll Rate Hearing September 13, 2018 AGENDA AND HOUSEKEEPING Speaker Signup Bathrooms/Exits Facebook Live Introductions Thanks and Recognition 6:30-6:35 6:35-6:55

More information

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7. TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc ALBEMARLE COUNTY TRANSPORTATION PRIORITIES (DRAFT) April, 0: The following are the counties strategies priorities

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

TRANSPORTATION DEMONSTRATION CORRIDORS STREET DESIGN PRIORITIES INTRODUCTION RECOMMENDATIONS

TRANSPORTATION DEMONSTRATION CORRIDORS STREET DESIGN PRIORITIES INTRODUCTION RECOMMENDATIONS D R AF T TRANSPORTATION INTRODUCTION 69 RECOMMENDATIONS 71 DEMONSTRATION CORRIDORS 87 STREET DESIGN PRIORITIES 103 INTRODUCTION A balanced and functional transportation system is a key element of any vibrant

More information

February 11, 2016 TPO Board Presentation

February 11, 2016 TPO Board Presentation February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Driving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter

Driving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter Driving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter BUSINESS 40 IMPROVEMENT PROJECT AUGUST 31, 2018 DRIVING TO THE DOWNTOWN HEALTH PLAZA DURING BUSINESS

More information

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. B0060 1.10 BALLARD US 60 3.700 INCLUDES KEVIL BYPASS.

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

1Q 18. Charlotte Industrial Market Report

1Q 18. Charlotte Industrial Market Report 1Q 18 Charlotte Industrial Greater Charlotte Area (28 Mile Radius from Uptown Charlotte) 2018 1Q Total Number of Buildings 5,819 Total Square Feet 232,659,846 Average Asking Rates $4.60 Overall Vacancy

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Lane Street. Kannapolis, NC. Lane Street ~ Est. 14,788 VPD. Exit 63. I-85 ~ Est.70,626 VPD. Parcel B +/ Acres $75k/ac

Lane Street. Kannapolis, NC. Lane Street ~ Est. 14,788 VPD. Exit 63. I-85 ~ Est.70,626 VPD. Parcel B +/ Acres $75k/ac Lane Street ~ Est. 14,788 VPD I-85 ~ Est.70,626 VPD Exit 63 Parcel A 35.553 Acres $115k/ac Parcel B +/- 24.06 Acres $75k/ac Parcel C +/- 63.04 Acres $50k/ac SINK KIMMEL FORDE BRITT THE NICHOLS COMPANY

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd. DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 9 November 15, 2017 Update: 11/9/17 3:45 p.m. New Pass, Bridge

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

F RMINGTON. Life made simple

F RMINGTON. Life made simple F RMINGTON Life made simple Life made simple HUNTERSVILLE 85 29 601 Overview Farmington, opening in 2019, is a master planned community comprised of entertainment, retail, medical/office and institutional

More information

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No. June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

GENERAL DESCRIPTION. Page 1 of 5

GENERAL DESCRIPTION. Page 1 of 5 38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,

More information

Description of Planning Board Recommended Network

Description of Planning Board Recommended Network I-270 Corridor Interchanges Frederick (MD 355) at Ridge (MD 1 27) New Interchange N/A N/A N/A X X n/a $ 66 2 I-270 at Clopper (MD 117) Upgrade Interchange, Include Park-and-Ride Lot N/A N/A N/A X X X n/a

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

Appendix E Transportation Plan Projects

Appendix E Transportation Plan Projects Appendix E Transportation Plan Projects THIS PAGE INTENTIONALLY LEFT BLANK 2035 Major Thoroughfare Plan & Multi Modal Connections Unincorporated Sumner County Road From To NORTHWEST US 31W/SR 41 SR 25

More information

Eayrestown Road. East Eay restown Road E EAYRESTOWN RD EAYRESTOWN RD (0.25) County Road (1.79) CULVERT. Road Overpass

Eayrestown Road. East Eay restown Road E EAYRESTOWN RD EAYRESTOWN RD (0.25) County Road (1.79) CULVERT. Road Overpass Mile Posts: 0.000 -.000 New Freedom Roa d Beaver Dam East Eay restown 685 Eayrestown Allentown Red Lion Disabled Americ an V eterans Hig h w ay 06 300104 of Lanes 87 685 BEAVER DAM RD (1.1) E EAYRESTOWN

More information

7.0 Preferred Alternative with Service Road Concept

7.0 Preferred Alternative with Service Road Concept .0 Preferred Alternative with Service Road Concept This section evaluates the traffic operations for all of the study years for the Build conditions as related to the Preferred Alternative with Service

More information

USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS

USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS 0.0 L SS Hill Rd 0.3 L SL S Gay Street 0.6 R SL E Blount Ave - stay S at SL 2.2 L SL Maryville Pike 2.3 R SS Martin Mill Pike 4.0 L Neubert Springs

More information

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements

More information

CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS

CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS Based on Applications Submitted to TCRPC and Presented to Town Hall Forums in December, 2008 and Additional Updates and LRP Task Force

More information

El Dorado County / Tahoe Roadwork Schedule

El Dorado County / Tahoe Roadwork Schedule Today s Date: Friday, August 3, 2012, #12-220 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566

More information

Station 1: Street & Sidewalk Upgrades

Station 1: Street & Sidewalk Upgrades Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

USBR 21 KENTUCKY TO GEORGIA ROUTE MILE TURNS ROADS

USBR 21 KENTUCKY TO GEORGIA ROUTE MILE TURNS ROADS USBR 21 KENTUCKY TO GEORGIA ROUTE MILE TURNS ROADS 0.0 KY State Line -at Jellico, TN 0.2 R TN-297 W/Main Street stores 18.6 L TN-63 wide shoulders 20.0 R Old TN-63/E - Royal Blue Rd 28.7 S continue on

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

3Q 17. Charlotte Retail Market Report

3Q 17. Charlotte Retail Market Report 3Q 17 Charlotte Retail Market Report Charlotte, North Carolina Greater Charlotte Area (28 ± Mile Radius from Uptown Charlotte) 2017 3Q Total Number of Buildings 10,130 Total Square Feet 124,473,544 Average

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

LIST OF PRIORITY PROJECTS 2020/ /35

LIST OF PRIORITY PROJECTS 2020/ /35 LIST OF PRIORITY PROJECTS 2020/21-2034/35 Adopted June 10, 2015 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest PROJECT PRIORITIES: FREEWAYS 92 Freeway System ITS 60 $2.3 $2.3 Highest 94 Freeway System ITS 60 $7.9 $10.2 Highest 65 North Cabot Interchange - Hwy 38 State Hwy 367 and State Hwy 38 US Hwy 67 / 167 New

More information

WARN Summary by County/Parish. Effective Date Company Layoff/Closure

WARN Summary by County/Parish. Effective Date Company Layoff/Closure WARN Summary by County/Parish - State: North Carolina - Display Contacts columns: No - Filter By: - Start: 1/1/2018 - End: 12/31/2018 County/Parish Company / Mecklenburg County 20180001 01/04/2018 1/5/2018

More information

Palmetto200 Relay - Leg #1

Palmetto200 Relay - Leg #1 Palmetto200 Relay - Leg #1 Distance: 6.76 Miles Start: Red Bank Arena Rating: Hard Finish: Bethany Lutheran Church GPS Coordinates for Finish: Lat: 33.878 Long: -81.219 Finish Address: 720 Bethany Church

More information

Clear Creek Business Park Highway 51 at I-485, Charlotte, NC

Clear Creek Business Park Highway 51 at I-485, Charlotte, NC Office - Warehouse Space for Lease Office/Warehouse for Lease For Lease 4,800 SF -,000 SF available for lease Available 2nd Quarter 2019 Drive-in and dock high doors available in each bay Clear Height:

More information

Store Store # Address City State Zip Phone NORTH CAROLINA Circle K Shawneehaw Ave Banner Elk NC (828) Circle K

Store Store # Address City State Zip Phone NORTH CAROLINA Circle K Shawneehaw Ave Banner Elk NC (828) Circle K Store Store # Address City State Zip Phone NORTH CAROLINA Circle K 2720250 379 Shawneehaw Ave Banner Elk NC 28604 (828) 898-5318 Circle K 2708379 101 Mt. Holly Rd. Belmont NC 28012 (704) 822-1921 Circle

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

It is our hope that this information packet will provide you with event details to enhance your experience.

It is our hope that this information packet will provide you with event details to enhance your experience. National Sponsors: Dear 5k Participants, Sponsors & Spectators, On behalf of the staff and board, we would like to thank you for your support of our organization. We are excited to have around 1,300 runners

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

4.1 Evaluation Criteria

4.1 Evaluation Criteria Section 3 of the I-280 Corridor Study report discussed potential improvements for the I-280 corridor improve mobility for all modes of transportation. This section evaluates those potential improvements

More information

Agenda Item No. 6C ATTACHMENT 1

Agenda Item No. 6C ATTACHMENT 1 ATTACHMENT District Bike Plan Proposed s Hillside Ln Livermore D TAC

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Regional Goals. The UnJAM process also developed regional mobility goals including:

Regional Goals. The UnJAM process also developed regional mobility goals including: Regional Goals The TJDC developed the United Jefferson Area Mobility lan (UnJAM), a transportation planning process and documents to address the needs of the Thomas Jefferson region. The UnJAM process

More information

RIDE III PROPOSED PROJECTS. April 2015

RIDE III PROPOSED PROJECTS. April 2015 RIDE III PROPOSED PROJECTS April 2015 Resurface 100 Miles of Paved Roads RIDE III Pave 100 Miles of Dirt Roads 19 Hwy 9 East Hwy 701 N Widening Conway Perimeter Road Phase II 1 29 Forestbrook Rd SELL Hwy

More information

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information