Introduction Environmental Setting. Existing Roadway Network. Local Roadways

Size: px
Start display at page:

Download "Introduction Environmental Setting. Existing Roadway Network. Local Roadways"

Transcription

1 Contra Costa County Tassajara Parks Project Transportation and Traffic 3.12 Transportation and Traffic Introduction This section describes the existing transportation setting and potential environmental effects from the Project on the Project Site and its surroundings. Descriptions and analysis in this section are based on, among other things, information contained in the Contra Costa County General Plan and the Traffic Impact Study (TIS) for Tassajara Parks, prepared by Kimley Horn & Associates and included in this Draft EIR as Appendix I Environmental Setting Existing Roadway Network The following provides a description of the principal roadways within the study area. The Project study area and roadways are depicted in Exhibit The existing conditions lane geometry and traffic controls for the study area intersections can be seen in Exhibit Local Roadways Camino Tassajara Camino Tassajara is a principal two to four lane arterial, with the intersection of Fallon Road and Tassajara Road at its southern terminus in Alameda County, and the intersection with Diablo Road in Contra Costa County at its northern terminus. It is a two lane rural road from the southern extent to the Town of Danville, where it widens to a four lane arterial with a median and bike lanes on both sides. The land uses for the two lane portion are predominantly uncultivated agricultural lands, rural open space, and equestrian facilities; the topography along this portion can be defined as rolling terrain. The land uses for the four lane portion are predominantly residential neighborhoods (located on collector streets) for most of the extent, along with commercial uses within the Town of Danville. Camino Tassajara is classified as a route of regional significance in the 2009 Tri Valley Transportation and Action Plan Update. 1 The posted speed limit is 45 miles per hour (mph) for most extents. Crow Canyon Road Crow Canyon Road is a principal, four to six lane, divided arterial with a northern terminus at Camino Tassajara where it becomes Blackhawk Road, and a southern terminus at East Castro Valley Boulevard in Castro Valley within Alameda County. It is one of the few inter regional arterial roadways providing access outside of the Tri Valley Area to the west. As such, it is classified as a route of regional significance in the 2009 Tri Valley Action Plan. Within the study area, the surrounding land uses are predominantly residential. The street section contains a center median, sidewalks, and bicycle lanes on both sides within San Ramon and Danville. On street parking is prohibited and the posted speed limit is 45 mph. Sycamore Valley Road Sycamore Valley Road is a principal, four lane, divided arterial with an eastern terminus at Camino Tassajara and a western terminus at San Ramon Valley Boulevard and Interstate 680 (I 680). It is classified as a route of regional significance in the 2009 Tri Valley Action Plan. Within the study area, 1 The 2009 Tri Valley Transportation and Action plan Update is the latest available, adopted version of this document. The more recent revised version was never finalized or adopted. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

2 Transportation and Traffic Contra Costa County Tassajara Parks Project the primary land uses are residential. Commercial land uses occur at the roadway s western terminus at its intersection with san Ramon Valley Road. It contains a center median, bicycle lanes on both sides, and sidewalks along the southern side. On street parking is prohibited and the posted speed limit is 45 mph. Blackhawk Road Blackhawk Road is a major, two to four lane collector with a southern terminus at Camino Tassajara where it becomes Crow Canyon Road, and a northern terminus at Mt. Diablo Scenic Boulevard. It is a two lane undivided roadway until Maplewood Drive where it widens to three and eventually a four lane median divided roadway. The primary land uses are connections to residential neighborhood collectors. An area of commercial land uses occurs at the roadways southern terminus at its intersection with Camino Tassajara and Crow Canyon Road. On street parking is prohibited and the posted speed limit is 40 mph. Dougherty Road Dougherty Road is a six lane, major arterial with a southern terminus at Bollinger Canyon Road and a northern terminus at Crow Canyon Road. The primary land uses are connections to residential neighborhood collectors. Bicycle lanes and sidewalks exist on both sides. On street parking is prohibited and the posted speed limit is 50 mph. Finley Road Finley Road is a two lane, undivided rural, local road that intersects Camino Tassajara at its southern terminus. The land uses are predominately uncultivated agricultural lands, equestrian facilities, and residential uses. The street s winding geometry contains narrow lanes and sharp curves. The sharp horizontal curves along the street make sight distances on certain approaches short. The posted speed limit is 30 mph. Ballfields Entrance Road The Ballfields Entrance is a three lane driveway for the Mustang Soccer League facilities located on the south side of Camino Tassajara. There are two lanes providing egress from the driveway and one driveway entry lane. Lusitano Street Lusitano Street is an undivided, residential, local road that intersects Camino Tassajara at its northern terminus. On street parking is utilized and it serves as one of the primary access points and arteries for the Alamo Creek residential development. The roadway shares a signalized intersection with the Tassajara Hills Elementary School Driveway at Camino Tassajara. During the nearby Tassajara Hills Elementary School s start and end times, it is used by parents who pick up and drop off children. Charbray Street Charbray Street is a two lane, divided, residential collector that serves as a primary access point and a major artery of the Alamo Creek residential development neighborhood. Bike lanes exist on both sides of the roadway and many school crossings are striped to accommodate school aged pedestrians. Street parking is prohibited. Charbray Street intersects Camino Tassajara at its northern terminus Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

3 Source: Kimley Horn, 2016 I / _studyarea.cdr Exhibit Project Study Area and Vicinity CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

4 THIS PAGE INTENTIONALLY LEFT BLANK

5 Source: Kimley Horn, 2016 Exhibit Existing Conditions Lane Geometry and Traffic Control / _existing_lane_geo.cdr CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

6 THIS PAGE INTENTIONALLY LEFT BLANK

7 Contra Costa County Tassajara Parks Project Transportation and Traffic Blackhawk Drive Blackhawk Drive is a two lane, undivided local road that intersects Camino Tassajara at its southern terminus and Blackhawk Road at its northern terminus. The only land uses are residential, and street parking is utilized. Hansen Lane Hansen Lane is a short, two lane, undivided local road that intersects Camino Tassajara at its southern terminus. There are a few residential land uses along the roadway segment, while most of the land remains undeveloped. This roadway shares a signalized intersection with Diablo Vista Middle School at Camino Tassajara. Lawrence Road Lawrence Road is a two lane local road that intersects Camino Tassajara at its northern terminus. It is mostly undivided, with a divided median at the Camino Tassajara intersection only. Most of the land uses are residential, and the roadway ends in a cul de sac at its southern terminus. Oakgate Drive Oakgate Drive is a short, two lane local road that intersects Camino Tassajara at its southern terminus. It is mostly undivided, with a divided median at the Camino Tassajara intersection only. All of the adjoining land uses are residential. Jasmine Way Jasmine Way is a short, two lane local road that intersects Camino Tassajara at its northern terminus. It is mostly undivided with a divided median at the Camino Tassajara intersection only. All of the adjoining land uses are residential. Mansfield Drive Mansfield Drive is a short, two lane local road that intersects Camino Tassajara at its southern terminus. It is mostly undivided, with a divided median at the Camino Tassajara intersection only. All of the adjoining land uses are residential, and it serves as a primary access point and artery for the residential neighborhood. Parkhaven Drive Parkhaven Drive is a two lane, local road that intersects Camino Tassajara at its northern terminus. It is mostly undivided, with divided medians at and near the Camino Tassajara intersection only. Most of the adjoining land uses are residential, and it serves as a primary access point and artery for the residential neighborhood. Rassani Drive Rassani Drive is a two lane, undivided local road that intersects Camino Tassajara at its northern terminus. All of the adjoining land uses are residential. Buckingham Drive Buckingham Drive is a short, two lane local road that intersects Camino Tassajara at its southern terminus. It is mostly undivided, with a divided median at the Camino Tassajara intersection only. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

8 Transportation and Traffic Contra Costa County Tassajara Parks Project All of the adjoining land uses are residential, and it serves as a primary access point and artery for the residential neighborhood. Conejo Drive Conejo Drive is a short, two lane, undivided local road that intersects Camino Tassajara at its southern terminus. All of the adjoining land uses are residential, and it serves as a primary access point and artery for the residential neighborhood. Tassajara Ranch Drive Tassajara Ranch Drive is a short, two lane local road that intersects Camino Tassajara at its northern terminus. It is mostly undivided, with a divided median at the Camino Tassajara intersection. All of the adjoining land uses are residential, and it serves as a primary access point and artery for the residential neighborhood. The roadway shares a signalized intersection with a large commercial shopping center at Camino Tassajara. Tassajara Village Drive Tassajara Village Drive is a short, two lane entranceway to a large commercial shopping center development on the south side of Camino Tassajara. It serves as the primary signalized entry point for the development, and is separated from the general parking lot by landscaped dividers. Liverpool Street Liverpool Street is a two lane, undivided local road that intersects Camino Tassajara at its northern terminus. All of the adjoining land uses are residential. Old Blackhawk Road Old Blackhawk Road is a two lane, undivided local road that intersects Camino Tassajara at its southern terminus. All of the adjoining land uses are residential. Holbrook Drive Holbrook Drive is a two lane, undivided entryway that serves as the primary driveway and only access point to Sycamore Valley Elementary School. The roadway intersects Camino Tassajara at its southern terminus and leads to the school s pick up/drop off loop and parking lots to the north. Creekside Avenue Creekside Avenue is a short, two lane, divided residential entryway that intersects Sunshine Circle at its southern terminus and Camino Tassajara at its northern terminus. There are no land uses directly accessing the roadway, and on street parking is prohibited. Regional Roadways I 680 I 680 is a south to north regional interstate that extends from I 280 in San Jose at the southern extent, to I 80 in Cordelia at the northern extent. Several portions contain high occupancy vehicle (HOV) lanes within the study area, express or High Occupancy Toll (HOT) lanes are currently present on the southern segments, and HOT lanes are under construction in central and southern areas of Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

9 Contra Costa County Tassajara Parks Project Transportation and Traffic Contra Costa County. Within the study area, the freeway is three to four lanes and it serves as a major north south route for the Tri Valley area. The posted speed limit is 65 mph. I 580 I 580 is a west to east regional interstate that extends from I 80 in Emeryville/Oakland at the western extent, to I 5 southeast of Tracy at the eastern extent. HOT lanes are currently in construction (to be completed early 2016) and will extend from approximately I 680 to Greenville/Altamont Pass Rd. The freeway serves as a major east west route providing the eastern valleys access to the greater San Francisco Bay area. Within the study area, the freeway is three to four lanes and the posted speed limit ranges from 55 to 65 mph. Study Facilities Roadway facilities in the Project vicinity, including intersections, queues, and freeway segments were selected for analysis in consultation with the following local jurisdictions: the Town of Danville, the City of Dublin, and the City of San Ramon. Each study facility is listed below. Intersections Seventeen existing intersections, as shown in Exhibit , were selected for evaluation in relation to the Project using the guidance in the CCTA Technical Procedures. In addition, the Finley Rd/Project Driveway (Equestrian Staging Area) intersection will be evaluated. Each intersection and the jurisdiction responsible for the intersection are listed below: 1. Camino Tassajara/Ballfields (Future Project Driveway) Contra Costa County 2. Camino Tassajara/Lusitano St Tassajara Elementary School Driveway Contra Costa County 3. Camino Tassajara/Blackhawk Dr Charbray St Contra Costa County 4. Camino Tassajara/Hansen Ln Diablo Vista MS Driveway Town of Danville 5. Camino Tassajara/Oak Gate Dr Lawrence Rd Town of Danville 6. Camino Tassajara/Mansfield Dr Jasmine Wy Town of Danville 7. Camino Tassajara/Parkhaven Dr Town of Danville 8. Camino Tassajara/Buckingham Dr Rassani Dr Town of Danville 9. Camino Tassajara/Conejo Dr Town of Danville 10. Camino Tassajara/Tassajara Ranch Dr Town of Danville 11. Camino Tassajara/Tassajara Village Dr Town of Danville 12. Camino Tassajara/Blackhawk Rd Crow Canyon Rd Town of Danville 13. Camino Tassajara/Old Blackhawk Rd Liverpool St Town of Danville 14. Camino Tassajara/Holbrook Dr Town of Danville 15. Camino Tassajara/Sycamore Valley Rd Town of Danville 16. Dougherty Rd/Crow Canyon Rd Town of San Ramon 17. Camino Tassajara/Finley Rd Contra Costa County 18. Finley Rd/Project Driveway (Future Equestrian Staging Area) Contra Costa County Study intersections were identified using guidelines from the California Department of Transportation s (Caltrans s) TIS Guidelines, Contra Costa County Transportation Authority s Technical Procedures, and the Contra Costa County General Plan as well as the Town of Danville and City of Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

10 Transportation and Traffic Contra Costa County Tassajara Parks Project San Ramon General Plans based on the anticipated Project trip generation and distribution. In general, intersections with at least 50 peak hour Project trips utilizing the intersection were selected for analysis. All study intersections are signalized except #17 (Camino Tassajara/Finley Road) which is a side street stop controlled intersection. Critical Queues The locations of critical queue spillbacks were identified within the study area based on the assessment of existing intersection turning movement counts and existing storage lengths, in addition to AM and PM operations observed in the field. The following intersections were selected for a queuing assessment: 1. Intersection #2: Camino Tassajara/Tassajara Hills Elementary School Driveway Lusitano Street 2. Intersection #12: Camino Tassajara/Blackhawk Road Crow Canyon Road Freeway Segments Freeway segments were chosen in accordance with the Caltrans TIS Guidelines and subsequent to consultation with Contra Costa County. Study freeway segments were divided based on the presence of interchanges. The following segments along I 580 and I 680 (bi directional) were included in the analysis: 1. I 580: Eden Canyon Road to Fallon Road El Charro Road Caltrans 2. I 680: West Las Positas Boulevard to El Charro Boulevard Caltrans Existing Conditions Existing Intersection Levels of Service Weekday intersection turning movement counts for the 17 existing study intersections (excluding the future Project driveway) were collected in March 2015 in a manner consistent with traffic count protocol as cited in the CCTA Technical Procedures and consistent with input from Danville and San Ramon. s were collected during the AM (7:00 a.m. to 9:00 a.m.) and PM (4:30 p.m. to 6:30 p.m.) peak periods of the weekday when local schools were in session. Additional counts, at the request of the Town of Danville, were collected at Intersection #2 (Camino Tassajara/Lusitano Street/Tassajara Hills Elementary School Driveway) during a typical weekday during the school dismissal period (2:30 to 3:30 p.m.) to analyze the intersection s operations during the dismissal time. Intersection volume data sheets for all traffic counts are provided in Appendix I. The resulting intersection turning movement volumes can be seen in Exhibit Traffic operations were evaluated at the study intersections under existing traffic conditions. Results of the analysis are presented in Table As shown, all intersections function within acceptable standards in this scenario. Analysis sheets are provided in Appendix I Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

11 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Existing Conditions Intersection Delay and Results Int# Intersection Camino Tassajara/Ballfields Project Driveway (Full Access) Camino Tassajara/Lusitano St Tassajara Hills ES Driveway Camino Tassajara/Blackhawk Dr Charbray St Camino Tassajara/Hansen Ln Diablo Vista MS Driveway Camino Tassajara/Oak Gate Dr Lawrence Rd Camino Tassajara/Mansfield Dr Jasmine Wy Criteria Jurisdiction Control AM Peak Existing PM Peak Delay Delay E County Signal A 1.4 A 2.1 E County Signal D 43.7 A 7.2 E County Signal B 17.6 B 11.3 E Danville Signal D 44.1 A 7.2 E Danville Signal D 47.5 A 9.1 E Danville Signal B 18.4 A Camino Tassajara/Parkhaven Dr E Danville Signal A 7.4 A Camino Tassajara/Buckingham Dr Rassani Dr E Danville Signal C 25.7 B Camino Tassajara/Conejo Dr E Danville Signal B 10.5 A Camino Tassajara/Tassajara Ranch Dr E Danville Signal C 32.6 B Camino Tassajara/Tassajara Village Dr E Danville Signal A 5.4 B Camino Tassajara/Blackhawk Rd Crow Canyon Rd Camino Tassajara/Old Blackhawk Rd Liverpool St E Danville Signal D 47.7 D 40.0 E Danville Signal B 15.5 A Camino Tassajara/Holbrook Dr E Danville Signal D 35.9 A Camino Tassajara/Sycamore Valley Rd E Danville Signal C 34.4 C Dougherty Rd/Crow Canyon Rd E San Ramon Signal B 15.7 D Camino Tassajara/Finley Rd E County SSSC* C 21.4 D 26.7 Notes: * For side street stop controlled (SSSC) intersections the worst approach delay and is reported. Intersection delay,, and v/c ratios calculated with Highway Capacity Manual (HCM) 2010 methodology using Synchro software. Intersections #4 and #5 above are coordinated intersections with leading exclusive pedestrian phases. HCM 2010 methodology does not support the inclusion of exclusive pedestrian phases. To be consistent with the methodology, the leading pedestrian phases only were not implemented in Synchro. Existing traffic counts conducted on March 3, 2015 Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

12 Transportation and Traffic Contra Costa County Tassajara Parks Project Existing Queues at Critical Locations Vehicle queues were evaluated at the locations identified as critical queue spillback locations under existing traffic conditions. Results of the analysis are presented in Table As shown, the calculated 95 th percentile queues do not exceed the existing turn pocket storage at any study locations. It should be noted, however, that while the Synchro analysis did not indicate that queues would spill back, spillback was physically observed for a short period (10 minutes) during the Existing AM peak hour due to school traffic. Table : Existing Conditions Queuing Results # Intersection Movement 2 12 Camino Tassajara/Lusitano Street Tassajara Hills Elementary School Driveway Camino Tassajara/Blackhawk Road Crow Canyon Road Storage Length (ft) Existing 95 th Percentile Queue (ft) AM PM NBL/T/R SBT/L SBR EBL a WBL WBT/R NBL SBL EBL WBL Notes: 95 th Percentile queue lengths were obtained from Synchro v8 software. Storage lengths are not given for through lanes or segment lengths, but rather, only shown for turn pockets. a The Synchro analysis did not indicate that queues would spillback, but this was observed for a short period during the Existing AM peak hour due to school traffic. Source: Kimley Horn and Associates, Inc., Existing Freeway Segment Level of Service Traffic operations were evaluated at the study freeway segments under existing traffic conditions. Results of the analysis are presented in Table Analysis sheets are provided in Appendix I Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

13 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Existing Conditions Freeway Analysis AM Peak Existing Conditions PM Peak Facility Interstate 580 Interstate 680 No. Study Segment 1 I 580 Eden Canyon Road/Foothill Road 2 I 580 Foothill Road/I 680 Junction 3 I 580 I 680 Junction/Dougherty Road 4 I 580 Dougherty Road/Hacienda Drive 5* I 580 Hacienda Drive/Tassajara Road Santa Rita Road 6* I 580 Tassajara Road/Fallon Road El Charro Road 7 I 680 W Las Positas Boulevard/Stoneridge Drive 8 I 680 Stoneridge Drive/I 580 Junction 9 I 680 I 580 Junction/Dublin Boulevard Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) E EB 4 6, D 8, F E WB 4 7, D 6, D E EB 4 6, D 8, F E WB 4 7, E 6, E E EB 5 1, A 11, F E WB 4 8, F 4, C E EB 7 1, A 11, D E WB 5 8, D 4, B E EB , A 1,992 9, E E WB 4 8, F 4, C E EB , A 1,892 9, F E WB 4 8, F 4, C E NB 3 3, C 5, D E SB 3 6, F 3, C E NB 3 3, C 6, E E SB 3 7, F 4, C E NB 3 4, C 7, F F SB 3 8, F 4, D Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

14 Contra Costa County Tassajara Parks Project Transportation and Traffic Table (cont.): Existing Conditions Freeway Analysis AM Peak Existing Conditions PM Peak Facility Interstate 680 No. Study Segment 10 I 680 Dublin Boulevard/Alcosta Boulevard 11* I 680 Alcosta Boulevard/Bollinger Canyon Road 12* I 680 Bollinger Canyon Road/Crow Canyon Road 13* I 680 Crow Canyon Road/Sycamore Valley Road 14* I 680 Sycamore Valley Road/Diablo Road 15* I 680 Diablo Road/El Charro Boulevard Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) E NB 4 4, C 7, D E SB 4 8, F 4, C E NB , C 1,331 5, E E SB 3 1,550 7, F 783 3, C E NB , B 1,258 5, C F SB 4 1,466 6, D 740 3, B E NB , B 1,315 5, C F SB 4 1,531 6, D 773 3, B E NB , C 1,436 6, E F SB 3 1,672 7, F 844 4, C E NB , C 1,420 6, E F SB 3 1,653 7, F 835 4, C Notes: Segments operating below acceptable as shown in the Criteria column are shown in bold. The analysis was performed using HCS 2010 software. For freeway segments where an auxiliary lane is > 2,500 feet in length, weaving does not apply; therefore, the auxiliary lane is considered a basic freeway lane for the purposes of this analysis. AADT obtained from Caltrans Traffic Data Branch (2013). * An asterisk indicates the freeway segment contains a high occupancy vehicle (HOV) lane. For these segments, the HOV lanes and traffic volumes were excluded from the analysis. HOV traffic volumes were removed from the Caltrans s indicated peak hour traffic volumes using information obtained from the Caltrans 2013 Managed Lanes Report. (a) Directional volumes in vehicles per hour (vph) calculated as: AADT x K Factor x D Factor percentage. The K Factor is the percentage of AADT during the peak hour for both directions of travel. The D Factor is the percentage of the peak hour travel in the peak direction. K and D factors multiplied with the AADT gives the one way peak period directional flow rate or the design hourly volume (DHV). (b) pc/mi/ln = passenger cars per mile per lane Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

15 Source: Kimley Horn, 2016 Exhibit Existing Conditions Peak Hour Turning Movements / _existing_peak_turning.cdr CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

16 THIS PAGE INTENTIONALLY LEFT BLANK

17 Contra Costa County Tassajara Parks Project Transportation and Traffic As shown, several segments operate below acceptable standards (see Criteria column). The following freeway segments do not function within acceptable standards according to criteria set forth by CCTA and Alameda County Transportation Commission (ACTC) under existing conditions: I 580 Eastbound PM Peak Hour 1. I 580 Eden Canyon Road/Foothill Road 2. I 580 Foothill Road/I 680 Junction 3. I 580 I 680 Junction/Dougherty Road 6. I 580 Tassajara Road/Fallon Road El Charro Road I 580 Westbound AM Peak Hour 3. I 580 I 680 Junction/Dougherty Road 5. I 580 Hacienda Drive/Tassajara Road Santa Rita Road 6. I 580 Tassajara Road/Fallon Road El Charro Road I 680 Northbound PM Peak Hour 9. I 680 I 580 Junction/Dublin Boulevard I 680 Southbound AM Peak Hour 7. I 680 W Las Positas Boulevard/Stoneridge Drive 8. I 680 Stoneridge Drive/I 580 Junction 10. I 680 Dublin Boulevard/Alcosta Boulevard 11. I 680 Alcosta Boulevard/Bollinger Canyon Road Existing Bicycle and Pedestrian Facilities In the immediate Project vicinity, sidewalks are present in the eastbound and westbound directions on Camino Tassajara from Lusitano Street to Sycamore Valley Road. A sidewalk is also present in the eastbound direction on Camino Tassajara between Lusitano Street and the Ballfields signalized T intersection. Additionally, sidewalks are present in northbound and southbound directions on Crow Canyon Road from Camino Tassajara to Dougherty Road. No other existing pedestrian facilities were observed within the Project study area on major arterials or collectors. Class II bicycle facilities are currently present on both northern and southern sides of Camino Tassajara from Lusitano Street to the Ballfields signalized T intersection. Additionally, bike lanes are present in the northbound direction on Crow Canyon Road from Camino Tassajara to Dougherty Road and southbound on Crow Canyon Road from Center Way to Dougherty Road. No other existing bicycle facilities were observed along major collectors or arterials within the Project study area. Existing Transit Service The Central Contra Costa Transit Authority ( CCCTA County Connection ) operates bus service within the Town of Danville and City of San Ramon along the I 680 corridor. The closest connection to this transit system is the Route 35 bus line, which operates along Bollinger Canyon Road between Wedgewood Road and Dougherty Road in San Ramon. The route runs from 6:00 a.m. to 8:17 p.m. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

18 Transportation and Traffic Contra Costa County Tassajara Parks Project during the weekdays, and has typical peak headways of 30 minutes and off peak headways of 60 minutes (CCCTA 2010). County Connection also operates flex service in the vicinity of the Project Site. TRAFFIX school bus service also operates in the vicinity and is operated by a joint powers authority 2. Annexation into the County Service Area (CSA) T 1 3 is expected for the Project Site; thus, flex and TRAFFIX service would be extended. In addition, County Connection operates a shuttle van to provide transportation services for those travelling out of the Alamo Creek, Monterosso, and Ponderosa Colony developments to the Danville Park and Ride lot and the Walnut Creek BART Station as funded by homeowners in those developments Regulatory Framework State California Department of Transportation Caltrans builds, operates, and maintains the state highway system, including the interstate highway system. Caltrans s mission is to improve mobility statewide. The department operates under strategic goals to provide a safe transportation system, optimize throughput and ensure reliable travel times, improve the delivery of state highway projects, provide transportation choices, and improve and enhance the State s investments and resources. Caltrans controls the planning of the state highway system and accessibility to the system. Caltrans establishes goals for highways and works with local and regional agencies to assess impacts and develop funding sources for improvements to the state highway system. Caltrans requires encroachment permits from agencies or new development before any construction work may be undertaken within the State s right ofway. For projects that would impact traffic flow and levels of services on state highways, Caltrans would review measures to mitigate the traffic impacts. However, Caltrans has adopted the 2013 ACTC CMP and 2013 CCTA CMP standards, which are the criteria used to identify impacts in this study. Senate Bill 743 In response to Senate Bill (SB) 743, the Office of Planning and Research (OPR) is updating California Environmental Quality Act (CEQA) guidelines to include new transportation related evaluation metrics. Draft guidelines were developed in August 2014 and public comments were received on the draft guidelines through November On January 20, 2016, revised draft guidelines were publicly released and public comments were received through February As of the writing of this Draft EIR, new guidelines have not yet been adopted and the final guidelines may change based on the comments received. The new guidelines that will be adopted to address SB 743 will require lead agencies to assess Vehicle Miles of Travel (VMT) impacts for projects. The draft guidelines indicate that a development 2 3 Town of Danville, City of San Ramon, Contra Costa County, and SRVUSD CSA T 1 provides flex transit to an unincorporated area east of Danville of approximately 1.17 square miles consisting of approximately 804 dwelling units directly south of Camino Tassajara and the Project Site. Transit to and from CSA T 1 is fully funded by fees collected from homeowners in the CSA. The travel area is defined as a 1.5 mile corridor along Camino Tassajara between CSA T 1 and I 680, and along I 680 to the Walnut Creek and Dublin BART stations Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

19 Contra Costa County Tassajara Parks Project Transportation and Traffic project that is not exempt and that results in vehicle miles traveled greater than regional average for the land use type may indicate a significant impact. However, the lead agency has yet to establish specific local VMT thresholds and industry wide standards are still in the advisory stage. The latest direction from OPR also lists new exemptions for certain projects with revised screening thresholds (e.g., 100 trips/day, map based, or near transit stations). In addition, the policy implementation will begin in early 2017 with a 2 year phase in period. As such, a VMT analysis is not provided as a part of this CEQA analysis at this time. However, a brief VMT analysis is provided in the TIS for informational purposes only. Regional Contra Costa Transportation Authority The CCTA is a regional public agency responsible for maintaining and improving the County s regional transportation system by planning, funding, and delivering critical transportation infrastructure projects and programs. The CCTA is also charged with monitoring the implementation of all elements of the Congestion Management Program (CMP) for the County and determining conformance with the CMP s requirements, through the assessment of multimodal transportation service objectives (MTSOs) CCTA Growth Management Program (GMP) The GMP is a component of Measure J that is used by Contra Costa County to manage continued growth in population, households, and jobs that are expected to occur through the year The overall goal of the GMP is to achieve a cooperative process for Growth Management on a countywide basis while maintaining local authority over land use decisions and the establishment of performance standards. Two relevant requirements of the GMP in the context of this study are the implementation of the action plans for their respective RTPC and new or continued development mitigation programs Tri Valley Transportation Plan and Action Plan for Routes of Regional Significance The 2009 Tri Valley Transportation Plan/Action Plan assesses transportation issues within the Tri Valley area and outlines a recommended package of vision statements, goals, policies, objectives, and actions for addressing those issues. In addition to serving as a guide for transportation planning through 2040, the Plan represents the Action Plan for Routes of Regional Significance for Contra Costa County jurisdictions, as mandated by Measures C and J, and provides information that can be incorporated into the CMP for Contra Costa and Alameda Counties. Camino Tassajara and Crow Canyon Road are defined as Routes of Regional Significance in the Tri Valley Transportation Plan and the Congestion Management Program CCTA Congestion Management Program (CMP) The CMP is one part of an overall strategy to reduce congestion, improve mobility, and increase overall sustainability of the transportation system in the County. The CMP fulfills the requirements of California Government Code Section and has been prepared by the CCTA in consultation with local jurisdictions, other public agencies and members of the public. Consistent with state law, the program contains five elements: Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

20 Transportation and Traffic Contra Costa County Tassajara Parks Project 1. Traffic Level of Service () standards; 2. A performance element that includes performance measures to evaluate current and future multi modal system performance for the movement of people and goods; 3. A seven year capital improvement program (CIP); 4. A program to analyze the impacts of land use decisions made by local jurisdictions on regional transportation systems; and 5. A travel demand element that promotes transportation alternatives to the single occupant vehicle. The CMP also includes the CCTA Capital Improvement Program (CIP). The CIP contains those roadway, transit, and trail projects that are already programmed (and thus have committed funding), those proposed for funding through the Metropolitan Transportation Commission s (MTC s) Regional Transportation Improvement Program (RTIP) process, Transportation Systems Management (TSM) projects, Transportation Fund for Clean Air (TFCA) projects, and those developer funded projects where funding through the fee programs is imminent CCTA Technical Procedures The 2013 CCTA Technical Procedures is a document created to establish a uniform approach, methodology, and tool set from which public agencies in Contra Costa County may apply to evaluate the impacts of land use decisions and related transportation projects on the local and regional transportation system. Compliance with the Measure J Growth Management Program requires that local jurisdictions use the Technical Procedures to analyze the impact of proposed development projects, General Plans, and General Plan Amendments. Measure C/Measure J In 1988, Contra Costa County voters approved Measure C, which was designed to facilitate cooperation between the County and local jurisdictions within the County on regional transportation and growth issues. Measure C established a countywide half cent sales tax to be collected for 20 years, through 2008, in order to fund roadway and transportation system improvements. The CCTA distributes sales tax revenues collected under Measure C to jurisdictions that implement the required growth management goals, policies, and actions adopted as part of their general plans. In 2004, County voters approved Measure J, extending the growth management requirements of Measure C through Tri Valley Transportation Council s Tri Valley Transportation Development Fee The Tri Valley Transportation Council (TVTC) consists of one representative of each of the following entities: County of Alameda, County of Contra Costa, City of Dublin, City of Livermore, City of Pleasanton, City of San Ramon, and Town of Danville. The TVTC periodically evaluates the impacts of projected land uses on regional transportation infrastructure in the Tri Valley area and establishes a cost nexus between land use projections and impacts to the regional transportation infrastructure. The Tri Valley Transportation Development (TVTD) fee establishes a regional funding source for transportation improvement projects in the Tri Valley Development Area. The fee for residential Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

21 Contra Costa County Tassajara Parks Project Transportation and Traffic developers shall be calculated based on the number of new residential dwelling units. If the developer constructs the improvements or facilities itself, the developer shall be reimbursed or given a credit towards the remaining impact fees due for the development. Alameda County Transportation Commission 2013 Congestion Management Program The Alameda County Transportation Commission 2013 Congestion Management Program (ACTC CMP) describes the strategies to assess and monitor the performance of Alameda County s multimodal transportation system, address congestion and improve the performance of a multimodal system, and strengthen the integration of transportation and land use planning. The CMP acts as a short range plan to implement the long range Countywide Transportation Plan. Local Contra Costa County General Plan The General Plan establishes the following goals and policies related to transportation and traffic that are relevant to this analysis: Goal 1: To provide a safe, efficient and integrated multimodal transportation system. Policy 1: The design and the scheduling of improvements to arterials and collectors shall give priority to intermodal safety over other factors including capacity. Program 1.1: Design local streets so that the widths and curvatures fit the needs of all users, the appropriate speed of travel, and the character of the surrounding site. Policy 2: The use of freeways for community circulation shall be minimized by prioritizing transit circulation, safe, direct non motorized routes, and secondarily by additional arterials and expressways. Policy 3: The use of pedestrian and bicycle facilities shall be encouraged. Proper facilities shall be designed to accommodate bikes, pedestrians, and transit. Program 3.1: Design a system of local and collector streets within a development to connect pedestrians and bicyclists with transit stops, activity centers and adjacent neighborhoods. Policy 4: Use of alternative forms of transportation, such as transit, bike and pedestrian modes, shall be encouraged in order to provide basic accessibility to those without access to a personal automobile and to help minimize automobile congestion and air pollution. Policy 5: Emergency response vehicles shall be accommodated in development project design. Goal 2: To permit development only in locations of the County where appropriate traffic level of service standards are ensured. Policy 6: Development shall be allowed only when transportation performance criteria are met and necessary facilities and/or programs are in place or committed to be developed within a specified period of time. Goal 3: To provide access to new development while minimizing conflict between circulation facilities and land uses. Policy 7: Transportation facilities serving new urban development shall be linked to and compatible with existing and planned roads, bicycle facilities, pedestrian facilities and pathways of adjoining areas, and such facilities shall use presently available public and semipublic rights of way where feasible. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

22 Transportation and Traffic Contra Costa County Tassajara Parks Project Policy 8: New development (including redevelopment and rehabilitation projects) shall contribute funds and/or institute programs to reduce parking demand and/or provide adequate parking. Policy 9: New development shall contribute funds and/or institute programs to provide adequate bicycle and pedestrian facilities where feasible. Policy 10: The use of local and collector roadways for neighborhood circulation shall be encouraged. Policy 11: New arterial roadways shall be routed around, rather than through neighborhoods, to minimize traffic impacts on residential areas. Goal 4: Plan for the needs of bicyclists and pedestrians. Policy 12: Accommodate and encourage other agencies to accommodate the needs for mobility, accessibility and safety of bicyclists and pedestrians when planning, designing and developing transportation improvements. Program 12.1: Incorporate sidewalks, bike paths, bike lanes, crosswalks, pedestrian cutthroughs, or other bicycle pedestrian improvements into new projects. Program 12.1: Accommodate cyclists and pedestrians during construction of transportation improvements and other development projects. Goal 5: Expand, improve and maintain facilities for walking and bicycling. Policy 13: Describe a system of bicycle facilities and key attractors of bicycle and pedestrian traffic so that all travelers, including people with disabilities, can travel safely and independently. Program 13.1: Where possible, roads selected for the comprehensive bikeway system should be 35 mph or less. Program 13.2: Ensure that pedestrian connectivity is preserved or enhanced in new developments by providing short, direct pedestrian connections between land uses and to building entrances. Program 13.3: Promote planning and coordination of pedestrian and bicycle facilities among cities, transit agencies and public utilities. Policy 14: Identify gaps in the bicycle network and needed improvements to pedestrian districts and key activity centers and define priorities for eliminating these gaps and making needed improvements. Facilities shall be designed to the best currently available standards and guidelines. Program 14.1: Pedestrian Districts should be created in areas of mixed or dense land use and intense or potentially intense pedestrian activity. Program 14.2: Streetscape improvements should be included in the design of high usage pedestrian facilities to encourage pedestrian activity. This would include improvements such as benches, public art, drinking fountains and pedestrian scale lighting fixtures. Program 14.3: Traffic calming measures should be designed so they improve pedestrian and bicycle movement in residential neighborhoods and commercial districts as well as strategic corridors between them that help form the comprehensive bicycle network. Goal 6: Improve safety for pedestrians and bicyclists. Policy 15: Reduce conflicts among motorists, pedestrians and bicyclists. Program 15.1: Use traffic control devices such as signs, signals or lights to warn motorists that pedestrians or bicyclists are in the roadway Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

23 Contra Costa County Tassajara Parks Project Transportation and Traffic Program 15.2: Provide buffers between roads and sidewalks utilizing planter strips or buffer zones that provide streetscape improvements. Goal 7: To identify, preserve and enhance scenic routes in the County. Policy 16: Scenic corridors shall be maintained with the intent of protecting attractive natural qualities adjacent to various roads throughout the county. Policy 17: For lands designated for urban use along scenic routes, planned unit developments shall be encouraged in covenant with land development projects. Measure 17.1: Consider the visual qualities and character of the corridor in reviewing plans for new roads, road improvements, or other public projects. This should include width, alignment, grade, slope and curvatures of traffic islands and side paths, drainage facilities, additional setbacks, and landscaping. Policy 18: Aesthetic design flexibility of development projects within a scenic corridor shall be encouraged. Measure 18.1: Attain development project design flexibility within the scenic corridor through application of the Planned Unit Development District Zoning Methodology Prior to commencement of the traffic analysis for the Project, representatives of Contra Costa County, the Town of Danville, the City of Dublin, and the City of San Ramon met to define the study network and establish a methodology for the analysis. In general, the CCTA Technical Guidance provided the basis for the selection of intersections and the methodology for the analysis. The analysis does utilize the Town of Danville trip generation rates for residential uses, as requested by the Town. Analysis in this section was based on, among other things, the traffic analysis prepared by Kimley Horn and Associates for the Project. The following is a summary of the analysis methodology. Scenario Development Conditions The scenarios analyzed in the TIS were based on the following development conditions: Existing (2015) Conditions Based on current traffic volumes collected in March 2015, existing roadway geometry, and traffic control. Existing (2015) Plus Project Conditions Based on existing traffic volumes, existing roadway geometry, and traffic control, and generated by the Project. Near Term Conditions Based on current traffic volumes, existing roadway geometry and traffic control, and traffic generated by approved and pending (but not yet completed) developments anticipated to occur at the time the Project is constructed. Near Term Plus Proposed Project Conditions Based on current traffic volumes, existing roadway geometry and traffic control, traffic generated by approved and pending (but not yet completed) developments, and traffic generated by the Project. Cumulative (2035) Conditions Based on future year traffic forecasts obtained from the 2014 Contra Costa Transportation Authority (CCTA) Travel Demand Model (TDM). The TDM includes Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

24 Transportation and Traffic Contra Costa County Tassajara Parks Project Capital Improvement Program (CIP) transportation projects anticipated to be completed by Year These CIP projects are included in the corresponding facilities General Plans. Cumulative (2035) Plus Project Conditions Based on future year forecasts obtained from the 2014 CCTA TDM and adding traffic generated by the Project. Includes roadway geometry and traffic control improvement projects indicated in the most recent CIP. Intersection Delay and Analysis Methodology Analysis of significant environmental impacts at intersections is based on the concept of Level of Service (). The of transportation facilities is a qualitative measure used to describe operational conditions. ranges from A (best), which represents minimal delay, to F (worst), which represents heavy delay and a facility that is operating at or near its functional capacity. Levels of Service for this study were based on methods defined in the Highway Capacity Manual, 2010 (HCM) using Synchro analysis software. The HCM includes procedures for analyzing multimodal side street stop controlled (SSSC), all way stop controlled (AWSC), and signalized intersections. For AWSC and signalized intersections, is defined as a function of average control delay for the intersection as a whole. For SSSC intersections, is defined as a function of average control delay for each minor street approach movement. Table relates the operational characteristics associated with each category for signalized and unsignalized intersections. Table : Intersection Definitions A Description Free flow with no delays. Users are virtually unaffected by others in the traffic stream Signalized (Average control delay per vehicle sec/veh.) Unsignalized (Average control delay per vehicle sec/veh.) B Stable traffic. Traffic flows smoothly with few delays C D E F Stable flow but the operation of individual users becomes affected by other vehicles. Modest delays. Approaching unstable flow. Operation of individual users becomes significantly affected by other vehicles. Delays may be more than one cycle during peak hours. Unstable flow with operating conditions at or near the capacity level. Long delays and vehicle queuing. Forced or breakdown flow that causes reduced capacity. Stop and go traffic conditions. Excessive long delays and vehicle queuing. Source: Transportation Research Board, Highway Capacity Manual (HCM) Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

25 Contra Costa County Tassajara Parks Project Transportation and Traffic Traffic Signal Warrants Traffic signals may be justified when traffic operations fall below acceptable thresholds and when one or more signal warrants are satisfied. Traffic volumes at the unsignalized study intersections were compared against the peak hour warrant in the 2014 California Manual on Uniform Traffic Control Devices (CA MUTCD). Traffic Signal Warrant #3 Peak Hour Warrant is satisfied when traffic volumes on the major and minor approaches exceed thresholds for one hour of the day. The Peak Hour Warrant is generally the first warrant to be satisfied. Other warrants such as for minimum vehicle volumes, interruption of continuous traffic, and traffic progression were not evaluated because they require higher traffic volumes to be satisfied. Signal warrants have no bearing on potentially significant impacts. However, if signalization of an unsignalized intersection is either part of the project or could serve as a potential project level mitigation, then a signal warrant is required to be met pursuant to MUTCD guidance. Vehicle Queuing Methodology As congestion increases, it is common for traffic at signals and stop signs to form lines of stopped (or queued) vehicles. The effects of vehicle queueing were analyzed at critical study intersections and the 95 th percentile queue is reported for right and left turn pockets as these are the movements which could spill into the mainline if overcapacity. The 95 th percentile queue length represents a condition where 95 percent of the time during the peak period, traffic volumes and related queuing will be at, or less, than the queue length determined by the analysis. This is referred to as the 95 th percentile queue. Average queuing is generally less. Queues were estimated for each development scenario using Synchro analysis software. Freeway Density and Methodology As outlined in the Caltrans Guide for the Preparation of Traffic Impact Studies, the measure of effectiveness (MOE) for a multi lane highway or freeway facility is measured by density of the freeway (passenger cars per mile per lane). definitions based on freeway segment density are presented in Table Table : Freeway Segment Criteria Freeway Segment Density (pc/mi/ln)* A 11 B > C > D > E > F > 45 Note: * Passenger cars (pc) per mile (mi) per lane (ln) Source: Transportation Research Board, Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

26 Transportation and Traffic Contra Costa County Tassajara Parks Project Trip Generation Trip generation for development projects is typically calculated based on information contained in the Institute of Transportation Engineer s (ITE) publication, Trip Generation 9th Edition. Trip Generation is a standard reference used by jurisdictions throughout the country for the estimation of trip generation potential of proposed developments. A trip is defined in Trip Generation as a single or one directional vehicle movement with either the origin or destination at the Project Site. In other words, a trip can be either to or from the site. In addition, a single visit to a site is counted as two trips (i.e., one to and one from the site). For purposes of determining the reasonable worst case impacts of traffic on the surrounding street network, the trips generated by the Project are estimated for the highest peak hour between the hours of 7:00 and 9:00 a.m. and between 4:30 and 6:30 p.m. on a weekday. While the Project itself may generate more traffic during other times of the day such as around noon, the peak of adjacent street traffic represents the time period when the combined uses consistently create the greatest amount of congestion, with the PM peak commonly being the greatest congestion period. As the Project consists principally of residential development, no weekend peak hour was considered in the analysis, as the weekend trip generation rates are typically lower for residential uses compared with weekday trip generation rates. Even though, individually, the park and recreational uses may generate higher trips on the weekend, the Project as a whole will generate significantly more trips during the typical weekday. Therefore, the weekday AM and PM peaks represent worst case scenarios in terms of potential traffic impacts. The proposed residential development is most appropriately classified as Single Family Detached Housing, which is represented by ITE Land Use Code 210. However, consistent with direction from local traffic engineering staff, alternative trip generation rates for single family residential homes were provided by the Town of Danville for use in this study. These trip generation rates are more conservative than ITE rates. There is no similar use for the equestrian facilities listed in ITE s Trip Generation Manual. Trip generation rates for the equestrian facilities were developed based on research of similar facilities. The study that best represented the Project estimated trip generation rates given raw count data of an equestrian facility use during the AM and PM peak hours (LLG 2008). The trip generation rates were developed using the number of anticipated parking spaces as an independent variable. No internal capture, diverted link or pass by trip reductions were taken for the Project given the land use types and land uses within the vicinity of the Project Site. Some reductions could be claimed for school site adjacency, particularly because of the two pedestrian paths on the Northern Site s western boundary. The pedestrian paths would provide direct connection to the adjacent Tassajara Hills Elementary School, thereby allowing potential future on site students the option to walk to school, potentially reducing related traffic trips. However, in the interest of a conservative traffic study, these potential trip reductions were not accounted for. The final trip generation was approved by Contra Costa County, the Town of Danville, and the City of San Ramon before being applied in this analysis (see Appendix I). The final trip generation can be seen in Table Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

27 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Tassajara Parks Trip Generation Trip Generation Rates Single Family Residential 1 Park Parking Spaces (Equestrian) 2 Park Parking Spaces (Pedestrian) 3 North Tassajara Parks (155 Acres) 4 Single Family Residential Future Equestrian Staging Area Pedestrian Staging Area Unit Dwelling Units (DU) Parking Space (PS) Parking Space (PS) 125 DU 30 PS 25 PS Total AM PM Daily AM PM In/Out In/Out %/75% 63%/37% %/30% 46%/54% %/39% 61%/39% 1, /131 81/ /1 4/ /10 15/10 Total Trips 1, / /61 Notes: 1 Trip generation rates developed by the Town of Danville were used in this study. The Town of Danville s rates are higher than ITE rates and thus more conservative. 2 Trip generation rates were developed based on research of similar equestrian facilities. One such study was Sycamore Trails Stables Trip Generation Study (Linscott, Law, & Greenspan Engineers 2008), in which trip generation rates were estimated given raw count data of an equestrian facility use during the AM and PM peak hours. 3 Trip generation rates were developed based on a conservative number of parking spaces and therefore exceed those proposed to be provided at the site. 4 The Northern Site is the only portion of the Project Site that generates trips. The approximately 609 acres of the Southern Site would be permanently preserved for park, recreation, open space agriculture, scenic, grazing, wetland preservation and creation, and habitat mitigation purposes and would be conveyed to the EBRPD by fee simple transfer or other appropriate legal mechanism (subject to a conservation easement approved by resource agencies). The remaining approximately 7 acres of the Southern Site has been contingently offered for dedication, to the San Ramon Valley Fire Protection District (SRVFPD) for potential future use in a manner consistent with the ULL. If the SRVFPD accepts the offer and eventually seeks to pursue development of this Parcel, that proposal would be required to comply with all applicable environmental review requirements under CEQA (which would be triggered because the SRVFPD would be required to obtain a discretionary land use permit from the County). Therefore, for purposes of this EIR, it is speculative to assume any development on this parcel. Source: Kimley Horn and Associates, Inc., Project Trip Distribution and Assignment The Project trip distribution was derived by performing a select zone analysis using the 2013 CCTA Travel Demand Model received from Contra Costa County. The travel demand model takes into account the Project s land uses and likely travel destinations within the greater Contra Costa County region, distributing the trips accordingly. The travel demand model also takes into account baseline and expected future changes in the roadway network and the County s roadway operational conditions. The select zone model runs can be seen in Appendix I. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

28 Transportation and Traffic Contra Costa County Tassajara Parks Project The Project s trip distribution was reviewed and approved by Contra Costa County, the Town of Danville, and the City of San Ramon prior to use in this traffic study. Exhibit presents the traffic distribution assumed for this analysis. Based on the assumed trip distribution, new vehicle trips generated by the Project were assigned to the street network as shown in Exhibit Thresholds of Significance According to the CEQA Guidelines Appendix G Environmental Checklist, transportation and traffic impacts resulting from the implementation of the proposed Project would be considered significant if the Project would: a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass transit and non motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit? b) Conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways? c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? (Refer to Section 7.0, Effects Found not to be Significant) d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? e) Result in inadequate emergency access? f) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities? Project Specific Thresholds The following discusses specific thresholds used to determine impacts as identified by jurisdiction or facility type. Project impacts are determined by comparing conditions with the Project to those without the Project. Significant impacts for intersections are created when traffic from the Project causes the to fall below a specific threshold. Mitigation for intersections, freeway segments, and queues with a significant impact must improve the or queue length back to no Project or baseline conditions. For all jurisdictions, this analysis assumes that if a facility operates below the applicable threshold in baseline conditions and continues to do so after inclusion of the Project, then it is a significant impact. It also assumes that an adequate subsequent mitigation for such a case would be one that brings, to the extent feasible, the facility operations back to or better than baseline operations Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

29 Source: Kimley Horn, 2016 I / _trip_distribution.cdr Exhibit Project Trip Distribution CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

30 THIS PAGE INTENTIONALLY LEFT BLANK

31 Source: Kimley Horn, 2016 Exhibit Project Trip Assignment / _trip_assignment.cdr CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

32 THIS PAGE INTENTIONALLY LEFT BLANK

33 Contra Costa County Tassajara Parks Project Transportation and Traffic Intersections County Facilities The CCTA Technical Procedures (2013), cites the usage of the corresponding action plan as an adequate reference for the determination of significant impacts. The Contra Costa County 2009 Tri Valley Transportation Plan and Action Plan for Routes of Regional Significance states the target MTSO is to maintain an intersection E or better. Intersections in downtown areas and other local intersections specifically exempted by local jurisdictions have no defined MTSO (Tri Valley Transportation Council 2014). For this analysis, within the jurisdiction of Contra Costa County, intersections are considered to be impacted significantly if the Project would cause a facility to degrade from acceptable E or better to unacceptable F. This standard is for all County facilities and not just routes of regional significance. Town of Danville Facilities The Town of Danville s 2030 General Plan states that E will remain Danville s operational standard for reviewing impacts and determining necessary roadway improvements on routes of regional significance (Town of Danville 2013). For this analysis, intersections within the jurisdiction of the Town of Danville are considered to be significantly impacted if the base case operations are E or better and the Project would degrade operations to F. City of San Ramon Facilities The City of San Ramon s 2030 General Plan Implementing Policy 5.1 I 1 states to strive to maintain a maximum D standard at all intersections during the AM and PM peak periods (City of San Ramon 2011). This analysis recognizes that the 2009 CCTA Tri Valley Action Plan criteria for routes of regional significance be applied to classified intersections. For this analysis, intersections within the jurisdiction of the City of San Ramon are considered to be significantly impacted if the base case operations are D or better and the Project would degrade operations to E or F, unless it is a route of regional significance, in which case, a significant impact occurs if the base case operations are E or better and the Project would degrade operations to F. Camino Tassajara and Crow Canyon Road are defined as a route of regional significance. Queuing If queuing extends beyond the storage length, vehicles block the adjacent through lane, which reduces intersection capacity and would be considered an operational deficiency. For this analysis, a significant impact is assumed to occur if the 95 th percentile queue increases by 25 feet or more (conservatively, the length of one vehicle) and the vehicle queue exceeds the turn pocket length due to the Project. Freeway Segments While Caltrans seeks to maintain a on freeway facilities at the transition between C and D, CCTA and ACTC have established freeway facility standards given local congestion management monitoring programs. Caltrans has adopted the 2013 ACTC CMP and 2013 CCTA CMP standards the criteria used to identify impacts in this study. For the purposes of this analysis, the County has determined, in its discretion, to utilize the criteria summarized below for the congestion management agencies to be the significance criteria utilized. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

34 Transportation and Traffic Contra Costa County Tassajara Parks Project The standards for freeway segments are established in the 2013 CCTA CMP for facilities within Contra Costa County, and within the 2013 ACTC CMP for facilities located within Alameda County. Freeway facilities within Contra Costa County have specific thresholds for segments along I 680. Freeway facilities within Alameda County have a threshold of E with specific exceptions of standard of F listed in the CMP for certain freeway segment connectors. The specific standards for the study area freeway segments are listed in the freeway segment tables within the analysis section Project Impacts and Mitigation Measures This section discusses potential environmental impacts associated with the development and operation of the Project and provides feasible mitigation measures where appropriate. As described in Section 2 of this R DEIR, a Memorandum of Understanding (MOU) is currently being considered to preserve certain land in the County for agriculture and open space, wetlands, or parks. The effect of the MOU would be to continue existing policy, and the MOU would not result in a substantial adverse change to existing conditions with respect to transportation. The range of actions to be considered pursuant to the MOU were it to be adopted would include promoting agriculture through the purchase of land or easements from willing sellers, through continuing the Williamson Act program and its related tax benefits, as well as through technical support to better manage weeds and water. To the extent that any specific projects that could be considered for funding pursuant to the MOU such as land conservation, weed management, or groundwater improvements could have adverse environmental effects, such projects would be subject to separate project level CEQA review as proposed actions are defined and funding for them is identified. As the precise location and scope of such projects is not known at this time, further consideration of potential impacts would be speculative. Existing Plus Project Conditions Impact TRANS 1: The Project would generate new trips that would contribute to unacceptable traffic operations under Existing Plus Project conditions. Impact Analysis This impact identifies potential impacts to intersection operations, critical queues, and freeway segments under the Existing Plus Project scenario. Each is discussed separately below. Analysis sheets are provided in Appendix I. Intersection Operations Traffic operations were evaluated at the study intersections inclusive of the Project s access points, under Existing Conditions with the addition of traffic generated by the Project, as shown in Exhibit Results of the analysis are presented in Table Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

35 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Existing Plus Project Conditions Intersection Delay and Int# Intersection Criteria Jurisdiction Control Existing Existing + Project AM Peak PM Peak AM Peak PM Peak Delay Delay Delay Delay Delay Delay 1 Camino Tassajara/Ballfields Project Driveway (Full Access) E County Signal A 1.4 A 2.1 A A Camino Tassajara/Lusitano St Tassajara Hills ES Driveway E County Signal D 43.7 A 7.2 D B Camino Tassajara/Blackhawk Dr Charbray St E County Signal B 17.6 B 11.3 B B Camino Tassajara/Hansen Ln Diablo Vista MS Driveway 1 E Danville Signal D 44.1 A 7.2 E A Camino Tassajara/Oak Gate Dr Lawrence Rd E Danville Signal D 47.5 A 9.1 E A Camino Tassajara/Mansfield Dr Jasmine Wy E Danville Signal B 18.4 A 6.9 C A Camino Tassajara/Parkhaven Dr E Danville Signal A 7.4 A 4.8 A A Camino Tassajara/Buckingham Dr Rassani Dr E Danville Signal C 25.7 B 10.1 C B Camino Tassajara/Conejo Dr E Danville Signal B 10.5 A 6.0 B A Camino Tassajara/Tassajara Ranch Dr E Danville Signal C 32.6 B 19.8 D C Camino Tassajara/Tassajara Village Dr E Danville Signal A 5.4 B 10.4 A B Camino Tassajara/Blackhawk Rd Crow Canyon Rd E Danville Signal D 47.7 D 40.0 D D Camino Tassajara/Old Blackhawk Rd Liverpool St E Danville Signal B 15.5 A 9.3 B A Camino Tassajara/Holbrook Dr E Danville Signal D 35.9 A 9.7 D B Camino Tassajara/Sycamore Valley Rd E Danville Signal C 34.4 C 22.4 D C Dougherty Rd/Crow Canyon Rd E San Ramon Signal B 15.7 D 40.7 B D Camino Tassajara/Finley Rd E County SSSC* C 21.4 D 26.7 C D Finley Rd/Project Driveway (Equestrian Staging Area) E County SSSC* A 8.5 A 8.5 Notes: 1 For this intersection only, the phasing used in the Synchro model was inconsistent with the timing sheet provided by the Town. In August 2016, Kimley Horn evaluated and confirmed that while revising to match the timing sheet will increase the intersection delay by approximately 5 seconds depending on the peak scenario, will remain as reported even with the increase in delay. correspondence from Jake Mirabella, Kimley Horn, August 18, * For side street stop controlled (SSSC) intersections the worst approach delay and is reported. Intersection delay,, and v/c ratios calculated with Highway Capacity Manual (HCM) 2010 methodology using Synchro software. Intersections #4 and #5 above are coordinated intersections with leading exclusive pedestrian phases. HCM 2010 methodology does not support the inclusion of exclusive pedestrian phases. To be consistent with the methodology, the leading pedestrian phases only were not implemented in Synchro. If a specific movement has a delay less than the approach or intersection average, and the trips are increased for this movement, the overall intersection delay is decreased. Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

36 Transportation and Traffic Contra Costa County Tassajara Parks Project As shown in Table , the Project would result in increased delay, but all intersections would still operate within acceptable standards. As such, impacts to intersection operations under the Existing Plus Project Conditions would be less than significant. Critical Queues Queuing operations were evaluated at the locations identified as critical queue spillback locations under Existing Plus Project Conditions. (Queuing at the project driveways is discussed under Impact TRANS 5.) Results of the analysis are presented in Table Table : Existing Plus Project Conditions Queuing Results 2 # Intersection Movement 12 Camino Tassajara/Lusitano Street Tassajara Hills ES Driveway Camino Tassajara/Blackhawk Road Crow Canyon Road Storage Length (ft) Existing Existing Plus Project 95 th Percentile Queue (ft) 95 th Percentile Queue (ft) AM PM AM PM NBL/T/R SBT/L SBR 70 B EBL a WBL WBT/R b NBL SBL EBL WBL Notes: 95 th Percentile queue lengths were obtained from Synchro v8 software. Storage lengths are not given for through lanes or segment lengths, but rather, only shown for turn pockets. a The Synchro analysis did not indicate that queues would spill back, but this was observed for a short period during the Existing AM peak hour due to school traffic. b The Tassajara Hills Elementary School driveway is proposed to provide 2 full lanes in each direction in addition to a 100 foot WBR turn pocket at the intersection in Plus Project conditions. For the Plus Project conditions, the WBR turn 95 th percentile queue is shown. Source: Kimley Horn and Associates, Inc., As shown in Table , none of the turn pocket storage lengths are over capacity when compared with the 95 th percentile queue. It should be noted, however, that while the Synchro analysis did not indicate that queues would spill back, this physically was observed for a short period (10 minutes) at the Camino Tassajara/Lusitano Street Tassajara Hills ES Driveway during the Existing AM peak hour due to school traffic. Nonetheless, because the 95 th percentile queue did not increase by 25 feet or more, impacts would be less than significant. Furthermore, the Project would provide two full lanes (i.e., no pocket) in Plus Project conditions at the southbound approach of the school driveway to alleviate intersection congestion. Freeway Segments Traffic operations were evaluated at the study freeway segments under Existing Plus Project Conditions. Results of the analysis are presented in Table Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

37 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Existing Plus Project Conditions Freeway Analysis Existing Conditions Existing Plus Project Conditions AM Peak PM Peak AM Peak PM Peak Facility Interstate 580 No * 6* Study Segment I 580 Eden Canyon Road/Foothill Road I 580 Foothill Road/I 680 Junction I 580 I 680 Junction/ Dougherty Road I 580 Dougherty Road/Hacienda Drive I 580 Hacienda Drive/Tassajara Road Santa Rita Road I 580 Tassajara Road/Fallon Road El Charro Road Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) E EB 4 6, D 8, F 6, D 8, F E WB 4 7, D 6, D 7, D 6, D E EB 4 6, D 8, F 6, D 8, F E WB 4 7, E 6, E 7, E 6, E E EB 5 1, A 11, F 1, A 11, F E WB 4 8, F 4, C 8, F 4, C E EB 7 1, A 11, D 1, A 11, D E WB 5 8, D 4, B 8, D 4, B E EB , A 1,992 9, E 1, A 9, E E WB 4 8, F 4, C 9, F 4, C E EB , A 1,892 9, F 1, A 9, F E WB 4 8, F 4, C 8, F 4, C Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

38 Contra Costa County Tassajara Parks Project Transportation and Traffic Table (cont.): Existing Plus Project Conditions Freeway Analysis Existing Conditions Existing Plus Project Conditions AM Peak PM Peak AM Peak PM Peak Facility Interstate 680 No * 12* Study Segment I 680 W Las Positas Boulevard/ Stoneridge Drive I 680 Stoneridge Drive/I 580 Junction I 680 I 580 Junction/Dublin Boulevard I 680 Dublin Boulevard/ Alcosta Boulevard I 680 Alcosta Boulevard/ Bollinger Canyon Road I 680 Bollinger Canyon Road/Crow Canyon Road Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) E NB 3 3, C 5, D 3, C 5, D E SB 3 6, F 3, C 6, F 3, C E NB 3 3, C 6, E 3, C 6, E E SB 3 7, F 4, C 7, F 4, C E NB 3 4, C 7, F 4, C 7, F F SB 3 8, F 4, D 8, F 4, D E NB 4 4, C 7, D 4, C 7, D E SB 4 8, F 4, C 8, F 4, C E NB , C 1,331 5, E 3, C 5, E E SB 3 1,550 7, F 783 3, C 7, F 3, C E NB , B 1,258 5, C 3, B 5, C F SB 4 1,466 6, D 740 3, B 6, D 3, B Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

39 Contra Costa County Tassajara Parks Project Transportation and Traffic Table (cont.): Existing Plus Project Conditions Freeway Analysis Existing Conditions Existing Plus Project Conditions AM Peak PM Peak AM Peak PM Peak Facility No. 13* 14* 15* Study Segment I 680 Crow Canyon Road/Sycamore Valley Road I 680 Sycamore Valley Road/Diablo Road I 680 Diablo Road/El Charro Boulevard Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) E NB , B 1,315 5, C 3, B 5, C F SB 4 1,531 6, D 773 3, B 6, D 3, B E NB , C 1,436 6, E 4, C 6, E F SB 3 1,672 7, F 844 4, C 7, F 4, C E NB , C 1,420 6, E 4, C 6, E F SB 3 1,653 7, F 835 4, C 7, F 4, C Notes: Freeway segment thresholds for this analysis were derived from the 2013 CCTA CMP and the 2013 ACTC CMP were referenced. Freeway segments operating below the standardized segment threshold as shown in the Criteria column are shown in bold. Significant impacts are highlighted. The analysis was performed using HCS 2010 software. For freeway segments where an auxiliary lane is > 2,500 feet in length, weaving does not apply; therefore, the auxiliary lane is considered to be a basic freeway lane for the purposes of this analysis. AADT obtained from Caltrans Traffic Data Branch (2013). * An asterisk indicates the freeway segment contains a high occupancy vehicle (HOV) lane. For these segments, the HOV lanes and traffic volumes were excluded from the analysis. HOV traffic volumes were removed from the Caltrans s indicated peak hour traffic volumes using information obtained from the Caltrans 2013 Managed Lanes Report. (a) Directional volumes in vehicles per hour (vph) calculated as: AADT x K Factor x D Factor percentage. The K Factor is the percentage of AADT during the peak hour for both directions of travel. The D Factor is the percentage of the peak hour travel in the peak direction. K and D factors multiplied with the AADT gives the one way peak period directional flow rate or the design hourly volume (DHV). (b) pc/mi/ln = passenger cars per mile per lane Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

40 Transportation and Traffic Contra Costa County Tassajara Parks Project As shown in Table , the following freeway segments do not function within acceptable standards (see Criteria column) according to criteria set forth by CCTA and ACTC under the Existing Conditions analysis scenario: I 580 Eastbound PM Peak Hour 1. I 580 Eden Canyon Road/Foothill Road 2. I 580 Foothill Road/I 680 Junction 3. I 580 I 680 Junction/Dougherty Road 6. I 580 Tassajara Road/Fallon Road El Charro Road I 580 Westbound AM Peak Hour 3. I 580 I 680 Junction/Dougherty Road 5. I 580 Hacienda Drive/Tassajara Road Santa Rita Road 6. I 580 Tassajara Road/Fallon Road El Charro Road I 680 Northbound PM Peak Hour 9. I 680 I 580 Junction/Dublin Boulevard I 680 Southbound AM Peak Hour 7. I 680 W Las Positas Boulevard/Stoneridge Drive 8. I 680 Stoneridge Drive/I 580 Junction 10. I 680 Dublin Boulevard/Alcosta Boulevard 11. I 680 Alcosta Boulevard/Bollinger Canyon Road These segments operate below acceptable standards (see Criteria column) under Existing Conditions. The addition of the Project would increase traffic volumes along these freeway segments, and they would continue to operate deficiently. Impacts are discussed separately below. I 580 Eastbound Freeway The eastbound freeway segments of I 580 between Eden Canyon Road and Dougherty Road and between Tassajara Road and Fallon Road currently operate at F under Existing Conditions during the PM peak hour (segments 1, 2, 4, and 6). With the addition of the Project, these segments would continue to operate at F during the PM peak hour. The Project trips would add approximately 0.06 percent volume to the freeway traffic. Because the freeway segments operate at F, which is below the standard for freeway facilities of E, this is a significant impact. I 580 Westbound Freeway The westbound freeway segments of I 580 between Dougherty Road and the I 680 Junction (segment 3) and between Fallon Road and Hacienda Drive (segments 5 and 6) currently operate at F for Existing Conditions during the AM peak hour. With the addition of the Project, these segments would continue to operate at F during the AM peak hour. The Project trips would add approximately 0.06 percent volume to freeway traffic. Because the freeway segments operate at F, which is below the standard for freeway facilities of E, this is a significant impact Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

41 Source: Kimley Horn, 2016 Exhibit Existing Plus Project Conditions Peak Hour Turning Movements / _plus_peak_turning.cdr CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

42 THIS PAGE INTENTIONALLY LEFT BLANK

43 Contra Costa County Tassajara Parks Project Transportation and Traffic I 680 Northbound Freeway The northbound freeway segments of I 680 between the I 580 Junction and Dublin Boulevard (segment 9) currently operate at F under Existing Conditions during the PM peak hour. With the addition of the Project, these segments would continue to operate at F during the PM peak hour. The Project trips would add approximately 0.13 percent volume to freeway traffic. Because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact. I 680 Southbound Freeway The southbound freeway segments of I 680 between Bollinger Canyon Road and Dublin Boulevard (segments 10 and 11), and between the I 580 Junction and West Las Positas Boulevard (segments 7, 8, and 9) currently operate at F under Existing Conditions during the AM peak hour. With the addition of the Project, these segments would continue to operate at F during the AM peak hour. The Project trips would add approximately 0.12 percent volume to freeway traffic. Because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact. Summary Under MM TRANS 1, the Project applicant would be required to pay applicable Tri Valley Transportation Development (TVTD) fees. The fees contribute to the construction of planned freeway improvements, including HOV lanes, auxiliary lanes, interchange improvements as well as other regional transportation improvements. Significant portions of I 580 and I 680 within the study area will be part of a Bay Area Express Lanes Network as part of Plan Bay Area, the Regional Transportation Plan adopted by MTC s Commissioners in July It designates a network of existing or planned HOV lanes that will be converted to Express Lanes and has been coordinated by MTC, but has included the direct planning and design work of the Congestion Management Agencies and Transportation Authorities of the counties in which the lanes will operate. In the Project vicinity, the following segments are planned for construction as part of the Bay Area Express Lanes Network: Under Construction I 680 Conversion of existing HOV lanes between Walnut Creek and San Ramon (22.5 miles). I 580 New express (HOT) lanes and conversion of existing lanes between Livermore and Dublin (13.2 miles). Planned Future Improvements I 680 New express (HOT) lanes (gap closure) between San Ramon and Sunol (20.1 miles). I 580 New express (HOT) lanes between Tracy and Livermore (16.8 miles). Payment of these fees would help to reduce the Project s impacts on the I 580 and I 680 segments. However, because the implementation and timing of these improvements are beyond the control of Contra Costa County, and because it has not been quantified if these improvements would fully mitigate the Project s contribution to the existing deficiency, impacts to freeway segments would remain significant and unavoidable. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

44 Transportation and Traffic Contra Costa County Tassajara Parks Project Level of Significance Before Mitigation Potentially significant impact. Mitigation Measures MM TRANS 1 Prior to the issuance of building permits, the Project applicant shall pay the applicable Tri Valley Transportation Development (TVTD) Fees, which shall serve as partial mitigation for the impact to freeway segments. The fees contribute to the construction of planned freeway improvements, including HOV lanes, auxiliary lanes, interchange improvements as well as other regional transportation improvements, including a contribution toward the new West Dublin BART Station. Impact fees are due at time of receipt of building permits. Payment of these fees will partially mitigate the incremental impact. Level of Significance After Mitigation Significant unavoidable impact. Near Term Plus Project Conditions Impact TRANS 2: The Project would generate new trips that would contribute to unacceptable traffic operations under Near Term Plus Project conditions. Impact Analysis This impact identifies potential impacts to intersection operations, critical queues, and freeway segments under the Near Term Plus Project scenario. Each is discussed separately below. Analysis sheets are provided in Appendix I. The Near Term Plus Project scenario was derived by adding the trips generated by two development projects in vicinity of the Project Site to the existing traffic volumes, and facility operations were assessed using the existing roadway network and geometry. The two development projects include the Creekside Memorial Park Cemetery and the Alamo Creek residential subdivision. The purpose of the Near Term Plus Project scenario is to analyze likely conditions at the time the Project is completed, taking into consideration two nearby, approved projects that may likely be completed in a similar time frame. The Near Term traffic volumes are shown in Exhibit The Near Term Plus Project scenario traffic volumes were derived by adding the peak hour trip assignment for the Project to the Near Term traffic volumes. The Near Term Plus Project peak hour intersection volumes are shown in Exhibit Intersection Operations Traffic operations were evaluated at the study intersections under near term conditions plus traffic generated by the Project, as seen in Exhibit Results of the analysis are presented in Table Locations operating unacceptably are bolded and significant Project impacts are highlighted Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

45 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Near Term Plus Project Conditions Intersection Delay and Near Term Near Term + Project Int# 1 Intersection Camino Tassajara/Ballfields Project Driveway (Full Access) Criteria Jurisdiction Control AM Peak PM Peak AM Peak PM Peak Delay Delay Delay Delay Delay Delay E County Signal A 1.4 A 2.0 A A Camino Tassajara/Lusitano St Tassajara Hills ES Driveway E County Signal D 48.0 A 9.9 D B Camino Tassajara/Blackhawk Dr Charbray St E County Signal C 20.9 B 13.9 C B Camino Tassajara/Hansen Ln Diablo Vista MS Driveway 1 E Danville Signal E 57.9 A 8.1 E A Camino Tassajara/Oak Gate Dr Lawrence Rd E Danville Signal E 65.1 B 10.1 F B Camino Tassajara/Mansfield Dr Jasmine Wy E Danville Signal C 24.4 A 7.5 C A Camino Tassajara/Parkhaven Dr E Danville Signal A 8.4 A 5.4 A A Camino Tassajara/Buckingham Dr Rassani Dr E Danville Signal C 34.0 B 11.0 D B Camino Tassajara/Conejo Dr E Danville Signal B 13.2 A 6.5 B A Camino Tassajara/Tassajara Ranch Dr E Danville Signal D 41.6 C 22.9 D C Camino Tassajara/Tassajara Village Dr E Danville Signal A 5.4 B 10.6 A B Camino Tassajara/Blackhawk Rd Crow Canyon Rd E Danville Signal D 49.9 D 43.4 D D Camino Tassajara/Old Blackhawk Rd Liverpool St E Danville Signal B 15.9 A 9.4 B A Camino Tassajara/Holbrook Dr E Danville Signal D 37.7 A 9.8 D B Camino Tassajara/Sycamore Valley Rd E Danville Signal D 37.6 C 23.4 D C Dougherty Rd/Crow Canyon Rd E San Ramon Signal B 16.2 D 46.7 B D Camino Tassajara/Finley Rd E County SSSC* C 22.8 D 33.3 C E Finley Rd/Project Driveway (Equestrian Staging Area) E County SSSC* A 8.7 A 8.6 Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

46 Contra Costa County Tassajara Parks Project Transportation and Traffic Table (cont.): Near Term Plus Project Conditions Intersection Delay and Near Term Near Term + Project AM Peak PM Peak AM Peak PM Peak Int# Intersection Criteria Jurisdiction Control Delay Delay Delay Delay Delay Delay Notes: 1 For this intersection only, the phasing used in the Synchro model was inconsistent with the timing sheet provided by the Town. In August 2016, Kimley Horn evaluated and confirmed that while revising to match the timing sheet will increase the intersection delay by approximately 5 seconds depending on the peak scenario, will remain as reported even with the increase in delay. correspondence from Jake Mirabella, Kimley Horn, August 18, * For side street stop controlled (SSSC) intersections the worst approach delay and is reported. Intersections that are operating below thresholds are shown in bold. Significant impacts are highlighted in blue. Intersection delay,, and v/c ratios calculated with Highway Capacity Manual (HCM) 2010 methodology using Synchro software. Intersections #4 and #5 above are coordinated intersection with leading exclusive pedestrian phases. HCM 2010 methodology does not support the inclusion of exclusive pedestrian phases. To be consistent with the methodology, the leading pedestrian phases only were not implemented in Synchro. If a specific movement has a delay less than the approach or intersection average, and the trips are increased for this movement, the overall intersection delay is decreased. It should be noted that calculations of delay at saturated conditions (i.e., F) are less reliable than at E or better. Therefore, delay in excess of 80 seconds is reported in the table to allow a relative comparison of without and with Project conditions and should not be interpreted as an exact representation of actual delay. Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

47 Source: Kimley Horn, 2016 Exhibit Near-Term Intersection Peak Hour Turning Movements / _near_intersection_peak_turning.cdr CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

48 THIS PAGE INTENTIONALLY LEFT BLANK

49 Source: Kimley Horn, 2016 Exhibit Near-Term Plus Project Peak Hour Turning Movements / _near_plus_peak_turning.cdr CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

50 THIS PAGE INTENTIONALLY LEFT BLANK

51 Contra Costa County Tassajara Parks Project Transportation and Traffic As shown in Table , the Project results in increased delay and causes a significant impact at the following intersection: Intersection #5: Camino Tassajara/Oak Gate Drive Lawrence Road (AM peak hour) The intersection of Camino Tassajara and Oak Gate Drive Lawrence Road (Intersection #5) currently operates at E (65.1 seconds per vehicle [s/veh]) under Near Term Conditions during the AM peak hour. With the addition of the Project, the intersection would worsen to operate at F (83.6 s/veh) during the AM peak hour. The impact is triggered when the Project generates 85 percent of its trips, which equates to approximately 123 of the proposed 125 single family dwelling units. Because the intersection operates at F, which is below the standard for intersection facilities of E, this is a significant impact. With the implementation of MM TRANS 2, the intersection would operate at an acceptable C (31.4 s/veh) for the AM peak hour. However, because the implementation and timing of this improvement are beyond the control of Contra Costa County (the intersection is under the jurisdiction of the Town of Danville), impacts to this intersection would remain significant and unavoidable. Critical Queues Queuing operations were evaluated at the locations identified as critical queue spillback locations under Near Term Plus Project traffic conditions. Results of the analysis are presented in Table Table : Near Term Plus Project Conditions Queuing Results # Intersection Movement 2 12 Camino Tassajara/Lusitano Street Tassajara Hills ES Driveway Camino Tassajara/Blackhawk Road Crow Canyon Road Storage Length (ft) Near Term Near Term Plus Project 95 th Percentile Queue (ft) 95 th Percentile Queue (ft) AM PM AM PM NBL/T/R SBT/L SBR 70 B EBL A WBL WBT/R B NBL SBL EBL WBL Notes: 95 th Percentile queue lengths were obtained from Synchro v8 software. Storage lengths are not given for through lanes or segment lengths, but rather, only shown for turn pockets. A. The Synchro analysis did not indicate that queues would spill back, but this was observed for a short period during the Existing AM peak hour due to school traffic. B. The Tassajara Hills Elementary School driveway is proposed to provide 2 full lanes in each direction in addition to a 100 foot WBR turn pocket at the intersection in Plus Project conditions. For Plus Project conditions, the WBR turn 95 th percentile queue is shown. Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

52 Transportation and Traffic Contra Costa County Tassajara Parks Project As shown in Table , none of the turn pocket storage lengths are over capacity when compared with the 95 th percentile queue. It should be noted, however, that while the Synchro analysis did not indicate that queues would spill back, spillback was physically observed at the intersection under existing conditions without the Project for a short period (10 minutes) at the Camino Tassajara/Lusitano Street Tassajara Hills ES Driveway during the Existing AM peak hour due to school traffic. Implementation of the Project would not worsen the observed spillback. As such, impacts would be less than significant. Furthermore, the Project, as a design feature, would provide two full lanes (i.e., no pocket) to the southbound approach of the school driveway to alleviate intersection congestion. Freeway Segments Traffic operations were evaluated at the study freeway segments under Near Term Plus Project traffic conditions. Results of the analysis are presented in Table Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

53 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Near Term Plus Project Conditions Freeway Analysis Near Term Conditions Near Term Plus Project Conditions AM Peak PM Peak AM Peak PM Peak Facility Interstate 580 No * 6* Study Segment I 580 Eden Canyon Road/Foothill Road I 580 Foothill Road/I 680 Junction I 580 I 680 Junction/ Dougherty Road I 580 Dougherty Road/Hacienda Drive I 580 Hacienda Drive/Tassajara Road Santa Rita Road I 580 Tassajara Road/Fallon Road El Charro Road Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) E EB 4 6, D 8, F 6, D 8, F E WB 4 7, D 6, D 7, E 6, C E EB 4 6, D 8, F 6, D 8, F E WB 4 7, E 6, E 7, E 6, E E EB 5 1, A 11, F 1, A 11, F E WB 4 8, F 4, C 8, F 4, C E EB 7 1, A 11, D 1, A 11, D E WB 5 8, D 4, B 8, D 4, B E EB , A 1,992 9, E 1, A 9, E E WB 4 9, F 4, C 9, F 4, C E EB , A 1,892 9, F 1, A 9, F E WB 4 8, F 4, C 8, F 4, C Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

54 Contra Costa County Tassajara Parks Project Transportation and Traffic Table (cont.): Near Term Plus Project Conditions Freeway Analysis Near Term Conditions Near Term Plus Project Conditions AM Peak PM Peak AM Peak PM Peak Facility Interstate 680 No * 12* Study Segment I 680 W Las Positas Boulevard/Ston eridge Drive I 680 Stoneridge Drive/I 580 Junction I 680 I 580 Junction/Dublin Boulevard I 680 Dublin Boulevard/Alco sta Boulevard I 680 Alcosta Boulevard/ Bollinger Canyon Road I 680 Bollinger Canyon Road/Crow Canyon Road Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) E NB 3 3, C 5, D 3, C 5, D E SB 3 6, F 3, C 6, F 3, C E NB 3 3, C 6, E 3, C 6, E E SB 3 7, F 4, C 7, F 4, C E NB 3 4, D 7, F 4, D 7, F F SB 3 8, F 4, D 8, F 4, D E NB 4 4, C 7, D 4, C 7, D E SB 4 8, F 4, C 8, F 4, C E NB , C 1,331 5, E 3, C 5, E E SB 3 1,550 7, F 783 3, C 7, F 3, C E NB , B 1,258 5, C 3, B 5, C F SB 4 1,466 6, D 740 3, B 6, D 3, B Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

55 Contra Costa County Tassajara Parks Project Transportation and Traffic Table (cont.): Near Term Plus Project Conditions Freeway Analysis Near Term Conditions Near Term Plus Project Conditions AM Peak PM Peak AM Peak PM Peak Facility No. 13* 14* 15* Study Segment I 680 Crow Canyon Road/Sycamore Valley Road I 680 Sycamore Valley Road/Diablo Road I 680 Diablo Road/El Charro Boulevard Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) E NB , B 1,315 5, C 3, B 5, C F SB 4 1,531 6, D 773 3, B 6, D 3, B E NB , C 1,436 6, E 4, C 6, E F SB 3 1,672 7, F 844 4, C 7, F 4, C E NB , C 1,420 6, E 4, C 6, E F SB 3 1,653 7, F 835 4, C 7, F 4, C Notes: Freeway segment thresholds for this analysis were derived from the 2013 CCTA CMP and 2013 ACTC CMP were referenced. Freeway segments operating below the standardized segment threshold as shown in the Criteria column are shown in bold. Significant impacts are highlighted. The analysis was performed using HCS 2010 software. For freeway segments where an auxiliary lane is > 2,500 feet in length, weaving does not apply; therefore, the auxiliary lane is considered to be a basic freeway lane for the purposes of this analysis. AADT obtained from Caltrans Traffic Data Branch (2013) and the pending and approved near term projects. * An asterisk indicates the freeway segment contains a high occupancy vehicle (HOV) lane. For these segments, the HOV lanes and traffic volumes were excluded from the analysis. HOV traffic volumes were removed from the Caltrans s indicated peak hour traffic volumes using information obtained from the Caltrans 2013 Managed Lanes Report. (a) Directional volumes in vehicles per hour (vph) calculated as: AADT x K Factor x D Factor percentage. The K Factor is the percentage of AADT during the peak hour for both directions of travel. The D Factor is the percentage of the peak hour travel in the peak direction. K and D factors multiplied with the AADT gives the one way peak period directional flow rate or the design hourly volume (DHV). (b) pc/mi/ln = passenger cars per mile per lane Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

56 Transportation and Traffic Contra Costa County Tassajara Parks Project As shown in Table , the following freeway segments do not function within acceptable standards according to criteria set forth by CCTA and ACTC under the Near Term analysis scenario: I 580 Eastbound PM Peak Hour 1. I 580 Eden Canyon Road/Foothill Road 2. I 580 Foothill Road/I 680 Junction 3. I 580 I 680 Junction/Dougherty Road 6. I 580 Tassajara Road/Fallon Road El Charro Road I 580 Westbound AM Peak Hour 3. I 580 I 680 Junction/Dougherty Road 5. I 580 Hacienda Drive/Tassajara Road Santa Rita Road 6. I 580 Tassajara Road/Fallon Road El Charro Road I 680 Northbound PM Peak Hour 9. I 680 I 580 Junction/Dublin Boulevard I 680 Southbound AM Peak Hour 7. I 680 W Las Positas Boulevard/Stoneridge Drive 8. I 680 Stoneridge Drive/I 580 Junction 10. I 680 Dublin Boulevard/Alcosta Boulevard 11. I 680 Alcosta Boulevard/Bollinger Canyon Road These segments operate below acceptable standards (see Criteria column) under Near Term conditions. The addition of the Project would increase the vehicular volume, and the operation would remain below the acceptable standard. These Near Term Plus Project freeway segment impacts are discussed separately below. I 580 Eastbound Freeway The eastbound freeway segments of I 580 between Eden Canyon Road and Dougherty Road (segments 1, 2, and 3) and between Tassajara Road and Fallon Road (segment 6) operate at F under Near Term Conditions during the PM peak hour. With the addition of the Project, these segments would continue to operate at F during the PM peak hour. The Project trips would add approximately 0.06 percent volume to freeway traffic. Because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact. I 580 Westbound Freeway The westbound freeway segments of I 580 between Dougherty Road and the I 680 Junction (segment 3) and between Fallon Road El Charro Road and Hacienda Drive (segment 5 and g) operate at F under Near Term Conditions during the AM peak hour. With the addition of the Project, these segments would continue to operate at F during the AM peak hour. The Project trips would add approximately 0.06 percent volume to freeway traffic. Because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

57 Contra Costa County Tassajara Parks Project Transportation and Traffic I 680 Northbound Freeway The northbound freeway segment of I 680 between the I 580 Junction and Dublin Boulevard (segment 9) operates at F under Near Term Conditions during the PM peak hour. With the addition of the Project, these segments would continue to operate at F during the PM peak hour. The Project trips would add approximately 0.13 percent trips to freeway traffic. Because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact. I 680 Southbound Freeway The southbound freeway segments of I 680 between Bollinger Canyon Road and Dublin Boulevard (segment 10 and 11), and between the I 580 Junction and West Las Positas Boulevard (segment 7 and 8) operate at F under Near Term Conditions during the AM peak hour. With the addition of the Project, these segments would continue to operate at F during the AM peak hour. Project trips would add approximately 0.12 percent volume to freeway traffic. Because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact. Summary With the implementation of MM TRANS 1, the Project applicant would be required to pay the applicable TVTD fees. The fees contribute to the construction of planned freeway improvements, including HOV lanes, auxiliary lanes, interchange improvements as well as other regional transportation improvements. Payment of these fees would help to reduce the Project s impacts on the I 580 and I 680 segments. However, because the implementation and timing of these improvements are beyond the control of Contra Costa County, and because it has not been quantified if these improvements would fully mitigate the Project s contribution to the existing deficiency, impacts to freeway segments would remain significant and unavoidable. Level of Significance Before Mitigation Potentially significant impact. Mitigation Measures Implement Mitigation Measure TRANS 1 and the following: MM TRANS 2 Prior to the issuance of the first building permit, the Project applicant shall fund the optimization of the signal timing at the intersection of Camino Tassajara and Oak Gate Drive Lawrence Road (Intersection #5). This will require signal coordination with Intersection #4: Camino Tassajara and Hansen Lane Diablo Vista Middle School Driveway. Both intersections are under the jurisdiction of the Town of Danville. Modifications to signal timing shall be reviewed by and meet the approval of the Town of Danville and Contra Costa Public Works Department prior to implementation. Updated timing and signal coordination shall be physically implemented prior to the issuance of the building permit for the 123 rd on site residential unit. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

58 Transportation and Traffic Contra Costa County Tassajara Parks Project Level of Significance After Mitigation Significant unavoidable impact. Cumulative Plus Project Conditions Impact TRANS 3: The Project would generate new trips that would contribute to unacceptable traffic operations under Cumulative Plus Project conditions. Impact Analysis This impact identifies potential impacts to intersection operations, critical queues, and freeway segments under the Cumulative Plus Project scenario. Each is discussed separately below. Analysis sheets are provided in Appendix I. Cumulative (2035) and Cumulative (2035) Plus Project traffic volumes can be seen in Exhibit and Exhibit respectively. The Cumulative Plus Project scenario was derived by adding Project trips to the Cumulative No Project volumes and assumed network. The assumed network considers the following updates to the roadway network: Widening of Crow Canyon Road to six lanes, which modifies the intersection geometry at Study Intersection #16: Dougherty Road/Crow Canyon Road. Express (toll) lanes on I 580 spanning from Hacienda Drive to Greenville Road in the eastbound direction, and from Greenville Road to San Ramon Road/Foothill Road in the westbound direction (ACTC 2013). The Express (toll) lane network will also include the portion of I 680 between the Contra Costa/Alameda County line and SR 84. Year 2035 roadway link volumes from the most recent CCTA Travel Demand Forecast model were obtained from the County. The model was used to plot bi directional AM and PM peak hour traffic volumes on each segment along roadways within the study area. Model base year (2010) and horizon year (2035) forecast volumes were compared to determine the annual incremental growth in traffic volumes at study intersection approach and departure links. Year 2035 turning movement volumes were calculated by adding the growth increment to the 2015 traffic count volumes to calculate the final adjusted roadway link forecast volume. Final adjusted forecast volumes were then converted to Cumulative (2035) intersection turning movement volumes using a process commonly referred to as the Furness method. The Furness method uses an iterative process to derive future turning movement volumes based on future year roadway link volumes and an initial estimate of turning percentages (obtained from the 2015 intersection turning movement counts). Intersection Operations Traffic operations were evaluated at the study intersections under Cumulative (2035) conditions plus traffic generated by the Project, as seen in Exhibit Results of the analysis are presented in Table Locations operating unacceptably are shown in bold, and significant Project impacts are highlighted Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

59 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Cumulative (2035) Plus Project Conditions Intersection Delay and Cumulative Cumulative + Project Int# 1 2 Intersection Camino Tassajara/Ballfields Project Driveway (Full Access) Camino Tassajara/Lusitano St Tassajara Hills ES Driveway Criteria Jurisdiction Control AM Peak PM Peak AM Peak PM Peak Delay Delay Delay Delay Delay Delay E County Signal A 1.3 A 1.8 A A E County Signal D 53.1 B 10.0 E B Camino Tassajara/Blackhawk Dr Charbray St E County Signal D 35.1 B 19.8 D C Camino Tassajara/Hansen Ln Diablo Vista MS Driveway 1 E Danville Signal F B 10.8 F B Camino Tassajara/Oak Gate Dr Lawrence Rd E Danville Signal F B 13.8 F B Camino Tassajara/Mansfield Dr Jasmine Wy E Danville Signal D 54.5 B 10.4 E B Camino Tassajara/Parkhaven Dr E Danville Signal B 15.5 A 8.1 C A Camino Tassajara/Buckingham Dr Rassani Dr E Danville Signal F 82.2 B 17.9 F B Camino Tassajara/Conejo Dr E Danville Signal C 32.5 A 9.3 D B Camino Tassajara/Tassajara Ranch Dr E Danville Signal E 71.3 E 56.3 F E Camino Tassajara/Tassajara Village Dr E Danville Signal A 5.5 B 11.1 A B Camino Tassajara/Blackhawk Rd Crow Canyon Rd E Danville Signal E 62.2 D 50.2 E D Camino Tassajara/Old Blackhawk Rd Liverpool St E Danville Signal B 17.6 B 10.3 B B Camino Tassajara/Holbrook Dr E Danville Signal D 45.8 B 10.3 D B Camino Tassajara/Sycamore Valley Rd E Danville Signal D 50.7 C 34.5 E D Dougherty Rd/Crow Canyon Rd E San Ramon Signal C 25.1 D 52.9 C E Camino Tassajara/Finley Rd E County SSSC* D 33.6 E 48.1 E F Finley Rd/Project Driveway (Equestrian Staging Area) E County SSSC* A 8.7 A 8.6 Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

60 Contra Costa County Tassajara Parks Project Transportation and Traffic Table (cont.): Cumulative (2035) Plus Project Conditions Intersection Delay and Cumulative Cumulative + Project Int# Intersection Criteria Jurisdiction Control AM Peak PM Peak AM Peak PM Peak Delay Delay Delay Delay Delay Delay Notes: 1 For this intersection only, the phasing used in the Synchro model was inconsistent with the timing sheet provided by the Town. In August 2016, Kimley Horn evaluated and confirmed that while revising to match the timing sheet will increase the intersection delay by approximately 5 seconds depending on the peak scenario, will remain as reported even with the increase in delay. correspondence from Jake Mirabella, Kimley Horn, August 18, * For side street stop controlled (SSSC) intersections the worst approach delay and is reported. Intersections that are operating below D are shown in bold. Significant impacts are highlighted in blue. Intersection delay,, and v/c ratios calculated with Highway Capacity Manual (HCM) 2010 methodology using Synchro software. Intersections #4 and #5 above are coordinated intersection with leading exclusive pedestrian phases. HCM 2010 methodology does not support the inclusion of exclusive pedestrian phases. To be consistent with the methodology, the leading pedestrian phases only were not implemented in Synchro. If a specific movement has a delay less than the approach or intersection average, and the trips are increased for this movement, the overall intersection delay is decreased. It should be noted that calculations of delay at saturated conditions (i.e., F) are less reliable than at E or better. Therefore, delay in excess of 80 seconds is reported in the table to allow a relative comparison of without and with Project conditions and should not be interpreted as an exact representation of actual delay. Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

61 Source: Kimley Horn, 2016 Exhibit Cumulative (2035) Peak Hour Turning Movements / _2035_peak_turning.cdr CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

62 THIS PAGE INTENTIONALLY LEFT BLANK

63 Source: Kimley Horn, 2016 Exhibit Cumulative (2035) Plus Project Peak Hour Turning Movements / _2035_plus_peak_turning.cdr CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

64 THIS PAGE INTENTIONALLY LEFT BLANK

65 Contra Costa County Tassajara Parks Project Transportation and Traffic As shown in Table , the Project would result in increased delay and cause a significant impact at the following intersections: Intersection #4: Camino Tassajara/Hansen Lane Diablo Vista Middle School Driveway (AM peak hour) Intersection #5: Camino Tassajara/Oak Gate Drive Lawrence Road (AM peak hour) Intersection #8: Camino Tassajara/Buckingham Drive Rassani Drive (AM peak hour) Intersection #10: Camino Tassajara/Tassajara Ranch Drive (AM peak hour) Intersection #17: Camino Tassajara/Finley Road (PM peak hour) All locations except for Intersection #10 and Intersection #17 were deficient under Cumulative No Project conditions during the AM peak hour. The addition of the Project increased traffic at these intersections and the intersections remained deficient. Intersections #10 and #17 became deficient with the inclusion of the Project. Intersection #17 is a side street stop controlled intersection and does not meet the MUTCD peak hour signal warrant in this analysis scenario. Each impacted intersection is discussed separately below. Camino Tassajara/Hansen Lane Diablo Vista Middle School Driveway (Intersection #4) The intersection of Camino Tassajara and Hansen Lane Diablo Vista Middle School Driveway (Intersection #4) operates at F (100.0 s/veh) under Cumulative Conditions during the AM peak hour. With the addition of the Project, the intersection would continue to operate at F (120.7 s/veh) during the AM peak hour. Because the intersection operates at F, which is below the standard for intersection facilities of E, this is a significant impact. With the implementation of MM TRANS 3a, this intersection would operate at an acceptable E (56.6 s/veh) for the AM peak hour. However, because the implementation and timing of this improvement are beyond the control of Contra Costa County (the intersection is under the jurisdiction of the Town of Danville), impacts to this intersection would remain significant and unavoidable. Camino Tassajara/Oak Gate Drive Lawrence Road (Intersection #5) The intersection of Camino Tassajara and Oak Gate Drive Lawrence Road (Intersection #5) operates at F (109.3 s/veh) under Cumulative Conditions during the AM peak hour. With the addition of the Project, the intersection would continue to operate at F (137.8 s/veh) during the AM peak hour. Because the intersection operates at F, which is below the standard for intersection facilities of E, this is a significant impact. With the implementation of MM TRANS 3b, this intersection would operate at an acceptable D (49.6 s/veh) for the AM peak hour. However, because the implementation and timing of this improvement are beyond the control of Contra Costa County (the intersection is under the jurisdiction of the Town of Danville), impacts to this intersection would remain significant and unavoidable. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

66 Transportation and Traffic Contra Costa County Tassajara Parks Project Camino Tassajara/Buckingham Drive Rassani Drive (Intersection #8) The intersection of Camino Tassajara and Buckingham Drive Rassani Drive (Intersection #8) operates at F (82.2 s/veh) under Cumulative Conditions during the AM peak hour. With the addition of the Project, the intersection would continue to operate at F (96.5 s/veh) during the AM peak hour. Because the intersection operates at F, which is below the standard for intersection facilities of E, this is a significant impact. With the implementation of MM TRANS 3c, this intersection would operate at an acceptable D (50.7 s/veh) for the AM peak hour. However, because the implementation and timing of this improvement are beyond the control of Contra Costa County (the intersection is under the jurisdiction of the Town of Danville), impacts to this intersection would remain significant and unavoidable. Camino Tassajara/Tassajara Ranch Drive (Intersection #10) The intersection of Camino Tassajara and Tassajara Ranch Drive (Intersection #10) operates at E (71.3 s/veh) under Cumulative Conditions during the AM peak hour. With the addition of the Project, conditions would worsen to operate at F (82.7 s/veh) during the AM peak hour. Because the intersection operates at F, which is below the standard for intersection facilities of E, this is a significant impact. With the implementation of MM TRANS 3d, this intersection would operate at an acceptable E (55.8 s/veh) for the AM peak hour. However, because the implementation and timing of this improvement are beyond the control of Contra Costa County (the intersection is under the jurisdiction of the Town of Danville), impacts to this intersection would remain significant and unavoidable. Camino Tassajara/Finley Road (Intersection #17) The intersection of Camino Tassajara and Finley Road (Intersection #17) operates at E (48.1 s/veh) under Cumulative Conditions during the PM peak hour. With the addition of the Project, conditions would worsen to operate at F (55.0 s/veh) during the PM peak hour. Because the intersection operates at F, which is below the standard for intersection facilities of E, this is a significant impact. With the implementation of MM TRANS 3e, this intersection would operate at an acceptable E (43.1 s/veh) for the PM peak hour. Furthermore, the intersection does not meet the AM or PM peak hour CA MUTCD signal warrant. This intersection is under the jurisdiction of Contra Costa County. As such, impacts would be less than significant with the implementation of mitigation. Critical Queues Queuing operations were evaluated at the locations identified as critical queue spillback locations under Cumulative Plus Project traffic conditions. Results of the analysis are presented in Table Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

67 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Cumulative (2035) Plus Project Conditions Queuing Results # Intersection Movement 2 12 Camino Tassajara/Lusitano Street Tassajara Hills ES Driveway Camino Tassajara/Blackhawk Road Crow Canyon Road Storage Length (ft) Cumulative Cumulative Plus Project 95 th Percentile Queue (ft) 95 th Percentile Queue (ft) AM PM AM PM NBL/T/R SBT/L SBR 70 B EBL A WBL WBT/R B NBL SBL EBL WBL Notes: 95 th Percentile queue lengths were obtained from Synchro v8 software. Storage lengths are not given for through lanes or segment lengths, but rather, only shown for turn pockets. A. The Synchro analysis did not indicate that queues would spill back, but this was observed for a short period during the Existing AM peak hour due to school traffic. B The Tassajara Hills Elementary School driveway is proposed to provide 2 full lanes in each direction in addition to a 100 foot WBR turn pocket at the intersection in Plus Project conditions. For Plus Project conditions, the WBR turn 95 th percentile queue is shown. Source: Kimley Horn and Associates, Inc., As shown in Table , none of the turn pocket storage lengths are over capacity when compared with the 95 th percentile queue. It should be noted, however, that while the Synchro analysis did not indicate that queues would spill back, spillback was physically observed at the intersection under existing conditions without the Project for a short period (10 minutes) at the Camino Tassajara/Lusitano Street Tassajara Hills ES Driveway during the Existing AM peak hour due to school traffic. As such, impacts would be less than significant. Furthermore, the Project would provide two full lanes (i.e., no pocket) at the southbound approach of the school driveway to alleviate intersection congestion. Freeway Segments Traffic operations were evaluated at the study freeway segments under Cumulative Plus Project traffic conditions. Results of the analysis are presented in Table Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

68 Contra Costa County Tassajara Parks Project Transportation and Traffic Table : Cumulative (2035) Plus Project Conditions Freeway Analysis Cumulative Conditions Cumulative Plus Project Conditions AM Peak PM Peak AM Peak PM Peak Facility Interstate 580 No * 6* Study Segment I 580 Eden Canyon Road/Foothill Road I 580 Foothill Road/I 680 Junction I 580 I 680 Junction/ Dougherty Road I 580 Dougherty Road/Hacienda Drive I 580 Hacienda Drive/Tassajara Road Santa Rita Road I 580 Tassajara Road/Fallon Road El Charro Road Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) E EB 4 1,106 7, E 1,473 9, F 7, E 9, F E WB 4 1,292 9, F 1,205 7, E 9, F 7, E E EB 4 1,017 7, E 1,521 9, F 7, E 9, F E WB 4 1,366 8, F 676 7, E 8, F 7, E E EB , B 1,532 13, F 4, B 13, F E WB 4 2,016 10, F 816 5, D 10, F 5, D E EB , A 1,799 13, E 3, A 13, E E WB 5 1,905 9, E 852 5, C 9, E 5, C E EB , B 1,824 11, F 3, B 11, F E WB 4 1,859 9, F 746 6, D 9, F 6, D E EB , A 994 9, F 1, A 9, F E WB 4 1,951 8, F 1,467 5, D 8, F 5, D Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

69 Contra Costa County Tassajara Parks Project Transportation and Traffic Table (cont.): Cumulative (2035) Plus Project Conditions Freeway Analysis Cumulative Conditions Cumulative Plus Project Conditions AM Peak PM Peak AM Peak PM Peak Facility Interstate 680 No * 12* Study Segment I 680 W Las Positas Boulevard/ Stoneridge Drive I 680 Stoneridge Drive/I 580 Junction I 680 I 580 Junction/ Dublin Boulevard I 680 Dublin Boulevard/ Alcosta Boulevard I 680 Alcosta Boulevard/ Bollinger Canyon Road I 680 Bollinger Canyon Road/Crow Canyon Road Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) E NB , C 1,761 5, D 3, C 5, D E SB 3 2,311 6, F 735 3, C 6, F 3, C E NB , C 1,619 6, E 3, C 6, E E SB 3 2,122 7, F 473 4, C 7, F 4, C E NB , C 804 7, F 4, C 7, F F SB 3 1,510 9, F 962 5, E 9, F 5, E E NB 4 1,208 4, C 1,574 7, D 4, C 7, D E SB 4 1,510 9, F 962 5, C 9, F 5, C E NB 3 1,120 4, C 1,377 5, E 4, C 5, E E SB 3 1,426 7, F 829 4, C 7, F 4, C E NB , C 1,116 5, C 4, C 5, C F SB 4 1,668 7, D 1,162 4, C 7, D 4, C Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

70 Contra Costa County Tassajara Parks Project Transportation and Traffic Table (cont.): Cumulative (2035) Plus Project Conditions Freeway Analysis Cumulative Conditions Cumulative Plus Project Conditions AM Peak PM Peak AM Peak PM Peak Facility No. 13* 14* 15* Study Segment I 680 Crow Canyon Road/Sycamore Valley Road I 680 Sycamore Valley Road/Diablo Road I 680 Diablo Road/El Charro Boulevard Criteria Direction Lanes HOV (vph) (vph) (a) Density (pc/mi/ln) (b) HOV (vph) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) (vph) (a) Density (pc/mi/ln) (b) E NB 4 1,124 5, C 1,348 6, D 5, C 6, D F SB 4 1,709 7, E 1,221 5, C 7, E 5, C E NB 3 1,140 5, D 1,456 6, E 5, D 6, E F SB 3 1,766 7, F 1,097 5, D 7, F 5, D E NB 3 1,054 5, D 1,263 6, E 5, D 6, E F SB 3 1,728 7, F 1,339 5, D 7, F 5, D Notes: Freeway segment thresholds for this analysis were derived from the 2013 CCTA CMP and 2013 ACTC CMP were referenced. Freeway segments operating below the standardized segment threshold (as shown in Criteria column) are shown in bold. Significant impacts are highlighted in blue. The analysis was performed using HCS 2010 software. For freeway segments where an auxiliary lane is > 2,500 feet in length, weaving does not apply; therefore, the auxiliary lane is considered to be a basic freeway lane for the purposes of this analysis. * An asterisk indicates the freeway segment contains a high occupancy vehicle (HOV) lane. For these segments, the HOV lanes and traffic volumes were excluded from the analysis. The CCTA 2014 Travel Demand Model was used to determine non HOV traffic volumes. (a) Directional volumes in vehicles per hour (vph) calculated by taking the Existing volumes and applying the growth rates obtained from the Contra Costa County Travel Demand Model, (b) pc/mi/ln = passenger cars per mile per lane Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

71 Contra Costa County Tassajara Parks Project Transportation and Traffic As shown in Table , the following freeway segments do not function within acceptable standards according to criteria set forth by CCTA and ACTC under the Cumulative Plus Project scenario: I 580 Eastbound PM Peak Hour 1. I 580 Eden Canyon Road/Foothill Road 2. I 580 Foothill Road/I 680 Junction 3. I 580 I 680 Junction/Dougherty Road 5. I 580 Hacienda Drive/Tassajara Road Santa Rita Road 6. I 580 Tassajara Road/Fallon Road El Charro Road I 580 Westbound AM Peak Hour 1. I 580 Eden Canyon Road/Foothill Road 2. I 580 Foothill Road/I 680 Junction 3. I 580 I 680 Junction/Dougherty Road 5. I 580 Hacienda Drive/Tassajara Road Santa Rita Road 6. I 580 Tassajara Road/Fallon Road El Charro Road I 680 Northbound PM Peak Hour 9. I 680 I 580 Junction/Dublin Boulevard I 680 Southbound AM Peak Hour 7. I 680 W Las Positas Boulevard/Stoneridge Drive 8. I 680 Stoneridge Drive/I 580 Junction 10. I 680 Dublin Boulevard/Alcosta Boulevard 11. I 680 Alcosta Boulevard/Bollinger Canyon Road These segments currently operate below the applicable standards (see Criteria column) under Cumulative Conditions, and the addition of Project traffic would exacerbate these deficiencies. Each impacted segment is discussed separately below. I 580 Eastbound Freeway The eastbound freeway segments of I 580 between Eden Canyon Road and Dougherty Road (segments 1, 2, and 3) and between Hacienda Road and Fallon Road El Charro Road (segments 5 and 6) operate at F under Cumulative Conditions during the PM peak hour. With the addition of the Project, these segments would continue to operate at F during the PM peak hour. The Project trips would add approximately 0.06 percent volume to freeway traffic because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact. I 580 Westbound Freeway The westbound freeway segments of I 580 between Dougherty Road and Eden Canyon Road (segments 1, 2, and 3) and between Fallon Road El Charro Road and Hacienda Drive (segment 5 and 6) operate at F under Cumulative Conditions during the AM peak hour. With the addition of the Project, these segments would continue to operate at F during the AM peak hour. The Project trips would add approximately 0.06 percent volume to freeway traffic. Because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

72 Transportation and Traffic Contra Costa County Tassajara Parks Project I 680 Northbound Freeway The northbound freeway segments of I 680 between the I 580 Junction and Dublin Boulevard (segment 9) operate at F under Cumulative Conditions during the PM peak hour. With the addition of the Project, these segments would continue to operate at F during the PM peak hour. The Project trips would add approximately 0.13 percent volume to freeway traffic because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact. I 680 Southbound Freeway The southbound freeway segments of I 680 between Bollinger Canyon Road and Dublin Boulevard (segment 10 and 11), and between the I 580 Junction and West Las Positas Boulevard (segment 7 and 8) operate at F under Cumulative Conditions during the AM peak hour. With the addition of the Project, these segments would continue to operate at F during the AM peak hour. The Project trips would add approximately 0.12 percent volume to freeway traffic. Because the freeway segment operates at F, which is below the standard for freeway facilities of E, this is a significant impact. Freeway Segment Summary With the implementation of MM TRANS 1, the Project applicant would be required to pay the applicable TVTD fees. The fees contribute to the construction of planned freeway improvements, including HOV lanes, auxiliary lanes, interchange improvements as well as other regional transportation improvement. Payment of these fees would help to reduce the Project s impacts on the I 580 and I 680 segments. However, because the implementation and timing of these improvements are beyond the control of Contra Costa County, and because it has not been quantified if these improvements would fully mitigate the Project s contribution to the existing deficiency, impacts to freeway segments would remain significant and unavoidable. Cumulative Plus Project Conditions Analysis Summary Under the Cumulative Plus Project Conditions, the project would cause a significant impact at five intersections. Implementation of mitigation would result in acceptable at all five intersections; however, because four of the impacted intersections are under the jurisdiction of the Town of Danville, the implementation and timing of mitigation are beyond the control of Contra Costa County. Therefore, impacts to intersections #4, #5, #8, and #10 would remain significant and unavoidable. No significant impacts would occur at critical queue locations under this scenario; therefore, no related mitigation is required and impacts would be less than significant. Project traffic would exacerbate deficiencies on several freeway segments under this scenario and would therefore result in significant related impacts. Implementation of mitigation (payment of TVTD fees) would help reduce the Project s freeway segment impacts but, for the reasons indicated above, would not fully mitigate the impacts. Therefore, under the Cumulative Plus Project Conditions, the project would result in significant unavoidable impacts to freeway segments even after the implementation of mitigation. Level of Significance Before Mitigation Potentially significant impact Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

73 Contra Costa County Tassajara Parks Project Transportation and Traffic Mitigation Measures Implement Mitigation Measure TRANS 1 and: MM TRANS 3a Prior to the issuance of the first building permit, the Project applicant shall fund optimization of the signal timing at the intersection of Camino Tassajara/Hansen Lane Diablo Vista Middle School Driveway (Intersection #4). This will require signal coordination with Intersection #5: Camino Tassajara and Oak Gate Drive Lawrence Road. Both intersections are under the jurisdiction of the Town of Danville. Modifications to signal timing shall be reviewed by and meet the approval of the Town of Danville and Contra Costa Public Works Department prior to implementation. MM TRANS 3b Prior to the issuance of the first building permit, the Project applicant shall fund optimization of the signal timing at the intersection of Camino Tassajara and Oak Gate Drive Lawrence Road (Intersection #5). This will require signal coordination with Intersection #4: Camino Tassajara and Hansen Lane Diablo Vista Middle School Driveway. Both intersections are under the jurisdiction of the Town of Danville. Modifications to signal timing shall be reviewed by and meet the approval of the Town of Danville and Contra Costa Public Works Department prior to implementation. MM TRANS 3c Prior to the issuance of the first building permit, the Project applicant shall fund optimization of the intersection signal timing at the intersection of Camino Tassajara and Buckingham Drive Rassani Drive (Intersection #8). This intersection is under the jurisdiction of the Town of Danville. Modifications to signal timing shall be reviewed by and meet the approval of the Town of Danville and Contra Costa Public Works Department prior to implementation. MM TRANS 3d Prior to the issuance of the first building permit, the Project applicant shall fund optimization of the intersection signal timing at the intersection of Camino Tassajara and Tassajara Ranch Drive (Intersection #10). This intersection is under the jurisdiction of the Town of Danville. Modifications to signal timing shall be reviewed by and meet the approval of the Town of Danville and Contra Costa Public Works Department prior to implementation. MM TRANS 3e Prior to the opening of the Future Equestrian Staging Area, the Project applicant shall add a 50 foot southbound right turn pocket to the intersection of Camino Tassajara and Finley Road (Intersection #17). Level of Significance After Mitigation Significant unavoidable impact. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

74 Transportation and Traffic Contra Costa County Tassajara Parks Project Elementary School Driveway and Circulation Impact TRANS 4: The Project would not substantially increase traffic volumes and cause transportation facilities to degrade below acceptable standard levels at the Tassajara Hills Elementary School driveway. Impact Analysis ITE trip generation rates, derived from empirical data collected in the field, include an assumption for school drop off and pick up trips in the total daily number of trips per household. The analysis contained in the TIA and summarized above includes an analysis of the AM peak hour, during which school drop off trips would occur, and as such includes an analysis of the Project s impacts on circulation in the vicinity of local schools. Given that as part of the Project, the parking lot and driveway of Tassajara Hills Elementary School, located directly adjacent to Northern Site, would be reconfigured to allow for a larger parking lot capacity and more efficient drop off and pick up operations (Exhibit 2 7a), an analysis of circulation at this school is provided in this R DEIR. The School has only one ingress and egress point, located on Camino Tassajara (Intersection #2 Camino Tassajara/Lusitano St Tassajara Elementary School Driveway). This reconfiguration is designed to improve existing conditions related to congestion at and adjacent to the school site at pick up and drop off times. This existing deficiency is not caused by the Project. The Project s proposed improvements (that are being proposed as a project design feature) to the existing school driveway and parking area include two ingress lanes and two egress lanes, as well as a westbound right turn pocket at the Camino Tassajara intersection to improve driveway circulation. The proposed site plan also identifies three continuous circulating aisles on the Site with 60 degree angled parking spaces on the easterly side of the lot and in the center of the lot (i.e., inside of the general circulating lanes). The school driveway operations were analyzed due to known existing issues at the driveway during AM and PM drop off and pick up, respectively. School Drop Off/Arrival Period (AM Peak Hour) The Tassajara Hills Elementary School Driveway and drop off operations were observed during a typical weekday in March The drop off arrival period lasted for approximately 30 minutes in the morning. During this 30 minute period, there was a distinct 10 minute peak within that period where arrivals were concentrated and congestion was highest. The intersection s eastbound leftturn queue operated over capacity during this 10 minute period (8:05 to 8:15 a.m.). 4 At 8:12 a.m., it was observed to overflow and block the eastbound through lane. All other turn pockets were observed to be within their capacity. Approximately eight eastbound vehicles were observed bypassing the over capacity eastbound left turn lane and making an eastbound to westbound U turn at the adjacent Ballfields intersection, and making a westbound right turn into the school driveway. The school s on site circulation was observed to be congested. The maximum queue extended approximately 120 feet north of the school driveway and Camino Tassajara intersection on the 4 The analysis of critical queue spillback locations includes this intersection within the analysis. It should be noted that although the 95 th percentile queues does not recognize the short, 10 minute period observed at over capacity for the EBL, the 50 th percentile queues are cited in the tabular notes for the critical queue analysis tables to compensate Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

75 Contra Costa County Tassajara Parks Project Transportation and Traffic school site. A few parked vehicles were observed to obstruct the school s circulating lanes as they backed up from an on site parking space into the parking lot drive isle. Due to the constrained capacity on the school site, many parents would drop their children off along Lusitano Street south of the school decreasing the roadway capacity and operations along this leg of the intersection. This also increased the number of northbound pedestrians crossing the westerly leg of the intersection at Camino Tassajara. It was concluded that the signalized intersection at Camino Tassajara, specifically the over capacity eastbound left, and the utilization of Lusitano Street served as a meter to limit the demand placed on the school site during this 10 minute peak period, as the capacity on the school site is limited and would likely not accommodate the current demand. The school drop off period overlaps with the Existing AM peak hour of the Project s traffic analysis. The preceding are in person observations to supplement that analysis. The full analysis of the existing intersection operations and queuing are provided in the TIS under Existing Conditions (Appendix I). School Pick Up/Dismissal Period (School Dismissal Peak Hour) The Tassajara Hills Elementary School Driveway (Intersection #2) was analyzed for operational conditions specifically during the school s afternoon dismissal period (2:30 3:30 p.m.) during a typical weekday in March Existing school peak hour intersection turning movement counts were conducted for the school dismissal baseline assessment. The volumes were projected to the Cumulative year 2035 using the same methodology as the PM peak hour volumes. Growth was only indicated to occur along the mainline for this period, and no projected increase in school vehicular volumes were assumed. The Existing and Cumulative baseline volumes for the afternoon school dismissal period are shown in Exhibit The Existing and Cumulative Plus Project volumes are also shown in Exhibit The resulting intersection delay and results are shown in Table No Near Term scenario was considered for the school dismissal period, as the other near term development projects included in the scenario did not indicate any project trips to be generated during this peak hour, and, thus, information on this scenario was not necessary to provide full disclosure of significant impacts. Table : School Dismissal Intersection Delay and Intersection #2: Camino Tassajara/Tassajara Hills ES Driveway School PM Dismissal (2:20 3:20 p.m.) Criteria Jurisdiction Control Scenario Base (No Project) Base Plus Project Delay Delay Delay E County Signal Existing B 17.7 B Cumulative B 20.0 C Notes: Intersection delay,, and v/c ratios calculated with Highway Capacity Manual (HCM) 2010 methodology using Synchro software. No Near Term scenario was analyzed for the elementary school PM peak hour because neither of the near term approved projects (i.e., Creekside Cemetery and Alamo Creek/Intervening Properties) identified project trips to be generated during this hour. Source: Kimley Horn and Associates, Inc., Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

76 Transportation and Traffic Contra Costa County Tassajara Parks Project As shown in Table , there are no significant intersection specific impacts during this analysis period. Based on a site visit conducted during a typical weekday afternoon dismissal, the intersection queues operated within the capacity of the storage pockets due to the staggered arrivals. The eastbound left turn maximum queue was observed to be eight vehicles (approximately 200 feet) and the westbound right turn maximum queue was observed to be three vehicles (approximately 75 feet). The eastbound left and westbound left turn pockets have a capacity of 660 feet and 350 feet, respectively. However, the school driveway was observed to be congested. The inbound queue into the school driveway was observed to extend almost to the Camino Tassajara intersection prior to school dismissal. Entering vehicles would enter and bypass this queue by driving in the opposing lane and then circulate to the parking lot on site and wait. There were also some vehicles observed making a U turn within the school parking lot, exiting the school to the south on Lusitano Street and parking. There was noticeable congestion along Lusitano Street during this period due to the school s circulation issues. Parents would bypass the on school circulation by parking and waiting for children in the neighborhood along Lusitano Street. These actions made access to the side streets on Lusitano Street difficult due to the influx of parent vehicles utilizing the roadway and neighborhood. Proposed School Circulation Improvements As previously indicated, the Project proposes the reconstruction of the existing Tassajara Hills Elementary School driveway and parking lot, including two ingress lanes and two egress lanes at the intersection to improve existing driveway and parking lot circulation. The Project also proposes three circulating aisles on the site with 60 degree angled parking spaces on the easterly side of the lot and in the center of the lot (i.e., inside of the general circulating lanes). These improvements are not required of the Project applicant and are being provided voluntarily as a community benefit. After review of these improvements, this analysis recommends the following to the proposed site plan: A two lane circulation for pick up/drop off. The outside lane would be a dedicated pickup/drop off lane and the inside lane will serve as a passing lane. Elementary schools are typically recommended to not contain more than two circulating lanes in order to prevent vehicular conflicts with school aged children accessing the school. All parking to be contained within the dual circulating lanes. Containing the parking spaces within the center of the lot reduces the number of potential blockages to the circulating lanes that egressing parked vehicles will create. It also removes the need for a third circulating lane and promotes better parking lot flow throughout the drive aisles. With this particular site, it also may provide increased parking capacity if the spaces were converted to 90 degree spaces. The conceptual parking lot circulation recommendations can be seen in Exhibit All proposed school circulation improvements, including the recommendations made herein, would be reviewed and accepted by the applicant, County, and SRVUSD prior to implementation. Because implementation of the Project would not cause the Camino Tassajara/Lusitano St Tassajara Elementary School Driveway to operate below standards, impacts would be less than significant Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

77 Source: Kimley Horn, 2016 Exhibit School Dismissal Intersection Turning Movements / _school_turning.cdr CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

78 THIS PAGE INTENTIONALLY LEFT BLANK

79 Source: Kimley Horn, 2016 I / _school_parking.cdr Exhibit School Parking Lot Conceptual Recommendations CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

80 THIS PAGE INTENTIONALLY LEFT BLANK

81 Contra Costa County Tassajara Parks Project Transportation and Traffic Level of Significance Before Mitigation Less than significant impact. Mitigation Measures No mitigation is necessary. Level of Significance After Mitigation Less than significant impact. Congestion Management Program Impact TRANS 5: The Project would conflict with an applicable congestion management program s level of service standards established by the County congestion management agency for designated roads or highways. Impact Analysis The standards for freeway segments are established in the 2013 CCTA Congestion Management Plan (CMP) for facilities within Contra Costa County, and within the 2013 ACTC CMP for facilities located within Alameda County. These standards were used to evaluate traffic impacts as indicated in Impact TRANS 1 through TRANS 3. As indicated in Impact TRANS 1 through TRANS 3, the Project would contribute trips to freeway segments already operating below acceptable standards. Implementation of MM TRANS 1, requiring the payment of applicable TVTD fees, would not fully mitigate the Project s contribution to unacceptable on impacted freeway segments for the reasons explained in Impacts TRANS 1 through TRANS 3. In addition, the Project would result in impacts to Camino Tassajara, a Route of Regional Significance as designated by the CMP. With the implementation of MM TRANS 2 through MM TRANS 3e, at impacted Camino Tassajara intersections would be acceptable. However, because several of the impacted intersections are under the jurisdiction of the Town of Danville, the implementation and timing of mitigation are beyond the control of Contra Costa County. Therefore, impacts to Camino Tassajara intersections within the Town of Danville would remain significant and unavoidable. Capacity improvements to regional facilities such as freeways are beyond the scope of any single land development project, as the cost of such improvements would be disproportionate to the project s actual impact. Instead, it is widely recognized and accepted that individual development projects can indirectly mitigate impacts through the payment of traffic impact fees (such as those required under MM TRANS 1) that fund capital improvements to transportation facilities, including freeways. Payment of these fees would help to reduce the Project s impacts on the I 580 and I 680 segments. However, because the implementation and timing of these improvements are beyond the control of Contra Costa County, and because it has not been quantified, if these improvements would fully mitigate the Project s contribution to the existing deficiency, impacts to freeway segments would remain significant and unavoidable. No other feasible mitigations exist; therefore, the residual significance of this impact is significant and unavoidable. Level of Significance Before Mitigation Potentially significant impact. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

82 Transportation and Traffic Contra Costa County Tassajara Parks Project Mitigation Measures Implement Mitigation Measure TRANS 1 through Mitigation Measure TRANS 3e. Level of Significance After Mitigation Significant unavoidable impact. Roadway Safety Impact TRANS 6: The Project may substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment). Impact Analysis The existing signalized intersection at Camino Tassajara and the entrance to the Mustang Soccer Complex would be modified to have a fourth leg and provide a full movement intersection to serve as the entrance to the residential development on the Northern Site. A new right in/right out access point would be constructed between the entrance to Tassajara Hills Elementary School and the entrance to the Mustang Soccer Complex. However, this access point would be limited to emergency vehicle access (EVA) only, and, therefore, this access point is not included in this analysis. Vehicular access would also be provided to the Future Equestrian Staging Area from Finley Road via the existing side street stop controlled intersection. A network of internal residential streets consisting of two lanes, parking on both sides, and separated sidewalks would provide on site access to the residential lots. On site circulation was evaluated at the Project s driveway and qualitatively assessed within the Project Site. The 95 th percentile project driveway queues (i.e., the intersection s southbound approach) were analyzed to be 33 feet in the AM peak hour and 24 feet in the PM peak hour. These queues are minimal and will not have any impact on site access or circulation of the currently designed internal roadway network. At this time, there are no confirmed intersection controls listed for the Project s internal intersections. For safety concerns, this is considered a potentially significant impact. However, MM TRANS 6a would require that all intersections on site be side street stop controlled or yield controlled intersections on the minor approaches in accordance with the 2014 revised California Manual of Uniform Traffic Control Devices (MUTCD) guidance as stated in Section 2B.04 as part of the final design review process. Therefore, impacts would be less than significant. The recommendations concerning the Project Site and driveway along Camino Tassajara are shown in Exhibit Contra Costa County and the City of Dublin are, at the time of publication of the R DEIR, coordinating on a project to improve traffic safety and address an existing deficient condition on Tassajara Road between Windermere Parkway in the County and Fallon Road in the City. The Project does not propose any design features or incompatible uses that would exacerbate this existing deficient condition Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

83 Source: Kimley Horn, 2016 I / _driveway_geom.cdr Exhibit Primary Access Driveway Recommended Geometry and Considerations CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

84 THIS PAGE INTENTIONALLY LEFT BLANK

85 Contra Costa County Tassajara Parks Project Transportation and Traffic The Future Equestrian Staging Area driveway intersects with Finley Road at an oblique angle. The existing intersection sight distances measured in the field along Finley Road for exiting vehicles are >1,500 feet to the south and 170 feet to the north. The required intersection sight distance according to AASHTO s geometric design guidelines given the existing roadway speed and approximate grade along Finley Road is 187 feet. The northerly intersection sight distance is currently limited due to the horizontal curvature of Finley Road north of the driveway and the brush within the curb radius. The Project proposes to realign the driveway onto Finley Road, which is anticipated to improve sight distance at this location. Nonetheless, due to the limited site distance to the north, this is considered a potentially significant impact. MM TRANS 6b requires the clearing of brush and any obstructions that limit the sight distance within the horizontal radius of Finley Road to ensure that adequate sight distance is provided in the northerly direction. The recommendations concerning the driveway along Finley Road are shown in Exhibit With the implementation of this mitigation, impacts would be less than significant. KHA prepared a memorandum titled Site Distance Evaluation at Camino Tassajara/Finley Road Intersection, dated April 6, 2016 (Appendix I) to evaluate the need for an acceleration lane on Camino Tassajara at the intersection to accommodate site distances. As concluded therein, with the incorporation of MM TRANS 3e, which requires the applicant to add a 50 foot southbound right turn pocket to Finley Road, sufficient site distances would still be present for all turning movements. Therefore, an acceleration lane is not needed and no significant roadway safety impacts would result from the Project at this location. Additionally, while the Contra Costa County Traffic Engineering Division reports no collisions involving cyclists in the vicinity of this intersection, 5 construction of a 3.8 mile Class II bikeway on Camino Tassajara south from the intersection with Finley Road as planned in the Contra Costa Countywide Bicycle and Pedestrian Plan will also improve roadway safety in the vicinity of the Project site. 6 With mitigation, sight distances, emergency vehicle access, and on site circulation planned for the Project appear to be adequate. The Project does not include any incompatible uses. No changes to existing site access would occur on the Southern Site. As such, impacts related to roadway hazards would be less than significant with the implementation of recommendations as mitigation. Level of Significance Before Mitigation Potentially significant impact. Mitigation Measures MM TRANS 6a The Project applicant shall construct all on site internal intersections to be sidestreet stop controlled or yield controlled intersections at the minor approaches. MM TRANS 6b Prior to implementation of any improvements at the Future Equestrian Staging Area, the Project applicant shall clear brush and any obstructions that limit the sight distance within the horizontal radius of Finley Road to ensure that adequate sight distance (i.e., 187 feet) is provided in the northerly direction from the Future Equestrian Staging Area s access driveway communication with Steve Rohwer, Traffic Safety Investigator, Contra Costa County Traffic Engineering Division, September 14, Contra Costa Transportation Authority, 2009 Contra Costa Countywide Bicycle and Pedestrian Plan, Table 15. Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

86 Transportation and Traffic Contra Costa County Tassajara Parks Project Level of Significance After Mitigation Less than significant impact. Emergency Access Impact TRANS 7: The Project would not result in inadequate emergency access. Impact Analysis The Project driveway and EVA access point would be engineered and constructed in accordance with design standards set forth by Contra Costa County, in consultation with the SRVFPD. The County has established design specifications in part to facilitate the ingress/egress of emergency vehicles. Further, all internal streets would also be designed to comply with all County standards related to emergency vehicle turning radii and vertical/horizontal clearance. As noted in Impact TRANS 6, emergency vehicle access and on site circulation planned for the Project are adequate. Therefore, impacts associated with emergency access would be less than significant. Level of Significance Before Mitigation Less than significant impact. Mitigation Measures No mitigation is necessary. Level of Significance After Mitigation Less than significant impact. Conflict with Alternative Transportation Impact TRANS 8: The Project would not conflict with adopted policies, plans or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks). Impact Analysis The proposed Project was evaluated to determine if it would conflict with adopted policies, plans, or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks) or generate pedestrian, bicycle, or transit travel demand that would not be accommodated by transit, bicycle, or pedestrian facilities and plans. The most prevalent option for residents to access their homes and users to access the staging areas on the Project Site is by driving given the current and proposed infrastructure. Walking and biking are also viable options. While no transit currently serves the Project Site, County Connection operates flex service in the vicinity of the Project and TRAFFIX school bus service operates in the vicinity of the Project Site. Annexation into the CSA T 1 district is expected for the Project Site, thus, flex and TRAFFIX service would be extended. Five foot sidewalks would be installed on the Project frontage along Camino Tassajara connecting the Project driveway to the adjacent intersection at Lusitano Street Tassajara Hills Elementary School Driveway Y:\Publications\Client (PN JN)\2648\ \EIR\3 R DEIR\ Sec03 12 Transportation.docx

87 Source: Kimley Horn, 2016 I / _northern_driveway_geom.cdr Exhibit Future Equestrian Staging Area Driveway Recommended Geometry and Considerations CONTRA COSTA COUNTY TASSAJARA PARKS PROJECT RECIRCULATED DRAFT ENVIRONMENTAL IMPACT REPORT

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Changes from Committee Review Draft 2017 Multimodal Transportation

More information

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis TRAFFIC OPERATIONS ANALYSIS REPORT Pacheco Boulevard Alignment Study and Alternatives Analysis PREPARED FOR: CITY OF MARTINEZ AND CONTRA COSTA COUNTY OCTOBER 2016 FINAL REPORT Prepared By: under contract

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

San Ramon City Center - City of San Ramon Draft Subsequent EIR Transportation Table (Cont.): Existing Intersection Levels of Service No. Inters

San Ramon City Center - City of San Ramon Draft Subsequent EIR Transportation Table (Cont.): Existing Intersection Levels of Service No. Inters San Ramon City Center - City of San Ramon Draft Subsequent EIR Table 4.12-3 (Cont.): Existing Intersection Levels of Service No. Intersection AM Peak Hour PM Peak Hour V/C Ratio LOS V/C Ratio LOS 29 Bollinger

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

4.12 TRANSPORTATION Executive Summary. Setting

4.12 TRANSPORTATION Executive Summary. Setting 4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

4.13 TRANSPORTATION AND TRAFFIC

4.13 TRANSPORTATION AND TRAFFIC 4.13 This chapter describes the regulatory framework and existing conditions in the vicinity of the Project site related to transportation and traffic, and the potential impacts of the proposed Project

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301

More information

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

CIRCULATION ELEMENT ADOPTED 1980 REPUBLISHED APRIL 2014 County of Santa Barbara Planning and Development 123 E. Anapamu Street Santa Barbara, CA 93101

CIRCULATION ELEMENT ADOPTED 1980 REPUBLISHED APRIL 2014 County of Santa Barbara Planning and Development 123 E. Anapamu Street Santa Barbara, CA 93101 CIRCULATION ELEMENT ADOPTED 1980 REPUBLISHED APRIL 2014 County of Santa Barbara Planning and Development 123 E. Anapamu Street Santa Barbara, CA 93101 The electronic version of the Santa Barbara County

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM 3.16 TRANSPORTATION, CIRCULATION, AND PARKING This section assesses the potential for implementation of the Orchard Park Redevelopment component of the 2018 LRDP to result in impacts related to transportation,

More information

Santa Clara I-280 CORRIDOR STUDY

Santa Clara I-280 CORRIDOR STUDY Santa Clara I-280 CORRIDOR STUDY OCTOBER 2017 PREPARED BY: 1.1 Background The I-280 Corridor Study within Santa Clara County is a high-level highway planning study led by the Santa Clara VTA, in partnership

More information

Chapter 6: Transportation

Chapter 6: Transportation Chapter 6: Transportation I. INTRODUCTION The purpose of the Transportation Plan element of the Comprehensive Plan is to provide guidance to the City of North Mankato, as well as existing and future landowners

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

TRAFFIC IMPACT STUDY CANYON HILLS PROJECT LOS ANGELES, CALIFORNIA INTRODUCTION This traffic analysis has been conducted to identify and evaluate the potential traffic impacts of the proposed Canyon Hills

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

TABLE OF CONTENTS. Executive Summary

TABLE OF CONTENTS. Executive Summary Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

5.3 TRAFFIC, CIRCULATION AND PARKING

5.3 TRAFFIC, CIRCULATION AND PARKING 5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT 1.0 INTRODUCTION This chapter provides an overview of the purpose, authorization and focus of this Recirculated Draft Environmental Impact Report (EIR), an identification of the Lead Agency, an outline

More information

4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology

4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology 4.11 TRANSPORTATION This section describes the road transportation system in the vicinity of the proposed Project and the potential impacts to this system from the proposed Project. The analysis in this

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

APPENDIX C TRAFFIC IMPACT ANALYSIS AND TECHNICAL APPENDIX FOR TEMPLO LA HERMOSA CHURCH: MERCED COUNTY, CALIFORNIA

APPENDIX C TRAFFIC IMPACT ANALYSIS AND TECHNICAL APPENDIX FOR TEMPLO LA HERMOSA CHURCH: MERCED COUNTY, CALIFORNIA APPENDIX C TRAFFIC IMPACT ANALYSIS AND TECHNICAL APPENDIX FOR TEMPLO LA HERMOSA CHURCH: MERCED COUNTY, CALIFORNIA TRAFFIC IMPACT ANALYSIS FOR TEMPLO LA HERMOSA CHURCH Merced County, California Prepared

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY ITEM Town of Atherton TRANSPORTATION COMMITTEE STAFF REPORT TO: FROM: MEMBERS OF THE COMMITTEE ROBERT OVADIA, PUBLIC WORKS DIRECTOR DATE: FEBRUARY 12, 2019 SUBJECT: REVIEW OF LOCAL TRAFFIC FLOW / LONG

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

Multimodal Through Corridors and Placemaking Corridors

Multimodal Through Corridors and Placemaking Corridors 68 Multimodal Through Corridors and Placemaking Corridors Corridors have different functions in a region. Some corridors are used to get smoothly and rapidly through a region or to get quickly to major

More information

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX ADOT Statewide Bicycle and Pedestrian Program Summary of Activities APPENDIX B PEDESTRIAN DEMAND INDEX May 24, 2009 Pedestrian Demand Index for State Highway Facilities Revised: May 29, 2007 Introduction

More information

I-105 Corridor Sustainability Study (CSS)

I-105 Corridor Sustainability Study (CSS) I-105 Corridor Sustainability Study (CSS) Metro Streets and Freeways Subcommittee March 21, 2019 Gary Hamrick Cambridge Systematics, Inc. I-105 CSS Project History & Background Funded by Caltrans Sustainable

More information

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015 Implementing Complete Streets in Ottawa October 1, 2015 The Essentials Complete Streets Implementation Framework will become part of the routine delivery of City transportation projects Approach uses every

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including

More information

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino

More information

MEMORANDUM. David Mohlenbrok, Environmental Services Manager

MEMORANDUM. David Mohlenbrok, Environmental Services Manager MEMORANDUM DATE: August 10, 2017 TO: FROM: RE: Planning Commission Members David Mohlenbrok, Environmental Services Manager Blue Memo # 1 for Rocklin Station Project Comments Received on Initial Study/Mitigated

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

3 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director

3 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 3 Department of Development Services Tim Snellings, Director Pete Calarco, Assistant Director 7 County Center Drive T: 53.552.37 Oroville, California 95965 F: 53.538.7785 buttecounty.net/dds BUTTE COUNTY

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

6.14 Traffic and Circulation

6.14 Traffic and Circulation 6.14 Traffic and Circulation 6.14.1 Introduction The analysis in this section summarizes the findings and recommendations presented in the "Marywood Development Traffic Impact Study, City of Orange, California"

More information

East 12 th Street Bikeway Feasibility Study

East 12 th Street Bikeway Feasibility Study Final Report East 12 th Street Bikeway Feasibility Study Prepared for: City of Oakland Public Works Agency Submitted by: 180 Grand Avenue, Suite 250 Oakland, CA 94612 Phone: (510) 839-1742; Fax: (510)

More information

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 12 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various bicycle improvements and traffic modifications

More information

Update of the Contra Costa Congestion Management Program

Update of the Contra Costa Congestion Management Program 2013 Update of the Contra Costa Congestion Management Program 2013 Contra Costa Congestion Management Program The preparation of this report has been financed through a grant from the U.S. Department of

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

AMATS Complete Streets Policy

AMATS Complete Streets Policy AMATS Complete Streets Policy Table of Contents: Section 1. Definition of Complete Streets Section 2. Principles of Complete Streets Section 3. Complete Streets Policy Section 4. Consistency Section 5.

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while simultaneously preserving

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS Section Title Page 4.1 Introduction... 4-1 4.1.1 General... 4-1 4.1.2 Applicant Responsibility... 4-1 4.1.3 Capacity and Safety Issues... 4-1 A.

More information