RP* Profile WC* FAR* Total phase cost ($000) Rotorua Integrated Network Strategy (RINS) Study HH_

Size: px
Start display at page:

Download "RP* Profile WC* FAR* Total phase cost ($000) Rotorua Integrated Network Strategy (RINS) Study HH_"

Transcription

1 NLTP Extract 2012/15 Region» Bay of Plenty Update: Jun :40AM Phase Bay of Plenty BOP Highway & Network Operations Transport planning Rotorua Integrated Network Strategy (RINS) Study HH_ Committed N Activity mangement Plan Bay of Plenty 12/15 Study 7 HH_ Approved N Road safety promotion Road Safety Promotion 12/15 - Bay of Plenty Construction 68 HM_ Approved N Maintenance and operation of State highways EW Rotorua SH36 January 2011 wind & rain event Permanent Construction Committed N EW 11/004/4 Emergency Restoration work following heavy rain Construction , Committed N EW SH2 Emergency Works Omokoroa 26 April 2011 Construction Committed N Heavy rain events 11th & 12th October 2011 BoP east Construction Committed N EW Bay of Plenty East remedials and clean up s 2011/12 Construction Committed N EW (3873 & 3877) Matata & TCC Event BOP R4 18 May 05 Construction , Committed N EW SH35 Maraenui bluff Drop out August 2010 Construction , , Committed N EW Waioeka Gorge Slip March 2012 Construction , , Committed N EW SH30 Ruato Bay Rock Fall 12 August 2012 Construction , , Approved N EW SH2 & 29 Athenree/ Stokes Rd / Ruahihi Bluff August 2012 Construction Approved N EW Bay Of Plenty East Construction Approved N RP* - Regional

2 EW SH35 Torere Bridge August 2012 Construction Approved N EW BOPE Heavy Rain April 2013 Construction Approved N EW SH30 Anaputa Point Slip July 2012 Construction Approved N Heavy Rain & High Wind Event - Sept 2013 Construction Approved N BOPE Emergency Works <$1million Construction Approved N BOPW Emergency Works < $1 million Construction Approved N EW Heavy Rainfall SH2 Papamoa Construction Approved N Maintenance, Operations and Renewals Programme State Highways HMM 73, , , ,267.7 Approved N Renewal of State highways Maintenance, Operations and Renewals Programme State Highways HMM 42, , , ,437.8 Approved N Preventive Maintenance Bay of Plenty 12/15 Construction MHH , , ,028.1 Approved N New & improved infrastructure for State highways TEL Tauranga Eastern Link Construction HH , , , ,580.8 Committed NRC Katikati Bypass Investigation MML Committed R Maunganui Rd/Girven Rd I/S Investigation HH , , Committed N Rotorua Eastern Arterial Investigation MM , Committed NC Tauriko Upgrade Investigation HM* , Committed N Kauri Point Passing Lane Design LM* Committed N Soldiers Road Realignment + IS Design HMM Committed N Bethlehem to Route J - Four laning (SH2) Design MMH Committed N Pekatahi Road/Rail Bridge Investigation MMH Committed NR Arden Cottage Curves Realignment Investigation MMH Committed R Tuapiro Rd PL Design HM* Committed N Tauranga Northern Link Property MM* Committed N Reids Canal Bridge Replacement (Large Project) Construction MMH , Committed C Harbour Link Construction Construction MMM , Committed NC RP* - Regional

3 Hairini Link - Stage 4 Investigation HM , Committed R Tauranga Northern Link Investigation MM* , Committed R TEL Tauranga Eastern Link Property HH , , Committed NR Bethlehem to Route J - Four laning (SH2) Property MMH , Committed N Pyes Pa Bypass Construction MML , Committed R Tauranga Central Corridor Improvements Construction MHH , Committed N SH29 Eastern Kaimai Safe System Corridor Investigation HMH Approved N SH5/SH30 Hemo Road/Old Taupo Road Safety Improvements Design HM Approved N Bethlehem to Waihi Road SI SH2 Construction HMM , , Approved N Maunganui Rd/Girven Rd I/S Design 11 HH , ,354.2 Approved N Maunganui Rd/Girven Rd I/S Construction 11 HH , Approved N Hairini Link - Stage 4 Construction 21 HM , ,196.6 Approved N Arden Cottage Curves Realignment Design MMH Approved N Route K conversion to ETC Construction HH , ,615.4 Approved N Minden Te Puna Intersection Improvements Investigation 66 HMH Approved N Minden Te Puna Intersection Improvements Design 66 HMH Approved N Arden Cottage Curves Realignment Construction MMH , , Approved N SH2 Takitimu Dr Elizabeth St Intersection - Interim Pre-implementation* MMH Approved N Safety Retrofit - Bay of Plenty Construction 16 HMM Approved N SH5/SH30 Hemo Road/Old Taupo Road Safer Intersection Investigation HMH Approved N Sun Valley Realignment Construction 32 HMH , , , Approved N SH2 Route Security Kukumoa Roading Improvements Investigation 31 MHH Approved N Pahoia/Esdaille Road SI Construction HMH Approved N Minor improvements State Highways 39 HMH , , , ,097.7 Approved N Hairini Link - Stage 4 Design 21 HM , ,031.3 Approved N RP* - Regional

4 Maunganui Rd/Girven Rd I/S Property 11 HH , Approved N HPMV - Port of Tauranga to Taupo Design 52 HMH Approved N HPMV - SH2 Waihi to Port of Tauranga Implementation HH , ,833.3 Approved N SH2 Apata Station Rd to Sargent Drive Median Barrier Investigation 63 HMH Approved N SH29 Eastern Kaimai Safe System Corridor Design 37 HMH Approved N SH 2 Northern Corridor Safe System Programme Investigation 40 HM* , Approved N SH29 Eastern Kaimai Safe System Corridor Construction 37 HMH , , , Approved N Hairini Link - Stage 4 Property 21 HM , ,117.7 Approved N Taneatua Rail Overbridge Construction 46 MMH , , Approved N Arden Cottage Curves Realignment Property MMH Approved N HPMV - Port of Tauranga to Taupo Construction 52 HMH Probable N Improved Driver Information - Bay of Plenty Construction 61 HMH Probable N Seismic Retrofit - Bay of Plenty Construction 53 HMH Probable N SH2 Apata Station Rd to Sargent Drive Median Barrier Construction 63 HMH , , ,587.7 Probable N SH2 Apata Station Rd to Sargent Drive Median Barrier Design 63 HMH Probable N Rotoma Bluff SVB Design 47 MLH Reserve N No3 Road Intersection Upgrade Design 44 MMH Reserve N Rotoma Hills PL Design 48 MLH Reserve N Maketu/Rangiuru Intersection Upgrade Investigation 43 HM* Reserve N SH29 SEDF Design 77 MMH Reserve N Rotoma Bluff SVB Investigation 47 MLH Reserve N Parkcliffe Curves Improvements Investigation 35 MLH Reserve N SH29 SEDF Construction 77 MMH Reserve N Parkcliffe Curves Improvements Design 35 MLH Reserve N Maketu/Rangiuru Intersection Upgrade Pre-implementation* 43 HM* Reserve N RP* - Regional

5 Rotoma Hills PL Construction 48 MLH , Reserve N RP* - Regional

Option 1: Investment Logic Map

Option 1: Investment Logic Map Option 1: Investment Logic Map Benefit Objective Weighting Scoring reviewed based on new Safety (30%) Safety 30% technical information Economic Economic efficiency 20% New additions to RLTP performance

More information

Feedback form. Let s get started. Waihi to Tauranga Corridor. You can

Feedback form. Let s get started. Waihi to Tauranga Corridor. You can Waihi to Tauranga Corridor Feedback form We appreciate you taking the time to provide feedback on the short list of options under consideration for State Highway 2 between Waihi and Tauranga. The different

More information

Regional Land Transport Plan 2018 For. Bay of Plenty Regional Council

Regional Land Transport Plan 2018 For. Bay of Plenty Regional Council Regional Land Transport Plan 2018 For Bay of Plenty Regional Council DRAFT: 15 April 2018 Global Research April 2018 Submission analysis Contents Introduction... 5 Synthesis of public submissions... 6

More information

mymarket Report How is the market?

mymarket Report How is the market? mymarket How is the market? Tauranga & Mt. Maunganui Winter 2016 The latest property market update for the Tauranga & Mt. Maunganui region. Helping you with your property decisions. mymarket The property

More information

Summary of GPS 2018 analysis

Summary of GPS 2018 analysis Summary of GPS 2018 analysis 6 March 2017 Not Government Policy Page 1 of 87 1. Purpose 1. This document contains analysis undertaken by the Ministry of Transport as part of the development of the draft

More information

WHANGAREI IMPROVEMENTS

WHANGAREI IMPROVEMENTS WHANGAREI IMPROVEMENTS PROJECT OVERVIEW The NZ Transport Agency (NZTA) is working with Whangarei District Council (WDC) to improve the state highway through Whangarei. In addition to the recently completed

More information

Community engagement guide May 2018

Community engagement guide May 2018 Community engagement guide May 2018 Greater Wellington Regional Council (GWRC), Hutt City Council (HCC) and the New Zealand Transport Agency (NZTA) are working together to achieve some big improvements

More information

471 Council - Long Term Plan Deliberations

471 Council - Long Term Plan Deliberations TaurangaCity 471 Council - Long Term Plan Deliberations DC No: 166 Purpose 1. To respond to public submissions on transportation issues in the Papamoa area to the 2015-2025 Tauranga City Council Long Term

More information

Auckland Council Finance & Performance Committee Presentation

Auckland Council Finance & Performance Committee Presentation Board Meeting 26 May 2015 Presentation Open Session Auckland Council Finance & Performance Committee Presentation Recommendation That the Board: i. Receives this report. Executive summary As part of the

More information

Western Bay of Plenty/ Tauranga Area

Western Bay of Plenty/ Tauranga Area ISSN 1176-841X July 5 Land Transport New Zealand has prepared this report. It is based on reported crash data and trends for the 4 period. The intent of the report is to highlight the key and provide partners

More information

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer For release: Immediately Page: 1 of 5 Date: April 2, 2012 Ref #: 2012-11 Media contacts: Karon Trenaman, 604-527-8766 ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer You ve likely

More information

Wellington Public Transport Spine Study

Wellington Public Transport Spine Study Wellington Public Transport Spine Study Study purpose Feasibility study Options for a high quality, high frequency PT system Key action from Ngauranga to Airport Corridor Plan (2008) Long-term outlook

More information

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18

Parewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18 RDC ROADING REPORT: FEBRUARY 2018 1. MAINTENANCE, OPERATIONS AND RENEWALS This year s resealing programme of 61 km has been completed. Pre-reseal repairs for the 2018/19 year have been programmed. Installing

More information

Twinning Hwy 11/17 Thunder Bay to Nipigon

Twinning Hwy 11/17 Thunder Bay to Nipigon Twinning Hwy 11/17 Thunder Bay to Nipigon 55 th Annual Engineering and Technology Conference Lakehead Chapter PEO November 4, 2016 Presented by: Bruce Caldwell, P. Eng., MBA Manager Program Planning Ministry

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

Hearing 3 - Tauranga

Hearing 3 - Tauranga Bay of Plenty Regional Land Transport Plan 2018 Hearing 3-12 April 2018 Full list of submitters TPOL1640 Heidi Hughes Organisation Greater 96 Ranch Road ZIP/Postal Code 3116 I am emailing our submission

More information

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland

More information

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013 Designing for Pedestrians: An Engineering Symposium Rutgers University March 21, 2013 The Problem 2 Pedestrian Fatalities Pedestrian Fatalities by Year in US (1994-2010) 6000 5000 4000 3000 2000 1000 0

More information

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Northern Virginia Express Lanes Design Challenges and Solutions IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Virginia Express Lanes Overview 60 miles of managed lanes (4 projects) Long

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

June Presentation Title. Peter Daly RACV. Presenter s Name

June Presentation Title. Peter Daly RACV. Presenter s Name June 17 2008 Presentation Title Peter Daly RACV Presenter s Name Overview What AusRAP is and isn t What it is trying to achieve How it works Key results Future directions What is AusRAP? Sister program

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

Regional Cycle Programme Update

Regional Cycle Programme Update Agenda Item 10 (ii) Regional Cycle Programme Update Glossary Auckland Council Auckland Transport Cycle Action Auckland New Zealand Transport Agency Regional Cycle Network (AC) (AT) (CAA) (NZTA) (RCN) Executive

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

LEARN AND GAIN CONFIDENCE

LEARN AND GAIN CONFIDENCE EXPLORE AND GET ACTIVE GET YOUR CREW TOGETHER LEARN AND GAIN CONFIDENCE GIVE IT A GO DO IT YOURSELF LEAD THE PACK Western Bay of Plenty WESTERN Bay of Plenty 406 Devonport Road Tauranga Phone: (07) 578

More information

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014 Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio Traffic Engineering Workshop June 4, 2014 Complete Streets Streets that enable safe access for users

More information

RTC Meeting. Monday 2 March Doc#

RTC Meeting. Monday 2 March Doc# RTC Meeting Monday 2 March 2015 Doc#3295215 Road Safety Item 4 Regional Fatalities 1) 68 year old male car passenger, T-bone crash at intersection, Hamilton 2) 66 year old male, quad bike roll over Te

More information

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017 INTRODUCTION + 241 km long, 2

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Broadway Complete Streets Project

Broadway Complete Streets Project Broadway Complete Streets Project Megan Johnson, P.E. Associate Civil Engineer James Pangburn, P.E. Consultant Project Manager After the construction of the highway system, Broadway was cut off

More information

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY HAMILTON BIKING PLAN 2015-2045 OUR VISION: A BIKE FRIENDLY CITY INTRODUCTION Biking as a travel option is experiencing a resurgence internationally and in New Zealand, growing as a familyfriendly and healthy

More information

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY CITY OF TULSA BICYCLE & PEDESTRIAN INFRASTRUCTURE TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY 31, 2013 CITY OF TULSA ENGINEERING SERVICES DEPARTMENT CITY OF TULSA ADA TRANSITION

More information

Bay of Plenty s iconic 70km multisport adventure Sunday 28 April 2013 Event day timeline:

Bay of Plenty s iconic 70km multisport adventure Sunday 28 April 2013 Event day timeline: Bay of Plenty s iconic 70km multisport adventure The Sunday 28 April 2013 companion Event day timeline: 6:00am T3 open for road bike drop off 6:15am T2 open for kayak drop off 6:45am T1 open for MTB drop

More information

Implementation Report # False Creek Bridges

Implementation Report # False Creek Bridges Implementation Report #1 2013-04-24 False Creek Bridges ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit

More information

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development State Transportation Commission 2015 Twelve Year Program Development Regional results of the survey and public feedback from August thru November 2013 Shenango Valley MPO Version 01-2014 Mobility Concerns

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North

More information

Western Corridor Plan 2012

Western Corridor Plan 2012 Page 1 of 25 Western Corridor Plan 2012 - August 2012 [Amendments to the draft Plan shown in red] FOR MORE INFORMATION Greater Wellington 142 Wakefield Street PO Box 11646 Manners Street Wellington 6142

More information

6.4 RECOMMENDED IMPROVEMENTS

6.4 RECOMMENDED IMPROVEMENTS 6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides

More information

Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information

Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information Theodore Roosevelt Expressway (TRE) study was completed in 2010. Conducted Public meetings Analyzed traffic Provided good information 2 All routes in oil producing counties have increased traffic. 3 Super

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Glenpool Community Overview Glenpool Glenpool is a city of nearly 12,000 residents located in Tulsa County southwest of Tulsa and Jenks. The city is growing

More information

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments! MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions

More information

Improving Road Safety for North Eastern State Roads of India A Case Study

Improving Road Safety for North Eastern State Roads of India A Case Study Improving Road Safety for North Eastern State Roads of India A Case Study North Eastern States Portugal Debasis Chakrabarty, Transportation Engineer Key figures of North Eastern States Road Project Total

More information

A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3.

A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3. A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE Highways Engineering Document WG 1.3.2 by Jonathan Thirkettle MARCH 2018 1. Introduction 1.1 I am Jonathan

More information

The Port of Virginia and Economic Development

The Port of Virginia and Economic Development The Port of Virginia and Economic Development RODNEY W. OLIVER, CHIEF FINANCIAL OFFICER VIRGINIA PORT AUTHORITY 1 EAST COAST / WEST TRADE BALANCE 2 AN IMPORT PARADIGM SHIFT The West Coast has traditionally

More information

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning Memorandum To: Smart Growth From: Bruce Robinson, Transport Advisor, Infrastructure Planning Subject: Te Tumu Transportation Assessment: Stage 1 Sensitivity Analysis Date: 1 June 2016 INTRODUCTION This

More information

Regional Bus Priority

Regional Bus Priority Regional Bus Priority Recommendation(s) That the Board: i) Notes the systematic review for bus priority measures on the proposed Frequent Transit Network (FTN). Executive summary The New Network public

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

HSM PREDICTIVE METHODS IN PRELIMINARY ENGINEERING

HSM PREDICTIVE METHODS IN PRELIMINARY ENGINEERING HSM PREDICTIVE METHODS IN PRELIMINARY ENGINEERING 2017 ILLINOIS THE CONFERENCE Filiberto Sotelo & Steven Schilke, P.E. OUTLINE Safety & Transportation Management Process What is HSM? Illinois HSM Predictive

More information

Public Information Meeting

Public Information Meeting Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special

More information

Working Group Meeting

Working Group Meeting Working Group Meeting February 6, 2018 Parks and Natural Resources Operations Building Transportation Analysis Draft Policy Framework Agenda 7:05 pm Welcome 7:10 pm Follow-up from Previous Meetings Schedule

More information

Highways England Road Safety Ambition. David Stones PACTS Autumn 2015 Conference 3 nd November 2015

Highways England Road Safety Ambition. David Stones PACTS Autumn 2015 Conference 3 nd November 2015 Highways England Road Safety Ambition David Stones PACTS Autumn 2015 Conference 3 nd November 2015 Highways England Strategic Road Network 4,300 miles (40% Motorway & 60% All Purpose Trunk Road). 34% of

More information

BOP ZONE YEAR 7 AND 8 ATHLETIC CHAMPIONSHIPS 2018 New Record

BOP ZONE YEAR 7 AND 8 ATHLETIC CHAMPIONSHIPS 2018 New Record BOP ZONE YEAR 7 AND 8 ATHLETIC CHAMPIONSHIPS 2018 New Record 100M Place Year 7 Girls - 100M School Time Record 1st Eilysa-Marie Ngairo Papamoa 14.06 13.81 / 2014 2nd Georgia Barnett Tauriko 14.07 3rd Lily-May

More information

Bridges and Arizona Crossings

Bridges and Arizona Crossings Circulation and Transportation 5-11 Discovery Street/Barham Drive. Discovery Street is planned 5.4.3 Specific Plan Circulation Improvements to be extended eastward from its terminus at Craven Road Circulation

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

Developing a Safer Cycling Strategy for the ACT ACRS Conference August 2012

Developing a Safer Cycling Strategy for the ACT ACRS Conference August 2012 Developing a Safer Cycling Strategy for the ACT ACRS Conference 2012 Peter Strang Canberra Manager Sarah Court Transport Consultant 10 August 2012 Presentation Outline Background Data Analysis (Stage 1)

More information

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME.

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. 1 PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. - SANDRA GREEN, CITY SECRETARY FARMERSVILLE CITY COUNCIL MEETING February

More information

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA 5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA The Transportation Services Committee recommends the adoption of the recommendations

More information

#!! "$% ##! &! # '#! % $ #!

#!! $% ##! &! # '#! % $ #! Executive Summary US Highway 16 (US 16) is the primary corridor connecting Rapid City to the Black Hills region. It serves a growing population of commercial and residential traffic, as well as seasonal

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng BUS RAPID TRANSIT A Canadian Perspective Why choose BRT? Because it is a practical and cost effective rapid transit solution for the most common types of land use in urban Canada Operating experience shows

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor

More information

Major Bike Routes 102 Avenue Workshop April 21, 2015

Major Bike Routes 102 Avenue Workshop April 21, 2015 Major Bike Routes 102 Avenue Workshop April 21, 2015 Our Purpose Today Provide context on how Major Bike Routes fit into Edmonton s future Share information on what we heard in our last phase, and how

More information

Transportation Action Plan. Transportation & Planning Committee March 14, 2016

Transportation Action Plan. Transportation & Planning Committee March 14, 2016 Transportation Action Plan Transportation & Planning Committee March 14, 2016 Planning to create a Great City Transit System Plan Zoning & Development Ordinance Centers, Corridors & Wedges Community Character

More information

Executive Summary June 2015

Executive Summary June 2015 Executive Summary June 2015 Highway 112 Corridor Study Benton and Washington Counties Executive Summary June 2015 Prepared by Transportation Planning and Policy Division Arkansas State Highway and Transportation

More information

Western Corridor Plan. Adopted August 2012

Western Corridor Plan. Adopted August 2012 Adopted August 2012 2012 Adopted August 2012 For more information, contact: Greater Wellington 142 Wakefield Street PO Box 11646 Manners Street Wellington 6142 Published September 2012 GW/CP-G-12/226 info@gw.govt.nz

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Bicycle Friendly Streets

Bicycle Friendly Streets Bicycle Friendly Streets 4.1 Guiding Principle and Objectives Bicycles are recognized as vehicles under the Highway Traffic Act, and as such, should be afforded the same consideration as motor vehicles

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders. Most decisions about whether or not to use transit involve time and cost, and most transit services are slower than travel by private vehicle. However, when transit is faster or nearly as fast as travel

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

CHAPTER 5 TRANSPORTATION

CHAPTER 5 TRANSPORTATION CHAPTER 5 TRANSPORTATION Introduction The movement of goods and people requires a transportation system of infrastructure and transit modes. Infrastructure includes roads, bridges, sidewalks, trails, railroads,

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information

DATABASE HEALTH INDEX - DASHBOARD

DATABASE HEALTH INDEX - DASHBOARD Page 1 of 7 DATABASE HEALTH INDEX - DASHBOARD Carriageway Asset Inventory Collected Data Non-Carriageway Asset Inventory Area: Date: MARLBOROUGH 26/07/2013 Category Measures Result Measure Capital Projects

More information

Bike Mount. the Green Net PARK2PARK. SAFE, SEPARATE and ACCESSIBLE Walk/Cycleways. Tauranga CONNECT GREEN LINE - Vision WAIMAPU ESTUARY

Bike Mount. the Green Net PARK2PARK. SAFE, SEPARATE and ACCESSIBLE Walk/Cycleways. Tauranga CONNECT GREEN LINE - Vision WAIMAPU ESTUARY the Green Net 2 Bike Mount SAFE, SEPARATE and ACCESSIBLE Walk/Cycleways Tauranga CONNECT GREEN LINE - Vision 2017-2020 Improve the quality of life for people in Tauranga City and Region by bringing citizens

More information

Speed Limits in the Hoddle Grid

Speed Limits in the Hoddle Grid Speed Limits in the Hoddle Grid Recent History of speed limits March 2013 Docs # 7738485 1 Introduction Muncipalities have power to Erect speed limit signs BUT Municipalities DO NOT have the power to approve

More information

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Southwestern RPO Prioritization Local Input Points for Division Needs Funding H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern

More information

Highway 1 Kamloops to Alberta Four-Laning Program

Highway 1 Kamloops to Alberta Four-Laning Program Highway 1 Kamloops to Alberta Four-Laning Program COMMUNITY ENGAGEMENT DISCUSSION GUIDE AND FEEDBACK FORM February 7 March 1, 2013 www.bchwy1.ca 1 FEEDBACK FORM INSIDE HOW INPUT WILL BE CONSIDERED FAST

More information

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Introduction Methodology Study area and data collection Results and recommendation Conclusion References Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

Students Travelling By Bus for 2017

Students Travelling By Bus for 2017 7 February 2017 Students Travelling By Bus for 2017 please return no later than Tuesday 13 th December 2016 to enable the 2017 Bus Lists to be prepared Tauriko School has a bus system that supports all

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Nevada s Transportation Infrastructure and Future Transportation Needs

Nevada s Transportation Infrastructure and Future Transportation Needs Nevada s Transportation Infrastructure and Future Transportation Needs Susan Martinovich, P.E. Director Interim Legislative Committee on Transportation Nov. 13, 2007 State Transportation Board of Directors

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Extent of seagrass in the Bay of Plenty in 2011

Extent of seagrass in the Bay of Plenty in 2011 Extent of seagrass in the Bay of Plenty in 2011 Title Title part 2 Bay of Plenty Regional Council Environmental Publication 2016/03 5 Quay Street PO Box 364 Whakatāne 3158 NEW ZEALAND ISSN: 1175-9372 (Print)

More information

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads 1 Stakeholder Update May 21, 2018 2 Agenda Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads Proposed Evaluation Criteria Next Steps 1 Project/Schedule

More information

Status April Transportation Priority Projects in Chester County

Status April Transportation Priority Projects in Chester County Transportation Priority Projects in Chester County April 2017 Highway & Trail Projects # Project Scope Current /Phase 1 US 202 over Amtrak Major bridge rehabilitation 17.567 began 03/17 2017 2 US 202 at

More information

Golden s Plan. For the Highway 6 & 93 Corridor

Golden s Plan. For the Highway 6 & 93 Corridor Golden s Plan For the Highway 6 & 93 Corridor Purpose of the Study Accommodate regional traffic needs on Highways 6 and 93, as defined by the Northwest Quadrant Feasibility Study. Find a solution that

More information

LANE ELIMINATION PROJECTS

LANE ELIMINATION PROJECTS PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:

More information

Post Implementation Review

Post Implementation Review Post Implementation Review State Highway 2 Dowse to Petone Upgrade Wellington Highways and Network Operations January 2014 The purpose of NZ Transport Agency Post Implementation Reviews are to: assess

More information

Status February Transportation Priority Projects in Chester County

Status February Transportation Priority Projects in Chester County Transportation Priority Projects in Chester County February 2018 Highway & Trail Projects # Project Scope Current /Phase 1 US 202 over Amtrak Major bridge rehabilitation 17.6 2017-2019 2 US 202 at PA 926

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Nottingham Junctions Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Introduction The is the key east-west link across the East Midlands. The route is subject

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information