STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019

Size: px
Start display at page:

Download "STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019"

Transcription

1 FFY 2019 STIP: STATEWIDE RAIL CROSSING PROJECTS- ITEM PROJECTS R R 0 SAFETY IMPROVEMENT PROTECTION DEVICES, CROSSING SURFACES, ADVANCE 2019 WARNING SIGNS, STRIPING, CLOSURES, ETC SPR $8,000,000 $8,000,000 NOBLE RAILROAD SIGNALS IN PERRY SIGNAL/GATE ARM AT FIR STREET/US-64 WITH BNSF 2019 XING U 11/30/2018 STP $9,455 $85,094 $94,549 JOHNSTON RAILROAD SIGNALS NEAR RAVIA SIGNAL/GATE ARMS AT COBB ROAD WITH BNSF 2019 XING S 11/30/2018 STP $21,694 $195,246 $216,940 MARSHALL RAILROAD SIGNALS NEAR NEW WOODVILLE, SIGNAL/GATE ARMS AT TIMBERLINE 2019 ROAD/N3590 WITH BNSF XING F 11/30/2018 STP $22,256 $200,299 $222,555 OKMULGEE RAILROAD SIGNALS NEAR HENRYETTA LIGHT SIGNAL/GATE ARMS AT SH-124/DUSTIN 2019 RD. WITH BNSF XING A 11/30/2018 STP $5,556 $50,004 $55,560 OKMULGEE RAILROAD SIGNALS IN HENRYETTA LIGHT SIGNAL/GATE ARMS AT S 4TH ST WITH 2019 BNSF XING X 11/30/2018 STP $20,433 $183,897 $204,330 OKMULGEE RAILROAD SIGNALS IN HENRYETTA LIGHT SIGNAL/GATE ARMS AT MAXINE AVENUE 2019 WITH BNSF XING Y 11/30/2018 STP $20,433 $183,897 $204,330 HUGHES CROSSING IMPR. & R/R SIGNALS NEAR WETUMKA SIGNAL/GATE ARM & 32' CONCRETE XING SURF 2019 AT CO RD E1250 WITH BNSF XING X 11/30/2018 STP $26,059 $234,528 $260,587 FEDERAL FUNDS OBLIGATED BALANCE STATEWIDE RAIL CROSSING PROJECTS FEDERAL FUNDS REMAINING BALANCE $8,000,000 FFY 2019 STIP: STATEWIDE-SMALL SCALE BRIDGE ITEM PROJECTS BRIDGE IMPR. IMPROVEMENT-- PAINTING MINOR REPAIRS, SEAL 2019 COAT/WATERPROOFING, SILANE TREATMENT, ETC STP $2,000,000 $2,000,000 PONTOTOC BRIDGE WATER PROOF SEAL 2019 DIVISION 3: BRIDGE WATER PROOFING SEAL (SILANE) 10/24/2018 STP $240,000 $60,000 $300,000 FEDERAL FUNDS OBLIGATED BALANCE $240,000 STATEWIDE SMALL SCALE BRIDGE IMPROVEMENT FEDERAL FUNDS REMAINING BALANCE $1,760,000 FFY 2019 STIP: STATEWIDE SMALL SCALE TRAFFIC SAFETY: ITEM PROJECTS SAFETY IMPROVEMENT SIGNING, INT MOD, LIGHTING, INTERCONNECT 2019 SYSTEMS,GUARDRAIL, DELINEATION, ETC SPR $8,524,600 $3,475,400 $12,000,000 FEDERAL FUNDS OBLIGATED BALANCE STATEWIDE SMALL SCALE TRAFFIC SAFETY FEDERAL FUNDS REMAINING BALANCE $12,000,000 FFY 2019 STIP: STATEWIDE ENHANCEMENT, BICYCLE & ITEM PROJECTS ENHAN 0 ENHANCEMENT PEDESTRIAN PATHS, SCENIC OR HISTORIC HIGHWAY 2019 PROGRAMS, LANDSCAPING, HISTORIC PRESERVATION, ETC TAP $12,000,000 $12,000,000 POTTAWATOMIE PEDESTRIAN IMPROVEMENTS 2019 MCLOUD: SIDEWALKS 11/29/2018 TAP $114,583 $20,570 $135,153 MURRAY ENHANCEMENT 2019 DAVIS: STREETSCAPE PROJECT 11/28/2018 TAP $246,503 $50,752 $297,255 BECKHAM PEDESTRIAN IMPROVEMENTS 2019 ELK CITY: STREETSCAPE PHASE 1 11/28/2018 TAP $572,227 $1,747,773 $2,320,000 FEDERAL FUNDS OBLIGATED BALANCE $933,313 STATEWIDE ENHANCEMENT FEDERAL FUNDS REMAINING BALANCE $11,066,687 ITEM PROJECTS IN RD 0 MONEY ONLY 2019 FFY 2019 STIP: ITEM: RECREATIONAL TRAILS TAP $1,800,000 $1,800,000 FEDERAL FUNDS OBLIGATED BALANCE STATEWIDE RECREATIONAL TRAILS FEDERAL FUNDS REMAINING BALANCE $1,800,000 FFY 2019 STIP: R/W CLEARANCE: REMOVAL & DISPOSAL OF ITEM PROJECTS RIGHT OF WAY CLEARANCE OBSTRUCTIONS ON PUBLIC R/W PRIOR TO UTILITY RELOCATION 2019 OR PROJECT STARTUP STP $1,000,000 $1,000,000 BECKHAM IS040B 0.1 RIGHT OF WAY CLEARANCE I-40B: OVER ELK CREEK LOCATED.15 MILE EAST OF THE SH 6 JCT 2019 IN ELK CITY 10/16/2018 NHPP $79,087 $79,087

2 FEDERAL FUNDS OBLIGATED BALANCE $79,087 STATEWIDE R/W CLEARANCE FEDERAL FUNDS REMAINING BALANCE $920,913 FFY 2019 STIP:3R/3P (RDY, IN CONJUNCTION WITH FHWA, ITEM PROJECTS RESURFACE SIMPLE PAVEMENT PRESERVE & RESTORE (ASPHALT OVERLAY, 2019 STRIPE, SIGNING & GUARDRAIL STP $35,000,000 $35,000,000 FEDERAL FUNDS OBLIGATED BALANCE STATEWIDE 3R/3P FEDERAL FUNDS REMAINING BALANCE $35,000,000 FY 2019 STIP: 3B(BRIDGE) IN CONJUNCTION WITH FHWA- ITEM PROJECTS JOINT SEAL/REPAIR PREVENTIVE MAINTENANCE INCLUDING PAINT, JOINTS, 2019 BEARINGS & DECK REPAIR NHPP $5,000,000 $5,000,000 FEDERAL FUNDS OBLIGATED BALANCE STATEWIDE 3B FEDERAL FUNDS REMAINING BALANCE $5,000,000 ITEM PROJECTS CONTRACT P.E. (AS OF 0 10/1/2013) 2019 FFY 2019 STIP: STATEWIDE PRELIMINARY ENGINEERING STP $25,000,000 $25,000,000 SEMIONLE US270 CONTRACT P.E. (AS OF /1/2013) 2019 US-270: SH-59 OVERPASS, 1.28 MIS S. OF US-270B 12/4/2018 STP $321,480 $80,370 $401,850 TULSA IS044 CONTRACT P.E. (AS OF 1 10/1/2013) I-44/US-75 INTERCHANGE RECONSTRUCTION FROM UNION AVE 2019 TO THE ARKANSAS RIVER 11/30/2018 NHPP $758,013 $3,032,050 $3,790,063 POTTAWATOMIE IS040 CONTRACT P.E. (AS OF /1/2013) I-40: FROM OKLAHOMA C/L, EAST 2.5 MILES; I-40 FROM 2.5 MI E 2019 OF C/L E 2.2 MI; I-40 FROM 4.7 MI E OF C/L E 2.7 MI 11/30/2018 NHPP $314,296 $2,828,663 $3,142,959 WOODS US281 CONTRACT P.E. (AS OF /1/2013) US-281: 1.45 MLS SOUTH OF JCT US-64/US-281 SOUTH IN ALVA, 2019 NORTH 1.45 MLS 11/1/2018 NHPP $408,536 $102,134 $510,670 OTTAWA SH069A CONTRACT P.E. (AS OF /1/2013) INTERSECTION AT SH-69A & SH-10 IN MIAMI, TURNING 2019 MOVEMENTS 10/24/2018 STP $244,704 $61,175 $305,879 CUSTER IS040 CONTRACT P.E. (AS OF /1/2013) I-40: REPLACE BRIDGES ON US-183 OVER I-40; 10.7 MI E OF 2019 WASHITA CO LN N&S 10/24/2018 NHPP $396,388 $99,097 $495,485 ROGERS SH066 CONTRACT P.E. (AS OF /1/2013) 2019 SH 66 BEGIN 5.25 MI SW OF CRAIG CL AND EXTEND NE 5.25 MI 10/24/2018 STP $694,000 $173,500 $867,500 FEDERAL FUNDS OBLIGATED BALANCE $1,743,628 STATEWIDE PRELIMINARY ENGINEERING FEDERAL FUNDS REMAINING BALANCE $23,256,372 ITEM PROJECTS COBRGE 0 BRIDGE & APPROACHES 2019 FFY 2019 STIP: STATEWIDE COUNTY BRIDGE PROGRAM STP $20,000,000 $20,000,000 PAWNEE BRIDGE & APPROACHES CO RD EW-50 OVER TRIBUTARY OF PEPPER CREEK BR 85 APPX MI S & 4 MI E OF SH-108 & US-64 11/29/2018 STP $604,127 $260,828 $864,955 OTTAWA BRIDGE & APPROACHES CO RD EW 190 OVER UNNAMED TRIB TO HORSE CREEK APPX MI W & 1.75 MI N OF US-60/US-69 JCT NE OF AFTON 11/29/2018 CIRB $390,644 $170,989 $561,633 NOWATA BRIDGE & APPROACHES CO RD (EW-27) OVER PANTHER CREEK APPX 5 MI S & 1.75 MI W 2019 OF SH-28/US-60 JCT 11/29/2018 STP $510,244 $218,676 $728,920 NOWATA BRIDGE & APPROACHES CO RD(NS-414) OVER DOUBLE CREEK APPX 2.5 MILE SOUTH OF 2019 US-60 11/29/2018 STP $779,748 $334,177 $1,113,925 MCCURTAIN BRIDGE & APPROACHES CO BR OVER WHITE OAK CREEK APPROX 3.5 MILE NORTH & MILE EAST OF VALLIANT 11/29/2018 STP $390,056 $106,929 $496,985 DELAWARE BRIDGE & APPROACHES CO RD(EW-519) OVER CRAZY CREEK APPROX 5.2 MILE EAST & MILE NORTH OF COLCORD (XTOWN BEAMS) 11/29/2018 CIRB $611,016 $261,865 $872,881 BEAVER BRIDGE & APPROACHES BR & APPR ON EW-019(0416C) OVER CAMP CREEK, 8.0 MILE 2019 NORTH & 7.6 MILE EAST OF ELMWOOD 11/29/2018 STP $480,000 $226,169 $706,169 MURRAY BRIDGE & APPROACHES BR & APPR ON (EW178) OVER BRANCH CREEK, 2.5 MILE NORTH 2019 & 0.6 MILE WEST OF DRAKE LOCAL NO /16/2018 STP $145,833 $703,112 $848,945 COAL BRIDGE & APPROACHES CO BR OVER UNNAMED CREEK, ON EW MILES SOUTH 2019 AND 2.3 MILES WEST OF LEHIGH 10/16/2018 STP $468,402 $117,100 $585,502

3 BRYAN BRIDGE & APPROACHES BR. & APPRO. OVER ISLAND BAYOU CR ON NS-370.5, 2.9 MIS S. & MIS E. OF CALERA, OK 10/16/2018 STP $640,916 $160,229 $801,145 FEDERAL FUNDS OBLIGATED BALANCE $4,026,215 STATEWIDE COUNTY BRIDGE PROGRAM FEDERAL FUNDS REMAINING BALANCE $15,973,785 ITEM PROJECTS CO RD 0 GRADE, DRAIN & SURFACE 2019 FFY 2019 STIP: STATEWIDE COUNTY ROAD PROGRAM STP $6,000,000 $6,000,000 MARSHALL RESURFACE NS-351 BEG AT SH-32, 2.5 MIS W. OF KINGSTON, OK & EXT S MIS 11/29/2018 STP $1,000,000 $454,928 $1,454,928 MCCLAIN RESURFACE RESURFACING OF CO RD EW-136 (230TH ST) FROM EASTERN AVE. 1.0 MILE EAST TO NS-311 (BRYANT AVE) AND SOUTH 2019 ALONG NS-311 APPROX. 2.5 MILE, MC-4468C 11/29/2018 STP $500,000 $500,739 $1,000,739 FEDERAL FUNDS OBLIGATED BALANCE $1,500,000 STATEWIDE COUNTY ROAD PROGRAM FEDERAL FUNDS REMAINING BALANCE $4,500,000 ITEM PROJECTS CT ST 0 GRADE, DRAIN & SURFACE FFY 2019 STIP: STATEWIDE SMALL CITY ROAD & BRIDGE 2019 PROGRAM STP $3,000,000 $3,000,000 FEDERAL FUNDS OBLIGATED BALANCE STATEWIDE SMALL CITY ROAD & BRIDGE PROGRAM FEDERAL FUNDS REMAINING BALANCE $3,000,000 FFY 2019 STIP: SAFE ROUTES TO SCHOOL: DESIGN, ITEM PROJECTS IN RD 0 SAFETY IMPROVEMENT DEVELOPMENT, & CONSTRUCTION & EDUCATIONAL 2019 PROGRAMS STATEWIDE SRS $2,000,000 $2,000,000 LATIMER CT ST SAFETY IMPROVEMENT 2019 SRS - JOHN G. SHERO MIDDLE SCH, GRACE RUSSELL ELEM SCH. 10/19/2018 SRS $200,000 $200,000 FEDERAL FUNDS OBLIGATED BALANCE $200,000 STATEWIDE SAFE ROUTES TO SCHOOL FEDERAL FUNDS REMAINING BALANCE $1,800,000 FFY 2019 STIP: STATEWIDE R/W ACQUISITION & UTILITY ITEM PROJECTS RIGHT OF WAY RELOCATION ESTIMATED COST $750,000 OR LESS (FOR 2019 PROJECTS NOT IN THE STIP) STP $3,500,000 $3,500,000 SH-34 OVER NORTH CANADIAN RV., 0.8 MILES NORTH OF JCT. US- WOODWARD SH UTILITIES /30/2018 STP $28,928 $115,710 $144,638 FEDERAL FUNDS OBLIGATED BALANCE STATEWIDE R/W ACQUISITION & UTILITY RELOCATION FEDERAL FUNDS REMAINING BALANCE $3,500,000 ITEM PROJECTS A.D.A. COMPLIANCE 2019 FFY 2019 STIP: STATEWIDE A.D.A. PROJECTS FOR COMPLIANCE HSIP $5,150,000 $1,030,000 $6,180,000 BEAVER US270 1 A.D.A. COMPLIANCE US-270: A.D.A. IMPROVEMENTS ALONG US-270 APPROX MI NORTH OF SH-3 EXTEND NORTH 1 MILE. 10/16/2018 HSIP $182,730 $182,730 FEDERAL FUNDS OBLIGATED BALANCE $182,730 STATEWIDE A.D.A. PROJECTS FEDERAL FUNDS REMAINING BALANCE $5,997,270 ITEM PROJECTS INTELLIGENT TRANSPORTATION 0 SYSTEMS FFY 2019 STIP: PROJECTS FOR INTELLIGENT TRANSPORTATION 2019 SYSTEM ACTIVITIES HSIP $2,500,000 $2,500,000 FEDERAL FUNDS OBLIGATED BALANCE STATEWIDE INTELLIGENT TRANSPORTATION SYSTEM FEDERAL FUNDS REMAINING BALANCE $2,500,000 ITEM FEDERAL FUNDING AMOUNT TOTAL $105,474,600 OBLIGATED FEDERAL FUNDS / OBLIGATED STATE FUNDS / OBLIGATED OTHER FUNDS / OBLIGATED ADVANCE CONSTRUCTION FUNDS / TOTAL $8,904,973 $44,238,932 $2,278,817 $5,976,423 $61,399,145

4 GRADE,DRAINING,BRIDGE & THRU WATTS 10/16/18 Modification Increase = Fed ADAIR US SURFACE 2019 decrease = $7,627,767 State increase = $7,632,802 10/16/2018 NHPP $12,719,658 $12,719,658 $25,439,316 ADAIR $12,719,658 $12,719,658 $25,439,316 ALFALFA SH008 6 RIGHT OF WAY 2019 SH-8: FROM 4.0 MI NORTH OF THE MAJOR C/L, NORTH 4.0 MI $62,641 $62,641 $125,281 ALFALFA SH008 6 UTILITIES 2019 SH-8: FROM 4.0 MI NORTH OF THE MAJOR C/L, NORTH 4.0 MI STP $320,000 $80,000 $400,000 ALFALFA SH008 4 UTILITIES 2019 SH-8: FR MAJOR COUNTY LINE EXTEND NORTH 4 MILES STP $320,000 $80,000 $400,000 ALFALFA SH008 4 RIGHT OF WAY 2019 SH-8: FR MAJOR COUNTY LINE EXTEND NORTH 4 MILES $76,500 $76,500 $153,000 ALFALFA SH045 GRADE,DRAINING,BRIDGE & 2.1 SURFACE SH-45 BEG APPROX. 2.1 MILE WEST OF SH-8 & EXT EAST 2.1 MILE 2019 TO SH-8. STP $4,500,000 $1,125,000 $5,625,000 ALFALFA US064 GRADE,DRAINING,BRIDGE & 1 SURFACE 2019 US-64 FROM 9.0 MI EAST OF THE WOODS C/L, EAST 4.6 MI STP $6,720,000 $1,680,000 $8,400,000 ALFALFA $11,999,141 $3,104,141 $15,103,281 BECKHAM RR REHAB RAILROAD BRIDGES TIGER IX GRANT: REBUILD OPEN DECK PILE TRESTLE MP 636.4; REHAB 15 BRIDGES BETWEEN ENID & ELK CITY 2019 (FARMRAIL RR) 12/5/2018 STP $2,699,153 $1,837,743 $4,536,896 BECKHAM RR RAILROAD REHABILITATION TIGER IX GRANT: RR CONST & REHAB 6K FEET OF SIDING NEAR OKEENE; 3800 FT OF SIDING IN ELK CITY & REPLACE 17 MILE OF 2019 RAIL & TIES BETWEEN ENID & CLINTON 12/5/2018 STP $7,172,996 $407,000 $4,326,097 $11,906,093 BECKHAM SH BRIDGE & APPROACHES SH-6: OVER SADLER CREEK LOCATED 1.7 MILES NORTH OF SH-55 WEST JCT 10/16/18 Modification Increas = $181,545 Fed 2019 increase = $145,236 State increase = $36,309 10/16/2018 STP $1,919,732 $479,933 $2,399,665 BECKHAM IS040B 0.2 BRIDGE & APPROACHES I-40 BUSINESS IN ELK CITY: BRIDGE AND APPROACHES OVER THE EAST FORK OF ELK CREEK LOCATED 1.1 MILES WEST OF THE I-40 EAST JCT. (WEST BOUND BRIDGE) 10/16/18 Modification Decrease = $88,759 Fed decrease = $71,008 State decrease = 2019 $17,751 10/16/2018 STP $1,273,266 $318,317 $1,591,583 BECKHAM IS040B 0.2 BRIDGE & APPROACHES I-40 BUSINESS IN ERICK: BRIDGE AND APPROACHES OVER LITTLE TURKEY CREEK LOCATED 0.2 MILE WEST OF THE SH-30 SOUTH 2019 JCT. (WEST BOUND BRIDGE) STP $1,824,587 $456,148 $2,280,735 BECKHAM SH152 4 RIGHT OF WAY SH-152, WIDEN AND RESURFACE BEGIN ON THE EAST SIDE OF 2019 THE SH-30 JCT AND EXT EAST 4.1 MILES. RW FOR (04) $327,000 $327,000 BECKHAM SH152 4 UTILITIES SH-152, WIDEN AND RESURFACE BEGIN ON THE EAST SIDE OF 2019 THE SH-30 JCT AND EXT EAST 4.1 MILES. RW FOR (04) STP $261,600 $65,400 $327,000 BECKHAM $15,151,334 $2,053,798 $6,163,840 $23,368,972 BLAIN SH WIDEN & RESURFACE SH-152, WIDEN AND RESURFACE BEGIN ON THE EAST SIDE OF 2019 THE SH-30 JCT AND EXT EAST 4.1 MILES. RW FOR (04) MILES. NHPP $5,572,918 $1,390,912 $6,963,830 BLAIN $5,572,918 $1,390,912 $6,963,830 BYRAN SH BRIDGE & APPROACHES SH-78 OVER RED RIVER BEGIN AT THE OKLAHOMA/TEXAS STATE 2019 LINE STP $6,651,267 $1,662,817 $7,683,550 $15,997,634 BRYAN SH RIGHT OF WAY SH-78 OVER YARNABY CREEK 3 MILES NORTH OF TEXAS STATE 2019 LINE $54,500 $54,500 BRYAN SH UTILITIES SH-78 OVER YARNABY CREEK 3 MILES NORTH OF TEXAS STATE 2019 LINE STP $43,600 $10,900 $54,500 GRADE,DRAINING,BRIDGE & US-69 BEGIN AT SOUTH END OF CALERA AND EXTEND NORTH TO SURFACE 2019 US-70 INTERCHANGE BRYAN US BRYAN NHPP / NHFP $34,000,000 $24,000,000 $62,000,000 $120,000,000 $40,694,867 $25,728,217 $69,683,550 $136,106,634 CADDO US UTILITIES 2018 CADDO US RIGHT OF WAY 2019 US-281: OVER WASHITA RIVER & TWO O'FLOWS FROM APPROX 0.74 MILES N. OF US-62 EXTEND N. APPROX 0.71 MILES STP $2,231,395 $557,848 $2,789,243 US-281: OVER WASHITA RIVER AND TWO O'FLOWS FROM APPROX 0.74 MILES N. OF US-62 EXTEND N. APPROX 0.71 MILES

5 CADDO SH RIGHT OF WAY SH-9: FROM JUST E. OF THE STINKING CR. BRIDGE IN KIOWA CO E MIS. TO THE SH 58 JCT. IN CARNEGIE $799,000 $799,000 CADDO SH UTILITIES SH-9: FROM JUST E. OF THE STINKING CR. BRIDGE IN KIOWA CO E MIS. TO THE SH 58 JCT. IN CARNEGIE STP $628,240 $157,060 $785,300 CADDO SH008 5 RIGHT OF WAY SH-8 BEGIN AT JCT SH-19/US-277 IN CYRIL, EXTEND WEST AND 2019 NORTH APPROX 5.0 MIS. $1,566,616 $1,566,616 CADDO SH008 5 UTILITIES SH-8 BEGIN AT JCT SH-19/US-277 IN CYRIL, EXTEND WEST AND 2019 NORTH APPROX 5.0 MIS. STP $1,069,196 $267,300 $1,336,496 CADDO US RIGHT OF WAY US-62: FROM JCT. SH-9 EXTENDING E 6.15 MILES TO CURB 2019 SECTION IN ANADARKO $2,250,000 $2,250,000 CADDO US UTILITIES US-62: FROM JCT. SH-9 EXTENDING E 6.15 MILES TO CURB 2019 SECTION IN ANADARKO STP $1,566,160 $391,540 $1,957,700 CADDO SH RIGHT OF WAY SH-58: INTERSECTION MODIFICATION AT JCT SH-152, EAST AND 2019 WEST $489,800 $489,800 CADDO SH UTILITIES SH-58: INTERSECTION MODIFICATION AT JCT SH-152, EAST AND WEST 10/17/18 Modification Decrease = $661,913 Fed 2019 decrease = $529,170 State decrease = $132,293 10/17/2018 STP $88,670 $22,167 $110,837 CADDO $5,583,661 $6,501,331 $12,084,992 SH-4 OVER THE N. CANADIAN RV, & 2 O'FLOWS 1.92, 2.13 & 2.26 CANADIAN SH BRIDGE & APPROACHES 2019 MI NORTH OF SH-66 STP $10,504,000 $2,626,000 $13,130,000 I-40B: OVER THE UPAC RAILROAD ON THE SOUTH EDGE OF EL CANADIAN IS040B BRIDGE & APPROACHES 2019 RENO NHPP $6,060,000 $1,515,000 $7,575,000 CANADIAN $16,564,000 $4,141,000 $20,705,000 CARTER SH & SURFACE SH-53: FROM 6.87 MI EAST OF SH-76, E. APPROX 7.67 MI 10/16/18 Modification Increase = $ 2,038,139 Fed decrease 2019 = $5,344,594 State increase = $7,382,734 10/16/2018 STP $11,625,176 $11,625,176 $23,250,352 CARTER $11,625,176 $11,625,176 $23,250,352 CHOCTAW SH RIGHT OF WAY 2019 SH-109 OVER HANUBBY CREEK NEAR GAY OKLAHOMA $54,500 $54,500 CHOCTAW SH UTILITIES 2019 SH-109 OVER HANUBBY CREEK NEAR GAY OKLAHOMA STP $43,600 $10,900 $54,500 CHOCTAW $43,600 $65,400 $109,000 CIMARRON US RIGHT OF WAY US-287 BEG APPROX 13.2 MILE NORTH OF BOISE CITY NORTH 2019 APPROX 5.3 MI $565,687 $565,687 CIMARRON US UTILITIES US-287 BEG APPROX 13.2 MILE NORTH OF BOISE CITY NORTH 2019 APPROX 5.3 MI NHPP $571,280 $571,280 CIMARRON US GRADE, DRAIN & SURFACE 2019 US-385: BOISE CITY SQUARE AND NORTH CIMARRON AVENUE NHPP $4,576,000 $1,144,000 $5,720,000 CIMARRON $5,147,280 $1,709,687 $6,856,967 CLEVELAND SH RIGHT OF WAY SH-9: FROM EAST END OF PECAN CREEK BRIDGE, EAST 5.55 MI 2019 TO SH-102 $1,635,000 $1,635,000 CLEVELAND SH UTILITIES SH-9: FROM EAST END OF PECAN CREEK BRIDGE, EAST 5.55 MI 2019 TO SH-102 STP $436,000 $109,000 $545,000 CLEVELAND IS RIGHT OF WAY I-35 UNDER INDIAN HILLS ROAD, 7.39 MI NORTH OF MCCLAIN 2019 C/L $112,270 $112,270 CLEVELAND IS UTILITIES I-35 UNDER INDIAN HILLS ROAD, 7.39 MI NORTH OF MCCLAIN 2019 C/L NHPP $50,521 $5,614 $56,135 CLEVELAND IS RIGHT OF WAY I-44: FROM JUST SOUTH OF 89TH STREET, NORTH TO 0.5 MI 2019 NORTH OF 89TH STREET $230,895 $230,895 CLEVELAND IS UTILITIES I-44: FROM JUST SOUTH OF 89TH STREET, NORTH TO 0.5 MI 2019 NORTH OF 89TH STREET NHPP $646,510 $161,627 $808,137 CLEVELAND SH RIGHT OF WAY 2019 SH-37 OVER UNNAMED CREEK, 5.3 MI EAST OF JCT I-44 $109,000 $109,000 CLEVELAND SH UTILITIES 2019 SH-37 OVER UNNAMED CREEK, 5.3 MI EAST OF JCT I-44 STP $43,600 $10,900 $54,500 CLEVELAND $1,176,631 $2,374,306 $3,550,937 COAL SH BRIDGE & APPROACHES 2019 SH-43 OVER MILL CREEK, 7.04 MI EAST OF US-75 STP $2,881,678 $720,484 $3,602,162 COAL US BRIDGE REHABILITATION US-75 OVER BRIAR CREEK, 5.56 MI NORTH OF ATOKA C/L /18/18 Modification - Moved to FFY18 7/18/2018 NHPP COAL $2,881,678 $720,484 $3,602,162

6 COMMANCHE SH UTILITIES SH 17: OVER LITTLE BEAVER CREEK 5.80 MIS. E. OF US 277 IN 2019 ELGIN $121,278 $30,319 $151,597 COMMANCHE SH RIGHT OF WAY SH 17: OVER LITTLE BEAVER CREEK 5.80 MIS. E. OF US 277 IN 2019 ELGIN $236,000 $59,000 $295,000 COMANCHE US277 3 RIGHT OF WAY US-277: BEGIN 1.56 MIS N. OF COTTON C/L, EXTEND N MILES $343,732 $343,732 COMANCHE US277 3 UTILITIES US-277: BEGIN 1.56 MIS N. OF COTTON C/L, EXTEND N MILES STP $323,512 $80,878 $404,390 COMANCHE SH RIGHT OF WAY 2019 SH-115 OVER UNNAMED CREEK JUST SOUTH OF MEERS STORE $43,001 $43,001 COMANCHE SH UTILITIES 2019 SH-115 OVER UNNAMED CREEK JUST SOUTH OF MEERS STORE STP $52,000 $13,000 $65,000 SH58:FROM SH 49 NW 6.4 MIS. 10/22/18 Amendment Increase = Fed increase = $2,209,600 State decrease = COMANCHE SH RIGHT OF WAY 2019 $2,209,600 10/22/2018 $2,209,600 $552,400 $2,762,000 COMANCHE SH UTILITIES 2019 SH58:FROM SH 49 NW 6.4 MIS. STP $936,451 $234,113 $1,170,564 COMANCHE $3,878,841 $1,356,443 $5,235,284 COTTON SH005A 0.55 BRIDGE & APPROACHES SH-5A OVER WEST CACHE CREEK AND TWO O'FLOW BRIDGES BEGIN APPROX 3.45 MIS E. OF JCT US-277 EXTEND E. APPROX 0.55 MIS. 10/16/18 Modification Increase = $584,503 Fed 2019 increase = $467,602 State increase = $116,901 10/16/2018 STP $3,266,678 $816,670 $4,083,348 COTTON SH005A 0.1 RIGHT OF WAY SH-5: OVER COX CREEK APPROXIMATELY 11.6 MILES E. OF TILLMAN C/L 10/17/18 Modification Decrease = $141, Fed increase = $30,400 State decrease = $ 7,600 10/17/2018 $30,400 $7,600 $38,000 COTTON SH005A 0.1 UTILITIES SH-5: OVER COX CREEK APPROXIMATELY 11.6 MILES E. OF TILLMAN C/L 10/17/18 Modification Decrease = $122, Fed decrease = $98,261 State decrease = $24,565 10/17/2018 STP $117,123 $29,281 $146,404 COTTON $3,414,201 $853,551 $4,267,752 CRAIG SH FORCE ACCOUNR BNSF FORCE ACCT FOR SH-2 SIG & SURF, AARDOT NO S, 2019 MILEPOST CHEROKEE SUBDIVISION 11/26/2018 NHPP $170,734 $42,683 $213,417 CRAIG SH GRADE, DRAIN & SURFACE SH-2: BEGINNING AT US-60 & EXTENDING NORTH TO HOSPITAL 2019 ROAD IN VINITA. NHPP $8,182,484 $2,045,621 $10,228,105 CRAIG $8,353,218 $2,088,304 $10,441,522 CREEK IS MONEY ONLY 2019 I-44 (TURNER TURNPIKE) OVER SH-66 $10,000,000 $10,000,000 CREEK SH048 PAVEMENT 6.38 REHABILITATION SH 48 BEGIN MILES NORTH OF SH 66 EAST JCT AND EXT 2019 NORTH 6.38 MI $4,400,000 $1,100,000 $5,500,000 CREEK SH UTILITIES 2019 SH-16 OVER THE TURNER TURNPIKE (I-44) NHPP $89,816 $22,454 $112,270 CREEK SH RIGHT OF WAY 2019 SH-16 OVER THE TURNER TURNPIKE (I-44) $112,270 $112,270 CREEK SH RIGHT OF WAY 2019 SH-16: FROM 1.0 MILE EAST OF JCT. SH-48N, EAST 4.5 MILES $1,007,925 $1,007,925 CREEK SH UTILITIES 2019 SH-16: FROM 1.0 MILE EAST OF JCT. SH-48N, EAST 4.5 MILES STP $268,800 $67,200 $336,000 CREEK SH RIGHT OF WAY 2019 SH 66 FR EAST OF DEPEW, EAST TO THE BRISTOW CITY LIMITS $1,711,300 $1,711,300 CREEK SH UTILITIES 2019 SH 66 FR EAST OF DEPEW, EAST TO THE BRISTOW CITY LIMITS STP $697,600 $174,400 $872,000 CREEK SH RIGHT OF WAY 2019 SH-16 OVER SAND CREEK, 0.7 MILES EAST OF THE JCT. SH-48 $115,540 $115,540 CREEK SH UTILITIES 2019 SH-16 OVER SAND CREEK, 0.7 MILES EAST OF THE JCT. SH-48 STP $92,432 $23,108 $115,540 CREEK SH RIGHT OF WAY 2019 SH-99 OVER THE CIMARRON RIVER, 4.4 MILES E S PAYNE C/L $54,500 $54,500 CREEK SH UTILITIES 2019 SH-99 OVER THE CIMARRON RIVER, 4.4 MILES E S PAYNE C/L STP $43,600 $10,900 $54,500 CREEK $5,592,248 $14,399,597 $19,991,845 CUSTER IS UTILITIES I-40 UNDER AIRPORT ROAD, 4.3 MILES EAST OF SH-54 IN 2019 WEATHERFORD. NHPP $95,400 $10,600 $106,000 CUSTER IS RIGHT OF WAY I-40: UNDER AIRPORT ROAD 4.3 MILES EAST OF SH-54 IN 2019 WEATHERFORD. STP $106,000 $106,000 CUSTER IS RESURFACE I-40: RESURFACE BEGINNING AT MP 59.2 AND EXTEND EAST TO 2019 MP $4,087,500 $4,087,500 $8,175,000

7 CUSTER BRIDGE WATERPROOF SEAL 2019 DIVISION 5 SILANE TREATMENT STP $87,200 $21,800 $109,000 CUSTER IS GRADE, DRAIN & SURFACE I-40: MODIFY THE I-40 EAST BOUND ON RAMP TO EXTEND TO THE SOUTH FRONTAGE ROAD. PHASE III WORK WITH 20% 2019 WEATHERFORD PARTICIPATION. NHPP $666,995 $166,749 $833,744 CUSTER SH & SURFACE SH-33: GR DR SURF & BR OVER THE FARMRAIL R/R AND TWO 2019 RCBS LOCATED 13.1 MILES EAST OF THE US-183 JCT. $6,219,338 $6,219,338 CUSTER IS BRIDGE & APPROACHES I-40 NORTH FRONTAGE ROAD, OVER LITTLE DEEP CREEK, 5.3 MI 2019 EAST OF SH-54 STP $1,507,117 $1,507,117 CUSTER BRIDGE PAINTING 2019 DIVISION 5 BRIDGE PAINTNG SITES TO BE DETERMINED STP $436,000 $109,000 $545,000 CUSTER SH RIGHT OF WAY SH-33, RECONSTRUCT PAVEMENT BEG 0.37 M EAST OF SH-47 AND EXT EAST.67 MILE. IN THE CITY OF THOMAS (10TH ST TO ST ST) $272,500 $272,500 CUSTER SH UTILITIES SH-33, RECONSTRUCT PAVEMENT BEG 0.37 M EAST OF SH-47 AND EXT EAST.67 MILE. IN THE CITY OF THOMAS (10TH ST TO ST ST) STP $218,000 $54,500 $272,500 CUSTER IS RIGHT OF WAY 2019 I-40 FRONTAGE ROAD, BRIDGE AND APPROACHES OVER DRY CREEK LOCATED 5.8 MILES NE OF THE WASHITA COUNTY LINE. $27,250 $27,250 I-40 FRONTAGE ROAD, BRIDGE AND APPROACHES OVER DRY CUSTER IS UTILITIES 2019 CREEK LOCATED 5.8 MILES NE OF THE WASHITA COUNTY LINE. NHPP $21,800 $5,450 $27,250 CUSTER $5,612,895 $12,421,055 $166,749 $18,200,699 DELAWARE SH085A 0.5 BRIDGE & APPROACHES 2019 SH 85A OVER HORSE CREEK, 3.5 MI EAST OF SH 85 STP $8,240,000 $2,060,000 $10,300,000 DELAWARE $8,240,000 $2,060,000 $10,300,000 GARFIELD US GRADE, DRAIN & SURFACE US 81: FROM 4.5 MILES NORTH OF SH-45, EXTEND NORTH MILES TO THE GRANT COUNTY LINE STP $4,120,000 $824,000 $4,944,000 GARFIELD US GRADE, DRAIN & SURFACE US 81: FROM SH-45, EXTEND NORTH 4.5 MILES TO 4.5 MILES 2019 SOUTH OF THE GRANT COUNTY LINE. STP $3,296,000 $824,000 $4,120,000 GARFIELD US060 PAVEMENT 4.38 REHABILITATION US 60: FROM CHESTNUT AVE. IN ENID N. APPROX. 4.4 MILES TO 2019 THE SH-45 JCT STP $2,472,000 $618,000 $3,090,000 GARFIELD US GRADE, DRAIN & SURFACE US-64/US-412: EB & WB BRIDGES OVER BLACKBEAR CR MIS. E. OF THE US-81 JCT 10/16/18 Modification Decrease 2019 = $138,444 Fed increase = $77,400 State decrease = $215,844 10/16/2018 NHPP $1,693,400 $188,156 $1,881,556 GARFIELD $11,581,400 $2,454,156 $14,035,556 GARVIN SH BRIDGE & APPROACHES SH-74 OVER UNNAMED CREEK, 6.33 MI NORTH OF SH-29 12/7/18 Modification Increase = $224,910 Fed increase = 2019 $180,728 State increase = $45,182 12/7/2018 STP $1,459,488 $364,872 $1,824,360 GARVIN US RIGHT OF WAY US-77 OVER UNNAMED CREEK & WASHITA RIVER OVERFLOW, 2019 FROM 1.78 MI NORTH & EAST OF MURRAY C/L, EAST 0.86 MI $853,537 $853,537 GARVIN US UTILITIES US-77 OVER UNNAMED CREEK & WASHITA RIVER OVERFLOW, 2019 FROM 1.78 MI NORTH & EAST OF MURRAY C/L, EAST 0.86 MI STP $535,288 $133,821 $669,109 GARVIN SH RIGHT OF WAY SH-19: FROM 2.40 MI NORTHEAST OF US-77, NORTHEAST THEN 2019 EAST 4.88 MI $1,347,240 $1,347,240 GARVIN SH UTILITIES SH-19: FROM 2.40 MI NORTHEAST OF US-77, NORTHEAST THEN 2019 EAST 4.88 MI STP $461,770 $115,442 $577,212 GARVIN IS RESURFACE 2019 I-35: FROM MP 66.2, EXTEND SOUTH TO MP NHPP $2,121,800 $272,285 $2,394,085 GARVIN $4,578,346 $3,087,197 $7,665,543 GRADY SH & SURFACE SH-37: BEGIN 0.8 MIS E. OF US-81 IN MINCO, EXT E. 3.8 MI TO BRAUM'S ROAD W. OF TUTTLE 10/22/18 Amendment 2019 Increase = $4,891,638 State increase = $2,345,083 10/22/2018 STP $9,380,331 $2,345,083 $11,725,414 GRADY US RIGHT OF WAY US 277:OVER SMITH CREEK 2.7 MIS. W. OF US 81 10/17/18 Modification Increase = $178,968 Fed increase = $296, State decrease = $117,832 10/17/2018 STP $296,800 $74,200 $371,000

8 GRADY US UTILITIES 2019 US 277:OVER SMITH CREEK 2.7 MIS. W. OF US 81 STP $588,675 $147,168 $735,843 GRADY SH RIGHT OF WAY SH 19:FROM MIS. E. OF US 81 E MIS. TO THE WASHITA RIVER BRIDGE 10/22/18 Modification Increase = 2019 $273,500 Fed increase = $872,800 State decrease = $599,300 10/22/2018 stp $872,800 $218,200 $1,091,000 GRADY SH UTILITIES SH 19:FROM MIS. E. OF US 81 E MIS. TO THE WASHITA RIVER BRIDGE 10/17/18 Modification Decrease = 2019 $714,937 Fed decrease = $571,950 State decrease = $142,987 10/17/2018 STP $256,450 $64,113 $320,563 GRADY $11,395,056 $2,848,764 $14,243,820 HARMON SH BRIDGE & APPROACHES SH-30: OVER ELM FORK OF THE RED RIVER, 7.6 MI NORTH OF SH STP $1,952,218 $1,952,218 $3,904,436 HARMON $1,952,218 $1,952,218 $3,904,436 HARPER BRIDGE PAINTING 2019 DIVISION 6 BRIDGE PAINT STP $80,000 $20,000 $100,000 HARPER JOINT SEAL / REPAIR 2019 DIVISION 6 BRIDGE JOINT STP $40,000 $10,000 $50,000 HARPER BRIDGE WATERPROOF SEAL 2019 DIVISION 6 BRIDGE SILANE STP $40,000 $10,000 $50,000 HARPER SAFETY IMPROVEMENT DIVISION SIX SAFETY IMPROVEMENTS (SITES TO BE 2019 DETERMINED) STP $200,000 $50,000 $250,000 HARPER US RIGHT OF WAY US-183: BEGIN 8.6 MILES N. OF THE WOODWARD CO. LN., 2019 EXTEND N. 4.3 MILES $570,000 $570,000 HARPER US UTILITIES US-183: BEGIN 8.6 MILES N. OF THE WOODWARD CO. LN., 2019 EXTEND N. 4.3 MILES STP $400,000 $400,000 $800,000 HARPER $760,000 $1,060,000 $1,820,000 HASKELL SH MONEY ONLY EUFAULA SPILLWAY BRIDGE,.1 MI. WEST OF 2019 HASKELL/MCINTOSH C/L STP $2,000,000 $2,000,000 $4,000,000 HASKELL $2,000,000 $2,000,000 $4,000,000 JACKSON SH005A 0.25 BRIDGE & APPROACHES SH-5: BRIDGE AND APPROACHES OVER SANDY CREEK LOCATED 2.3 MILE NW OF THE SH-6 JUNCTION. 12/7/18 Modification Increase = $7,842 Fed increase = $6,474 State increase = 2019 $1,568 12/7/2018 STP $1,973,232 $493,908 $2,467,140 JACKSON SH BRIDGE & APPROACHES SH-6: BRIDGE AND APPROACHES OVER UNNAMED CREEK 2019 LOCATED 2.6 MILES NORTHEAST OF THE SH-34 JUNCTION. STP $1,174,377 $1,174,377 JACKSON SH RIGHT OF WAY SH-19, BRIDGE AND APPROACHES OVER THE N. FORK OF THE 2019 RED RIVER LOCATED AT THE JACKSON/KIOWA COUNTY LINE. $109,000 $109,000 JACKSON SH UTILITIES SH-19, BRIDGE AND APPROACHES OVER THE N. FORK OF THE 2019 RED RIVER LOCATED AT THE JACKSON/KIOWA COUNTY LINE. STP $109,000 $109,000 JACKSON $2,082,232 $1,777,285 $3,859,517 JOHNSTON SH RESURFACE 2019 SH-7 OVER PECAN CREEK, 0.8 MI EAST OF SH-99 $2,775,264 $693,816 $3,469,080 JOHNSTON SH BRIDGE & APPROACHES 2019 SH-7 OVER PECAN CREEK, 0.8 MI EAST OF SH-99 $1,588,046 $397,012 $1,985,058 JOHNSTON SH048 1 RIGHT OF WAY SH-48: BEGIN 1.0 MI SOUTH OF JOHNSTON C/L, EXTEND NORTH MI $393,048 $393,048 JOHNSTON SH048 1 UTILITIES SH-48: BEGIN 1.0 MI SOUTH OF JOHNSTON C/L, EXTEND NORTH MI STP $393,048 $393,048 JOHNSTON SH RIGHT OF WAY 2019 SH-48 OVER SANDY CREEK, 0.60 MI NORTH OF JCT SH-7 $109,000 $109,000 JOHNSTON SH UTILITIES 2019 SH-48 OVER SANDY CREEK, 0.60 MI NORTH OF JCT SH-7 STP $43,600 $10,900 $54,500 JOHNSTON SH RIGHT OF WAY SH-48: OVER DELAWARE CREEK AND WALNUT CREEK, BEGIN MI NORTH OF JCT SH-7 $299,750 $299,750 JOHNSTON SH UTILITIES SH-48: OVER DELAWARE CREEK AND WALNUT CREEK, BEGIN MI NORTH OF JCT SH-7 STP $130,800 $32,700 $163,500 JOHNSTON SH048A 0.02 BRIDGE REHABILITATION SH-48A OVER BIG SANDY CREEK, 3.4 MI WEST OF JCT SH-48 (REDECK AND SUBSTRUCTURE REPAIR) 7/18/18 Modification Moved to FFY18. 7/18/2018 STP JOHNSTON $4,930,757 $1,936,226 $6,866,983

9 KAY IS BRIDGE & APPROACHES 2019 I-35: BRIDGE AND APPROACHES OVER US-60 NHPP $4,040,000 $1,010,000 $5,050,000 KAY $4,040,000 $1,010,000 $5,050,000 SH-33: PAVEMENT REHABILITATION IN KINGFISHER ON SH-33 KINGFISHER SH033 PAVEMENT 0.25 REHABILITATION FROM US-81 JCT 0.4 MI EAST TO SECOND STREET; ON US-81, 2019 FROM SH-33 JCT, 2 BLKS SOUTH $480,000 $120,000 $600,000 KINGFISHER SH & SURFACE SH-51: FROM US-81 IN HENNESSEY EAST MI INCLUDES RCB 2019 EXTENSIONS & RCB REPLACEMENT OVER CAMP CREEK STP $11,312,000 $2,828,000 $14,140,000 KINGFISHER SH RIGHT OF WAY 2019 SH-33:FROM THE LOGAN COUNTY LINE, EXTEND WEST 5.0 MILES $103,000 $103,000 KINGFISHER SH UTILITIES 2019 SH-33:FROM THE LOGAN COUNTY LINE, EXTEND WEST 5.0 MILES STP $82,400 $20,600 $103,000 KINGFISHER US BRIDGE PAINTING CIMARRON RIVER, NB AND SB BRIDGES ON I-44 OVER BLACK 2019 GOLD DRIVE AND BNSF NHPP $2,080,600 $520,150 $2,600,750 KINGFISHER $13,955,000 $3,591,750 $17,546,750 KIOWA US062B 0.3 UTILITIES US-62B, OVER EAST OTTER & TWO UNNAMED CREEKS, 0.8 & MI WEST OF THE US-183 JCT. STP $65,400 $16,351 $81,751 KIOWA US062B 0.3 RIGHT OF WAY US-62B, OVER EAST OTTER & TWO UNNAMED CREEKS, 0.8 & MI WEST OF THE US-183 JCT. $81,750 $81,750 KIOWA SH UTILITIES SH-49, OVER AN UNNAMED CREEK, 1.2 EAST OF SH-54 STP $43,600 $10,900 $54,500 KIOWA SH RIGHT OF WAY 2019 SH-49, OVER AN UNNAMED CREEK, 1.2 EAST OF SH-54 $54,500 $54,500 KIOWA SH UTILITIES SH-115, THREE BRIDGES, TWO OVER TRIB OF SADDLE MTN CRK, OVER SADDLE NTN CRK, 1.8, 2.0, & 2.2 MI NW OF THE 2019 COMANCHE C/L $65,400 $16,351 $81,751 KIOWA SH RIGHT OF WAY SH-115, THREE BRIDGES, TWO OVER TRIB OF SADDLE MTN CRK, OVER SADDLE NTN CRK, 1.8, 2.0, & 2.2 MI NW OF THE 2019 COMANCHE C/L $81,750 $81,750 KIOWA SH & SURFACE SH-6: BEGIN 5.2 MI. S. OF THE SH-55E JCT. IN BECKHAM CO. & EXT. N. 5.0 MI. 10/16/18 Modification Increase = $1,252,010 Fed increase = $1,001,608 State increase = $250,402 12/7/18 Modification Decrease =13,085 Fed decrease = 2019 $10,469 State decrease = $2,617 12/7/2018 STP $18,041,309 $4,510,327 $22,551,636 KIOWA US062E 0.2 BRIDGE & APPROACHES 2019 US-62B: OVER E. FORK DEEP RED CREEK, 2.4 MI EAST OF US-183 STP $948,810 $237,202 $1,186,012 KIOWA $19,164,519 $5,009,131 $24,173,650 LINCOLN SH066B 0.2 UTILITIES 2019 SH-66B OVER CAPTAIN CREEK, 1.5 MI NORTHEAST OF SH-66 STP $92,432 $23,108 $115,540 LINCOLN US177 5 RIGHT OF WAY 2019 US-177: FROM SH-105, NORTH 5.01 MI T0 PAYNE C/L $2,457,535 $2,457,535 LINCOLN US177 5 UTILITIES 2019 US-177: FROM SH-105, NORTH 5.01 MI T0 PAYNE C/L STP $1,038,036 $259,509 $1,297,545 LINCOLN SH RIGHT OF WAY SH-99 OVER SAND & UNNAMED CREEKS, & MI 2019 NORTH OF SH-66 $224,360 $224,360 LINCOLN SH UTILITIES SH-99 OVER SAND & UNNAMED CREEKS, & MI 2019 NORTH OF SH-66 STP $89,756 $22,440 $112,196 LINCOLN SH RIGHT OF WAY SH-102: OVER UNNAMED CREEK, FROM 9.85 MIS NORTH OF US JCT, EXT NORTH 0.50 MIS $163,500 $163,500 LINCOLN SH UTILITIES SH-102: OVER UNNAMED CREEK, FROM 9.85 MIS NORTH OF US JCT, EXT NORTH 0.50 MIS STP $87,200 $21,800 $109,000 LINCOLN $1,307,424 $3,172,252 $4,479,676 LOGAN SH BRIDGE & APPROACHES SH 51: OVER WEST BEAVER CREEK 12.6 MILES EAST OF THE KINGFISHER C/L 10/16/18 Modification Decrease = 2019 $246,907 Fed decrease = $197,526 State decrease = $49,381 10/16/2018 STP $2,549,674 $637,419 $3,187,093 LOGAN SH BRIDGE & APPROACHES SH 51: OVER MIDDLE BEAVER CREEK 13.7 MILES EAST OF THE KINGFISHER C/L 10/16/18 Modification Increase = 2019 $310,417 Fed increase = $248,334 State increase = $62,083 10/16/2018 STP $1,137,134 $284,283 $1,421,417

10 LOGAN $3,686,808 $921,702 $4,608,510 LOVE IS BRIDGE & APPROACHES I-35: COUNTY ROAD E2180 OVER I MIS. N. OF THE TEXAS 2019 STATE LINE NHPP $1,820,081 $455,020 $2,275,101 LOVE SH UTILITIES SH-32: OVER WILSON CREEK BEGIN APPROX 0.3 MILES W. OF 2019 MARSHALL C/L STP $31,972 $127,888 $159,860 LOVE US RIGHT OF WAY US-77: FROM APPROX 1.0 MILE N. OF TEXAS STATE LINE, EXTEND 2019 N. 5.1 MILES. $1,024,600 $1,024,600 LOVE US UTILITIES US-77: FROM APPROX 1.0 MILE N. OF TEXAS STATE LINE, EXTEND 2019 N. 5.1 MILES. STP $1,229,520 $307,380 $1,536,900 LOVE $3,049,601 $1,818,972 $127,888 $4,996,461 MAYES SH BRIDGE REHABILITATION SH-28 BRIDGE REHAB PENSACOLA DAM, EAST/WEST SPILL WAY BRIDGES OVER GRAND LAKE: 0.5, 2.0, & 2.3 MILES SE JCT SH (HYDROBLAST) STP $4,098,400 $1,024,600 $5,123,000 MAYES $4,098,400 $1,024,600 $5,123,000 MCCLAIN IS RIGHT OF WAY 2019 I-35/SH-9 INTERCHANGE (PHASE III) $11,208,491 $11,208,491 MCCLAIN IS UTILITIES 2019 I-35/SH-9 INTERCHANGE (PHASE III) NHPP $739,760 $184,940 $924,700 MCCLAIN IS GRADE, DRAIN & SURFACE 2019 I-35: RECONSTRUCT SOUTHBOUND RAMP AT SH-74 IN GOLDSBY NHPP $1,814,175 $307,625 $2,121,800 MCCLAIN IS & SURFACE 2019 I-35 UNDER LADD ROAD, 5.9 MI SOUTH OF CLEVELAND C/L NHPP $7,097,840 $1,774,460 $8,872,300 MCCLAIN IS BRIDGE REHABILITATION 2019 I-35 UNDER SH-74, 2.76 MI SOUTH OF CLEVELAND C/L (REDECK) NHPP $978,165 $224,540 $1,202,705 MCCLAIN SH076 3 RIGHT OF WAY 2019 SH-76: FROM SH-130, NORTH 3.0 MI TO SH-37 (ADD CAPACITY) $2,241,698 $2,241,698 MCCLAIN SH076 3 UTILITIES 2019 SH-76: FROM SH-130, NORTH 3.0 MI TO SH-37 (ADD CAPACITY) STP $448,340 $112,085 $560,425 MCCLAIN IS RESURFACE 2019 I-35: FROM SH-59, NORTH 2.4 MI NHPP $4,185,600 $1,046,400 $5,232,000 MCCLAIN $15,263,880 $17,100,239 $32,364,119 MCINTOSH US UTILITIES US-266: OVER ELK CREEK, 1.18 MILES EAST & OVER UNNAMED 2019 CREEK, 1.74 MILES EAST OF US-69 BUS. STP $74,121 $18,530 $92,651 MCINTOSH US RIGHT OF WAY US-266: OVER ELK CREEK, 1.18 MILES EAST & BRIDGE OVER 2019 UNNAMED CREEK, 1.74 MILES EAST OF US-69 BUS. $174,400 $43,600 $218,000 MCINTOSH IS BRIDGE & APPROACHES I-40: BRIDGES OVER RAILROAD AND CO RD, 20 MI EAST OF OKMULGEE CO LINE 10/22/18 Amendment Increase = $ Fed decrease = $5,955,320 State increase = $10,494,371 12/7/18 Modification Increase = $13,404 Fed 2019 increase = $2,681 Stateincrease = $10,323 12/4/2018 NHPP $3,198,201 $12,792,805 $15,991,006 PAVEMENT REHABILITATION 2019 MCINTOSH US MCINTOSH US-69: FROM PITTSBURG C/L NORTH APPROX MILES TO JCT SH-9 NHPP $20,897,442 $5,224,360 $26,121,802 $24,344,164 $18,079,295 $42,423,459 MURRAY SH RESURFACE SH 7: PAVEMENT REPLACEMENT FROM 3RD ST. TO 10TH ST. IN 2019 DAVIS STP $1,626,327 $1,626,327 MURRAY SH RIGHT OF WAY 2019 SH 110: FROM JUST N. OF PRIMROSE LN. N MIS. $100,000 $100,000 MURRAY SH UTILITIES 2019 SH 110: FROM JUST N. OF PRIMROSE LN. N MIS. STP $120,000 $30,000 $150,000 MURRAY $120,000 $1,756,327 $1,876,327 MUSKOGEE US UTILITIES US-62: BRIDGE OVER ARKANSAS RIVER, 2.4 MILES EAST OF SH JCT. (WESTBOUND & EASTBOUND) STP $218,000 $54,500 $272,500 MUSKOGEE US RIGHT OF WAY US-62: BRIDGE OVER ARKANSAS RIVER, 2.4 MILES EAST OF SH JCT. (WESTBOUND & EASTBOUND) $523,200 $130,800 $654,000 MUSKOGEE BRIDGE WATERPROOF SEAL 2019 BRIDGE WATER PROOF SEAL (SITE TO BE DETERMINED) STP $40,000 $10,000 $50,000 I-40: BRIDGES OVER SH-2, APPROX. 2.3 MILES EAST OF MUSKOGEE IS JOINT SEAL / REPAIR 2019 MCINTOSH C/L NHPP $41,600 $10,400 $52,000

11 MUSKOGEE $822,800 $205,700 $1,028,500 NOBLE BRIDGE PAINTING 2019 DIVISION 4 - BRIDGE PAINT $800,000 $200,000 $1,000,000 NOBLE BRIDGE WATERPROOF SEAL 2019 DIVISION 4 - BRIDGE WATERPROOF SEAL STP $80,000 $20,000 $100,000 NOBLE BRIDGE PAINTING 2019 DIVISION 4 - BRIDGE PAINT & JOINT REPAIR STP $103,000 $103,000 NOBLE US064 5 RIGHT OF WAY US-64, SHOULDERS AND RESURFACE FROM US-177 JCT, EAST 5.0 MILES, INCLUDING WIDENING FOR THIRD LANETHROUGH 2019 MORRISON $1,010,000 $1,010,000 NOBLE US064 5 UTILITIES US-64, SHOULDERS AND RESURFACE FROM US-177 JCT, EAST 5.0 MILES, INCLUDING WIDENING FOR THIRD LANETHROUGH 2019 MORRISON STP $808,000 $202,000 $1,010,000 NOBLE $1,791,000 $1,432,000 $3,223,000 OKFUSKEE US RIGHT OF WAY US-75: FROM 7.07 MI NORTH OF HUGHES C/L, NORTH 4.23 MI 2019 TO JUST NORTH OF I-40 $865,860 $865,860 OKFUSKEE US UTILITIES US-75: FROM 7.07 MI NORTH OF HUGHES C/L, NORTH 4.23 MI 2019 TO JUST NORTH OF I-40 STP $923,621 $230,905 $1,154,526 OKFUSKEE IS RESURFACE 2019 I-40: FROM 7.79 MI EAST OF SEMINOLE C/L, EAST 5.97 MI NHPP $5,101,200 $1,275,300 $6,376,500 OKFUSKEE $6,024,821 $2,372,065 $8,396,886 OKLAHOMA SIGNING 2019 OKC METRO: HIGHWAY SIGNING ENHANCEMENT $1,600,000 $400,000 $2,000,000 OKLAHOMA SH UTILITIES SH-66: FROM 5.57 MIS. E. OF I-35 (DIVISION ST). EXTEND EAST 2019 APPR. 1 MILE THROUGH ARCADIA $80,000 $20,000 $100,000 OKLAHOMA SH RIGHT OF WAY SH-66: FROM 5.57 MIS. E. OF I-35 (DIVISION ST). EXTEND EAST 2019 APPR. 1 MILE THROUGH ARCADIA $460,000 $40,000 $500,000 I-235: NB TO WB & EB TO NB FLYOVER BRIDGES I-235/I-44 OKLAHOMA IS & SURFACE 2019 INTERCHANGE NHPP $28,280,000 $7,070,000 $35,350,000 OKLAHOMA IS & SURFACE I-235: MAINLINE THRU I-44 INTERCHANGE 5/17/18 Amendment Increase =$35,350,000 Fed increase =$36,360,000 State decrease = $1,010,000 10/16/18 Modification Increase = 5,800,337 Fed decrease = $68,419,831 State increase = 2019 $65,220,169 10/16/2018 NHPP $43,300,169 $43,300,169 $86,600,338 I-35: NB & SB BRIDGES OVER WATERLOO ROAD AT THE LOGAN OKLAHOMA IS RIGHT OF WAY 2019 C/L $1,545,000 $1,545,000 OKLAHOMA IS044 PAVEMENT 0.75 REHABILITATION I-44: DOWEL BAR RETROFIT AND DIAMOND GRINDING FROM SW 74TH ST, NORTH TO THE OKLAHOMA RIVER, ADDED LANE ON SB 2019 FROM 0.5 SOUTH OF 74TH ST NHPP $8,080,000 $2,020,000 $10,100,000 OKLAHOMA IS BRIDGE REHABILITATION I-44: BRIDGE REHABILITATION OVER I-240, 1.3 MILES NORTH OF THE CLEVELAND COUNTY LINE INCLUDING RAMP AND NB 2019 MAINLINE NHPP $2,424,000 $606,000 $3,030,000 OKLAHOMA IS BRIDGE REHABILITATION I-44: NB AND SB BRIDGE REHABILITATION OVER 59TH ST, MILES SOUTH OF THE SH-152 JCT NHPP $1,212,000 $303,000 $1,515,000 OKLAHOMA IS BRIDGE REHABILITATION I-44; EB & WB SW 29TH OVER, APPROX MLS NORTH OF 2019 CLEVELAND C/L NHPP $1,616,000 $404,000 $2,020,000 OKLAHOMA IS BRIDGE REHABILITATION 2019 I-44: NB AND SB BRIDGES OVER OKLAHOMA RIVER NHPP $2,020,000 $505,000 $2,525,000 OKLAHOMA IS BRIDGE REHABILITATION I-44: EASTBOUND BRIDGE OVER INDEPENDENCE AVENUE, MILES NORTH OF THE I-240 INTERCHANGE NHPP $404,000 $101,000 $505,000 OKLAHOMA $89,476,169 $56,314,169 $145,790,338 OKMULGEE US075 INTERSECTION MODIFICATION US-75: SAFETY IMPROVEMENT(LEFT TURN LANES),( BETWEEN OKMULGEE & BEGGS) FROM APPROX. 1.4 MI. N. OF SH-56 LOOP, N. APPROX. 3.5 MI. 8/9/18 Amendment Increase = $1,086,567 Fed increase = $549,255 State increase = $537, /7/18 Moved from FFY18 12/7/2018 NHPP $2,149,255 $537,312 $2,686,567 OKMULGEE US075 INTERSECTION 4.7 MODIFICATION US-75: FROM 7.5 MI NORTH OF US-62 NORTH 4.7 MI (LEFT TURN LANES) 7/18/18 Modification Decrease = $1,171,077 Fed decrease = $486,861 State decrease = $234,216 12/7/ Modification, Move from FFY18. 12/7/2018 NHPP $783,139 $195, ,923

12 US-75: BRIDGES OVER COAL CR. & KO & G R.R. (ABANDONED), OKMULGEE US BRIDGE & APPROACHES MI. & 1.2 MI. NORTH OF I-40 NHPP $942,850 $3,771,401 $4,714,251 OKMULGEE $3,875,244 $4,504,497 $8,379,741 OSAGE SH099 1 BRIDGE & APPROACHES 2019 SH-99: OVER CANEY RIVER, APRROX. 7.5 MILES NORTH OF SH- 99/SH-10 JCT. STP $4,841,494 $1,210,374 $6,051,868 OSAGE SH011 2 RIGHT OF WAY 2019 SH-11: FR BARNSDALL, EXTEND SOUTHEAST APPROX. 2.0 MILES $1,974,613 $1,974,613 OSAGE SH011 2 UTILITIES 2019 SH-11: FR BARNSDALL, EXTEND SOUTHEAST APPROX. 2.0 MILES STP $928,205 $232,053 $1,160,258 OSAGE SH BRIDGE & APPROACHES 2019 SH-18: OVER SALT CREEK, 2.0 MILES NORTH OF THE PAWNEE C/L STP $4,551,455 $4,551,455 OSAGE SH RIGHT OF WAY SH-11: FROM 2 MILES S.E. OF BARNSDALL EXTEND S.E MILES $141,789 $141,789 OSAGE SH UTILITIES SH-11: FROM 2 MILES S.E. OF BARNSDALL EXTEND S.E MILES NHPP $152,260 $38,065 $190,325 OSAGE SH BRIDGE & APPROACHES 2019 SH-20: SYCAMORE CREEK, 7.9 MILE EAST OF SH-18 STP $1,748,363 $437,090 $2,185,453 OSAGE SH BRIDGE & APPROACHES 2019 SH-20: BUG CREEK, 11.5 MI EAST OF JCT. SH18 STP $5,448,990 $1,362,248 $6,811,238 OSAGE SH020 INTERSECTION 0.25 MODIFICATION SH-20: INTERSECTION AT SH-20 & JAYVINE HILL ROAD, MILES WEST OF SH-11 NHPP $2,737,285 $684,320 $3,421,605 OSAGE SH BRIDGE & APPROACHES 2019 SH-99: OVER POND CREEK, 5.1 MILES NORTH OF SH-10 JCT. STP $5,108,800 $1,277,200 $6,386,000 OSAGE SH GRADE, DRAIN &BRIDGE SH-11: OVER RED EAGLE BRANCH CREEK, 9.2 MILES EAST OF JCT SH-99 STP $674,159 $168,540 $842,699 OSAGE SH BRIDGE & APPROACHES 2019 SH 99 OVER BIRCH CREEK, 2.7 MI NORTH OF JCT SH 10 STP $975,002 $243,753 $1,218,755 OSAGE US BRIDGE & APPROACHES 2019 US-60 OVER SALT CREEK, 1.2 MI WEST OF THE JCT OF SH-18 NHPP $1,921,915 $480,478 $2,402,393 OSAGE SH RIGHT OF WAY SH 18 BRIDGE AND APPROACHES OVER SALT CREEK LOCATED MI N PAWNEE CL $109,090 $109,090 OSAGE SH UTILITIES SH 18 BRIDGE AND APPROACHES OVER SALT CREEK LOCATED MI N PAWNEE CL STP $84,872 $21,218 $106,090 OSAGE $24,621,345 $12,932,286 $37,553,631 OTTAWA SH069A 0.6 UTILITIES INTERSECTION AT SH-69A & SH-10 IN MIAMI, TURNING 2019 MOVEMENTS $160,000 $40,000 $200,000 OTTAWA SH069A 0.6 RIGHT OF WAY INTERSECTION AT SH-69A & SH-10 IN MIAMI, TURNING 2019 MOVEMENTS $240,000 $60,000 $300,000 OTTAWA US UTILITIES 2019 US 59 FROM JCT SH 125 NORTHWEST TO I-44 $853,802 $213,451 $1,067,253 OTTAWA US RIGHT OF WAY 2019 US 59 FROM JCT SH 125 NORTHWEST TO I-44 $6,854,000 $6,854,000 OTTAWA $1,253,802 $7,167,451 $8,421,253 PAWNEE US BRIDGE & APPROACHES US-64: OVER THE PEDESTRIAN TRAIL, APPROX. 0.2 MI SOUTH OF 2019 SH-99 STP $2,153,894 $538,473 $2,692,367 PAWNEE US RIGHT OF WAY 2019 US-64: FROM APPROX. 4.2 MILES EAST OF SH-18 EAST 2.3 MILES $650,205 $650,205 PAWNEE US UTILITIES 2019 US-64: FROM APPROX. 4.2 MILES EAST OF SH-18 EAST 2.3 MILES STP $305,634 $76,409 $382,043 PAWNEE US RIGHT OF WAY 2019 US-64: FROM JCT. SH-18 EAST 4.2 MILES $1,262,163 $1,262,163 PAWNEE US UTILITIES 2019 US-64: FROM JCT. SH-18 EAST 4.2 MILES STP $593,288 $148,322 $741,610 PAWNEE US BRIDGE & APPROACHES 2019 US-64: CEDAR CREEK, APPROX. 0.1 MILES SOUTH OF SH-99 JCT. STP $4,548,315 $1,137,078 $5,685,393 PAWNEE US RIGHT OF WAY 2019 US-64 FR. THE NOBLE C/L EAST 4.50 MILES $1,744,000 $1,744,000 PAWNEE US UTILITIES 2019 US-64 FR. THE NOBLE C/L EAST 4.50 MILES STP $784,800 $196,200 $981,000 PAWNEE $8,385,931 $5,752,850 $14,138,781 PAYNE US177 3 UTILITIES US-177: FROM THE CIMARRON TURNPIKE SPUR, EXTEND NORTH MILES STP $130,800 $32,700 $163,500 PAYNE US177 3 RIGHT OF WAY US-177: FROM THE CIMARRON TURNPIKE SPUR, EXTEND NORTH MILES STP $130,800 $32,700 $163,500

13 PAYNE $261,600 $65,400 $327,000 PITTSBURG US INTERCHANGE US-69 CONSTRUCTION KINKEAD ROAD IN 2019 MCALESTER NHPP $16,000,000 $4,000,000 $20,000,000 PITTSBURG $16,000,000 $4,000,000 $20,000,000 PONTOTOC SH WIDEN & RESURFACE 2019 SH-99: FROM 5.5 MI NORTH OF SH-99A, NORTH TO SH-3 STP $5,240,640 $1,310,160 $6,550,800 PONTOTOC $5,240,640 $1,310,160 $6,550,800 POTTAWATOMIE IS040 5 RIGHT OF WAY 2019 I-40: BRIDGES FROM (MP TO MP ) $100,000 $100,000 POTTAWATOMIE IS040 5 UTILITIES 2019 I-40: BRIDGES FROM (MP TO MP ) $100,000 $100,000 POTTAWATOMIE SH RIGHT OF WAY SH-9: FROM SH-102, EAST 5.49 MI TO END OF EXISTING 2019 CONCRETE SECTION AT WEST SIDE OF TECUMSEH $2,272,565 $2,272,565 POTTAWATOMIE SH UTILITIES SH-9: FROM SH-102, EAST 5.49 MI TO END OF EXISTING 2019 CONCRETE SECTION AT WEST SIDE OF TECUMSEH STP $1,010,063 $252,515 $1,262,578 POTTAWATOMIE SH003E 0.2 BRIDGE & APPROACHES SH-3E OVER ROCK CREEK, 3.8 MI EAST OF SH-18 12/7/18 Modification Increase = $234,776 Fed increase = $187, State increase = $46,955 12/7/2018 STP $2,436,820 $609,205 $3,046,025 POTTAWATOMIE US BRIDGE REHABILITATION 2019 US-270 OVER US-270B, 4.25 MI SOUTH OF I-40 STP $1,128,946 $1,128,946 POTTAWATOMIE US270 1 RIGHT OF WAY 2019 US-270: OVER TWO UNNAMED CREEKS, 7.2 MI EAST OF US-177 $336,810 $336,810 POTTAWATOMIE US270 1 UTILITIES 2019 US-270: OVER TWO UNNAMED CREEKS, 7.2 MI EAST OF US-177 STP $89,816 $22,454 $112,270 POTTAWATOMIE US270E 0.52 GRADE, DRAIN & SURFACE KICKAPOO STREET (US-270B) FROM KICKAPOO SPUR SOUTH TO 2019 FARRELL (SH-18) $15,450,000 $15,450,000 POTTAWATOMIE $3,536,699 $20,272,495 $23,809,194 PUSHMATAHA SH UTILITIES 2019 SH-3 OVER KIAMICHI RIVER, 8 MILES EAST OF ANTLERS NHPP $193,040 $48,260 $241,300 PUSHMATAHA BRIDGE WATERPROOF SEAL DIVISION 2: DIVISION WIDE SILANE PROJECTS (BRIDGE 2019 WATERPROOFING SEAL) STP $25,750 $25,750 $51,500 PUSHMATAHA JOINT SEAL / REPAIR 2019 DIVISION 2: BRIDGE MAINTENANCE - VARIOUS LOCATIONS STP $164,800 $41,200 $206,000 PUSHMATAHA BRIDGE PAINTING 2019 DIVISION 2: MAINTENANCE - VARIOUS LOCATIONS STP $659,200 $164,800 $824,000 PUSHMATAHA US BRIDGE & APPROACHES US-271 OVER UNNAMED CREEK APPROXIMATELY 11.1 MILES 2019 NORTH OF ANTLERS STP $1,050,105 $262,526 $1,312,631 PUSHMATAHA US BRIDGE & APPROACHES US-271 OVER UNNAMED CREEK APPROXIMATELY 5.15 MILES SW 2019 OF LEFLORE C/L STP $576,800 $144,200 $721,000 PUSHMATAHA $2,669,695 $686,736 $3,356,431 ROGER MILLS US BRIDGE & APPROACHES US-283: OVER DEAD WARRIOR CREEK, 7.4 MILES NORTH OF THE SH-47 WEST JCT. 10/16/18 Modification Decrease = 2019 $139,287 Fed decrease = $111,430 State decrease = $27,857 10/16/2018 STP $1,448,761 $362,190 $1,810,951 ROGER MILLS $1,448,761 $362,190 $1,810,951 ROGERS SH CABLE BARRIER 2019 SH-20 FROM 5.88 MILES EAST OF SH-66 EXTEND EAST 7.3 MILES INTO MAYES CL $640,000 $160,000 $800,000 ROGERS IS INTERCHANGE 2019 I-44: INTERCHANGE AT 165TH E AVE -SPLIT FUNDING REQUIRED NHPP $15,812,962 $3,953,241 $19,766,203 ROGERS US BRIDGE & APPROACHES 2019 US 412 OVER THE VERDIGRIS RIVER O'FLOW NHPP $5,127,975 $1,281,992 $6,409,967 ROGERS US RIGHT OF WAY 2019 US-412: VERDIGRIS RIVER WESTBOUND, 7.5 MILES EAST OF I-44 $54,500 $54,500 ROGERS US UTILITIES 2019 US-412: VERDIGRIS RIVER WESTBOUND, 7.5 MILES EAST OF I-44 NHPP $43,600 $10,900 $54,500 ROGERS $21,624,537 $5,460,633 $27,085,170 SEMINOLE SH009 1 GRADE, DRAIN & SURFACE SH-9: FROM 8.58 MI EAST OF SH-3E, EXTEND EAST 1.0 MI 12/7/18 Modification Increase = $1,397,651 Fed increase = 2019 $1,153,919 State increase = $243,732 12/7/2018 STP $2,709,161 $677,290 $3,386,451 SEMINOLE US UTILITIES US-270 OVER WEWOKA CREEK & RAILROAD, FROM 4.89 MI EAST 2019 OF SH-270A IN SEMINOLE, EAST 1.2 MI 10/22/2018 STP $11,175,474 $2,793,869 $13,969,343 SEMINOLE SH003E 8 RIGHT OF WAY SH-99: FROM 3.05 MI SOUTH OF US-270, SOUTH 8.0 MI (NEW 2019 PARALLEL LANES & RESURFACE EXISTING LANES) $2,616,000 $2,616,000

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018 FFY 2018 STIP: STATEWIDE RAIL CROSSING ITEM PROJECTS 99 9 1704924 R R 0 SAFETY IMPROVEMENT PROJECTS=PROTECTION DEVICES, CROSSING SURFACES, 2018 ADVANCE WARNING SIGNS, STRIPING, CLOSURES, ETC $8,000,000

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan

OKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan OKLAHOMA DEPARTMENT OF TRANSPORTATION FFY-2018 through FFY-2021 Asset Preservation Plan Table of Contents SECTION I FOREWORD - Letter from the Director SECTION II BUDGETARY PROJECTIONS SECTION III BALANCING

More information

Bowhunter Observation Survey

Bowhunter Observation Survey Oklahoma Department of Wildlife Conservation Bowhunter Observation Survey 2017-Season The Oklahoma Department of Wildlife Conservation (ODWC) sought participation from bowhunters for the second annual

More information

Bowhunter Observation Survey

Bowhunter Observation Survey Oklahoma Department of Wildlife Conservation Bowhunter Observation Survey 2016-Season The Oklahoma Department of Wildlife Conservation (ODWC) sought participation from bowhunters for the inaugural Bowhunter

More information

AWARDED: CALL ORDER: 043 PROJECT NO.:NHPPY-203N(012)3P J.P. NUMBER:2972604C BAMS NO: 130128 CALENDAR DAYS ALLOTTED: 60 NHPPY-261N(012)3P 2967604C NHPPY-264N(008)3P 2972704C COUNTY: ATOKA HIGHWAY NO.: SH-7/SH-3

More information

AWARDED: CALL ORDER: 020 PROJECT NO.:BRO-103D(059)CO J.P. NUMBER:2110304 BAMS NO: 070001 CALENDAR DAYS ALLOTTED: 120 COUNTY: ATOKA HIGHWAY NO.: COUNTY ROAD LENGTH: 0.1530 MILES DESCRIPTION : BRIDGE & APPROACHES

More information

06/01/15 AWARDED: CALL ORDER: 005 PROJECT NO.:CIRB-102C(130)RB J.P. NUMBER:2483209 BAMS NO: 150183 CALENDAR DAYS ALLOTTED: 150 COUNTY: ALFALFA HIGHWAY NO.: COUNTY ROAD (NS-255) LENGTH: 5.0300 MILES DESCRIPTION

More information

AWARDED: CALL ORDER: 030 PROJECT NO.:NHY-13N(116)TR J.P. NUMBER:2409804 BAMS NO: 070225 CALENDAR DAYS ALLOTTED: 30 COUNTY: ATOKA HIGHWAY NO.: US-69/US-75 LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNALS

More information

*REVISED-AWARDED CALL ORDER /09/13

*REVISED-AWARDED CALL ORDER /09/13 *REVISED-AWARDED CALL ORDER 180 12/09/13 AWARDED: CALL ORDER: 020 PROJECT NO.:NHPPY-101N(023)SS J.P. NUMBER:1692809 BAMS NO: 130355 CALENDAR DAYS ALLOTTED: 365 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH:

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15 AWARDED: CALL ORDER: 010 PROJECT NO.:NHPP-201N(014)RW J.P. NUMBER:1692823 BAMS NO: 150186 CALENDAR DAYS ALLOTTED: 180 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH: 3.3140 MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17 AWARDED: CALL ORDER: 010 PROJECT NO.:STP-202C(033) J.P. NUMBER:2794304 BAMS NO: 170112 CALENDAR DAYS ALLOTTED: 300 COUNTY: ALFALFA HIGHWAY NO.: SH-8 LENGTH: 0.2510 MILES LOCATION : SH-8: OVER DRIFTWOOD

More information

AWARDED: CALL ORDER: 020 PROJECT NO.:STPY-101A(072) J.P. NUMBER:2422904 BAMS NO: 090608 CALENDAR DAYS ALLOTTED: 325 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH: 2.6800 MILES DESCRIPTION : GRADING, DRAIN, AND

More information

AWARDED: CALL ORDER: 015 PROJECT NO.:STP-205C(038)3P J.P. NUMBER:3110804 BAMS NO: 150045 CALENDAR DAYS ALLOTTED: 30 COUNTY: BECKHAM HIGHWAY NO.: I-40B LENGTH: 1.6200 MILES LOCATION : I-40B: FROM THE NORTH

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15 05/04/15 AWARDED: CALL ORDER: 010 PROJECT NO.:CIRB -202C(028)RB J.P. NUMBER:2483308 BAMS NO: 150120 CALENDAR DAYS ALLOTTED: 120 COUNTY: ALFALFA HIGHWAY NO.: COUNTY ROAD (EW-08) LENGTH: 3.9690 MILES DESCRIPTION

More information

Club County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa

Club County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa Stilwell FFA Adair 9 7 Total Adair 9 7 9 F-150 E3 1456-1466 Alfalfa County 4-H Alfalfa 0 8 Cherokee FFA Alfalfa 2 0 Timberlake FFA Alfalfa 1 6 Total Alfalfa 3 14 14 Expedition A12 East 1281-1297 Atoka

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000 PROJECT NO.: E-SAP-144B(36) J.P. NUMBER: 18705(04) CALL ORDER: 010 PROPOSAL NUMBER: 000504 COUNTY: MCCLAIN HIGHWAY NO.: SH-9 DESCRIPTION: BRIDGE REPAIR LOCATION : ON SH-9 OVER I-35 APPROXIMATELY 0.5 MILE

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000 PROJECT NO.: E-SAP-144B(36) J.P. NUMBER: 18705(04) CALL ORDER: 010 PROPOSAL NUMBER: 000504 COUNTY: MCCLAIN HIGHWAY NO.: SH-9 DESCRIPTION: BRIDGE REPAIR LOCATION : ON SH-9 OVER I-35 APPROXIMATELY 0.5 MILE

More information

AWARDED: CALL ORDER: 080 PROJECT NO.: SAP-111D(41) J.P. NUMBER: 1879104 BAMS NO: 010065 CALENDAR DAYS ALLOTTED: 30 COUNTY: CHEROKEE HIGHWAY NO.: PARK ROAD LENGTH: 0.000000 MILES LOCATION : SEQUOYAH STATE

More information

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION PUBLIC STOCKING REPORT 2016 Table Of Contents SUMMARY OF SPECIES STOCKED... 3 PUBLIC STOCKINGS BY REGION... 4 CENTRAL REGION... 4 EAST CENTRAL

More information

AWARDED: CALL ORDER: 020 PROJECT NO.:CIRB-102C(126)RB J.P. NUMBER:2483204 BAMS NO: 130174 CALENDAR DAYS ALLOTTED: 200 COUNTY: ALFALFA HIGHWAY NO.: EW-25 LENGTH: 4.9740 MILES DESCRIPTION : GRADE, DRAIN,

More information

Estimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1

Estimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1 Disclaimer: This web page is designed to aid farmers with their marketing and risk management decisions. The risk of loss in trading futures, options, forward contracts, and hedge-to-arrive can be substantial

More information

AWARDED: CALL ORDER: 020 PROJECT NO.:BRFY-017N(018) J.P. NUMBER:1020904 BAMS NO: 080410 CALENDAR DAYS ALLOTTED: 300 COUNTY: ATOKA HIGHWAY NO.: SH-3 LENGTH: 1.1740 MILES LOCATION : SH-3: OVER MUDDY BOGGY

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17 AWARDED: CALL ORDER: 400 PROJECT NO.:NHPPI-216N(021)SS J.P. NUMBER:2705004 BAMS NO: 170342 CALENDAR DAYS ALLOTTED: 300 COUNTY: COMANCHE HIGHWAY NO.: I-44 LENGTH: 0.9610 MILES DESCRIPTION : INTERCHANGE

More information

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION PUBLIC STOCKING REPORT 2017 Table of Contents SUMMARY OF SPECIES STOCKED... 3 PUBLIC STOCKINGS BY REGION... 4 Central Region... 4 East Central

More information

DAVID JAMESON 2014 BIG-GAME REPORT. By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician OUTDOOR OKLAHOMA

DAVID JAMESON 2014 BIG-GAME REPORT. By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician OUTDOOR OKLAHOMA DAVID JAMESON 214 BIG-GAME REPORT By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician 14 OUTDOOR OKLAHOMA FIGURE 1 Total Deer Harvest 12 1 8 6 4 2 1972 1973 1974 197 1976 1977

More information

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016 RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION

OKLAHOMA DEPARTMENT OF TRANSPORTATION BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-NBIL(8)CI CALL ORDER: 00 COUNTY: CARTER DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 70 PROPOSAL NUMBER: 08 HIGHWAY NO: COUNTY ROAD COUNTY ROAD

More information

LINE ITEM REPORT 9/18/2009

LINE ITEM REPORT 9/18/2009 Fiscal Year STIM Ind ARRA Cert County JP Number Project No. CLEVELAND 22670(07) STPY 114C (259) LINE ITEM REPORT 9/18/2009 KINGFISHER 25884(04) STP -137D (083) RR 10/21/2008 Awarded GRANT 25986(04) STP

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

STIP Scoping and Design Projects November Administrative Amendment

STIP Scoping and Design Projects November Administrative Amendment NW Dekalb US 36 1P3237 Scoping for pavement and shoulder improvements in the westbound lanes from east of Rte. 31 (north) to Rte. C. Project includes eastbound lanes shoulder improvements from Rte. 33

More information

Annual Listing of Obligated MPO Projects

Annual Listing of Obligated MPO Projects Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

2011 BIG GAME REPORT

2011 BIG GAME REPORT 2011 BIG GAME REPORT By: Jerry Shaw, Programs Section Supervisor and Gary Keller, Wildlife Research Technician 2011-2012 DEER SEASON As I write this report, the temperature outside is hovering right around

More information

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: MONTANA ROAD CONSTRUCTION REPORT 09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: US 191 - WARM SPRINGS CREEK BRIDGE MILE POST 10.0 TO 10.1 SITE IS 10 MILES NORTH OF LEWISTOWN, MT. CONTRACTOR

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

APPENDIX E GRADE CROSSING LOCATIONS

APPENDIX E GRADE CROSSING LOCATIONS APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Cotton Belt Corridor PE/EIS

Cotton Belt Corridor PE/EIS Cotton Belt Corridor PE/EIS February, 28, 2011 Cotton Belt Corridor PE/EIS February 28, 2011 Prepared by Stantec Consulting, Inc Cotton Belt Corridor PE/EIS Table of Contents 1.0 INTRODUCTION... 2 2.0

More information

NJTPA DRAFT Transportation Improvement Program Fiscal Years

NJTPA DRAFT Transportation Improvement Program Fiscal Years County Route 6 Bridge (MA-14) Mileposts: 0.46 DBNUM: NS9811 The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient and functionally obsolete.

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. B0060 1.10 BALLARD US 60 3.700 INCLUDES KEVIL BYPASS.

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m. BRIDGE REHABILITATION Welcome 53 Avenue Overpass over Whitemud Drive Rehabilitation Public Information Session Wednesday, March 9, 2016 4:30-8:00 p.m. Tonight you can: Learn about the 53 Avenue Overpass

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities. Table of Contents 3.1. Interim vs. Ultimate Configuration for the Remaining Segments of NTE... 1 3.2. Characteristics of Project Segments... 3 3.2.1. All Segments... 5 3.2.2. Segment 2E... 8 3.2.3. Segment

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 5 YEAR TIP LET LIST DIVISION 14 Let (B) TIP Sub No. Div County Let Type Description 10/14 I-5512 14 Division Design Raleigh Let (DDRL) I-40 REHABILITATE TUNNELS 15, 17, AND 104 12/14 W-5214M 14 Division

More information

News Release Eastern Oregon Region 5

News Release Eastern Oregon Region 5 News Release Eastern Oregon Region 5 Morrow, Umatilla, Wallowa, Union, Baker, Grant, Harney, and Malheur Counties Oregon Department of Transportation Date: May 22, 2015 NR number: 150522015 For more information:

More information

Big. Game. Report BIG GAME REPORT

Big. Game. Report BIG GAME REPORT 2 0 0 5 Big Game Report 10 2005 BIG GAME REPORT By Mike Shaw, Wildlife Research Supervisor & Jerry Shaw, Wildlife Research Technician JOHN FORD 2005 BIG GAME REPORT 11 H2004-05 DEER SEASONS Hunters this

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Iowa Highway 58 Corridor Improvement Study

Iowa Highway 58 Corridor Improvement Study 1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

Non-Motorized Overpass at SR 5/US1

Non-Motorized Overpass at SR 5/US1 Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior

More information

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

Kentucky Highway District 7

Kentucky Highway District 7 Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013) B-4579 Oakdale Bridge Replace bridge-mcintyre Creek Additional time needed for design and to acquire ROW November 16, 2011 2011 2012 $300,000 B-4651 Poplin Bridge Replace bridge-south Fork Crooked Creek

More information