OKLAHOMA DEPARTMENT OF TRANSPORTATION
|
|
- Clifton Lewis
- 5 years ago
- Views:
Transcription
1 BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-NBIL(8)CI CALL ORDER: 00 COUNTY: CARTER DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 70 PROPOSAL NUMBER: 08 HIGHWAY NO: COUNTY ROAD COUNTY ROAD (EW-90): OVER WALNUT CREEK, 0. MILES WEST OF SH-7. SILVER STAR CONSTRUCTION COMPANY, INC. K & R BUILDERS, INC. $77,7. EARTH BUILDERS, L.P. $777,80.00
2 BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-C(007)AG CALL ORDER: 00 COUNTY: CLEVELAND DESCRIPTION: SIDEWALK IMPROVEMENT J.P. NUMBER 90 PROPOSAL NUMBER: 08 HIGHWAY NO: CITY STREET CITY STREET(BOYD ST.): FROM CLASSEN BLVD TO BARKLEY STREET IN NORMAN SAC SERVICES, INC. $,.0 AUSTIN PAVING LLC $,.0 OLIVAS CONSTRUCTION COMPANY, INC. $9,.00 TRI-STAR CONSTRUCTION, LLC $9,9.00 PARATHON CONST. LLC $9,70.00 MTZ CONSTRUCTION NON-RESPONSIVE FRONTIER BRIDGE, INC. CIMARRON CONSTRUCTION COMPANY $,70.00 RUDY CONSTRUCTION CO. $,89.00 RDNJ, INC. DBA A-TECH PAVING $, JLT CONTRACTING, LLC $,809.70
3 BID OPENING OF November, 0 November, 0 PROJECT NO.: SSP-N(0)SB J.P. NUMBER 70 CALL ORDER: 00 PROPOSAL NUMBER: 009 COUNTY: COMANCHE HIGHWAY NO: I- DESCRIPTION: BRIDGE AND APPROACHES I-: MULTIPLE LOCATIONS AT TRI-LEVEL INTERCHANGE IN LAWTON. ALLEN CONTRACTING, INC. $,9,.0 OBC, INC. $,8,80.9
4 BID OPENING OF November, 0 November, 0 PROJECT NO.: HSIP-C(0)TR CALL ORDER: 00 COUNTY: COMANCHE DESCRIPTION: TRAFFIC SIGNAL J.P. NUMBER 090 PROPOSAL NUMBER: 08 HIGHWAY NO: US-77 US-77: AT THE INTERSECTION OF SH-7 IN ELGIN. MIDSTATE TRAFFIC CONTROL, INC. $9,88. TRAFFIC SIGNALS, INC. $0,9. TRAFFIC & LIGHTING SYSTEMS, LLC $07,0.0
5 BID OPENING OF November, 0 November, 0 PROJECT NO.: SSP-C(0)SS CALL ORDER: 00 COUNTY: GARFIELD DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 0 PROPOSAL NUMBER: 088 HIGHWAY NO: SH- SH-: OVER TURKEY CREEK,. MI NORTH OF THE KINGFISHER COUNTY LINE. 7 B & B BRIDGE COMPANY, LLC WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $,7,988.0 BRIDGES, INC. DBA SCUDDER BRIDGE CO. THE CUMMINS CONSTRUCTION CO., INC. MANHATTAN ROAD & BRIDGE COMPANY OBC, INC. $,970,.8 K & R BUILDERS, INC. $,,7.
6 BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-9D(00)CI CALL ORDER: 0 COUNTY: HARMON DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 8700 PROPOSAL NUMBER: 0 HIGHWAY NO: COUNTY ROAD COUNTY ROAD (NS-7): OVER AN UNNAMED CREEK,. MILES SOUTH AND. MILES EAST OF SH-9/SH-0 JCT. FRONTIER BRIDGE, INC. $0,7. KLAVER CONSTRUCTION COMPANY, INC. $,90. MANHATTAN ROAD & BRIDGE COMPANY SEWELL BROS., INC. K & R BUILDERS, INC. $99,90. EARTH BUILDERS, L.P. $7,.00
7 PROJECT NO.: CIRB-9D(00)RB CALL ORDER: 0 COUNTY: HARMON DESCRIPTION: BID OPENING OF November, 0 November, 0 J.P. NUMBER 900 PROPOSAL NUMBER: 089 HIGHWAY NO: COUNTY ROAD GRADE, DRAIN, SURFACE, AND INTERSECTION MODIFICATION COUNTY ROAD (EW-8/EW-0): EW-8 FROM SH-0, EXTEND WEST. EW-0 AT NS-70,.0 MI N AND.0 MI W OF US-/SH-0 JCT. APAC-CENTRAL, INC. CORNELL CONSTRUCTION COMPANY, INC. $,070,0.8
8 BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-C()CI CALL ORDER: 0 COUNTY: HUGHES DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER PROPOSAL NUMBER: 090 HIGHWAY NO: COUNTY ROAD COUNTY ROAD: OVER CANEY BOGGY CREEK, 7. MILES SOUTH AND. MILES WEST OF STUART B & B BRIDGE COMPANY, LLC WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $,8,0.00 MANHATTAN ROAD & BRIDGE COMPANY SEWELL BROS., INC. BRIDGECO CONTRACTORS, INC. $7,9.70 K & R BUILDERS, INC. $7,. PBX CORPORATION PARADIGM CONSTRUCTION & ENGINEERING, INC EARTH BUILDERS, L.P.
9 BID OPENING OF November, 0 November, 0 PROJECT NO.: SSR-B(00)SR CALL ORDER: 0 COUNTY: KAY DESCRIPTION: RESURFACE (ASPHALT) J.P. NUMBER 000 PROPOSAL NUMBER: 09 HIGHWAY NO: US-77 US-77: FROM SH- WEST, EXTEND NORTH THEN EAST. EVANS & ASSOCIATES CONSTRUCTION CO., INC. $,9,79.00
10 PROJECT NO.: NHPPY-N(08) CALL ORDER: 70 COUNTY: MCCURTAIN DESCRIPTION: BID OPENING OF November, 0 November, 0 GRADE, DRAIN, SURFACE, AND BRIDGE J.P. NUMBER 770 PROPOSAL NUMBER: 008 HIGHWAY NO: US-70 US-70: FROM. MILES EAST OF US-9, EXTEND EAST. R. K. HALL CONSTRUCTION, LTD. $,77,9.0 KOSS CONSTRUCTION COMPANY & SUBSIDIARY THE CUMMINS CONSTRUCTION CO., INC. $,,. MANHATTAN ROAD & BRIDGE COMPANY OBC, INC. L & N BRIDGE, LLC
11 BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-NBIL(0)CI CALL ORDER: 7 COUNTY: MURRAY DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 880 PROPOSAL NUMBER: 09 HIGHWAY NO: COUNTY ROAD COUNTY ROAD: OVER BUCKHORN CREEK.9 MILES SOUTH AND.0 MILES EAST OF THE SOUTH US-77/SH-7 JCT. SEWELL BROS., INC. ALLEN CONTRACTING, INC. $,.9 BRIDGECO CONTRACTORS, INC. $,7.00 K & R BUILDERS, INC. $0,90. PBX CORPORATION EARTH BUILDERS, L.P. $,07.00
12 BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-D(87)CI CALL ORDER: 00 COUNTY: NOBLE DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 770 PROPOSAL NUMBER: 09 HIGHWAY NO: COUNTY ROAD COUNTY ROAD (EW-8): OVER COW CREEK, 7.0 MI WEST OF SUMNER B & B BRIDGE COMPANY, LLC WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $97,8.00 BRIDGES, INC. DBA SCUDDER BRIDGE CO. $98,9.0 MANHATTAN ROAD & BRIDGE COMPANY CIMARRON CONSTRUCTION COMPANY $8,0.0 BRIDGECO CONTRACTORS, INC. $77,7.00 K & R BUILDERS, INC. $7, PBX CORPORATION BELK BRIDGE, INC. $9,07.
13 PROJECT NO.: NHPPY-7N(00)SS CALL ORDER: 0 COUNTY: OSAGE DESCRIPTION: BID OPENING OF November, 0 November, 0 GRADE, DRAIN, SURFACE, AND BRIDGE J.P. NUMBER 870 PROPOSAL NUMBER: 09 HIGHWAY NO: US-0 US-0: FROM.0 MILES EAST OF SH-99, EXTEND EAST KOLB GRADING, LLC $8,077,89.8 KOSS CONST. CO. & SUB./BOB BERGKAMP CONST. CO., INC. $,,9. A. M. COHRON & SON, INC. PACE CONSTRUCTION CO., LLC B & B BRIDGE COMPANY, LLC REECE CONSTRUCTION CO., INC. DONDLINGER & SONS CONSTRUCTION CO., INC. VENTURE CORPORATION DBA V. C. O. PAVING BOB BERGKAMP CONSTRUCTION CO., INC. EBERT CONSTRUCTION CO., INC. & SUBSIDIARY $,,78.7 CROSSLAND CONSTRUCTION COMPANY, INC. APAC-CENTRAL, INC. MANHATTAN ROAD & BRIDGE CO. /MJE, LLC $,7,7. SEWELL BROS., INC. SHERWOOD CONSTRUCTION CO., INC. $9,,70.7 ALLEN CONTRACTING, INC. BECCO CONTRACTORS, INC.
14 BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-8C(7)CI CALL ORDER: 80 COUNTY: OTTAWA DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 090 PROPOSAL NUMBER: 09 HIGHWAY NO: COUNTY ROAD (EW-) COUNTY ROAD (EW-): OVER NEOSHO RIVER,. MILES EAST OF THE CRAIG COUNTY LINE JENSEN CONSTRUCTION COMPANY $,88,09.0 A. M. COHRON & SON, INC. $,79,0.7 UNITED CONTRACTORS, INC. PACE CONSTRUCTION CO., LLC B & B BRIDGE COMPANY, LLC $,9,9.00 MIES CONSTRUCTION, INC. MANHATTAN ROAD & BRIDGE COMPANY $,78,7. BECCO CONTRACTORS, INC. OBC, INC. PARADIGM CONSTRUCTION & ENGINEERING, INC
15 BID OPENING OF November, 0 November, 0 PROJECT NO.: SSR-N(0)SR CALL ORDER: 0 COUNTY: PITTSBURG DESCRIPTION: RESURFACE (ASPHALT) J.P. NUMBER 00 PROPOSAL NUMBER: 000 HIGHWAY NO: US-9 US-9: FROM US-9B AND. MILES NORTH OF US-9B, EXTEND NORTH. GLOVER & ASSOCIATES, INC. $8,8.70 JOB CONSTRUCTION CO., INC. $0,.97
16 BID OPENING OF November, 0 November, 0 PROJECT NO.: SSP-8N(0)SS J.P. NUMBER CALL ORDER: 0 PROPOSAL NUMBER: 00 COUNTY: SEQUOYAH HIGHWAY NO: I-0 DESCRIPTION: GRADE, DRAIN, SURFACE, AND SITE PLAN I-0: TRUCK WEIGH STATION/PORT OF ENTRY LOCATED. MILES WEST OF THE ARKANSAS STATE LINE. DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV $,,7. CROSSLAND CONSTRUCTION COMPANY, INC. FORSGREN INC. $,79,0. SHERWOOD CONSTRUCTION CO., INC.
17 BID OPENING OF November, 0 November, 0 PROJECT NO.: SSP-8N(0)SS J.P. NUMBER 909 CALL ORDER: PROPOSAL NUMBER: 00 COUNTY: SEQUOYAH HIGHWAY NO: I-0 DESCRIPTION: FACILITY PLAN I-0: TRUCK WEIGH STATION/PORT OF ENTRY LOCATED. MILES WEST OF THE ARKANSAS STATE LINE. CROSSLAND CONSTRUCTION COMPANY, INC. $,8,88.0 FORSGREN INC. BESHEARS CONSTRUCTION, INC.
18 BID OPENING OF November, 0 November, 0 PROJECT NO.: SSP-8N(0)SS J.P. NUMBER 90909C CALL ORDER: PROPOSAL NUMBER: 00 COUNTY: SEQUOYAH HIGHWAY NO: I-0 DESCRIPTION: GRADE, DRAIN, SURFACE, AND FACILITY PLAN I-0: TRUCK WEIGH STATION/PORT OF ENTRY LOCATED. MILES WEST OF THE ARKANSAS STATE LINE. DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV $9,08,0.00 CROSSLAND CONSTRUCTION COMPANY, INC. FORSGREN INC. $9,90,9. SOUTHERN INDUSTRIAL CONTRACTORS, LLC SHERWOOD CONSTRUCTION CO., INC. $0,078,0.
19 BID OPENING OF November, 0 November, 0 PROJECT NO.: STPY-7C(009)RW CALL ORDER: 0 COUNTY: WAGONER DESCRIPTION: RIGHT-OF-WAY CLEARANCE J.P. NUMBER 07 PROPOSAL NUMBER: 00 HIGHWAY NO: SH- SH-: FROM JUST NORTHWEST OF OKAY, EXTEND NORTH. HELLER CONSTRUCTION, INC. $, ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC $79,.00 THUNDER DIASTER SERVICES, INC. J.E. DIRT WURX, LLC $7,97.00 ARK WRECKING OF OK., INC. $9,0.00 M & M WRECKING, INC. $,90.00
20 BID OPENING OF November, 0 November, 0 PROJECT NO.: SSP-7B(9)SS CALL ORDER: 0 COUNTY: WOODS DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 7000 PROPOSAL NUMBER: 007 HIGHWAY NO: US- US-: OVER RED HORSE CREEK,. MILES EAST OF SH A. M. COHRON & SON, INC. B & B BRIDGE COMPANY, LLC REECE CONSTRUCTION CO., INC. J & R SAND COMPANY, INC. $,70,88.0 VENTURE CORPORATION DBA V. C. O. PAVING $,0,9. EBERT CONSTRUCTION CO., INC. & SUBSIDIARY L & M CONTRACTORS, INC. MIES CONSTRUCTION, INC. THE CUMMINS CONSTRUCTION CO., INC. SEWELL BROS., INC. $,99,97.8 OBC, INC.
OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15
AWARDED: CALL ORDER: 010 PROJECT NO.:NHPP-201N(014)RW J.P. NUMBER:1692823 BAMS NO: 150186 CALENDAR DAYS ALLOTTED: 180 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH: 3.3140 MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE
More information*REVISED-AWARDED CALL ORDER /09/13
*REVISED-AWARDED CALL ORDER 180 12/09/13 AWARDED: CALL ORDER: 020 PROJECT NO.:NHPPY-101N(023)SS J.P. NUMBER:1692809 BAMS NO: 130355 CALENDAR DAYS ALLOTTED: 365 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH:
More informationAWARDED: CALL ORDER: 015 PROJECT NO.:STP-205C(038)3P J.P. NUMBER:3110804 BAMS NO: 150045 CALENDAR DAYS ALLOTTED: 30 COUNTY: BECKHAM HIGHWAY NO.: I-40B LENGTH: 1.6200 MILES LOCATION : I-40B: FROM THE NORTH
More informationAWARDED: CALL ORDER: 043 PROJECT NO.:NHPPY-203N(012)3P J.P. NUMBER:2972604C BAMS NO: 130128 CALENDAR DAYS ALLOTTED: 60 NHPPY-261N(012)3P 2967604C NHPPY-264N(008)3P 2972704C COUNTY: ATOKA HIGHWAY NO.: SH-7/SH-3
More informationAWARDED: CALL ORDER: 020 PROJECT NO.:STPY-101A(072) J.P. NUMBER:2422904 BAMS NO: 090608 CALENDAR DAYS ALLOTTED: 325 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH: 2.6800 MILES DESCRIPTION : GRADING, DRAIN, AND
More informationAWARDED: CALL ORDER: 020 PROJECT NO.:CIRB-102C(126)RB J.P. NUMBER:2483204 BAMS NO: 130174 CALENDAR DAYS ALLOTTED: 200 COUNTY: ALFALFA HIGHWAY NO.: EW-25 LENGTH: 4.9740 MILES DESCRIPTION : GRADE, DRAIN,
More information06/01/15 AWARDED: CALL ORDER: 005 PROJECT NO.:CIRB-102C(130)RB J.P. NUMBER:2483209 BAMS NO: 150183 CALENDAR DAYS ALLOTTED: 150 COUNTY: ALFALFA HIGHWAY NO.: COUNTY ROAD (NS-255) LENGTH: 5.0300 MILES DESCRIPTION
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15
05/04/15 AWARDED: CALL ORDER: 010 PROJECT NO.:CIRB -202C(028)RB J.P. NUMBER:2483308 BAMS NO: 150120 CALENDAR DAYS ALLOTTED: 120 COUNTY: ALFALFA HIGHWAY NO.: COUNTY ROAD (EW-08) LENGTH: 3.9690 MILES DESCRIPTION
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17
AWARDED: CALL ORDER: 400 PROJECT NO.:NHPPI-216N(021)SS J.P. NUMBER:2705004 BAMS NO: 170342 CALENDAR DAYS ALLOTTED: 300 COUNTY: COMANCHE HIGHWAY NO.: I-44 LENGTH: 0.9610 MILES DESCRIPTION : INTERCHANGE
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17
AWARDED: CALL ORDER: 010 PROJECT NO.:STP-202C(033) J.P. NUMBER:2794304 BAMS NO: 170112 CALENDAR DAYS ALLOTTED: 300 COUNTY: ALFALFA HIGHWAY NO.: SH-8 LENGTH: 0.2510 MILES LOCATION : SH-8: OVER DRIFTWOOD
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000
PROJECT NO.: E-SAP-144B(36) J.P. NUMBER: 18705(04) CALL ORDER: 010 PROPOSAL NUMBER: 000504 COUNTY: MCCLAIN HIGHWAY NO.: SH-9 DESCRIPTION: BRIDGE REPAIR LOCATION : ON SH-9 OVER I-35 APPROXIMATELY 0.5 MILE
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000
PROJECT NO.: E-SAP-144B(36) J.P. NUMBER: 18705(04) CALL ORDER: 010 PROPOSAL NUMBER: 000504 COUNTY: MCCLAIN HIGHWAY NO.: SH-9 DESCRIPTION: BRIDGE REPAIR LOCATION : ON SH-9 OVER I-35 APPROXIMATELY 0.5 MILE
More informationAWARDED: CALL ORDER: 030 PROJECT NO.:NHY-13N(116)TR J.P. NUMBER:2409804 BAMS NO: 070225 CALENDAR DAYS ALLOTTED: 30 COUNTY: ATOKA HIGHWAY NO.: US-69/US-75 LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNALS
More informationAWARDED: CALL ORDER: 020 PROJECT NO.:BRO-103D(059)CO J.P. NUMBER:2110304 BAMS NO: 070001 CALENDAR DAYS ALLOTTED: 120 COUNTY: ATOKA HIGHWAY NO.: COUNTY ROAD LENGTH: 0.1530 MILES DESCRIPTION : BRIDGE & APPROACHES
More informationAWARDED: CALL ORDER: 080 PROJECT NO.: SAP-111D(41) J.P. NUMBER: 1879104 BAMS NO: 010065 CALENDAR DAYS ALLOTTED: 30 COUNTY: CHEROKEE HIGHWAY NO.: PARK ROAD LENGTH: 0.000000 MILES LOCATION : SEQUOYAH STATE
More informationAWARDED: CALL ORDER: 020 PROJECT NO.:BRFY-017N(018) J.P. NUMBER:1020904 BAMS NO: 080410 CALENDAR DAYS ALLOTTED: 300 COUNTY: ATOKA HIGHWAY NO.: SH-3 LENGTH: 1.1740 MILES LOCATION : SH-3: OVER MUDDY BOGGY
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019
FFY 2019 STIP: STATEWIDE RAIL CROSSING PROJECTS- ITEM PROJECTS 99 9 1704925 R R 0 SAFETY IMPROVEMENT PROTECTION DEVICES, CROSSING SURFACES, ADVANCE 2019 WARNING SIGNS, STRIPING, CLOSURES, ETC SPR $8,000,000
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan
OKLAHOMA DEPARTMENT OF TRANSPORTATION FFY-2018 through FFY-2021 Asset Preservation Plan Table of Contents SECTION I FOREWORD - Letter from the Director SECTION II BUDGETARY PROJECTIONS SECTION III BALANCING
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018
FFY 2018 STIP: STATEWIDE RAIL CROSSING ITEM PROJECTS 99 9 1704924 R R 0 SAFETY IMPROVEMENT PROJECTS=PROTECTION DEVICES, CROSSING SURFACES, 2018 ADVANCE WARNING SIGNS, STRIPING, CLOSURES, ETC $8,000,000
More informationBowhunter Observation Survey
Oklahoma Department of Wildlife Conservation Bowhunter Observation Survey 2017-Season The Oklahoma Department of Wildlife Conservation (ODWC) sought participation from bowhunters for the second annual
More informationBowhunter Observation Survey
Oklahoma Department of Wildlife Conservation Bowhunter Observation Survey 2016-Season The Oklahoma Department of Wildlife Conservation (ODWC) sought participation from bowhunters for the inaugural Bowhunter
More informationApparent Bids for Letting of January 20, 2017
Apparent Bids for Letting of January 20, 2017 Letting ID: 170120 Cut-Off Time: 11:00:59 AM A01-170120-A01 NODAWAY ****(1): Job J1P3056B Route 71 NODAWAY County. Bridge painting over White Cloud Creek north
More informationAsphalt Concrete Plants With Expired or Nearly Expired Scale Certifications (Scales must be recertified every six months)
Asphalt Concrete lants With Expired or Nearly Expired Scale Certifications : Expired : Will expire in the next month or less : ortable lant IA Evaluator Name: Bobby Winkle Count of Scale Certs.: 1 Div
More informationEASTBOUND AND WESTBOUND ROADWAYS MILEPOST TO MILEPOST OTTAWA AND SANDUSKY COUNTIES, OHIO
General Info Number: Description: Deadline: PROJECT NO. 59-18-04 (RE-BID) PAVEMENT REPAIRS EASTBOUND AND WESTBOUND ROADWAYS MILEPOST 80.50 TO MILEPOST 86.15 OTTAWA AND SANDUSKY COUNTIES, OHIO JULY 3, 2018
More informationEstimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1
Disclaimer: This web page is designed to aid farmers with their marketing and risk management decisions. The risk of loss in trading futures, options, forward contracts, and hedge-to-arrive can be substantial
More informationTaylor Road Resurfacing Project
Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project
More informationACTIVE PROJECTS DIRECTORY
District KC Off System CCN Dist Const and Matls Engineer Brian R. Burger B2B 600 NE Colbern Road Lee's Summit MO 64086 Phone (816)622-6500 Fax SiteManager Creator SiteManager Creator District Phone District
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationWeymouth - Abington Route 18 Widening and Reconstruction Project File No
Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013
More informationOKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION
OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION PUBLIC STOCKING REPORT 2016 Table Of Contents SUMMARY OF SPECIES STOCKED... 3 PUBLIC STOCKINGS BY REGION... 4 CENTRAL REGION... 4 EAST CENTRAL
More informationSouth Portland City Council Position Paper of the City Manager
Agenda Item #19 Meeting of May 16, 2016 South Portland City Council Position Paper of the City Manager Subject: ORDER #153-15/16 Appropriating $24,985 from the Sewer User Reserve Account and award of Bid
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationTABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, SEPTEMBER 16, 2014 FOR LETTING OF SEPTEMBER 26, 2014
TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, SEPTEMBER 16, 2014 FOR LETTING OF SEPTEMBER 26, 2014 The Asphalt Indexes for the Month of September 2014 are: ACI
More informationODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.
1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening
More informationIH 20 RANGER HILL PUBLIC MEETING
IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the
More informationFY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects
-2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo
More informationRADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016
RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationProgress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)
Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationCincinnati Dayton Rd Widening
Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge
More informationOKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION
OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION PUBLIC STOCKING REPORT 2017 Table of Contents SUMMARY OF SPECIES STOCKED... 3 PUBLIC STOCKINGS BY REGION... 4 Central Region... 4 East Central
More informationSFY Transportation Improvement Program Highway and Bikeway Element Amendments
PID Project Description SFY 2014-2017 Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data CUY FARNSLEIGH RD IMPROVEMENT Bike/Pedestrian/Streetscape C Shaker
More informationDAVID JAMESON 2014 BIG-GAME REPORT. By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician OUTDOOR OKLAHOMA
DAVID JAMESON 214 BIG-GAME REPORT By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician 14 OUTDOOR OKLAHOMA FIGURE 1 Total Deer Harvest 12 1 8 6 4 2 1972 1973 1974 197 1976 1977
More informationENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop
ENERGY SECTOR ROADWAY REPAIR PROJECT August 15, 2013 Industry Workshop Safety Moment Sign-in Sheet Exit Locations Gathering Point Directions from Emergency Responders Signal to re-enter the Building or
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationProject Application. Project Location: Salem Drive (Federal Route 1101)
Project Application General Information Municipality/Lead Agency: Hoffman Estates 1. Contact Person: Michael Hankey 2. Contact Phone: 847 252-5801 3. Contact Email: mike.hankey@hoffmanestates.org Project
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 13 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025200 REMOVAL OF EXISTING STRUCTURES 4 020100 CONTRACTOR CONSTRUCTION STAKING 5 025602 FIELD OFFICE AND LABORATORY
More informationI-10 AT SCENIC LOOP RD. Open House
I-10 AT SCENIC LOOP RD Open House General Information I-10 At Scenic Loop Rd KENDALL COUNTY OPEN HOUSE June 30, 2015 Currey Creek Baptist Church 35 Cascade Cavern 5:00 7:00 Boerne, TX 78015 2 Public Meeting
More informationRIDE III PROPOSED PROJECTS. April 2015
RIDE III PROPOSED PROJECTS April 2015 Resurface 100 Miles of Paved Roads RIDE III Pave 100 Miles of Dirt Roads 19 Hwy 9 East Hwy 701 N Widening Conway Perimeter Road Phase II 1 29 Forestbrook Rd SELL Hwy
More informationBikeable/Walkable Community Plan. Oct. 11, 2012 City Council Workshop
Bikeable/Walkable Community Plan Oct. 11, 2012 City Council Workshop Background 2006 - O Fallon s population was 72,477. Citizen Survey showed a strong interest in additional bike & pedestrian opportunities.
More informationAnnual Listing of Obligated MPO Projects
Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,
More informationClub County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa
Stilwell FFA Adair 9 7 Total Adair 9 7 9 F-150 E3 1456-1466 Alfalfa County 4-H Alfalfa 0 8 Cherokee FFA Alfalfa 2 0 Timberlake FFA Alfalfa 1 6 Total Alfalfa 3 14 14 Expedition A12 East 1281-1297 Atoka
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationFigure 1-1 STATE ROUTE 10
3.14 The existing road in Quitchupah Creek was originally an old wagon road prior to 1900. It served ranches, allowed access to the forest up on the plateau, and provided a route for east-west travel.
More informationRoute 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council
Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: 0007-253-109 UPC 106573 Presentation to Town Council June 26, 2017 Council Decisions East Market Street / Battlefield
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationUPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase
Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally
More informationHospital Link Project Project Update November 2017
Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationMISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER
DESIGN DESIGNATION A.A.D.T - = V = M.P.H MISSOURI AND TRANSPORTATION PLANS FOR PROPOSED HIGHWAY INDE OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET --------------------------- 1 TYPICAL SECTIONS (TS) (1
More informationSR 2108-A12 Forbes Avenue Betterment. March 1, 2018
SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John
More informationAPPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,
APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER 2013 14:19 Thursday, June 13, 2013 1 ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR 0034-01-124 US 83 C 34-1-124 5 3.2 P14BM $2,112,500 $3,721,952
More informationREPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.
General Info Number: Description: Deadline: (Estimated Cost: $1,000,000) PROJECT NO. 53-16-03 REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST 139.50, LORAIN COUNTY, OHIO MAY 23, 2016
More informationLINE ITEM REPORT 9/18/2009
Fiscal Year STIM Ind ARRA Cert County JP Number Project No. CLEVELAND 22670(07) STPY 114C (259) LINE ITEM REPORT 9/18/2009 KINGFISHER 25884(04) STP -137D (083) RR 10/21/2008 Awarded GRANT 25986(04) STP
More informationConcrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationPROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT
PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April
More informationHighway Construction
Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;
More informationPROJECT FACT SHEET March 21, 2018
SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationAdvanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationBID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT
CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,
More informationTRANSPORTATION COMMISSION OF WYOMING
TRANSPORTATION COMMISSION OF WYOMING The Transportation Commission of Wyoming met in the Commission Room of the Transportation Headquarters building in Cheyenne on June 24, 2010. The teleconference was
More informationEXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %
Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south
More informationSuper 2: Recent Research in Energy Corridors
Super 2: Recent Research in Energy Corridors Kay Fitzpatrick Senior Research Engineer Texas A&M Transportation Institute Super 2 Highways Definition Discussed in TxDOT Roadway Design Manual (Chapter 4,
More informationQ AGGREGATE / EMULSION MATERIALS for Washington County Departments
Q-18-655 AGGREGATE / EMULSION MATERIALS for Washington County Departments Item Beaver Creek Quarry C. William Hetzer, Craig Paving, Hammaker East, LTD. Fayettevelle, PA Martin Marietta Williamsport, MD
More informationAppendix A: Grouped Projects Projects by Grouping (FHWA Format)
Appendix A: Grouped Projects Projects by Grouping (FHWA Format) MPO TIP Report 5/22/28 5:18:43 PM Appendix A Projects by Grouping MPO Construction : Bridge Rehabilitation/Replacement/Reconstruction GRP-1
More informationAttached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects
More informationAppendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station
Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,
More information3.9 Recreational Trails and Natural Areas
3.9 Recreational Trails and Natural Areas 3.9.1 Introduction Parks and other recreational facilities such as trails, bicycle routes, and open space are important community resources. This section discusses
More informationMILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO
MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve
More informationMUNICIPALITY OF ANCHORAGE Traffic Department MEMORANDUM
MUNICIPALITY OF ANCHORAGE DATE: MEMORANDUM TO: FROM: SUBJECT: Anchorage Contractors, Builders, Designers, and Land Owners Robert E. Kniefel, P.E., Municipal Traffic Engineer Municipal Driveway Standards
More informationRio Intersection Traffic Restrictions Begin Monday
May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationCurrent Roadway Projects Wednesday, September 03, 2014
Current Roadway Projects Wednesday, September 03, 2014 Restore our Roads Projects 1 US 72 East at Moores Mill Road Additional lane WB from Moores Mill to Sparkman Drive and intersection improvements at
More informationINDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:
INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.
More informationLong Island Rail Road Expansion Project Floral Park to Hicksville
Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral
More informationI-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS
I- COMAL COUNTY OPERATIONAL IMPROVEMENTS OPEN HOUSE The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been,
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationRM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS
RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT January 25, 2017 RM 620/2222 BYPASS - INTRODUCTION Because of the enormous traffic demand at the RM 620/2222 intersection, TxDOT searched for a way to relieve
More informationProposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017
Proposed FUL-SR 66 Relocation on to CR 24 Presentation to Archbold Village Council April 17, 2017 Robert J. Seaman, P.E., P.S. Village Engineer Andrew J. Langenderfer, P.E. Sr. Project Manager Agenda Stakeholders
More informationDECEMBER 2007 SIGNIFICANT FACTS AND TRENDS
KANSAS DEPARTMENT OF TRANSPORTATION BUREAU OF TRANSPORTATION PLANNING DECEMBER 0 SIGNIFICANT FACTS AND TRENDS DEPARTMENTOF DEPARTMENTOFTRANSPORTATION TRANSPORTATION KA N SAS Contact the Traffic and Field
More informationFigure 2-1 City Of Boynton Beach, Florida Anionic Exchange Resin Facility and East Water Treatment Plant Improvements EXISTING SITE PLAN
Figure 2-1 City Of Boynton Beach, Florida EXISTING SITE PLAN N Figure 2-2 City Of Boynton Beach, Florida PROPOSED SITE HORIZONTAL CONTROL PLAN N Figure 4-1 City of Boynton Beach, Florida EAST WTP EXISTING
More informationPROJECT FACT SHEET May 25, 2018
SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient
More informationJuly 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007
July 2007 NO. 0707 UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 Tex-207-F, Determining Density of Compacted Bituminous Mixtures. is now on-line at the TxDOT website. This test procedure was implemented effective
More information