D L R C C T R A F F I C N E W S

Size: px
Start display at page:

Download "D L R C C T R A F F I C N E W S"

Transcription

1 D L R C C T R A F F I C N E W S Saturday, 22 nd September 2018 to Friday 28 th September 2018 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works of which the Traffic and Road Safety Section has been informed. Details are supplied as per information received by 16:00 hrs. on the preceding Thursday. Emergency road works cannot be forecast.» New Entry Estimate of Potential Disruption: # Update *** major ** medium * minor PROPOSED ROAD CLOSURE Section 75 of the Roads Act, 1993 Temporary Closure of Tivoli Terrace East, Dún Laoghaire Dún Laoghaire-Rathdown County Council has received an application from D & S Higgins Construction Ltd, 4A Bailelease Mall, Donabate, Dublin, to temporarily close Tivoli Terrace, Dún Laoghaire from the junction of Tivoli Terrace South to the junction of Tivoli Terrace North from a.m. to 4.00 p.m on Monday 8 th October, 2018 to Thursday 11 th October 2018 inclusive, in order to dismantle a crane. The proposed diversions routes will be signposted. Any interested party may lodge an objection in writing with the Senior Engineer, Traffic Section, County Hall, Marine Road, Dun Laoghaire or info@dlrcoco.ie on or before Tuesday 25 th September, Page 1 of 5

2 ROAD CLOSURES Temporary Closure of Roads within Sandyford Business District to facilitate the 2018 Spirit Sandyford 5K Dún Laoghaire-Rathdown County Council has made an order for partial to full closure of a number of roads within Sandyford Business District on Thursday 27 th September 2018, to facilitate the 2018 Spirit Sandyford 5K. The Start Time of the Race is 7.30 p.m. It is envisaged that the roads will be closed at 7.15 p.m. and will remain closed until after the completion of the race at 8.30 p.m. The Roads affected are as follows: 1. Blackthorn Road, (Partial) 2. Blackthorn Avenue, (Partial) 3. Carmanhall Road 4. Three Rock Road 5. Corrig Road 6. Raven s Rock Road A Traffic Management Plan will be in place and all diversion routes will be clearly signposted. Emergency Access can be provided, if required, during the period of the roads closures. Temporary Closure of Military Road, Killiney Dún Laoghaire-Rathdown County Council has made an order to temporarily close Military Road, Killiney from the junction of Church Road and Shanganagh Road to the junction with Killiney Hill Road from a.m. to 4.00 p.m. from Thursday 4 th October, 2018 to Friday 5 th October, 2018 inclusive, in order to facilitate a gas connection. The proposed diversions routes will be signposted. Temporary Closure of Brookfield Place, Blackrock Dún Laoghaire-Rathdown County Council has made an order to close Brookfield Place, Blackrock where it intersects Brookfield Terrace to through traffic on Monday 17 th September, 2018 to Tuesday 18 th September, 2018 from 10 a.m. to 4.00 p.m. The purpose of the closure is to facilitate a gas connection. The proposed diversion route will be signposted and details of the plan will be available on our website A Traffic Management Plan will be in place and the diversion routes will be clearly signposted. Page 2 of 5

3 Temporary Closure of Monkstown Road, Clifton Lane Dún Laoghaire-Rathdown County Council has made an order to close Monkstown Road from Monkstown Village to the junction with Temple Hill Road from: Tuesday, 7 th August 2018 to Tuesday, 30 th October However, it is not anticipated that the works will extend beyond the end of September The closure is to facilitate Road/Footpath restoration and associated works on Monkstown Road and Clifton Lane. Diversion routes will be via N31 (Old Dunleary Road, Longford Terrace, Seapoint Avenue) and York Road, Mounttown Road Upper, Monkstown Avenue, Stradbrook Road, Frascati Road. ROADWORKS / LANE RESTRICTIONS» Summerhill Road, Dún Laoghaire ** Gas main installation works will commence on Thursday, 27 th September 2018 between 10:00 and 16:00 hrs. A Stop / Go Traffic Management Plan will be in place.» Clonkeen Road, Deansgrange ** Gas main installation works will commence on Monday, 24 th September 2018 until Friday, 28 th September 2018 between 10:00 and 16:00 hrs. A Traffic Management Plan will be in place.» Seapoint Avenue ** Upgrading of public lighting lanterns local to Brighton Vale Junction. Works to commence on Wednesday, 26 th September 2018 to Friday, 28 th September 2018 between 10:00 and 16:00 hrs. Page 3 of 5

4 # Queen s Road, Dún Laoghaire between East Pier and Park Road *** Footpath Restoration works will continue until Friday, 28 th September 2018 between 10:00 and 16:00 hrs. A Stop / Go Traffic Management Plan will be in operation. # Sallynoggin Village Sallynoggin Road / Pearse Street / O Rourke Park ** Junction upgrade works will continue until Friday, 28 th September 2018 between 9:30 and 16:30 hrs. A Stop / Go Traffic Management Plan will be in operation. Lower Kilmacud Road *** at the junctions of South Avenue and Upper Kilmacud Road Upgrade of existing junctions commenced on Monday, 3 rd September Permanent Traffic Management is in place until the end of November. Any lane restrictions required will be in place from 10:00 to 16:00 hrs. daily. Newtownpark Avenue, Blackrock *** Road surface and footpath restoration works (Phase 1) commenced on Monday, 17 th September 2018 for 4-weeks between 10:00 and 16:00 hrs. Monkstown Road Road Closure *** Road/Footpath Restoration and associated works commenced on Tuesday, 7 th August 2018 until Friday, 28 th September 2018 between 08:00 and 19:00 hrs. A Traffic Management Plan and signed detours will be in operation and local access will be maintained. Windsor Terrace Dún Laoghaire Baths Redevelopment *** Construction commenced on the redevelopment of the Baths site on Monday, 23 rd April Construction is programmed to be completed by Q During September, the new pier construction will progress. There should be no Traffic Management restrictions on Windsor Terrace with the exception of the delivery of materials, which will be short term and between 10:00-16:00 hrs. Monday Friday. Page 4 of 5

5 N11 Northbound between Bray Road Junction and Westminster Junction ** Public lighting column and lantern upgrade works commenced on Monday, 23 rd July 2018 until Friday, 28 th September 2018 (intermittent). Work will be carried out between the hours of 10:00 and 16:00 hrs. and 19:30 Midnight (if required). N11 Southbound between Westminster Road Junction and Bray Road Junction ** Public lighting column and lantern upgrade works commenced on Monday, 23 rd July 2018 until Friday, 28 th September 2018 (intermittent). Work will be carried out between the hours of 10:00-16:00 and 19:30 Midnight (if required). Public Lighting Lantern and Bracket Upgrade Works ** Public lighting lantern and bracket upgrade works will take place on: 1. Kilmacud Road Upper 2. Deansgrange Road 3. Blackthorn Drive 4. Kill Lane/Avenue 5. Clonskeagh Road 6. Leopardstown Road 7. Kilmacud Road Lower 8. Cornelscourt Hill 9. Avoca Ave 10. Monkstown Ring Road 11. Stradbrook Road 12. Sallynoggin Road These works will continue until Friday, 21 st December A Stop / Go Traffic Management Plan will be in operation as required. Crofton Road, Dún Laoghaire * Installation of a public lighting column and associated works (on the green space on Crofton Road) commenced on Monday, 17 th September 2018 until Friday, 28 th September (intermittent) between 10:00 and 16:00 hrs. M50/M11 - Northbound/Southbound Information on planned road works along the M50 can be found at: Page 5 of 5 End

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S D L R C C T R A F F I C N E W S Saturday, 11 th August 2018 to Friday, 17 th August 2018 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below

More information

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S D L R C C T R A F F I C N E W S Saturday 23 rd July 2016 to Friday 29 th July 2016 A public service provided by the Transportation & Water Services Department of Dún Laoghaire-Rathdown County Council.

More information

Dún Laoghaire - Rathdown County Council. Cycle Network Review Study Report October 2012

Dún Laoghaire - Rathdown County Council. Cycle Network Review Study Report October 2012 Dún Laoghaire - Rathdown County Council Study Report October 2012 Z:\C2400-C2499\C2467\3_DOCUMENTS\10\TEMPORARYDIRECTORY\CYCLE STUDY REPORT_C2467.20 - ISSUE 10A.DOCX Dún Laoghaire - Rathdown County Council

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

POTTERY BUSINESS CENTRE DEVELOPMENT

POTTERY BUSINESS CENTRE DEVELOPMENT POTTERY BUSINESS CENTRE A H I G H S P E C I F I C A T I O N O F F I C E P R E M I S E S F R O M 4 0 M 2 L E A S E - P U R C H A S E - L E A S E / P U R C H A S E DEVELOPMENT Quality Management In order

More information

DÚN LAOGHAIRE COMHAIRLE DÁIL CEANNTAR. Submission to Boundary Committee No.2: County of Dún Laoghaire-Rathdown

DÚN LAOGHAIRE COMHAIRLE DÁIL CEANNTAR. Submission to Boundary Committee No.2: County of Dún Laoghaire-Rathdown DÚN LAOGHAIRE COMHAIRLE DÁIL CEANNTAR Submission to Boundary Committee No.2: County of Dún Laoghaire-Rathdown Dún Laoghaire Fianna Fáil Comhairle Dáil Ceanntar represents the Fianna Fáil organisation in

More information

COMHAIRLE CHONTAE DHÚN LAOGHAIRE-RÁTH AN DÚIN DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL

COMHAIRLE CHONTAE DHÚN LAOGHAIRE-RÁTH AN DÚIN DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL COMHAIRLE CHONTAE DHÚN LAOGHAIRE-RÁTH AN DÚIN DÚN LAOGHAIRE-RATHDOWN COUNTY COUNCIL Phone: 2054700 County Hall Dún Laoghaire Co. Dublin 28 October 2008 To Each Member of the Dún Laoghaire Area Committee

More information

MEETING OF DÚN LAOGHAIRE AREA COMMITTEE 27 SEPTEMBER Confirmation of Issues

MEETING OF DÚN LAOGHAIRE AREA COMMITTEE 27 SEPTEMBER Confirmation of Issues MEETING OF DÚN LAOGHAIRE AREA COMMITTEE 27 SEPTEMBER 2010 Confirmation of Issues Question: Councillor V. Boyhan To ask the Manager to provide the following: (a) a list of waste water discharge licences,

More information

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson

More information

PRIME RESIDENTIAL DEVELOPMENT OPPORTUNITY WITH FULL PLANNING PERMISSION FOR 13 LUXURY APARTMENTS

PRIME RESIDENTIAL DEVELOPMENT OPPORTUNITY WITH FULL PLANNING PERMISSION FOR 13 LUXURY APARTMENTS PRIME RESIDENTIAL DEVELOPMENT OPPORTUNITY WITH FULL PLANNING PERMISSION FOR 13 LUXURY APARTMENTS CGI of proposed scheme FULL PLANNING PERMISSION FOR 13 LUXURY APARTMENTS THE OPPORTUNITY 2 2 & 2 3 Prime

More information

Beach Wheelchair Hire Killiney Beach

Beach Wheelchair Hire Killiney Beach Beach Wheelchair Hire Killiney Beach From July 12 th 2018 Dún Laoghaire-Rathdown County Council offers a Beach Wheelchair hire service at Killiney Beach. These wheelchairs allow visitors with disabilities

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

Roads Maintenance Municipal Services Roads Programme Footpath Programme

Roads Maintenance Municipal Services Roads Programme Footpath Programme Roads Maintenance Municipal Services 2016 2018 Roads Programme 2016 Footpath Programme February 2016 0 Introduction The Annual Roads and Footpath programmes are usually presented to the 2 Area Committees

More information

Commonwealth Heads of Government Meeting: London 2018

Commonwealth Heads of Government Meeting: London 2018 Commonwealth Heads of Government Meeting: London 2018 Resident and Business Factsheet Location: The Royal Parks, the Commonwealth Village and the QEII Centre Impact dates: Saturday 14 to Sunday 22 April

More information

M6 J7 Rushall Canal: Essential Repair Work Briefing

M6 J7 Rushall Canal: Essential Repair Work Briefing M6 J7 Rushall Canal: Essential Repair Work Briefing Highways England need to carry out essential repair work to the M6 northbound carriageway between junctions 7 and 8 to keep it in a safe condition. From

More information

Bus Public Transport Strategy. External Road Proposals. Specific Objective: Specific Objectives: Specific Objective: Luas

Bus Public Transport Strategy. External Road Proposals. Specific Objective: Specific Objectives: Specific Objective: Luas External Road Proposals The existing at-grade junctions along the N11 especially Leopardswn Road, Clonkeen Road and Johnswn Road will be assessed identify measures improve capacity and reduce congestion.

More information

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route Dún Laoghaire Rathdown County Council Luas to Dart via UCD Cycle and Pedestrian Route October 2012 Luas to Dart via UCD Cycle and Pedestrian Route DOCUMENT CONTROL SHEET Client: Project Title: Document

More information

Agenda Item 34. N11 - Brewery Road Improvement Scheme

Agenda Item 34. N11 - Brewery Road Improvement Scheme Agenda Item 34 N11 - Brewery Road Improvement Scheme Public Consultation Report on Submissions Client: Dún Laoghaire-Rathdown County Council Date: November 2017 Job Number: 13_066A Document Pack Page 11

More information

Why invest in the 1 Street S.W. Corridor?

Why invest in the 1 Street S.W. Corridor? Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with

More information

A Dublin Suburban Timetable for Commuters (not Irish Rail) Part 1 Problems and Rationale of Solution

A Dublin Suburban Timetable for Commuters (not Irish Rail) Part 1 Problems and Rationale of Solution A Dublin Suburban Timetable for Commuters (not Irish Rail) Part 1 Problems and Rationale of Solution 13 January 2010 ! "#!#$%&'()*+,($ The 2010 Timetable has been universally declared a failure by DART

More information

EXHIBIT R1. Neighborhood Cul-de-Sac Implementation

EXHIBIT R1. Neighborhood Cul-de-Sac Implementation Neighborhood Cul-de-Sac Implementation The traffic study conducted for the Talaria project analyzed the amount of project traffic expected to use local, residential streets immediately north of the project

More information

Purple Line Extension. La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit

Purple Line Extension. La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit Purple Line Extension La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit La Brea Station Decking Schedule *Dates and work activities subject to change

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Lincoln Half Marathon Sunday 1 October 2017

Lincoln Half Marathon Sunday 1 October 2017 TRAFFIC INFORMATION Lincoln Half Marathon Sunday 1 October 2017 This document outlines details of the road closures and diversions that will be in place on the day of the event. Key Notes: The event will

More information

Richmond-Adelaide Cycle Tracks

Richmond-Adelaide Cycle Tracks Public Drop-In Event Richmond-Adelaide Cycle Tracks June 25, 2018 12:00 p.m. 3:00 p.m. 4:30 p.m. 7:30 p.m. Metro Hall, Rotunda 55 John Street 1 Purpose of Event In Scope Communicate an update about the

More information

APPENDIX E Evaluation of Improvement Alternatives

APPENDIX E Evaluation of Improvement Alternatives APPENDIX E Evaluation of Improvement Alternatives Table E-1 Preliminary Comparison of Design Alternatives, Concord Table E-2 Preliminary Comparison of Route 2 Improvement Packages, Acton and Concord TABLE

More information

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Approximate schedule with phases and proposed Maintenance of Travel (MOT) plans February 2017 Project Elements Removal of existing bridge

More information

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP December 29, 2014 Volume 2, Issue 102 DOUG s CORNER COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug s Corner.1 3 Traffic/Active Work 4-6

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

Dún Laoghaire s Digital Transformation Summary of the Action Plan for the creation of the Digital Dún Laoghaire Cluster

Dún Laoghaire s Digital Transformation Summary of the Action Plan for the creation of the Digital Dún Laoghaire Cluster Dún Laoghaire s Digital Transformation Summary of the Action Plan for the creation of the Digital Dún Laoghaire Cluster Authors Eoin Costello Sven Spollen-Behrens April 2017 An initiative of Dún Laoghaire

More information

Cincinnati Dayton Rd Widening

Cincinnati Dayton Rd Widening Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge

More information

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Nottingham Junctions Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Introduction The is the key east-west link across the East Midlands. The route is subject

More information

Welcome. Welcome to the second open house on the Downtown Transportation Study.

Welcome. Welcome to the second open house on the Downtown Transportation Study. Welcome 1 Welcome to the second open house on the Downtown Transportation Study. The purpose of this meeting is to: Recap the study objectives Summarize feedback to date Present information on the alternatives

More information

EIS - National Maternity Hospital

EIS - National Maternity Hospital 6.0 Traffic and Transportation 6.1 Introduction This chapter of the Environmental Impact Statement (EIS) presents the transport strategy for, and potential transport impacts of the proposed development

More information

Wanaka Community Board 16 November Report for Agenda Item: 1. Temporary Road Closure - Challenge Wanaka Triathlon Event 2017

Wanaka Community Board 16 November Report for Agenda Item: 1. Temporary Road Closure - Challenge Wanaka Triathlon Event 2017 Wanaka Community Board 16 November 2016 Department: Property & Infrastructure Report for Agenda Item: 1 Temporary Road Closure - Challenge Wanaka Triathlon Event 2017 Purpose 1 The purpose of this report

More information

PUBLIC INFORMATION MEETING

PUBLIC INFORMATION MEETING PUBLIC INFORMATION MEETING Bridge Rehabilitation Project Project Identification Number 5134.45 NY Route 5 Buffalo Skyway I-190 North Ramp, Pearl Street Ramp Wednesday, April 18, 2018 4:00 p.m. to 7:00

More information

Agenda Item # Page # RECOMMENDATION

Agenda Item # Page # RECOMMENDATION TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 2, 2016 JOHN BRAAM, P. ENG. MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER FIELD MARSHAL WOLSELEY

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Proposed Strategic Housing Development at the Former Doyle s Nursery and Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18

Proposed Strategic Housing Development at the Former Doyle s Nursery and Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18 Proposed Strategic Housing Development at the Former Doyle s Nursery and Garden Centre and Benoni, Brennanstown Road, Cabinteely, Mobility Management Plan Quality information Prepared by Checked by Approved

More information

A Socio-Economic Profile of Dún Laoghaire-Rathdown for the LCDC

A Socio-Economic Profile of Dún Laoghaire-Rathdown for the LCDC A Socio-Economic Profile of Dún Laoghaire-Rathdown for the LCDC Dublin City South Dublin Dundrum N 9 Blackrock Stillorgan 9 Dún Laoghaire Glencullen/Sandyford Killiney-Shankill Wicklow All-Island Research

More information

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha To: NDOR Environmental From: Randy McCart, HDR Date: 4 April 2017 RE: Public Involvement Summary Report, HSIP-5003(12) 132 nd and West Center Road, Omaha; C.N. 22629 Public Involvement Outreach Requirements

More information

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA 5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA The Transportation Services Committee recommends the adoption of the recommendations

More information

Seapoint Rugby Club Mini Rugby Festival 2017

Seapoint Rugby Club Mini Rugby Festival 2017 Information & Registration Pack On behalf of Seapoint Rugby Club I have great pleasure in inviting you to participate in our International Mini Rugby Festival which will take place at our club grounds

More information

Works on Local Government Controlled Roads. & Traffic Control Permit No

Works on Local Government Controlled Roads. & Traffic Control Permit No Works on Local Government Controlled Roads & Traffic Control Permit No. 171219-000220 Pursuant to Local Government Act 2009 (Section 75) This permit is valid for the following purpose(s) at the locations,

More information

A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving

A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving DRAFT: Transport Efficiency and Impact Guide April 2018 GUIDELINE DEVELOPMENT

More information

TRAFFIC INFORMATION Lincoln Half Marathon Traffic Information Summary Sunday 2 October, 2016

TRAFFIC INFORMATION Lincoln Half Marathon Traffic Information Summary Sunday 2 October, 2016 TRAFFIC INFORMATION Lincoln Half Marathon Sunday 2nd October 2016 This document outlines details of the road closures and diversions that will be in place on the day of the event. Key Notes: The event

More information

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND: ITEM # 29 DATE: 05-08-18 COUNCIL ACTION FORM SUBJECT: ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND: Ames will be an overnight stop for RAGBRAI XLVI from Tuesday, July 24 th, through Wednesday, July 25 th.

More information

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate

More information

Honorable City Council i. A / Richard A. Leahy, City Manager \~v Thomas E. Hansen, P.E., Public Works Director/ ;?:?-

Honorable City Council i. A / Richard A. Leahy, City Manager \~v Thomas E. Hansen, P.E., Public Works Director/ ;?:?- ----r 1: I To: From: By: Subject: CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US Honorable City Council i. A / Richard A. Leahy,

More information

Taylor Road Resurfacing Project

Taylor Road Resurfacing Project Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: November 9, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction & Traffic Highlights

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

Festival of Inclusion

Festival of Inclusion Programme of events Festival of Inclusion 5th-13th October 2018 Our Cultural Heritage: Where the Past Meets the Future Diversity Fashion Show Community 5k walk/run dlr Big Sing Dementia Awareness Talk

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Dún Laoghaire Town 2020 Vision

Dún Laoghaire Town 2020 Vision Dún Laoghaire Town 2020 Vision Outlining a five-year strategy for Dún Laoghaire Town Commissioned by the Dún Laoghaire Business Improvement District Company Derek Hughes, Managing Director Wessel Badenhorst,

More information

Dowling/Beaty Cycling Route

Dowling/Beaty Cycling Route Public Meeting #2 Dowling/Beaty Cycling Route May 17, 2017 6:00 p.m. 8:00 p.m. Parkdale Public Library - Auditorium 1303 Queen Street West How to Participate Share your questions, ideas and concerns We

More information

IL Route 71 Construction Update

IL Route 71 Construction Update 100 Parkers Mill Oswego, IL. 60543 (630) 554-3618 4.20.16 IL 71 TRAFFIC ADVISORY: Tentatively scheduled for April 21st A new traffic pattern from Paradise to Wolf Crossing on IL 71 will be in use. The

More information

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION A draft traffic control plan, consistent with the following applicable conditions, must be included in every permit application submitted to the City of

More information

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017 WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE

2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE 2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE 2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS HOLD HARD ROAD & SAWMILL ROAD INTERSECTION HARD ROAD WIDENING RIVERSIDE DRIVE REALIGNMENT I-270/US

More information

Recommendations. Central Salem Mobility Study

Recommendations. Central Salem Mobility Study Central Salem Mobility Study The Central Salem Mobility Study evaluated a range of multimodal transportation issues affecting downtown Salem, including circulation, access, and safety for people traveling

More information

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE CONTRACTOR S WEEKLY UPDATE -19TH AVENUE-BETHANY HOME TO DUNLAP January 19, 2015 Volume 2, Issue 105 DOUG s CORNER COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug s Corner.1 3 Traffic/Active Work 4-6

More information

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS CITY OF LINWOOD ATLANTIC COUNTY, NEW JERSEY March 30, 2006 PREPARED FOR: City of Linwood 400 Poplar Avenue Linwood,

More information

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS Contractor s Weekly Update NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP April 21, 2014 Volume 2, Issue 65 Doug s Corner SSWJV SAFETY QUALITY COURTEOUS RESPONSIVE DEPENDABLE In this issue: Doug

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Municipal Public Participation Network Submission For the 2018 budgets. Athlone Municipal District. Athlone Municipal Electoral Area

Municipal Public Participation Network Submission For the 2018 budgets. Athlone Municipal District. Athlone Municipal Electoral Area Athlone Municipal Public Participation Network 2017 Submission For the 2018 budgets to the Athlone Municipal District On Matters Relating to Athlone Municipal Electoral Area Affiliated to Westmeath Public

More information

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas GLEN EIRA CITY COUNCIL MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas 1 WHAT HAVE WE HEARD? WHAT NOW? Stage one Tell us what you love about your shopping strip November

More information

Transportation and Air Quality Committee GEL Project Briefing and Update

Transportation and Air Quality Committee GEL Project Briefing and Update Transportation and Air Quality Committee GEL Project Briefing and Update Mr. Darryl D. Van Meter, P.E. State Innovative Delivery Engineer June 11, 2015 Georgia Express Lane Projects 2 Program Benefits

More information

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009 MEMORANDUM Transportation Jim Kollbaum, PE 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: CyRide / ISU Intermodal Facility Steering Committee Date: August 31, 2009

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May 25 May 31, 2017 College Parkway: Lee County DOT will be trimming

More information

Harriet Fraser Traffic Engineering & Transportation Planning

Harriet Fraser Traffic Engineering & Transportation Planning Appendix 5: Traffic Assessment 71 26 February 2015 Mr James Beban Senior Resource Consents Planner Cuttriss Consultants Ltd PO Box 30429 Lower Hutt PO Box 40170 Upper Hutt 5140 P 04 526 2979 M 027 668

More information

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary Stantec Consulting Services Inc. 38 Technology Drive Suite 100, Irvine CA 92618-5312 September 8, 2017 File: 2073014320 Attention: Mark Trestik, Assistant City Engineer City of Beach Department of Public

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades STAFF REPORT ACTION REQUIRED and Bicycle Lane Upgrades Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services 19 and

More information

2.0 Reasons Dublin Cycling Campaign supports the proposed design

2.0 Reasons Dublin Cycling Campaign supports the proposed design Dublin Area Bus Network Redesign Public Consultation - September 2018 1.0 Introduction Dublin Cycling Campaign is the advocacy group for cycling in Dublin. Dublin Cycling Campaign wants to make Dublin

More information

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts PROJECT OVERVIEW Project Goal and Description The goal of the is to increase pedestrian safety and comfort along Lower Great Highway by evaluating and implementing near- and medium-term pedestrian improvements

More information

Commonwealth Heads of Government Meeting: London 2018

Commonwealth Heads of Government Meeting: London 2018 Commonwealth Heads of Government Meeting: London 2018 Residents and businesses factsheet, City of London Impact dates: Monday 16 Wednesday 18 April 2018 CITY OF LONDON CLOSURE AREAS 1 Location overview:

More information

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units Wesbrook Place Traffic Analysis of Redistributed Dwelling Units 1 Summary This report presents an analysis of the changes in traffic volumes in the Wesbrook Place neighbourhood associated with a redistribution

More information

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

COUNCIL ACTION FORM SUBJECT: REQUESTS FROM AMES VELO FOR AMES GRAND PRIX

COUNCIL ACTION FORM SUBJECT: REQUESTS FROM AMES VELO FOR AMES GRAND PRIX ITEM # 11 a & b DATE: 04-10-18 COUNCIL ACTION FORM SUBJECT: REQUESTS FROM AMES VELO FOR AMES GRAND PRIX BACKGROUND: The Ames Velo organization has proposed hosting its second Annual Ames Grand Prix bicycle

More information

Mr. Randy Kowalchuk, President

Mr. Randy Kowalchuk, President October 20, 2017 #201, 8506-200th Street, Langley, BC V2Y 0M1 T: 604.371.0091 F: 604.371.0098 Our Reference: 31931 Naramata Benchland Properties 176 Fraser Court, Penticton, BC V2A 8B4 Attention: Mr. Randy

More information

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager Agenda Item # 4 Work Session Meeting Date September 8, 2015 Prepared By Approved By Daryl Braithwaite Public Works Director Suzanne R. Ludlow City Manager Discussion Item Background Temporary Neighborhood

More information

Astoria Boulevard ADA and Station Renewal Track Improvements. February 19, 2019

Astoria Boulevard ADA and Station Renewal Track Improvements. February 19, 2019 Astoria Boulevard ADA and Station Renewal Track Improvements February 19, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install

More information

Collision Site Investigation - Bodenham By-Pass Background

Collision Site Investigation - Bodenham By-Pass Background Collision Site Investigation - Bodenham By-Pass Background The junction of the C12 and A338 was the subject of a Local Safety Scheme (LSS) in 2011. Analysation of the collisions at the time revealed the

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m. BRIDGE REHABILITATION Welcome 53 Avenue Overpass over Whitemud Drive Rehabilitation Public Information Session Wednesday, March 9, 2016 4:30-8:00 p.m. Tonight you can: Learn about the 53 Avenue Overpass

More information

Upgrade to smart motorway Junctions 3 to 12

Upgrade to smart motorway Junctions 3 to 12 Upgrade to smart motorway Junctions 3 to 12 Information exhibitions July 2018 About smart motorways Smart motorways are a technology All lane running driven approach to the use of our motorways, increasing

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE October 12 October 18, 2017 Gunnery Road and 8th Street SW Intersection

More information

NORTH BRAY & ENVIRONS LUTS

NORTH BRAY & ENVIRONS LUTS NORTH BRAY & ENVIRONS LUTS Dun Laoghaire Rathdown County Council, Wicklow County Council & Bray Town Council Draft Final Report for Public Consultation July 2006 Dun Laoghaire Rathdown County Council,

More information

On the instructions of OFFICE PORTFOLIO WITHIN ADELPHI HOUSE DUN LAOGHAIRE, CO. DUBLIN

On the instructions of OFFICE PORTFOLIO WITHIN ADELPHI HOUSE DUN LAOGHAIRE, CO. DUBLIN On the instructions of OFFICE PORTFOLIO WITHIN ADELPHI HOUSE DUN LAOGHAIRE, CO. DUBLIN LOCATION & IMMEDIATE VICINITY The property is located on Georges Street Upper, which is nestled in the centre of Dun

More information

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1 TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield

More information

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018: Veterans Boulevard (formerly Boundary Road) This two-year construction project will widen and pave all of Veterans Boulevard. In 2017, the first portion of the road from Highway 16A to 44 Avenue was completed.

More information

2015 Data review. Capturing Ready Lane NEXUS vehicles

2015 Data review. Capturing Ready Lane NEXUS vehicles 2015 Data review Capturing Ready Lane NEXUS vehicles Problem: NEXUS users make up the majority of traffic using the Ready Lane, but they are currently considered either standard traffic or Ready Lane traffic.

More information

QUEEN ELIZABETH WAY / MARTINDALE ROAD BRIDGE DEMOLITION DETOUR ANALYSIS

QUEEN ELIZABETH WAY / MARTINDALE ROAD BRIDGE DEMOLITION DETOUR ANALYSIS QUEEN ELIZABETH WAY / MARTINDALE ROAD BRIDGE DEMOLITION DETOUR ANALYSIS Fabio Saccon, P.Eng Area Traffic Manager Bernard James Engineer in Training Martin Sneep Senior Project Manager Lance Dutchak Traffic

More information

Lee County Department of Transportation

Lee County Department of Transportation Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE New Updates & Revisions September 3 rd, through September 9 th, 2015

More information

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH OVERVIEW N 51 ST BOULEVARD N 51 ST BOULEVARD 12,100 44,700 W CAPITOL DRIVE 52,600

More information