1 Meeting Notes Subject: Advisory Team Meeting #2 Client: SDDOT Project: Brookings Area MTP Project No: Meeting Date: September 30th, 2010 Meeting Location: Brookings SDDOT Office Notes by: HDR Attendees: HDR Jason Kjenstad and Rick Laughlin Banner Steve Rames City of Brookings Jackie Lanning, Thad Drietz, Mike Struck, Marty Stanwick SDDOT Steve Gramm, Brad Remmich, Ron Sherman (Brooke White was unable to attend) FHWA Mark Hoines Brookings County Larry Jensen Brookings Traffic Safety Committee Rep Skip Webster SDSU Dean Kattelmann City of Aurora Chuck Tiltrum (was unable to attend) Topics Discussed: 1.) Previous Meeting Minutes the study team spent the first portion of the meeting discussing the issues identified during the kick-off meeting and the network model figure. The list is shown below with additions or corrections: a. 6th Street 22 nd though 25 th Avenue (High Accident Rates, sight distance problems, flow) b. The intersection of 20 th Street South / Main Avenue South (Will this intersection need a signal or does it warrant a signal now) c. 20 th Street West of Main Avenue (What improvements are required) d. East/West Interstate Crossing at 20 th Street (Overpass to access Industrial Park) e. North/South Bike Routes (How to connect 6 th Street to 8 th Street South) f. Future Interchange at 32 nd / I29? Or 20 th / I29? (Will an interchange provide for additional access, safety, open capacity on other street segments) g. Will a signal at 34 th Street be needed? (SDDOT would like 34 th Street Avenue signalized in lieu of 32 nd Street Avenue due to the fact that 34 th Street Avenue is a future arterial and it provides for better signal spacing from the east I29 ramp) h. Hwy 14 Bypass improvements? (Are improvements warranted at Western and Hwy 14 Bypass, should a median or other safety measures be implemented) i. Would it be feasible or practical for the City of Brookings to take over 6 th Street as a City Street versus the SDDOT having jurisdiction? j. What improvements are needed to promote safety along Hwy 14 at each location that the campus has extended roadways? (Are signals, turn lanes, reduction in speed limit, medians necessary) k. Bike Routes to Campus? (Need a plan to incorporate bike traffic through the City of Brookings to the Campus) l. Pedestrian Plan along Medary Avenue? (how can pedestrian traffic across Medary Avenue be handled in a safe manner) m. Investigate Transit needs from area apartment complexes to the Campus. n. Concerns with the entrance to SDSU from 6 th Street being relocated from 12 th Avenue to 13 th Avenue? (Should the signal be relocated, is a signal warranted at 13 th ) o. Traffic on 22 nd Avenue South, traffic entering from the Elkton Exit on I29 is increasing traffic and there are concerns at the existing intersections south of 8 th Street South. p. 20 th Street Extension to Aurora? (Could it be feasible) Page 1 of 4
2 q. US 14 Bypass people have been observed making evasive maneuvers and passing on the right shoulder between I29 and the segment that is currently 4 lanes. 2.) Turning Movement Counts all turning movement counts required for the study have been taken as of September 30 th, During model calibration and intersection analysis HDR will determine if any additional counts or recounts are needed. 3.) Origin / Destination Study a majority of the O/D stations have been counted with three locations remaining; Banner is scheduled to conduct the O/D study on Highway 14 on Tuesday October 5 th, Banners approach was discussed with SDDOT and Brookings County staff at the completion of our study advisory team meeting. The Brookings County Police Department has also been informed of the current plan. Banner & Associates shall complete the necessary coordination to complete the O/D study in a safe and controlled manner. It is requested that John R. at the SDDOT Brookings office also be notified if changes take place to the current schedule. 4.) Event Observation HDR staff completed event observation for the South Dakota State University Football game on September 18 th, Average attendance at Coughlin-Alumni Stadium is over 13,200 fans. This type of traffic certainly has the potential to impact local streets and adjacent highways. Event Observation was completed for a period of 3 hours before the game and after the game until traffic levels normalized. Observation notes where provided to the Study Advisory Team during the September 30 th, 2010 meeting but the top concerns are identified below (not in order): a. The I29 northbound off ramp (east I29 ramp) intersection at 6 th Street (US 14) was observed to queue on average 8 vehicles with over 16 vehicles viewed at peak times. Delays certainly were not extreme but and event timing plan could be established that may minimize delay entering the City of Brookings. I29 East Ramp at 6 th Street (US 14) b. Stadium Road and 16 th Avenue W are used to enter the Coughlin Stadium parking area off of US 14B, currently no turn lanes exist on US 14B which causes some delay for the US 14B users and also some safety concerns. c. Parking along Stadium Road and 16 th Avenue W is reducing the speeds at which users can enter those streets from US 14A. Parking currently is allowed on both shoulders which reduces the lane widths, site distances, and speeds. It appears additional parking to remove users from parking on street within 300 to 400 feet from US 14B would greatly benefit entering and exiting both Stadium Road and 16 th Avenue W. Page 2 of 4
3 US 14B at Stadium Road d. The north leg of 22 nd Avenue and 6 th Street seemed to be geometrically challenging for some users, the three lane section north of 6 th Street widens out at the intersection to 4 lanes which are slightly offset from the south leg. The southbound direction does not currently have left turning phasing. Capacity didn t seem to be a large concern except for just a few cycles before and after the game. e. Lighting on US 14B at the entrance roads to the stadium does not exist, this makes exiting during the nighttime hours more difficult. f. Lighting on Medary Avenue near the Pedestrian Cross walks is poor, lighting exists on and over the street which causes pedestrians to be visible only after they enter the cross walk. 5.) Website / Facebook Page The following corrections were requested of the website pages and online survey: a. Home Page add a space in the first line b. Project Page Change inspecting to investigating in the first paragraph c. Project Page Change and to or in 3 rd paragraph when discussing interchange and overpass d. Project Page Modify 4 th Paragraph as desired based on comments on the 1 st and 2 nd sentences. e. Events Page Change Events link to Events / Documents link as we can place the public meeting or report information under this link. f. Get Involved Page no comments g. Online Survey Modify map colors with some green tones to reduce the overall red tone. h. Online Survey Add options or Retired and Unemployed to the pull down menus for question #2. Due to this comment #3 will only be asked if you are not unemployed or retired.. i. Online Survey for questions #8 add names of schools to clarify question as traffic at one school may be ok while traffic at another school location may be poor. 6.) Public Meeting Prep Discussion No changes in the location and time, press releases will be in the Brookings Register, Volga Tribune, and Collegian. An additional request was made to place the meeting release in the Town and Country Shopper; it will go to the shopper the week of the 11 th. 7.) Open House Presentation Discussion - Overall the presentation seemed to fairly easy to follow, one request is to have an additional slide that leads the public into realizing that we also want their comments on Rail, Air, Transit, etc Anything that may be viewed as intermodal or other than passenger car travel. This slide will be added after the Study Advisory Teams Issues and Needs slide. 8.) Open House Displays the following requests were made in regards to the display layouts: a. Recreational Path / Bike Paths need to additional information in regards to what the city has for on-street routes and also what the campus has for on street routes. Page 3 of 4
4 Follow-Up Tasks: b. Recreational Path / Bike Paths need to reduce the scale slightly to cover more of US 14 west of Brookings so people can comment on bike access from Volga, possibly use an inset. c. All Boards graphically show issues that the Study Advisory Team identified on the boards, this will allow the public to see what we are really asking of them and make additional comments. 1. Mike and Jackie will talk about the project website on the City channel on October 12 th, Town and Country Shopper HDR has coordinated to run the meeting announcement in the Town and Country Shopper the week of the 11 th. 3. Mike S. will provide sketch showing changes to the growth areas and other potential developments that should be included in the forecast model. 4. HDR to resubmit updated display boards to study advisory team via pdf for comments the week before the meeting. 5. Public Meeting Members of the Study Advisory Team that can attend shall be at City Hall 30 minutes before the meeting time of 5:00 pm. 6. HDR to work with Jackie/Thad and Dean to get bike route/path information to update boards. Page 4 of 4
5
Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
More informationGlenn Avenue Corridor Traffic Operational Evaluation
Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationA number of inferences have been drawn from the observations, each of which is discussed below.
Technical Memo To: Steve Gramm, Study Advisory Team From: Rick Laughlin Project: I-190/Silver St. CC: Date: 4/4/2011 Job No: RE: Special event observation HDR conducted an observation of special event
More informationHighway 111 Corridor Study
Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,
More informationSubject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis
MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationBrookings Traffic Safety Committee 2017 Annual Report
Brookings Traffic Safety Committee 2017 Annual Report PURPOSE The current Traffic Safety Committee was formed by Resolution 58-79 dated December 18, 1979 with its stated duties and responsibilities of
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More informationMETHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)
Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic
More informationAPPENDIXB. Traffic Operations Technical Memorandum
APPENDIXB Traffic Operations Technical Memorandum Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 MEMORANDUM Transportation Jim Kollbaum, PE
More informationHighway 217 Corridor Study. Phase I Overview Report
Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems
More informationWELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018
WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis
More informationSECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY
SECTION 7 INVEY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY The study corridor includes a total of 19 signalized intersections. Through consultation with Campbell County and the KYTC,
More informationGuidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions
ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way
More informationRecommended Roadway Plan Section 2 - Land Development and Roadway Access
Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines
More information2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE
2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE COMMITTEE RECOMMENDATIONS AS AMENDED That Council approve: 1. The endorsement
More informationAccess Location, Spacing, Turn Lanes, and Medians
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationDonahue Drive Corridor Traffic Operational Evaluation
Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More information3.0 PROJECT DESCRIPTION
The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.
More informationFINAL Albertville Business Park AUAR Update Traffic Study
FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...
More informationJONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY
JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State
More information#!! "$% ##! &! # '#! % $ #!
Executive Summary US Highway 16 (US 16) is the primary corridor connecting Rapid City to the Black Hills region. It serves a growing population of commercial and residential traffic, as well as seasonal
More informationORANGE COUNTY TRAFFIC COMMITTEE. Intersection Control. Constituent. Deepthi Arabolu. Relocate Stop Sign
ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 3 SUBJECT: Intersection Control LOCATION: Browning Avenue at Rainbow Drive; North Tustin; TB 830-E3 INITIATED BY: INVESTIGATOR: REQUEST: Constituent
More informationTraffic Management Guidelines for Structure Rehabilitation Projects
, Traffic Management Guidelines for Structure Rehabilitation Projects February 2009 1 Purpose & Background These guidelines were prepared in order to assist the Regional Structural Office in determining
More informationAPPENDIX A TRAFFIC ANALYSIS
APPENDIX A TRAFFI ALYSIS 1) 9/15/06 Traffic Analysis Memo; revised 9/29/06, 11/1/06, and 1/02/07 2) 7/6/09 SDDOT Traffic Analysis Recommendations for SD20/US81 Intersection Memo To: Watertown South onnector
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationCITY OF SASKATOON COUNCIL POLICY
ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationIntersection Traffic Control Feasibility Study
Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,
More informationCity of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014
Page: 1 of 8 1 POLICY 1.01 The City shall follow all of the specifications in the Manual of Uniform Traffic Control Devices for Canada, prepared by the National Committee of Uniform Traffic Control, and
More informationRM 620 FEASIBILITY STUDY
RM 620 FEASIBILITY STUDY Sections 5 & 6 December 7, 2015 STUDY PROCESS Study Purpose and Goals The RM 620 Feasibility Study was launched by the Texas Department of Transportation (TxDOT) to analyze transportation
More informationPERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4
PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,
More informationExecutive Summary June 2015
Executive Summary June 2015 Highway 112 Corridor Study Benton and Washington Counties Executive Summary June 2015 Prepared by Transportation Planning and Policy Division Arkansas State Highway and Transportation
More informationFORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION
FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise
More informationFigure 1: Vicinity Map of the Study Area
ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove
More informationChapter 4 Traffic Analysis
Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More information1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.
Most decisions about whether or not to use transit involve time and cost, and most transit services are slower than travel by private vehicle. However, when transit is faster or nearly as fast as travel
More informationCHAPTER 1 STANDARD PRACTICES
CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles
More informationDowntown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services
Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue Bus Rapid and Conventional Transit Planning and Design Services City of Saskatoon February 2018 Project Team HDR Corporation
More informationFINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM
FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item
More informationCycle Track Design Best Practices Cycle Track Sections
Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide
More informationINNOVATIVE INTERSECTION DESIGN
INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and
More informationAppendix C. Bicycle Route Signage
Appendix C Bicycle Route Signage This page intentionally left blank. APPENDIX C - BICYCLE ROUTE AND WAYFINDING SIGNAGE Bicycle route signs are wayfinding signs that guide bicyclists along preferred, designated
More informationIowa State Fair Special Events Management Strategic Plan
Iowa State Fair Special Events Management Strategic Plan April 2010 Prepared for Prepared by Table of Contents 1.0 Introduction... 1 2.0 Key Event Elements... 1 2.1 Event Characteristics and Attendance...
More informationLSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)
LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsccs.com May 15, 2009 Mr. Davis Farrar Western Slope Consulting, LLC
More information1. Provide a dedicated westbound approach bus lane at the intersection;
3. MODIFICATIONS AT HIGHWAY 417 WESTBOUND OFF-RAMP/PINCREST ROAD - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public hearing, that Council approve the preliminary design for the proposed modifications
More informationBike Routes Assessment: 95 Ave, 106 St & 40 Ave. Replace with appropriate image in View > Master.
Bike Routes Assessment: 95 Ave, 106 St & 40 Ave Replace with appropriate image in View > Master. Transportation Committee October 15, 2014 City Council Direction What we are trying to achieve The Way Ahead:
More informationREGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES
REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction
More informationNorthbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project
Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed
More informationMUTCD Part 6: Temporary Traffic Control
MUTCD Part 6: Temporary Traffic Control OMUTCD English units are preferred. OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES TABLE OF CONTENTS PREFACE INTRODUCTION TABLE OF CONTENTS PART 1. GENERAL Chapter
More informationArterial Management Plan for US Route 250 and State Route 623
Arterial Management Plan for US Route 250 and State Route 623 June 25, 2014 Brad Shelton, AICP Access Management and Traffic Impact Analysis Programs Manager Transportation and Mobility Planning Division
More informationPERFORMANCE ACTIVITY 405 LIMB MANAGEMENT
PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations
More information8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN
8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report
More informationSTREET AND HIGHWAY PLAN
STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets
More informationMUTCD Part 6G: Type of Temporary Traffic Control Zone Activities
MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,
More informationTRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio
TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationAttachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program
Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationNorthwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)
Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a
More informationTraffic Control Inspection Checklist Segment:
Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager
More informationTraffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas
ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest
More informationTraffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning
F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,
More informationSimulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer
Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer Abstract The Exposition Corridor transit project is a light rail project
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationDraft North Industrial Area-Wide Traffic Plan
Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block
More informationSTANLEY STREET December 19, 2017
STANLEY STREET December 19, 2017 Welcome Mike Wiza, Mayor Scott Beduhn, Director of Public Works Agenda 1. Introduction 2. Existing Roadway Conditions 3. Current Alternative Improvements 4. Summary of
More informationProject Description Form 6V
Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project
More informationRoute 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection
TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC
More informationDavid Agacinski FDOT District One Bicycle & Pedestrian Coordinator Daniels Parkway Ft. Myers, Florida 33913
Meeting Notes Date: December 20, 2018 Project #: 20166 To: David Agacinski FDOT District One Bicycle & Pedestrian Coordinator 10041 Daniels Parkway Ft. Myers, Florida 33913 From: Project: Subject: Patty
More informationM-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016
M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has
More informationTRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT
TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE
More informationBrian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project
MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October
More informationExisting Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer
Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /
More informationMemorandum. Sunday, July 13, Saturday, July 19, 2014
Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn
More informationTraffic Academy: IJS & IMS FAQ/RULES OF THUMB
FAQ/RULES OF THUMB HCS intersection analysis criteria See LDM Figure 401-14aE Cycle lengths between 60 to 120 seconds No impractical phases, i.e., 1 second green time Yellow + All Red must be no less than
More informationHENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.
HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc
More informationINDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.
INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting
More informationMINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY
MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study
More informationPERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3
PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 Install Remove Repair 613 IMPACT ATTENUATOR ACTIVITY DESCRIPTION Repair, install, remove and maintain
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationReadington Road (C.R. 637) Construction
Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon
More informationCo-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department
28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationTRANSPORTATION & MOBILITY
TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines
More informationAPPENDIX E: Transportation Technical Report
New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Reston Project Environmental Assessment APPENDIX E: Transportation Technical Report E.1 Introduction As part of the overall environmental
More informationInnovative Intersections
Innovative Intersections Things You Need to Know About FDOT D-7 Safety Academy October 19, 2016 Mark Doctor FHWA Resource Center Atlanta, GA HOW DO YOU FEEL??? about innovative intersections??? Why is
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationMEMORANDUM. Our project study area included the following locations:
MEMORANDUM Date: To: From: Subject: Najib O. Habesch Nick M. Fomenko, PE, PTOE Bushnell Park North Traffic Assessment BETA Project #: 4461 As part of our contract to undertake the design of the Bushnell
More informationMeeting Minutes. I-29 Exit 77 (41 st Street) Interchange Study and Environmental Assessment Carolyn Avenue Landowners
SDDOT I-29 Exit 77 (41 st Street) Interchange Study and Environmental Assessment Carolyn Avenue Landowners Meeting Minutes Meeting Minutes Project: Subject: I-29 Exit 77 (41 st Street) Interchange Study
More informationTRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT
November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront
More informationOperational Comparison of Transit Signal Priority Strategies
Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,
More informationRoad Safety Audit Report: Interstate 516
Road Safety Audit Report: Interstate 516 Interstate 516 from Veterans Pkwy to Montgomery St. (State Route 420 from Veterans Pkwy to City Street 115207) Table of Contents Introduction Road Safety Audit
More informationFAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:
FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,
More informationLTAC: Katie Mencarini, Central & Hampton Roads streets and a fifteen minute debrief to discuss the findings. Participants walked along Mill Road
Walkabout Summary On June 3, 2013, five participants met at Glen Allen Elementary School in Glen Allen, Virginia to take a closer look at the walking and biking network around the school. In addition to
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More information