2016 VEHICLE SUPPORT GUIDE

Size: px
Start display at page:

Download "2016 VEHICLE SUPPORT GUIDE"

Transcription

1 2016 VEHICLE SUPPORT GUIDE DRIVING DIRECTIONS & ECHANGE POINT INFORMATION RACE DAY CONTACT In case of emergency, dial 911. For urgent KT82 questions, please contact GO! St. Louis staff at

2 1

3 NOTE: All legs subject to change. 2

4 OVERVIEW of PARKWAY NORTH HIGH SCHOOL AREA Parkway North High School Fee Fee Road, HOST HOTEL Drury Hotel, Olive Boulevard, APPROACH ROUTES to START 270 to Olive West to Fee Fee Road to Parkway North 141 to Olive East to Fee Fee Road to Parkway North 364 to Bennington Place South to Fee Fee Road West to Parkway North 3

5 PARKWAY NORTH HIGH SCHOOL, Start of the KT82 Trail Relay Parking Teams enter Vehicle Check in Unavailable Parkway North High School Fee Fee Road, Start Proceed to Check in & Support Vehicle Inspection Station Ample Parking Available KT82 Start Line on Track 4

6 DRIVING DIRECTIONS, LEG 1. PARKWAY NORTH HIGH SCHOOL to LAKEHOUSE BAR & GRILL START DIRECTIONS Left on Fee Fee Road,.8 miles Right on Olive,.6 miles Right on Creve Coeur Mill Road, 1.5 miles Right in to Lakehouse Bar & Grill Parking Approximate Driving Time = 5 Minutes RUN ROUTE = 2.29 Miles Parkway North Track Cross Fee Fee Road Cross Bookbinder To Exchange 1 5

7 Creve Coeur Mill Road 6

8 DRIVING DIRECTIONS, LEG 2. LAKEHOUSE BAR & GRILL TO 364 ACCESS N 364 ACCESS ECHANGE 2 DIRECTIONS = Le on Creve Coeur Mill Road, 1.5 miles Right on Olive Blvd, 0.25 mile Right on 141 / Maryland Heights Expressway, 1.1 miles Right on 364 West, 2.5 miles Exit 14 toward S. River Road,.4 miles Right on S. River Road and immediate Right on Hemsath Road,.3 Miles RUN ROUTE = 3.93 Miles Leave Lakehouse exchange Le on aty Trail connector Cross 364 Bridge To Exchange 2 Right in to 364 Access Parking Lot A i e i i e = 9 i es 7

9 ECHANGE 2, 364 ACCESS Support Vehicle Parking 8

10 DRIVING DIRECTIONS, LEG ACCESS to GREENS BOTTOM ROAD TRAIL HEAD 364 ACCESS GREENS BOTTOM ROAD TRAIL HEAD ECHANGE 3 DIRECTIONS = Right on S. River Road,.1 miles Left on S. River Road / Arena Parkway, 2.2 miles S. River Road becomes Upper Bottom Road Left on Jungs Station Road,.6 miles CAUTION=TRAIL CROSSING!!! RUN ROUTE = 3.20 MILES Right hand turn on to Katy Trail Greens Bottom Road Crosses Trail To Exchange 3 Jungs Station Road becomes Greens Bottom Road Continue on Greens Bottom Road, 1.3 miles Left in to Greens Bottom Road Trail Head for Exchange 3 Parking Approximate Travel Time = 8 minutes 9

11 ECHANGE 3, GREENS BOTTOM ROAD Rest Rooms Support Vehicle Parking 10

12 LEG 4, DRIVING DIRECTIONS. GREENS BOTTOM ROAD to MISSOURI RESEARCH PARK / BUSCH GREENWAY Missouri x Research Park Trail Head DIRECTIONS e on reens o om Road,. miles Right on Pitman Hill Road, 2.8 miles, CAUTION!! TRAIL CROSSING!! e to 4 est,. miles e at Missouri Research Park Drive, 1.1 miles e at Ducke reek usch reeen a igns to Parking,. miles Approximate Driving Time = 19 minutes RUN ROUTE = 7.25 MILES ater ta on at 2.4 Miles Road Crossing Use Cau on reens o om Road crosses Trail Right turn on the Missouri Research Park Trail To Exchange 4 11

13 ECHANGE 4, MISSOURI RESEARCH PARK / BUSCH GREENWAY Overflow SV Parking Support Vehicle Parking MEDICAL STATION 1 12

14 LEG 5, DRIVING DIRECTIONS. MISSOURI RESEARCH PARK / BUSCH GREENWAY to WELDON SPRING CONSERVATION AREA / LEWIS & CLARK TRAIL HEAD DIRECTIONS = Exit parking,.5 miles Right on Research Park Drive, 1.1 miles Left on 94 West, Miles Right Left at into sign Department for Weldon Spring of Energy Conservation parking Area / Lewis & Clark Trail Head Parking Approximate Driving Time = 9 minutes RUN ROUTE = 4.72 MILES Missouri Research Park trail Right on to Katy Trail Water Station at Mile 1.99 Right in to Weldon Spring Conservation Area Uphill and single track to Lewis & Clark Trail Head 13

15 ECHANGE 5 OVERVIEW Parking in overflow lot Teams walk on shoulder to Exchange 5 Exchange 5 14

16 ECHANGE 5 PARKING Support Vehicle Parking Pedestrian Crossing Exchange 5 Park in Support Vehicle Parking area. Cross Highway 94 on foot and proceed to Exchange 5 15

17 ECHANGE 5, WELDON SPRING CONSERVATION AREA / LEWIS & CLARK TRAIL HEAD 16

18 LEG 6, DRIVING DIRECTIONS. DEPARTMENT OF ENERGY to WELDON SPRING TRAIL HEAD DIRECTIONS CAUTION!! TRAIL CROSSING!! RUN ROUTE = 5.89 MILES Single Track & Downhill on the Clark Trail Right turn on to Katy Trail Approximate Driving Time = 6 minutes To Exchange 6 17

19 ECHANGE 6, WELDON SPRING TRAIL HEAD Rest Rooms Support Vehicle Parking MEDICAL STATION 2 18

20 LEG 7, DRIVING DIRECTIONS. WELDON SPRING TRAIL HEAD TO WELDON SPRING CONSERVATION AREA DIRECTIONS = Right to exit parking CAUTION!! TRAIL CROSSING!! on nue or ile e on to e t mile CAUTION!! RUNNERS CROSSING ROAD!! Right in to Parking Approximate Driving Time = 4 minutes RUN ROUTE = 5.73 MILES Depart Exchange 6 Right on Hamburg Trail ater ta on at ile e on to o t alle Trail onnector e on to o t alle Trail ollo ign au on Tape to Exchange 19

21 ECHANGE 7, WELDON SPRING CONSERVATION AREA Support Vehicle Parking ECHANGE RULES = Support Vehicles approach exchange via Westbound Highway 94 Use Great Caution as Runners are running close to cones and also crossing Highway 94 Support Vehicles exit with right turn on to Westbound Highway 94 20

22 LEG 8, DRIVING DIRECTIONS. WELDON SPRING CONSERVATION AREA to MATSON DIRECTIONS = Right on 94 West, 3.7 Miles (through Defiance) CAUTION!! TRAIL CROSSING!! on nue on 94 West,.9 miles Right on Matson Hill Road CAUTION!! TRAIL CROSSING!! Immediate Right in to Parking Approximate Driving Time = 8 minutes RUN ROUTE = 4.43 MILES Depart Exchange 7 Cross ig a 4 Use Cau on Right on to Hamburg Trail Right on Katy Trail Water ta on at. 3 Miles To Exchange 8 21

23 ECHANGE 8, MATSON Support Vehicle Parking Rest Room ECHANGE RULES = Support Vehicles approach via Westbound Highway 94 and a Right turn on Matson Hill Road Support Vehicles must exit parking with a Right on Matson Hill Road to Exchange 9 22

24 LEG 9, DRIVING DIRECTIONS. MATSON to AUGUSTA DIRECTIONS = Right on Matson Hill Road, 1.2 Miles e on D ke Road,.7 miles ear e on to Schl ers rg Road,.9 miles Right on to 94 West,.7 miles e on h rch Road,.4 miles Right on Hackmann Road,.1 miles e on o er Street,.2 miles RUN ROUTE = 5.70 MILES Depart Exchange 8 ig a 9 Crosses Trai Use Cau on Water Sta on at Mile 2.19 To Exchange 9 Right on Main Street,.1 miles e on lic Street Right or e in to arking Approximate Driving Time = 21 minutes 23

25 ECHANGE 9, AUGUSTA Support Vehicle Parking Rest Rooms 24

26 LEG 10, DRIVING DIRECTIONS. AUGUSTA to DUTZOW DIRECTIONS = North on Public Street e on ain Street,.1 miles Right on Jackson Street,.7 miles e on to 9 est, 7. miles e turn to sta on 9 est,. miles Right in to Parking Approximate Driving Time = 14 minutes RUN ROUTE = 7.56 MILES Depart Exchange 9 ater Sta on at ile. 0 ater Sta on at ile.07 ig a 4 Crossing Use Cau on Exchange 10 25

27 ECHANGE 10, DUTZOW Rest Rooms Support Vehicle Parking ECHANGE RULES = Support Vehicles approach via Westbound 94 Support Vehicles Exit via Eastbound 94 26

28 LEG 11, DRIVING DIRECTIONS. DUTZOW to MARTHASVILLE DIRECTIONS Le on East, 2 miles Le on Bluff Road at irst Bank), 2 miles Bluff Becomes Loop Road Con nue Straight at Stop Sign to Boone Monument Road, miles Le on Highway D, 1 1 miles Highway D becomes Main Street RUN ROUTE = 3.78 MILES Depart Exchange 10 Boone Monument Road Crosses Trail 1 Street Hig a D Crosses Trai Use Cau on To Exchange 11 Le on 1 Street, 1 miles Right on Depot Street and mmediate le in to arking Approximate Driving Time = 11 minutes 27

29 ECHANGE 11, MARTHASVILLE Fuel Support Vehicle Rest Parking Rooms MEDICAL STATION 3 ECHANGE RULES = Support Vehicles Approach via Southbound Highway D Support Vehicles Exit via a e on to Depot Street FUEL = Fuel is available adjacent to Exchange 11 or on Highway 19 North of Marthasville 28

30 LEG 12, DRIVING DIRECTIONS. MARTHASVILLE to CONCORD HILL ROAD DIRECTIONS = Left on Depot Street,.2 miles Right on 5th Street,.1 miles Left on West South Street,.1 miles Left on to Highway 47,.2 miles RUN ROUTE = 3.46 MILES Depart Exchange 11 To Exchange 12 Right on 94 West, 3.2 miles Right on Concord Hill Road CAUTION!! TRAIL CROSSING!! Straight to parking Approximate Driving Time = 7 minutes 29

31 ECHANGE 12, CONCORD HILL ROAD Support Vehicle Parking in front of Peers Store To Exchange 13 Private Road DO NOT ENTER DO NOT ENTER Private Road Support Vehicle Parking on south side of Peers Bluff Rd Katy Trail DO NOT ENTER Private Road 94 DO NOT ENTER ECHANGE RULES = Support Vehicles approach from 94 West to Concord Hill Road Support Vehicles MUST depart via Concord Hill Road North Support Vehicles should park facing exit on Concord Hill Road 30

32 LEG 13, DRIVING DIRECTIONS. CONCORD HILL ROAD to TRELOAR DIRECTIONS = Exit via Concord Hill Road North, 3.7 miles Concord Hill Road becomes Mill Road e on High a N, 1.3 miles e on och Cree Road,.1 miles RUN ROUTE = 3.56 MILES Depart Exchange 12 o Cree Roa Crosses Trai Use Cau on To Exchange 13 Right on Mar et treet and e to ar ing Approximate Driving Time = 13 minutes 31

33 ECHANGE 13, TRELOAR Support Vehicle Parking Rest Room ECHANGE RULES = Support Vehicles approach via Highway N 32

34 LEG 14, DRIVING DIRECTIONS. TRELOAR to BERNHEIMER ROAD DIRECTIONS = Right on Market Street Right on Koch Creek Road,.1 Miles CAUTION!! TRAIL CROSSING!! Right on 94, 2.9 Miles CAUTION!! TRAIL CROSSING!! Con n e on 94,.2 Miles Le on Bernheimer Road at arr Sign,.2 Miles CAUTION!! TRAIL CROSSING!! Con n e on Bernheimer Road,. miles Approximate Driving Time = 8 Minutes RUN ROUTE = 4.17 MILES Leave Exchange 13 Hig a 4 rosses trai Use Cau on Bernheimer Road crosses trail Exchange 14 33

35 ECHANGE 14, BERNHEIMER ROAD ECHANGE RULES = Support Vehicles approach exchange point via Bernheimer Road Westbound. Support Vehicles exit by continuing West on Bernheimer toward Exchange 15 34

36 LEG 15, DRIVING DIRECTIONS. BERNHEIMER ROAD to LOST CREEK VINEYARD DIRECTIONS = Continue on Bernheimer Road CAUTION!! TRAIL CROSSING!! Continue on Bernheimer Road, 2.2 miles Right to continue on Bernheimer Road Left on 94, 3.9 miles Left on Gore Road at Lost Creek Vineyard sign,.3 miles RUN ROUTE = 5.18 MILES Depart exchange 14 Water Station at Mile 2.80 Right turn on Gore Road Exchange 15 Left in to Lost Creek Vineyard Parking Approximate Driving Time = 13 minutes 35

37 ECHANGE 15, LOST CREEK VINEYARD Support Vehicle Parking Lost Creek Vineyard Support Vehicle Parking ECHANGE RULES = Support Vehicles approach via Gore Road, enter Lost Creek Vineyard only at Enter sign 36

38 LEG 16, DRIVING DIRECTIONS. LOST CREEK VINEYARD to CASE ROAD DIRECTIONS = Right on Gore Road,.2 miles Le on est,.5 miles Right on Case Road,.1 miles Approximate Driving Time = 6 minutes RUN ROUTE = 3.42 MILES Leave exchange 15 Right turn on Katy Trail ig a 4 Crosses Trai Use Cau on To Exchange 16 37

39 ECHANGE 16, CASE ROAD ECHANGE RULES = Support Vehicles approach via Highway 94 Westbound and turn on to Case Road To exit, Support Vehicles continue Westbound on Case Road toward Exchange 17 38

40 LEG 17, DRIVING DIRECTIONS. CASE ROAD to McKITTRICK DIRECTIONS = Continue on Case Road, 1.8 miles Bear Left to remain on Case Road,.6 miles CAUTION!! TRAIL CROSSING!! Continue on Case Road,.1 miles Right on 94, 2.1 miles Right on McKittrick Road,.4 miles RUN ROUTE = 3.84 MILES Leave Exchange 16 Case Road Crossing McKittrick Road Crosses Trail To Exchange 17 CAUTION!! TRAIL CROSSING!! Left on Sterline Street,.1 miles Left in to Parking Approximate Driving Time = 12 minutes 39

41 ECHANGE 17, McKITTRICK Support Vehicle Parking Rest Room ECHANGE RULES = Support Vehicles approach via Sterline Street Support Vehicles MUST e it via e turn out o Trail Head on to Sterline Street inal Runner Le turn. mile rom e change, imme iatel a er tunnel. 40

42 LEG 18, DRIVING DIRECTIONS. McKITTRICK to HERMANN & FINISH DIRECTIONS = Left on Sterline Street Left on Main Street,.3 miles Left on Highway 19, 2.3 miles CAUTION!! RUNNERS on RIGHT SHOULDER!! Cross Bridge in to Hermann Left on 3rd, 4th or 5th Street,.2 miles Park & Join your finishing runner on Gutenberg Street for TEAM FINISH! Approximate Driving Time = 9 minutes RUN ROUTE = 2.59 Miles Leave Exchange 17 Under Highway 19 then Left Turn to Highway 19 Shoulder Cross Missouri River Left on 2nd Street Right on Gutenberg Street FINISH!! 41

43 LEG 18, HERMANN & FINISH FINISH Amphitheater MEDICAL STATION 4 Teams are encouraged to join Leg 18 runner on Gutenberg for a TEAM FINISH!!!! 42

44 SPONSORED BY WITH SUPPORT FROM

2017 VEHICLE SUPPORT GUIDE

2017 VEHICLE SUPPORT GUIDE 2017 VEHICLE SUPPORT GUIDE DRIVING DIRECTIONS & EXCHANGE POINT INFORMATION RACE DAY CONTACT In case of emergency, dial 911. For urgent KT82 questions, please contact GO! St. Louis staff at 314-477-9427

More information

Driving Directions & Exchange Point Information

Driving Directions & Exchange Point Information Driving Directions & Exchange Point Information race day contacts In case of emergency, dial 911. For urgent KT82 questions, please contact GO! St. Louis staff at 636.248.2209 or 314.477.9427 1 2 OVERVIEW

More information

PARTICIPANT RACE GUIDE

PARTICIPANT RACE GUIDE PARTICIPANT RACE GUIDE JUNE 3, 20 The GO! Missouri TM KT82 participant guide is the exclusive property of GO! St. Louis and may not be copied, duplicated or edited in any manner without the written permission

More information

PART #1 ALTON, IL TO MACHENS, MO

PART #1 ALTON, IL TO MACHENS, MO The TransAm Eastern Express - Westbound Map Set #18A Alton, IL to Augusta, MO (via Clark Bridge) 52.0 Miles / Cumulative Climbing: 780 PART #1 ALTON, IL TO MACHENS, MO CYCLING NARRATIVE: 0.0 Leaving Alton

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

2017 Relay Team Handbook

2017 Relay Team Handbook 2017 Relay Team Handbook Race Date: April 23, 2017 (Updated 4/05/17) PRESENTED BY Welcome to the Mt. Si Relay 2017 This booklet contains important information for the 34th Annual Mt. Si Relay, April 23,

More information

About The Big Bend Open Road Race U.S 285 Course Notes

About The Big Bend Open Road Race U.S 285 Course Notes 2018 About The Big Bend Open Road Race U.S 285 Course Notes Course notes for 2018, Ft. Stockton to Sanderson and return. * Please note that these course notes are based on the 2017 race. You will notice

More information

Leg Map & Elevation Profile. Finish Address: 1913 Highway 402 Huger, SC

Leg Map & Elevation Profile. Finish Address: 1913 Highway 402 Huger, SC Palmetto70 Relay - Leg #1 Distance: 2.80 Miles Start: Witherbee Ranger Station Rating: Easy Finish: Huger Rec Area GPS Coordinates for Finish: Lat: 33.135 Lon: -79.811 Finish Address: 1913 Highway 402

More information

Durrance Elementary School

Durrance Elementary School Durrance Elementary School SCHOOL ROUTE PLAN For DURRANCE ELEMENTARY SCHOOL LOCATION 9 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE February 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-039 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015 Vehicular and Pedestrian Access to Herndon Metrorail Station Robert B. Boxer, Director John Stuart, Clark Nexen Project Location The project is located in the Town of Herndon along Herndon Parkway between

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center

Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center 35 Rock Road - Monday thru Friday EASTBOUND Effective: November 26, 2018 & Valley Industries 5:01A 5:07A 5:17A 5:28A 5:23A 5:30A 5:40A 5:51A 5:47A 5:54A 6:04A 6:16A 5:35A 5:41A 5:51A 5:58A 6:10A 6:17A

More information

Important Lane Closures for Jan , 2012

Important Lane Closures for Jan , 2012 Jan. 19, 2011 CONTACT: Marcia McAllister T: 703-572-0506 C: 571-730-9117 marcia.mcallister@dullesmetro.com Important Lane Closures for Jan. 22-28, 2012 Bridge Construction along Median of Route 7 Continues,

More information

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017 Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road October 3, 2017 Study Area (area within a ¼-mile radius of the study intersections) Route

More information

To Whom It May Concern:

To Whom It May Concern: 19 To hom It May Concern: The St Patrick s Music City Half Marathon, 10k, 5k and Lucky Dog One Mile ag n alk will take place on Saturday, March 16th. There will be some lane and street closures between

More information

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.

More information

2017 TIR Driver Directions & Instructions Important Notes:

2017 TIR Driver Directions & Instructions Important Notes: 2017 TIR Driver Directions & Instructions Important Notes: We suggest having this document, the event maps (online or printed out), a GPS device (and its charger), the exchange coordinates, and a regular

More information

Iowa Highway 58 Corridor Improvement Study

Iowa Highway 58 Corridor Improvement Study 1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project

More information

FEDEX GROUND PITTSBURGH MARATHON RELAY HANDBOOK

FEDEX GROUND PITTSBURGH MARATHON RELAY HANDBOOK FEDEX GROUND PITTSBURGH MARATHON RELAY HANDBOOK The FedEx Ground Pittsburgh Marathon Relay course is the same as the DICK S Sporting Goods Pittsburgh Marathon course. The 2-5 person relay offers a distance

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

Race Weekend Instructions

Race Weekend Instructions Race Weekend Instructions Thank You for registering for the Surfer s Path Marathon, Capitola Half Marathon or Capitola Half Marathon Relay. We re excited to bring you this event that showcases the Santa

More information

3.5 Preferred Design Description of LRT/Road Layout, Stops and Stations

3.5 Preferred Design Description of LRT/Road Layout, Stops and Stations 3.5 Preferred Design Description of LRT/Road Layout, Stops and Stions The following section includes a detailed description of LRT/ road layout (including special cross-sections), bridge modificions, and

More information

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Serving North Carolina s High Country with Continuing, Cooperative,

More information

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program City of El Cerrito San Pablo Avenue Specific Plan Capital Improvement Program May 2015 San Pablo Avenue Intersection Improvements San Pablo Avenue and Hill Street/Eastshore Boulevard Background Existing

More information

Foothill Expressway Improvements Between El Monte and San Antonio

Foothill Expressway Improvements Between El Monte and San Antonio Foothill Expressway Improvements Between El Monte and San Antonio June 29, 2017 - Los Altos Community Meeting Introduction Project Background Agenda Visit Stations: Provide Input and Ask Questions Reconvene:

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

BRR Leg 25 (4.3 miles, Moderate)

BRR Leg 25 (4.3 miles, Moderate) BRR Leg 25 (4.3 miles, Moderate) Min 2290 Max 2492 Ascent +287 Descent -244 0.0 EZ 24 (Bakersville Fire Dept.) 0.0 Cross bridge 0.0 L Route 226 4.3 Red Hill Baptist Church, on L (EZ 25) Leg Notes: 226

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 12a 9/8/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE

More information

OCEAN TO SOUND RELAY SEPTEMBER 25, 2016 COURSE DESCRIPTION LEG 1

OCEAN TO SOUND RELAY SEPTEMBER 25, 2016 COURSE DESCRIPTION LEG 1 GENERAL DESCRIPTION: 5.9 MILES--ALL FLAT START: JONES BEACH STATE PARK FIELD #2 FINISH: CEDAR CREEK PARK (SEAFORD) OCEAN TO SOUND RELAY LEG 1 0.0 miles START ON BOARDWALK AT EAST END OF JONES BEACH PARKING

More information

OTO BIKE/PED PLAN REPORT

OTO BIKE/PED PLAN REPORT OTO BIKE/PED PLAN REPORT 6/30/2012 Implementation in FY2012 This report outlines the bike/ped accomplishments related to the OTO Bike/Ped Plan. Activities occurring during the 2012 Fiscal Year, July 1,

More information

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017 AGENDA ITEM 6 TxDOT Bicycle Tourism Trails Study Update April 2017 BAC Meeting April 10, 2017 Agenda Approval of interim products o Present study vision statement, goals, and study objectives o Present

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc. TEHIL MEMORUM To: Kevin Even, P.E. Village Engineer and Public Works irector Village of Waunakee 400 King James Way, uite 200 Madison, Wisconsin 3719 608-663-1218 www.klengineering.com From: Kevin Wehner,

More information

Road Construction Summary Report

Road Construction Summary Report Road Construction Summary Report New Location Description Impacts When Est. Completion Date Delay Church St/ROUTE - 952G Eastbound/Westbound ramp to Route 5 Westbound City Ramp will be closed From 6pm

More information

A-1 Arcadia with Signal

A-1 Arcadia with Signal A-1 Arcadia with Signal Dakota St Variation: Half 3/4 with westbound left at Main 4 - Fewer downtown access points - Less efficient traffic operations - Highest project costs vanston. ote: traffic volumes

More information

Some streets and highways will be closed to vehicular traffic during the 2015 Road World Championships. While

Some streets and highways will be closed to vehicular traffic during the 2015 Road World Championships. While Some streets and highways will be closed to vehicular traffic during the 2015 Road World Championships. While some closures last the entire duration of the 2015 Worlds, most will occur daily to accommodate

More information

9 th Annual. And Youth Super Sprint. August 27, Proceeds to benefit: FAMILIES OF THE WOUNDED FUND

9 th Annual. And Youth Super Sprint. August 27, Proceeds to benefit: FAMILIES OF THE WOUNDED FUND 9 th Annual And Youth Super Sprint August 27, 2017 Proceeds to benefit: FAMILIES OF THE WOUNDED FUND Sprint Triathlon: $65 per person (Add $10 after August 7); $110 for relay team of 3 persons (Add $10

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 24-30, 2019 Corbett Road: Motorists who use Corbett Road in North

More information

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PRESENT Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PROJECT TEAM REPRESENTATIVES Name Organization Celia McAdam Luke McNeel Caird Leo Heuston Judy Matsui

More information

Trail and Driving Directions

Trail and Driving Directions Trail and Driving Directions GETTING TO THE START: FROM CADILLAC: Follow M-55 west from US131 for 20.9 miles to the corner of M-37 and M-55 FROM THE INTERSECTION OF M-55 AND M-37: Head west on M-55 2.7

More information

Public Engagement Session

Public Engagement Session Public Engagement Session Valley Line West LRT will play an essen al role in connec ng Edmonton s communi es, and we are working to have it ready to go as soon as funding becomes available for construc

More information

Gravel Bike Guide Haywood County

Gravel Bike Guide Haywood County Gravel Bike Guide Haywood County Haywood County is an ideal place for bicycling on gravel roads, because 37% or 129,994 acres of Haywood County is federal property, including portions of the Pisgah National

More information

Route 190 Corridor Enfield / Somers, Ct.

Route 190 Corridor Enfield / Somers, Ct. Route 190 Corridor Enfield / Somers, Ct. A Multi-Faceted Approach Prepared by: Robert P. Jurasin, P.E., Wilbur Smith Associates Herbert S. Levinson, Transportation Consultant 6 th National Conference on

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

Fish Lake Team Relay Course Information 2016

Fish Lake Team Relay Course Information 2016 Fish Lake Team Relay Course Information 2016 Fish Lake Team Relay Course Information 2016 The Fish Lake Team Relay begins at Fish Lake Lodge on the shores of beautiful Fish Lake located in Sevier County,

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

South Shore Babe Ruth : 635 Page Ave - S.I. N.Y (718) College of Staten Island: 2800 Victory Blvd S.I. N.Y

South Shore Babe Ruth : 635 Page Ave - S.I. N.Y (718) College of Staten Island: 2800 Victory Blvd S.I. N.Y Great American Classic Field Directions Field Key: SS South Shore Babe Ruth CSI College of SI NS New Springville LL AL American Legion Brooklyn WS West Shore Little League CHS Curtis HS ND New Dorp HS

More information

MARCH 2005 PERFORMANCES DRIVING DIRECTIONS

MARCH 2005 PERFORMANCES DRIVING DIRECTIONS All dancers must arrive (generally) 30 minutes before performance time as noted after each performance location and wait quietly before dancing. Dancers who do not arrive on time for a performance may

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:

More information

3rd Annual Passaic River Paddle Relay Registration Form

3rd Annual Passaic River Paddle Relay Registration Form 3rd Annual Passaic River Paddle Relay Registration Form - Event Date: Saturday, May 12th, 2007 Race starts at 9:00am RAIN OR SHINE Please send completed form and check to: Thomas Pietrykoski PVSC 600 Wilson

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY SECTION 7 INVEY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY The study corridor includes a total of 19 signalized intersections. Through consultation with Campbell County and the KYTC,

More information

Mile Posts: ROUTE 550 (West to East) SRI = Date last inventoried: June Begin Rt. 550 MP=0.

Mile Posts: ROUTE 550 (West to East) SRI = Date last inventoried: June Begin Rt. 550 MP=0. Mile Posts: 0.000 -.000 Olive Street Main Street Railroad Avenue Hall Carisle P lac e NJ 347 Broad Street New Ward Avenue 748 Station 710 De l se a Drive Leesburg Belleplain 47 8535 Main Street 740 of

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

TRANSPORTATION IMPROVEMENT PLAN

TRANSPORTATION IMPROVEMENT PLAN Administration -- $675,000 $692,000 $709,000 -- -- 1 Interfund Transfer (Rural Roads) -- $1,280,000 $1,296,000 $1,312,000 -- -- 2 Economic Development Fund -- $7,000,000 -- -- -- -- 3 City of Cottleville

More information

4 Level of Service Results: HOV and Express Lanes

4 Level of Service Results: HOV and Express Lanes 4 Level of Service Results: HOV and Express Lanes Considering the importance of managed lanes (such as HOV and express lanes) in improving the overall performance of a corridor, Alameda CTC started monitoring

More information

2018 Tour of Anchorage Race Bible

2018 Tour of Anchorage Race Bible 2018 Tour of Anchorage Race Bible Sponsors The Arctic Bicycle Club Road Division appreciates our amazing sponsors! Our sponsors generous support makes events like the Tour of Anchorage possible. Thank

More information

USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS

USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS 0.0 L SS Hill Rd 0.3 L SL S Gay Street 0.6 R SL E Blount Ave - stay S at SL 2.2 L SL Maryville Pike 2.3 R SS Martin Mill Pike 4.0 L Neubert Springs

More information

CSAH 101 Preliminary Design

CSAH 101 Preliminary Design CSAH 101 Preliminary Design Public Open House No. 2 January 29, 2013 CSAH 62 to Hutchins Drive Welcome / Introductions Hennepin County Craig Twinem, Transportation Maury Hooper, Transportation Nick Peterson,

More information

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle Bluffdale 14600 South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle From Pony Express to UPRR Bridge over SR-140 $ 669,700 $ 624,361 To build bicycle/shoulder lanes on SR-140. SR-140 is an official

More information

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013 CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant February 5, 2013 Service Overview Study Overview East Cooper Service Analysis Provide additional analysis as a follow up

More information

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS Community Visioning Open House The Community Visioning Open House was held on January, 31st 2018 at Harrisburg Area Community College (HACC), Lancaster Campus. Approximately 80 people attended this Open

More information

MAKING MISSOURI A BETTER PLACE TO WALK AND RIDE A BICYCLE!

MAKING MISSOURI A BETTER PLACE TO WALK AND RIDE A BICYCLE! MAKING MISSOURI A BETTER PLACE TO WALK AND RIDE A BICYCLE! 1709 Missouri Blvd Ste. C #200 Jefferson City, MO 65109 MoBikeFed.org EXECUTIVE DIRECTOR: Brent Hugh director@ mobikefed.org BOARD OF DIRECTORS:

More information

Evaluation Criteria. Record of Decision (ROD) 7/04-8/05 8/05-9/05 TBD TBD TBD. Final EIS (FEIS) Community Outreach

Evaluation Criteria. Record of Decision (ROD) 7/04-8/05 8/05-9/05 TBD TBD TBD. Final EIS (FEIS) Community Outreach EIS Process We are here 1 2 3 4 5 Scoping Purpose and Need Evaluation Criteria Alternative Development Alternative 7/03-12/03 12/03-2/04 12/03-2/04 1/04-5/04 3/04-8/04 6 7 8 9 10 Draft EIS (DEIS) Evaluation

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: November 9, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction & Traffic Highlights

More information

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate

More information

American Legion Legacy Run Route Plan

American Legion Legacy Run Route Plan American Legion Legacy Run Route Plan Indianapolis to Houston, August 18-22, 2013 This plan is subject to change based on changing road conditions during the Run, or when directed by law enforcement or

More information

Transportation Impacts: Toronto York Spadina Subway Extension

Transportation Impacts: Toronto York Spadina Subway Extension STAFF REPORT ACTION REQUIRED Transportation Impacts: Toronto York Spadina Subway Extension Date: June 6, 2011 To: From: Wards: Reference Number: North York Community Council Director, Transportation Services

More information

Fish Lake Team Relay Course Information

Fish Lake Team Relay Course Information Fish Lake Team Relay Course Information Fish Lake Team Relay Course Information The Fish Lake Team Relay begins at Fish Lake Lodge on the shores of beautiful Fish Lake located in Sevier County, Utah. The

More information

To: Visiting Team. From: Craig Biggs, Associate Athletic Director for Operations

To: Visiting Team. From: Craig Biggs, Associate Athletic Director for Operations TEAM HOST MANUAL To: Visiting Team From: Craig Biggs, Associate Athletic Director for Operations In an attempt to accommodate you and your team during your stay in Bowling Green, the WKU Team Host Manual

More information

POLICY ADVISORY COMMITTEE

POLICY ADVISORY COMMITTEE September 27, 2018 POLICY ADVISORY COMMITTEE ENVIRONMENTAL ANALYSIS PHASE Agenda 1. Welcome and introductions. 2. Overview of project activities and process. 3. Public engagement update. 4. Community Advisory

More information

APPENDIX C. SIGNING INDEX. Regulatory Signs

APPENDIX C. SIGNING INDEX. Regulatory Signs 2005 Edition Appendix C-1 APPENDIX C. SIGNING INDEX Regulatory Signs R1-1 R1-2 R1-2a R1-3 R1-4 Sec. 2B.04 Sec. 2B.08 Sec. 2B.08 Sec. 2B.04 Sec. 2B.04 R1-5 R1-5a R1-6 R2-1 R2-2 R2-H2a Sec. 2B.11 Sec. 2B.11

More information

ELK VALLEY ULTRA RACER HANDBOOK PRESENTED BY STAG LEAP RUNNING CO. JULY 29, 2017 FERNIE, BC

ELK VALLEY ULTRA RACER HANDBOOK PRESENTED BY STAG LEAP RUNNING CO. JULY 29, 2017 FERNIE, BC ELK VALLEY ULTRA RACER HANDBOOK JULY 29, 2017 FERNIE, BC PRESENTED BY STAG LEAP RUNNING CO. TABLE OF CONTENTS WELCOME PAGE 3 GETTING READY PAGES 3 4 o Accommodation Discounts o Can t Race? o Change to

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Queensgate Drive Corridor Traffic Study

Queensgate Drive Corridor Traffic Study January 2015 Prepared for: City of Richland Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington 99336 Table of Contents Introduction and Background... 1 Existing

More information

Highway 169 Mobility Study Technical Advisory Committee Meeting #9 Meeting Record

Highway 169 Mobility Study Technical Advisory Committee Meeting #9 Meeting Record Highway 169 Mobility Study Technical Advisory Committee Meeting #9 Meeting Record Thursday, May 25, 2017 8:30-10:30 a.m. City of Eden Prairie Heritage Rooms I and II Attendees Brad Larsen, MnDOT Angie

More information

Driving and Parking with University Parking Permit

Driving and Parking with University Parking Permit Visitor Information University of California, Berkeley School of Social Welfare 120 Haviland Hall 510-642-4241 (Front Desk) Driving and Parking with University Parking Permit The enclosed F hangtag permit

More information

DAFFODIL FESTIVAL 2018 STREET PARADE BANDS & LARGE MARCHING UNITS USING BUSES (SU#5)

DAFFODIL FESTIVAL 2018 STREET PARADE BANDS & LARGE MARCHING UNITS USING BUSES (SU#5) DAFFODIL FESTIVAL 2018 STREET PARADE BANDS & LARGE MARCHING UNITS USING BUSES (SU#5) The Parade will start at: 10:15 a.m. in Tacoma 2:30 p.m. in Sumner 12:45 p.m. in Puyallup 5:00 p.m. in Orting MARCHERS:

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

West Circle Drive (CSAH 22) Traffic Operations Study

West Circle Drive (CSAH 22) Traffic Operations Study West Circle Drive (CSAH 22) Traffic Operations Study May 24, 2016 Open House Harriet Bishop Elementary School 6:45 8:00 p.m. Presentation at 7:00 p.m. Purpose of Tonight s Meeting Introductions Explain

More information

RACE BOOK. PARTICIPANT S GUIDE TO THE RACE WEEKEND

RACE BOOK. PARTICIPANT S GUIDE TO THE RACE WEEKEND RACE BOOK A P R I L 7, 2 0 1 8 H A L F 5 K R E L AY PARTICIPANT S GUIDE TO THE RACE WEEKEND www.runbentonville.com TABLE OF CONTENTS 3 4 5 6 7 8 9 10 11 12 13 14 SCHEDULE OF EVENTS RACE RULES & TIME LIMIT

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Dear Participants: Annie Doucette Physical Oceanography Department

Dear Participants: Annie Doucette Physical Oceanography Department AOMIP School (October 20) and AOMIP Workshop (October, 21, 22, and 23) Information Package Woods Hole Oceanographic Institution Woods Hole, Massachusetts 02543 October 20, 21, 22, and 23, 2009 Dear Participants:

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

DIRECTIONS TO MCCORMICK PLACE SOUTH BUILDING. Driving Directions. Page. 14

DIRECTIONS TO MCCORMICK PLACE SOUTH BUILDING. Driving Directions. Page. 14 DIRECTIONS TO MCCORMICK PLACE SOUTH BUILDING Public Gates Drop Off/Pick Up: Gate 4 Taxi Drop Off/Pick Up: Gate 4 Shuttle Bus Drop Off/Pick Up: Gates 1 3 * Private Charter Drop Off/Pick Up: Gate 26 (North

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information