1 Lane Departure Road Safety Audit for Interstate 290 through Worcester, Massachusetts Prepared by Central Massachusetts Regional Planning Commission and University of Massachusetts Traffic Safety Research Program Prepared for Massachusetts Highway Department Federal Highway Administration

2 1.0 Introduction to Road Safety Audits & Lane Departure Crashes in Massachusetts The Federal Highway Administration defines a Road Safety Audit (RSA) as the formal safety examination of an existing or future road or intersection by an independent, multidisciplinary team. The purpose of an RSA is to identify potential safety issues and possible opportunities for safety improvements considering all roadway users. Specific objectives of an RSA include, but are not limited to the following: Minimizing the risk and severity of road crashes that may be affected by the existing or future roadway at a specific location or nearby network; Improving the awareness of safe design practices which are likely to result in safety benefits based upon potential safety concerns. Although RSA s have been employed in other countries for some time, they are being fully embraced across the United States as a low cost opportunity to make significant safety improvements at any number of stages ranging from project development and planning through existing operation. Furthermore, RSA s have proven to be effective on projects of all shapes and sizes. The RSA program here in the Commonwealth presents a unique and exciting opportunity for improvements in roadway safety. The RSA program in Massachusetts is being implemented in accordance with the Commonwealth s role as a lead state in preventing run-off the road (lane departure) crashes and in conjunction with the Strategic Highway Safety Plan (SHSP). Lane departure crashes are a notable problem area for Massachusetts, especially for crashes with high injury severities. Between 2002 and 2004, lane departure crashes accounted for nearly 20 percent of all crashes in Massachusetts and approximately one-quarter of crashes involving an incapacitating injury. Almost one-half of fatal crashes between 2002 and 2004 were lane departure crashes. As the crash severity increases, so too does the percent of crashes that is lane departures as shown in Figure 1. All Massachusetts Crashes, Massachusetts Incapacitating Injury Crashes, Massachusetts Fatal Crashes, % 24.5% 46.2% Lane Departure Crashes Other Crashes Figure 1 Relationship between Lane Departure Crashes and Injury Severity In an effort to combat the lane departure problem, a strategy was developed for the SHSP to identify hot spot lane departure locations, perform road safety audits and implement low-cost comprehensive countermeasures. The following report summarizes the findings of a RSA focused on lane departure crashes (LD-RSA) along Interstate 290 (I-290) through Worcester, Massachusetts. Page 2

3 2.0 Background Material for Interstate 290 I-290 is a 20 mile segment of highway that stretches from Auburn, Massachusetts to Marlborough, Massachusetts. I-290 connects the Massachusetts Turnpike (I- 90) through downtown Worcester, Massachusetts and bends east towards Marlborough, Massachusetts before ending at Interstate 495. Worcester is the second largest city in New England, located in Worcester County, with a population estimated to be over 175,000 in Within Worcester, I-290 extends approximately 7 miles and has 12 exits which provide access to facilities such as the Worcester Regional Airport, the Amtrak/Commuter Rail Station, local colleges, and other major roads (Interstates and state routes). Three of the twelve exits are westbound exit/eastbound entrance only, three are eastbound exit/westbound entrance only, and one has no westbound entrance. The cross section for I-290 varies from three up to a maximum of five lanes in each direction at various points as it passes through downtown Worcester. A sample cross-section for I-290 is shown in Figure 2, Figure 2 Interstate 290 in Worcester and a summary of major characteristics, including crash summaries, is presented in Figure 3. The LD-RSA for I-290 was held on November 28, 2007 at the CMRPC offices in Worcester, Massachusetts. In total, 12 team members participated in the road safety audit as listed in Table 1, and as indicated representatives were present from Federal, State, Regional and Local agencies including a cross-section of engineering/planning, education, and enforcement expertise. Members of the lane departure road safety audit team were encouraged to visit I-290 prior to the meeting to familiarize themselves with the roadway attributes and characteristics. A copy of the meeting agenda and instructions, as well as a packet of pertinent information was distributed to RSA meeting invitees prior to the meeting; this information is included in the Appendix of this report. Table 1 Participating Audit Team Members Audit Team Members Bonnie Polin Neil Boudreau One Hwang Lisa Schletzbaum Sylvia Hertl Tim White Ken Petraglia Mark Johnson Joe Frawley Dan Nicoloro Kevin Krasnecky Michael Knodler Agency/Affiliation Massachusetts Highway Department Safety Management Unit Massachusetts Highway Department Traffic Engineering Section Massachusetts Highway Department Highway Design Massachusetts Highway Department Safety Management Unit Massachusetts Highway Department Safety Management Unit Federal Highway Administration Beta Group, Inc. Massachusetts Highway Department District 3 Traffic Engineering Massachusetts Highway Department District 3 Traffic Engineering Massachusetts State Police Central Massachusetts Regional Planning Commission University of Massachusetts Amherst Page 3

4 In WB direction the area after the merge with I-190 becomes 5 lanes prior to a middle lane drop Combined horizontal and vertical curve East toward I-495 Dual exit 19 & 20 in EB direction Vertical curve (downgrade EB) with fairly straight alignment ATR Location #3 Sept Core area of downtown Worcester which is serviced by a series of closely spaced interchanges, including exits 13, 14, 15, and 16 ATR Location #2 Aug Cluster of lane departure crashes. Tangent section of roadway following / leading curves with in an area with limited concrete median or roadside barriers Horizontal curve with enhanced delineation ATR Location #1 Sept Southwest to Auburn and MassPike (I-90) As may be expected there is a high level of adjacent development and visual activity throughout the corridor Figure 3 Major Characteristics for Interstate 290 through Worcester Page 4

5 Additional information regarding crashes, volumes, and speed limits were summarized during the course of the meeting as follows. Massachusetts Highway Department (MassHighway) traffic count data was provided for both the eastbound and westbound directions from three different ATR studies, which are summarized in Table 2. As shown the ADT varies from the core of downtown Worcester as compared to the study location just south of downtown. Through downtown the ADT exceeds 125,000, with a slightly higher eastbound volume. During peak periods there are over 10,000 vehicles on I-290. Table 2 Summary of Observed Traffic Volumes along Route 24 Interval ATR Location #1 I-290 North of Hope Ave. September 2007 ATR Location #2 I-290 at East Central Street August 2007 ATR Location #3 I-290 at Lincoln Street September 2007 Start time EB WB TOTAL EB WB TOTAL EB WB TOTAL 12:00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 AM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM :00 PM Daily Totals Page 5

6 Observed travel speeds and speed limits are a concern on along I-290. On either side of Worcester, I-290 is posted at 65 mph, with actual travel speeds likely in excess of that value based upon anecdotal accounts of RSA team members present; however through the existing curvature and the core of downtown Worcester, the posted speed limit is 50 mph. This reduction, as well as driver s recognition of it, and adherence to it, is discussed in greater detail later in this report. The actual speed regulations for I-290 through Worcester are summarized in Table 3. Table 2 Summary of Speed Regulations for I-290 in Worcester Eastbound Westbound Beginning at the Auburn line Beginning at the Shrewsbury line 0.51 miles at 65 mph 1.45 miles at 65 mph 4.87 miles at 50 mph 4.88 miles at 50 mph 1.46 miles at 65 mph 0.51 miles at 65 mph Ending at the Shrewsbury line Ending at the Auburn line MassHighway compiled, and distributed I-290 crash data. There were 371 reported crashes along I-290 in Worcester between 2005 and Of these crashes, 29 percent (109 crashes) were lane departure crashes (plotted in Figure 3), and 6 percent were work zone crashes; the frequency of work zone crashes is not surprising given both the magnitude and duration of construction along this corridor. A comprehensive summary of the 371 crashes is included within the Appendix; however, some of the key observations include the following: o 65 percent of all crashes occurred during daylight conditions, and 26 percent occurred at night. By comparison, 51 percent of lane departure crashes occurred at night. o Considering all crashes, the predominant crash pattern was rear-end crashes (48 percent) followed by single vehicle crashes (25 percent), and sideswipes in the same direction (17 percent). 94 percent of the lane departure crashes involved a single vehicle. o For lane departure crashes, 36 and 26 percent of crashes involved a median barrier or guard rail, respectively. o Lane departure crashes tended to be more severe as 60 percent involved an injury (59 percent) or fatality (1 percent). Amongst all crashes, 30 percent involved an injury (29 percent) or fatality (1 percent). o A variety of driver contributing codes were included for lane departure crashes: failure to keep proper lane (26 percent), driving too fast for conditions (17 percent), exceeding authorized speed limit (13 percent), operating vehicle in erratic, reckless, careless manner (9 percent), over correcting / over-steering (7 percent), and unknown or not reported (18 percent). Additional resources made available to the team during the audit meeting included field videos from several drives along I-290 which were used in aiding discussion of specific roadway elements. Also available were possible resources including the AASHTO Strategic Highway Safety Plan and the related National Cooperative Highway Research Program (NCHRP) 500 series reports. Page 6

7 3.0 Characterization of Major Traffic Safety Challenges Following a brief introduction to the RSA process in general, the meeting participants were asked to summarize and characterize potential safety considerations along I-290 through Worcester. The initial characterization of the major safety considerations focused on several key elements. An initial topic of conversation was related to speeds throughout the corridor. Of specific concern was the reduction in speed (65 to 50 mph) that occurs on both ends of this segment. The Massachusetts State Police had sent a letter requesting enhanced signage or other measures which would alert drivers to the speed reduction. These sentiments were echoed by many of the RSA team members in attendance. Coupled with this concern over reductions were the anecdotal reports of off-peak speeds which were reported in the range of 80 to 85 mph. A second major concern in the westbound direction was the overall 5-lane cross-section and merging / weaving once I-190 joins in to I-290. Specifically cited was the wide cross-section with worn pavement markings, as well as the fact that the downstream lane drop is a merge of two middle lanes. Also noted was the perceived panic which some drivers experience resulting in drivers attempting to move right, immediately after the merge occurs to access the next downstream exit. The existing work zones and construction, which have been ongoing for some time, were discussed; however, it was reported that major construction is scheduled for completion in the spring of Traffic spills back on to I-290 from some of the exit ramps. The safety concern was attributed to the adjacent surface intersections that were not equipped to process the existing traffic. A specific example mentioned was Exit 18 where an intersection two blocks from the interchange (Salisbury Street) queues enough to impede the exiting right-turn traffic from I-290. The traveling conditions along I-290 vary considerably throughout the course of the day and across days of the week. This is particularly true in light of the current construction and associated work zones. Some concern was raised about how this information is related to drivers. It is relevant to note that there are overhead variable message signs (see Figure 4) at both ends of this corridor which are operated by the traffic operations center out of Boston. Merging from some of the area on-ramps was discussed. A specific example mentioned was the on-ramp from Grafton Street (Exit 14) that has a high jersey barrier, which obstructs visibility of traffic streams, both entering and main line, from one another (see Figure 5). Another cited on-ramp was from East Central Street where drivers nervous about weaving attempt to do so as quickly as possible, often before it is safe. Other significant factors mentioned at the outset of the meeting included the following: o A clogged catch basin near Vernon Street; o Condition of existing pavement markings and signage; o Overall pavement conditions; o Condition of cobblestones and/or markings for on-ramps; and o Condition of crash cushions for off-ramps. Figure 4 Current VMS Figure 5 On-ramp from Grafton Street Page 7

8 4.0 Summary of Short Term Recommendations for I-290 through Worcester The formal review of potential safety concerns along I-290 was completed by the entire audit team. Following identification of a potential safety issue, the dialogue focused on possible countermeasures with some preliminary discussion regarding the feasibility of implementation (timeframe and cost) as well as the potential payoff of safety benefits. Given the potential for an immediate impact, there was an added focus on short term (less than 1 year) and low cost (less than $10,000) improvements that could be implemented quickly resulting in a positive safety impact. Unlike other roadways being evaluated as part of the Massachusetts LD-RSA process, some of the opportunities for I-290 are limited because of its Interstate classification. Additionally, it may be expected that associated costs for recommended strategies may be higher again because of the Interstate classification. For example, routine maintenance may cost more in this application because of the challenges and requirements for completing this along the Interstate. Based partly in response to concern from the Massachusetts State Police, the Massachusetts Highway Department previously reviewed opportunities that would enhance communication of the changing roadway environment to drivers on either side of this roadway segment. In particular, there was a desire to alert drivers of the speed reduction and curvature. A summary of the complete changes, which includes the proposed changes as well as discussion regarding other alternatives that were deemed not applicable, is included in the Appendix. Some of the proposed signage scheduled to be added in the spring of 2008 is shown in Figure 6. Figure 6 Proposed Signage for Interstate 290 Page 8

9 A majority of the remaining short-term recommendations were related to general maintenance and included some of the following tasks: Replace worn or damaged signage (e.g. Exit 19 WB sign was downed at time of field visit); Repair glare paddles that are damaged around horizontal curve near I-190; Reapply pavement markings that are currently very worn through/north of downtown area and consider exploring higher quality markings based upon benefit/cost analysis; Repair loose cobblestones in the area near several on-ramps; Inspect crash cushions at off-ramps including sand barrels that were broken open (EB in downtown area) at the time of the field visit; and Inspect and repair catch basin near Vernon Street which floods the nearby by ramp in the eastbound direction. Some other short term recommendations that should be considered are listed below. Enhance signage near Grafton Street on-ramp that would alert drivers of oncoming traffic. Please note that longer-term strategies should possibly be considered here as the limited sight distance could be problematic. Examples may include installation of a device that separates traffic streams until sight distance for the weave is provided. Identify opportunities to utilize and expand upon the ITS infrastructure that is in place. From a safety perspective, the most recognizable safety benefit would be communication of dynamic roadway conditions to drivers (i.e., congestion ahead, crash ahead, etc.). Consider modifications at adjacent surface streets that would help prevent vehicles from queuing on to the I-290 mainline. Many different types of modifications have the opportunity to result in potential improvements to safety along I-290. A specific example is the proposed signal timing modifications at Lincoln Square. 5.0 Summary of Additional I-290 Countermeasures Although an emphasis was placed upon short term and low cost improvements that could be carried out immediately, the focus of the team was not limited to those constraints. The following section details countermeasures discussed by the team, which are reflective of all costs and timeframes and includes both general (entire corridor) and specific safety opportunities. Please note that with respect to the timeframe, there are some unknown variables that must be further explored. Several definitions exist for low, mid, and high cost as well as for short, mid and long term implementation timeframes. For purposes of this report, low cost improvements will be under $10,000, mid costs will be under $50,000, and high costs will be above $50,000. From a timeframe perspective, short term will refer to implementation timeframes less than 1 year, while mid and long term will refer to countermeasures that will take 1 to 3, and greater than 3 years, respectively. Page 9

10 Potential Safety Issue Communicating changing conditions to drivers, specifically, speed reduction & curvature Interchange improvements Possible Countermeasures Continue with proposed signage recommended by MassHighway (see Appendix for details). After the signage is added, an evaluation should be completed to determine its effectiveness, which may result in the identification of other safety opportunities. Explore ways of improving operations at these intersections where congestion problems have been reported and consider how this may tie in with current/proposed developments. Implementation Timeframe & Cost Short Term & Low Cost Short Term & Low Cost Potential Safety Payoff High Low Solutions of all timeframes, costs, and safety payoffs are possible Photos Concrete medians barriers Add median barrier reflectors. Short Term & Low Cost Low Sight distance at Grafton Street on ramp to I-290EB Enhance signage near Grafton Street on-ramp that would alert drivers of oncoming traffic. Short Term & Low Cost Low Driver behavior issues Explore expanded partnerships with HSD for education and enforcement support regarding high speed, aggressive driving and road rage, distracted driving, and tailgating. Short Term & Low/Mid Cost Mid/High Page 10

11 Potential Safety Issue Possible Countermeasures Implementation Timeframe & Cost Potential Safety Payoff Photos Drainage and pavement concerns Repair poor pavement areas (e.g. through / north of downtown). Perform catch basin inspection to improve current drainage, specifically the I-290 EB catch basin near Vernon Street. Long Term & High Cost Short Term & Low Cost Mid/High Low/Mid Markings & delineation Improve pavement markings through/north of downtown and evaluate highly reflective and durable pavement markings using a benefit /cost analysis. Mid Term & Mid/High Cost High Expand ITS related activity Integrate ITS technology such as cameras and variable message signs, which can be employed for monitoring (operations or crashes), driver feedback regarding congestion, or weather conditions. Long Term & High Cost Mid/High Merge from I-190 with I-290WB Consider alternative to eliminate confusing center lane merge, and provide a more orderly flow through 5-lane cross-section where unnecessary weaves are made. Short Term & Low Cost; however actual improvement will be long-term Low Page 11

12 6.0 Discussion As previously noted, the opportunities for safety improvements for I-290 may be somewhat restrictive or expensive as compared to other roadways. Nevertheless, it is important to note that for the safety improvement opportunities described in the previous sections: 1) many treatments are both low cost and short term; and 2) there is a complimentary nature of many of the safety strategies in that one improvement may address multiple safety issues. Please note that although this document provides a series of specific recommendations which warrant short term implementation, it should be noted that the approach towards improved safety is dynamic in nature and warrants revisiting over time. It is also worth noting that some of the modifications may already be in the process of implementation. For example, proposed signage is scheduled for spring 2008; some of this may be included as part of current construction, and the remainder should be considered moving forward. Several additional topics that were discussed at the audit meeting and warrant consideration. Some discussion was focused upon the closure and/or consolidation of on-ramps, such as the two on-ramps from Grafton Street. As another example, it was noted that the Vernon Street ramp was closed during construction, and it was also noted that Belmont Street to I-290WB is a high rear-end crash location. In the end, it was believed that existing volumes were too high for such closures; however perhaps these could be explored with any long-range plans in the future. Another element discussed related to interchanges was the I-290 EB split at I-190, and in particular the weave from the Lincoln Street on ramp. There was a suggestion to add a lane from the ramp and continue it through. This may be considered, moving forward. Success stories were woven in to the discussion as well. Two safety aspects that were cited included the curve delineation as well as the improved roadway lighting. There was some discussion at the RSA meeting regarding what lessons could be learned from the major construction effort undertaken on I-290. It may be worth developing a brief report which reflects upon the work zone practices and their impacts; this which may be useful in developing future work zones across the Commonwealth. Page 12

13 7.0 Appendix: Distributed RSA Meeting Materials Materials provided to RSA team members in advance of the meeting included the following: 1. Agenda 2. RSA and Lane Departure Introduction 3. Crash Data Summary 4. Geo-Located Crash Map 5. LD-RSA Checklist 6. MassHighway Letter Detailing Proposed Signage Page 13

14 Road Safety Audit for Worcester I-290 Meeting Place: Central Mass Regional Planning Commission 35 Harvard Street, Worcester Wednesday, November 28, :00 11:00 AM Type of meeting: Attendees: Please bring: Lane Departure Road Safety Audit Invited Participants to Comprise a Multidisciplinary Team Thoughts and Enthusiasm!! 9:00 AM Welcome and Introductions 9:15 AM Introduction to Road Safety Audits and Lane Departure Crashes 9:30 AM Review of Site Specific Material Crash & Volume provided in advance Existing Geometries and Conditions Video and Images 10:00 AM Completion of RSA Identification of Safety Concerns using checklists as a guide Identification of Possible Countermeasures 11:00 AM Adjourn for the Day but the RSA has not ended Instructions for Participants: Before attending the RSA on November 28th participants are encouraged to drive I-290 within Worcester, MA and complete/consider elements on the RSA advisory checklist with a focus on safety factors affecting roadway departure crashes. All participants will be actively involved in the process throughout. Participants are encouraged to come with thoughts and ideas, but are reminded that the synergy that develops and respect for others opinions are key elements to the success of the overall RSA process. After the initial RSA meeting, participants will be asked to comment and respond to the document materials to assure it is reflective of the RSA completed by the multidisciplinary team. Page 14

15 Introduction to Road Safety Audits & Lane Departure Crashes in Massachusetts The Federal Highway Administration defines a Road Safety Audit (RSA) as the formal safety examination of an existing or future road or intersection by an independent, multidisciplinary team. The purpose of an RSA is to identify potential safety issues and possible opportunities for safety improvements considering all roadway users. Specific objectives of an RSA include, but are not limited to the following: Minimize the risk and severity of road crashes that may be affected by the existing or future roadway at a specific location or nearby network; Improve the awareness of safe design practices which are likely to result in safety benefits based upon potential safety concerns. Although RSA s have been employed in other countries for some time, they are being fully embraced across the United States as a low cost opportunity to make significant safety improvements at any number of stages ranging from project development and planning through existing operation. Furthermore, RSA s have proven to be effective on projects of all shapes and sizes. The RSA program here in the Commonwealth prevents a unique and exciting opportunity for improvements in roadway safety. The RSA program in Massachusetts is being implemented in accordance with the Commonwealth s role as a Lead State in preventing run-off the road (lane departure) crashes and in conjunction with the Strategic Highway Safety Plan (SHSP). Lane departure crashes are a notable problem area for Massachusetts, especially for crashes with higher injury severities. Between 2002 and 2004, lane departure crashes accounted for nearly 20 percent of all crashes in Massachusetts and approximately one-quarter of crashes involving an incapacitating injury. Almost one-half of fatal crashes between 2002 and 2004 were lane departure crashes. As the crash severity increases, so does the percent of crashes that are lane departures as shown in the figure below. All Massachusetts Crashes, Massachusetts Incapacitating Injury Crashes, Massachusetts Fatal Crashes, % 24.5% 46.2% Lane Departure Crashes Other Crashes In an effort to combat the lane departure problem, a strategy was developed for the SHSP to identify hot spot lane departure location, perform road safety audits and implement low-cost comprehensive countermeasures. Page 15

16 Page 16

17 Page 17

18 Page 18

19 Page 19

20 Page 20

21 GEOMETRIC DESIGN Issue Comment A. Speed (Design Speed; Speed Limit & Zoning; Sight Distance; Overtaking Are there speed-related issues along the corridor? Please consider the following elements: Horizontal and vertical alignment; Posted and advisory speeds Driver compliance with speed limits Approximate sight distance Safety passing opportunities B. Road alignment and cross section With respect to the roadway alignment and crosssection please consider the appropriateness of the following elements: Functional class (Urban Principal Arterial) Delineation of alignment; Widths (lanes, shoulders, medians); Sight distance for access points; Cross-slopes Curbs and gutters Drainage features C. Intersections For intersections along the corridor please consider all potential safety issues. Some specific considerations should include the following: Intersections fit alignment (i.e. curvature) Traffic control devices alert motorists as necessary Sight distance and sight lines seem appropriate Vehicles can safely slow/stop for turns Conflict point management Adequate spacing for various vehicle types Capacity problems that result in safety problems D. Auxiliary lanes Do auxiliary lanes appear to be adequate? Could the taper locations and alignments be causing safety deficiencies? Are should widths at merges causing safety deficiencies? Page 21

22 E. Clear zones and crash barriers For the roadside the major considerations are clear zone issues and crash barriers. Consider the following: Do there appear to be clear zones issues? Are hazards located too close the road? Are side slopes acceptable? Are suitable crash barriers (i.e., guard rails, curbs, etc.) appropriate for minimizing crash severity? Barrier features: end treatments, visibility, etc. F. Bridges and culverts (if necessary) Are there specific issues related to bridges and culverts that may result in safety concerns? G. Pavement (Defects, Skid Resistance, and Flooding) Is the pavement free of defects including excessive roughness or rutting, potholes, loose material, edge drop-offs, etc.) that could result in safety problems (for example, loss of steering control)? Does the pavement appear to have adequate skid resistance, particularly on curves, step grades and approaches to intersections? Is the pavement free of areas where flooding or sheet flow of water could contribute to safety problems? In general, is the pavement quality sufficient for safe travel of heavy and oversized vehicles? H. Lighting (Lighting and Glare) It is important to consider to the impacts of lighting. Some specifics include the following: Is lighting required and, if so, has it been adequately provided? Are there glare issues resulting from headlights during night time operations or from sunlight? Page 22

23 TRAFFIC CONTROL DEVICES Issue Comment I. Signs Signage is a critical element in providing a safe roadway environment. Please consider the following: Are all current signs visible? Are they conspicuous and clear? Are the correct signs used for each situation? Are signs visible (consider both night and day)? Does the retroreflectivity or illumination appear satisfactory? Are there any concerns regarding sign supports? J. Traffic signals Although the focus of this RSA are lane departures, this does present an opportunity for us to consider any traffic signals. Specifically: If present, do the traffic signals appear to be designed, installed, and operating correctly? Is the controller located in a safe position? (where it is unlikely to be hit, but maintenance access is safe) Is there adequate sight distance to the ends of possible vehicle queues? K. Marking and delineation Is the line marking and delineation: appropriate for the function of the road? consistent along the route? likely to be effective under all expected conditions? (day, night, wet, dry, fog, rising and setting sun, oncoming headlights, etc.) Are centerlines, edgelines, and lane lines provided? If not, do drivers have adequate guidance? Page 23

24 ROADWAY ACTIVITY Issue With respect to roadway activity please consider safety elements related to the following: Pedestrians Bicycles Public transportation vehicles and riders Emergency vehicles Commercial vehicles Slow moving vehicles Comment ENVIRONMENTAL CONSIDERATIONS Issue Comment Weather & Animals From an environmental perspective it is important to consider any potential impacts. Most notably is likely to be the impacts of weather or animals, including: Possible effects of rain, fog, snow, ice, wind on design features. Has snow fall accumulation been considered in the design (storage, sight distance around snowbanks, etc.)? Are there any known animal travel/migration routes in surrounding areas which could affect design? Page 24

25 Page 25

26 Page 26

27 Page 27

28 Page 28

Lane Departure Road Safety Audit for Interstate 195 through Swansea, Massachusetts

Lane Departure Road Safety Audit for Interstate 195 through Swansea, Massachusetts Lane Departure Road Safety Audit for Interstate 195 through Swansea, Massachusetts Prepared by The Southeast Regional Planning & Economic Development District and The University of Massachusetts Traffic

More information

Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts

Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts Prepared by University of Massachusetts Traffic Safety Research Program Prepared for Massachusetts Highway

More information

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department ROAD SAFETY AUDIT Falmouth Road (Route 28)/Bearses Way Town of Barnstable May 2009 Prepared for: Massachusetts Highway Department Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA

More information

Lane Departure Road Safety Audit for Route 130 in Mashpee, Massachusetts

Lane Departure Road Safety Audit for Route 130 in Mashpee, Massachusetts Lane Departure Road Safety Audit for Route 130 in Mashpee, Massachusetts Prepared by Cape Cod Commission and University of Massachusetts Traffic Safety Research Program Prepared for Massachusetts Highway

More information

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control

More information

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments

More information

CHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT

CHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT CHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT 6.1 Road alignment and cross-section 6.1.1 Visibility; sight distance Is sight distance adequate for the speed of traffic using the route? Is adequate sight

More information

Road Safety Audit Report: Interstate 516

Road Safety Audit Report: Interstate 516 Road Safety Audit Report: Interstate 516 Interstate 516 from Veterans Pkwy to Montgomery St. (State Route 420 from Veterans Pkwy to City Street 115207) Table of Contents Introduction Road Safety Audit

More information

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015 ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,

More information

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT 5.1 General items 5.1.1 Alignment Are the roadworks located safely with respect to horizontal and vertical alignment? If not, does works signing cater for this?

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

ROAD SAFETY AUDIT MAJOR HIGHWAY MEDIAN CROSS-OVER CRASHES ROUTE 146 SUTTON. Prepared by MS Transportation Systems, Inc. Framingham, Massachusetts

ROAD SAFETY AUDIT MAJOR HIGHWAY MEDIAN CROSS-OVER CRASHES ROUTE 146 SUTTON. Prepared by MS Transportation Systems, Inc. Framingham, Massachusetts ROAD SAFETY AUDIT MAJOR HIGHWAY MEDIAN CROSS-OVER CRASHES ROUTE 146 SUTTON Prepared for Prepared by MS Transportation Systems, Inc. Framingham, Massachusetts March 2009 ROAD SAFETY AUDIT MAJOR HIGHWAY

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Mass Pike Interchange 6, I-291 and Burnett Road City of Chicopee November 4, 2013 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data...

More information

CHECKLIST 4: PRE-OPENING STAGE AUDIT

CHECKLIST 4: PRE-OPENING STAGE AUDIT CHECKLIST 4: PRE-OPENING STAGE AUDIT 4.1 General topics 4.1.1 Changes since previous audit; translation of design into practice General check: have any matters that have changed since a previous audit

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

Pavement Markings (1 of 3)

Pavement Markings (1 of 3) Pavement Markings (1 of 3) DESCRIPTION AND DEFINITION Disadvantages Relatively high cost (over typical Crash reduction as yet unknown painted edge line) No tactile effect The STOP AHEAD pavement marking

More information

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio Road Safety Audit Course Participant Guidebook August 22 & 23, 2017 Cleveland Avenue Columbus, Ohio 1 2 Table of Contents Executive Summary... 5 Cleveland Avenue City of Columbus... 6 Road Location Details...

More information

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration Engineering Countermeasures for Transportation Safety Adam Larsen Safety Engineer Federal Highway Administration 360-619-7751 Adam.Larsen@DOT.GOV Countermeasure Selection Resources Manual for Selecting

More information

Annual Progress Report from VDOT on the Effect of the Aging Population on State Agencies

Annual Progress Report from VDOT on the Effect of the Aging Population on State Agencies Annual Progress Report from VDOT on the Effect of the Aging Population on State Agencies HB 110 (2006 GA Session) Report to the Governor and General Assembly of Virginia Virginia Department of Transportation

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane July 24, 2018 TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane DPWandYOU.com Making a difference, together Meeting Agenda Purpose of the project Overview of work conducted

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4 PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,

More information

STANLEY STREET December 19, 2017

STANLEY STREET December 19, 2017 STANLEY STREET December 19, 2017 Welcome Mike Wiza, Mayor Scott Beduhn, Director of Public Works Agenda 1. Introduction 2. Existing Roadway Conditions 3. Current Alternative Improvements 4. Summary of

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

Part-time Shoulder Use Guide

Part-time Shoulder Use Guide 1 Part-time Shoulder Use Guide FHWA Guide AASHTO SCOD, Baltimore, MD June 2016 DOTs Face Increasing Challenges 2 Performance Based Practical Design 3 PBPD is a decision making approach that helps agencies

More information

Blair Park Traffic Calming Study

Blair Park Traffic Calming Study Blair Park Traffic Calming Study Williston, Vermont Prepared for: Chittenden County Regional Planning Commission Town of Williston, Vermont Prepared by: Stantec Consulting Services Inc. 55 Green Mountain

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

CHAPTER 1 STANDARD PRACTICES

CHAPTER 1 STANDARD PRACTICES CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles

More information

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT ROAD SAFETY AUDIT Route 135 at Route 30 January 2016 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Road Safety Audit Route 135 at Route

More information

MEMORANDUM INTRODUCTION AREA DESCRIPTION. DATE: December 8, 2017

MEMORANDUM INTRODUCTION AREA DESCRIPTION. DATE: December 8, 2017 7719 SOUTH MAIN STREET MIDVALE, UT 84047 P 801.307.3400 MEMORANDUM DATE: December 8, 2017 TO: FROM: SUBJECT: PROJECT NUMBER: 344-7517-003 PROJECT NAME: Keith Ludwig, P.E. Midvale City Lesley Burns, Midvale

More information

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016 ROAD SAFETY AUDIT Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston November 1, 2016 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety

What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety Adam Larsen Safety Engineer Federal Highway Administration 360-619-7751 Adam.Larsen@DOT.GOV Adam Larsen TTP Safety Engineer

More information

Proven Safety Countermeasures. FHWA Office of Safety January 12, :00 p.m. to 2:00 p.m. Eastern Time

Proven Safety Countermeasures. FHWA Office of Safety January 12, :00 p.m. to 2:00 p.m. Eastern Time Proven Safety Countermeasures FHWA Office of Safety January 12, 2012 1:00 p.m. to 2:00 p.m. Eastern Time Introduction and Background While States should still be considering the application of all of the

More information

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the

More information

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2) October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 20 June 2009 Part 3: Motorways and Expressways CONTENTS Reference Page Page Number Date SECTION 12: MARKINGS AND DELINEATION 12.1 GENERAL... 12-1 June 2009 12.1.1 INTRODUCTION... 12-1 June 2009

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT ROAD SAFETY AUDIT Route 16 at Interstate 395 Town of Webster October 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT ROAD SAFETY AUDIT East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton May 11, 2016 Prepared For: MassDOT Prepared By: 101 Walnut Street Watertown, MA Road Safety Audit

More information

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA PENN STATE TESC SESSION 8B MOVING PENNDOT AND PTC FORWARD DECEMBER 8, 2017 Agenda Define Active Traffic Management and describe

More information

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT County Street at Hart Street City of Taunton January 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street, 4 th Floor Boston,

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division

More information

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT ROAD SAFETY AUDIT State Road (Route 6) Corridor Town of Dartmouth March 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by Toward Zero Deaths Regional SHSP Road Show Meeting presented by Virginia Strategic Highway Safety Plan December 1, 2016 1 Welcome & Introductions Purpose of the Meeting Objectives & Key Outcomes Agenda»

More information

Closing Plenary Session

Closing Plenary Session TRAFFIC SAFETY CONFERENCE Closing Plenary Session June 9, 2017 Las Colinas, TX Order of Report Out June 9, 2017 Las Colinas, TX Distracted Driving Prioritized Countermeasures Countermeasure 4a Systemically

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No. June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -

More information

Designing and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser

Designing and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser Designing and Benchmarking Mine Roads for Safe and Efficient Haulage Roger Thompson Alex Visser Departments of Mining and Civil & Bio-systems Engineering University of Pretoria, South Africa Aim of Presentation

More information

Abstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection

Abstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection ITE 2015 Western District Annual Meeting Ada County Highway District s Flashing Yellow Arrow Initiative Primary Author: Tim Curns, PE Ada County Highway District Traffic Engineer Author: Andrew Cibor,

More information

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Introduction Methodology Study area and data collection Results and recommendation Conclusion References Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision

More information

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013

Designing for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013 Designing for Pedestrians: An Engineering Symposium Rutgers University March 21, 2013 The Problem 2 Pedestrian Fatalities Pedestrian Fatalities by Year in US (1994-2010) 6000 5000 4000 3000 2000 1000 0

More information

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations

More information

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO. TRAFFIC STUDY Birch Bluff Road / Pleasant Avenue 01/15/2018 City of Tonka Bay 4901 Manitou Road Tonka Bay, MN 55331 WSB PROJECT NO. 10805-000 Birch Bluff Road/ Pleasant Avenue Traffic Study For: City of

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Part-Time Shoulder Use

Part-Time Shoulder Use TRANSPORTATION RESEARCH BOARD Part-Time Shoulder Use Thursday, October 12, 2017 2:00-3:30PM ET The Transportation Research Board has met the standards and requirements of the Registered Continuing Education

More information

City of Vestavia Hills Traffic Calming Policy for Residential Streets

City of Vestavia Hills Traffic Calming Policy for Residential Streets City of Vestavia Hills Traffic Calming Policy for Residential Streets PURPOSE: The purpose of the Traffic Calming Policy for Residential Streets is to address safety concerns related to vehicular traffic

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM. DATE June 2, 2011

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM. DATE June 2, 2011 BOSTON METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org Jeffrey

More information

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation

More information

Speed Management Action Plan

Speed Management Action Plan Speed Management Action Plan National Selection Criteria Criteria Description Fatalities The number of fatalities resulting from speeding-related crashes. Percentage Compares total fatalities in each State

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details

More information

Road Safety Assessments. Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL.

Road Safety Assessments. Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL. Road Safety Assessments Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL. Why Are We Here? 2005 US Traffic Fatalities = 43,443 1429 4329 1361 1616 1534 3504 1729 3543 Illinois Annual Fatallities

More information

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.

More information

From Mile Zero to Target Zero the Dawson Creek Case Study

From Mile Zero to Target Zero the Dawson Creek Case Study From Mile Zero to Target Zero the Dawson Creek Case Study Raheem Dilgir, President, TranSafe Consulting Ltd. and Kevin Henderson, Manager of Planning and Development, City of Dawson Creek Paper prepared

More information

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon SR 53 Corridor Study Final Report Presentation Friday, October 3, 2014 10:00 AM to noon SR 53 Corridor Study Final Report Presentation Study Purpose: Investigate safety improvements along the SR 53 corridor

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

Module 5: Navigating Roadways

Module 5: Navigating Roadways Module 5: Navigating Roadways Topic 1: Intersections 1. One out of FATAL crashes occur at intersections. 2. Label the intersection warning signs: 3. When possible, begin searching seconds ahead of the

More information

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT ROAD SAFETY AUDIT Centre Street (Route 123) at Plymouth Street Municipality of Brockton November, 2017 Prepared For: MassDOT On Behalf Of: City of Brockton Prepared By: Old Colony Planning Council 70 School

More information

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer 8 Toolbox of Countermeasures and Their to Make Intersections Safer Introduction Studies included in the NCHRP 17-18 (3), Guidance for Implementation of the AASHTO Strategic Highway Safety Plan, as well

More information

APPENDIX G Lane Departure Action Plan

APPENDIX G Lane Departure Action Plan APPENDIX G Introduction Lane Departure is one of nine emphasis areas of the North Carolina Strategic Highway Safety Plan. This emphasis area targets the following crashes: Ran Off Road Left Ran Off Road

More information

Why Zone In on Speed Reduction?

Why Zone In on Speed Reduction? Learn it. Do it. Live it! SPEED REDUCTION IN THE ZONE Why Zone In on Speed Reduction? Speeding is a serious issue that plays a major role in the risk of serious injury and pedestrian fatality in a crash.

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford ROAD SAFETY AUDIT East Main Street (Route 16) at Medway Road (Route 109), East Main Street (Route 16) at Quarry Square Driveways, East Main Street (Route 16) at Beaver Street/ Fortune Boulevard Town of

More information

Readington Road (C.R. 637) Construction

Readington Road (C.R. 637) Construction Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon

More information

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE Virginia Supplement to the 2009 MUTCD Revision 1 Page TC-3-1 PART 3. MARKINGS CHAPTER 3A. GENERAL PAGE Section 3A.01 Functions and Limitations Section 3A.02 Standardization of Application Section 3A.03

More information