1 Deployment of Adaptive Traffic Signal Control Pilot in VDOT June 28, 2012 Dean H. Gustafson, PE, PTOE Regional Operations Director for Staunton and Culpeper Districts With permission from Michael Clements, PE and Michael Fontaine, PE, PhD
2 Adaptive Traffic Control System (ATCS) Advertisement We don t make the traffic signals along your commute to work; We make the traffic signals on your commute greener. 2
3 Traffic Signal Control Current Practice Actuated control Time-of-day plans by day of week Relies on regular retiming Does not respond well to changes in flow Adaptive control Optimizes on the fly locally and globally No fixed phase order, cycle length, or splits Adapts to unexpected variations in flow 3
4 The ATCS Challenge Global Optimization Local 4
5 Goals & Benefits of VDOT s ATCS Initiative Adaptive Traffic Control Systems (ATCS) Benefits: Improve Congestion/Delay/Travel Time with better traffic flow Improve Safety with less stop and go conditions Improve Environment with reduced emission & fuel consumption Improve Incident Management with Real-Time Signal Responses 5
6 The Process Sees/Vision Responds Optimizes Ethernet Connection Inputs Detector Call 6
7 Corridor Selection Factors Selection Factors Daily and weekly fluctuations in traffic flow Heavy traffic volumes Highly variable traffic patterns Special events and non-recurring traffic congestion Requires frequent re-timing due to changing traffic volumes and patterns Heavy side street traffic flow (but not oversaturated on all 4 approaches for extended periods of time) Corridor of Statewide Significance (CoSS) Conflicts with other traffic modes (peds, transit, etc.) Support from local authorities 7
8 ATCS Pilot Project Corridors Installed U.S. 29 in Fauquier County (Warrenton) ~ 6 intersections U.S. 11 in Frederick County (Stephenson) ~ 6 intersections U.S. 250 in Charlottesville/Albemarle County (Pantops) ~ 8 intersections U.S. 17/50/522 in Frederick County (I-81 Exit 313) ~ 6 intersections Route 277 in Frederick County (I-81 Exit 307) ~ 6 intersections Route 7 in Winchester/Frederick County (I-81 Exit 315) ~ 12 intersections Route 620 (Braddock Rd) in Fairfax County ~ 5 intersections 8
9 ATCS Pilot Project Corridors Purchased U.S. 340 in Waynesboro ~ 12 intersections U.S. 250 in Staunton ~ 10 intersections Route 20 in Albemarle County ~ 2 intersections (added on to US 250) U.S. 17 in York County ~ 22 intersections (Phase 2) U.S. 17 in Isle of Wight County (south of JRB) ~ 4 intersections Route 419 in Roanoke ~ 12 intersections 9
10 Research Overview Traffic Engineering Division is working with Regions to deploy test cases VCTIR is performing before/after evaluations Objectives: Assess system effectiveness Determine situations where adaptive control provides the most benefit Project is still underway 10
11 Evaluation Mainline operations Travel time Speed Stops Side street operations Delay Changes in crashes Data sources: floating car runs, Bluetooth, INRIX Data 11
12 Sample of Results US 250 in Charlottesville US 29 in Warrenton Braddock Rd in Fairfax Future Plans 12
13 US 250 Pantops Deployment Corridor Length - Approx 3 miles 13
14 Results Mainline Travel Time Time Period Direction Before After Change AM Peak EB 7:06 4:54-2:12 (-31.0%) WB 11:10 6:28-4:42 (-42.1%) Midday EB 7:01 5:05-1:56 (-27.6%) WB 7:46 6:34-1:12 (-15.5%) PM Peak EB 9:08 5:18-3:50 (-42.0%) WB 7:41 5:47-1:54 (-24.7%) 14
15 Results Mean # of Stops Time Period Direction Before After Change AM Peak EB (-61.3%) WB (-64.6%) Midday EB (-64.2%) WB (-44.4%) PM Peak EB (-80.0%) WB (-56.5%) 15
16 US 29 Warrenton Corridor Length - Approx 10 miles 16
17 Results Mainline Travel Time Time Period Direction Before After Change AM Peak NB 13:09 12:37-0:32 (-4.1%) SB 12:14 11:36-0:38 (-5.2%) Midday NB 12:15 11:46-0:29 (-3.9%) SB 12:02 11:45-0:16 (-2.2%) PM Peak NB 12:14 12:27 +0:13 (+1.8%) SB 12:33 12:57 +0:24 (+3.2%) 17
18 Results Mean # of Stops Time Period Direction Before After Change AM Peak NB (-25.0%) SB (-44.1%) Midday NB (-50.6%) SB (-51.5%) PM Peak NB (+6.1%) SB (-3.1%) 18
19 Braddock Rd Corridor Length - Approx 2 miles 19
20 Using INRIX Data to Examine Performance 20
21 Observations at Braddock InSync generally improved WB traffic, but increased delay EB in the morning Mainline stops generally declined Issues at the congested intersection of Braddock and Ox Rd (SR 123) System has been turned off and will be re-evaluated 21
22 Lessons Learned So Far System can produce very significant reductions in travel times and stops Effectiveness may be limited when: Intersections are over saturated Corridor already functions well Spacing between intersections is very wide, causing platoons of traffic to break up Communications are unreliable 22
23 Initial Results, Challenges & Lessons Learned Before & After Studies Results U.S. 250 (Pantops) in Charlottesville/Albemarle County Route 620 (Braddock Rd) in Fairfax County Lessons Learned ATCS no better in over-saturated conditions Spend time/money on collecting off-peak data Queues matter Broadband Communications is KEY Public expectations need to be addressed in urban areas Beware of controller actuated beacons Double check IP addresses (and then check again) 23
24 Using Technology to Move Forward ATCS Central System cable hub InSync Tesla Data Collection BlueTooth technology for travel time/delay INRIX data for continuous monitoring Monitoring Bringing the video feed back to the Traffic Operations Center Communications plan 24
25 Using Technology to Move Forward INRIX Sample 25
26 Using Technology to Move Forward Intersection Web View 26
27 Using Technology to Move Forward Northwestern Region TOC View of ATCS Corridor 27
Hard Shoulder Running is a valuable tool July 14, Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division
Hard Shoulder Running is a valuable tool July 14, 2016 Dean H. Gustafson, PE, PTOE State Operations Engineer VDOT Operations Division Virginia 2 VDOT s Statewide Operations Program Operations Statistics
More information5 Ways WellSynchronized. Signals Increase Intersection Safety. By Dr. Reggie Chandra, PE, PTOE
5 Ways WellSynchronized Signals Increase Intersection Safety By Dr. Reggie Chandra, PE, PTOE 1 The World Health Organization (WHO) calls traffic injuries a global public health problem, citing a human
More informationCONNECTED VEHICLE PILOT DEPLOYMENT PROGRAM
CONNECTED VEHICLE PILOT DEPLOYMENT PROGRAM August 2, 2016 Presentation Concept Pilot Location Deployment Characteristics Use Cases Application Overview 2 Concept Demonstrate and measure the impact of Connected
More informationSelf-Organizing Signals: A Better Framework for Transit Signal Priority
Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 3-13-2015 Self-Organizing Signals: A Better Framework for Transit Signal Priority Peter
More informationKING STREET TRANSIT PILOT
STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS PREVIOUS HIGHLIGHTS TRANSIT RELIABILITY TRANSIT TRAVEL TIMES 85% of streetcars arriving within 4 minutes westbound during
More informationIntersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison
Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Michael Wallwork, Roundabout Expert, Orange Park, Florida Tom Bertulis (MS, PE, PTOE),
More informationCongestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014
Congestion Reducing Activities Toby Carr GDOT Director of Planning April 10, 2014 GDOT Performance Dashboard Congestion Congestion Relief Strategies 511 HEROS RTOP Highway Emergency Response Operators
More information3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION
Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends:
More informationArterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff
Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First
More informationTABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS
TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS A. Volume, Demand, and Capacity 2-1 B. Performance Measures 2-7 C. Critical Lane Volume Analysis 2-9 3. DATA COLLECTION 4. SIGNAL PHASING
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationOptimizing The Operations of Closely Spaced Traffic Signals. Gordon E. Meth, P.E., PTOE ITE District 1 Annual Meeting May 21, 2004
Optimizing The Operations of Closely Spaced Traffic Signals Gordon E. Meth, P.E., PTOE ITE District 1 Annual Meeting May 21, 2004 Closely Spaced Signals - The Challenges According to many sources, minimum
More informationUniversity of California, Davis Transit Signal Priority Implementation Study
Proposal University of California, Davis Transit Signal Priority Implementation Study Prepared for: Prepared by: University of California, Davis 2990 Lava Ridge Court Suite 200 Roseville, CA 95661 November
More informationSUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011
SUPERSTREETS IN TEXAS ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011 1 Superstreet Corridor Location 2 3 US Highway 281 2007 Looking south above Evans Road, pm peak
More informationCongestion Protection for Transit: Lessons from Europe and Application to MBTA Route 66
Congestion Protection for Transit: Lessons from Europe and Application to MBTA Route 66 Peter G. Furth Chris Boll 1 Break the Vicious Cycle more people use cars congested streets slower transit X X congestion
More informationMineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st
Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24
More informationMaryland State Highway Mobility Report. Morteza Tadayon
Maryland State Highway Mobility Report Morteza Tadayon Background Mobility is a Key Performance Area (KPA) in the SHA Business Plan SHA adopts a performance based approach Monitors Highway System to identify
More informationBluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle
Bluffdale 14600 South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle From Pony Express to UPRR Bridge over SR-140 $ 669,700 $ 624,361 To build bicycle/shoulder lanes on SR-140. SR-140 is an official
More information5858 N COLLEGE, LLC N College Avenue Traffic Impact Study
5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...
More informationPearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3
Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study April 11, 2013 Steering Committee Meeting #3 Meeting Agenda Welcome & Introductions Review Project Purpose & Needs Results
More informationLocal Traffic Management. Tools for local agencies
Local Traffic Management Tools for local agencies Overview: How to assess impacts of new road opening How to assess impacts of a large, special event How to manage traffic signal systems Elkhart County
More informationArterial Traffic Analysis Actuated Signal Control
Arterial Traffic Analysis Actuated Signal Control Dr. Gang-Len Chang Professor and Director of Traffic Safety and Operations Lab. University of Maryland-College Park Actuated Signal Control Fully Actuated
More informationMathematics of Planet Earth Managing Traffic Flow On Urban Road Networks
Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks Adrian George Manager Network Improvements Anthony Fitts Manager Signal Design Melbourne s transport demands are growing 5m people
More informationPublic Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study
Public Involvement Meeting Tuesday, June 13, 2017 Albany Shaker Road Corridor Study Agenda / Meeting Outline 1. Introduce the project 2. Complete Streets 3. Share/confirm our findings 4. Your Opinion 5.
More informationCommunity Advisory Committee
Community Advisory Committee Meeting #1 November 19, 2014 Presentation Team Matt Fulda, Greater Bridgeport Regional Council Chris Granatini, P.E., Tighe & Bond Craig Yannes, P.E., PE PTOE, Tighe & Bond
More informationINNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate
INNOVATIVE INTERSECTION SOLUTIONS Jay Bockisch, PE, PTOE Senior Associate INNOVATIVE INTERSECTION SOLUTIONS Innovative intersection overview Case studies Continuous flow intersection Modern roundabouts
More informationMeasuring and Assessing Traffic Congestion: a Case Study
AITPM 2014 National Conference Adelaide, 12-15 August 2014 Measuring and Assessing Traffic Congestion: a Case Study Cennet Yumlu, Sara Moridpour and Rahmi Akçelik Presenter: Rahmi Akçelik sidrasolutions.com
More informationTraffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor)
Onondaga County Department of Transportation Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor) Prepared for: Syracuse Metropolitan Transportation Council 126 North Salina
More informationBOSTON REGION METROPOLITAN PLANNING ORGANIZATION
PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,
More informationPublic Opinion, Traffic Performance, the Environment, and Safety After Construction of Double-Lane Roundabouts
Public Opinion, Traffic Performance, the Environment, and Safety After Construction of Double-Lane Roundabouts TRB 93 rd Annual Meeting Washington, D.C. January 15, 2014 Wen Hu, Ph.D. Intersection crashes
More informationIMPACT OF TRANSIT SIGNAL PRIORITY (TSP) ON BUS TRAVEL TIMES, LATE BUS RECOVERY, DELAY AND LEVEL OF SERVICE (LOS)
IMPACT OF TRANSIT SIGNAL PRIORITY (TSP) ON BUS TRAVEL TIMES, LATE BUS RECOVERY, DELAY AND LEVEL OF SERVICE (LOS) Presenter: Sotonye Ikiriko 1, Deo Chimba 1 College of Engineering, Tennessee State University,
More informationMultimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland
Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland A Path to Successful Implementation James Allday Bunch - Sabra, Wang & Associates, Inc. ITS
More informationI-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council
I-25 PEL: CO Springs Denver South Connection Presentation to Castle Rock Town Council June 20, 2017 An Important Corridor to Colorado Links the state s two major metropolitan areas and communities between
More informationSIDRA INTERSECTION 6.1 UPDATE HISTORY
Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA ABN 79 088 889 687 For all technical support, sales support and general enquiries: support.sidrasolutions.com SIDRA INTERSECTION
More informationEffects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc.
Effects of Traffic Signal Retiming on Safety Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc. Introduction It has long been recognized that traffic signal timing can have an impact
More informationModule 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions
Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions CONTENTS (MODULE 3) Introduction...1 Purpose...1 Goals and Learning Outcomes...1 Organization
More informationConcurrent Monitoring, Analysis, and Visualization of Freeway and Arterial Performance for Recurring and Non-recurring Congestion
Concurrent Monitoring, Analysis, and Visualization of Freeway and Arterial Performance for Recurring and Non-recurring Congestion For Presentation at the NATMEC 2010 Session on: Congestion Monitoring and
More informationReference: Laguna Canyon Road Traffic Conditions Data Collection Summary
Stantec Consulting Services Inc. 38 Technology Drive Suite 100, Irvine CA 92618-5312 September 8, 2017 File: 2073014320 Attention: Mark Trestik, Assistant City Engineer City of Beach Department of Public
More informationBalancing Operation & Safety for Motorized and Non-Motorized Traffic
Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete
More informationJoshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013
Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Creating Great Streets Through Road Diets and Conversions The Charlotte Experience Topics to Discuss Charlotte s
More informationMEMORANDUM. TO: Transportation Planning and Programming Committee December 4, 2008 of the Boston Region Metropolitan Planning Organization
MEMORANDUM TO: Transportation Planning and Programming Committee December 4, 2008 of the Boston Region Metropolitan Planning Organization FROM: Mark S. Abbott, PE Efi Pagitsas RE: MBTA Transit Signal Priority
More informationFigure 1: Vicinity Map of the Study Area
ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove
More informationLincoln Avenue Road Diet Trial
Lincoln Avenue Road Diet Trial Data Collection Report June 1, 2015 Department of Transportation Table of Contents I. Introduction...... 3 II. Data Collection Methodology & Results...... 5 A. Traffic Volume
More informationIntroduction to Traffic Signal Timing
Introduction to Traffic Signal Timing Course No: C-7 Credit: PDH Jeffrey W. Buckholz, Ph.D., P.E., PTOE Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 98 P: (877) -58
More informationI-95 Northbound at US 1 (Exit 126) Design and Study Final Report
I-95 Northbound at US 1 (Exit 126) Design and Study Final Report July 2018 Prepared by: Prepared for: TABLE OF CONTENTS 1 Introduction... 1 Study Area Limits... 1 Purpose and Need of the Study... 1 Safety
More informationTraffic Engineering and Operations for BRT in Los Angeles
Traffic Engineering and Operations for BRT in Los Angeles NACTO BRT Running Way Workshop #2 June 29, 2010 By: Kang Hu, PE, PTOE Chun Wong, PE LADOT s s Involvement in BRT LADOT has partnered with LA Metro
More informationWebinar: Exploring Pedestrian Responsive Traffic Signal Timing Strategies in Urban Areas
Portland State University PDXScholar TREC Webinar Series Transportation Research and Education Center (TREC) 1-29-2015 Webinar: Exploring Pedestrian Responsive Traffic Signal Timing Strategies in Urban
More informationA Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY
A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY Ashley McLain, PE, PTOE Abstract The HCS 2010 Streets module was used to analyze a segment of the US 31W corridor
More informationNorthbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project
Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed
More informationShockoe Bottom Preliminary Traffic and Parking Analysis
Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA
More informationAssessing the Traffic and Energy Impacts of Connected and Automated Vehicles (CAVs)
Assessing the Traffic and Energy Impacts of Connected and Automated Vehicles (CAVs) Steven E. Shladover, Sc.D. (Retired from) California PATH Program University of California, Berkeley SIP-adus Workshop
More informationCity of Bellevue s Adaptive Left Turn Phasing. Presented by : Mark Poch, PE, PTOE City of Bellevue, WA
City of Bellevue s Adaptive Left Turn Phasing Presented by : Mark Poch, PE, PTOE City of Bellevue, WA May 1, 2015 130,000 pop. 197 signals The Challenge Protected Only Turns The Challenge Protected Only
More informationRoute 28 Corridor Safety and Operations Study
Route 28 Corridor Safety and Operations Study Technical Committee Meeting #4 May 22, 2015 1 Agenda Planned Corridor Activities Candidate Improvements Recommendations Immediate Actions & Status Next Steps
More informationOperation Green Light Traffic Signal Coordination Report North Oak Trafficway - New Mark Drive to NE 42nd Street
Introduction Operation Green Light Traffic Signal Coordination Report North Oak Trafficway - New Mark Drive to NE 42nd Street Operation Green Light (OGL) is a regional effort to improve traffic flow and
More informationSynchro Studio 8. Overview. By Ioannis Psarros
Synchro Studio 8 Overview By Ioannis Psarros What is Synchro? Software for signal optimization Developed by Trafficware Optimization can be applied to: Cycle lengths Splits Offsets Source: http://bikewalklee.blogspot.com
More informationOperational Comparison of Transit Signal Priority Strategies
Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,
More informationRoute 28 Corridor Safety and Operations Study
Route 28 Corridor Safety and Operations Study Steering Committee Meeting #5 May 29, 2015 1 Agenda Planned Corridor Activities Candidate Improvements Recommendations Immediate Actions & Status Next Steps
More informationMEASUREMENT OF RECURRING VERSUS NON-RECURRING CONGESTION
Final Report Research Project T2695, Task 36 Congestion Measurement MEASUREMENT OF RECURRING VERSUS NON-RECURRING CONGESTION by John M. Ishimaru Senior Research Engineer Mark E. Hallenbeck Director Jennifer
More informationThe Route 29 Corridor Study was initiated at the request of Virginia s Commonwealth
CHAPTER 2: Study Background and approach The Route 29 Corridor Study was initiated at the request of Virginia s Commonwealth Transportation Board in response to requests from members of the General Assembly
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationMETHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)
Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic
More informationTraffic Signal Design
Traffic Signal Design Instructor: S. M. Mahdi Amiripour m.amiripour@gmail.com 2 Introduction Intersection is an area shared by two or more roads Designated for the vehicles to turn to different directions
More informationIntersection LOS Intersection level of service (LOS) is defined by the Highway Capacity Manual (HCM) by the following criteria:
Page 2 of 9 Intersection LOS Intersection level of service (LOS) is defined by the Highway Capacity Manual (HCM) by the following criteria: Table 1 LOS Definitions Level of Signalized Un-Signalized Definition
More informationAn Evaluation of Signalized Intersection System Analysis Techniques Walter J. Freeman, P.E., Kien Y. Ho, P.E., Elizabeth A. McChesney, E.I.T.
An Evaluation of Signalized Intersection System Analysis Techniques Walter J. Freeman, P.E., Kien Y. Ho, P.E., Elizabeth A. McChesney, E.I.T. A system of signalized intersections is a critical element
More informationTime Based Traffic Signal Coordination (A Case Study of Gatthaghar and Naya Thimi Intersections)
pp. 48 54 Time Based Traffic Signal Coordination (A Case Study of Gatthaghar and Naya Thimi Intersections) Binayak Bhattarai 1 *, Anil Marsani 2 1 Graduate Student, M.Sc. in Transportation Engineering,
More informationTRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane
July 24, 2018 TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane DPWandYOU.com Making a difference, together Meeting Agenda Purpose of the project Overview of work conducted
More informationDefining Purpose and Need
Advanced Design Flexibility Pilot Workshop Session 4 Jack Broz, PE, HR Green May 5-6, 2010 Defining Purpose and Need In your agency s project development process, when do design engineers typically get
More informationA Comparative Analysis of Roundabouts and Traffic Signals through a Corridor
Louisiana State University LSU Digital Commons LSU Master's Theses Graduate School 2015 A Comparative Analysis of Roundabouts and Traffic Signals through a Corridor Melissa Arrigo LeBas Louisiana State
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationEvaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation
Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad
More informationAppendix MSP Minneapolis-St. Paul, Minnesota 2003 Annual Report on Freeway Mobility and Reliability
(http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix MSP Minneapolis-St. Paul, Minnesota 2003 Annual Report on Freeway Mobility and Reliability This report is a
More informationI-95/Temple Avenue Improvements Project Colonial Heights, VA
I-95/Temple Avenue Improvements Project Colonial Heights, VA Pardon Our Dust Informational Meeting February 3, 2016 Harold Dyson, P.E. Construction Manager, Richmond District Tom Heil, P.E. Allan Myers
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationArterial Performance Evaluation on an Adaptive Traffic Signal Control System
Available online at www.sciencedirect.com Procedia Social and Behavioral Sciences 16 (2011) 230 239 6 th International Symposium on Highway Capacity and Quality of Service Stockholm, Sweden June 28 July
More informationPublic Information Meeting
Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special
More informationRoad Diets: Improving Safety for All Road Users
Road Diets: Improving Safety for All Road Users Tamara Redmon, Federal Highway Administration Brian Chandler, Leidos Keith Knapp, Iowa Local Technical Assistance Program March 3, 2015 Today s Presentation
More informationQueensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011
: Summary of Recommendations Presentation to Manhattan Community Board 8 May 4, 2011 1 Overview Study Goal: Identify cost-effective ways to improve bus speed and reliability for local and express buses
More informationSH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R
SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, 2 0 1 3 B R A Z O S C E N T E R Project Overview Study Goals and Objectives» Improve traffic flow» Reduce delay»
More informationRoute 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015
Route 28 Corridor Safety and Operations Study Public Information Meetings July 20 and 22, 2015 1 Study Goals and Objectives Phase 1 Short-term Short-term improvements Ability to implement quickly Cost
More informationTraffic Engineering and Highway Safety Bulletin Retiming Traffic Signals
C Y E R I N D D I B U T Traffic Engineering and Highway Safety Bulletin Retiming Traffic Signals July 2011 Did You Know? Poor signal timing causes 5 percent of traffic congestion according to the Federal
More informationMemorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process.
Charlottesville-Albemarle Metropolitan Planning Organization POB 1505, 401 E. Water St, Charlottesville, VA 22902 www.tjpdc.org (434) 979-7310 phone info@tjpdc.org email Memorandum To: MPO CTAC From: Wood
More informationCongestion Evaluation Best Practices
Congestion Evaluation Best Practices Todd Litman Victoria Transport Policy Institute Presented International Transportation and Economic Development Conference 10 April 2014 Congestion Indicators Indicator
More informationMeasuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute
Measuring the Distribution and Costs of Congestion Tim Lomax Texas Transportation Institute http://mobility.tamu.edu The Congestion Measurement Story Travel time, variations, compare to goals WHAT? WHY?
More informationLESSONS LEARNED: ALTERNATIVE INTERSECTION AND INTERCHANGES
LESSONS LEARNED: ALTERNATIVE INTERSECTION AND INTERCHANGES CRAIG ELEY, P.E., CHOICE ONE ENGINEEING MARC GRAKE, P.E., ODOT DISTRICT 8 TRAFFIC OPERATIONS KRAIG SHREWSBERRY, P.E., PTOE, ODOT DISTRICT 6 TRAFFIC
More informationLet s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation
Let s Make I-40 Better Action Team Friday, March 29, 2019 Hosted by RTP Foundation RTA Welcome Geoff Lang, MetLife, RTA Chair Jim Beley, The Umstead Hotel & Spa, RTA regional travel experience chair NCDOT
More informationFACT SHEET VirginiaDOT.org
FACT SHEET VirginiaDOT.org Interstate 64 East Hampton Roads Bridge-Tunnel (HRBT) Paving Project Hampton/ Norfolk Contractor: Basic Construction (part of the I-64 paving project in Hampton) Contract Amount:
More informationTHE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS. Integrating Transportation Planning, Project Development, and Project Programming
THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS Integrating Transportation Planning, Project Development, and Project Programming March 21, 2017 AGENDA Program Overview Project Development Project Types
More informationARRENTON RANSPORTATION
ARRENTON RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationCounty Board Workshop
CH 21 Downtown Reconstruction Project County Board Workshop Tuesday, October 24, 2017 CH 21 Downtown Prior Lake Reconstruction Agenda 1) Review remaining Project Alternatives 2) Public Engagement Summary
More informationEXISTING (2006) CONDITIONS
Section 2 EXISTING (2006) CONDITIONS This section provides a description of the existing transportation system in the study area and a comprehensive analysis of existing traffic operations and crash history.
More informationHIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY. James A. Bonneson, Ph.D., P.E.
HIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY James A. Bonneson, Ph.D., P.E. Texas Transportation ti Institute t Housekeeping 2 All participant phone lines are muted to avoid distractions
More informationAppendix SEA Seattle, Washington 2003 Annual Report on Freeway Mobility and Reliability
(http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix SEA Seattle, Washington 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement to:
More informationAlbany Shaker Road Corridor Study Public Meeting # 2
Albany Shaker Road Corridor Study Public Meeting # 2 Scope / Meeting Purpose This project is a CDTC Linkage Study. The Linkage Program is designed to implement the adopted planning and investment principles
More informationCalibrate and Implement Signal Timing
I-95 Traffic Operations and Traffic Management On-Call Technical Memorandum Calibrate and Implement Signal Timing June 8, 7 Prepared for South Central Regional Council of Governments Prepared by Urbitran
More informationFigure 1 in the attachments shows the location of the study intersections and the general area of study.
Technical Memorandum To: Jenny Max, City of Nisswa From: Bryant Ficek, PE, PTOE Max Moreland, PE Date: July 16, 218 Re: CSH 77/Nokomis venue rea Traffic Study Existing Conditions Grand View Lodge on Gull
More informationToronto and East York Community Council. Director, Transportation Services, Toronto and East York District
No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity
More informationCITY OF ABBOTSFORD TRANSPORTATION AND TRANSIT MASTER PLAN
CITY OF ABBOTSFORD TRANSPORTATION AND TRANSIT MASTER PLAN EXECUTIVE COMMITTEE MONDAY, OCTOBER 2, 2017 TRANSPORTATION & TRANSIT AGENDA 1. Plan Overview 2. Shaping Influences 3. Existing Conditions and What
More informationFHWA/IN/JTRP-2010/22. Final Report
JOINT TRANSPORTATION RESEARCH PROGRAM FHWA/IN/JTRP-2010/22 Final Report QUANTIFYING BENEFITS OF TRAFFIC SIGNAL RETIMING Christopher M. Day Thomas M. Brennan, Jr. Hiromal Premachandra Alexander M. Hainen
More informationCenter Street (S.R. 36) Road Diet Kingsport, TN
TSITE 2015 Summer Meeting Gatlinburg, TN July 30, 2015 Center Street (S.R. 36) Road Diet Kingsport, TN Jason Carder, P.E. Mattern& Craig Najmeh Jami, E.I.T RPM Transportation Consultants AGENDA BACKGROUND
More informationBENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016
BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 This page left intentionally blank. Table of Contents 1.0 Introduction... 1 1.1 Crash
More information