Calibrate and Implement Signal Timing

Size: px
Start display at page:

Download "Calibrate and Implement Signal Timing"

Transcription

1 I-95 Traffic Operations and Traffic Management On-Call Technical Memorandum Calibrate and Implement Signal Timing June 8, 7 Prepared for South Central Regional Council of Governments Prepared by Urbitran Associates, Inc. In Association with Clough Harbour & Associates, LLP Dunn Engineering Associates, P.C.

2 Overview Traffic signal timing plans were developed for 39 intersections that were identified by SCRCOG, the City of New Haven and the Consultant as listed in Table and shown in Figure. Four timing plans were developed for 35 of the intersections. A single emergency timing plan was developed for four of the intersections. The timing plans for of the intersections were input to the central traffic control computer located in the City of New Haven, and observed and monitored in the field. Network Development and Calibration The SYNCHRO traffic simulation network for the study area was developed and calibrated using traffic and roadway data from an earlier (Phase ) study supplemented by additional data provided by SCRCOG and the City of New Haven. In addition, field observations were conducted during the study to observe queuing, conflicts, signal timing operations and other pertinent traffic operational conditions, and were used to help refine the calibrated network for existing conditions. Six sub-area networks were developed: Three were implemented, and three are to be implemented at a later date. Ikea Area: This sub-area includes six signalized intersections controlled by the Naztec type signal controller. Four timing plans were developed. Two of the plans - weekday AM peak, and weekday PM peak / Saturday-Sunday midday were successfully implemented and monitored on June 8 th, 7. The other two plans are for the same time periods for the future condition when diversion due to I-95 reconstruction is projected to occur. These plans were entered and stored into the system. In addition, at one location (the intersection at Ikea driveway), a fifth plan was implemented and monitored for Saturday-Sunday midday. Existing and proposed plans are presented in Tables A and B, respectively. Grand Avenue: This sub-area includes four signalized intersections controlled by the Naztec type signal controller. One timing plan was developed for emergency situations when incidents on southbound I-9 are projected to cause traffic to be diverted to this corridor. The plan was entered and stored into the system. It was tested and adjusted during the midday period on June 7 th, 7. Existing and proposed plans are presented in Tables 3A and 3B, respectively. Lower reet and Water Street. This sub-area includes eleven signalized intersections controlled by the Transcore type signal controller. Four timing plans were developed. Two of the plans weekday AM peak and weekday PM peak were entered and stored into the system. They were partially tested, but infrastucture issues with the City s central computer system prevented the plans from running live for more than a few hours. These two plans will be monitored when infrastucture issues are cleared up, expected to occur during the first or second week in July, 7. The other two plans are for the same time periods for the future condition when diversion

3 due to I-95 reconstruction is projected to occur. These plans were entered and stored into the system. Existing and proposed plans are presented in Tables 4A and 4B, respectively. Upper reet and Middletown Avenue. This sub-area includes nine intersections. Four plans were developed for the future condition weekday AM peak, weekday PM peak, daily midday, and all other times. These plans will be implemented when new signal hardware comes online, projected to occur about 9. It was assumed that the future hardware would include signal equipment not currently present, such as controllers capable of coordinated operation, loop detectors and pedestrian signals, per Design Report for Zone 5d, Computerized Signal System Phase 3, issued by Wilbur Smith Associates in November, 999. Existing and proposed plans are presented in Tables 5A and 5B, respectively. Forbes Avenue. This sub-area includes five signalized intersections. Four of the signals are currently under ConnDOT s jurisdiction. One is an isolated intersection under the jurisdiction of the city of New Haven. Four timing plans were developed for the future condition weekday AM peak, weekday PM peak, weekday midday, and all other times. Existing and proposed plans are presented in Tables 6A and 6B, respectively. Middletown Avenue and Foxon Boulevard. This sub-area includes four intersections. Signal control is currently under ConnDOT s juridiction. Four plans were developed for the future condition weekday AM peak, weekday PM peak, daily midday, and all other times. Existing and proposed plans are presented in Tables 7A and 7B, respectively. Figures through 7 show the SYNCHRO traffic networks for the four sub-areas. 3

4 TABLE SUMMARY OF STUDY INTERSECTIONS No. Corridor Major Street Minor Street Jurisdiction System Contoller Type Deliverable No. of Timing Plans Ikea Sargent Dr Brewery St New Haven Naztec Naztec 7 TS- Implement and Monitor 3 No Ikea Long Wharf Dr Canal Dock Rd New Haven Naztec Naztec 7 TS- Implement and Monitor 4 No 3 Ikea Sargent Dr Canal Dock Rd New Haven Naztec Naztec 7 TS- Implement and Monitor 4 No 4 Ikea Sargent Dr I-95 SB Off Ramp Exit 46 New Haven Naztec Naztec 7 TS- Implement and Monitor 4 No 5 Ikea Sargent Dr Church St Extension New Haven Naztec Naztec 7 TS- Implement and Monitor 4 No 6 Ikea Sargent Dr I-95 SB On Ramp Exit 46 New Haven Naztec Naztec 7 TS- Implement and Monitor 4 No 7 Grand Ave E Grand Ave Quinnipiac Ave New Haven Naztec Naztec 7 TS- Implement (Emergency) Yes 8 Grand Ave Grand Ave Front St New Haven Naztec Naztec 7 TS- Implement (Emergency) Yes 9 Grand Ave Grand Ave Clinton Ave New Haven Naztec Naztec 7 TS- Implement (Emergency) No Grand Ave Grand Ave Ferry St New Haven Naztec Naztec 7 TS- Implement (Emergency) Yes US Water St Chestnut St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 No US Water St Brewery St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 Yes 3 US Water St Olive St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 Yes 4 US Water St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 Yes 5 Lower NB Fair St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 Yes 6 Lower SB George St/Fair St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 Yes 7 Lower Chapel St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 Yes 8 Lower Court St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 No 9 Lower Elm St/Grand Ave New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 Yes Lower Grove St/Olive St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 Yes Lower Audubon St New Haven Transcore Naztec, TCT TS- Implement and Monitor 4 Yes Upper Humphery St New Haven Isolated NA Timing Only 4 Yes 3 Upper Edwards St New Haven Isolated NA Timing Only 4 Yes 4 Upper East St/Mechanic St New Haven Isolated NA Timing Only 4 Yes 5 Upper I-9 NB Off Ramp Exit 5/James St New Haven Isolated NA Timing Only 4 Yes 6 Upper Blatchley Ave/Willow St New Haven Isolated NA Timing Only 4 Yes 7 Upper Ferry St/May St New Haven Isolated NA Timing Only 4 Yes 8 Upper Middletown Ave Ferry St New Haven Isolated NA Timing Only 4 Yes 9 Upper Middletown Ave I-9 SB Off Ramp Exit 7 New Haven Isolated NA Timing Only 4 No 3 Upper Middletown Ave Clinton Ave New Haven Isolated NA Timing Only 4 No 3 US Forbes Ave Townsend Ave ConnDOT NA NA Timing Only 4 Yes 3 US Forbes Ave Woodward Ave ConnDOT NA NA Timing Only 4 Yes 33 US Forbes Ave Fulton St ConnDOT NA NA Timing Only 4 No 34 US Forbes Ave Stiles StWheeler St ConnDOT NA NA Timing Only 4 No 35 US Water St East St New Haven Isolated NA Timing Only 4 Yes 36 Middletown/Foxon Middletown Ave I-9 SB Ramp Exit 8 ConnDOT NA NA Timing Only (Emergency) Yes 37 Middletown/Foxon Middletown Ave Foxon Blvd/I-9 NB Off Ramp Exit 8 ConnDOT NA NA Timing Only (Emergency) Yes 38 Middletown/Foxon Foxon Blvd Shopping Center ConnDOT NA NA Timing Only (Emergency) No 39 Middletown/Foxon Foxon Blvd Quinnipiac Ave ConnDOT NA NA Timing Only (Emergency) Yes Studied during Phase?

5 YORK ST HIGH ST COLLEGE ST 34 $# DIVISION ST TEMPLE ST *) 46 Yale Div School Yale University ELM ST COURT ST CHURCH ST CHAPEL ST CROWN ST GEORGE ST PROSPECT ST CHURCH STREET EXT UNION AVE BREWERY ST SARGENT DR TRUMBULL ST LONG WHARF DR AUDUBON ST GROVE ST WALL ST FAIR ST WATER CANNER ST WHITNEY AVE 3 OLIVE ST ST 47 LIVINGSTON ST ORANGE ST GRAND AVE HUMPHREY ST STATE ST 3 HAMILTON ST NEW HAVEN HARBOR EDWARDS ST EAST ST WILLOW ST MECHANIC ST HUMPHREY ST MILL CHAPEL ST East Rock Park RIVER *) FORBES AVE JAMES ST 49 6 MAY ST 5 *) LOMBARD ST BLATCHLEY AVE WHEELER ST 5 FERRY ST 3 WOODWARD AVE 7 FULTON ST GRAND AVE FARREN AVE TOWNSEND AVE MIDDLETOWN AVE FERRY ST BR QUINNIPIAC AVE CLINTON AVE 3 FRONT ST QUINNIPIAC RIVER BURWELL ST MAIN ST ANX 4 MAIN ST $# 4 E GRAND AVE RUSSELL ST 4 MIDDLETOWN AVE FOXON BLVD QUINNIPIAC AVE 4 ESSEX ST HEMINGWAY ST EASTERN ST 8 $# Alling Memorial G.C. LAUREL ST &% NORTH HIGH ST 5 East Shore Pk CHARTER OAK AVE HIGH ST THOMPSON AVE *) HEMMINGWAY AVE LEGEND 3 4 Ft Hale Pk Document, implement and monitor 4 timing plans Document 4 timing plans Document, implement and monitor emergency timing plan Document emergency timing plan Nathan Hale Pk BURR ST DODGE AVE Tweed- NewHaven Airport FIGURE STUDY INTERSECTIONS

6 TABLE A IKEA AREA (NAZTEC SIGNALS) EXISTING TIMING MAIN ST CROSS ST SPLIT TABLE NO. TIME Phase Phase Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Phase 8 CYCLE OFFSET 6-9 M-F Split Long Wharf Dr Canal Dock Rd -7 S-S Split M-F M-F Split Sargent Dr Canal Dock Rd -7 S-S Split M-F M-F Split Sargent Dr I-95 SB Off -7 S-S Split M-F M-F Church St Ext/ Split Sargent Dr -7 S-S I-95 SB On-Ramp Split M-F M-F Split Sargent Dr Brewery St -7 S-S Split M-F

7 MAIN ST CROSS ST SPLIT TABLE NO. TIME Phas Phas Phas 3 Phas 4 Phas 5 Phas 6 Phas 7 Phas 8 CYCLE OFFSET Split 5 Present 6-9 M-F Present 5-9 M-F Split Present -7 S-S Long Wharf Dr Canal Dock Rd Split 7 Future 6-9 M-F Split 8 Future 5-9 M-F Future -7 S-S Split 5 Present 6-9 M-F Sargent Dr Sargent Dr Sargent Dr Sargent Dr Canal Dock Rd / Ikea Driveway I-95 SB Off Church St Ext/ I-95 SB On-Ramp Brewery St TABLE B IKEA AREA (NAZTEC SIGNALS) PROPOSED TIMING Split 6 Present 5-9 M-F Present -7 S-S Split 7 Future 6-9 M-F Split 8 Future 5-9 M-F Split 9 Pres & Fut -7 S-S Split 5 Present 6-9 M-F Split 6 Present 5-9 M-F Present -7 S-S Split 7 Future 6-9 M-F Split 8 Future 5-9 M-F Future -7 S-S Split 5 Present 6-9 M-F Split 6 Present 5-9 M-F Present -7 S-S Split 7 Future 6-9 M-F Split 8 Future 5-9 M-F Future -7 S-S Split 5 Present 6-9 M-F Split 6 Present 5-9 M-F Present -7 S-S Split 7 Future 6-9 M-F Split 8 Future 5-9 M-F Future -7 S-S

8 TABLE 3A GRAND AVENUE (NAZTEC SIGNALS) EXISTING TIMING MAIN ST CROSS ST SPLIT TABLE NO. TIME Phase Phase Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Phase 8 CYCLE OFFSET Grand Ave Grand Ave Grand Ave Grand Ave Quinnipiac Ave Front St Clinton Ave Ferry St Split Split Split Split 6-9 M-F 6-9 M-F 6-9 M-F 6-9 M-F Split 3 Split 3 Split 3 Split M-F 5-9 M-F 5-9 M-F 5-9 M-F TABLE 3B GRAND AVENUE (NAZTEC SIGNALS) PROPOSED TIMING MAIN ST CROSS ST SPLIT TABLE NO. TIME Phas Phas Phas 3 Phas 4 Phas 5 Phas 6 Phas 7 Phas 8 CYCLE OFFSET Grand Ave Quinnipiac Ave Split Emergency Grand Ave Front St Split Emergency Grand Ave Clinton Ave Split Emergency Grand Ave Ferry St Split Emergency

9 TABLE 4A LOWER STATE ST AND WATER ST (TRANSCORE SIGNALS) EXISTING TIMING MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Phase 8 CYCLE OFFSET COMMENTS Movement EB/WB SB Water St Chestnut St Type Fixed Actuated Plan AM Peak Split act NA Plan 3 PM Peak Split act NA Movement WB EB/WB NB Water St Brewery St Type Fixed Fixed Fixed Plan AM Peak Split Plan 3 PM Peak Split Movement EB/WB SB Water St Olive St Type Fixed Fixed Plan AM Peak Split Plan 3 PM Peak Split 9 5 Movement NB-L/EB-R SB Ped EB-R/WB SB-L NB Dummy Dummy Water St Type Actuated Coord Ped Button Actuated Actuated Coord Plan AM Peak Split Plan 3 PM Peak Split Movement SB EB Ped SB George St/ Type Coord Fixed Ped Button Fair St Plan AM Peak Split Plan 3 PM Peak Split Movement NB EB NB Fair St Type Fixed Fixed Plan AM Peak Split Plan 3 PM Peak Split 5 45 Movement NB-L SB Ped EB/WB SB-L NB Dummy Dummy Chapel St Type Actuated Coordinated Ped Button Fixed Actuated Coordinated Plan AM Peak Split Plan 3 PM Peak Split Movement NB/SB EB/WB Ped Type Coordinated Actuated Ped Button Court St Minimum Split 5 Plan AM Peak Split Plan 3 PM Peak Split Movement NB/SB EB Ped Elm St Type Fixed Fixed Ped Button Plan AM Peak Split Plan 3 PM Peak Split Movement SB NB-L Ped EB/WB NB SB-L EB-WB Grove St/Olive Type Fixed Fixed Ped Button Fixed Fixed Fixed Fixed St Plan AM Peak Split ; 9 w/ped NA Plan 3 PM Peak Split ; 9 w/ped NA Movement NB/SB EB/WB Audubon St Type Fixed Fixed Plan AM Peak Split 7 9 Plan 3 PM Peak Split Detection at minor movement. No coordination. Observed cycle and splits different than given on timing sheets. No detection. Pre-timed operation. Offset reference to beginning of yellow Phase. Observed cycle and splits different than given on timing sheets. No detection. Pre-timed operation. Offset reference to beginning of yellow Phase. Observed cycle and splits this year different than last year. Detection at all minor movements. Actuated/coordinated operation with ped button. Offset reference to beginning of yellow Phases and 6. Unused ped time goes to next phase. No detection. Coordinated operation with ped button. Offset reference to beginning of yellow Phase. Unused ped time goes to coordinated phase. No detection. Pre-timed operation. Offset reference to beginning of yellow Phase. Detection at major street left turns. Coordinated operation with ped button. Offset reference to beginning of yellow Phase. Unused ped time goes to next phase. Detection at minor street. Coordinated operation with ped button. Offset reference to beginning of yellow Phase. Unused ped time goes to coordinated phase. No detection. Coordinated operation with ped button. Offset reference to beginning of yellow Phase. Unused ped time goes to next phase. No detection. Ped time added to cycle - no coordination. Observed phase sequence different than given on timing sheets. No detection. Pre-timed operation. Offset reference to beginning of yellow Phase.

10 MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Phase 8 CYCLE OFFSET COMMENTS Movement EB/WB SB Water St Water St Water St SB NB Chestnut St Brewery St Olive St Water St George St/ Fair St Fair St Chapel St TABLE 4B PAGE OF LOWER STATE ST AND WATER ST (TRANSCORE SIGNALS) PROPOSED TIMING Type Coordinated Fixed Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Movement WB EB/WB NB Type Fixed Fixed Fixed Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Movement EB/WB SB Type Fixed Fixed Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Movement NB-L/EB-R SB Ped EB-R/WB SB-L NB Dummy Dummy Type Actuated Coord Ped Button Actuated Actuated Coord Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Movement NB EB Ped Type Coord Fixed Ped Button Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Movement SB EB Type Fixed Fixed Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Movement NB-L SB Ped EB/WB SB-L NB Dummy Dummy Type Actuated Coordinated Ped Button Fixed Actuated Coordinated Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Detection at minor movement. Actuated/coordinated operation. Offset reference to beginning of yellow Phase. No detection. Pre-timed operation. Offset reference to beginning of yellow Phase. No detection. Pre-timed operation. Offset reference to beginning of yellow Phase. Detection at all minor movements. Actuated/coordinated operation with ped button. Offset reference to beginning of yellow Phases and 6. Unused ped time goes to next phase. No detection. Coordinated operation with ped button. Offset reference to beginning of yellow Phase. Unused ped time goes to coordinated phase. No detection. Pre-timed operation. Offset reference to beginning of yellow Phase. Detection at major street left turns. Coordinated operation with ped button. Offset reference to beginning of yellow Phase. Unused ped time goes to next phase.

11 TABLE 4B PAGE OF TRANSCORE SIGNALS - LOWER STATE ST AND WATER ST PROPOSED TIMING MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Phase 8 CYCLE OFFSET COMMENTS Movement NB/SB EB/WB Ped Type Coordinated Actuated Ped Button Court St Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Movement NB/SB EB Ped Type Fixed Coordinated Ped Button Elm St Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Movement SB NB-L Ped EB/WB NB SB-L EB-WB Type Fixed Coordinated Ped Button Fixed Fixed Fixed Fixed Grove St/Olive Plan 5 AM Peak Split St Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Movement NB/SB EB/WB Type Fixed Fixed Audubon St Plan 5 AM Peak Split Plan 6 PM Peak Split Plan 7 AM Peak Split Future Plan 8 PM Peak Split Future Detection at minor street. Coordinated operation with ped button. Offset reference to beginning of yellow Phase. Unused ped time goes to coordinated phase. No detection. Coordinated operation with ped button. Offset reference to beginning of yellow Phase. Unused ped time goes to next phase. No detection. Coordinated operation with ped button. Offset reference to beginning of yellow Phase. Unused ped time goes to coordinated phase. No detection. Pre-timed operation. Offset reference to beginning of yellow Phase.

12 TABLE 5A UPPER STATE ST AND MIDDLETOWN AVE EXISTING TIMING MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 CYCLE OFFSET COMMENTS Humphrey St Movement State NB/SB Ped Humphrey WB Humphrey EB/WB No detection. Ped time added to cycle. Type Fixed Ped Button Fixed Fixed No coordination. Split (All Times) w/o ped; 98 w/ped NA Movement State NB/SB Ped Edwards EB & State SB-R Detection at minor movement. Semi Edwards St Type Fixed Ped Button Actuated actuated. Ped time added to cycle. No Split (All Times) 45 3 Max NA NA corodination. Movement State EB/WB Ped East NB/SB East St / No detection. Ped time added to cycle. Type Fixed Ped Button Fixed Mechanic St No coordination. Split (All Times) w/o ped; w/ped NA James St / Movement State EB/WB James NB / Driveway SB Ramp EB Detection at NB & SB movements. Semi I-9 Exit 5 NB Type Fixed Actuated Fixed actuated. No corodination. Off Ramp Split (All Times) NA NA Movement State EB/WB Ped Blatchley/Willow NB/SB Blatchley Ave / No detection. Ped time added to cycle. Type Fixed Ped Button Fixed Willow St No coordination. Split (All Times) w/o ped; w/ped NA Movement State EB/WB State WB/Ferry NB-R Ferry NB Ped Ferry St / May No detection. Ped time added to cycle. Type Fixed Fixed Fixed Ped Button St No coordination. Split (All Times) w/o ped; 99 w/ped NA Movement Middletown WB/Ferry NB-R Ferry NB/SB-R Ferry SB/Middletown WB-R Middletown Ferry St Type Fixed Fixed Fixed Ave No detection. No ped signals. Split (All Times) Unknown Movement Middletown EB/WB Ramp NB Middletown I-9 Exit 7 SB Type Fixed Fixed Ave Off-Ramp No detection. No ped signals. Split (All Times) Unknown Movement Middletown EB/WB Clinton NB/SB Middletown Clinton St Type Fixed Fixed Ave No detection. No ped signals. Split (All Times) Unknown

13 TABLE 5B PAGE OF UPPER STATE ST AND MIDDLETOWN AVE PROPOSED TIMING MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 CYCLE OFFSET COMMENTS Movement State NB/SB Ped Humphrey WB Humphrey EB/WB Type Coordinated Ped Button Actuated Actuated Humphery St Weekday AM Peak Split Weekday PM Peak Split Daily Midday Split All Other Times Movement State NB/SB Ped Edwards EB & State SB-R Type Coordinated Ped Button Actuated Edwards St Weekday AM Peak Split Weekday PM Peak Split Daily Midday Split All Other Times Movement State EB/WB Ped East NB/SB Type Coordinated Ped Button Actuated East St / Weekday AM Peak Split Mechanic St Weekday PM Peak Split Daily Midday Split All Other Times Movement State EB/WB Ped James NB / Driveway SB Ramp EB Type Coordinated Ped Button Actuated Actuated James St / Weekday AM Peak Split I-9 Exit 5 NB Off Ramp Weekday PM Peak Split Daily Midday Split All Other Times Movement State EB/WB Ped Blatchley NB / Willow EB Type Coordinated Ped Button Actuated Blatchley Ave / Weekday AM Peak Split Willow St Weekday PM Peak Split Daily Midday Split All Other Times Movement State EB/WB State WB / Ferry NB-R Ferry NB Ped Type Coordinated Fixed Actuated Ped Button Ferry St / May Weekday AM Peak Split St Weekday PM Peak Split Daily Midday Split All Other Times Movement Middletown WB/Ferry NB-R Ferry NB/SB-R Ferry SB/Middletown WB-R Type Middletown Weekday AM Peak Split Ferry St Ave Weekday PM Peak Split Daily Midday Split All Other Times Install left turn lanes at both approaches and EB Humphrey St approach. New loop detectors at Humphrey St approaches. New pedestrian signals. Coordinated operation. Unused time goes to next phase. Offset reference to beginning of yellow Phase. New loop detectors at Edwards St approaches. New pedestrian signals. Coordinated operation. Unused time goes to next phase. Offset reference to beginning of yellow Phase. New loop detectors at East St and Mechanic St approaches. New pedestrian signals. Coordinated operation. Unused time goes to next phase. Offset reference to beginning of yellow Phase. New loop detectors at James St, driveway and ramp approaches. New pedestrian signals. Coordinated operation. Unused time goes to next phase. Offset reference to beginning of yellow Phase. Remove all RTOR prohibitions. New loop detectors at Willow St and Blatchley Ave approaches. New pedestrian signals. Coordinated operation. Unused time goes to next phase. Offset reference to beginning of yellow Phase. Remove all RTOR prohibitions on NB Ferry St. New loop detectors at Feery St approach. New pedestrian signals. Coordinated operation. Unused time goes to next phase. Offset reference to beginning of yellow Phase.

14 MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 CYCLE OFFSET COMMENTS Movement Middletown EB/WB Ped Ramp NB Middletown Ave Middletown Ave I-9 Exit 7 SB Off-Ramp Clinton St PAGE OF TABLE 5B UPPER STATE ST AND MIDDLETOWN AVE PROPOSED TIMING Type Coordinated Ped Button Actuated Weekday AM Peak Split Weekday PM Peak Split Daily Midday Split All Other Times Movement Middletown EB/WB Ped Clinton NB/SB Type Coordinated Ped Button Actuated Weekday AM Peak Split 59 9 Weekday PM Peak Split Daily Midday Split All Other Times New loop detectors at ramp approach. New pedestrian signals. Coordinated operation. Unused time goes to next phase. Offset reference to beginning of yellow Phase. New loop detectors at Clinton St approaches. New pedestrian signals. Coordinated operation. Unused time goes to next phase. Offset reference to beginning of yellow Phase.

15 TABLE 6A FORBES AVE EXISITNG TIMING MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 Phase 5 CYCLE OFFSET COMMENTS Movement EB EB/WB SB NB/SB Water St East St Type Fixed Fixed Fixed Fixed Pre-timed operation. All Times Unknown Movement EB/WB EB/WB NB/SB Forbes Ave Stiles St / Wheeler St Type Actuated Coordinated Actuated Splits Controlled by LCU Controlled by LCU Controlled by LCU LCU LCU Movement EB/WB NB/SB Forbes Ave Fulton St Type Coordinated Actuated Splits Controlled by LCU Controlled by LCU LCU LCU Movement EB/WB Ped NB NB/SB Type Coordinated Ped Button Actuated Actuated Forbes Ave Woodward Pattern 6-9 Daily Ave Pattern All other times Pattern Daily Pattern Movement WB EB/WB Ped SB NB/SB Forbes Ave Townsend Ave Type Fixed Fixed Ped Button Fixed Fixed All Times w/o ped; 95 w/ped NA Detection at minor movements. Coordinated operation. Unused time goes to next phase. Actual timings controlled by closed loop LCU. Detection at minor movement. Coordinated operation. Unused time goes to next phase. Actual timings controlled by closed loop LCU. Detection at minor movements. Coordinated operation. Unused ped time goes to coordinated phase. Ped time added to cycle. No coordination.

16 MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 Phase 5 CYCLE OFFSET COMMENTS Movement EB EB/WB SB NB/SB Type Fixed Fixed Fixed Fixed Water St East St Weekday AM Peak Split NA Weekday PM Peak Split NA Pre-timed operation. Weekday Midday Split NA All Other Times NA Movement EB/WB EB/WB NB/SB Type Actuated Coordinated Actuated Forbes Ave Forbes Ave Forbes Ave Stiles St / Wheeler St Fulton St Woodward Ave Forbes Ave Townsend Ave TABLE 6B FORBES AVE PROPOSED TIMING Weekday AM Peak Split Weekday PM Peak Split Weekday Midday Split All Other Times Movement EB/WB NB/SB Type Coordinated Actuated Weekday AM Peak Split Weekday PM Peak Split Weekday Midday Split All Other Times Movement EB/WB Ped NB NB/SB Type Coordinated Ped Button Actuated Actuated Weekday AM Peak Split Weekday PM Peak Split Weekday Midday Split All Other Times Movement WB EB/WB Ped SB NB/SB Type Fixed Fixed Ped Button Fixed Fixed Weekday AM Peak Split Weekday PM Peak Split Weekday Midday Split All Other Times Detection at minor movements. Coordinated operation. Unused time goes to next phase. Detection at minor movement. Coordinated operation. Unused time goes to next phase. Detection at minor movements. Coordinated operation. Unused time goes to next phase. Detection at minor movements. Coordinated operation. Unused time goes to next phase.

17 TABLE 7A FOXON BLVD EXISITNG TIMING MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 CYCLE OFFSET COMMENTS Movement EB/WB SB Middletown I-9 Exit 8 SB Type Actuated Coordinated Ave Ramps 63-9 M-F All Other Times Middletown Movement EB-L EB/WB SB NB Foxon Blvd Ave / I-9 Exit Type Actuated Coordinated Actuated Actuated 8 NB Off M-F Ramp All Other Times Movement WB / NB-R EB/WB NB Foxon Blvd New Haven Type Actuated Coordinated Actuated Plaza 63-9 M-F All Other Times Movement EB-L WB Ped NB-L / SB-L WB-L EB NB/SB Foxon Blvd Quinnipiac Type Actuated Coordinated Ped Button Actuated Actuated Coordinated Actuated Blvd 63-9 M-F All Other Times Detection at minor movements. Coordinated operation. Unused time goes to next phase. Detection at minor movements. Coordinated operation. Unused time goes to next phase. Detection at minor movements. Coordinated operation. Unused time goes to next phase. Detection at minor movements. Coordinated operation. Unused time goes to next phase. MAIN ST CROSS ST CATEGORY Phase Phase Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 CYCLE OFFSET COMMENTS Movement EB/WB SB Middletown Ave Foxon Blvd Foxon Blvd Foxon Blvd I-9 Exit 8 SB Ramps Middletown Ave / I-9 Exit 8 NB Off- Ramp New Haven Plaza Quinnipiac Blvd TABLE 7B FOXON BLVD PROPOSED TIMING Type Actuated Coordinated 63-9 M-F M-F M-F; -7 S-S All Other Times Movement EB-L EB/WB SB NB Type Actuated Coordinated Actuated Actuated 63-9 M-F M-F M-F; All Other Times Movement WB / NB-R EB/WB NB Type Actuated Coordinated Actuated 63-9 M-F M-F M-F; All Other Times Movement EB-L WB Ped NB-L / SB-L WB-L EB NB/SB Type Actuated Coordinated Ped Button Actuated Actuated Coordinated Actuated 63-9 M-F M-F M-F; All Other Times Detection at minor movements. Coordinated operation. Unused time goes to next phase. Detection at minor movements. Coordinated operation. Unused time goes to next phase. Detection at minor movements. Coordinated operation. Unused time goes to next phase. Detection at minor movements. Coordinated operation. Unused time goes to next phase.

18 Figure Ikea Area Brewery St Rt 34 Off Ramp Long Wharf Dr Food Terminal Dr Church St Ext NB Off ramp Long Wharf Dr NB On Ramp SB On Ramp Long SB OFF Ramp Sargent Dr Sargent Dr Urbitran

19 Figure 3 Grand Ave Clinton Av Ferry St Grand Ave Grand Ferry St Front St Quinnipiac Av Urbitran

20 Elm St Olive St Figure 4 Lower / Water St Grove St Audubon St Court St Chapel St George St Fair St N Frontage Rd Olive St Chestnut St Water St Water St Brewery St Urbitran

21 Figure 5 Upper - Middletown Ave Clinton Av Clinton Av Middletown May St Willow St I-9ex7 SB Off-ramp Blatchley Av Mechanic St Exit 5 NB Off Ramp Edwards St James St Ferry St East St Humphrey St Urbitran

22 Figure 6 Forbes Ave East St Water St Forbes Ave Long Wharf Dr Fulton St Stiles St Wheeler St Townsend Ave Forbes Ave Forbes Ave Townsend Ave Woodward Av Urbitran

23 Figure 7 Middletown Ave and Foxon Blvd I-9 on-ramp Middletown Ave Foxon Blvd Foxon Blvd Shopping Center Quinnipiac Av Urbitran

24 URBITRAN New York 7 West 3rd Street New York, NY Glen Cove Ave, Suite Glen Cove, NY New Jersey 57 Broad Street, 5th Floor Newark, NJ Connecticut 5 Union Avenue Union Station, Third Floor East New Haven, CT Pennsylvania 538 Spruce Street, Suite 6 Scranton, PA Engineers Architects Planners

Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor)

Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor) Onondaga County Department of Transportation Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor) Prepared for: Syracuse Metropolitan Transportation Council 126 North Salina

More information

University of California, Davis Transit Signal Priority Implementation Study

University of California, Davis Transit Signal Priority Implementation Study Proposal University of California, Davis Transit Signal Priority Implementation Study Prepared for: Prepared by: University of California, Davis 2990 Lava Ridge Court Suite 200 Roseville, CA 95661 November

More information

Holland Tunnel Exit in NJ

Holland Tunnel Exit in NJ Holland Tunnel Exit in NJ Using Operational Changes to Enhance Tunnel Throughput IBTTA Maintenance & Operations Workshop Daniel Jacobs, General Manager Trans. & Revenue May 17, 2016 Holland Tunnel Opened

More information

Traffic Signal Optimization Project (Electronics Parkway/Henry Clay Boulevard) (Future Coordinated Corridor)

Traffic Signal Optimization Project (Electronics Parkway/Henry Clay Boulevard) (Future Coordinated Corridor) Onondaga County Department of Transportation Traffic Signal Optimization Project (Electronics Parkway/Henry Clay Boulevard) (Future Coordinated Corridor) Prepared for: Syracuse Metropolitan Transportation

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary Stantec Consulting Services Inc. 38 Technology Drive Suite 100, Irvine CA 92618-5312 September 8, 2017 File: 2073014320 Attention: Mark Trestik, Assistant City Engineer City of Beach Department of Public

More information

Delaware Avenue Corridor Study

Delaware Avenue Corridor Study Delaware Avenue Corridor Study City of Marysville, Ohio February 19, 2009 ms consultants, inc. engineers, architects, planners 2221 Schrock Road Columbus, Ohio 43229-1547 ms ms consultants, inc. engineers

More information

Traffic Signal Study. City of Marysville, Ohio. ms consultants, inc. engineers, architects, planners 2221 Schrock Road Columbus, Ohio

Traffic Signal Study. City of Marysville, Ohio. ms consultants, inc. engineers, architects, planners 2221 Schrock Road Columbus, Ohio Traffic Signal Study City of Marysville, Ohio February 26, 2009 ms consultants, inc. engineers, architects, planners 2221 Schrock Road Columbus, Ohio 43229-1547 ms ms consultants, inc. engineers - architects

More information

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011 : Summary of Recommendations Presentation to Manhattan Community Board 8 May 4, 2011 1 Overview Study Goal: Identify cost-effective ways to improve bus speed and reliability for local and express buses

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

Operation Green Light Traffic Signal Coordination Report North Oak Trafficway - New Mark Drive to NE 42nd Street

Operation Green Light Traffic Signal Coordination Report North Oak Trafficway - New Mark Drive to NE 42nd Street Introduction Operation Green Light Traffic Signal Coordination Report North Oak Trafficway - New Mark Drive to NE 42nd Street Operation Green Light (OGL) is a regional effort to improve traffic flow and

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

APPENDIX E: Transportation Technical Report

APPENDIX E: Transportation Technical Report New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Reston Project Environmental Assessment APPENDIX E: Transportation Technical Report E.1 Introduction As part of the overall environmental

More information

Actuated Signal Timing Design CIVL 4162/6162

Actuated Signal Timing Design CIVL 4162/6162 Actuated Signal Timing Design CIVL 4162/6162 Session Objective Explain terms related to actuated signals Explain why and where actuated signals are used Determine detector locations given traffic conditions

More information

Syracuse University University Place Road Closure

Syracuse University University Place Road Closure Transportation Impact Study for the proposed Syracuse University University Place Road Closure City of Syracuse, Onondaga County, NY March 216 Project No. 3613 Prepared For: Syracuse University Office

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions CONTENTS (MODULE 3) Introduction...1 Purpose...1 Goals and Learning Outcomes...1 Organization

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Synchro Studio 8. Overview. By Ioannis Psarros

Synchro Studio 8. Overview. By Ioannis Psarros Synchro Studio 8 Overview By Ioannis Psarros What is Synchro? Software for signal optimization Developed by Trafficware Optimization can be applied to: Cycle lengths Splits Offsets Source: http://bikewalklee.blogspot.com

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

MIT Kendall Square Initiative

MIT Kendall Square Initiative MIT Kendall Square Initiative Volume II: Technical Studies and Information (NoMa Project and SoMa Project) Final Development Plan Submission Cambridge Planning Board #302 and #303 November 5, Submitted

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Intersection LOS Intersection level of service (LOS) is defined by the Highway Capacity Manual (HCM) by the following criteria:

Intersection LOS Intersection level of service (LOS) is defined by the Highway Capacity Manual (HCM) by the following criteria: Page 2 of 9 Intersection LOS Intersection level of service (LOS) is defined by the Highway Capacity Manual (HCM) by the following criteria: Table 1 LOS Definitions Level of Signalized Un-Signalized Definition

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Memorandum. Bob Doyle - SGJJR. Chris Wall Wade Trim. Date: 5/16/2018. Huron Traffic Study Analysis Summary

Memorandum. Bob Doyle - SGJJR. Chris Wall Wade Trim. Date: 5/16/2018. Huron Traffic Study Analysis Summary Memorandum To: From: Bob Doyle - SGJJR Chris Wall Wade Trim Date: 5/16/218 Subject: Huron Traffic Study Analysis Summary Overview As part of the Huron Street Improvement project, the Downtown Development

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

EASTSIDE HIGHWAY ORIGIN-DESTINATION (OD) SURVEY SUMMARY

EASTSIDE HIGHWAY ORIGIN-DESTINATION (OD) SURVEY SUMMARY 1. Introduction EASTSIDE HIGHWAY ORIGIN-DESTINATION (OD) SURVEY SUMMARY Travel is core to human activity; demand for travel is derived from purposes for which people wish to travel between places. Given

More information

Traffic Operations Memorandum

Traffic Operations Memorandum Traffic Operations Memorandum MEMORANDUM Date: May 24 th, 2017 To: From: Re: David Stillman, Project Manager, City of Cupertino Brooke DuBose, Project Manager Robert Burchfield, PE Craig Schoenberg, PE

More information

SCOPE Application, Design, Operations,

SCOPE Application, Design, Operations, SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 2016 Church Street Access Study 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 13202 www.smtcmpo.org Syracuse Metropolitan Transportation Council Final Report February 23, 2016 This

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS A. Volume, Demand, and Capacity 2-1 B. Performance Measures 2-7 C. Critical Lane Volume Analysis 2-9 3. DATA COLLECTION 4. SIGNAL PHASING

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

City and County of San Francisco APS Safety & Access Tool. Cover Sheet. Total score = crosswalk worksheet score + intersection worksheet score

City and County of San Francisco APS Safety & Access Tool. Cover Sheet. Total score = crosswalk worksheet score + intersection worksheet score City and County of San Francisco APS Safety & Access Tool Location of Intersection or Crosswalk: Cover Sheet Evaluator Name: Date Evaluation Completed: Total score = crosswalk worksheet score + intersection

More information

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3 Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study April 11, 2013 Steering Committee Meeting #3 Meeting Agenda Welcome & Introductions Review Project Purpose & Needs Results

More information

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Hao Xu (Corresponding Author) Research Associate Department of Civil & Environmental Engineering Texas

More information

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends:

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:

More information

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017 Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis DRAFT Davidson Elementary School Expansion Transportation Impact Analysis Prepared for: Town of Davidson 216 S. Main Street Davidson, NC 28036 Prepared by: Stantec Consulting Services Inc. 2127 Ayrsley

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion

More information

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street, Suite 100 Syracuse, NY 13202 Telephone (315) 422-5716; Fax

More information

LOOP 360 IMPROVEMENT STUDY

LOOP 360 IMPROVEMENT STUDY LOOP 360 IMPROVEMENT STUDY Overview and Preliminary Analysis August 2015 1 STUDY PROCESS 2 Study Background Loop 360 serves a wide range of users, including residents, businesses, bicyclists, and commuters

More information

Route 79/Davol Street Corridor Study

Route 79/Davol Street Corridor Study Route 79/Davol Street Corridor Study Fall River, MA Public Information Meeting #2 November 21, 2013 Fall River Heritage State Park Fall River, MA Agenda Welcome and Introductions Overview of Study Process

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

EXISTING (2006) CONDITIONS

EXISTING (2006) CONDITIONS Section 2 EXISTING (2006) CONDITIONS This section provides a description of the existing transportation system in the study area and a comprehensive analysis of existing traffic operations and crash history.

More information

Transportation Setting

Transportation Setting Transportation Setting Operational Analysis Study Area and Periods The study area consists of the following intersections: 1. Serramonte Boulevard/I-28 Southbound Ramps 2. Serramonte Boulevard/I-28 rthbound

More information

San Pablo High Treatment applied incrementally at each N + ++

San Pablo High Treatment applied incrementally at each N + ++ Transit Improvements T1 Further study options for creation or designation of segregated transit lanes along San Pablo, including options for restrictions during a limited number of peak travel hours and

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current Existing and Future Conditions

More information

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview IBI GROUP 18401 Von Karman Avenue Suite 110 Irvine CA 92612 USA tel 949 833 5588 fax 949 833 5511 ibigroup.com Memorandum To/Attention Steering Committee Members Date February 17, 2016 From IBI Group Project

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study City Council October 6, 2014 Presentation Outline Project Initiation & Process Corridor Conditions & Issues Vision & Goals Concept Development - Development/Evaluation Implementation

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Martha White, Natick Town Administrator February 17, 2011 Eric Nascimento, MassDOT

More information

Application of Diamond Interchange Control Strategies at Closely Spaced Intersections

Application of Diamond Interchange Control Strategies at Closely Spaced Intersections Application of Diamond Interchange Control Strategies at Closely Spaced Intersections Zong Tian, Thomas Urbanik II, and Reed Gibby Signalized diamond interchanges are one of the most common interchange

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

The current document is revised based on the comments received on:

The current document is revised based on the comments received on: General Overview 1 Introduction Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current

More information

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park Traffic Impact Analysis Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park Silver Spring, MD Lot 17: Site Plan No. 821413 Lot 18: Site Plan No. 821414 Filing Number: 13-TS-1198527A Prepared

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

Figure 5A: Diagram of Crashes, May 2005 to May 2008 (Part 1)

Figure 5A: Diagram of Crashes, May 2005 to May 2008 (Part 1) Figure 5A: Diagram of Crashes, May 2005 to May 2008 (Part 1) Canal Pointe Boulevard Study - March 2015 10 Table of Contents INTRODUCTION... 1 EXISTING CONDITIONS... 1 Existing Roadway Conditions and Controls...

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

Arterial Management Plan for US Route 250 and State Route 623

Arterial Management Plan for US Route 250 and State Route 623 Arterial Management Plan for US Route 250 and State Route 623 June 25, 2014 Brad Shelton, AICP Access Management and Traffic Impact Analysis Programs Manager Transportation and Mobility Planning Division

More information

Circulation and Mobility

Circulation and Mobility SECTION 4 Circulation and Mobility OVERVIEW The first phase of the circulation analysis is to address specific concerns regarding the circulation system in the vicinity of the Gateway Specific Plan area

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service

More information

Introduction to Traffic Signal Timing

Introduction to Traffic Signal Timing Introduction to Traffic Signal Timing Course No: C-7 Credit: PDH Jeffrey W. Buckholz, Ph.D., P.E., PTOE Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 98 P: (877) -58

More information

JACKSON PARK REVITALIZATION TRAFFIC IMPACT STUDY FINAL REPORT

JACKSON PARK REVITALIZATION TRAFFIC IMPACT STUDY FINAL REPORT JACKSON PARK REVITALIZATION TRAFFIC IMPACT STUDY FINAL REPORT Submitted to: Prepared by: February 2018 EXECUTIVE SUMMARY The City of Chicago and Chicago Park District are considering a large-scale revitalization

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Route 28 Corridor Safety and Operations Study

Route 28 Corridor Safety and Operations Study Route 28 Corridor Safety and Operations Study Technical Committee Meeting #4 May 22, 2015 1 Agenda Planned Corridor Activities Candidate Improvements Recommendations Immediate Actions & Status Next Steps

More information

Multilane Roundabouts

Multilane Roundabouts Multilane Roundabouts Supplement to Synchro 7 Studio Users Guide Discussion SimTraffic 7 has been updated to better model multilane roundabouts. With the new logic it is possible to model a two-lane arterial

More information

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 44 Project INTERSECTION: 16TH AVENUE & EAST MALL FOR AM PEAK HOUR Group Work: Syed Shafaat Ali Shah (2347426) Mohammad Moudud Hasan

More information

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program (OCX) 52 crossings 8

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 Welcome! Meeting Agenda Project update presentation Up to 15 minutes for Pulse Q&A about project design. (Please reserve

More information

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

APPENDIX F SUPPLEMENTAL TRAFFIC DATA APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael

More information