E. STRUCTURAL STEEL G. STRUCTURAL SPECIAL INSPECTIONS

Size: px
Start display at page:

Download "E. STRUCTURAL STEEL G. STRUCTURAL SPECIAL INSPECTIONS"

Transcription

1 9 9. GENERL STRUTURL NOTES. ESIGN INFORMTION. OES a. ESIGN ONFORMS TO I 9 NEW JERSEY EITION. b. MERIN ONRETE INSTITUTE (I) - "UILING OE REQUIREMENTS FOR STRUTURL ONRETE" I - c. MERIN INSTITUTE OF STEEL ONSTRUTION (IS) - "SPEIFITIONS FOR STRUTURL STEEL UILING" IS 6-. d. MERIN SOIETY OF IVIL ENGINEERS (SE) - "MINIMUM ESIGN LOS FOR UILINGS N OTHER STRUTURES", SE 7-, e. MERIN WELING SOIETY (WS) - "STRUTURL WELING OE - STEEL", WS.-.. LOS a. FLOOR LIVE LO - FLOOR LIVE LO PSF - OLLTERL HUNG ROOF LO PSF b. MINIMUM ROOF LIVE LO PSF c. GROUN SNOW LO, Pg PSF - FLT ROOF SNOW LO, Pf 7. PSF - SNOW EPOSURE FTOR, e. - SNOW IMPORTNE FTOR, I. - THERML FTOR, t. d. WIN LOS - SI WIN SPEE, V - WIN IMPORTNE FTOR, I. - WIN EPOSURE TEGORY e. SEISMI LOS - I 9 - SEISMI OUPNY TEGORY II - SEISMI IMPORTNE FTOR, I. -. SE SPETRL RESPONSE, Ss. -. SE SPETRL RESPONSE, S.67 - SITE SOIL LSS - SITE OEFFIIENT SHORT PERIO, Fz. - SITE OEFFIIENT LONG PERIO, Fv. - Sms. - Sm.6 - Sds. - Sd.7 - SEISMI ESIGN TEGORY. EMOLITION. ONTRTOR SHLL VERIFY LL ONITIONS N IMENSIONS PRIOR TO STRTING EMOLITION.. ONTRTOR SHLL E RESPONSILE FOR ESIGN N INSTLLTION OF NY REQUIRE SHORING PRIOR TO EMOLITION.. INSTLLTION OF LL TEMPORRY UST PROOFING N ONTRTOR SHLL E RESPONSILE FOR ESIGN N WTERPROOFING REQUIRE TO PREVENT ERIS OR WTER FROM ENTERING OTHER RES OF THE STRUTURE WHIH RE NOT INLUE WITHIN THE WORK.. THE ONTRTOR SHLL OORINTE INSTLLTION OF THE TEMPORRY UST PROOFING N WTER PROOFING WITH THE OWNER.. MGE TO EISTING STRUTURE TO REMIN S RESULT OF OR SSOITE WITH THE EMOLITION SHLL E REPIRE OR REPLE T THE ONTRTORS EPENSE. 6. ONTRTOR SHLL PREVENT ERIS FROM ENTERING OTHER RES OF THE STRUTURE WHIH RE NOT INLUE WITHIN THE WORK. 7. LL MTERILS FROM EMOLITION SHLL E REMOVE FROM THE SITE N PROPERLY ISPOSE OF Y THE ONTRTOR.. THE ONTRTOR SHLL FIEL VERIFY LL STRUTURL ONITIONS, NEW N EISTING, N NOTIFY THE ENGINEER OF NY ISREPNIES. 9. THE ONTRTOR SHLL OORINTE LL EMOLITION WITH THE OWNER.. FOUNTIONS. FOUNTIONS HVE EEN PROPORTIONE FOR N LLOWLE NET ERING PRESSURE OF PSF IN ORNE WITH THE "REPORT OF GEOTEHNIL INVESTIGTION, PROPOSE UILING ITION, H MIROSYSTEMS", TE MY 9,, PREPRE Y ERTH ENGINEERING INORPORTE.. FROST EPTH = '-". KFILLING T FOUNTION WLLS SHLL E ONE IN SUH MNNER THT THE IFFERENE IN GRES ON EITHER SIE OF THE WLL SHLL NOT EEE FEET T NY STGE OF KFILLING UNTIL THE ONTRT GRES RE REHE.. HEVY EQUIPMENT SHLL NOT E PERMITTE LOSER THN FEET FROM NY FOUNTION WLL. IF ONTRTOR EEMS IT IS NEESSRY TO OPERTE SUH EQUIPMENT LOSER THN FEET, THE ONTRTOR SHLL E SOLELY RESPONSILE N, T HIS OWN EPENSE, PROVIE EQUTE SUPPORTS OF WLL RES TO WITHSTN THE ITIONL LOS SUPERIMPOSE FROM SUH EQUIPMENT.. VERIFY IMENSIONS N LOTIONS OF LL SLOTS, PIPE SLEEVES, ET. REQUIRE FOR WORK OF OTHER ISIPLINES. PROVIE WTERTIGHT SLEEVES T LL PIPE PENETRTIONS THROUGH FOUNTION WLL. 6. LL FOUNTIONS SHLL E POURE ON RY SOIL. LL EVTIONS SHLL E EQUTELY EWTERE PRIOR TO POURING OF ONRETE. 7. PROVIE OWELS IN FOUNTIONS FOR LL WLLS N OLUMNS OF SME NUMER N SIZE S THE VERTIL REINFORING OVE UNLESS NOTE.. ONTRTOR MUST E PROVIE WITH THE GEOTEHNIL REPORT S REFERENE IN ITEM #. 9. LL SOILS N FOUNTION WORK SHLL E PERFORME N ONSTRUTE IN STRIT ORNE WITH THE REFERENE GEOTEHNIL REPORT.. LL FOUNTIONS SHLL E PLE ON SUITLE ENSE NTURL SOILS.. THE ONTRTOR SHLL PROVIE UNERPINNING OR OTHER METHO TO SUPPORT THE SOILS ENETH THE EISTING FOUNTION OR NY STRUTURL ELEMENT URING ONSTRUTION. EMOLITION N FOUNTION EVTION TO PREVENT SETTLEMENT OF EISTING JENT STRUTURES. REQUIRE FOUNTION SUPPORT SHLL E OORINTE WITH THE GEOTEHNIL ENGINEER.. THE OTTOM OF THE NEW FOUNTIONS SHLL NOT ER ON OR E OVE THE IN-PLE FILL, EISTING SLS, FOUNTION ELEMENTS, PVEMENT OR UTILITIES.. ST-IN-PLE-ONRETE. MTERILS a. ONRETE, Y OMPRESSIVE STRENGTH (MIN) - f'c = PSI USE FOR FOUNTIONS N RETINING WLLS (IR ENTRINE) - f'c = PSI SL-ON-GRE - ETERIOR EPOSE ONRETE SHLL HVE ETWEEN TO 7% ENTRINE IR. b. REINFORING STEEL - R REINFORING STM 6 GRE 6 - R REINFORING (WELE) STM 7 GRE 6 - WELE WIRE REINFORING (WWR) STM 6 (FLT SHEET) ONRETE OVER FOR REINFORING RS SHLL E S FOLLOWS (UNLESS NOTE) - FOOTING N SLS ST GINST GROUN " - ONRETE TO E IN ONTT WITH GROUN OR WETHER: T RS GRETER THN # " T RS # OR LESS /" - ONRETE NOTE TO E EPOSE TO GROUN OR WETHER: EMS, GIRERS OR OLUMNS /" SLS N WLLS /" - PROVIE HIRS FOR SUPPORT OF LL REINFOREMENT. LIFTING OF RS OR MEH URING PLEMENT OF ONRETE IS NOT PERMITTE. - SEE THE ONRETE REINFORING EVELOPMENT LENGTH TLE, IN THE ON SHEET S-, FOR IMENSIONS "Ld" S NOTE ON RWINGS. - OWEL R SUSTITUTIONS SHLL E PERMITTE PROVIE THT MNUFTURER'S T SUPPORTS % OF THE FULL TENSION SPLIE VLUE.. ONRETE ONSTRUTION SHLL ONFORM TO "SPEIFITIONS FOR STRUTURL ONRETE", I -. SHOP RWINGS SHLL ONFORM TO I ETILING MNUL, I SP KEYS SHLL E " EEP " WIE, UNLESS NOTE.. PROVIE SUPPLEMENTRY REINFORING T LL SL-ON-GRE RE- ENTRNT ORNERS PER ETIL ON S-. 6. LOTIONS OF LL ONSTRUTION JOINTS NOT SHOWN ON RWINGS SHLL E SUMITTE TO ENGINEER FOR PPROVL PRIOR TO ETILING OF REINFORING. LL ONSTRUTION JOINTS SHLL E LERLY SHOWN IN RER ETIL RWINGS. ENGINEER MY REQUIRE ITIONL REINFORING T ONSTRUTION JOINTS. 7. HMFER LL EPOSE ONRETE UNLESS NOTE OTHERWISE.. PROVIE MIL VPOR RETRE UNER LL SLS ON GRE. REFER TO RHITETURL RWINGS N SHEET S- FOR MORE ETILS. E. STRUTURL STEEL. STM MTERILS a. STRUTURL STEEL STM 99, GRE UNLESS NOTE b. NGLES, HNNELS N MISELLNEOUS STEEL STM 6 c. NHOR ROS STM F, GRE 6 d. HIGH STRENGTH OLTS STM (/"Ø) UNLESS NOTE (OF NORTH MERIN MNUFTURER) e. WELING ELETROES WS. (E7) f. PIPE STM, GRE g. SQURE N RETNGULR HOLLOW STRUTURL SETIONS (HSS) STM, GRE h. SE PLTES GROUT (FLOWLE) 6, PSI i. PLTES STM 6 OR STM 7, GRE WHERE INITE. STEEL ONSTRUTION SHLL ONFORM TO "SPEIFITIONS FOR STRUTURL STEEL FOR UILINGS" IS 6-.. WELING SHLL ONFORM TO "STRUTURL WELING OE" WS... ONNETIONS NOT SHOWN ON THE RWINGS SHLL E ESIGNE Y THE STEEL FRITOR. ONNETIONS SHLL E ESIGNE IN ORNE WITH IS "SPEIFITIONS FOR STRUTURL JOINTS USING STM OR 9 OLTS" N IS "OE OF STNR PRTIES FOR STEEL UILINGS N RIGES". LL OLTE ONNETIONS SHLL HVE MINIMUM OF OLTS. MINIMUM OLT SIZE SHLL E /"Ø N MINIMUM WEL SIZE SHLL E /. WT RING ONNETIONS SHLL HVE MINIMUM OF OLTS. LL WELING SHLL ONFORM TO THE LTEST EITION OF WS... LL LIP NGLE ONNETION MTERILS SHLL E / THIK MINIMUM. PROVIE / STIFFENER PLTES LOLLY T LL HNGERS N POSTS. SHER TS SHLL E / THIK MINIMUM. 6. LL SHER ONNETIONS SHLL E ESIGNE Y THE STEEL FRITOR FOR LOS SHOWN ON PLNS UNLESS OTHERWISE INITE. SHER TS RE REQUIRE T ESIGNTE EM EN ONNETIONS NOTE ON PLNS N T LL FR MOMENT ONNETIONS. 7. PROVIE /"Ø STM FSTENERS T LL SHER T ONNETIONS.. LL LOS SHOWN ON THE PLNS RE SERVIE LOS IN KIPS. WHERE NO LOS RE SHOWN, ONNETIONS SHLL E ESIGNE FOR MINIMUM SHER OF KIPS N MINIMUM TENSION OF KIPS. 9. STEEL EPOSE TO ETERIOR ENVIRONMENT SHLL E HOT-IPPE GLVNIZE.. SHOP ONNETIONS MY E OLTE OR WELE. E. STRUTURL STEEL (ONT). PROVIE STIFFENER PLTES ON OTH SIES OF THE WE OF EMS SUPPORTING OLUMNS OR RUNNING OVER THE TOPS OF OLUMNS., EMS SUPPORTING STIR STRUTS N STIR HNGERS, ET. MINIMUM STIFFENER PLTE THIKNESS SHLL E /, FLNGE THIKNESS OF OLUMN OVE OR ELOW EM, OR EM WE THIKNESS, WHIHEVER IS GRETER.. SPNREL NGLE T PERIMETER EGE OF FLOOR SL/ROOF SHLL E JUSTLE. SHIP NGLES LOOSE N SET WITH STRING LINE IN FIEL FOR VERTIL N HORIZONTL LIGNMENT FTER STEEL IS FULLY ERETE TO MIMUM TOLERNE OF /" HORIZONTL PER Y/PER FLOOR. NGLE SHLL E INSTLLE IN ONE LENGTH PER Y. SEE TYPIL ETILS.. STRUTURL STEEL ONTRTOR SHLL PROVIE LL TEMPORRY RING OF THE STEEL FRME REQUIRE TO MINTIN PLUMNESS N STILITY URING ONSTRUTION.. LL MOMENT ONNETIONS SHLL E ESIGNE FOR THE FULL MOMENT PITY OF THE MEMER UNLESS OTHERWISE NOTE.. PROVIE N SET LL NGLES SUPPORTING MSONRY S SHOWN ON RHITETURL N/OR STRUTURL RWINGS. NGLES NOT INITE S ONTINUOUS WHIH SUPPORT MSONRY SHLL E /" SHORTER THN MSONRY OPENING. 6. SEE RHITETURL RWINGS FOR LOOSE LINTELS OVER OPENINGS IN ETERIOR OR INTERIOR MSONRY WLLS, INLUING OOR OPENINGS. 7. LL LINTELS N SHELF NGLES WITHIN ETERIOR WLLS SHLL E HOT-IPPE GLVNIZE F. MISELLNEOUS. IMENSIONS OF EQUIPMENT OPENINGS, SUPPORTS, PS, SL EPRESSIONS, FOUNTIONS N NHORGE HVE EEN ETERMINE USING SPEIFI MNUFTURER'S EQUIPMENT. FINL IMENSIONS SHLL E VERIFIE WITH THE TUL EQUIPMENT PURHSE. IMENSIONS SHLL E HNGE ONLY WITH PPROVL OF THE ENGINEER.. SEE RHITETURL, MEHNIL, PLUMING N ELETRIL SHEETS FOR ITIONL OPENINGS, SLEEVES, EMEE ITEMS, UNERGROUN PIPING, N ELETRIL GROUNING NOT SHOWN ON STRUTURL SHEETS.. ONTRTOR SHLL VERIFY LL IMENSIONS, ELEVTIONS N EISTING ONITIONS PRIOR TO PROEEING WITH WORK. VRITIONS ETWEEN SHEET N TUL EISTING ONITIONS SHLL E ROUGHT TO THE TTENTION OF THE ENGINEER PRIOR TO PROEEING WITH THE WORK.. OORINTE FINL IMENSIONS OF UT OPENINGS, SL EPRESSIONS, N EQUIPMENT SUPPORTS WITH THE PPROPRITE ONTRTOR. IMENSIONS WHERE SHOWN ON ONTRT OUMENTS SHLL E HNGE ONLY WITH THE PPROVL OF THE ENGINEER.. SEE OTHER ISIPLINE RWINGS FOR LOTION OF URS, ONRETE PS, FLOOR EPRESSIONS, ROOF N FLOOR RINS. 6. VERIFY FRMING FOR SUPPORT OF MEHNIL EQUIPMENT N NY MEHNIL OPENINGS WITH MEHNIL TRES PRIOR TO SUMISSION OF SHOP RWINGS. 7. NOTES, TYPIL ETILS, N SHEULES PPLY TO LL STRUTURL WORK UNLESS NOTE OTHERWISE. FOR ONITIONS NOT SPEIFILLY SHOWN, PROVIE ETILS OF SIMILR NTURE. VERIFY PPLIILITY Y SUMITTING SHOP RWINGS FOR REVIEW.. STRUTURL RWINGS SHLL E USE IN ONJUNTION WITH OTHER ISIPLINES RWINGS. IF THERE IS ISREPNY ETWEEN RWINGS IT IS ONTRTORS RESPONSIILITY TO NOTIFY THE ENGINEER PRIOR TO PERFORMING WORK. 9. SEE OTHER ISIPLINES RWINGS N SPEIFITIONS FOR WTERPROOFING / MPPROOFING N FIREPROOFING ETILS N REQUIREMENTS.. PLE ONUITS SHOWN ON OTHER ISIPLINE RWINGS OVE OR ELOW ONRETE ON METL EK FLOORS WHENEVER POSSILE. SUMIT ONUIT LYOUTS FOR ONUITS PLE IN ONRETE ON METL EK FLOORS TO THE ENGINEER FOR REVIEW PRIOR TO INSTLLTION.. THIS STRUTURE HS EEN ESIGNE TO E SELF-SUPPORTE N STLE FTER THE ONSTRUTION OF THE UILING HS EEN OMPLETE. THE STILITY OF THE STRUTURE PRIOR TO OMPLETION IS SOLELY THE RESPONSIILITY OF THE ONTRTOR. THIS RESPONSIILITY INLUES LL RELTE SPETS OF ONSTRUTION TIVITY INLUING, UT NOT LIMITE TO, ERETION METHOS, ERETION SEQUENE, TEMPORRY RING, FORMS, SHORING, USE OF EQUIPMENT N SIMILR ONSTRUTION PROEURES. G. STRUTURL SPEIL INSPETIONS. IN ORNE WITH SETION 7 OF THE INTERNTIONL UILING OE, N LL PPLILE STTE N LOL REQUIREMENTS, N INEPENENT PPROVE GENY SHLL MKE PERIOI N/OR ONTINUOUS INSPETIONS OF THE ONSTRUTION PROGRESS IN ORNE WITH THE FOLLOWING REQUIREMENTS: STEEL ONSTRUTION SETION 7., TLE 7. ONRETE ONSTRUTION SETION 7., TLE 7. SOILS SETION 7.7, TLE 7.7 H. METL UILING SYSTEMS. THE METL UILING MNUFTURER SHLL E THE ENGINEER-OF- REOR OF THE SUPERSTRUTURE N E RESPONSILE FOR ITS ESIGN. THE METL UILING MNUFTURER SHLL PROVIE THE OMPLETE SUPERSTRUTURE UILING ENVELOPE, INLUING UT NOT LIMITE TO NHOR RO IMETER, ONFIGURTION N STEEL GRE, GIRTS, RNE SUPPORTS, N OTHER MISELLNEOUS STRUTURL STEEL RELTE TO THE UILING SUPERSTRUTURE. STV, IN. IS RESPONSILE ONLY FOR THE STRUTURL ESIGN OF THE FOUNTIONS N EMEMENT LENGTHS OF THE NHOR ROS.. THE ONTRTOR IS TO REFER TO THE METL UILING MNUFTURER'S OUMENTS FOR FRMING OF THE SUPERSTRUTURE N INSTLLTION OF THE NHOR ROS.. THE FOUNTIONS, INLUING WLLS, PIERS, FOOTINGS, GRE EMS, PILE PS, ET., SHLL NOT E PLE UNTIL THE FINL ESIGN LOS N NHOR RO SIZES N LYOUT HVE EEN SUMITTE ON SHOP RWINGS N HVE EEN REVIEWE Y STV, IN.. THE METL UILING MNUFTURER SHLL SUMIT LL SUPERSTRUTURE OUMENTS N LULTIONS NEESSRY TO OTIN UILING PERMITS. THESE OUMENTS SHLL E SELE Y THE QULIFIE REGISTERE PROFESSIONL ENGINEER RESPONSILE FOR THE SUPERSTRUTURE ESIGN.. THE METL UILING MNUFTURER SHLL PROVIE SUMITTL ONTINING FINL FOUNTION RETIONS, UTILIZING OE REQUIRE LO OMINTIONS, N FINL ERETION N NHOR RO LYOUT N ETIL RWINGS WHIH SHOW THE LOTIONS OF WHERE THE FOUNTION RETIONS RE GIVEN. THIS SUMITTL SHLL E SIGNE N SELE Y REGISTERE PROFESSIONL ENGINEER, LIENSE IN THE STTE WHERE THE PROJET IS LOTE, RESPONSILE FOR THE SUPERSTRUTURE ESIGN. I. POST INSTLLE NHORS. PROVIE OUMENTTION INITING THT LL POST INSTLLE NHORS (EPOY HESIVE N MEHNIL/EPNSION) HVE EEN ESIGNE, N INSTLLE IN ORNE WITH THE MNUFTURER'S REOMMENTIONS. IN ITION TO THE MNUFTURER'S PROUT ESIGN INFORMTION, PROVIE THE I-EVLUTION SERVIE REPORTS SHOWING OMPLINE WITH THE PPLILE UILING OES LISTE IN SETION OF THESE GENERL NOTES (. ESIGN INFORMTION). SUMIT LULTIONS PREPRE Y REGISTERE PROFESSIONL ENGINEER INITING THE REQUIRE IMETER, EMEMENT EPTH, N PITY OF EH NHOR OR NHOR GROUP IF NOT PROVIE ON THE RWING. NHOR RETIONS FOR EQUIPMENT SHLL E PROVIE Y THE EQUIPMENT SUPPLIER. SIGNE N SELE LULTIONS SHLL E SUMITTE S PRT OF THE SHOP RWING PROESS.. OWEL RS SHLL E EMEE TO EVELOP THE YIEL STRENGTH OF THE R.. LL NHORS SHLL SSUME THE RKE ONRETE ESIGN ONITION, UNLESS NOTE OTHERWISE.. LL NHORS SHLL E INSTLLE IN ORNE WITH THE MNUFTURER'S PRINTE INSTLLTION INSTRUTIONS. 6. RRNGE FOR THE NHOR MNUFTURER'S REPRESENTTIVE TO PROVIE ON-SITE INSTLLTION TRINING FOR LL POST-INSTLLE NHORS. SUMIT TO THE OWNER OUMENTTION ONFIRMING THT LL OF THE INSTLLING PERSONNEL HVE EEN TRINE PRIOR TO OMMENEMENT OF INSTLLING NHORS. 7. NHOR PITY IS EPENENT UPON SPING ETWEEN JENT NHORS N PROIMITY OF NHORS TO THE EGE OF ONRETE OR MSONRY. INSTLL NHORS IN ORNE WITH THE MNUFTURER'S SPING N EGE LERNE RESTRITIONS.. LOTE Y NON-EVSIVE MENS, N VOI LL EISTING REINFOREMENT PRIOR TO THE INSTLLTION OF NHORS. IF THE EISTING REINFORING LYOUT PROHIITS THE INSTLLTION OF NHORS S INITE IN THE RWINGS, IMMEITELY NOTIFY THE ONTRTING OFFIER. EM SIZE TEHNIL TERMS REVITION TERM TO NJ ONN ORP WL EM EO ES G GR HPT HSS JT NI PP PL PMF PROJ SP STL V WWR Wx F LEGEN Wx () K TO K ONTRTION JOINT ONNETION ORPORTION OWEL EMEMENT EGE OF EK EH SIE GGE, GUGE GUR RIL HIGH POINT HOLLOW STRUTURL SETION ISOLTION JOINT JOINT NOT IN ONTRT PREST HOLLOW ORE PLNK PLTE PREMOLE FILLER PROJETION SPES STEEL NEW WORK EISTING TO REMIN EISTING TO E EMOLISHE SLNTE TET INITES EISTING STRUTURES N/OR FETURES GURRIL N TOE PLTE GURRIL TOE PLTE EM ESIGNTION (FRMING PLNS) () FLOOR RIN P- VERTIL RE TOP OF STEEL ELEVTION WELE WIRE REINFORING SHER LO IN KIPS INITES VERTIL OLUMN RING OVE N/OR ELOW TOP OF FOOTING ELEVTION PIER MRK Skanska US uilding East Township Line Road, Suite lue ell, P 9 t f SUONSULTNTS PROJET IENTIFITION PROJET NO.: ESIGNE Y: RWN Y: HEKE Y: PPROVE Y: OPYRIGHT: STV rchitects, Inc. West Welsh rive ouglassville, P 9 t 6.. f 6.. SELS ITION N RENOVTIONS PRLIN, NEW JERSEY /7/ PERMIT RWINGS J 6// STRUTURL ISSUE FOR J ONSTRUTION MRK TE ESRIPTION Y ISSUE LOK STV RHITETS, IN. K. RRON J. RILLO ROTHENERGER GENERL STRUTURL NOTES N LEGEN S- 7 // 7:6: M :\Users\weimarrj\ocuments\7_S-_weimarrj.rvt

2 9 9. STTEMENT OF SPEIL INSPETIONS. SPEIL INSPETIONS SHLL E PROVIE Y THE OWNER ORING TO I 9 NEW JERSEY EITION, HPTER 7. THE NMES N REENTILS OF THE SPEIL INSPETORS TO E USE SHLL E SUMITTE TO THE ENGINEER OF REOR FOR PPROVL.. SPEIL INSPETION REPORTS SHLL E PROVIE TO THE ENGINEER OF REOR N ONTRTOR.. OFF-SITE FRITION WHERE FRITION OF STRUTURL LO ERING MEMERS N SSEMLIES IS EING PERFORME ON THE PREMISES OF FRITOR'S SHOP, SPEIL INSPETION OF THE FRITE ITEMS SHLL E IN ORNE WITH I 9 NEW JERSEY EITION, SETION 7... THIS SHLL INLUE STRUTURL STEEL FRITION, PREST ONRETE, OL FORME STEEL TRUSSES N OPEN WE STEEL JOISTS. Skanska US uilding East Township Line Road, Suite lue ell, P 9 t f SUONSULTNTS I TLE 7. REQUIRE VERIFITION N INSPETION OF STEEL ONSTRUTION I TLE 7. REQUIRE VERIFITION N INSPETION OF ONRETE ONSTRUTION 6 MNUFTURER'S ERTIFIE TEST REPORTS MTERIL VERIFITION OF WEL FILLER MTERILS: IENTIFITION MRKINGS TO ONFORM TO WS SPEIFITIONS IN THE PPROVE ONSTRUTION OUMENTS MNUFTURER'S ERTIFITE OF OMPLINE REQUIRE INSPETION OF WELING: STRUTURL STEEL N OL FORME STEEL EK ) OMPLETE N PRTIL JOINT PENETRTION GROOVE WELS ) MULTIPSS FILLET WELS ) SINGLE-PSS FILLET WELS > / ) PLUG N SLOT WELS ) SINGLE-PSS FILLET WELS < / 6) FLOOR N ROOF EK WELS INSPETION OF STEEL FRME JOINT ETILS FOR OMPLINE WITH PPROVE ONSTRUTION OUMENTS VERIFITION N INSPETION MTERIL VERIFITIONS OF HIGH-STRENGTH OLTS, NUTS N WSHERS IENTIFITION MRKINGS TO ONFORM TO STM STNRS SPEIFIE IN THE PPROVE ONSTRUTION OUMENTS MNUFTURER'S ERTIFITE OF OMPLINE REQUIRE INSPETION OF HIGH-STRENGTH OLTING SNUG-TIGHT JOINTS PRETENSIONE N SLIP RITIL JOINTS USING TURN-OF-NUT WITH MTHMRKING, TWIST-OFF OLT OR IRET TENSION INITOR METHOS OF INSTLLTION PRETENSIONE N SLIP RITIL JOINTS USING TURN-OF-NUT WITHOUT MTHMRKING, TWIST- OFF OLT OR LIRTE WRENH METHOS OF INSTLLTION MTERIL VERIFITION OF STRUTURL STEEL N OL FORME STEEL EK FOR STRUTURL STEEL, IENTIFITION MRKINGS TO ONFORM TO IS 6 FOR OTHER STEEL, IENTIFITION MRKINGS TO ONFORM TO STM STNRS SPEIFIE IN THE PPROVE ONSTRUTION OUMENTS ETILS SUH S RING N STIFFENING MEMER LOTIONS PPLITION OF JOINT ETILS T EH ONNETION ONTINUOUS PERIOI REFERENE STNR PPLILE STM MTERIL SPEIFITIONS; IS 6, SETION. IS 6, SETION M. IS 6, SETION M. PPLILE STM MTERIL STNRS IS 6, SETION. N PPLILE SW OUMENTS WS. WS. I REFERENE VERIFITION N INSPETION INSPETION OF REINFORING STEEL N PLEMENT INSPETION OF OLTS TO E INSTLLE IN ONRETE PRIOR TO N URING PLEMENT OF ONRETE WHERE LLOWLE LOS HVE EEN INRESE INSPETION OF NHORS INSTLLE IN HRENE ONRETE VERIFYING USE OF REQUIRE ESIGN MI T THE TIME FRESH ONRETE IS SMPLE TO FRITE SPEIMEN FOR STRENGTH TESTS, PERFORM SLUMP N IR ONTENT TESTS, N ETERMINE THE TEMPERTURE OF THE ONRETE INSPETION OF ONRETE PLEMENT FOR PROPER PPLITION TEHNIQUES INSPETION FOR MINTENNE OF SPEIFIE URING TEMPERTURE N TEHNIQUES INSPETION FORM WORK FOR SHPE, LOTION N IMENSIONS OF THE ONRETE MEMER EING FORME INSPET PRESTRESSE ONRETE: a. PPLITION OF PRESTRESSING FORES b. GROUTING OF ONE PRESTRESSING TENONS IN THE SEISMI-FORE-RESTRINT SYSTEM ERETION OF PREST ONRETE MEMERS VERIFITION N INSPETION VERIFY MTERILS ELOW FOOTINGS RE EQUTE TO HIEVE THE ESIGN ERING PITY VERIFY EVTIONS RE ETENE TO PROPER EPTH N HVE REHE PROPER MTERIL PERFORM LSSIFITION N TESTING OF ONTROLLE FILL MTERILS VERIFY USE OF PROPER MTERILS, ENSITIES N LIFT THIKNESSES URING PLEMENT N OMPTION OF OMPTE KFILL PRIOR TO PLEMENT OF ONTROLLE FILL, OSERVE SUGRE N VERIFY THT SITE HS EEN PREPRE ONTINUOUS I TLE 7.7 PERIOI REQUIRE VERIFITION N INSPETION OF SOILS ONTINUOUS PERIOI REFERENE STNR I :., I..,.. I :..6,..,, I : H,. -. STM 7, STM, I :.6,. I :.9,. I :. -. I : 6. I :. I :.. I : 6 REFERENE STNR I REFERENE 9. 9., , 9., , 9.7, I REFERENE R SIZE ONRETE REINFORING EVELOPMENT LENGTH (Ld) EMS OLUMNS R SIZE OTTOM RS OTHER RS R SIZE L f'c ksi ksi ksi ksi ksi ksi f'c ksi ksi ksi # # 7 # # 9 7 # 6 # #6 9 6 #6 9 6 # #7 9 # # # #9 6 # # 7 6 # # f'c # # # #6 #7 # #9 # # NOTES: SLS/MTS THIKNESS GRETER THN " LL RS OT. RS LL RS ksi ksi ksi ksi ksi ksi ksi ksi ksi TLE OVE LIST VLUES OF "Ld" IN INHES. R SIZE f'c # # # #6 #7 # #9 # #. MULTIPLITION FTORS FOR HIGHER STRENGTH ONRETE: f'c = 6 KSI L =.9 x KSI TLE VLUE f'c = KSI L =.79 x KSI TLE VLUE f'c = KSI L =.7 x KSI TLE VLUE f'c = KSI L =.6 x KSI TLE VLUE. LL LP SPLIES SHLL E. Ld UNLESS NOTE OTHERWISE ON THE RWINGS.. FOR LIGHTWEIGHT GGREGTE ONRETE, MULTIPLY THE TULTE VLUES Y.. FOR EPOY-OTE RS, MULTIPLY THE TULTE VLUE Y.. 6. OMINTIONS OF EFFETS UE TO THE ONRETE STRENGTH, WEIGHT, N EPOY RS RE UMULTIVE. Ld SHLL E MULTIPLIE Y EH FTOR TO OTIN THE ORRET VLUE. TLE SSUMPTIONS:. MINIMUM LER OVER S LISTE IN THE GENERL NOTES.. MINIMUM LER SPING OF " ETWEEN RS.. fy=6 ksi. NORML WEIGHT ONRETE.. FOR WLLS: SE = LER SPING db N LER OVER db SE = OTHER THN SE VERTIL RS WLLS HORIZONTL RS SE SE SE SE ksi ksi ksi ksi ksi ksi ksi ksi ksi ksi ksi ksi STV rchitects, Inc. West Welsh rive ouglassville, P 9 t 6.. f 6.. SELS PROJET IENTIFITION ITION N RENOVTIONS PRLIN, NEW JERSEY /7/ PERMIT RWINGS J 6// STRUTURL ISSUE FOR J ONSTRUTION MRK TE ESRIPTION Y PROJET NO.: ESIGNE Y: RWN Y: HEKE Y: PPROVE Y: OPYRIGHT: ISSUE LOK STV RHITETS, IN. K. RRON J. RILLO ROTHENERGER STRUTURL SPEIL INSPETINS S- 7 // 7:6: M :\Users\weimarrj\ocuments\7_S-_weimarrj.rvt

3 9 9. ' - ". ' - /" 9' - " 9" GENERL SHEET NOTES SHEET NOTES. FOR GENERL STRUTURL NOTES N LEGEN, SEE SHEET S-. Skanska US uilding. FOR FOOTING SHEULE N ETILS, SEE SHEET S-.. FOR PIER ETILS SEE SHEET S-.. FOR TYPIL ETILS SEE SHEET S-.. STEPPER SUPPORT TO E STIS Y OWNER. ESIGNE N SUPPLIE Y OWNER East Township Line Road, Suite lue ell, P 9 t f SUONSULTNTS T/EIST EPRESSE RE EL 96'- STV rchitects, Inc. West Welsh rive ouglassville, P 9 t 6.. f 6.. EIST STEPPER P 9' - " 6' - " ' - " ' - 9" 9' - " 9' - " I RILLE PIER GUY WIRE NHOR (TYP PL) EIST P EIST '-" SQ FTG W/ '-x'-" PIER I RILLE PIER (TYP 6 PL) EQPT P P ' - 9" ' - / ( 96' - " ) /". " ON SL-ON-GRE W/ #@ EW ' - 6 SLOPE FOOTING P P P ' - " POST ' - " ('- THIK SL) ON SL-ON-GRE W/ #@ EW (T & ) SEE NOTE () /"Ø SH PIPE POST UP TO EL 9'-9 /" ' - 9 /" ' - /" ( 96' - " ) T/EIST FTG EL 97'-" 9 S- TYP S- T P 9' - " 6' - " ( 96' - " ) ' - EIST '-" SQ FTG W/ '-x'-" PIER 7 POST POST POST ' - 9" ' - 9" SLOPE FOOTING ( 97' - " ) ' - /" EIST " MU FN WLL UNEVTE PIPE SLEEVE W/ LINK SEL SEE PLUM SHT FOR LOTION P S- POST TYP T P STEPPE FOOTING ' - " ' - 7 /".6. FOUNTION N RWL SPE PLN / = '-" ' ' 6' - TOP OF EIST GROUN FLOOR SL EL '-" (TUM) - TOP OF NEW RWL SPE SL-ON-GRE EL 96'- - TOP OF PIER ELEVTION '-" UNLESS NOTE. P P ' - 6 /" S-. ( 97' - " ) EIST 6'-" SQ FTG W/ '- SQ PIER SEE PIPE PENETRTION T WLL FTG ETIL ON S- P SLOPE FOOTING ' - " S- PIER & FTG PIER & FTG TYP T P PIER & FTG ' - 6' - /" 6' - 7 /" /" NEW ITION 9. KEYPLN SLE: NONE PROJET IENTIFITION PROJET NO.: ESIGNE Y: RWN Y: HEKE Y: PPROVE Y: OPYRIGHT: SELS ITION N RENOVTIONS PRLIN, NEW JERSEY /7/ PERMIT RWINGS J 6// STRUTURL ISSUE FOR J ONSTRUTION MRK TE ESRIPTION Y ISSUE LOK STV RHITETS, IN. K. RRON J. RILLO ROTHENERGER FOUNTION N RWL SPE PLN 7 // 7:6: M :\Users\weimarrj\ocuments\7_S-_weimarrj.rvt

4 9 9. ' - ". ' - /" 9' - " (6) EIST I ON PIERS EIST HV SUPPORT STL 9" GENERL SHEET NOTES SHEET NOTES. FOR GENERL STRUTURL NOTES N LEGEN, SEE SHEET S-.. OORINTE LOTION N ETENTS OF Lx's WITH ESS OOR ON RHITETURL SHEETS.. OORINTE HSE SIZE N LOTION WITH RHITETURL SHEETS. FINL LOTION OF THE ULTRTEH STEPPER N ITS STIS VIRTION ISOLTION SUPPORT FRME SHLL E PROVIE Y THE OWNER N OORINTE Y THE ESIGN UIL ONTRTOR WITH THE STRUTURL STEEL N RISE ESS FLOOR RWINGS. URRENTLY THE STEPPER MHINE REFERENE TUM EFINES THE ORNER OF THE OPENING FOR THE PROPOSE LYOUT. Skanska US uilding East Township Line Road, Suite lue ell, P 9 t f SUONSULTNTS EIST OOR P EIST EPRESSE RE. /" LW ONRETE ON /" METL FORM EK WITH FLOOR RIN. (TOTL THIKNESS = /") TOP OF SL EL 99'-9 /". OORINTE WITH SHOWER LOTION SHOWN ON THE RHITETURL N PLUMING SHEETS. 6. PRE-ENGINEERE UILING SHLL E ESIGNE N SUPPLIE Y OTHERS. 7. STRUTURL STEEL FLOOR SUPPORT SHLL E OORINTE WITH RISE ESS FLOOR SUPPORTS STV rchitects, Inc. West Welsh rive ouglassville, P 9 t 6.. f 6... OORINTE WITH SHOWER LOTION SHOWN ON THE RHITETURL N PLUMING SHEETS. 9' - " 6' - " 9' - " ' - " 9' - " 9' - " ' - " ' - " () I RILLE PIER GUY WIRE NHOR W/ " EYE OLT W/ WSHER & L NUTS (T/PIER EL '-) FOR REINF SEE RILLE PIER SET SHT S-. FOR EMEMENT SIMILR TO SETION /S- EQUIP P 6' - 9" S- TYP ' - " +/- EM POKET (TYP 7 PL) SEE ET ON S- EQUIP P ' - 9" ' - " ' - / ' - 7 /" ' - / ' - " (TYP) (SIM). ' - / +/- /" EIST EQUIP P I RILLE PIER (TYP 6 PL) T/PIER EL '-" 6 S- x SEE NOTE ONT Lx ' - " ONT L6x x 7' - " 6' - / ' - 9 /" EIST MU WLL Lx SEE NOTE 7' - /" SEE NOTE ' - /" 9 9' - 9 /" 6' - " ' - 9 9/ SL 7 " ON WLL TOP OF WLL EL '-" (TYP) ' - " STEPPER SPRT FRME (Y OTHERS) '-" (TYP UN) ' - (TYP) STEPPER MHINE REF TUM. SEE NOTE ' - " 6' - ' - /" (TYP UN) ' - 6 /" ' - / L # TOP (TYP) NJ (TYP) NJ (TYP) ' - 7 /" ' - " ' - 7 /".6. FIRST FLOOR & GRE SL PLN / = '-" 7/ ' ' 6' - TOP OF EIST GROUN FLOOR SL EL '-" (TUM) - TOP OF SL-ON-GRE EL '-" - INITES x TOP OF STEEL EL '- /" ' - /" S-. FE OF EIST MU FN WLL N SL /" EPRESSE SL W/ F. SEE NOTE SL ON GRE W/ #@ EW ENTERE, TOP OF SL EL '-" SEE ETIL ON S PRE-ENGINEERE UILING OL (TYP) SEE NOTE 6 /" 6' - /" 6' - /" NEW ITION 9. KEYPLN SLE: NONE PROJET IENTIFITION PROJET NO.: ESIGNE Y: RWN Y: HEKE Y: PPROVE Y: OPYRIGHT: SELS ITION N RENOVTIONS PRLIN, NEW JERSEY /7/ PERMIT RWINGS J 6// STRUTURL ISSUE FOR J ONSTRUTION MRK TE ESRIPTION Y ISSUE LOK STV RHITETS, IN. K. RRON J. RILLO ROTHENERGER FIRST FLOOR & GRE SL PLN S- 7 // 7:6: M :\Users\weimarrj\ocuments\7_S-_weimarrj.rvt

5 9 9. ' - FIN GRE #@ EW EF ON. #@ EW (T& ) ' - " SETION S- FIN GRE /" = '-" Lxx/ w/ /"Ø HILTI KWIK OLT " O ( /" EM) #@ EW EF T/STL EL ' - " ' - " T/SL EL 96' - ' - OOR IMENSION WITH OWNER SUPPLIE PLTFORM FOR SL REINF SEE PLN ' - ' - ON #@ EW (T & ) /" GP PER ULTRTEH INSTLLTION GUIELINES (TYP LL ROUN) ' ' ' T/SL EL ' - " T/FTG EL 97' - " EIST GRE LER ROOM WLL SEE RH SHT RISE FLR SEE RH SHT SEE ET /S- FOR SL REINF SEE PLN VRIES #@ #@ EW EF /" ' - " ON #@ EW (T & ). ' - " T/FLR EL ' - " ' - " T/SL EL 96' - STEPPER SUPPORT TO E STIS (Y OWNER) EM POKET x" Wx'- /" P ERING PL /xx'-9" W/ () /"I x " STU NHORS SETION /" = '-" " #@ EW ENTERE FOR SL REINF SEE PLN (TYP) (6) # T& RISE FLR SEE RH SHT " ' - " ' - FOR SL REINF SEE PLN ' ' ' SE PL P- ' - " 6 SETION SETION /" = '-" S- /" = '-" ' ' ' OORINTE LOTION N ETENTS OF Lx's WITH ESS OOR ON RHITETURL SHEETS. 9 SETION /" = '-" S- S- ' ' ' T/FLR EL ' - " T/SL EL 96' - #@ T& ' - " PL /x /x'-" W/ () /"I OLTS ON /" G /" Ø SH PIPE POST ' ' ' RISE FLR SEE RH SHT T/ FLR EL ' - " ' - " T/ SL EL 96' - RISE FLR SEE RH SHT ' - " T/SL EL 96' - VRIES ERING PL /xx'-9" w/ () /"Øx" STU NHORS TOP OF EM SHELF EL 9'-9/" RISE FLR SEE RH SHT FOR SL REINF SEE PLN FOR SL REINF SEE PLN ' - (TYP) #@ EW (T & ) T/FTG EL 96' - " ' - /" #@ EW EF ' - ' - " T/SL EL ' - " ' - /" LW ON ON /" METL FORM EK (TOTL THIKNESS = ) w/ WWR 6x6-W.9xW.9 (TYP) L6xx/ LLV /" I PIPE POST SE PL P- FOR SL REINF SEE PLN THIKENE SL EYON " ' - " SETION S- ' - 9 9/ x x SL (FS) 6 / " SLOPE FOOTING ' - " ON (TYP) EIST " MU FN WLL EIST ON FTG FOR SL REINF SEE PLN 6/ EIST FLR SL ' - ' - ' - T/SL EL ' - " ' - " (+/-) SLOPE FOOTING Lxx/ ONT w/ /"Ø HILTI KWIK OLT " O ( /" EM) (TYP SIES) O NOT UNERMINE EISTING FOOTING T/EIST FTG 97' - " ' - T/FTG EL 97' - " EIST " MU WLL ' - EIST SL ' - EIST ON FN T/EIST FTG 97' - " O NOT UNERMINE EISTING FOUNTION EM POKET SEE SET SHT T/SL EL 96' - ' - FIN GRE T/P EL ' - " (FIEL FERIFY) FOR SL REINF SEE PLN ' - " /" ' - FE OF EIST PIER () # EF O NOT UNERMINE EISTING FOOTING SLOPE FOOTING (SEE PLN) #@ EW) #@ EW RILL & EPOY GROUT # WLS TO MTH NEW WLL REINF T/EIST SL EL ' - " /" = '-" ' ' ' 7 SETION S- SETION /" = '-" /" = '-" ' ' ' ' ' ' SETION S- /" = '-" SETION S- SETION /" = '-" /" = '-" GENERL SHEET NOTES SHEET NOTES. FOR GENERL STRUTURL NOTES N LEGEN, SEE SHEET S-. ' ' ' ' - ' ' ' EIST FTG T/EIST FTG EL 97' - " ' ' ' T/EIST SL EL ' - " ' - ' - " (+/-) EIST EQUIP FN Skanska US uilding East Township Line Road, Suite lue ell, P 9 t f SUONSULTNTS PROJET IENTIFITION PROJET NO.: ESIGNE Y: RWN Y: HEKE Y: PPROVE Y: OPYRIGHT: STV rchitects, Inc. West Welsh rive ouglassville, P 9 t 6.. f 6.. SELS ITION N RENOVTIONS PRLIN, NEW JERSEY /7/ PERMIT RWINGS J 6// STRUTURL ISSUE FOR J ONSTRUTION MRK TE ESRIPTION Y ISSUE LOK STV RHITETS, IN. K. RRON J. RILLO ROTHENERGER ONRETE SETIONS 7 // 7:6: M :\Users\weimarrj\ocuments\7_S-_weimarrj.rvt

6 9 9. SEE RH SHEETS GENERL SHEET NOTES SHEET NOTES T/STL EL ' - T/PIER EL ' - " 7" EM & RILLE PIER T/ FLR EL ' - " FOR SL REINF SEE PLN TOP OF EM SHELF EL 9'-9 /" RISE FLR SEE RH SHT TOP OF RISE FLOOR EL '-" TOS EL 99'- POUR STOP ( SIES) /" TOP OF ON EL 99'-9 /" TOP OF RISE FLOOR EL '-". FOR GENERL STRUTURL NOTES N LEGEN, SEE SHEET S-.. FINL NHOR RO IMETER N PLEMENT MUST E OORINTE WITH THE PRE-ENGINEER METL UILING MNUFTURER. Skanska US uilding East Township Line Road, Suite lue ell, P 9 t f ' - " " GROUT /"Ø POST INSTLLE HILTI KWIK OLT TZ ( /" EM) I RILLE PIER FOR REINF SEE TYPIL RILLE PIER SETION ON S- FIN GRE PPRO EL '-" ' - " T/SL EL 96' - " ' - PIPE SLEEVE W/ LINK SEL SEE PLUM SHT FOR INV EL (TYP) FOR PIPE SIZE & LOTION SEE PLUM SHT FOR SL REINF SEE PLN /" LW ON ON /" METL FORM EK (TOTL THIKNESS = /" #@ EW SETION S- /" = '-" SUONSULTNTS STV rchitects, Inc. West Welsh rive ouglassville, P 9 t 6.. f 6.. 6'-" MINIMUM EMEMENT ' - " SETION /" = '-" ' ' ' - FOR INFORMTION NOT SHOWN SEE SET ON SHEET SETION S- /" = '-" ' ' ' #6 HIRPIN # TIE TIES PER SET /" /" OUTSIE FE OF WLL/GIRT LINE NHOR RO (TYP) SEE NOTE L OLUMN # TIE TIES PER SET THEORETIL OUTLINE OF PIER Ld (TYP) /" OUTSIE FE OF WLL/GIRT LINE #6 HIRPIN NHOR RO (TYP) SEE NOTE L OLUMN # " " ' - Ld (TYP) ' - SELS # VERT Ld (TYP) " " OUTSIE FE OF WLL/GIRT LINE # VERT Ld ' - " " #7 VERT OUTSIE FE OF WLL/GIRT LINE /" /" OLUMN L #6 HIRPIN NHOR RO (TYP) SEE NOTE FIN GRE #@ EW EF ON FOR SL REINF SEE PLN ' - PIER P ETIL " = '-" ' ' PIER P ETIL " = '-" ' ' " = '-" PIER P ETIL.6 ' ' PROJET IENTIFITION ITION N RENOVTIONS PRLIN, NEW JERSEY #@ EW (T & ) ' - " SETION /" = '-" ' ' ' /7/ PERMIT RWINGS J 6// STRUTURL ISSUE FOR J ONSTRUTION MRK TE ESRIPTION Y PROJET NO.: ESIGNE Y: RWN Y: HEKE Y: PPROVE Y: OPYRIGHT: ISSUE LOK STV RHITETS, IN. K. RRON J. RILLO ROTHENERGER ONRETE SETIONS S- 7 // 7:6: M :\Users\weimarrj\ocuments\7_S-_weimarrj.rvt

7 9 9. GENERL SHEET NOTES SHEET NOTES. FOR GENERL STRUTURL NOTES N LEGEN, SEE SHEET S-. Skanska US uilding WLL OLUMN OR EQUIPMENT FOUNTION East Township Line Road, Suite lue ell, P 9 t f EL (SEE PLN) FOR REINFORING SEE PLNS T T/ " RUSHE STONE SHTO #7 OR EQUIVLENT / T/ "" FILL WITH FLEILE SELNT T/ / " " FILL WITH FLEILE SELNT FLEILE SELNT # UILING FELT (ON REKER) TURNE UP VPOR RETRER TOP OF FOOTING (SEE PLN) '-" '-" (MIN) '-" '-" (M) TOP OF FOOTING (SEE PLN) SUONSULTNTS STV rchitects, Inc. West Welsh rive ouglassville, P 9 t 6.. f 6.. " LEN STRUTURL FILL MIL VPOR RETRER /"Ø x '-6 LONG SMOOTH '-" O, OT WITH GRESE ONTRTION JOINT (NJ) ONSTRUTION JOINT (J) ISOLTION JOINT () " STEPPE FOOTING ETIL SLE: NONE SL-ON-GRE ETIL SLE: NONE I # x '-" (TOP) OLUMN (SEE PLN FOR ORIENTTION) ONTRTION JOINTS SHLL E SW UT. ONSTRUTION JOINTS MY E SUSTITUTE FOR ONTRTION JOINTS T ONTRTOR'S OPTION. FOR LOTION OF JOINTS SEE SL PLNS, M JOINT SPING = '-" UNO. REINFOREMENT SUPPORT '-" O EH WY OVER ENTIRE SL RE UNLESS NOTE. " LR # (6) #6 (EQULLY SPE) NJ NJ NHOR ROS, WITH NUTS N HEVY WSHER SHLL E PROVIE Y PEM MNUFTURER. OLUMN Y PRE ENGINEER UILING MFR TOP OF SL & PIER EL (SEE PLN) FOR FOOTING REINF SEE SHEULE TOP OF FOOTING EL (SEE PLN) NON-SHRINK NON-METLLI GROUT PERIMETER TIE ONLY /" LR (TYP) LEVELING NUT (TYP) FOR PIER ETILS SEE SHEET S- TIE OR TIE SET " " " TYPIL RILLE PIER SETION SLE: NONE GRE SL ONTRTION JOINT T ISONTINUOUS JOINT ETIL SLE: NONE SELS T " LR ONRETE PROJET IENTIFITION HORIZONTL RS EQULLY SPE * I ST HOOK OWELS * LENGTH x WITH (SEE PLN FOR ORIENTTION) PIER N FOOTING ETIL SLE: NONE WHERE PIER HEIGHT IS LESS THN '-", ETEN OWELS TO TOP OF PIER IN LIEU OF PROVIING SEPRTE VERTIL RS. TOP OF FOOTING EL (SEE PLN) '-" (MIN) STNR WEIGHT PIPE SLEEVE (SPLIT FOR INSTLLTION T EISTING PIPE) " LR (TYP) ELEVTION TO SUIT PIPE INVERT ELEVTION # x '-" (TOP) '-" ITION N RENOVTIONS PRLIN, NEW JERSEY 'L' '' TYPE- '' TOP OF ONRETE TTER THRES EH SIE OF NUT NHOR OLT ETIL SLE: NONE NHOR RO SHEULE MRK - I '' LENGTH 'L' /" " REMRKS PEM OLUMN FOR FOOTING REINF SEE STEPPE FOOTING ETIL SEE PLUMING SHEETS FOR NEW OR EISTING PIPE SIZE, INVERT ELEVTION, N LOTION TYPIL WLL FOOTING ETIL T PIPE PENETRTION SLE: NONE SL RE-ENTRNT ORNER ETIL SLE: NONE /7/ PERMIT RWINGS J 6// STRUTURL ISSUE FOR J ONSTRUTION MRK TE ESRIPTION Y PROJET NO.: ESIGNE Y: RWN Y: HEKE Y: PPROVE Y: OPYRIGHT: ISSUE LOK STV RHITETS, IN. K. RRON J. RILLO ROTHENERGER ONRETE ETILS S- 7 // 7:6:9 M :\Users\weimarrj\ocuments\7_S-_weimarrj.rvt

8 9 9. GENERL SHEET NOTES SHEET NOTES /6 OLUMN / WELE STIFFENER PL (S) /" P PLTE WITH () OLT ONNETION NOTE: - WHERE EM FRMES INTO OLUMN ENTERLINE, PROVIE HOLES IN STIFFENER PLTE FOR ONNETION /" SH PIPE POST " /" /" SE PLTE P- SLE: NONE " /" /" PL /xx'-" /6 () /Ø HOLES FOR /"Ø POST INSTLLE HILTI KWIK OLT-TZ ( /" EM) /"Ø SH PIPE " EM POKET /" " /" OTT FLG 9" " " /6 /6 () /" I x" STU NHORS ERING PL /xx'-9" EM POKET ETIL SLE: NONE. FOR GENERL STRUTURL NOTES N LEGEN, SEE SHEET S-. Skanska US uilding East Township Line Road, Suite lue ell, P 9 t f SUONSULTNTS STV rchitects, Inc. West Welsh rive ouglassville, P 9 t 6.. f 6.. TYPIL EM OVER OLUMN ONNETION SLE: NONE OOR IMENSION WITH OWNER SUPPLIE PLTFORM /6 - /6 - RISE FLOOR SEE RH SHT SELS Lxx/ Lxx/ ETIL /" = '-" PROJET IENTIFITION ITION N RENOVTIONS PRLIN, NEW JERSEY /7/ PERMIT RWINGS J 6// STRUTURL ISSUE FOR J ONSTRUTION MRK TE ESRIPTION Y PROJET NO.: ESIGNE Y: RWN Y: HEKE Y: PPROVE Y: OPYRIGHT: ISSUE LOK STV RHITETS, IN. K. RRON J. RILLO ROTHENERGER STEEL ETILS S- 7 // 7:6:9 M :\Users\weimarrj\ocuments\7_S-_weimarrj.rvt

HORIZONTAL SLIDER - NON-IMPACT

HORIZONTAL SLIDER - NON-IMPACT 73 /" 72" MX. UNIT 7 7/8" MX. SSH /" GLSS LO HORIZONTL SLIER - NON-IMPT 3" MX. SSH WITH /" GLSS LO X 75 /" WITH 7" MX. UNIT WITH O 3" MX. SSH WITH /" GLSS LO 75 /" WITH 7" MX. UNIT WITH GENERL NOTES:.

More information

MISSISSIPPI RIVER SPILLWAY PLAN (2013 FLOOD RECOVERY) MISSISSIPPI RIVER SPILLWAY PROFILE (2013 FLOOD RECOVERY) C-200 PROJECT BOUNDARY

MISSISSIPPI RIVER SPILLWAY PLAN (2013 FLOOD RECOVERY) MISSISSIPPI RIVER SPILLWAY PROFILE (2013 FLOOD RECOVERY) C-200 PROJECT BOUNDARY c:\pw_working\mvr\b5eddlh\d032060\_-200xxx.dgn $TE$ 5E 9:6:5 M N 37+00 372+00 373+00 37+00 PO N 3397.37 E 23639.0 535.90 537.6 535.8 535.27 535.2 535.07 H:V 50H:V 375+00 5H:V 376+00 5H:V H:V 3H:V PROJET

More information

NMSU PROJ #3077 STORAGE FACILITY - PHASE 3 BUILDING C (384)

NMSU PROJ #3077 STORAGE FACILITY - PHASE 3 BUILDING C (384) 2 SEPT 26, WG PROJET NO: OWNER: NEW MEXIO STTE UNIVERSITY NMSU PROJ #3077 STORGE FILITY - PHSE 3 UILING (384) RWING INEX: GENERL G00 OVER SHEET NMSU STORGES PHSE 3 RESERH R. LS RUES, NM 8800 780 E UNIVERSITY

More information

NEW INTERLOCKING BLOCK RETAINING WALL, TYP. 7' - 0" 4' - 0" CRUSHED ROCK, TYP. 3' - 0" 8' - 0" 2' - 0" 3' - 0" 6' - 0" 24' - 0" 1% MIN.

NEW INTERLOCKING BLOCK RETAINING WALL, TYP. 7' - 0 4' - 0 CRUSHED ROCK, TYP. 3' - 0 8' - 0 2' - 0 3' - 0 6' - 0 24' - 0 1% MIN. ' - 0" ' - 0" 6' - " ' - 8" 6' - 0" ' - 5" ' - 0" ' - " 6' - 7/" ' - /" ' - 0" RUSHE ROK, TYP. ' - 0" NEW INTERLOKING LOK RETINING WLL, TYP. ' - 0" LIMIT OF ITION OVE ' - " ON. SL ON. WLL - SEE STRUTURL

More information

1'-0" [0.305 m] WALL TYPICAL U.N.O. OPP. HAND C S3.3 S3.3 TW 99'-8 OPP. HAND TW 99'-8 TF 95'-6 B S3.2

1'-0 [0.305 m] WALL TYPICAL U.N.O. OPP. HAND C S3.3 S3.3 TW 99'-8 OPP. HAND TW 99'-8 TF 95'-6 B S3.2 FOUNDTION PLN NOTES 1. T.W. INDITES TOP OF ON. WLL ELEV.. T.F. INDITES TOP OF ON. FOOTING ELEV.. T.L. TOP OF LEDGE 4. INDITES FOOTING STEP 5. INDITES TOP OF ONRETE WLL STEP HND '-6" [0.76 m] FTG. TYPIL

More information

LOT 2 PEDRICK-ECKERD FILING NO. 3

LOT 2 PEDRICK-ECKERD FILING NO. 3 SITE WG NO. RWING TITLE LOT PERIK-EKER FILING NO. 67 SEURITY LV OLORO SPRINGS, O 809 OF TITLE SHEET OF EVELOPMENT PLN OF EVELOPMENT ETILS OF PRELIMINRY UTILITY N PULI FILITY PLN OF PRELIMINRY GRING PLN

More information

Instructions for Continued Airworthiness

Instructions for Continued Airworthiness Instructions for ontinued irworthiness Grizzly law Ski rag ocument No. F00I ircraft Serial Number: ST Number: S0K These Instructions for ontinued irworthiness shall be included in the airplane Maintenance

More information

HD CONDUIT MIN. 10% FALL CHAMBER MONITORING SYSTEM HD CONDUIT REFER NOTE 13 SECTION C-C DETAILS OF BENCHING

HD CONDUIT MIN. 10% FALL CHAMBER MONITORING SYSTEM HD CONDUIT REFER NOTE 13 SECTION C-C DETAILS OF BENCHING FLOT SWITH DN50 upv PRESSURE FOR SENSOR TUING ( OVER) REFER TO 4 ND FLOT SWITH (50%) DN80 upv SUTION (600 OVER) GRVITY SEWER MINS FLL TOWRDS SUMP REFER TO NOTE 9 PLN (OVERS REMOVED) SLIDE GTE VLVE ± HMER

More information

10mm SHOWER PANEL SIZES 1000 & 1200 SIZES 500, 600, 700, 800 & 900 SIZES 1000 & 1200 OPTION 1 - PAGES 2-4 OPTION 2 - PAGES 2-5 OPTION 3 - PAGES 6-7

10mm SHOWER PANEL SIZES 1000 & 1200 SIZES 500, 600, 700, 800 & 900 SIZES 1000 & 1200 OPTION 1 - PAGES 2-4 OPTION 2 - PAGES 2-5 OPTION 3 - PAGES 6-7 SHOWER PANEL 785 / Issue / 5 SIZES 5, 6, 7, 8 & 9 SIZES & SIZES & OPTION - PAGES - OPTION - PAGES - 5 OPTION 3 - PAGES 6-7 Plese red these instrutions refully nd keep for future referene. Inorret fitting

More information

JOHNSTON COUNTY DEPARTMENT OF UTILITIES DUCHESS DOWNS FORCE MAIN IMPROVMENTS OCTOBER 2017

JOHNSTON COUNTY DEPARTMENT OF UTILITIES DUCHESS DOWNS FORCE MAIN IMPROVMENTS OCTOBER 2017 DEPRTMENT OF UTILITIES FORE MIN IMPROVMENTS OTOER 2017 Owner: Johnston ounty ORD OF OMMISSIRS Jeffrey P. arver - hairman Ted G. Godwin - Vice hairman ookie Pope llen L. Mims, Jr. had M. Stewart Keith ranch

More information

MOBILEYE SERIES / C MOBILEYE DISPLAY BATTERY BOOST DETAIL STARTER CABLE TO CHASSIS BATTERY

MOBILEYE SERIES / C MOBILEYE DISPLAY BATTERY BOOST DETAIL STARTER CABLE TO CHASSIS BATTERY PNEL-WIRE OVER -0-HT 000H-0-0R () MOILEYE 0-00 SERIES 000000 / 0-0-000 SEL-TRIM,EGE 0-0-000 (0MM) PNEL-WIRE OVER -0-HT MOILEYE ISPLY TTERY OOST ETIL EXTENER-SHFT,NTENN 0-0-000 NUT 0MU-0-000 STRTER LE HSSIS

More information

Fino Installation Instructions

Fino Installation Instructions Fino nstlltion nstrutions #1500154- Rev C Fino nstlltion nstrutions A Light Fixture Trnsformer Qty: 0 or 1 1 C Prts Rotting Mgneti Mounts Qty: 3 or 6 2 D Fixe Mgneti Mounts Qty: 4 or 8 2 E Rotting Woo

More information

1 Measurement. What you will learn. World s largest cylindrical aquarium. Australian Curriculum Measurement and Geometry Using units of measurement

1 Measurement. What you will learn. World s largest cylindrical aquarium. Australian Curriculum Measurement and Geometry Using units of measurement Austrlin Curriulum Mesurement nd Geometry Using units of mesurement hpter 1 Mesurement Wht you will lern 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 Conversion of units Perimeter Cirumferene Are Are of irle Surfe

More information

AN Wireless Tower Assembly Instructions

AN Wireless Tower Assembly Instructions N Wireless Tower ssembly Instructions RED THOROUGHLY EFORE SSEMLY ND ERETION Thank you for your purchase of an N Wireless Self Supporting Tower. N Wireless Towers are designed and fabricated to be high-strength,

More information

Copyright 2015 Winnebago Industries, Inc.

Copyright 2015 Winnebago Industries, Inc. anger of electrical shock, burns or death. lways remove all power sources before attempting any repair, service or diagnostic work. Power can be present from shore power, generator, inverter or battery.

More information

6 TRIGONOMETRY TASK 6.1 TASK 6.2. hypotenuse. opposite. adjacent. opposite. hypotenuse 34. adjacent. opposite. a f

6 TRIGONOMETRY TASK 6.1 TASK 6.2. hypotenuse. opposite. adjacent. opposite. hypotenuse 34. adjacent. opposite. a f 1 6 TIGONOMETY TK 6.1 In eh tringle elow, note the ngle given nd stte whether the identified side is in the orret position or not. 1. 4. opposite 41 2. djent 3. 58 63 djent 32 hypotenuse 5. 68 djent 6.

More information

400 Series Flat Panel Monitor Arm Rotate Mount Double Pivot P/L

400 Series Flat Panel Monitor Arm Rotate Mount Double Pivot P/L User's Guide 400 Series Flt Pnel Monitor Arm Rotte Mount Doule Pivot P/L < 23ls. (10.44 kg) For the ltest User Instlltion Guide plese visit: www.ergotron.om 1 of 10 Hzrd Symols Review These symols lert

More information

* SEE ANCHOR SCHEDULE SHEET 7

* SEE ANCHOR SCHEDULE SHEET 7 "-20 MLE PNELMTE W/ WINGNUT -1/2" O.C. "-20 X 1/2" MCHINE OLT & NUT -1/2" O.C 04/0/15 JH UPDTE TO 5TH EDITION (2014) FC 8/14/1 Y DTE SPCING ERROR OR MSONRY POWERS CLK-IN W/ "-20 SIDEWLK OLT -1/2" O.C.

More information

Holder Assembly. Assembly. 1 MCP bottom holder. 2 MCP top holder 3 Clip. 9.5x9.5x0.4 1 lbf. Weight: 0.32 lbs. Allen Zhao

Holder Assembly. Assembly. 1 MCP bottom holder. 2 MCP top holder 3 Clip. 9.5x9.5x0.4 1 lbf. Weight: 0.32 lbs. Allen Zhao Holder ssembly ssembly 9.5x9.5x0. lbf MP bottom holder Weight: 0. lbs MP top holder lip llen Zhao Sheet Metal inder top spring clamp spacer inding for mm edge llen Zhao FE of MP Load:.: 5G Max on the plane

More information

Workrite Sierra HX & HXL Assembly Instructions for 3-leg Electric Workcenters

Workrite Sierra HX & HXL Assembly Instructions for 3-leg Electric Workcenters Workrite ierr HX & HXL Assemly Instrutions for 3-leg Eletri Workenters #1500216- Rev Workrite ierr HX & HXL Eletri Workenters - Assemly Instrutions for 3-leg les Rer Leg rket* Qty: 2 List of rts, grouped

More information

Lesson 2 PRACTICE PROBLEMS Using Trigonometry in Any Triangle

Lesson 2 PRACTICE PROBLEMS Using Trigonometry in Any Triangle Nme: Unit 6 Trigonometri Methods Lesson 2 PRTIE PROLEMS Using Trigonometry in ny Tringle I n utilize the Lw of Sines nd the Lw of osines to solve prolems involving indiret mesurement in non-right tringles.

More information

Right Triangle Trigonometry

Right Triangle Trigonometry ONDENSED LESSON 1.1 Right Tringle Trigonometr In this lesson ou will lern out the trigonometri rtios ssoited with right tringle use trigonometri rtios to find unknown side lengths in right tringle use

More information

Models 461-S, 461-8S and S Regulators Regulators Installation and Maintenance Instructions

Models 461-S, 461-8S and S Regulators Regulators Installation and Maintenance Instructions RM-1330 R7 Moels 461-S, 461-8S n 461-1S Regultors Regultors Instlltion n Mintenne Instrutions Instlltion n Mintenne Instrutions Moel 461-S, 461-8S, n 461-1S Regultor Regultor Moels 461-S, 461-8S, n 461-1S

More information

TYPICAL CARRIAGEWAY SCALE - A3 SIZE

TYPICAL CARRIAGEWAY SCALE - A3 SIZE EXISNG SURFE LEVEL SURFE LEVEL m TYPIL. UP TO.m DEPENDENT ON WETHERING DEPTH OF PKIRI FORMON m TYPIL. UP TO 5.m DEPENDENT ON WETHERING DEPTH OF PKIRI FORMON TYPIL UT SEON REFER TO DEL R TYPIL FILL SEON

More information

Hook-up Checklist for the Ranger PM7000 (EU)

Hook-up Checklist for the Ranger PM7000 (EU) Rnger Hook-up Cheklist for the Rnger (EU) Reserh Limited Reserh Limited Step 1. Estlish type of instlltion (e.g. no. of phses). Step 2. Estlish type of trnsduers (PTs, CTs et.). Step 3. Choose one of the

More information

Tweed Border Hockey Association Inc.

Tweed Border Hockey Association Inc. Twee Borer Hokey Assoition In. Competition Poliies: Setion 1: CLUB RESPONSIBILITIES 1. Entry of Tems 2. Fees n Fines in Arrers 3. Tems 4. Registrtion of Plyers 5. Gring of Plyers n Tems Setion 2: COMPETITION

More information

St Ac Ex Sp TOPICS (Text and Practice Books) 4.1 Triangles and Squares Pythagoras' Theorem - -

St Ac Ex Sp TOPICS (Text and Practice Books) 4.1 Triangles and Squares Pythagoras' Theorem - - MEP: Demonstrtion Projet UNIT 4 Trigonometry N: Shpe, Spe nd Mesures e,f St Ex Sp TOPIS (Text nd Prtie ooks) 4.1 Tringles nd Squres - - - 4. Pythgors' Theorem - - 4.3 Extending Pythgors' Theorem - - 4.4

More information

Apply the Pythagorean Theorem

Apply the Pythagorean Theorem 8. Apply the Pythgoren Theorem The Pythgoren theorem is nmed fter the Greek philosopher nd mthemtiin Pythgors (580500 B.C.E.). Although nient texts indite tht different iviliztions understood this property

More information

Cooling System. Table of Contents. Section 6C - Models with Closed Cooling. Models with Closed Cooling

Cooling System. Table of Contents. Section 6C - Models with Closed Cooling. Models with Closed Cooling Cooling System Moels with Close Cooling Tle of Contents Setion 6C - Moels with Close Cooling Speifitions...6C-2 Generl Informtion... 6C-2 Desription...6C-2 Full Loop Close Cooling Systems...6C-3 Hlf Loop

More information

BED TOWER ADDITION EXPANSION & RENOVATIONS

BED TOWER ADDITION EXPANSION & RENOVATIONS /" " " 0 000 North entral Expressway Suite 00 allas, Texas 7 t.8.8700 f.8.870 E TOWER ITION EXPNSION & RENOVTIONS IT ENO # SOILE HOL PREP/RE STTION LEN PRO/STG SURGERY/ENO RE LINE EU. STG STG NESTH / NESTH

More information

Waste and Pest Management Policy

Waste and Pest Management Policy Wste n Pest Mngement Poliy Doument Numer: Doument Dte: Brisne Mrkets Limite Pge 1 of 11 Wste n Pest Mngement Poliy 1.0 Overview... 3 2.0 The Requirement for Whole of Site Approh... 3 3.0 Levels of Responsiility

More information

Chapter 31 Pythagoras theorem and trigonometry (2)

Chapter 31 Pythagoras theorem and trigonometry (2) HPTR 31 86 3 The lengths of the two shortest sides of right-ngled tringle re m nd ( 3) m respetively. The length of the hypotenuse is 15 m. Show tht 2 3 108 Solve the eqution 2 3 108 Write down the lengths

More information

SGP-20S SGP-25S SGP-32S SGP-40S. Price $ $ $ $ Filtered compressed air, lubricated or non-lubricated

SGP-20S SGP-25S SGP-32S SGP-40S. Price $ $ $ $ Filtered compressed air, lubricated or non-lubricated SGP-S -JW SELF-ENTERING PRLLEL PNEUMTI GRIPPER (SERIES SGP-S) Double-ting. Ptented bklsh djusting system. High performne in ompt size. The rugged onstrution ensures trouble-free long life nd relibility

More information

Coroutines in Propeller Assembly Language

Coroutines in Propeller Assembly Language www.prllxsemiondutor.om sles@prllxsemiondutor.om support@prllxsemiondutor.om phone: 916 632 4664 fx:916 624 8003 pplition Note oroutines in Propeller ssemly Lnguge strt: The multiore P8X32 does not require

More information

McAfee Change Control and Application Control Installation Guide For use with epolicy Orchestrator and 4.6.0

McAfee Change Control and Application Control Installation Guide For use with epolicy Orchestrator and 4.6.0 MAfee Chnge Control n Applition Control 6.0.0 Instlltion Guie For use with epoliy Orhestrtor 4.5.0 n 4.6.0 COPYRIGHT Copyright 2011 MAfee, In. All Rights Reserve. No prt of this pulition my e reproue,

More information

Apply the Law of Sines. You solved right triangles. You will solve triangles that have no right angle.

Apply the Law of Sines. You solved right triangles. You will solve triangles that have no right angle. 13.5 pply te Lw of Sines TEKS.1,.4, 2.4.; P.3.E efore Now You solved rigt tringles. You will solve tringles tt ve no rigt ngle. Wy? So you n find te distne etween frwy ojets, s in Ex. 44. Key Voulry lw

More information

Stettler Shop and Office

Stettler Shop and Office 0 00 00 GENERL REQUIREMENTS. THIS PROJET IS EING ONSTRED UNDER THE DESIGN/UILD PROJET DELIVERY.. FOR THE PURPOSES OF THE OTIONL HELTH ND SFETY T, THE PRIME ONTRTOR FOR THE WORK SITE WILL E THE DESIGN/UILDER

More information

Test Bank for Code It 6th Edition by Green

Test Bank for Code It 6th Edition by Green Test Bnk for 3 2 1 Coe It 6th Eition y Green Link full ownlo of test nk : http://testnkir.om/ownlo/test-nk-for-3-2-1-oe-it-6th-eition-y-green/ Link full ownlo of solution mnul: http://testnkir.om/ownlo/solution-mnul-for-3-2-1-oe-it-6th-eition-y-green/

More information

ALLMATIC CENTRO GRIPP FOR CENTRAL GRIPPING

ALLMATIC CENTRO GRIPP FOR CENTRAL GRIPPING 186 186 ALLMATIC CENTRO GRIPP FOR CENTRAL GRIPPING Our ll-rouner stns out for its super preision n urility. Centrl lmping of workpiee for onventionl lmping n lmping of unmine prts. Iel for five-sie mining.

More information

Connectors according to DIN / IEC

Connectors according to DIN / IEC E L E C T R O N I C C O N N E C T O R S Connetors ording to DIN 41612 / IEC 60603-2 56 ept GmH I Tel. +49 (0) 88 61 / 25 01 0 I Fx +49 (0) 88 61 / 55 07 I E-Mil sles@ept.de I www.ept.de Contents Introdution

More information

In any right-angle triangle the side opposite to the right angle is called the Label the Hypotenuse in each diagram above.

In any right-angle triangle the side opposite to the right angle is called the Label the Hypotenuse in each diagram above. 9 Ademi Mth Dte: Pythgoren Theorem RIGHT ANGLE TRIANGLE - A right tringle is tringle with one 90 0 ngle. For exmple: In ny right-ngle tringle the side opposite to the right ngle is lled the Lbel the Hypotenuse

More information

Hybrid Relief Valves

Hybrid Relief Valves Hyrid Relief Vlves Crtridge Type Pge Diret Ating Relief, Before Chek 7 Diret Ating Relief, After Chek 7 Pilot Operted, Blned Piston, Ventle, Relief, Before Chek 7 T-8A Pilot Operted, Blned Piston, Ventle,

More information

City of Rio Rancho Department of Public Works

City of Rio Rancho Department of Public Works P -E L P -C L P -H L C P -B L C MULTIPLE CHNNELS ORIENTTION MULTIPLE CHNNELS ORIENTTION 2 MULTIPLE CHNNELS ORIENTTION 1 P -B L P -E L P L -C P L -H P - L B B SINGLE CHNNEL ORIENTTION SINGLE CHNNEL ORIENTTION

More information

RM-1328 R10. Sensus Metering Systems. Model 121 Regulators. Installation and Maintenance Instructions

RM-1328 R10. Sensus Metering Systems. Model 121 Regulators. Installation and Maintenance Instructions Sensus Metering Systems RM-8 R0 T H E G A S I N D U S T R Y Instlltion n Mintenne Instrutions Introution Te Moel Regultor represents omintion o pity, perormne n vlue... Stremline oy pssges provie lrge

More information

TOURNAMENT REGULATIONS RABOBANK HOCKEY WORLD CUP 2014

TOURNAMENT REGULATIONS RABOBANK HOCKEY WORLD CUP 2014 TOURNAMENT REGULATIONS RABOBANK HOCKEY WORLD CUP 2014 My 2014 INTERNATIONAL HOCKEY FEDERATION CONTENTS 1 Rules of ompetition 2 Tournment Offiils 3 Tem entry 4 Pre-tournment riefing meetings 5 Composition

More information

MATHEMATICAL PRACTICES In the Solve It, you used what you know about triangles to find missing lengths. Key Concept Law of Sines

MATHEMATICAL PRACTICES In the Solve It, you used what you know about triangles to find missing lengths. Key Concept Law of Sines 8-5 -20-5 Lw of Sines ontent Stndrds G.SRT.11 Understnd nd ppl the Lw of Sines... to find unknown mesurements in right nd non-right tringles... lso G.SRT.10 Ojetives To ppl the Lw of Sines 66 ft 35 135

More information

REQUEST FOR COMMENTS

REQUEST FOR COMMENTS REQUEST FOR COMMENTS NEW UNIFORM STNDRD DRWING NUMER 217.S2, "RESIDENTIL CUR ND GUTTER R-TYPE"; MODIFICTIONS TO STNDRD DRWING NUMERS 223, 224, 226.S1, ND 227.S1 The Specifications Subcommittee of the Regional

More information

CC24-7 ELITE. Temperature Controller USER S MANUAL Legion Dr. Mason, MI USA April 2011 Ph. (517) Fax (517)

CC24-7 ELITE. Temperature Controller USER S MANUAL Legion Dr. Mason, MI USA April 2011 Ph. (517) Fax (517) Temperture Controller CC24-7 ELITE USER S MANUAL Ative Alrms Selet Progrm Room Set Point Min Vent Timer Vent Door / Stti Pressure Tunnel Curtin Messge Center USER DEFINED SHORT-CUT KEY Aeroteh, In. FORM:

More information

INVESTIGATION 2. What s the Angle?

INVESTIGATION 2. What s the Angle? INVESTIGATION 2 Wht s the Angle? In the previous investigtion, you lerned tht when the rigidity property of tringles is comined with the ility to djust the length of side, the opportunities for useful

More information

Standard Products BRACKETS CONNECTORS ELBOWS FLANGES SPHERES / HEMISPHERES / POST & END CAPS SLIP-ON FITTINGS BIKE RACKS MISCELLANEOUS PRODUCTS

Standard Products BRACKETS CONNECTORS ELBOWS FLANGES SPHERES / HEMISPHERES / POST & END CAPS SLIP-ON FITTINGS BIKE RACKS MISCELLANEOUS PRODUCTS Stndrd Produts BRACKETS CONNECTORS ELBOWS FLANGES SPHERES / HEMISPHERES / POST & END CAPS SLIP-ON FITTINGS BIKE RACKS MISCELLANEOUS PRODUCTS Formed Wll Mount Brkets Formed Wll Mount Brket Aville in Steel,

More information

Ruth Foster, M.Ed. Author

Ruth Foster, M.Ed. Author Eitor Eri Migliio Mnging Eitor In Mssler Levin, M.A. Illustrtor Viki Frser Cover Artist Bren DiAntonis Art Proution Mnger Kevin Brnes Imging Jmes Ewr Gre Ros C. See Pulisher Mry D. Smith, M.S. E. Author

More information

MORNING SIDE - AQUATIC CENTER RENOVATIONS 2400 HARN BOULEVARD, CLEARWATER, FL 33756

MORNING SIDE - AQUATIC CENTER RENOVATIONS 2400 HARN BOULEVARD, CLEARWATER, FL 33756 MORNING SIE - QUTI ENTER RENOVTIONS 00 RN OULEVR, LERWTER, L 7 TLE O ONTENT ddress: 00 arn oulevard learwater, lorida 7 Pinellas ounty OVER SEET NOTES & SPEIITIONS SITE PLN ONSTRUTION PLN MIN POOL EQUIPMENT

More information

Cooling System. Table of Contents. Section 6A - All Models. All Models

Cooling System. Table of Contents. Section 6A - All Models. All Models Cooling System All Models Tle of Contents Setion 6A - All Models Flow Speifitions...6A-3 Sewter Inlet Speifitions...6A-4 Generl Informtion...6A-4 Sewter Pump Identifition...6A-4 Sewter Inlet Hose...6A-5

More information

AQUATICS CENTER NEW ENGLAND SPORTS VILLAGE. 60% Construction Set NOT FOR CONSTRUCTION 27 JULY 2017 AQUATICS CENTER LLB ARCHITECTS CONSULTANTS

AQUATICS CENTER NEW ENGLAND SPORTS VILLAGE. 60% Construction Set NOT FOR CONSTRUCTION 27 JULY 2017 AQUATICS CENTER LLB ARCHITECTS CONSULTANTS LL RHITETS 6 EXHNGE STREET PWTUKET, RI 0860 ONSULTING ENGINEERS ONSULTNTS IVIL ENGINEER / LNDSPE LEVEL DESIGN GROUP 49 SOUTH STREET, UNIT, PLINVILLE, M 076 508-695- STRUTURL TD FIRE PROTETION / PLUMING

More information

AT200 INSTALLATION MANUAL

AT200 INSTALLATION MANUAL ENGLISH AT200 INSTALLATION MANUAL D29020CS416-XXX - SEAT & BOWL COMBINATION-CWH D23020CS11S-XXX - BOWL-CWH D28000AS416-XXX - SEAT / BODY UNIT-CWH Cnvs White (415) Tle of Contents 1. Oserve Listed Preutions

More information

LIVE STEAM TRACTION ENGINE CALLED "MINNIE" COAL FIRED

LIVE STEAM TRACTION ENGINE CALLED MINNIE COAL FIRED ...... NOTES: ORIGINL ESIGN Y LEONR.C.MSON -, CONVERTE TO METRIC Y RTHUR GROVES - 00, RERWN Y JULIUS..M. E WL - 0 USING SOLIWORKS 0 GENERL RRNGEMENT JW RUGHTING SERVICES TE J..M. E WL. RIGHTWELL STREET

More information

SECTION 5 CONVEY LINE & CONVEY LINE ACCESSORIES Tubing and Pipe

SECTION 5 CONVEY LINE & CONVEY LINE ACCESSORIES Tubing and Pipe SETION 5 ONVEY LINE & ONVEY LINE ESSORIES Tubing and Pipe TUING ND PIPE STRIGHT LENGTHS vailable in cut-to-length; 20-ft to 40-ft random lengths vailable in: galvanized steel MTERIL FORM ITEM NUMER DESRIPTION

More information

Linking Your Accounts

Linking Your Accounts Linking Your Aounts This guie explins how to link your Morgn Stnley ounts for stremline online ess to your shres n sh using single log on. Your Morgn Stnley Stok Pln ount hols your pln shres n n lso hol

More information

Public Disclosure for Tax-Exempt Organizations

Public Disclosure for Tax-Exempt Organizations Puli Dislosure for Tx-Exempt Orgniztions Tx-exempt orgniztions re require to mke opy of their pplition for exemption n Form(s) 990 (n 990-T, if pplile) ville for puli inspetion n to provie opies of suh

More information

7.2 Assess Your Understanding

7.2 Assess Your Understanding 538 HPTER 7 pplitions of Trigonometri Funtions 7. ssess Your Understnding re You Prepred? nswers re given t the end of these exerises. If you get wrong nswer, red the pges listed in red. 1. The differene

More information

Level 2/3 Certificates in Hospitality and Catering Principles (Technical Certificates) /33

Level 2/3 Certificates in Hospitality and Catering Principles (Technical Certificates) /33 Level 2/3 Certifites in Hospitlity n Ctering Priniples (Tehnil Certifites) 7091-32/33 www.itynguils.om Version 1.11 (Otoer 2017) Qulifition hnook Aout City & Guils As the UK s leing votionl eution orgnistion,

More information

POST POOL RULE SIGN NO GLASS OR ANIMALS IN THE FENCED POOL AREA NO FOOD, OR BEVERAGES IN POOL OR ON WET DECK SHOWER BEFORE ENTERING POOL

POST POOL RULE SIGN NO GLASS OR ANIMALS IN THE FENCED POOL AREA NO FOOD, OR BEVERAGES IN POOL OR ON WET DECK SHOWER BEFORE ENTERING POOL FENE: ealth epartments ode requires that all public pools shall be surrounded by a minimum 8" high fence. The fence shall be continuous around the perimeter of the pool area that is not otherwise blocked

More information

Gebrauchs- und Montageanleitung Operating and installation instructions. Instrucciones de uso y montaje. Instrucţiuni de montaj şi utilizare

Gebrauchs- und Montageanleitung Operating and installation instructions. Instrucciones de uso y montaje. Instrucţiuni de montaj şi utilizare Geruhs- und Montgenleitung Operting nd instlltion instrutions GEBRUIKS- EN INSTALLATIEVOORSCHRIFTEN Instruiones de uso y montje Instrukj osługi i montżu Инструкция ПО ЭКСПЛУАТАЦИИ И МОНТАЖУ Instruţiuni

More information

Geometry. Trigonometry of Right Triangles. Slide 2 / 240. Slide 1 / 240. Slide 4 / 240. Slide 3 / 240. Slide 6 / 240.

Geometry. Trigonometry of Right Triangles. Slide 2 / 240. Slide 1 / 240. Slide 4 / 240. Slide 3 / 240. Slide 6 / 240. Slide 1 / 240 New Jersey enter for Tehing nd Lerning Progressive Mthemtis Inititive This mteril is mde freely ville t www.njtl.org nd is intended for the non-ommeril use of students nd tehers. These mterils

More information

INSTALLATION INSTRUCTIONS AND USER MANUAL FOR SLOAN EAF GOOSENECK SERIES FAUCETS

INSTALLATION INSTRUCTIONS AND USER MANUAL FOR SLOAN EAF GOOSENECK SERIES FAUCETS ode No: 0816409 Rev. 1 (07/11) INSTLLTION INSTRUTIONS ND USER MNUL FOR SLON EF GOOSENEK SERIES FUETS EF-700 Powered, Sensor ctivated Electronic Gooseneck Hand Washing Faucets EF-750 attery Powered, Sensor

More information

IMPLEMENTS FOR SUGAR CANE

IMPLEMENTS FOR SUGAR CANE IMPLEMENTS FOR SUGR NE S-LT ode: 09 Series: S- Rev.: 00 Date Rev.: MRÇO/20 09090966 78 54 09090965 6287 55 FRME HYDRULI ST-L... 1 EN FERTILIZER SSY... 2 20" LDE DIS SSY... 3 FRME MEHNIL ST-L... 4 SPEED

More information

5.5 The Law of Sines

5.5 The Law of Sines 434 HPTER 5 nlyti Trigonometry 5.5 Te Lw of Sines Wt you ll lern out Deriving te Lw of Sines Solving Tringles (S, S) Te miguous se (SS) pplitions... nd wy Te Lw of Sines is powerful extension of te tringle

More information

HCI Examination Please answer in Swedish or English

HCI Examination Please answer in Swedish or English HCI Exmintion 02.06.04 8.45-12.45 Plese nswer in Swedish or English PLEASE HAND IN FIRST PAGE OF EXAMINATION SHEET (TES) IF YOU ANSWER MULITPLE CHOICE HERE PART I: NECESSARY FOR PASS (GODKÄNT) 1. Multiple

More information

Flow Divider / Combiner Cartridge Valves

Flow Divider / Combiner Cartridge Valves Flow Divier / Cominer Vlves Type Pge Divie Only 9 Divier / Cominer, Close Centre 95 Synhronizing Divier / Cominer 96 Divier / Cominer, Close Centre, High 97 Int l Shortut Ctlogue #999-901-1 9 Flow Divier

More information

pge 2 Owner's Mnul for Thern 4WS nd 4HS Series Power Winhes Two-Yer Limited Wrrnty Plese reord the following: Dte Purhsed: Model No.: Seril No.: This

pge 2 Owner's Mnul for Thern 4WS nd 4HS Series Power Winhes Two-Yer Limited Wrrnty Plese reord the following: Dte Purhsed: Model No.: Seril No.: This Red this Own er s Mn u l thor ough ly e fore op er t ing the equip ment. Keep it with the equip ment t ll times. Re ple ments re vil le from Thern, In. IMPORTANT: Plese reord produt informtion on pge 2.

More information

So Chic Dollhouse. Assembly Instructions Item #65078

So Chic Dollhouse. Assembly Instructions Item #65078 Please retain this information for future reference So hic Dollhouse ssembly Instructions Item #65078 To order replacement parts, please visit UTION: dult assembly required. Hardware contains small screws

More information

Name Class Date SAMPLE. Complete the missing numbers in the sequences below. 753, ,982. The area of the shape is approximately cm 2

Name Class Date SAMPLE. Complete the missing numbers in the sequences below. 753, ,982. The area of the shape is approximately cm 2 End of term: TEST A You will need penil. Yer 5 Nme Clss Dte 1 2 Complete the missing numers in the sequenes elow. 200 3926 4926 400 500 700 7926 753,982 553,982 Estimte the re of the shpe elow. The re

More information

Recall that the area of a triangle can be found using the sine of one of the angles.

Recall that the area of a triangle can be found using the sine of one of the angles. Nme lss Dte 14.1 Lw of Sines Essentil Question: How n you use trigonometri rtios to find side lengts nd ngle mesures of non-rigt tringles? Resoure Loker Explore Use n re Formul to Derive te Lw of Sines

More information

Robot Control User Manual /0718-V01

Robot Control User Manual /0718-V01 Root Control User Mnul 0021919/0718-V01 2 CONTENT 1. INTRODUCTION... 4 2. PROGRAM DESCRIPTION... 4 3. SKR CONNECTION... 5 4. PROGRAM INSTALLATION... 6 5. DRIVER INSTALLATION... 6 6. MAIN SCREEN... 7 7.

More information

SAMPLE EVALUATION ONLY

SAMPLE EVALUATION ONLY mesurement nd geometry topic 15 Pythgors theorem 15.1 Overview Why lern this? Pythgors ws fmous mthemtiin who lived out 2500 yers go. He is redited with eing the fi rst person to prove tht in ny rightngled

More information

OWNER S MANUAL GRIPS

OWNER S MANUAL GRIPS OWNER S MNUL GRIPS GRIPS OWNER S MNUL TLE OF ONTENTS EFORE OPERTING THIS TOOL, RE N UNERSTN LL OF THE Maxis Tools... INSTRUTIONS N SFETY INFORMTION IN THIS MNUL Warning Labels... Safety and Precautions...5

More information

MARUTI SUZUKI FMSCI NATIONAL AUTOCROSS CHAMPIONSHIP 2016 MARUTI SUZUKI AUTOCROSS CHAMPIONSHIP 2016 ROUND 1 COCHIN SUPPLEMENTARY REGULATIONS

MARUTI SUZUKI FMSCI NATIONAL AUTOCROSS CHAMPIONSHIP 2016 MARUTI SUZUKI AUTOCROSS CHAMPIONSHIP 2016 ROUND 1 COCHIN SUPPLEMENTARY REGULATIONS MARUTI SUZUKI FMSCI NATIONAL AUTOCROSS CHAMPIONSHIP 2016 MARUTI SUZUKI AUTOCROSS CHAMPIONSHIP 2016 ROUND 1 COCHIN SUPPLEMENTARY REGULATIONS APPROVED BY: (Ntionl Sports Feertion reognize y the Government

More information

EXAMPLE 1 PAGE: 1 Instrument type PBX100LA 3 2 Pressure range bar 55 3 Electrical device I-1-Hz contact 61 4 Any options Blow-out plug 57-58

EXAMPLE 1 PAGE: 1 Instrument type PBX100LA 3 2 Pressure range bar 55 3 Electrical device I-1-Hz contact 61 4 Any options Blow-out plug 57-58 GENERL INFORMTION This specification document is for pressure gauges manufactured by: STIKO, Industrieweg 5, 9301 LM Roden, The Netherlands. STIKO is a manufacturer of mechanical instruments in the area

More information

RECTANGULAR CONNECTORS

RECTANGULAR CONNECTORS RETNGULR ONNETORS FN360 Series FN-365P FN-365J FN-364P FN-364P FN-364J FN-364J FN-365P FN-365J FN-364P FN-364J FN-362J FN-363J FN-365P FN-367J FN-365P FN-364P FN-361P With type cover FN-365J FN-364P With

More information

LEVEL 1 LAW THEORY AND GAME MANAGEMENT EXAMINATION

LEVEL 1 LAW THEORY AND GAME MANAGEMENT EXAMINATION LEVEL 1 LAW THEORY AND GAME MANAGEMENT EXAMINATION 2010 This exmintion is omprise of questions on the Lws of the Gme n spets of gme mngement tht re pplile to the role of the referee uring mth. The exmintion

More information

Contents. Introduction... 4 About Twin Beads and SuperDuos... 5 Tools and Materials... 6 Techniques... 8

Contents. Introduction... 4 About Twin Beads and SuperDuos... 5 Tools and Materials... 6 Techniques... 8 Contents Introution... 4 Aout Twin Bes n SuperDuos.... 5 Tools n Mterils... 6 Tehniques.... 8 Brelets Duet twin peyote stith... 17 City Lights twin squre stith... 19 Nine Pth twin right-ngle weve... 22

More information

VENTS SERIES DOMESTIC ELECTRIC FANS. User s Manual

VENTS SERIES DOMESTIC ELECTRIC FANS. User s Manual VENTS SERIES OMESTIC ELECTRIC FANS User s Mnul 008 ESIGNATION BASIC SPECIFICATIONS "VENTS" fns re designed for ventiltion of domesti nd similr premises (prtments, offies, stores, grges, kithens, throoms,

More information

hknengineers hkn S STRUCTURAL GENERAL NOTES & TYPICAL DETAILS PLAN KEYS EASTSIDE REGIONAL PARK REC CENTER CITY OF EL PASO - C.I.D.

hknengineers hkn S STRUCTURAL GENERAL NOTES & TYPICAL DETAILS PLAN KEYS EASTSIDE REGIONAL PARK REC CENTER CITY OF EL PASO - C.I.D. LN : PLN YS 0//07 :07:8 PM :\Users\eornelas\ocuments\STRUTPRP_NMOL_eornelas@.com.rvt SIN RITRI: ROOF LOS: ROOF LIV LOS: 6 PSF 0 PSF WIN LOIN: SI WIN SP 90 MP UILIN TORY II IMPORTN FTOR.0 WIN XPOSUR INTRNL

More information

ACCU-STEAM GAS GRIDDLE PARTS MANUAL

ACCU-STEAM GAS GRIDDLE PARTS MANUAL U-STEM S RILE PRTS MNUL orm SP800-0808 ccutemp Products, Inc. 8 North linton Park ort Wayne, IN 68 800-80-0 www.accutemp.net OUMENT HISTORY urrent revision: Prior revision: None ate: 08/08/08 ate: None

More information

Gas Tank Gasket Kit & 22

Gas Tank Gasket Kit & 22 Manufactured 4/86 to Present 169kV/40k G SETION ONTENTS Gas Tank Gasket Kit.... 21 & 22 esiccant Kit..... 23 Interrupter Repair Kit...... 24 Rotating Seal Kit...... 25 Pilot/harging Valve Kit... 26 ashpot

More information

system safety equipment such as SVRD alerts systems and 911 systems and immediate life saving equipment rings with ropes and Sheppard s hooks

system safety equipment such as SVRD alerts systems and 911 systems and immediate life saving equipment rings with ropes and Sheppard s hooks ORDINANCE NO 08 072 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF GREENVILLE TEXAS AMENDING CHAPTER 10 ARTICLE 10 04 SWIMMING POOLS SECTION 10 04 001 AND AMENDING APPENDIX A ARTICLE AI0 04 SWIMMING POOLS

More information

SERIES 8200/8300 SAFETY RELIEF VALVES

SERIES 8200/8300 SAFETY RELIEF VALVES TYLOR VLVE HS EEN PROTETIN THE ENVIRONMENT WITH WORLD LSS PRODUTS ND PROVIDIN EXELLENT USTOMER SERVIE SINE SERIES / SFETY RELIEF VLVES SERIES / SFETY RELIEF VLVES Taylor Valve / Safety Relief Valves are

More information

LEHIGH VALLEY LEHIGH VALLEY CONNIE MACK BASEBALL

LEHIGH VALLEY LEHIGH VALLEY CONNIE MACK BASEBALL LEHIGH VALLEY LEHIGH VALLEY CONNIE MACK BASEBALL PAGE RULE DESCRIPTION 1 # 1 MEMBERSHIP 2 # 2 DUES # 3 FINES 3 # 4 OFFICERS 4 # 4 OFFICERS CONTINUED # 5 AMENDMENTS # 6 PENALITIES 5 # 7 TEAM SUSPENSIONS

More information

Energy saving ventilation Air handling units (Catalogue no. 2) Industrial and commercial ventilation. (Catalogue no. 1)

Energy saving ventilation Air handling units (Catalogue no. 2) Industrial and commercial ventilation. (Catalogue no. 1) Industril nd ommeril ventiltion (Ctlogue no. 1) Industril nd ommeril ventiltion omponents - fns for round nd retngulr duts, sound-insulted, xil nd roof fns, ir hndling units with het reovery, ir heting

More information

9444LQ 702V V PAGE 3

9444LQ 702V V PAGE 3 Form 990 (016) Pge Prt Sttement of Progrm Servie Aomplishments Chek if Shedule O ontins response or note to ny line in this Prt m m m m m m m m m m m m m m m m m m m m m m m m 1 Briefly desrie the orgniztion's

More information

LOK-BOLT AS. Mechanical Anchors GENERAL INFORMATION SECTION CONTENTS. Sleeve Anchor

LOK-BOLT AS. Mechanical Anchors GENERAL INFORMATION SECTION CONTENTS. Sleeve Anchor General Information Mechanical s GENERAL INFORMATION LOK-BOLT AS Sleeve PRODUCT DESCRIPTION The Lok-Bolt AS is an all-steel pre-assemble single unit sleeve anchor which is esigne for use in concrete or

More information

Carcass Gain, Efficiency, and Profitability of Steers at Extended Days on Feed

Carcass Gain, Efficiency, and Profitability of Steers at Extended Days on Feed Crss Gin, Effiieny, n Profitility of Steers t Extene Dys on Fee Roert G. Bonurnt, Jim C. MDonl, Glen E. Erikson, Kte Brooks, Rik N. Funston, n Kelly Bruns Summry Steers were iniviully fe for 22 n 44 ys

More information

METRIC TOLERANCE DATA & STANDARD SPECIFICATION MATERIAL TOLERANCE HEAT TREAT

METRIC TOLERANCE DATA & STANDARD SPECIFICATION MATERIAL TOLERANCE HEAT TREAT Metric Fixture Pins METRIC TOLERNCE T & STNR SPECIFICTION MTERIL TOLERNCE HET TRET HRENE & ROUN 8620 STINLESS 300 SERIES MIL STEEL 8620 PREHRENE 311 &P 12mm I OR LESS R C 50-52.6 -.9 EEP 16mm I N UP R

More information

McAfee Application Control 6.1.0

McAfee Application Control 6.1.0 Evlution Guie MAfee Applition Control 6.1.0 For use with epoliy Orhestrtor 4.5.0 4.6.0 COPYRIGHT Copyright 2012 MAfee, In. Do not opy without permission. TRADEMARK ATTRIBUTIONS MAfee, the MAfee logo, MAfee

More information

Thank You. Warranty Message

Thank You. Warranty Message Thnk You Thnk you for purhsing MotorGuide Xi5 Wireless Trolling Motor. The Xi5 is designed nd engineered to deliver the performne tht nglers expet: quiet opertion, reliility, nd preise ontrol. We re onfident

More information

LAMAR DIXON EXPO CENTER - TASK 2

LAMAR DIXON EXPO CENTER - TASK 2 LMR IXON XPO NTR - TSK RL MRGNY MNGMNT GNY GRNT PROJT 0 Government Street, ST. 00 p..8.69 f..8.70 lient: Parish of scension, Louisiana Parish President Tommy Martinez rchitect: Structural: ouncil Members

More information

ASTM A182 STAINLESS HIGH PRESSURE FITTINGS INDEX

ASTM A182 STAINLESS HIGH PRESSURE FITTINGS INDEX STM 182 STINLESS HIH PRESSURE FITTINS INEX 90 ELOW / ROSS / TEE / 45 ELOW - SOKET 46 OUPLIN / HLF OUPLIN / P - SOKET 47 90 ELOW / ROSS / TEE / 45 ELOW - THREE 48 OUPLIN / HLF OUPLIN / P - THREE 49 REUIN

More information

PRODUCTS, LLC EUROCONTROLS AUTOMATION INC. MICRONESIA (GALVANIZED STEEL) REVISIONS DWN 120' SSV TOWER ASSEMBLY CP FILE NO.

PRODUCTS, LLC EUROCONTROLS AUTOMATION INC. MICRONESIA (GALVANIZED STEEL) REVISIONS DWN 120' SSV TOWER ASSEMBLY CP FILE NO. REV. DESCRIPTION 90 PP R PRODUCTS, LLC R PRODUCTS, LLC EUROCONTROLS UTOMTION INC. MICRONESI (GLVNIZED STEEL) PO OX 5999 PEORI, IL 660-5999 TOLL FREE 800--ROHN THIS DRWING IS THE PROPERTY OF ROHN. IT IS

More information

MURRAY-CALLOWAY EDC INDUSTRIAL DEVELOPMENT

MURRAY-CALLOWAY EDC INDUSTRIAL DEVELOPMENT PHS: SHMTI SIGN - NOT OR ONSTRUTION T: 09..205 SHT INX SHT NUMR ISSU T esigner -03-04 SON LOOR PLN OI PLNS 09/5/5 09/2/5 GNRL G-000 G-00 OVR GNRL RQUIRMNTS RHITTURL -00-0 -02-05 -06-20 -30-302 -40-50 -60

More information

TeeJay Publishers Homework for Level C book Ch 12 - Length & Area

TeeJay Publishers Homework for Level C book Ch 12 - Length & Area Chpter 12 Exerise Perentges 1 Length & Are 1. Would you use ruler, tpe mesure or r odometer to mesure : your tehers height the length of 5 note the length of your edroom d the distne from Glsgow to Crlisle?

More information