1 FINAL DRAINAGE REPORT Road Improvements (MP 0.6) Prepared for: Prepared by: Mesa County Engineering Department 200 S. Spruce Street Grand Junction, CO DOWL 222 South Park Avenue Montrose, Colorado, (970) August 17, 2018

2 Final Drainage Report 31 Road Intersection Improvements TABLE OF CONTENTS 1. INTRODUCTION BACKGROUND PROJECT LOCATION... 1 FIGURE ROAD (MP 0.6) PROJECT AREA DESIGN CRITERIA PREVIOUS DESIGN INFORMATION TOPOGRAPHY VEGETATION GENERAL SOILS AND GEOLOGY EXISTING DRAINAGE FEATURES HYDROLOGIC ANALYSIS HYDRAULIC ANALYSIS.7 4. BANK STABILIZATION RECOMMENDATIONS CONCLUSIONS AND RECOMMENDATIONS REFERENCES DOWL January 27, 2017 i

3 Final Drainage Report 31 Road Intersection Improvements Table 1: Table 2: Table 3: PFDS Rainfall Values for the Grand Valley Area Cover Conditions Hydrology Modeling Results LIST OF TABLES Figure 1: Figure 2: Figure 3. Figure 4. Figure 5. Figure 6. Figure 7. Figure Road (MP 0.6) Project Area Atwell Gulch Basin Map Photo of 45.5 Road at project location NRCS WSS Soil Map of Atwell Gulch Photo of RS 1110 showing erosion and temporary rip-rap HEC-RAS RS 1110 cross-section of existing conditions HEC-RAS RS 1110 cross-section with gabion wall Gabion Wall Schematic cross-section detail LIST OF FIGURES Appendix A: Appendix B: Appendix C: Appendix D: Existing and Proposed Project Site Plans NRCS Web Soil Survey Data NOAA 14 PFDS Data HEC-RAS Output Pre-Developed and Developed Conditions LIST OF APPENDICES DOWL January 27, 2017 ii

4 Final Drainage Report 45.5 Road (MP 0.6) Improvements 1. INTRODUCTION 1.1 Background As part of proposed roadway improvements at MP 0.6 on 45.4 Road in Mesa County, DOWL has prepared this Drainage Report for the region contributing runoff into the project area. Storm flows are currently conveyed by Atwell Gulch on the east side of 45.5 Road and they have eroded large portions of the roadway embankment at MP 0.6. This report is intended to present the following information: project site characteristics, identification of existing drainage system H & H components, drainage analysis and results, preliminary design for current project area improvements, conclusions and recommendations. 1.2 Project Location The 45.5 Road (MP0.6) Project (Project) is located approximately 0.6 miles north of the intersection of 45.5 Road and Colorado State Highway 330 north of Mesa, Colorado, within Mesa County. Refer to Exhibit 1 for the general project location. Figure Road (MP 0.6) Project Area DOWL March 15,

5 Final Drainage Report 45.5 Road (MP 0.6) Improvements 1.3 Design Criteria The purpose of the project is to design improvements relating to erosion of the road prism on the west bank of Atwell Gulch at the MP 0.6 locations. Surface stormwater currently flows in in a meandering stream pattern that is eroding portions of 45.5 Road and endangering the asphalt pavement of the road. The Atwell Gulch drainage channels is well established on the east side of 45.5 Road and is directed towards the road in several sections as a cut bank. The scope of work for this drainage report is to determine and design bank stabilization that will accommodate the 100-year design storm in Atwell Gulch, an ephemeral stream channel. 1.4 Previous Design Information Per Mesa County, it does not appear that any existing drainage reports were prepared or are available for the 45.5 Road (MP0.6) project area. DOWL previously prepared drainage reports for Shire Gulch, the 45.5 Road Improvements Phases I/II and the 45.5 Road 4B projects. No known Atwell Gulch drainage reports were available as a reference for this report. Figure 2. Atwell Gulch basin upstream of the project location. DOWL March 15,

6 Final Drainage Report 45.5 Road (MP 0.6) Improvements 1.3 Topography Topography of the project area for project area ranges from an elevation of approximately 7,923 feet (MSL) on the topographic highpoint to the east of the intersection, to 5,200 feet (MSL) at the low point of the project limits to the north and south. The general drainage direction of stormwater runoff is to the southwest at an average grade of approximately 413 feet per mile or 7.8%. 1.4 Vegetation Vegetation in the project area consists primarily of native grasses, shrubs. including rabbit brush and sagebrush and pinyon-juniper trees. Additionally, there are tamarisk trees adjacent to Atwell Gulch which are an invasive species and non-native to the project area. Figure 3. View looking west at vegetation adjacent to the project area. Eroded section of the 45.5 Road bank is to the lower left of the photo. 1.5 General Soils and Geology Information from the NRCS Web Soil Survey (WSS) site indicates that there are thirteen (13) mapped soil units identified in the Atwell Gulch basin. Table 1 below summarizes those soil DOWL March 15,

7 Final Drainage Report 45.5 Road (MP 0.6) Improvements units. More detailed soils descriptions obtained from the WSS website are presented in Appendix B and in the geotechnical report prepared by DOWL for the project. In general, the project area and Atwell Gulch basin are composed of approximately 79% sandstone rock outcrops of the Ohio Creek member of the Mesa Verde formation and the remaining 21% represent colluvial loam soils derived from weathering of that rock. Slopes range from 3 percent up to 90 percent for vertical rock cliffs to the west and east of the MP 0.6 site. Figure 4. Project Soils Map. (Source: NRCS-USDA Web Soil Survey) 1.6 Existing Drainage Features As evidenced by the incised nature of the Atwell Gulch drainage channel on the east side of 45.5 Road, stormwater flows to the project area are readily conveyed towards the 45.5 Road section and then south towards Plateau Creek through numerous channels within the basin in addition to the main Atwell Gulch channel. Drainage features observed during our site visits include: access drive culverts on the west side of 45.5 Road, a 12-inch CMP culvert that DOWL March 15,

8 Final Drainage Report 45.5 Road (MP 0.6) Improvements crosses 45.5 Road near Station 8+25 of the project plans and the 36-inch CMP culvert under SH 330 to the east of the 45.5 Road intersection. Figure 5. View looking downstream at right bank erosion adjacent to 45.5 road. Note sandstone bedrock at the surface of the stream channel and rip-rap placed along the bank and at the toe to minimize erosion of the bank. DOWL March 15,

9 Final Drainage Report 45.5 Road (MP 0.6) Improvements 2. HYDROLOGIC ANALYSIS This section of the report reviews the sources for hydrologic data used hydraulic analysis in Section 4. In addition to the StreamStats data, which calculated the 100-year flow using the USGS regression equation for the northwest Hydrologic Region, we used the USDA Win TR 55 software and the CDWR Unit Hydrograph spreadsheet to estimate peak flow for the Shire Gulch basin. The recently published NOAA Atlas 14 was consulted for revisions to rainfall depth and frequency-duration for the interval storms over a 24-hour period. The data for Mesa, Colorado with a 90% confidence interval was used for our analysis and is presented in Appendix C. RETURN PERIOD 24-HR TOTAL PRECIPITATION (IN) 2-year year year year year year 2.50 Table 1. Summary of NOAA Atlas 14 precipitation data for varying recurrence periods. RETURN PERIOD STREAMSTATS WIN TR-55 PEAK FLOWS (c.f.s) PEAK FLOWS (c.f.s.) 2-year year year year year year Table 2. Summary of StreamStats Peak-Flow Statistics Data for Atwell Gulch Basin 2.1 Win TR 55 Model To confirm that StreamStats returned reasonable rainfall and flow data for the Atwell Gulch basin, we also modeled the basin using Win TR 55 software form the US Department of Agriculture (USDA). Output for this model is included in Appendix C of this report. Assumptions for the TR 55 model: Basin area = 6.92 sqare miles. This is slightly smaller than the area returned by the StreamStats program (8.04 sq. miles), but was calculated from USGS maps, and aerial photos using AutoCAD and appears to better represent the contributing basin for Atwell Gulch Weighted CN = 82 for arid rangeland, from StreamStats data Channel length = 6.58 miles Lc = 3.62 miles Slope = ft/ft DOWL March 15,

10 Final Drainage Report 45.5 Road (MP 0.6) Improvements NOAA Type A Design Storm The Win TR-55 calculation resulted in a peak flow at 3,353 cfs, which was similar to the StreamStats estimate of 3,600 cfs. To be conservative, the StreamStats values were used in HEC-RAS hydraulic analysis presented in Section 4 below. Win TR-55 output is presented in Appendix C of this report. 2.2 Existing 100-Year Floodplains\Easements There is no published FEMA floodplain insurance rate map (FIRM) for the Atwell Gulch drainage. A Flood Insurance Study (FIS) for Mesa County, FIS # 08029CV000A, completed in August 2010, does not include Atwell Gulch in the analysis. 3. HYDRAULIC ANALYSES In our preliminary options analysis, we proposed eight varying solutions to stabilizing the bank along 45.5 Road while avoiding construction below the ordinary highwater mark as mapped by ERO Resources. Mesa County selected a gabion wall option with spiral soil nails anchored by a 3-4-foot concrete to wall as shown in Figure 5 below. Using the information obtained in Section 3 as input into the US Army Corps of Engineers HEC-RAS 5.03 hydraulic modeling software, we calculated the minimum required gabion wall height and length pass the estimated 100-year flow of 3,600 cfs. The following assumptions were used for the HEC- RAS culvert sizing analysis: Maximum 100-year flow of 3,600 cfs obtained from StreamStats calculations. Cross-sections of the channel were taken from topographic survey performed by DOWL, as supplemented by digital terrain mapping (DTM) provided by Mesa County for the purpose of confirming gabion wall locations for the project. In order to simulate the bank stabilization proposed using the gabion walls and anchor nails, we modeled a bridge abutment in HEC-RAS. Both pre-developed and developed conditions models were created in HEC-RAS 5.03 to simulate flow conditions with and without the proposed gabion wall stabilization structure. The model output for both analyses are presented in Appendix D and summarized in Table 3 below. Analysis for scour was also performed in HEC-RAS and scour on river right segments will be managed with the bank stabilization structures described above. Scour analysis output is also presented in Appendix D. Condition 2-YR 5-YR 10-YR 25-YR 50-YR 100-YR Existing Gabion Wall Table 3. Summary of water surface elevations for pre-developed and developed conditions at RS DOWL March 15,

11 Final Drainage Report 45.5 Road (MP 0.6) Improvements Figure 6. RS 1110 cross-section of existing conditions. 100-year W.S. elevation is Figure 7. RS 1110 cross-section of Option #2 gabion wall. Modeled as an abutment to a bridge to match structural conditions of design. 100-year water surface is at DOWL March 15,

12 Final Drainage Report 45.5 Road (MP 0.6) Improvements 4. BANK STABILIZATION RECOMMENDATIONS After reviewing and presenting eight options for bank stabilization to Mesa County, Option #2 consisting of a gabion wall with soil anchors and a concrete retaining toe wall was selected for design and final modeling. This option is similar to past bank stabilization efforts by Mesa county along Atwell Gulch except for the retaining wall at the base and the anchors. Both of these additions should minimize future maintenance of this section. In sections of the project area that had slopes greater than 2H;1V, the DOWL design uses grouted and un-grouted rip-rap to retain the slope. In general, these areas are moderately well vegetated and appear stable under current flow conditions. The proposed gabion wall structure is reserved for those section of the channel that have eroded and are nearly vertical. The concrete toe wall will be doweled into underlying sandstone bedrock which is at or near the channel surface throughout the project area. The geotechnical report prepared By DOWL for the project explains the retaining structure in greater detail. Figure 8 below provides a typical gabion wall detail at RS 110 which was used in the hydraulic analyses in Section 3. Figure 8. Gabion Wall schematic design DOWL March 15,

13

14 Final Drainage Report 45.5 Road (MP 0.6) Improvements 7. REFERENCES Mesa County Colorado GIS Website, Mesa County Stormwater Management Manual (SWMM), dated December 31, 2007, issued April Natural Resources Conservation Service National Cooperative Soils Survey Website, CDOT Standards and Specifications for Road and Bridge Construction (2017) Erosion Control and Stormwater Quality Field Guide, Colorado Department of Transportation (undated) DOWL March 15,

15 APPENDIX A EXISTING AND PROPOSED SITE PLANS

16 EXISTING CONDITIONS ISSUED FOR BID R SC-VM-BA-45.5RD-ATWELL.dwg EXISTING CONDITIONS 45.5 ROAD IMPROVEMENTS MP 0.6 MESA COUNTY, CO

17 SITE PLAN ISSUED FOR BID R MC-CB-45.5 Road Design Base.dwg SITE PLAN 45.5 ROAD IMPROVEMENTS MP 0.6 MESA COUNTY, CO

18 APPENDIX B NRCS WEB SOIL SURVEY DATA

19 108 9' 27'' W Soil Map Douglas-Plateau Area, Colorado, Parts of Garfield and Mesa Counties; and Grand Mesa - West Elk... (GlobalWatershed) 108 4' 51'' W ' 27'' N 39 16' 27'' N ' 43'' N 39 11' 43'' N ' 27'' W N Map Scale: 1:42,600 if printed on A portrait (8.5" x 11") sheet. Meters Feet Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 12N WGS ' 51'' W Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/26/2018 Page 1 of 3

20 Soil Map Douglas-Plateau Area, Colorado, Parts of Garfield and Mesa Counties; and Grand Mesa - West Elk Area, Colorado, Parts of Delta, Garfield, Gunnison, Mesa, and Montrose Counties (GlobalWatershed) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Douglas-Plateau Area, Colorado, Parts of Garfield and Mesa Counties Survey Area Data: Version 10, Oct 12, 2017 Soil Survey Area: Grand Mesa - West Elk Area, Colorado, Parts of Delta, Garfield, Gunnison, Mesa, and Montrose Counties Survey Area Data: Version 7, Oct 10, 2017 Your area of interest (AOI) includes more than one soil survey area. These survey areas may have been mapped at different scales, with a different land use in mind, at different times, or at different levels of detail. This may result in map unit symbols, soil properties, and interpretations that do not completely agree across soil survey area boundaries. Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: 2, 2017 Dec 31, 2009 Mar The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/26/2018 Page 2 of 3

21 Soil Map Douglas-Plateau Area, Colorado, Parts of Garfield and Mesa Counties; and Grand Mesa - West Elk Area, Colorado, Parts of Delta, Garfield, Gunnison, Mesa, and Montrose Counties GlobalWatershed Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 2 Badland % 3 Barx loam, 3 to 12 percent slopes 7 Biedsaw-Sunup gravelly loams, 10 to 40 percent slopes 12 Bunkwater very fine sandy loam, 1 to 8 percent slopes 32 Dominguez clay loam, 3 to 8 percent slopes 61 Rock outcrop-torriorthents complex, 15 to 90 percent slopes 66 Torriorthents, warm-rock outcrop complex, 35 to 90 percent slopes 69 Travessilla-Rock outcrop complex, 10 to 35 percent slopes % % % % % 1, % 1, % Subtotals for Soil Survey Area 3, % Totals for Area of Interest 4, % Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 102 Badland % 103 Barx loam, 3 to 12 percent slopes % 180 Rock outcrop, shale % 192 Torriorthents, cool-rock outcrop, 35 to 90 percent slopes 193 Torriorthents, warm-rock outcrop, 35 to 90 percent slopes % % Subtotals for Soil Survey Area % Totals for Area of Interest 4, % Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/26/2018 Page 3 of 3

22 APPENDIX C NOAA 14 PFDS DATA AND RUNOFF CALCULATIONS

23 StreamStats Page 2 of 3 StreamStats Report Region ID: CO Workspace ID: CO Clicked Point (Latitude, Longitude): , Time: :17: Basin Characteristics Parameter Code Parameter Description Value Unit DRNAREA Area that drains to a point on a stream 8.04 square miles EL7500 Percent of area above 7500 ft 0 percent PRECIP Mean Annual Precipitation inches BSLDEM10M Mean basin slope computed from 10 m DEM 25.5 percent CSL1085LFP Change in elevation divided by length between points 10 and 85 percent of distance along the longest flow path to the basin divide, LFP from 2D grid feet per mi ELEV Mean Basin Elevation 5954 feet ELEVMAX Maximum basin elevation 7920 feet I24H100Y Maximum 24-hour precipitation that occurs on average once in 100 years 2.5 inches I24H2Y Maximum 24-hour precipitation that occurs on average once in 2 years - Equivalent to precitation intensity index 1.18 inches I6H100Y 6-hour precipitation that is expected to occur on average once in 100 years 1.87 inches I6H2Y Maximum 6-hour precipitation that occurs on average once in 2 years 0.79 LAT_OUT Latitude of Basin Outlet degrees LC11BARE Percentage of barren from NLCD 2011 class LC11CRPHAY Percentage of cultivated crops and hay, classes 81 and 82, from NLCD percent LC11DEV Percentage of developed (urban) land from NLCD 2011 classes percent LC11FOREST Percentage of forest from NLCD 2011 classes percent LC11GRASS Percent of area covered by grassland/herbaceous using 2011 NLCD 0 LC11IMP Average percentage of impervious area determined from NLCD 2011 impervious dataset 0.7 percent LC11SHRUB Percent of area covered by shrubland using 2011 NLCD 73.7 LC11SNOIC Percent snow and ice from NLCD 2011 class 12 0 LC11WATER Percent of open water, class 11, from NLCD LC11WETLND Percentage of wetlands, classes 90 and 95, from NLCD LFPLENGTH Length of longest flow path 7.79 miles LONG_OUT Longitude of Basin Outlet degrees MINBELEV Minimum basin elevation 5200 feet OUTLETELEV Elevation of the stream outlet in thousands of feet above NAVD feet RCN Runoff-curve number as defined by NRCS ( RUNCO_CO Soil runoff coefficient as defined by Verdin and Gross (2017) 0.34 SSURGOA Percentage of area of Hydrologic Soil Type A from SSURGO 49 percent SSURGOB Percentage of area of Hydrologic Soil Type B from SSURGO 1.9 percent SSURGOC Percentage of area of Hydrologic Soil Type C from SSURGO 17.2 percent SSURGOD Percentage of area of Hydrologic Soil Type D from SSURGO 25 percent STATSCLAY Percentage of clay soils from STATSGO percent STORNHD Percent storage (wetlands and waterbodies) determined from 1:24K NHD 0 percent 1/10/2018

24 StreamStats Page 3 of 3 1/10/2018 Parameter Code Parameter Description Value Unit TOC Time of concentration in hours 1.89 Peak-Flow Statistics Parameters [100 Percent (8.01 square miles) Northwest Region Peak Flow] Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 8.04 square miles EL7500 Percent above 7500 ft 0 percent 0 99 PRECIP Mean Annual Precipitation inches 8 49 Peak-Flow Statistics Flow Report [100 Percent (8.01 square miles) Northwest Region Peak Flow] PIl: Prediction Interval-Lower, PIu: Prediction Interval-Upper, SEp: Standard Error of Prediction, SE: Standard Error (other -- see report) Statistic Value Unit SEp 2 Year Peak Flood 120 ft^3/s Year Peak Flood 371 ft^3/s Year Peak Flood 736 ft^3/s Year Peak Flood 1540 ft^3/s Year Peak Flood 2410 ft^3/s Year Peak Flood 3600 ft^3/s Year Peak Flood 5130 ft^3/s Year Peak Flood 7740 ft^3/s 79 Peak-Flow Statistics Citations Capesius, J.P., and Stephens, V. C.,2009, Regional Regression Equations for Estimation of Natural Streamflow Statistics in Colorado: U. S. Geological Survey Scientific Investigations Report , 32 p. (

25 Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 8, Version 2 MESA LAKES Station ID: Location name: Mesa, Colorado, USA* Latitude: , Longitude: Elevation: Elevation (station metadata): ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffery Bonnin NOAA, National Weather Service, Silver Spring, Maryland PF_tabular PF_graphical Maps_&_aerials Duration 5-min 10-min 15-min 30-min 60-min 2-hr 3-hr 6-hr 12-hr 24-hr 2-day 3-day 4-day 7-day 10-day 20-day 30-day 45-day 60-day PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches) 1 Average recurrence interval (years) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) 1.17 ( ) 1.49 ( ) 1.89 ( ) 2.19 ( ) 2.45 ( ) 3.18 ( ) 3.81 ( ) 5.46 ( ) 6.80 ( ) 8.50 ( ) 9.96 ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) 1.06 ( ) 1.33 ( ) 1.68 ( ) 2.15 ( ) 2.51 ( ) 2.82 ( ) 3.66 ( ) 4.35 ( ) 6.15 ( ) 7.64 ( ) 9.61 ( ) 11.3 ( ) ( ) ( ) ( ) ( ) ( ) 1.03 ( ) 1.11 ( ) 1.31 ( ) 1.60 ( ) 2.02 ( ) 2.59 ( ) 3.05 ( ) 3.45 ( ) 4.45 ( ) 5.24 ( ) 7.28 ( ) 9.02 ( ) 11.4 ( ) 13.5 ( ) ( ) ( ) ( ) ( ) 1.10 ( ) 1.26 ( ) 1.33 ( ) 1.52 ( ) 1.85 ( ) 2.32 ( ) 2.98 ( ) 3.53 ( ) 4.00 ( ) 5.13 ( ) 6.01 ( ) 8.23 ( ) 10.2 ( ) 12.8 ( ) 15.2 ( ) ( ) ( ) ( ) 1.21 ( ) 1.39 ( ) 1.57 ( ) 1.64 ( ) 1.84 ( ) 2.21 ( ) 2.76 ( ) 3.54 ( ) 4.21 ( ) 4.78 ( ) 6.10 ( ) 7.08 ( ) 9.55 ( ) 11.7 ( ) 14.7 ( ) 17.5 ( ) ( ) ( ) 1.09 ( ) 1.40 ( ) 1.61 ( ) 1.81 ( ) 1.88 ( ) 2.09 ( ) 2.50 ( ) 3.12 ( ) 3.99 ( ) 4.76 ( ) 5.41 ( ) 6.87 ( ) 7.93 ( ) 10.6 ( ) 12.9 ( ) 16.1 ( ) 19.1 ( ) ( ) 1.01 ( ) 1.23 ( ) 1.58 ( ) 1.82 ( ) 2.05 ( ) 2.13 ( ) 2.36 ( ) 2.82 ( ) 3.50 ( ) 4.47 ( ) 5.33 ( ) 6.06 ( ) 7.66 ( ) 8.80 ( ) 11.6 ( ) 14.1 ( ) 17.5 ( ) 20.7 ( ) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS) ( ) 1.11 ( ) 1.35 ( ) 1.75 ( ) 2.02 ( ) 2.29 ( ) 2.38 ( ) 2.64 ( ) 3.16 ( ) 3.90 ( ) 4.97 ( ) 5.94 ( ) 6.75 ( ) 8.48 ( ) 9.70 ( ) 12.7 ( ) 15.3 ( ) 18.9 ( ) 22.2 ( ) ( ) 1.23 ( ) 1.50 ( ) 1.97 ( ) 2.29 ( ) 2.61 ( ) 2.71 ( ) 3.03 ( ) 3.63 ( ) 4.47 ( ) 5.65 ( ) 6.77 ( ) 7.69 ( ) 9.59 ( ) 10.9 ( ) 14.1 ( ) 16.9 ( ) 20.6 ( ) 24.1 ( ) ( ) 1.30 ( ) 1.59 ( ) 2.11 ( ) 2.48 ( ) 2.84 ( ) 2.97 ( ) 3.34 ( ) 4.01 ( ) 4.93 ( ) 6.20 ( ) 7.43 ( ) 8.43 ( ) 10.5 ( ) 11.9 ( ) 15.2 ( ) 18.1 ( ) 21.9 ( ) 25.4 ( ) Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top 6/21/2018

26 Precipitation Frequency Data Server Page 2 of 4 6/21/2018 PF graphical Back to Top

27 Precipitation Frequency Data Server Page 3 of 4 6/21/2018 Maps & aerials Small scale terrain 3km + 2mi Large scale terrain 100km + 60mi Large scale map 100km + 60mi

28 Precipitation Frequency Data Server Page 4 of 4 6/21/ km + 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD Questions?: HDSC.Questions@noaa.gov Disclaimer

29 APPENDIX D HEC-RAS MODEL OUTPUT

30 Plan: existing Ephemeral Wash Creek FL RS: Profile: 100-YR E.G. Elev (ft) Element Left OB Channel Right OB Vel Head (ft) 2.94 Wt. n-val W.S. Elev (ft) Reach Len. (ft) Crit W.S. (ft) Flow Area (sq ft) E.G. Slope (ft/ft) Area (sq ft) Q Total (cfs) Flow (cfs) Top Width (ft) Top Width (ft) Vel Total (ft/s) Avg. Vel. (ft/s) Max Chl Dpth (ft) 9.53 Hydr. Depth (ft) 6.98 Conv. Total (cfs) Conv. (cfs) Length Wtd. (ft) Wetted Per. (ft) Min Ch El (ft) Shear (lb/sq ft) 4.78 Alpha 1.00 Stream Power (lb/ft s) Frctn Loss (ft) 0.21 Cum Volume (acre-ft) 8.20 C & E Loss (ft) 0.41 Cum SA (acres) 1.39

31 45.5 Road - Existing conditions Plan: exist 6/21/ Legend WS 500-YR WS 100-YR WS 50-YR WS 25-YR WS 10-YR Ground Bank Sta 5235 Elevation (ft) Station (ft)

32 HEC-RAS Plan: exist River: Ephemeral Wash Reach: Creek FL Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR

33 HEC-RAS Plan: exist River: Ephemeral Wash Reach: Creek FL (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR

34 HEC-RAS Plan: exist River: Ephemeral Wash Reach: Creek FL (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR

35 HEC-RAS Plan: exist River: Ephemeral Wash Reach: Creek FL (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL 5 10-YR Creek FL 5 25-YR Creek FL 5 50-YR Creek FL YR Creek FL YR

36 Road - Gabion Option Plan: Option #2 - Run 1 6/21/2018 Gabion Wall.02 Legend WS 500-YR WS 100-YR WS 50-YR WS 25-YR WS 10-YR Ground Bank Sta 5235 Elevation (ft) Station (ft)

37 HEC-RAS Plan: gabion River: Ephemeral Wash Reach: Creek FL Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL 1110 Bridge Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR Creek FL YR

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

Dam Modification Report Stingy Run Fly Ash Reservoir Appendix E Spillway System Design Calculations E1: Spillway/Energy Dissipater Design for 100-year Event CHE8273 8 September 4, 2014 Written by: CJW

More information

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL APRIL 2011 APRIL 2011 Page 1 Preface TIDEROUT 2, Build 1.22 dated June 29, 2006 is the current

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Sussex County, DE Preliminary Study Overview

Sussex County, DE Preliminary Study Overview Sussex County, DE Preliminary Study Overview Coastal study scope: 102 miles of entire County shoreline Revised 102 panels for coastal study Riverine study scope: 14 streams, 67.1 miles, within the Nanticoke

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

Hillview Crossing Townhome Development

Hillview Crossing Townhome Development Territorial Landworks, Inc. P.O. Box 3851 (406) 721 0142 Missoula, MT 59806 PRELIMINARY GRADING AND DRAINAGE ENGINEERING DESIGN REPORT FOR CALCULATIONS USING USDA/NRCS WinTR 55 PROGRAM & IN ACCORDANCE

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc.

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc. Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed December 2004 The Cadmus Group, Inc. Grand Valley State University Annis Water Resources Institute Submitted

More information

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 RACETRACK ROAD CULVERT OVER THE SPRING RUN & GREEN SPRINGS ROAD CULVERT OVER AN UNNAMED TRIBUTARY TO SPRING RUN BERWICK TOWNSHIP

More information

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed.

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed. Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed December 2004 The Cadmus Group, Inc. Grand Valley State University Annis Water

More information

Skagit River Historical Flood Elevations and Peak Flow Estimates

Skagit River Historical Flood Elevations and Peak Flow Estimates Skagit River Historical Flood Elevations and Peak Flow Estimates to be presented at Skagit River GI H&H Technical Workshop Wednesday, June 17, 2009 Background Corps of Engineers began a General Investigation

More information

Legend. Figure 1 Location Map McKelvey Woods Trail Project City of Maryland Heights St. Louis County, Missouri. Proposed Trail NORTH.

Legend. Figure 1 Location Map McKelvey Woods Trail Project City of Maryland Heights St. Louis County, Missouri. Proposed Trail NORTH. Path: V:\St Louis Office\St Louis County\65679_McKelvey Woods Trail Extension_for Herleth\GIS\DataFiles\ArcDocs\Wetlands 2013\Report Maps\Figure1.mxd brichards 4/23/2013 Proposed Trail 0 0.5 1 2 Miles

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

PRELIMINARY STORM DRAINAGE REPORT

PRELIMINARY STORM DRAINAGE REPORT PRELIMINARY STORM DRAINAGE REPORT DRURY LANE DEVELOPMENT 704 1ST STREET SULTAN, WA 98294-94240 PARCEL #28083200305500 AUDITOR S FILE NO. 1090255 CITY OF SULTAN SNOHOMISH COUNTY, WASHINGTON PREPARED FOR:

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

SECTION 2 HYDROLOGY AND FLOW REGIMES

SECTION 2 HYDROLOGY AND FLOW REGIMES SECTION 2 HYDROLOGY AND FLOW REGIMES In this section historical streamflow data from permanent USGS gaging stations will be presented and discussed to document long-term flow regime trends within the Cache-Bayou

More information

Importance of un-named tributary streams to Brook Trout populations. Dr. Jonathan M. Niles Dr. Dan Ressler

Importance of un-named tributary streams to Brook Trout populations. Dr. Jonathan M. Niles Dr. Dan Ressler Importance of un-named tributary streams to Brook Trout populations. Dr. Jonathan M. Niles Dr. Dan Ressler Pennsylvania Streams All streams of PA have a designated use - Huge resource - 8,011 named tributaries:

More information

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012 Bridge Design Preliminary Bridge Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

Picture Spring Branch Hydrologic and Hydraulic Analysis Report. Prepared for: Anne Arundel County. Final

Picture Spring Branch Hydrologic and Hydraulic Analysis Report. Prepared for: Anne Arundel County. Final Picture Spring Branch Hydrologic and Hydraulic Analysis Report Prepared for: Anne Arundel County Final Date: November 30, 2017 Picture Spring Branch Hydrologic and Hydraulic Analysis Report November 30,

More information

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES (Approved XXXXX, 2010) Working Draft Version January 14, 2010 VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

Assessment of Soil Erosion at a DC Park Facility Spring Valley Park NW Washington, DC

Assessment of Soil Erosion at a DC Park Facility Spring Valley Park NW Washington, DC Assessment of Soil Erosion at a DC Park Facility Spring Valley Park NW Washington, DC Annual Progress Report for FY 2004 Prepared by: Principal Investigators: Inder Bhambri, Ph.D., PE Philip Brach, Ph.D.,

More information

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek City of Fairway, Kansas Fairway Stormwater Level of Service Study - Phase 2 Project No. 108200 Revision 1 12/6/2018 Stormwater

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT NAPA COUNTY, CALIFORNIA PREPARED BY NAPA COUNTY RESOURCE CONSERVATION DISTRICT 1303 JEFFERSON ST. SUITE 500B NAPA, CALIFORNIA 94559 WWW.NAPARCD.ORG

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

3.0 Basin and Watershed Characteristics

3.0 Basin and Watershed Characteristics 3.0 Basin and Watershed Characteristics 3.1 Basin Characteristics 3.1.1 Crystal Lake Crystal Lake, located in the cities of Burnsville and Lakeville (Dakota County), covers an area of approximately 292

More information

Red River Basin and FM Diversion Hydrology. North Dakota Water Education Foundation Executive Briefing July 13, 2012

Red River Basin and FM Diversion Hydrology. North Dakota Water Education Foundation Executive Briefing July 13, 2012 Red River Basin and FM Diversion Hydrology North Dakota Water Education Foundation Executive Briefing July 13, 2012 Red River Basin Total Drainage Area: 45,000 square miles North Dakota Fargo, ND Moorhead,

More information

Illinois State Water Survey

Illinois State Water Survey Illinois State Water Survey HYDROLOGY DIVISION SWS Contract Report 508 COMPARISON OF 1987 AND 1989 BED PROFILE SURVEYS OF THE LOWER CACHE RIVER by Richard Allgire Office of Sediment and Wetland Studies

More information

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California HEC-RAS Version 3.1.3 May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California X X XXXXXX XXXX XXXX XX XXXX X X X X X X X X X X X X X X X X X X X XXXXXXX XXXX

More information

A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE

A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE Paul G. Schweiger, P.E. 1, Darrell M. Temple, P.E. 2 Danny McCook 3, P.E., & Amanda J. Hess, P.E. 4 ABSTRACT More than

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Three Mile Creek 2011

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Three Mile Creek 2011 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Three Mile Creek 2011 By Joseph D. Stewig Montrose Area Fisheries Office TABLE OF CONTENTS

More information

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa -

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - Stormwater Management Pond Design Brief Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - December 2008 Ref: 647-07 J.F. Sabourin and Associates Inc. Water Resources and

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

Hydrologic, Hydraulic and Geomorphic Technical Memorandum

Hydrologic, Hydraulic and Geomorphic Technical Memorandum Appendix A Hydrologic, Hydraulic and Geomorphic Technical Memorandum 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis

More information

TROUT CREEK WATERSHED (Second Year of Snowline Data)

TROUT CREEK WATERSHED (Second Year of Snowline Data) Extent of Snow Cover During the 2002 Spring Freshet For the TROUT CREEK WATERSHED (Second Year of Snowline Data) (Penticton Forest District) 1.0 INTRODUCTION The extent of snow cover over a watershed basin

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

Gaviota Creek Fish Passage and Geomorphic Assessment

Gaviota Creek Fish Passage and Geomorphic Assessment Gaviota Creek Fish Passage and Geomorphic Assessment Prepared for California Department of Fish and Game And Pacific States Marine Fisheries Commission Prepared by Michael Love and Associates PO Box 4477

More information

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The

More information

APPENDIX C. Fluvial and Tidal Hydraulics Report

APPENDIX C. Fluvial and Tidal Hydraulics Report APPENDIX C Fluvial and Tidal Hydraulics Report BUENA VISTA LAGOON ENHANCEMENT PROJECT FLUVIAL AND TIDAL HYDRAULICS ANALYSES Prepared for: SANDAG 401 B Street, Suite 800 San Diego, California 92101 Contact:

More information

CE 535, Spring 2002 Preliminary Design Example 1 / 6

CE 535, Spring 2002 Preliminary Design Example 1 / 6 CE 535, Spring 2002 Preliminary Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

2016 NC Coastal Local Governments Annual Meeting

2016 NC Coastal Local Governments Annual Meeting 2016 NC Coastal Local Governments Annual Meeting Coastal Flood Study Modeling and Mapping 101 April 21, 2016 Tom Langan, PE, CFM Engineering Supervisor NCEM Floodplain Mapping Program FEMA Coastal Flood

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

Creek Trash Assessment (CTA) Methodology (Demonstration: Mill Run Creek, Cheltenham, Pa.)

Creek Trash Assessment (CTA) Methodology (Demonstration: Mill Run Creek, Cheltenham, Pa.) Creek Trash Assessment (CTA) Methodology (Demonstration: Mill Run Creek, Cheltenham, Pa.) Mill Run Creek emerges from a storm sewer in Philadelphia to an open creek in Cheltenham. The Creek downstream

More information

Hydraulic Modeling of Stream Enhancement Methods

Hydraulic Modeling of Stream Enhancement Methods Hydraulic Modeling of Stream Enhancement Methods Matthew J. Curry John J. Levitsky Abstract Development within watersheds increases the amounts of runoff causing stream erosion and degradation of stream

More information

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA TOPICS COVERED Aquatic Organism Passage (AOP) Benefits of AOP Crossings

More information

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared

More information

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points. Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI 01-001 Should really follow HEC 18, but this summary will get you the main points. 1: Determine scour analysis variables 2: Analyze long-term bed

More information

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 09/25/2018 DRAFT FEMA Region I PA H&H Study ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 Region I Federal Emergency Management Agency (FEMA) Public Assistance Hydrologic and Hydraulic (H&H)

More information

STREAM SURVEY File form No..

STREAM SURVEY File form No.. scanned for KRIS THE RESOURCES AGENCY OF CALIFORNIA California Department of Fish and Game STREAM SURVEY File form No.. Date: September 4, 1969. NAME: North Fork Schooner Gulch Creek COUNTY: Mendocino.

More information

Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013

Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013 Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013 2013 Annual Performance Report Enhancing Connectivity in the Ash-Black Rock Sub-basin of the West Branch Narraguagus River. Project

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2018-00168-MVM Applicant: City of Lino Lakes Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil

More information

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Prepared For: Woodard & Curran 95 Cedar Street, Suite 100 Providence, RI 02903

More information

APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS

APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11, EVALUATING SCOUR AT BRIDGES APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS APRIL 2011 APPENDIX C ESTIMATING SCOUR IN

More information

Non-Motorized Overpass at SR 5/US1

Non-Motorized Overpass at SR 5/US1 Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

More information

Stream Assessment. Date. Data Collected by. Location. Name of Stream and River Basin. Stream Order. Streambank Materials. Streambank Vegetation

Stream Assessment. Date. Data Collected by. Location. Name of Stream and River Basin. Stream Order. Streambank Materials. Streambank Vegetation Stream Assessment Date Data Collected by Location Name of Stream and River Basin Stream Order Streambank Materials Streambank Vegetation Floodplain Soils Floodplain Vegetation Valley Type Valley Constraints

More information

JEFFERSON COUNTY, ARKANSAS AND INCORPORATED AREAS

JEFFERSON COUNTY, ARKANSAS AND INCORPORATED AREAS JEFFERSON COUNTY, ARKANSAS Community Name Community Number ALTHEIMER, CITY OF 050107 HUMPHREY, CITY OF 050108 JEFFERSON COUNTY 050440 (UNINCORPORATED AREAS) PINE BLUFF, CITY OF 050109 REDFIELD, CITY OF

More information

Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified: 5/22/06 Compiled by: Cliff Dolchok

Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified: 5/22/06 Compiled by: Cliff Dolchok 813 W. Northern Lights Blvd. Anchorage, AK 99503 Phone: 907-269-3000 Fax: 907-269-3044 www.akenergyauthority.org SITE SUMMARY Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified:

More information

Boothbay Harbor Rotary Club May 12, 2016

Boothbay Harbor Rotary Club May 12, 2016 Mapping Potential Sea Level Rise and Storm Surge in Boothbay Harbor, ME Boothbay Harbor Rotary Club May 12, 2016 Peter A. Slovinsky, Marine Geologist Maine Geological Survey S.M. Dickson, MGS Quickly,

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Appendix J: Q1-Highway 35 Route Construction Plan

Appendix J: Q1-Highway 35 Route Construction Plan PSC REF#:150055 Wisconsin CPCN Appendix J Appendix J: Q1-Highway 35 Route Construction Plan Public Service Commission of Wisconsin RECEIVED: 06/29/11, 8:51:24 AM Hampton Rochester La Crosse 345 kv Transmission

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

CALCASIEU SALINITY STRUCTURES. HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers)

CALCASIEU SALINITY STRUCTURES. HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers) CALCASIEU SALINITY STRUCTURES HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers) Presentation Overview 1 2 3 4 5 Project Overview and CEA Circulation Modeling Vessel Hydrodynamics Modeling

More information

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area

CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area CCR Landfill 2017 Annual Inspection Report NC1 Ash Disposal Area Omaha Public Power District Nebraska City Station Nebraska City, Nebraska January 19, 2018 OPPD Nebraska City Station NC1 Ash Disposal Area

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December 2007 Grand Valley Ranger District Grand Mesa, Uncompahgre, Gunnison National Forests Prepared

More information

fjj. p... D For approval D Approved as submitted D Resubmit copies for approval

fjj. p... D For approval D Approved as submitted D Resubmit copies for approval TO: URBAN ENGINEERING, INC. 877 South Alvernon Way Tucson, AZ. 85711 (52) 31838 Fax (52) 318388 Pima County Regional Flood Control District 21 N. Stone Ave., 4'" Floor Tucson, AZ. 8571 I[ [C:::'l_''l["[~fcc'.

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

2018 Annual Inspection Report

2018 Annual Inspection Report 2018 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2019 Table of Contents Certification...

More information

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design

MEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: DRAFT Technical Memorandum: Levee Emergency Spillway Design MEMORANUM TNC Fisher Slough Final esign and Permitting Subject: RAFT Technical Memorandum: Levee Emergency Spillway esign To: From: Internal Memorandum For Record Yen Hsu Chen (Tetra Tech) avid Cline (Tetra

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

Modeling of Long Culverts and Stormdrains A Comparison of Different Methods

Modeling of Long Culverts and Stormdrains A Comparison of Different Methods Modeling of Long Culverts and Stormdrains A Comparison of Different Methods Shrinivas Kaulgud, P.E., CFM Cheryl Hannan, P.E., CFM, LEED AP October 12, 2017 Presentation Outline Introduction Case Studies

More information

Water surface slope extending up to 20 channel widths up and downstream of crossing.

Water surface slope extending up to 20 channel widths up and downstream of crossing. Site Evaluations Site Information Site Location: Mt ood NF, Forest Road 7 Year Installed: Pre-987 Lat/Long: 8 W Watershed rea (mi ): N Stream Slope (ft/ft) : Channel Type: Step-pool ankfull Width (ft):

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

D.B. Wilson Station CCR Landfill

D.B. Wilson Station CCR Landfill D.B. Wilson Station CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Closure and Post-closure Care Plan October 11, 2016 Prepared By: Project ID: 160030A Big

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Undeveloped Zoning Inventory February 2004

Undeveloped Zoning Inventory February 2004 Undeveloped Zoning Inventory February 2004 Prepared by Planning Department Undeveloped Zoning Inventory February 2004 Project Description: The Undeveloped Zoning Inventory (the Inventory) is a periodic

More information

Massachusetts Stream Crossing Case Studies

Massachusetts Stream Crossing Case Studies Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people

More information

Planning & Zoning Commission

Planning & Zoning Commission Preliminary Plat Westwood, Section 3 Planning & Zoning Commission Planning & Development Department March 21, 2016 Request Subdivide approximately 38.1 acres of previously unplatted property to create

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

UPPER BEACH REPLENISHMENT PROJECT RELATED

UPPER BEACH REPLENISHMENT PROJECT RELATED ASSESSMENT OF SAND VOLUME LOSS at the TOWNSHIP of UPPER BEACH REPLENISHMENT PROJECT RELATED to the LANDFALL OF HURRICANE SANDY - PURSUANT TO NJ-DR 4086 This assessment is in response to Hurricane Sandy

More information

Discussion on the Selection of the Recommended Fish Passage Design Discharge

Discussion on the Selection of the Recommended Fish Passage Design Discharge Discussion on the Selection of the Recommended Fish Passage Design Discharge Introduction The provision of fish passage is a requirement for most proposed culvert and bridge installations in Alberta, depending

More information

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA AUTHORS: Joe Richards, Environmental Science Associates Jane Atha, Washington Department of Fish & Wildlife Colin Thorne,

More information

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD FINAL ROUTE AND POND STUDY PROJECT NO. C-9570.10 Prepared for: Pasco County

More information

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for: Annual CCR Landfill Inspection Lansing Landfill Prepared for: Interstate Power and Light Company Lansing Generating Station 2320 Power Plant Drive Lansing, Iowa 52151 Prepared by: SCS ENGINEERS 2830 Dairy

More information