12-Month Anticipated Bid List

Size: px
Start display at page:

Download "12-Month Anticipated Bid List"

Transcription

1 12-Month Anticipated Bid List June 2018 to May 2019 Description Federal Construction Cost Range June 2018 CL (D) CN Grassy Creek Trail Emergency Culvert Replacement Project to replace existing culvert that is prone to cause upstream flooding and maintenance challenges CW (C) CN Missing Sidewalk: Moller Rd from 38th St to Moller Way Missing sidewalks on Moller Rd from 38th St to Moller Way $200,000 to $400,000 PA (D) CN Garfield Park MacAllister Amphitheater Renovation Tuck Point Exterior Bricks, Install Theater Lighting and Sound Systems < $150,000 PA (D) CN Basketball & Tennis Court Color Coating Color Coat, Crack Fill and Restripped Various Hardcourts throughout the System < $150,000 PA (C) CN Garfield Arts Center Lighting Install new lighting on the interior of the Garfield Arts Center and Corporate Shelter < $150,000 PA (G) CN Commons Park 204 East New York St. Site Development Construct new park with playground, swings, benches, grill, sidewalks, ping pong table and drinking fountain. < $150,000 RS (A) CN 2018 Resurfacing Program Resurfacing $10,000,000 Placeholder $750,000 to $1,500,000 TR (C) CN 40th/Meridian Signal New traffic signal and curb ramps for 40th and Meridian adjacent to Tarkington Park July 2018 CL (B) CN Culvert Replacement 7968 Rucker Rd WN1280 Culvert Replacement of asset WN1280 at Rucker Rd. This culvert is an outlet to a retention pond in Ivy Hills neighborhood. Culvert design is being coordinated with SD $200,000 to $400,000 CW (A) CN New Sidewalks along Lynhurst Dr and High School Rd New sidewalk installation and pedestrian bridge with related items. Project limits are Lynhurst Dr from Troy Ave to I 70 and High School Rd from Morris St to Rockville Rd. $250,000 to $500,000 ED (B) CN 16th and Monon Development Street infrastructure work adjacent to the Monon Trail from 17th St. to 21st St. The project is a collaboration between DMD and DPW and includes the widening of an alleyway, new sidewalk and ADA ramps and street resurfacing as well as additional stormwater infrastructure. LD (C) CN Little Eagle Creek Levee Segment LEC 04 Rehabilitation Component project of LD , FEMA Levee Certification Program Countywide. Feasibility studies and levee remediation construction for Little Eagle Creek Levee Segment LEC 04. $2,500,000 to $4,000,000 LD A(03) CN ILFPP Rehabilitation of Downtown Federal Levees Standard project design flood (1913) performance analyses of the Federal Indianapolis Local Flood Protection Project. Project is necessitated for the system to remain in the USACE Levee Rehabilitation and Inspection Program. Component of LD B. $750,000 to $1,500,000 PA (A) CN Perry Park Ice Arena Driveway Expansion Expand Zamboni Driveway Width and Gravel Nature Trail < $150,000 PA (D) CN Carroll Road & 42nd Street Park 2018 construction of drainage ditch through development fill to relieve flooding on upstream (southern) adjacent private property. This park was a Land Donation of 19.6 Acres from Neighborhood Group. Long term plan is for land to be a natural area. PA (C) CN Douglass Park Aquatic Mechanical Swimming Pool Infrastructure Replace Filters, Pumps, Chemical Systems & Electrical Fixtures $300,000 to $600,000 Post Date: 6/8/2018 ** The anticipated bid list is subject to change based on available funding and external agency requirements.** Page 1 of 6

2 PA (C) CN Broad Ripple Dog Park Improvements Renovate the dog park by adding play features from grant dollars, expand concrete plaza, install synthetic turf area, improve drainage, add wash station and shade shelter. PA (B) CN Eagle Creek Dog Park Gordon Gilmer Kiosk Donation Purchase and Install Donated Kiosk at Dog Park Entrance < $150,000 PA (C) CN Centennial & Groff Spray Pad Renovation Renovate/Replace Spray Pad, Add Walks, Shade Structures $300,000 to $600,000 PA (C) CN Windsor Village Spray Pad Renovation Renovate/Replace Spray Pad, Add Walks, Shade Structures and Close Filtration System SD (03) CN Upper Pogues Run Regional Detention Basin Proposed detention basin to serve as an outfall for the City of Lawrence. Would entail increasing size of I 465 pipe, purchasing land for detention and water quality measures, and possibly downstream channel improvements. $750,000 to $1,500,000 ST (C) CN Central Greens Development: Phase 4 Roadway extension Kirkbride Way from Steeples Blvd to Tibbs Rd; roadway extension Steeples Blvd to Vermont St. Construction of Ohio St & Handley St (Holladay Properties doing Design) $3,000,000 to $5,000,000 August 2018 CL (B) CN Small Structure Replacement, WR3176 at 4755 N. Michigan Rd. Small Structure Replacement of asset WR3176 an existing 6 0 span by 6 0 rise concrete box culvert structure with a 5 3 span by 5 3 rise HDPE Liner Solid Wall, SDR structure. PA (C) CN Lake Sullivan Skate Park Lighting Improve Lighting and Phase 2 Add Streetscape Skateboard Features & Bowl PA (C) CN Brookside Park Aquatics Replace Pool Amenities Slides, Water Play Features, Climbing Walls, Shade Structures and Site Furnishings PA (C) CN Garfield Park Aquatic Mechanical Swimming Pool Infrastructure Replace Filters, Pumps, Chemical Systems & Electrical Fixtures PA (B) CN Arsenal Park Spray Pad Renovations Renovate Spray Pad Concrete Deck, Walks, Pumps, Water Lines and Spray Features $250,000 to $500,000 RS (D) CN Crack Sealing in 2018 Quadrant 4 Southeast Quadrant Locations TBD RS (A) CN Keystone Crossing Dr from Woodfield Crossing to Sandy Point Dr Roadway reconstruction RS (B) CN Crack Sealing in 2018 Quadrant 1 Northwest Quadrant Locations TBD RS (B) CN Crack Sealing in 2018 Quadrant 2 Crack Sealing in the Northeast Quadrant Locations TBD Crack Sealing in 2018 Quadrant 3 RS (B) CN Southwest Quadrant Locations TBD ST (C) CN Market Street Streetscape from Alabama St to East St. Combine Artistry, Cummins and Flaherty Collins Streetscape designs into one set of bid documents September 2018 CW (B) CN Indy Access Curb Sidewalk and Ramps Quote No. 1 Spot repairs to improve pedestrian accessibility. Locations provided by Beverly Ramsey's recommendations from customer service. $100,000 to $200,000 Post Date: 6/8/2018 ** The anticipated bid list is subject to change based on available funding and external agency requirements.** Page 2 of 6

3 Description Federal Construction Cost Range Drainage improvements in 6 separate locations in SE Franklin Township originally planned in conjunction with BL A. SD (09) CN Southeast Franklin Township Drainage Improvements PHASE 1: includes Edgewood Avenue, Village Drive to Southeastern Avenue; Hickory Road and Indian Creek Road S; Acton Road, Virgil Road to McGregor Road; Acton Road and Maze Road intersection. PHASE 2: includes Wonderland Drive, Senour ST (B) CN Indianapolis Neighborhood Infrastructure Program Funding Placeholder Public Right of Way Infrastructure Grants to be awarded with local match funds from community based organizations. > $5,000,000 Massachusetts Avenue/Dearborn Street/21st Street Intersection ST (B) CN Geometric Revisions Improvements HSIP FY2019 TR (D) CN 10th Street & Camp Street Signal Installation New Ped Signal and assoicated improvements at 10th & Camp < $150,000 October 2018 CW (B) CN Indy Access Curb Sidewalk and Ramps Quote No. 2 Spot repairs to improve pedestrian accessibility. Locations recommended by Beverly Ramsey's recommendations from customer service. $100,000 to $200,000 CW (B) CN Indy Access Curb Sidewalk and Ramps Quote No. 3 Spot repairs to improve pedestrian accessibility. Locations provided by Beverly Ramsey's recommendations from customer service. $100,000 to $200,000 PA B(03) CN Central Canal Towpath from 16th St. to 29th St. CN/INS CSX abandon railroad line from 29th Street to 16th St. running along side of the Central Canal Towpath. $1,000,000 to $2,000,000 PA (C) CN NRPA Sandorf Playground Project NRPA Sponsored Project with Various Vendors Working with IPF $1,000,000 to $2,000,000 PA (C) CN ST (C) CN Pennsy Trail Ph 3B Post Road to German Church Road CN TAP FY 2019 Arlington Ave. and Edgewood Ave. Intersection CMAQ FY2019 This project consists of the extension of Pennsy Trail in Warren Township between Post Road and German Church Road on the old Pennsylvania RR line. The 2 mile extension will include a 12 wide asphalt multi use path, two railroad bridge rehabs at Morris Ditch and Grassy Creek, and pedestrian flashers at the Post Road, Mitthoeffer Road, and German Church Road The purpose for the project is to upgrade the level of service and improve intersection control while increasing intersection capacity with the construction of a roundabout intersection. The planned improvements will also improve the overall safety of the intersection. INDOT Contract #R TR (B) CN Washington Street and Hamilton Ave Intersection Installation of a new "Hawk" Pedestrian Traffic Signal TS (C) CN November 2018 Binford Blvd. from 38th Street to I 69 CN/INS HSIP FY 2019 The project includes a variety of vehicular and pedestrian safety improvements at approximately 16 intersections from 38th Street to 75th street. The improvements would vary by intersection but would generally consist of improved signage; refreshed pavement markings and improved channelization [new stop bars, lane markings, crosswalks, edge lines, center Cold Spring Road over Crooked Creek (1715F) and 38th Street EB over White BM (B) CN Bridge Rehabilitation River (1703F) BM (C) CN 38th Street over CSX Railroad STP FY 2019 Bridge Rehabilitation $3,000,000 to $5,000,000 BM (C) CN Lynhurst Drive over Mars Ditch (3002F) STP FY 2019 Bridge Rehabilitation BM (C) CN Pagoda Drive (Garfield Park) over Pleasant Run(3216L) STP FY 2019 Bridge Replacement RS (B) CN Pennsylvania Street Resurfacing from 12th Street to 25th Street Resurfacing from 12th Street to 25th Street ST (A) CN On Call Pot Hole Patching 2018 Locations to be Determined $100,000 to $200,000 December 2018 Post Date: 6/8/2018 ** The anticipated bid list is subject to change based on available funding and external agency requirements.** Page 3 of 6

4 TR (B) CN Meridian Street and St. Clair Street Pedestrian Improvements HSIP FY2019 Install new pedestrian crosswalk warning signs, flashing beacons, special warning signs, and upgrade pedestrian curb ramps and refuge areas at areas of high conflict between pedestrians and vehicular traffic TR (B) CN 16th Street and Alabama Street Pedestrian Improvements HSIP FY2019 Install new pedestrian crosswalk warning signs, flashing beacons, special warning signs, and upgrade pedestrian curb ramps and refuge areas at areas of high conflict between pedestrians and vehicular traffic TR (B) CN Michigan Street (E.) and Tecumseh Street Pedestrian Improvements HSIP FY2019 Install new pedestrian crosswalk warning signs, flashing beacons, special warning signs, and upgrade pedestrian curb ramps and refuge areas at areas of high conflict between pedestrians and vehicular traffic January 2019 CL (C) CN Culvert Replacement at 6724 Mimosa Lane Replacing existing culvert with larger culvert pipe that meets City design standards and reduces flooding upstream of Mimosa Ln. < $150,000 CW (C) CN 30 S. Meridian Brick Gutter Improvements Mitigation of ponding in gutters along either side of Meridian between Maryland and Washington Streets. (This is placeholder project until this brick spot repair is officially absorbed into the current downtown brick repair on call.) < $150,000 LD (H) CN Crooked Creek Watershed Flood Mitigation Evaluation, analyses and design of flood mitigation alternatives for the Crooked Creek Watershed within Indianapolis/Marion County. Design effort will focus on flood mitigation at Riverside Golf Course. $300,000 to $600,000 LD (A) CN Water Supply Pump Intake Associated with Indy North Levee (Placeholder for Funds Owed to CEG) Partnership project with CEG to provide water supply protection. CEG is managing the project, and DPW is reimbursing CEG up to $8,000, of cost. LD A(06) CN ILFPP Rehabilitation of Downtown Federal Levees Standard project design flood (1913) performance analyses of the Federal Indianapolis Local Flood Protection Project. Project is necessitated for the system to remain in the USACE Levee Rehabilitation and Inspection Program. Component of LD B. $1,000,000 to $2,000,000 SD (C) CN 5800 King Avenue Drainage Improvements This project will mitigate standing water at 5814 King Avenue and along 58th Street west of Michigan Road by installing hybrid ditches and connecting to the existing storm system at the intersection of 58th and Tremont Streets. SD E(03) CN Norwaldo Phase II Storm Water Improvement Project Section 4 Continuation of neighborhood drainage improvements in the Northdale Maple Lawn neighborhood. New drainage improvements, including standard storm sewers and permeable pavers with underdrain, and miscellaneous pavement improvements bounded by Kessler Boulevard to the north, Evanston Avenue to the east, 56th Street to the south, and $3,000,000 to $5,000,000 SD (C) CN 282 N. Holmes Avenue Drainage Improvements This project will drain a low area that holds water in the alley by 282 N. Holmes Avenue. < $150,000 SD (C) CN Misc. Drainage Improvements Franklin and Perry Twps. Drainage Improvements at 3 locations: Virgil, Winchester Village, and Victoria & Epler ST (B) CN Oliver Street Roadway Improvements from Harding Street to White River Roadway and Site Improvements > $5,000,000 ST (C) CN Pleasant Run Greenways Trail Enhancements TAP FY 2019 Trail enhancements. INDOT Contract # R $750,000 to $1,500,000 February 2019 BM (B) CN Monon Trail over Kessler Blvd Bridge repair due to vehicle on bridge < $150,000 BM (C) CN Dandy Trail over Big Eagle Creek STP FY 2019 Bridge Rehabilitation $3,000,000 to $5,000,000 BM (C) CN Morgantown Road over Pleasant Run STP FY 2020 Bridge Rehabilitation $750,000 to $1,500,000 CL (B) CN 6800 Lee Road Culvert Replacement Culvert Replacement of Asset FL2001 within the City of Lawrence Post Date: 6/8/2018 ** The anticipated bid list is subject to change based on available funding and external agency requirements.** Page 4 of 6

5 CL (B) CN 7739 Mendenhall Road Culvert Replacement Culvert Replacement of Asset WS3615 (Priority Tier 1, Sufficiency Rating 26.9) PA (C) CN Fall Creek Trail Rehabilitation from Keystone Ave. to 56th Street Repave trail low areas becoming overwhelmed by silt $1,000,000 to $2,000,000 SD (C) CN Ivy Hills Drainage Improvements 1) Dredging and expansion of Ivy Hills private pond and associated channel and storm improvements at Kilmer Ln, Susan Dr, Whittier Pl and Rucker Rd; Drainage Improvements on Graham Road at Attleboro Ct and Barnstable Ct. 2) Possible acquisition of recurring flooding property at 7727 Camelback Dr. SD (D) CN Upper Blue Creek Watershed Drainage Improvements by 75th & Hague Road Drainage infrastructure improvements to mitigate flooding in Castleton Farms, Scarborough Village and 75th Street that includes sidewalk, ADA ramps, and pedestrian intersection improvements. SD (B) CN 7019 Eastwick Lane Drainage Improvements (IPR 89) Project to mitigate flash flooding of cul de sac, putting homes at risk of flood damage < $150,000 SD B(08) CN 40th & Butler Ave. Neighborhood Drainage Improvements Neighborhood Drainage Improvements in Area 1: 38th to 42nd and Emerson to Hawthorne, and Area 2: 38th to 40th from Layman to Audobon $1,000,000 to $2,000,000 SD D(03) CN 21st & Butler Ave. Neighborhood Drainage Improvements 21st to 23rd and Emerson to Hawthorne $1,000,000 to $2,000,000 SD (C) CN City of Lawrence: Lawrence Trades District Drainage Improvements Drainage improvements for an industrial park within the City of Lawrence. Project includes improvements along Allen, Sellers and Hull Streets. $750,000 to $1,500,000 SD (C) CN Fleming and McCarty Drainage Improvements Mitigation of flooded streets and yards along Fleming Street between McCarty and Vandalia Avenue. (IPR 96) ST (C) CN Park Avenue Bike and Pedestrian Corridor TAP FY 2019 Park Ave. from 17th to 19th March 2019 BM (B) CN 79th Street over Fall Creek (0701F) Bridge Rehabilitation BM (B) CN 63rd Street over Indian Creek (1406F) Bridge Rehabilitation $200,000 to $400,000 BM (B) CN Georgetown Rd over Dry Run (1610F) Bridge Rehabilitation $250,000 to $500,000 BM (B) CN Oriental St over Pogues Run (2520L) Bridge Rehabilitation $200,000 to $400,000 BM (B) CN Edgewood over Little Buck (4105F) Bridge Rehabilitation $250,000 to $500,000 Misc. North Side Drainage Improvements (Knollwood, Brendon Forest Dr., SD (G) CN Various drainage improvements in Washington and Lawrence Townships < $150,000 75th & Brookview) TS (H) CN April 2019 Binford Blvd. from 38th Street to I 69 CN/INS HSIP FY 2019 The project includes a variety of vehicular and pedestrian safety improvements at approximately 16 intersections from 38th Street to 75th street. The improvements would vary by intersection but would generally consist of improved signage; refreshed pavement markings and improved channelization [new stop bars, lane markings, crosswalks, edge lines, center $3,000,000 to $5,000,000 BR (B) CN Fall Creek over Blue Creek (1304F) Bridge Replacement $300,000 to $600,000 Post Date: 6/8/2018 ** The anticipated bid list is subject to change based on available funding and external agency requirements.** Page 5 of 6

6 BR (B) CN Hanna over Dollar Hide (3612L) Bridge Replacement $300,000 to $600,000 PA (C) CN Andrew Ramsey Splash Pad Renovation Renovate Splash Pad with new amenities and mechanical components. $200,000 to $400,000 May 2019 CL (B) CN 9540 Fall Creek Road Culvert Replacement Culvert Replacement of Asset FL1966 (Priority Tier 1, Sufficiency Rating 20.0) $200,000 to $400,000 SD (C) CN 75th & Sargent Road Area Drainage Improvements Project to mitigate flooding, erosion and safety concerns along Sargent Road $750,000 to $1,500,000 SD (C) CN 2829 Westbrook Avenue Drainage Improvements Project to mitigate flooded alley between Westbrook Avenue and Denison Street in Mars Hill < $150,000 Post Date: 6/8/2018 ** The anticipated bid list is subject to change based on available funding and external agency requirements.** Page 6 of 6

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

CITY OF SOUTH DAYTONA

CITY OF SOUTH DAYTONA CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

F L E T C H E R A V E N U E

F L E T C H E R A V E N U E Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are

More information

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

Derby Street. Project Updates. Salem, Massachusetts

Derby Street. Project Updates. Salem, Massachusetts Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

2012 Capital Budget Capital Improvement Program

2012 Capital Budget Capital Improvement Program 2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

This chapter describes the proposed circulation system and transportation alternatives associated with

This chapter describes the proposed circulation system and transportation alternatives associated with 5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

CITY OF ROSEVILLE DESIGN STANDARDS

CITY OF ROSEVILLE DESIGN STANDARDS CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR

More information

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

FEASIBILITY STUDY MACARTHUR BOULEVARD

FEASIBILITY STUDY MACARTHUR BOULEVARD FEASIBILITY STUDY MACARTHUR BOULEVARD Wabash Avenue to South Grand Avenue Springfield, IL SANGAMON COUNTY TABLE OF CONTENTS 1.0 DESCRIPTION & PURPOSE AND NEED OF STUDY... 1 2.0 EXISTING CONDITIONS... 2

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek, INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements INCORPORATE FEATURE PAVIN IN CROSSWALK AND INTERSECTION FIELDS Identifies high-priority pedestrian areas and create a station identity through colorful and interesting patterns ADD CURB EXTENSIONS Extending

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M. WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm

More information

Enhancing Downtown

Enhancing Downtown Enhancing Downtown 2014-2015 Process Masterplan reviewed TIF scope, fund availability, and timing Conceptual cost estimate stage things may change with full engineering Sequencing Coordination with businesses

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Reams Road RCA Study. Board of County Commissioners Public Hearing

Reams Road RCA Study. Board of County Commissioners Public Hearing Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement

More information

Connectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail

Connectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail C1 Whitefish River - Kay Beller Park to BNSF Loop Extend the along the river between 2nd St and Railway St providing a key connection for multiple trail networks. Include a Bike Channel adjacent to stairs

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

City of North Mankato Parks Master Plan 2015 Citizen Input

City of North Mankato Parks Master Plan 2015 Citizen Input Date/Name What park do you visit most? Why? 1/23/15 Bluff and King Arthur 1/23/15 Reserve - It is the closest park to our house and the only park we have access to if we want to walk on a sidewalk/trail

More information

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Warsaw, Missouri Van Buren Street Preliminary Engineering Report

Warsaw, Missouri Van Buren Street Preliminary Engineering Report Warsaw, Missouri Van Buren Street Preliminary Engineering Report Prepared for: The City of Warsaw 181 Harrison Street Warsaw, MO 65355 (660) 438-5522 Prepared by Charles LePage, P.E. CFS Engineers 119

More information

Ocean Park Boulevard Green Street Project Community Workshop

Ocean Park Boulevard Green Street Project Community Workshop Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,

More information

West End Connectivity Master Plan

West End Connectivity Master Plan West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Applications for Funding

Applications for Funding Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library Presentation Format Project Goals and Overview Sidewalk

More information

5 th & Avon Community Brainstorm

5 th & Avon Community Brainstorm 5 th & Avon Community Brainstorm $ Projects 1. Toddler playground in Scottsville 2. Plantings/trees in front of jail and armory along Avon St. 3. Landscaping of Avon Extended from City limits to Mill Creek

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

Appendix B - Street Sections

Appendix B - Street Sections Appendix B - Street Sections 6TH STREET CORRIDOR PLAN STREET SECTIONS The street sections in Appendix B include recommended improvements to streets for North Glenwood. They include existing conditions

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Multi-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period

Multi-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period 2011 CITY CENTER MASTER PLAN UPDATE ADOPTED TRANSPORTATION ELEMENT PROJECT LIST FOR THE CBD, WATERFRONT, AND YORK, SEHOME, AND LETTERED STREETS NEIGHBORHOODS IMMEDIATELY ADJACENT TO CITY CENTER TRANSPORTATION

More information

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014 2014 Street and Utility Improvement Project Feasibility Report January 28, 2014 Public Informational Meeting 22 residents from 17 properties signed in Questions about construction (FAQs) Eyebrow cul-de-sac

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

RENTAL OF ATHLETIC FIELDS & AMENITIES See attached detailed policy and list of field classifications

RENTAL OF ATHLETIC FIELDS & AMENITIES See attached detailed policy and list of field classifications Description Classification A RENTAL OF ATHLETIC FIELDS & AMENITIES See attached detailed policy and list of field classifications 2018 Approved Per hour, per field (unless otherwise noted) Annual Administrative

More information

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility ADA Transition Plan FY19-FY28 Date: November 5, 2018 Prepared by: City Of Gainesville Department of Mobility 1.0 INTRODUCTION 1.1 BACKGROUND The federal statute known as the Americans with Disabilities

More information

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan 5 System Components Wakefield Street Photo Simulation showing Sharrows Introduction The Master Plan identifies various system components that, together, create a comprehensive greenway system. These components

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff

More information

City Avenue Projects

City Avenue Projects City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private

More information

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 Traffic Improvements Project Goals Widen roadway to construction two-way left turn lanes-greatly decreases congestion Ease access to & from

More information

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero. RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS

14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS 14 TH STREET TRANSPORTATION & STREETSCAPE DESIGN STUDY PLAN B PLAN B TRANSPORTATION & STREETSCAPE RECOMMENDATIONS 141 Symbols Recommendations - Southern End of 14th Street Study Area Streetscape Each icon

More information

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective Moving Together Conference Complete Streets from the MassDOT District 5 Perspective Timothy Kochan, Transportation Planner and Bicycle/ Pedestrian Coordinator District 5 Office Taunton S Overview of District

More information

Community Open House December 13, A project of the Green Infrastructure Center, supported by Skeo Solutions

Community Open House December 13, A project of the Green Infrastructure Center, supported by Skeo Solutions Community Open House December 13, 2011 A project of the Green Infrastructure Center, supported by Skeo Solutions Project Background The Green Infrastructure Center, Inc. (GIC) was formed in 2006 to help

More information

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT 1 Project Goals 1 Improved Safety: Lighting, Multi-Modal Circulation, Emergency Access, Tripping Hazards; Stormwater 4 Environmental Performance:

More information