MP Series Mechanical Pinch Valve (Open body) IOM Manual
|
|
- Duane Elijah Pearson
- 5 years ago
- Views:
Transcription
1 MP Series Mechanical Pinch Valve (Open bdy) IOM Manual (INSTALLATION, OPERATION, AND MAINTENANCE MANUAL) Weir Minerals India Plt N. 471/D-1, 3rd Main. IV Phase, Peenya Industrial Area Bangalre , India Phne : +91 (0) Fax : +91 (0) india.wmd@weirminerals.cm Website : Page 1
2 Frewrd Cngratulatins n yur purchase f the ISOGATE MP Series Mechanical Pinch Valve. This is a reliable equipment that ffers a lng peratinal life if yu fllw sme simple guidelines as described in this manual This manual is designed as a reference fr users f the ISOGATE MP Series Mechanical Pinch Valve t Outline prper installatin prcedures fr the valve Outline the principles and methds f peratin f the valve Describe hw t maintain and stre the valve If mre technical infrmatin is required, please feel free t cntact yur lcal Weir representative r the Weir factry in yur area. Safety Weir Minerals India Private Limited Plt N. 471/D-1, 3rd Main. IV Phase, Peenya Industrial Area Bangalre , India Phne : +91 (0) Fax : +91 (0) india.wmd@weirminerals.cm Website : The valve and assciated cmpnents invlve cmplex mving parts and devices. Take all necessary precautins t prevent harm t persns and/r equipment The prduct can be fitted with air r manual gear actuatrs. D nt put yur hands r fingers in the frame r the prt areas when the valve cycles. The valve sleeve is designed fr maximum perating pressures as listed. Limit perating pressure t prevent harm t persns and/r equipment Weir assumes n respnsibility r liability arising ut f the imprper use r applicatin f any prducts described herein. Dcument Revisin The infrmatin in this manual has been checked and is believed t be accurate and reliable. Hwever, specificatins are subject t change withut ntice. Weir assumes n respnsibility r liability fr the inaccuracies in r use f this manual. Revisin Level / Date f Publicatin / Principal Changes Revisin A / January 2013 / First Publicatin Operatinal Principle Descriptin This Mechanical Pinch valve is a packing less valve. All the sealing is dne by the elastmeric sleeves installed in the valve husing. These sleeves als frm the replaceable wear sectin fr the valve. Actuatin f the valve invlves bringing a pair f pinch bars utside the elastmeric sleeves t mve clser t shut ff the flw. This valve can be used fr bth ON-OFF & thrttling applicatins as well. Page 2
3 Table f Cntents Frewrd 2 Safety 2 Dcument Revisin 2 INTRODUCTION 4 Overview 4 Identificatin 4 INSTALLATION 5-11 Lcatin 5 Flanges 5 Blting 5 ANSI UNC Table 6 ANSI Metric Table 7 BS Table D 8 BS Table E 9 DIN PN10 Table 10 DIN P16 Table 11 OPERATION 12 Wrking Pressure 12 Thrttling 12 Clsure 12 MAINTENANCE Safety Cnsideratins 13 Lubricatin 13 Strage 13 Valve Remval 13 Sleeve Remval 14 Sleeve Replacement 14 DRAWINGS Assembly Open Bdy 1-5 Manual 15 Assembly Open Bdy 6-12 Manual (Gear Operated) 16 Assembly Open Bdy 1-12 Pneumatic 17 Open Bdy Dimensin Hand Wheel 18 Open Bdy Dimensin Bevel Gear 19 Open Bdy Dimensin Pneumatic Cylinder 20 Page 3
4 Intrductin Overview The ISOGATE MP Series Mechanical Pinch Valve cmprises f Cast metal Open bdy: Supprts/huses the actuating mechanism, pinching mechanism, and flexible pinch sleeve. Actuating mechanism: Manual hand wheel, bevel gear hand wheel, pneumatic cylinder, hydraulic cylinder r electric mtr gear that drives (actuates) the pinching mechanism. Pinching mechanism: Mechanical Bridge, pinch bars, tie rds and stem, which are driven by the actuating mechanism t squeeze (pinch) and relax the flexible pinch sleeve. Flexible pinch sleeve: Cntains the prcess fluid and is pinched by the pinching mechanism t allw thrttling r n/ff cntrl f the prcess fluid flw. Operating the actuating mechanism simultaneusly mves the upper and lwer mechanical pinch bars t pen and clse the valve. The valve has a fully unbstructed bre when pened and pinches shut at the sleeve center line when clsed. Identificatin The ISOGATE MP Series Mechanical Pinch Valve mdel number is made up f numbers and letters as fllws Size Valve Series Bdy Type Bdy Material Blt Pattern Sleeve Material Actuatr Optins Accessries 015 = 15 mm/1/2 020 = 20 mm/3/4 025 = 25 mm/1 032 = 32 mm/1 ¼ 040 = 40 mm / 1 ½ 050 = 50 mm / = 80 mm / = 100 mm / = 125 mm / = 150 mm / = 200 mm / = 250 mm / = 300 mm / = 350 mm / = 400 mm / = 450 mm / = 500 mm / 20 MP Mechanical Pinch Valve OB Open Bdy G = Cast Irn D = Ductile Irn W = WCB L= LCB D=LCC S = CF8M N = Hastally C M = Mnel X = Duplex Y = Super Duplex UNIT M = Metric U= UNC / Inch Drill Pattern D = BS10 Table D E = BS10 Table E H = BS10 Table H A = DIN PN 10 B = DIN PN 16 C = DIN PN25 S = ANSI # 150 T = ANSI # 300 Z = Special R = Natural Rubber B = Butyl L = Linard HD60 H = HNBR P =Neprene S = EPDM W = Hypaln V = Vitn U = PU Z = Special M = Manual Hand wheel G = Manual Gear A = Air DA C = Air Fail Clse O = Air Fail Open H =Hydraulic E = Electric B = Bare stem Z = Special X = Nne E= Epxy cated bdy L= 17-4PH Trim S =316 SS Trim O=Manual Override Z=Special X= Nne L=Prximity Limit Switch P= Pneumatic Psitiner E=Elec-Pneu Psitiner S=Single Cil Slenid Valve D=Duble Cil Slenid Valve C=Speed Cntrller A=Air Flw Regulatr F = Filter Regulatr Z=Specials 600 = 600 mm / 24 Example: 100MPOBGMSRMXX 100 mm ANSI Metric Flanged Manual Valve 015MPOBGUDPAXPA 15 mm ANSI UNC Pneumatic Valve with Pneumatic psitiner and AFR Page 4
5 Installatin Lcatin The MP Series Mechanical Pinch Valve may be installed int piping with the centerline and perating mechanism axes in any altitude angle, vertical r hrizntal. Additinal supprt shuld be prvided fr large size r heavy valves t minimize pipe line bending lads n valve frame and flanges. Flw thrugh the valve may be in either directin. The inside diameter f the mating piping shuld match the bre size f the valve. Flanges The valves use industry standard end flange blting patterns. Flanges mating t the ISOGATE MP Series Pinch Valve shuld be flat full faced. The flange can be serrated if required (eight 90º 1/16 deep ntches per inch) t help hld the pinch sleeve in psitin. If the mating flange is a slippery material such as PVC r rubber, a serrated metal gasket shuld be used between bth surfaces. If the mating flange is a fragile material such as PVC, a flange backing ring shuld be used. Blting The valve shuld be in the fully pen psitin during installatin. Flange blt/stud lengths are determined by valve bdy type and size (Refer Pages 6 t 11). Open bdy pinch valves are supplied with thrugh end flange blt hles. The minimum flange blt/stud length is the sum f the nut height, valve flange width, valve pinch sleeve width, pipeline flange thickness and backing ring thickness (if used). The blt/stud shuld nt extend beynd the valve flange t the pint f tuching the valve frame. Flange blts shuld be tightened in a star pattern. The first tightening pass shuld be t 1/2 f the trque value listed. The secnd tightening pass shuld be t the full trque value listed. If further tightening is required t seal, an additinal tightening pass shuld be made nt t exceed 1-1/2 times the value listed in the tables belw. Page 5
6 ANSI UNC CL.150 mm Valve Size Inch Valve Flange (Inch) Sleeve Flange (Inch) # f Blt Hles Blt Circle Diameter (Inch) Thread Size Open Bdy (Inch) Blt Trque /2-13 UNC /2-13UNC /2-13UNC /2-13UNC /2-13UNC /8-11UNC /8-11UNC /8-11UNC /4-10UNC /4-10UNC /4-10UNC /8-9UNC /8-9UNC UNC UNC /8 7UNC /8 7UNC /4 7UNC ft-lbs N-m Page 6
7 ANSI Metric CL.150 mm Valve Size Inch Valve Flange (mm) Sleeve Flange (mm) # f Blt Hles Blt Circle Diameter (mm) Thread Size Open Bdy (mm) Blt Trque M M M M M M M M M M M M M M M M M M ft-lbs (N-m) Page 7
8 BS Table D Valve Size Valve Flange Sleeve Flange mm Inch mm Inch mm Inch # f Blt Hles Blt Circle Diameter (Inch) mm Inch Thread Size Open Bdy (mm) Blt Trque M M M M M M M M M M M M M M M M M M Ft-lbs N-m Page 8
9 BS Table E Valve Size Valve Flange Sleeve Flange mm Inch mm Inch mm Inch # f Blt Hles Blt Circle Diameter mm Inch Thread Size Open Bdy (mm) Blt Trque M M M M M M M M M M M M M M M M M M Ft-lbs N-m Page 9
10 DIN PN10 Valve Size Valve Flange Sleeve Flange mm Inch mm Inch mm Inch # f Blt Hles Blt Circle Diameter mm Inch Thread Size Open Bdy (mm) Blt Trque ft-lbs N-m M M M M M M M M M M M M M M M M M M Page 10
11 DIN P16 Valve Size Valve Flange Sleeve Flange mm Inch mm Inch mm Inch # f Blt Hles Blt Circle Diameter mm Inch Thread Size Open Bdy (Inch) Blt Trque ft-lbs N-m M M M M M M M M M M M M M M M M M M Page 11
12 Operatin Wrking Pressure The maximum permitted line (wrking) pressure fr the MP Series Mechanical Pinch Valve depends n the size selected; refer the tables n page 18, 19 and 20. Standard MP Series Mechanical Pinch Valves are nt nrmally recmmended fr use in negative pressure (vacuum) cnditins. Please cntact yur nearest Weir Minerals representative fr further infrmatin. Thrttling The valve can be used fr bth n-ff and thrttling (flw cntrl) applicatins. Standard MP Series Mechanical Pinch Valves are nt nrmally recmmended fr high differential pressure r heavy duty thrttling applicatins. Please cntact yur Weir Minerals representative fr further infrmatin. Clsure Manually Open valves frm 1 t 5 emply a metal hand wheel. Manually Open valves frm 6 t 12 emply a trque reducing bevel gear with a metal hand wheel. Fr all manually perated MP Series valves, clckwise rtatin f the hand wheel clses the valve and cunter-clckwise rtatin pens the valve. Rtating the valve hand wheel mves the valve stem and pinches r relaxes the pinch sleeve. Fr valves with a hand wheel, nly the stem and hand wheel rise and fall as the valve is clsed and pened. Fr valves with a bevel gear assembly hand wheel, the stem, bridge and bevel gear assembly rise and fall as the valve is clsed and pened. The valve shuld be clsed firmly t the pint where all flw thrugh the valve is fully stpped. The valve shuld nt be ver-tightened, as damage t the mechanisms and/r pinch sleeve may ccur. Levers r extensins (cheaters) shuld never be used t assist in clsing the valve D nt emply sharp implements fr Redding r cleaning the pipe line in the event f a blckage, as this can result in damage t the valve pinch sleeve. (Nte: fig shwn belw is fr illustrative purpse nly) OPEN Full bre flw in either directin CLOSED N seat t clg r wear Page 12
13 Maintenance Safety Cnsideratins Assciated prcess equipment must be islated frm accidental start up r release f residual pressure. Prcess fluid/slurry must be drained frm the pipeline, prir t remval f valve frm pipeline. If heat is present sufficient time must be allwed t ensure that the valve, cmpnents and residual prcess fluid/slurry have cled t a safe wrking temperature It is recmmended that a safe methd f wrk is detailed fr the specific applicatin/task and a risk assessment carried ut prir t cmmencing wrk. The apprpriate Persnal Prtectin Equipment (PPE) shuld be wrn at all times Lubricatin The actuating and pinching mechanism threads shuld be lubricated with high quality lithium based grease (Mbil grease XHP-222 r equivalent) t ensure smth peratin. The grease shuld be applied directly t the threads. D nt allw grease t cntact the natural rubber pinch sleeve. Strage Prir t strage, thrughly drain and clean the valve. The valve and sleeve shuld be stred indrs, prtected frm temperature and humidity extremes and expsure t dust, debris, misture, vibratin and sunlight. In harsh envirnments the equipment shuld be cvered with a prtective tarpaulin that allws prper air circulatin. The sleeve shuld als be prtected frm heat, light, and expsure t zne. Stre valves with the actuatr in the up/pen psitin. D nt stre heavy bjects n the pinch sleeve. Fr strage perid greater than 36 mnths, please cntact Weir. Valve Remval If the valve sleeve has been cmprmised (wrn, split r hled) prcess fluid/slurry may splash ut frm the sleeve. Suitable precautins shuld be taken t ensure any hazards present frm this prcess fluid are taken int accunt and dealt with accrdingly. The valve must be fully remved frm the pipe line fr replacement f the pinch sleeve. Prcedure Set the valve t the fully pen psitin. Remve end flange t pipeline flange blts. Relieve pipe frces frm valve and remve valve frm the pipeline. Page 13
14 Maintenance Sleeve Remval Set the valve n a wrk bench r suitable wrk lcatin. Ensure that the valve is in the fully pen psitin. Open Bdy ½ 24 Remve the tw lwer half flange n either side by remving the fur flange blts. Remve the fur pening tab screws frm the upper and lwer pinch bars. Cntinue disassembly accrding t valve size as fllws. ½ 5 : Release the tie rds frm yke. Remve the lwer pinch bar and tie rds. Remve the ld valve sleeve by withdrawing thrugh the pening created : Remve the lwer pinch bar frm the tie rds. Remve the ld valve sleeve by withdrawing thrugh the pening created by remving the lwer pinch bar. Sleeve Replacement Select genuine Weir Minerals Linatex ISOGATE MP Series replacement pinch sleeve with the apprpriate material fr the prcess applicatin. Thrughly clean the frame, pinching and actuating mechanisms, and lubricate the threads (refer Lubricatin ) t ensure free peratin. Fllw the reverse f Sleeve Remval. There are n specific trque ratings fr the half flange blts r frame blts but they shuld be tightened firmly and evenly. Page 14
15 Drawings Assembly Open Bdy 1/2-5 Manual Item Descriptin 1 Stem pipe guard 2 Hand Wheel 3 Stem 4 Cap 5 Stem bush 6 Stem guard bellw 7 Yke 8 Tie rd 9 Tp plate 10 Side frame 11 Rubber sleeve 12 Lwer pinch 13 Upper pinch 14 Fastener 15 Half flange 16 Psitive pening tab screw Page 15
16 Drawings Assembly Open Bdy 6-12 Bevel Gear Item Descriptin 1 Bevel gear 2 Adaptr plate 3 Stem 4 Stem guard bellw 5 Yke 6 Tie rd 7 Tp Plate 8 Side frame 9 Rubber sleeve 10 Lwer pinch 11 Upper pinch 12 Fasteners 13 Half flange 14 Psitive pening tab screw Page 16
17 Drawings Assembly Open Bdy 1-12 Pneumatic Actuatr Item Descriptin 1 Air cylinder 2 Adaptr plate 3 Pneumatic stud 4 Stem guard bellw 5 Yke 6 Tie rd 7 Tp Plate 8 Side frame 9 Rubber sleeve 10 Lwer pinch 11 Upper pinch 12 Half flange 13 Fasteners 14 Psitive pening tab screw Page 17
18 Drawings Open Bdy Dimensin Hand Wheel Nminal Size (A) End t End (B) Height Max (C) Drp (D) Width (E) Dia (F) Overall Height (G) Max WP Weight steel mm in mm In mm in mm in mm In mm in mm in Kpa psi Kg lbs Page 18
19 Drawings Open Bdy Dimensin Bevel Gear Nminal End t End Height Overall Weight Drp (D) Width (E) Dia (G) Offset (F) Max WP Size (A) (B) Max (C) Height (H) (Steel) mm in mm in mm in mm in mm in Mm in mm in mm in Kpa psi Kg lbs Page 19
20 Drawings Open Bdy Dimensin Pneumatic Cylinder Nminal Size (A) End t End (B) Height Max (C)* Drp (D) Width (E) Overall Height (H)* Max WP Weight mm in mm in mm In mm in mm in mm in Kpa psi Kg lbs Steel * Heights H & C are indicative fr standard Duble acting Cylinders. In case f spring return actuatrs, these dimensins may increase. Page 20
Large Diameter TECTITE Installation and Specifications Manual
Large Diameter TECTITE Installatin and Specificatins Manual TECTITE fittings are a heat free methd fr jining Cpper, CPVC and PEX tube. TECTITE prvides a clean and easy jining methd designed t save time
More informationGema s OptiColor System
Gema s OptiClr System The Gema OptiClr system is a simple, lw cst quick clr change slutin fr manual gun users that have multiple hppers set up t spray varius clrs. The OptiClr Manifld allws the user t
More informationField Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work
Field Instructin 5.2 Ples Inspectin and Supprt Prir t Cmmencement f Wrk Purpse This instructin utlines the minimum inspectin and supprting requirements fr wrk n ples. Safety Befre cmmencement f wrk, a
More informationAPCF1 Model Tripod.
APCF1 Mdel Tripd www.ravellipht.cm Prduct Overview The Ravelli APCF1 is a Prfessinal Quality Carbn Fiber Tripd prviding a slid base fr high-end phtgraphic equipment. This mdel is a mix f carbn fiber and
More informationFume Hood User Guidelines
Fume Hd User Guidelines 1. Intrductin A fume hd cabinet is an enclsed wrking chamber fitted with an exhaust ventilatin system. The primary functin f the fume hd cabinet is t prtect individuals wrking with
More information2016 AWWA/WEA Spring Conference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016
2016 AWWA/WEA Spring Cnference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016 Gal Discuss in detail the art f actuatrs retrfits fr the Water/Wastewater market
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins 2. Specificatins and main dimensins 3. Parts included 4. Cntrl bx 5. Installatin 6. Adjusting the strke length f the lift 7. Operatin mdes
More informationTechnical Data Sheet DW1 Undercoats
Descriptin Wanda 8100 2K Primer ffers great filling and sanding prperties, excellent hld ut, fast dry, and gd adhesin n prperly prepared substrates. 4 Wanda 8100 2K Primer Wanda 2K Hardener Std 418.03093
More informationSponge-Jet Continuous VAC- Recovery System User Manual
Spnge-Jet Spnge Blasting System Spnge-Jet Cntinuus VAC- Recvery System User Manual Mdel CVR-P110 Headquarters/Manufactured By: Spnge-Jet, Inc. (USA) 14 Pattersn Lane, Newingtn, NH 03801 1-603-610-7950
More informationTechnical Data Sheet EW1 Top coats
Tp cats Descriptin Wanda PU 2K HS is a single layer Plyurethane tpcat which ffers gd pacity, high glss, quick dry and gd weather resistance. It is suitable fr repair r verall re-sprays. 4 Wanda PU 2K HS
More informationDown and Out Mount Assembly & Installation Directions
Dwn and Out Munt Assembly & Installatin Directins Munting the Dwn and Out Munt crrectly takes a lt f thught and a lt f planning. Please read the directins thrughly and plan ut hw the munt wuld be installed
More informationDivision of Training
Suthwest United Fire Districts Divisin f Training Minimum s Skills s Minimum s NFPA 1500 calls fr the establishment f an annual prficiency evaluatin fr all members f the department. These prficiencies
More informationURGENT MEDICAL DEVICE RECALL : /29/ C Z
Custmer Cde Number: ##### Custmer Address City, State, Zip Cuntry Attentin: Risk Management Attentin: Reference: URGENT MEDICAL DEVICE RECALL March 09, 2012 Risk Management, Operating Rm Directr, Operating
More information243 Service Regulators
Regulatr Installatin and Maintenance Instructins Service Regulatrs RM-06- Rev. Intrductin The is a large capacity general-purpse gas pressure regulatr. Its utstanding perfrmance and versatility make it
More informationPressure reducing valve. Type UZRB6
Pressure reducing valve type UZRB6 NS 6 up t21 MPa up t 30 DATA SHEET - OPERA RATION MANUA NUAL dm 3/min WK 424 770 03.2015 APPLICATION Pressure reducing valve fr subplate munting type UZRB6 is used t
More informationWabo Crete FlexFoam Armorless closed-cell joint seal and elastomeric concrete expansion joint system
Wab Crete FlexFam Armrless clsed-cell jint seal and elastmeric cncrete expansin jint system Features Benefits Unique Seal Prfile Designs High Perfrmance Jint Header Armrless Technlgy Versatile Mvement
More informationManagement: Shop Coordinator, Shop Supervisor and Fire Safety Staff
FACILITIES MANAGEMENT Ht Wrk Plicy fr Wrk Perfrmed By University Emplyees 03/13/18 - Last Revisin INTENT: The intended purpse f this Plicy is t prvide a safe wrk/learning envirnment in University buildings
More informationHow to Install a Toilet By See Jane DrillTM Copyright 2013, All Rights Reserved
Hw t Install a Tilet By See Jane DrillTM Cpyright 2013, All Rights Reserved Objective T learn hw t remve an existing tilet and install a new tilet. The steps described in these written instructins and
More informationWA270 Water Broom Important Safety Instructions Assembly Operation Maintenance Service Information
WA270 Water Brm Imprtant Safety Instructins Assembly Operatin Maintenance Service Infrmatin IMPORTANT SAFETY INSTRUCTIONS IMPROPER OPERATION OR MAINTENANCE OF THIS PRODUCT COULD RESULT IN SERIOUS INJURY
More informationOwner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013
Well Shut-in Practice - Attachment 1 Practice Owner: USA Divisin Safety Revisin N: 00 Date last revised: 01/14/2013 1.0 Applicability This practice applies t all Encana Oil & Gas (USA) Inc. (Encana) emplyees
More information175 knm Torque Tool and Calibration Unit
Client Lg: Tag N Pages 1 f 9 Prject Title Lcatin 175 knm Trque Tl and Calibratin Unit Depr P N NA 01 31.05.2012 Issued fr infrmatin T.L R.Ø. K.N Rev. N. Date Reasn fr Revisin Prepared Checked Apprved Vendr
More informationIMPORTANT SAFETY INFORMATION
Installatin Instructin English UNPACKING INSTRUCTIONS! Carefully pen the cartn, remve cntents and lay ut n cardbard r ther prtective surface t avid damage.! Check package cntents against the Supplied Parts
More informationVOLTMAX Design Specifications
VOLTMAX Design Specificatins Revisin 0 May 2017 The VOLTMAX line f electric bilers was develped t efficiently supply hydrnic heating systems in cmmercial, institutinal and industrial applicatins. The biler
More informationRev B Medivators Inc.
Site Requirements MEDIVATORS, RAPICIDE, and ADVANTAGE are registered trademarks f Medivatrs Inc. ADASPOR is a registered trademark f Medivatrs Inc. Windws is a registered trademark f Micrsft Crpratin.
More informationA Guide to Relocating Hazardous Materials
A Guide t Relcating Hazardus Materials Created: March 2001 Last revisin: March 2018 TABLE OF CONTENTS Intrductin Online Resurces 3 Helpful Cntact Infrmatin 3 Planning fr the Mve Wh t Ntify f the Mve 4
More informationBlack Brant Vb. Please read and understand all instructions before building!
Black Brant Vb The Black Brandt VB kit cntains all the parts necessary* t build a flying high pwer rcket: (1) Pre-sltted main airframe (1) Nse cne (3) Fins (1) Pistn ejectin kit: (1) Pistn tube (1) Sltted
More informationOPERATIONS CHALLENGE 2017
OPERATIONS CHALLENGE 2017 COLLECTION SYSTEM EVENT During the event, yur team will cmplete the fllwing: The event simulates cnnecting a 4-inch PVC lateral sewer t an existing 8-inch PVC sewer pipe while
More informationHydraulic accumulator cut-off and protection unit type B20
Hydraulic accumulatr cut-ff and prtectin unit type B20 NS20 up t 36 a D SHEE - OERION NUL WK 491 810 07.2016 LICION Hydraulic accumulatr prtectin and cut-ff unit is used fr cnnecting hydraulic accumulatr
More informationRESQ TRAINING INTERNATIONAL. Rev 0 - July 2012 USER INSTRUCTIONS. User Instructions for TED Training Emergency Dummy by RESQ-Gear.
TED Training Emergency Dummy RESQ TRAINING INTERNATIONAL Rev 0 - July 2012 USER INSTRUCTIONS User Instructins fr TED Training Emergency Dummy by RESQ-Gear.cm USER INSTRUCTIONS TED Training Emergency Dummy
More informationTYPE 1 BEARINGS. The spherical knuckle allows the bearing to self-align while the rudderstock rotates within the bearing.
TYPE 1 BEARINGS Designed t be fitted t bats up t 45 feet in length the TYPE 1 bearings feature a spherical Ertalyte knuckle fitted within a precisin machined aluminium husing. This results in a bearing
More informationSponge-Jet Media Recycler User Manual
Spnge-Jet Spnge Blasting System Spnge-Jet Media Recycler User Manual Mdel: 35P 35P-CE 50P 50P-CE Headquarters/Manufactured By: Spnge-Jet, Inc. (USA) 14 Pattersn Lane, Newingtn, NH 03801 1-603-610-7950
More informationConcept 305 P. Pre-installation Guide IMPORTANT!
Pre-installatin Guide Cncept 305 P IMPORTANT! Please fllw the instructins in this guide when preparing the installatin site prir t arrival and installatin f the equipment December 8th, 2017 Editin AA,
More informationPILOT OPERATED CHECK VALVE - Series VC4V
PILOT OPERTED CHECK VLVE - Series VCV Veljan Pilt Operated Check Valves VCV are with pilt cntrl fr hydraulic unlckg. These are sprg-laded pppet type valves. Muntg cnfiguratin f VCV are accrdg t Internatinal
More informationDocument Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE
Dcument Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE Dcument Number PO-WHS-03 Dcument Status Authr Manager Human Resurces August 2012 Apprving Authrity Management Cmmittee August 2012
More informationTechnical Documentation
Quality f the future. Technical Dcumentatin Manual Black Bx Light Order-N.: 0255-004 Sparkasse Pfrzheim Calw (BLZ 666 500 85) Kt.-Nr. 791326 UniCredit Bank AG Karlsruhe (BLZ 660 202 86) Kt.-Nr. 15653957
More informationCITY OF SACRAMENTO. Regulatory Compliance Program
CITY OF SACRAMENTO Regulatry Cmpliance Prgram Tpic: Ergnmics Prgram Effective Date: 05/19/09 Frm: T: Human Resurces Department Risk Management Divisin Department Directrs/Divisin Managers Supersedes: 03/03
More informationUCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD.
FORENSICS OPERATING MANUAL 1 2731 Bartram Rd Bristl, PA 19007 USA POSITIVE PRESSURE MANIFOLD POSITIVE PRESSURE MANIFOLD MANUAL POSITIVE PRESSURE EXTRACTION OPERATION INSTRION Thery f Operatin 2 The Psitive
More informationRESPIRATORY PROTECTION PROGRAM UW-GREEN BAY
UWGB Respiratry Plan RESPIRATORY PROTECTION PROGRAM UW-GREEN BAY Table f Cntents: I. Purpse II. III. IV. Prgram Administratin Wh Is Cvered Prgram Elements V. Designated Respnsibilities VI. Fit Test Prtcls
More informationSlim Down and Out Swivel Mount Assembly & Installation Directions
Slim Dwn and Out Swivel Munt Assembly & Installatin Directins Munting the Slim Dwn and Out Swivel Munt crrectly takes a lt f thught and a lt f planning. Please read the directins thrughly and plan ut hw
More informationMECHANICAL SEALS & DRY SEALS
Training Title MECHANICAL SEALS & DRY SEALS Training Duratin 5 days Training Venue and Dates REF ME01 Mechanical Seals & Dry Seals 5 24-28 April 16 $4,250 Dubai, UAE Training will be held at any f the
More informationRevision: 05/20/15. To provide procedures for the safe and effective use of technical rope rescue equipment during emergency operations.
Revisin: Fire Chief: Eric Thmpsn PURPOSE T prvide prcedures fr the safe and effective use f technical rpe rescue equipment during emergency peratins. POLICY This plicy is designed t prvide general guidelines
More informationInstalling the ACT D MAND KONTROLS Systems
Installing the ACT D MAND KONTROLS Systems Mdel C1-100-PF fr Standard Piping (Nn-recirculating) Pre-Fab Systems Installatins shall be in accrdance with the manufacturer s instructins per the requirements
More informationGALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature
Fire Chief Signature Date Effective: 01apr13 Revised: Page: 1 f 5 Purpse: T establish standards fr GFD peratins when facilitatings ice r water rescue incidents,including safety cnsideratins, respnsibility,
More informationPXY88. Reference & Maintenance Manual. PXY88 Series Linear Positioning Stages (PLG110, PLG160, PLG210) S E R I E S
PXY88 Series Linear Psitining Stages PXY88 S E R I E S Reference & Maintenance Manual (PLG110, PLG160, PLG210) Linear Psitining Rtary Psitining Mtin Cntrls Engineered Slutins 32114 Mallard Ave. PO Bx 409
More informationLab rotation on vacuum techniques and thermal imaging
Lab rtatin n vacuum techniques and thermal imaging Objectives Manually perate a high vacuum system thrugh pump dwn and vent rutines. Learn apprpriate vacuum system terminlgy rughing, backing, freline,
More informationInstructor Guide. Counter Sinking. Flush Riveting
Instructr Guide Cunter Sinking Flush Riveting Cunter Sinking Flush Riveting: Aircraft Skin Prtectin Sectin Time: 1.5 hurs Sectin Objectives: After listening t a lecture cvering the imprtance f preventing
More informationProcess Safety Management Program for Contractors
Page 1 f 7 Sect: 1.0 Purpse This sectin cntains requirements fr Ardent (Cntract Emplyer) and ur subcntractrs fr assisting ur clients in preventing r minimizing the cnsequences f catastrphic releases f
More informationStandard Operating Procedure
Standard Operating Prcedure Sectin 1 Lab Specific Infrmatin Cmpressed Gases Department: Cllege f Engineering Discvery Learning Labs Date SOP was written: 10/29/2018 Date SOP was apprved by PI/lab supervisr:
More informationInstructions for use. turbomax pro 24 E 28/2 E
nstructins fr use turbmax pr 4 E 8/ E GB Table f cntents; General infrmatin Table f cntents General infrmatin....................... Fr yur infrmatin........................... Key t symbls...............................
More informationInstallation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents
Installatin Manual fr VersaScreen Pr and VersaScreen IceBlaster Gutter Prtectin Prducts Table f Cntents VersaScreen/VersaScreen Pr Installatin p. 2-4 VersaScreen IceBlaster p. 5-7 IceBlaster RE p. 5-6
More informationEspa Pumps (UK) Ltd Riverside Avenue West Lawford, Manningtree Essex CO11 1UN
Espa Pumps (UK) Ltd 15-16 Riverside Avenue West Lawfrd, Manningtree Essex CO11 1UN Tel: (01206) 391291 / Fax: (01206) 391239 sales@espa.c.uk www.espa-pumps.c.uk HEALTH & SAFETY The main phases f the installatin
More informationSponge-Jet Feed Unit User Manual
Spnge-Jet Spnge Blasting System Spnge-Jet Feed Unit User Manual Mdels: 100-HP 100-HP-CE 100-HP-J 200-HP 200-HP-CE Headquarters/Manufactured By: Spnge-Jet, Inc. (USA) 14 Pattersn Lane, Newingtn, NH 03801
More informationDisinfection and decontamination
Revisin histry Versin Date issued Amendment Details 1.0 5 Dec 2013 All 2.0 1 Dec 2015 All Sectin(s) Details Refrmatted frm Appendix 3 f PLANTPLAN (V1.0 Nv 2011). Original dcument separated int tw Guidelines.
More informationGeneral Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems
General Industry Tlbx Talks Prviding Excellence in Regulatry Cmpliance Management Systems General Industry Tlbx Talks Table f Cntents Why Safety Meetings are Imprtant...- 3 - Guidelines fr Safety Training
More informationBall coupling FIRG / FIRG-Q
Ball cupling Page 1 REVISION STATUS Issuance/revisin date Revisin index dified pages 08/11/2016 0 -- Dcument issuance dificatin descriptin Ball cupling Page 2 Smmari WARNINGS... 3 INSTRUCTIONS FOR STORAGE
More informationMAINTENANCE, SERVICE & INSPECTION OF AIR RECEIVERS & COMPRESSORS
Dcument Ref: LHS2012/10 Revisin Date: 03/10/2012 Clane Business Park Clane, C. Kildare Ph: 045-868342 Fax: 045-861447 www.liftingandhandling.ie enquiries@liftingandhandling.ie MAINTENANCE, SERVICE & INSPECTION
More informationField Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.
Field Instructin 10.3 Specialised Insulated Plant fr Vegetatin Management Purpse This instructin utlines the minimum requirements and safe apprach distances (SADs) fr specialised insulated plant peratrs
More informationWinthrop University - Safety in the Chemistry Laboratory
Winthrp University - Safety in the Chemistry Labratry The Department f Chemistry, Physics, and Gelgy at Winthrp University makes every effrt t prvide a safe learning envirnment fr the chemistry student.
More informationLIGHTING & POWER UNIT TYPE LPU57
Title LIGHTING & POWER UNIT TYPE LPU57 USER MANUAL Dcument Number 40-374-12 Issue 03 03 DFCOM1 Added 2017.05.11 MC MC PC 02 Address and Lg Update 2017.03.23 CW CW PC 01 Original issue 2014.02.20 PC PC
More informationLARZEP, S.A. LARZEP AUSTRALIA PTY. LTD.
HYDRAULIC PULLERS MODELS: FU0500 - FU1000 - FU2000 - FU3000 - FU5000 COMPLETE FV0500-1000-2000-3000-5000 3 JAWS PULLER FX0500-1000-2000-3000-5000 2 JAWS PULLER FT0500-1000-2000-3000-5000 GROSS BEARING
More informationDescription: Model Number: Robinhood Canopy RHCVI9G
Descriptin: Mdel Number: Rbinhd Canpy RHCVI9G Overview Pre-Installatin Thank yu fr purchasing a quality Rbinhd rangehd. Rbinhd has a high standard f quality cntrl and every rangehd is tested and apprved
More informationMODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations:
INSTALLATION AND MAINTENANCE MANUAL Explsin Prf Lw Prfile Linear LED Light EPL-24-50LED Series MODELS 2 & 4 Versins SUITABLE FOR WET LOCATIONS in the fllwing lcatins r unclassified lcatins: Fr Use In:
More informationSponge-Jet B-VAC User Manual
Spnge-Jet Spnge Blasting System Spnge-Jet B-VAC User Manual Mdel: B-VAC Pr 3 Headquarters/Manufactured By: Spnge-Jet, Inc. (USA) 14 Pattersn Lane, Newingtn, NH 03801 1-603-610-7950 / www.spngejet.cm 2008
More informationExercise 2: Reviewing the Workplace Inspection Checklist (30 min) p
Exercise 2: Reviewing the Wrkplace Inspectin Checklist (30 min) p. 19-20 Part One: Behaviurs vs. Cnditins (15 min) Wrking individually: Think f 3 r 4 incidents that have ccurred r have the ptential t ccur
More informationImpact resistance of fiberboard shipping containers
T 801 m-94 SUGGESTED METHOD 1944 OFFICIAL STANDARD 1971 OFFICIAL TEST METHOD 1983 REVISED 1988 1994 TAPPI The infrmatin and data cntained in this dcument were prepared by a technical cmmittee f the Assciatin.
More informationNordson AP-300/600 Plasma Systems Operational Manual July 2017
Nrdsn AP-300/600 Plasma Systems Operatinal Manual July 2017 User s Manual Page 1 A. 2.1 System Start-up T start the system first check the fllwing: 1. The pump in the back is turned n and running 2. Check
More informationAUTOMATIC WATERING SYSTEMS
Page: 32 AUTOMATIC WATERING SYSTEMS Edstrm Flex Tube System The superir quality and versatility f the Edstrm Flex Tube System mean it can tackle almst any small-animal autmatic watering needs. Edstrm valves
More informationWORKSTATIONS mysite User Guide. mysite Workstation System User Guide
Wrkstatin System Issue 1 Page 1 f 6 Sectin 1 INTRODUCTION 1.1 Intrductin Precisin s wrkstatin system ffers a fresh lk in design, functinality and perfrmance, prviding a cmplete slutin fr any ffice. Fixed
More informationPrecautionary Statement ( )
Precautinary Statement (01-50-1506) Bimet Orthpedics, Inc. 01-50-1506 P.O. Bx 587 Date: 05/06 56 East Bell Drive Warsaw, Indiana 46581 USA Recmmendatins fr the Care and Handling Bimet Premier II Acetabular
More informationWarranty & Service Information Proprietary Notice: Limited Warranty: Service Support:
Operatins Manual PHI Management Inc. PO Bx 369 Prt Richey Flrida 34654 (813) 507-4429 Warranty & Service Infrmatin Prprietary Ntice: Infrmatin cntained in this dcument is cpyrighted by PHI MGMT, and may
More informationKennecott Utah Copper Corporation Safety and Health Standards
Revisin N. 3 07/2004 Page 1 f 5 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N.: 16.7 Scafflding 16.7.1 INTRODUCTION 16.7.1.1 The purpse f this standard is t define specific requirements
More informationGuidelines for Handling of Nuclear Gauges
Manitba STANDARD PROCEDURE INSTRUCTION Title Guidelines fr Handling f Nuclear Gauges Department Supersedes SPI Dated SPI 34-36 Effective Date Safety Health and Envirnment April 15, 2009 May 12, 2011 Guidelines
More informationAutoclear Superior 250
Nrth America Technical Data Sheet S1.05.22 Descriptin A tw cmpnent VOC cmpliant clearcat, designed fr use ver Autwave. Cnsisting f ne clearcat, ne dedicated hardener and three reducers, designed fr ptimum
More informationBaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full
BaseStatin 1000 Irrigatin Cntrller Keeping a Pnd r Cistern Full If yu have a pnd r a cistern that is fed frm an external water surce, yu can use a Baseline bisensr sil misture sensr with yur Baseline cntrller
More informationPA-65-x Multi-Range Air Differential Pressure Transmitter
Date f Issue: 06/01/2015 Page 1 f 5 PA-65-x Multi-Range Air Differential Pressure Transmitter Features: Benefits: Field selectable multi-ranges Field selectable multi-utput Simple 5 step set-up LCD Display
More informationStudent Name: Application for Employment-Based Field Practicum. DEPARTMENT of SOCIAL WORK
DEPARTMENT f SOCIAL WORK Student Name: Applicatin fr Emplyment-Based Field Practicum Directins: The field educatin prcess is a partnership invlving the scial wrk prgram, field educatin Prgram, scial wrk
More informationCONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE
CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE Are the emplyees r cntractrs wh wrk in yur facility expsed t cnfined space hazards? Have yu cnducted a thrugh assessment f yur facility
More informationEDS Instruction Manual
EDS Instructin Manual The EDS Ultra series: "...an ultra-lightweight, quick-change, and reliable drink system, frm a quality engineering cmpany... Audi Sprt's Allan McNish Prgressive Mtrsprt Ltd Unit 10a
More informationGEORGIA INSTITUTE OF TECHNOLOGY ENVIRONMENTAL HEALTH AND SAFETY FALL PROTECTION PROCEDURE
PURPOSE The purpse f this prcedure is t specify practices and training fr the safety f GEORGIA TECH emplyees while wrking n elevated surfaces and ladders. GEORGIA TECH emplyees wh wrk at heights f fur
More informationSPARC Match Rules v1.2
SPARC Match Rules v1.2 If an event chses t use nn-standard rules they will make the alteratins clear and publicly available prir t the event. Bt Lad In and Activatin: In arenas where rbt pwer up is pssible
More informationWinthrop University - Safety in the Chemistry Laboratory
Winthrp University - Safety in the Chemistry Labratry The Department f Chemistry, Physics, and Gelgy at Winthrp University makes every effrt t prvide a safe learning envirnment fr the chemistry student.
More informationHot Work Policy and Procedures
1.0 Plicy Statement The University f New Haven has develped a ht wrk plicy and prcedure in accrdance with Occupatinal Health and Safety Administratin (OSHA) regulatins. 1.1 Purpse The University f New
More informationTHE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL
THE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL Intrductin Implementing an effective disciplinary prcess is an imprtant factr fr all frmats f ftball, helping t establish a quality,
More informationNote: Other Divisions (ex: Research Operations) may have additional or more stringent requirements in addition to this procedure.
Regulatin: Reference: Title: Hazardus Materials Spill Respnse Plicy Plicy Number: Effective Date: Next Review Date: 75.27 August 2012 March 2018 Prcedure Statement: This plicy will cver the accidental
More informationAutoclear Superior Pack
Descriptin A 2 Pack versin f Autclear Superir 250, designed fr use ver Autwave. Cnsisting f tw clearcats and ne dedicated hardener. cvers all sizes f repairs, under all applicatin cnditins, cmbined with
More informationSAFETY MANAGEMENT SYSTEM
1. PURPOSE This prgram cvers the requirements assciated with the selectin, maintenance, training and use f Persnal Prtective Equipment (PPE) used t prtect individuals frm actual r ptential safety and health
More informationEarly Learning Centre Child-Safe Environment Policy
Early Learning Centre Child-Safe Envirnment Plicy Natinal Quality Standard Related Standards/Regulatins Standard 2.2 Safety Element 2.2.1 Supervisin: At all times, reasnable precautins and adequate supervisin
More informationSafety Folder Quick Start Guide
Safety Flder Quick Start Guide Intrductin Hw Hw Where t Safety Management Systems t get started the system will help yu cmply with the law and hw t get help Safety Flder Intrductin t Safety Management
More informationPULSAR ZERO Flow sensitive Unloader valve
Ultim aggirnament: 20/04/18 PULSAR ZERO Flw sensitive Unlader valve Technical manual: E 267 Pressure regulating valve unlader type with zer setting n delivery line: at gun clsure the water flw is bypassed
More informationMECHANICS & TECHNIQUES 3PO
MECHANICS & TECHNIQUES 3PO FIBA Main Cmpetitins Summer 2014 2 This material includes mre practical apprach and detailed techniques fr sme key situatins n the curt and it is based n FIBA Referees Manual
More informationCantilever Beam Bending of Soft Tissue
Cantilever Beam Bending f Sft Tissue Intrductin Cantilever beam bending is a methd used t determine the mechanical prperties f a material. It is used because it is relatively inexpensive t perfrm and gives
More informationXR Pressure Regulators
Cat.N.C1-5 XR63 64 65 Pressure Regulatrs OUTLINE This is a pressure regulatr develped fr semicnductr prcess cntrl. Dust ccurrence and measuring fluid stagnancy are effectively prevented, assuring high
More informationCPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field
COLORS Object: Successfully run yur chice f ne f the tw ver-lapping mini-agility curses n the same field Scring: All bstacles must be perfrmed successfully t qualify unless within the faults allwed Levels
More informationLivermore Harley Owners Group RIDING WITH LIVERMORE HOG
Livermre Harley Owners Grup RIDING WITH LIVERMORE HOG 2010 Riding with Livermre HOG Table f Cntents Page 1 Welcme Page 2 Ride Planning Page 2 Rad Captains Page 2 Grup Ride Basics Page 3 Grup Riding Prcedures
More informationPRODUCT DATA SHEET. SP550 Spray 1. USES: 2. KEY BENEFITS: DATE: MARCH 2014 COMPANY DETAILS
PRODUCT DATA SHEET SP550 Spray DATE: MARCH 2014 COMPANY DETAILS Cmpany Name: Rubberbnd SA 1. USES: Rubar SP550 Spray is a dual cmpnent instant-set prduct designed and manufactured fr waterprfing and surface
More informationAmerican Association of State Highway and Transportation Officials
American Assciatin f State Highway and Transprtatin Officials Seven (7) Page Frm An Applicatin frm the State Highway r Transprtatin Department f Oklahma fr (select ne f the fllwing): Eliminatin f a U.S.
More informationLab Pilot Fermenter Type LP351, 75 Liters OPERATING INSTRUCTIONS
Lab Pilt Fermenter Type LP351, 75 Liters OPERATING INSTRUCTIONS Befre yu start... 1. Autclave antifam and base slutin (in glass bttles) alng with three feeder tubing lines with hypdermic needles attached
More informationRecreational Sports Racquetball Rules
Recreatinal Sprts Racquetball Rules Mdificatins have been made t suit BYU-Idah Recreatinal Sprts prgrams. Rule 1: Players Racquetball is an individual sprt, as such each team shall cnsist f ne (1) player.
More informationHigh Stick causing medical attention will result in an automatic 5 minute major and a game
The Tulsa Adult Hckey League is sanctined by the United Hckey Unin and fllws all USA Hckey rules. Belw is a link t the USA Hckey rule bk. All players MUST be registered with United Hckey Unin fr the current
More informationExposure Control Plan
Expsure Cntrl Plan Expsure t Hydrgen Sulphide (H 2 S) during Manure Handling Operatins Emplyer Cmpany Infrmatin Name Address Cntact infrmatin (names and phne numbers) Purpse We have a duty t prtect ur
More information