Contracts Subjects to Prior Review (US$)

Size: px
Start display at page:

Download "Contracts Subjects to Prior Review (US$)"

Transcription

1 re Authorized Expenditure Category Goods Works Services (including training) Value Threshold (US$) Procurement ICB NCB s Subjects Prior Review (US$) All ICB contracts First 2 NCB contracts <00,000 Shopping First Shopping contract NA DC All DC contracts ICB NCB All ICB contracts First 2 NCB contracts <00,000 Shopping First Shopping contract NA DC All DC contracts >=200,000 QCBS/QBS/LCS/FBS a/ b/ <200,000 CQS >=00,000 for firms; all SSS contracts; all TORs NA [Country] [Project Name] THRESHOLDS FOR PROCUREMENT METHODS AND BANK PRIOR REVIEW SSS NA IC >=50,000 for individuals; all SSS contracts; all TORs Notes: a/ Shortlist may compose entirely of national consultants for assignments of less than US$00,000 equivalent per contract. b/ As appropriate, these methods may be adopted for assignments costing less than $200,000. ICB International Competitive Bidding NCB National Competitive Bidding DC Direct ing QCBS Quality and Cost Based Selection QBS Quality Based Selection LCS Least Cost Selection FBS Fixed Budget Selection CQS Selection Based on s Qualifications SSS Single Source Selection IC Individual s

2 THE KYRGYZ REPUBLIC SECOND ON-FARM IRRIGATION PROJECT ADITIONAL FINANCING (OIP2 AF) PROCUREMENT PLAN - GOODS AND WORKS for aditional Financing ( PP: ; Update No. ; WB NOL: ) (Date ПЗ: ; Updating ; approval ВБ: ) Item Reference as per PAD Ref. Description Plan/Actual Procu. Draft BD WB No-objection Invitation WB BD Bids Bid Opening Bid Award Обзор Бнк Конкурс. Вскрытие ВБ ВБ Оценочный Подписние Звершение Контркт Описние Плн/фкт (предврит./п документ н Объявление конкурсных н присуждение Пункт Тблице зкупок н конкурс. док. отчет Документ об оследующ.) рссмотрение ВБ зявок Оценке Goods # OIP2AF/IDA/ICB/G/0-2 Procurement of 20 Small Wheeled Plan/Плн ICB Prior 23-Nov-2 7-Dec-2 4-Dec-2 25-Jan-3 26-Mar-3 9-Apr-3 23-Apr-3 20-Oct-3 Excavars (not tracr-mounted type) # OIP2AF/IDA/ICB/G/02 Procurement of the office equipment for RSU Plan/Плн ICB Prior 7-Dec-2 3-Dec-2 7-Jan-3 8-Feb-3 9-Apr-3 3-May-3 7-May-3 5-Aug-3 2 #2 2AF/IDA/G/DC/water Procurement of water metering devices 3 Plan/Плн DC Prior n/a n/a n/a n/a 22-Nov-2 6-Dec-2 20-Dec-2 20-Feb-3 metering devices 02/2 Примечния 4 #2 2AF/IDA/G/S/office & filed equipments 0/2 Office Equipment for oblast design teams (computer, field equipment) Plan/Плн Shopping Post n/a n/a 6-Jul-2 30-Jul-2 3-Aug-2 n/a 20-Aug-2 30-Sep-2 Shopping Post n/a n/a 24-Apr-2 6-Aug-2 7-Aug-2 n/a 4-Aug-2 4-Oct-2 Sinobase Ltd. 5 #2 2AF/IDA/G/S/procurement vehicle 0/2, Lot Vehicle for oblast design teams Plan/Плн Shopping Post n/a n/a -Jul-2 25-Jul-2 8-Aug-2 n/a 5-Aug-2 30-Sep-2 Shopping Post n/a n/a 20/07/2 03/08/2 08/08/2 n/a 05/08/2 20/08/2 ABM-Av.Ltd 6 # 2AF/IDA/G/S/procurement of vehicles 0/2, Lot 2 Vehicle for PIU Plan/Плн Shopping Post n/a n/a 3-Oct-3 27-Oct-3 0-Nov-3 n/a 7-Nov-3 6-Jan-4 Shopping Post n/a n/a 20/07/2 03/08/2 08/08/2 n/a 05/08/2 20/08/2 Asia Mors Ltd. 7 # 2AF/IDA/G/S/procurement of field equipment 03/3 Procurement of Field equipment (geodatic levels) for WUA Support Units Plan/Плн Shopping Post n/a n/a 0-Dec-2 24-Dec-2 7-Jan-3 n/a 4-Jan-3 5-Mar-3 8 # OIP2AF/IDA/ICB/NCS/03 Digital mapping #2 OIP2AF/NCB-0 Rehabilitation of on-farm irrigation net in "Uch-korgon-Isfairam" #2 Rehabilitation of on-farm irrigation net in WUA (in 8 WUAs) Plan/Плн ICB Prior 8-Nov-2 2-Dec-2 9-Dec-2 20-Jan-3 2-Mar-3 4-Apr-3 8-Apr-3 5-Oct-3 Works Plan/Плн NCB Prior 9-Dec-2 2-Jan-3 9-Jan-3 8-Feb-3 25-Mar-3 8-Apr-3 22-Apr-3 22-Apr-5 Plan/Плн NCB Post 4-Sep-2 8-Sep-2 25-Sep-2 6-Nov-2 5-Jan-3 9-Jan-3 2-Feb-3 2-Feb-5 Excavars will be procured gether witn Basic project (Second On-Farm Irrigation project)

3 Item Пункт Тблице Reference as per PAD Документ об Оценке Ref. Description Plan vs Actual Firm or Ind. Контркт Описние Плн и Фкт 2AF- CS/Ind/SSS/0 THE KYRGYZ REPUBLIC SECOND ON-FARM IRRIGATION PROJECT ADITIONAL FINANCING (OIP2 AF) PROCUREMENT PLAN - Consulting Services for aditional Financing THE PLAN OF CONSULTING SERVICES PURCHASE IN ACCORDANCE WITH SQS, SSS AND IND. METHOD ( PP: ; Update No. ; WB NOL: ) (Date ПЗ: ; Updating ; approval ВБ: ) International on Asset Management (from Mar 202 May 205) Фирм или Индивидул отбор Draft TOR Обзор Бнк (предврит./п ТЗ оследующ.) TOR ВБ Зпрос н вырж. зинт report for Short list & Issued / Short (for CQS) list Оцен. отчет по крткому ВБ н списку и и крткий список Срок подчи предложени й финльного Draft ВБ н Подписние Звершение Примечни финльный контркт я Planned/Плн Ind SSS Prior 27-May-2 3-Jun-2 n/a n/a n/a n/a n/a 0-Jun-2 24-Jun-2 -Jul-2 3-Jan-5 Ind SSS Prior 25-Jun-2 6-Jul-2 n/a n/a n/a n/a n/a 27-Jun-2 6-Jul-2 6-Jul-2 30-Nov-2 Консультнт Mr. Alan Beadle 2 2AF- CS/Ind/SSS/02-03 National on Asset Management (from Mar 202 May 205) Planned/Плн Ind SSS Prior 5-Jun-2 22-Jun-2 n/a n/a n/a n/a n/a 29-Jun-2 3-Jul-2 20-Jul-2 3-Jan-5 Ind SSS Prior 9-Jul-2 9-Jul-2 n/a n/a n/a n/a n/a 9-Jul-2 9-Jul-2 23-Jul-2 23-Mar-3 Mr. Segizbaev O AF- CS/Ind/0-2 PIU Oblast Design Teams. Three (3) Design Engineers for North Region Planned/Плн Ind SSS Prior 20-Apr-2 27-Apr-2 n/a n/a n/a n/a n/a 5-May-2 30-May-2 -Jun-2 3-Jan-5 Ind SSS Prior 5-Apr-2 7-May-2 n/a n/a n/a n/a n/a 9-Jun-2 6-Jul-2 9-Jul-2 9-Jul-3.Bekboev U. 2.Samsaliev K. 3.Abdygaziev M AF- CS/Ind/ AF- CS/Ind/3-30 PIU Oblast Design Teams. Six (6) Design engineers for South Region PIU Field Supervision engineers (7 persons) Planned/Плн Ind IC Post 20-Apr-2 27-Apr-2 4-May-2 25-May-2 n/a n/a n/a n/a n/a -Jun-2 3-Jan-5 Ind IC Post 5-Apr-2 7-May-2 25-Jan-2 25-Apr-2 n/a n/a n/a n/a n/a 30-Apr-2 -May-3 Planned/Плн Ind Ind/SSS Prior/Post* 3-Feb-3 0-Feb-3 7-Feb-3 0-Mar-3 n/a n/a n/a n/a n/a 7-Mar-3 3-Dec-5. Anipaev K. 2.Jeenaliev K. 3.Karpova L. 4.Bekboev J. 5.Manasov T. 6 T hb R 7 3 2AF- CS/Ind/3-43 PIU Staff (current) Planned/Плн Ind SSS Prior/Post 26-May-3 2-Jun-3 n/a n/a n/a n/a n/a 9-Jun-3 23-Jun-3 30-Jun-3 3-May AF- CS/Ind/44 Environment speciast Planned/Плн Ind SSS Prior 27-May-3 3-Jun-3 n/a n/a n/a n/a n/a 0-Jun-3 24-Jun-3 -Jul-3 3-Jan AF- CS/Ind/45 PIU WUA Support Fund Manager Planned/Плн Ind IC Post 7-Jan-3 2-Jan-3 23-Jan-3 3-Feb-3 n/a 20-Feb-3 6-Mar-3 3-Mar-3 n/a 20-Mar-3 3-Dec-4 0 Table2 3 2AF- CS/Ind/46 Procurement specialist assistant Planned/Плн Ind Ind Post 9-Apr-2 23-Apr-2 30-Apr-2 4-May-2 n/a n/a n/a n/a n/a 20-Jun-2 30-Oct-3 Ind Ind Post 2-Apr-2 23-Apr-2 6-May-2 -Jun-2 n/a n/a n/a n/a n/a 2-Jun-2 2-Jun-3 Umetaliev A. 3 2AF/CS/Ind/47 Local Lawer Planned/Плн Ind Ind Post 7-Jun-2 -Jul-2 8-Jul-2 22-Jul-2 n/a n/a n/a n/a n/a 0-Aug-2 0-Aug-3 Ind Ind Post 2-Jul-2 2-Jul-2 8-Jul-2 20-Aug-2 n/a n/a n/a n/a n/a -Oct-2 2-Oct-2 Orozbaev Ibraim 2 Table3 3 2AF- CS/CQ/03 End-of-project survey Planned/Плн Firm CQS Post 2-Jun-5 5-Jul-5 7-Jul-5 28-Jul-5 n/a 4-Aug-5 8-Aug-5 25-Aug-5 n/a -Sep-5 -Jan-6 3 Table3 3 2AF/CS/Ind/48 Social Specialist Planned/Плн Ind IC Post 25-Jul-2 8-Aug-2 n/a n/a n/a n/a n/a n/a n/a 5-Sep-2 5-Sep-3 Ind IC Post 3-Aug-2 4-Aug-2 7-Sep-2 5-Oct-2 n/a n/a n/a n/a n/a 23-Oct-2 23-Oct-3 Soltanalieva Venera 4 Table3 2 2AF/CS/SSS/49 Engineer-expert on lisence expertise Planned/Плн Ind SSS Prior 0-Oct-2 24-Oct-2 n/a n/a n/a n/a n/a 0-Oct-2 24-Oct-2 26-Oct-2 26-Oct-3 5 Table3 3 2AF/CS/SSS/50 Local Economy Specialist Planned/Плн Ind SSS Prior 0-Oct-2 24-Oct-2 n/a n/a n/a n/a n/a 0-Oct-2 24-Oct-2 30-Oct-2 30-Nov-3 6 Table3 3 2AF/CS/SSS/5 International on Gender Issues Planned/Плн Ind SSS Prior 26-Oct-2 9-Nov-2 n/a n/a n/a n/a n/a 26-Oct-2 9-Nov-2 6-Nov-2 0-Dec-2 Ind SSS Prior 23-Oct-2 2-Nov-2 n/a n/a n/a n/a n/a 6-Nov-2 2-Nov-2 26-Nov-2 30-Dec-2 Rustamova Sabina 7 Table3 3 2AF/CS/SSS/52 International Specialist on environmental and safeguard aspects Planned/Плн Ind SSS Prior 26-Oct-2 9-Nov-2 n/a n/a n/a n/a n/a 26-Oct-2 9-Nov-2 6-Nov-2 0-Dec-2 8 Table3 3 2AF/CS/Ind/53 Public Relation Specialist Planned/Плн Ind IC Post 5-Dec-2 29-Dec-2 5-Jan-3 26-Jan-3 n/a n/a n/a n/a n/a 2-Feb-3 3-Jan Table3 Table3 2AF- WUA AF Impact Planned/Плн Firm CQS Post 2-Jun-4 5-Jul-4 7-Jul-4 28-Jul-4 n/a 4-Aug-4 8-Aug-4 25-Aug-4 n/a -Sep-4 -Jan-5 CS/CQ/04 Study Continuation of the Planned/Плн Ind SSS Prior 5-Mar-3 9-Mar-3 n/a n/a n/a n/a n/a 26-Mar-3 9-Apr-3 6-Apr-3 6-Oct-3 demonstration plots as financed 2AF/CS/SSS/54 under the WMIP * SSS available only those persons who have worked for original project and their prfomance was rated satisfacry

4 Item Пункт Cost Table Тблице Reference as per PAD Документу об Оценке Table3 3 Ref. Description Plan vs Actual Контркт OIP2AF/IDA/ CS/LCS/0 Описние Project Audit Плн и Фкт Обзор Бнк (предврит./ отбор последующ.) THE KYRGYZ REPUBLIC Second on-farm Irrigation Prpject Additional Financing PROCUREMENT PLAN - CONSULTANTS QCBS ( PP: ; Update No. ; WB NOL: ) (Date ПЗ: ; Updating ; approval ВБ: ) Зпрос н вырж. зинт Draft (incl. TOR, Short List) (full package) Бнк н вкл полный ТЗ и КС пкет Issued Tech. (TER) TER Срок подчи Технически й предложени оценочный ВБ н ТО й отчет (ТО) Combined Tech & Fin Eval. Комбин. оцен. отчет финльного Draft е Бнк н контркт Подписн ие Planned/Плн LCS Prior 29/2/ 04/0/5 /0/5 8/0/5 08/02/5 22/02/5 0/03/5 n/a 5/03/5 22/03/5 29/03/5 29/05/5 Звершени е Примечния Planned

5 SECOND ON-FARM IRRIGATION PROJECT ADITIONAL FINANCING (OIP2 AF) PROCUREMENT PLAN -Training category ( PP: ; Update No. ; WB NOL: ) (Date ПЗ: ; Updating ; approval ВБ: ) Item Пункт Тблице Reference as per PAD Документ об Оценке Ref. Контркт Description Описние Plan vs Actual Плн и Фкт Firm or Ind. Фирм или Индив идул отбор WB Review (Prior/ Post) Draft TOR TOR Обзор Бнк (предври ТЗ е ВБ т./послед ующ.) Зпрос н вырж. зинт report for Short list & Оцен. отчет по крткому списку и / Short list е ВБ н и крткий список Issued (for CQS) Срок подчи предложени й финльног о Draft е ВБ н финльн ый контркт Подписн ие Звершени Примечн е ия n/a 2 n/a Training on modernisation of hydraulic facilities Training on engineering issues 3 n/a field trainings 4 n/a International Trainings 5 n/a 6 n/a 6 n/a 20 2AF/Tr/S SS/0 knowledge exchange between experts and WUA representatives in the South region knowledge exchange between experts and WUA representatives in the North region 7 (seven) oblast seminars with WUA representatives Continuation of the demonstration plots as financed under the WMIP Planned/Плн n/a n/a Post n/a n/a n/a n/a n/a n/a n/a n/a n/a 07/07/3 n/a Planned/Плн n/a n/a Post n/a n/a n/a n/a n/a n/a n/a n/a n/a 0/09/3 n/a Planned/Плн n/a n/a Post n/a n/a n/a n/a n/a n/a n/a n/a n/a 5/0/3 n/a Planned/Плн n/a n/a Post n/a n/a n/a n/a n/a n/a n/a n/a n/a 0/07/3 n/a Planned/Плн n/a n/a Post n/a n/a n/a n/a n/a n/a n/a n/a n/a 0/07/3 30/07/3 Planned/Плн n/a n/a Post n/a n/a n/a n/a n/a n/a n/a n/a n/a 0/08/3 3/08/3 Planned/Плн n/a n/a Post n/a n/a n/a n/a n/a n/a n/a n/a n/a 0/05/3 3/05/3 Planned/Плн firm SSS Prior 5-Mar-3 9-Mar-3 n/a n/a n/a n/a n/a 26-Mar-3 9-Apr-3 6-Apr-3 6-Oct-3 Grant agreement Allocated ed

Kyrgyzstan Agricultural Productivity Assistance Project

Kyrgyzstan Agricultural Productivity Assistance Project re Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Item Ref. Description Пункта GOODS/ТОВАРЫ Plan vs Actual Контракта Описание контракта План и Факт 1

More information

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Expenditure Category Goods Works Consultant Services (including training) Value Threshold (US$)

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Goods. Works

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Goods. Works re Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Expenditure Category Notes: Goods Works Consultant Services THE KYRGYZ REPUBLIC PROCUREMENT PLAN - for

More information

Total planned cost under the Grant USD 19,8 mln.

Total planned cost under the Grant USD 19,8 mln. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized No 1 Costs Category PBF Payments ( Including of the first verification by SHASS, which

More information

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$) re Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Expenditure Category Goods Works Consultant Services (including training) Value Threshold (US$) Procurement

More information

THRESHOLDS FOR PROCUREMENT METHODS AND BANK PRIOR REVIEW. Contracts Subjects to Prior Review (US$)

THRESHOLDS FOR PROCUREMENT METHODS AND BANK PRIOR REVIEW. Contracts Subjects to Prior Review (US$) re uthorized Public isclosure uthorized Public isclosure uthorized Public isclosure uthorized Kyrgyz Republic Expenditure ategory Goods Works onsultant Services (including training) THRESHOLS FOR PROUREMENT

More information

Kyrgyz Republic Bishkek and Osh Urban Infrastructure Project

Kyrgyz Republic Bishkek and Osh Urban Infrastructure Project re uthorized Public Disclosure uthorized Public Disclosure uthorized Public Disclosure uthorized Item GOODS/ 1 2 3 WORKS ost Table odes omponent Reference as per PD D ontract Ref. ontract Description BO-HO-1-G-NS-2-3/4

More information

REVISED PROCUREMENT PLAN 30-Dec-12

REVISED PROCUREMENT PLAN 30-Dec-12 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Government of the People s Republic of Bangladesh SKILLS AND TRAINING ENHANCEMENT PROJECT (STEP)

More information

General. Procurement Plan

General. Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General 1. Project Information Project Name: Country: General Plan Public Finance

More information

Request for Proposals. Prep & Submissio n by Ex Ag. Noobjection. Plan vs. Actual. Date

Request for Proposals. Prep & Submissio n by Ex Ag. Noobjection. Plan vs. Actual. Date losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country/Organisation: Nigeria: Lagos Metropolitan Area Transport Authority (LAMATA) Project/Programme:

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun Jul

More information

Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$)

Public Disclosure Authorized. Public Disclosure Authorized. Expenditure Category. Contract Value Threshold (US$) re Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Expenditure Category Goods Works Consultant Services (including training) Value Threshold (US$) Procurement

More information

Procurement Plan for Consultancy Services (As of April 30, 2010)

Procurement Plan for Consultancy Services (As of April 30, 2010) losure Authorized Serial no. Procurement Plan for Consultancy Services (As of April 30, 2010) LKR USD Date Currency Value 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 1 1/2008 RERED

More information

Prior Review Threshold

Prior Review Threshold Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date of General Procurement Notice: 1 Prior Review Threshold Procurement Method ICB Goods

More information

Procurement Plan-Goods. Draft Bid Documents, including specs and quantities, draft SPN. Notice Advert. Noobjection. Prep & Submis sion by Ex Agency

Procurement Plan-Goods. Draft Bid Documents, including specs and quantities, draft SPN. Notice Advert. Noobjection. Prep & Submis sion by Ex Agency Public Disclosure Authorized Procurement Plan-Goods Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country/Organisation: Project/Programme: MONTHS) Loan #: CR Description*

More information

2018 HR & PAYROLL Deadlines

2018 HR & PAYROLL Deadlines th (by payment date) EPAF 3rd PARTY FEEDS WTE Approval 2018 HR & PAYROLL s Normal Payroll day s 2017 B1-26 3 * 13-Dec-17 15-Dec-17 n/a n/a n/a 28-Dec-17 29-Dec-17 11:00 AM 16-Dec-2017 29-Dec-2017 JAN 2018

More information

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report Billing Budgeted Billed Dollar Percent Month Revenues Revenues Variance Variance Jan 2018 11,943,180.68 12,697,662.47 754,481.79

More information

Category Works: Activities ShowHide

Category Works: Activities ShowHide Public Disclosure Authorized Project name: Project for Agriculture Commercialization and Trade Loan: CR. 5180, H813 Procurement Plan Version: 2018-1 Status: Approved Date of Last Change of Status: 16/09/2016

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan-Goods

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan-Goods losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country/Organisation: Ethiopia /UDCBO CBDSD RELG Component 2 : 3698-ET Package Number Lot Number

More information

1 PEW RESEARCH CENTER

1 PEW RESEARCH CENTER 1 SEPTEMBER 2018 POLITICAL SURVEY FINAL TOPLINE SEPTEMBER 18-24, 2018 N=1,754 QUESTIONS 1-2, 7-8, 11-13, 28 PREVIOUSLY RELEASED NO QUESTIONS 3-6, 9-10, 14-27, 29-32, 34-43, 47-49 QUESTION 33 HELD FOR FUTURE

More information

STEP-4-CP-O-WD-3. Contract under execution. Post Review STEP-26-NCB-B-GD-3.2. Contract under execution Post Review STEP-22-NCB-B-GD-1.

STEP-4-CP-O-WD-3. Contract under execution. Post Review STEP-26-NCB-B-GD-3.2. Contract under execution Post Review STEP-22-NCB-B-GD-1. Public Disclosure Authorized Project name: Skills and Training Enhancement Project Loan: 4764-BD Procurement Plan Version: 2015-1 Status: Approved Date of Last Change of Status: 30/04/2015 Public Disclosure

More information

September 2018 FY Key Performance Report

September 2018 FY Key Performance Report September 20 FY 2019 - Key Performance Report Management Notes: The information in this report is based on the FY 2019 Operating Budget, adopted by the Board on June 11, 20. RT s farebox recovery ratio

More information

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS -- FINAL TOPLINE -- Timberline: 937008 IS: 954 Princeton Job #: 17-02-002 Jeff Jones, Lydia Saad February 1-5, 2017 Results are based on telephone

More information

Farm Energy IQ. Wind Energy on Farms. Objectives of this Module. How windy is it? How windy is it? How windy is it? 2/16/2015

Farm Energy IQ. Wind Energy on Farms. Objectives of this Module. How windy is it? How windy is it? How windy is it? 2/16/2015 Farms Today Securing Our Energy Future Ed Johnstonbaugh, Penn State Extension Objectives of this Module At the conclusion of this module, you should: Understand wind requirements for power generation Be

More information

Planned Procurement Opportunities Report. June 2018

Planned Procurement Opportunities Report. June 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

MPTS Committee meeting, 19 September Annex A: MPTS Performance Dashboard

MPTS Committee meeting, 19 September Annex A: MPTS Performance Dashboard Annex A: MPTS Performance Dashboard MPTS Performance Dashboard KPIs Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec To commence 100% of Interim Orders Tribunal (IOT) hearings within 3 weeks of referral

More information

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS -- FINAL TOPLINE -- Timberline: 937008 JT: 165 Princeton Job #: 18-02-002 Jeff Jones, Lydia Saad February 1-10, 2018 Results are based on telephone

More information

May 2018 FY Key Performance Report

May 2018 FY Key Performance Report May 20 FY 20 - Key Performance Report Management Notes: The information in this report is based on the FY 20 Operating Budget, Amendment 2, adopted by the Board on January 22, 20. RT s farebox recovery

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

Agreed by the Recipient, dated February, 2011 KYRGYZ REPUBLIC: Agribusiness and Marketing Project - P PROCUREMENT PLAN - GOODS AND WORKS

Agreed by the Recipient, dated February, 2011 KYRGYZ REPUBLIC: Agribusiness and Marketing Project - P PROCUREMENT PLAN - GOODS AND WORKS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Bid Bid Ref Type Method Draft Bank's Invitat. Bid Bid Bank's Bank's Remarks No: Bidding

More information

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORK AND EDUCATION

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORK AND EDUCATION GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORK AND EDUCATION -- FINAL TOPLINE -- Timberline: 937008 IS: 786 Princeton Job #: 16-08-012 Jeff Jones, Lydia Saad August 3-7, 2016 Results are based on

More information

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( ) Wisconsin 511 Traveler Information 211 Annual Usage Summary January 3, 212 Overall to-date Summary 36 months of operation 1,16,63 total calls the 1 Million mark was passed on December 3, 212 3,627,527

More information

Bluetongue Disease (BT)

Bluetongue Disease (BT) Bluetongue Disease (BT) Analysis of ADNS data since 01/2018 Reporting period: 2018-01-01 2018-12-09 Data query: 2018-12-10 AGES DSR Austrian Agency for Health and Food Safety www.ages.at Parameters Data

More information

FREEDOM OF INFORMATION REQUEST

FREEDOM OF INFORMATION REQUEST FREEDOM OF INFORMATION REQUEST REQUEST NUMBER: FOI Request 003905-16 REQUEST DETAILS: As part of my research I am requesting information on the numbers of 'strip searches' that have taken place within

More information

January 2019 FY Key Performance Report

January 2019 FY Key Performance Report January 2019 FY 2019 - Key Performance Report Management Notes: The information in this report is based on the FY 2019 Operating Budget, adopted by the Board on June 11, 20. RT s farebox recovery ratio

More information

NCC Cable System Order

NCC Cable System Order Order # 62508883 Flight s 03/13/18-04/01/18 Syscode 2107 Agency Canal Partners Media System Name Spectrum/DISH- I+ Tampa-St. Pete, FL Advertiser Levine For Governor Phone (301) 951-2620 Credit Update 03/13/18

More information

Nasdaq Dubai AED TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2)

Nasdaq Dubai AED TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2) NasdaqDubai Circular No: 14 /2018 Date of Issue: 13 March 2018 Date of Expiry : Upon issue of replacement Circular Nasdaq Dubai AED TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced

More information

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE AND ECONOMIC AFFAIRS (VOTE 21 & 50) GENERAL PROCUREMENT NOTICE (GPN)

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE AND ECONOMIC AFFAIRS (VOTE 21 & 50) GENERAL PROCUREMENT NOTICE (GPN) THE UNITED REPUBLIC TANZANIA MINISTRY FINANCE AND ECONOMIC AFFAIRS (VOTE 21 & 50) GENERAL PROCUREMENT NOTICE (GPN) Procurement Plan for Goods, Works, Non- Consultancy Services and Consultancy Services

More information

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings.

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings. PUBLIC MEETINGS Citizens are welcome and encouraged to attend all City of Geneva public meetings. Public meeting guests are also urged to participate in any of the City s many public meetings that take

More information

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN Macroeconomic Research and Statistics Department Vol. XVIl, No.3 March 2018 CONTENTS Preface....01 Bhutan s Key Economic Indicators..02 Table

More information

GENERAL PROCUREMENT NOTICE NO.1/2016/2017. PPF Pensions Fund. Morogoro Road/Samora Avenue. Dar es Salaam, Tanzania. Telephone: /21

GENERAL PROCUREMENT NOTICE NO.1/2016/2017. PPF Pensions Fund. Morogoro Road/Samora Avenue. Dar es Salaam, Tanzania. Telephone: /21 ISO 9001:2008 Certified GENERAL PROCUREMENT NOTICE NO.1/2016/2017 PPF Pensions Fund 11 th Floor PPF House Morogoro Road/Samora Avenue Dar es Salaam, Tanzania Telephone: +255 22 2113919/21 Fax: +255 22

More information

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN Department of Macroeconomic Research and Statistics Vol. XVIl, No.9 September 2018 CONTENTS Preface....01 Bhutan s Key Economic Indicators..02

More information

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN Department of Macroeconomic Research and Statistics Vol. XVIl, No.11 November 2018 CONTENTS Preface....01 Bhutan s Key Economic Indicators..02

More information

September 2017 MLS Statistical Report. Residential Inventory

September 2017 MLS Statistical Report. Residential Inventory September 217 MLS Statistical Report Residential Inventory 2 2 1 1 21 216 217 Summary Inventories: Residential inventory is down 1%, Lots / Land inventory is down 13% and commercial inventory was down

More information

The Herzliya Conference The Economic Dimension Prof. Rafi Melnick Provost, Interdisciplinary Center (IDC) Herzliya

The Herzliya Conference The Economic Dimension Prof. Rafi Melnick Provost, Interdisciplinary Center (IDC) Herzliya The Herzliya Conference The Economic Dimension 2009 Provost, Interdisciplinary Center (IDC) Herzliya The Big Issues The broken crystal ball A crisis that happens once in 100 years From a country oriented

More information

Hospitality Outlook Asheville, NC

Hospitality Outlook Asheville, NC Hospitality Outlook Asheville, NC Chad Church STR cchurch@str.com 2017 STR, Inc. All Rights Reserved. Any reprint, use or republication of all or a part of this presentation without the prior written approval

More information

Farmland Booms and Busts: Will the Cycle be Broken?

Farmland Booms and Busts: Will the Cycle be Broken? Farmland Booms and Busts: Will the Cycle be Broken? Kansas Society of Farm Managers and Rural Appraisers Salina, KS February 23 rd, 2012 Brian C. Briggeman Associate Professor and Director of the Arthur

More information

Western University Unsealed Nuclear Substance Contamination Monitoring Record

Western University Unsealed Nuclear Substance Contamination Monitoring Record Western University Unsealed Contamination Monitoring Record Permit Holder: Room number: A. Indirect Monitoring (Wipe test using liquid scintillation counter or NaI counter) Counter Type: Make Model Contamination

More information

July 2015 Sept Cork City Pedestrian Counter Report

July 2015 Sept Cork City Pedestrian Counter Report July 2015 Sept 2015 Cork City Pedestrian Counter Report Disclaimer Cork City Council has produced this report based on information extracted from our Pedestrian Counter Monitoring System. Although care

More information

b Number issued 200,000 (marked with * in the attached appendix) Exercise price is as set out in the appendix

b Number issued 200,000 (marked with * in the attached appendix) Exercise price is as set out in the appendix www.sli-systems.com Level 1, EPIC 78 106 Manchester Street Christchurch New Zealand Phone: 0800 754 797 Fax:03 961 3262 22 May 2018 Client Market Services NZX Limited WELLINGTON By NZ MAP NOTIFICATION

More information

NASDAQ DUBAI TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2)

NASDAQ DUBAI TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2) Nasdaq Dubai Circular No : 71/17 Date of Issue : 24 December 2017 Date of Expiry : Upon issue of replacement Circular NASDAQ DUBAI TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced

More information

SWISS reports stable load factors

SWISS reports stable load factors SWISS Corporate Communications Phone: +41 (0)848 773 773 Fax: +41 (0)44 564 2127 communications@swiss.com SWISS.COM Media release Zurich Airport, October 10, 2008 SWISS reports stable load factors SWISS

More information

African swine fever in domestic pigs and wild boar (ASF)

African swine fever in domestic pigs and wild boar (ASF) African swine fever in domestic pigs and wild boar (ASF) Analysis of ADNS data since 01/2018 Reporting period: 2018-01-01 2018-12-09 Data query: 2018-12-10 AGES DSR Austrian Agency for Health and Food

More information

Calendar On US Federal Reserve Holidays, no settlements will take place for USD.

Calendar On US Federal Reserve Holidays, no settlements will take place for USD. NASDAQ Dubai Notice No: NASDAQ Dubai Trading Holidays and Settlement Calendar 2012 Date of Issue: NASDAQ Dubai TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2012 For Derivatives, Exchange Traded Commodities,

More information

INSTRUCTOR DEVELOPMENT COURSE AWARD WINNING PADI 5-STAR IDC CENTRE.

INSTRUCTOR DEVELOPMENT COURSE AWARD WINNING PADI 5-STAR IDC CENTRE. INSTRUCTOR DEVELOPMENT COURSE AWARD WINNING PADI 5-STAR IDC CENTRE www.facebook.com/goprosaireecottage WELCOME TO THE INSTRUCTOR DEVELOPMENT COURSE!!! MEET YOUR COURSE DIRECTOR: Marcel van den Berg Platinum

More information

MAR DASHBOARD MAR. Compliant % Breakdown Mar % Late % On-time MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

MAR DASHBOARD MAR. Compliant % Breakdown Mar % Late % On-time MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Positive Response Compliance 215 Compliant 215 Non-Compliant 216 Compliant 216 Non-Compliant 1% 87% 96% 86% 96% 88% 97% 89% 89% 88% 86% 92% 93% 94% 96% 94% 8% 6% 4% 2% 13% JAN 4% 14% FEB 4% 12% 3% 11%

More information

FOR SALE BILLBOARD EASEMENT OFF US Laurelwood Rd, Santa Clara, CA 95054

FOR SALE BILLBOARD EASEMENT OFF US Laurelwood Rd, Santa Clara, CA 95054 All Sperry Van Ness Offices Independently Owned & Operated. The information listed above has been obtained from sources we believe to be reliable, however, we accept no responsibility for its correctness.

More information

Farm Energy IQ. Farms Today Securing Our Energy Future. Wind Energy on Farms

Farm Energy IQ. Farms Today Securing Our Energy Future. Wind Energy on Farms Farm Energy IQ Farms Today Securing Our Energy Future Wind Energy on Farms Farm Energy IQ Wind Energy on Farms Ed Johnstonbaugh, Penn State Extension Objectives of this Module At the conclusion of this

More information

INSTRUCTOR DEVELOPMENT COURSE AWARD WINNING PADI 5-STAR IDC CENTRE.

INSTRUCTOR DEVELOPMENT COURSE AWARD WINNING PADI 5-STAR IDC CENTRE. INSTRUCTOR DEVELOPMENT COURSE AWARD WINNING PADI 5-STAR IDC CENTRE www.facebook.com/goprosaireecottage WELCOME TO THE INSTRUCTOR DEVELOPMENT COURSE!!! MEET YOUR COURSE DIRECTOR: Marcel van den Berg Platinum

More information

Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability

Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability (http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement to: Monitoring

More information

May 2018 MLS Statistical Report

May 2018 MLS Statistical Report Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec January February March April May June July August Septem October Novem Decemb Days on Market The graph on the right illustrates the drastic decline in the

More information

KC Scout Kansas City s Bi-State Transportation Management Center

KC Scout Kansas City s Bi-State Transportation Management Center KC Scout Kansas City s Bi-State Transportation Management Center Operations Report May 216 This report contains statistical and operational data of activities at the Scout TMC for the period Sunday, May

More information

ACCA TRAINING WITH FIRST INTUITION. first intuition we train accountants

ACCA TRAINING WITH FIRST INTUITION. first intuition we train accountants ACCA TRAINING WITH FIRST INTUITION ACCA Qualification Structure 1 FUNDAMENTALS Start here if you have a university degree that is not finance and accounting, or if you are a school leaver with a minimum

More information

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY Ridership Report JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY July July 2013 Total MNR System Ridership was 7.346 million vs. 7.439 million in July 2012, a decrease of 92,959 passengers

More information

Preston s Edmond Market Report

Preston s Edmond Market Report Preston s Edmond arket Report July 2 Prepared By Brian Preston RE/AX Associates obile: 45-826-5725 Office: 45-359-87 bpreston88@sbcglobal.net www.edmond4sale.com Realtor of the Year 1995 & 22 Lifetime

More information

US Economic Activity

US Economic Activity US Economic Activity GDP has been in positive territory for seven consecutive quarters, and the advance estimate shows the US economy grew at a 1.0% rate in the fourth quarter 2015. US Economic Activity

More information

3. EXCEL FORMULAS & TABLES

3. EXCEL FORMULAS & TABLES Fall 2017 CS130 - Excel Formulas & Tables 1 3. EXCEL FORMULAS & TABLES Fall 2017 Fall 2017 CS130 - Excel Formulas & Tables 2 Cell References Absolute reference - refer to cells by their fixed position.

More information

September 2016 Financial Results

September 2016 Financial Results September 2016 Financial Results Unaudited financial results for the one months ending 30 September 2016 Contents Executive Summary......... 1 Statement of Activities (Budget).. 3 Statement of Activities

More information

Hotel Industry Update. Stephen Hennis, CHA, ISHC

Hotel Industry Update. Stephen Hennis, CHA, ISHC Hotel Industry Update Stephen Hennis, CHA, ISHC 1 Through Aug 2012: Strong Results Despite Headwinds % Change Room Supply* 1.2 bn 0.4% Room Demand* 741 mm 3.3% Occupancy 63% 2.9% A.D.R. $106 4.3% RevPAR

More information

FOR RELEASE: FRIDAY, MARCH 30 AT 5 AM

FOR RELEASE: FRIDAY, MARCH 30 AT 5 AM Interviews with 1,014 adult Americans conducted by telephone by ORC International on March 24-25, 2012. The margin of sampling error for results based on the total sample is plus or minus 3 percentage

More information

A comment on recent events, and...

A comment on recent events, and... A comment on recent events, and... where we are in the current economic cycle November 15, 2016 Mark Schniepp Director Likely Trump Policies $4 to $5 Trillion in tax cuts over 10 years to corporations,

More information

FINANCIAL ANALYSIS. Stoby

FINANCIAL ANALYSIS. Stoby FINANCIAL ANALYSIS Stoby INVESTMENTS AND FINANCING Investments planned over the period : Investments 2018 2019 2020 2021 Intangible assets Company creation 1 500 Web platform development 8 290 Accounting

More information

Suburb Flyover Report

Suburb Flyover Report Suburb Flyover Report NARRABEEN (House) Prepared By: Shelley Bakhuizen, Ray White Mona Vale NARRABEEN - Suburb Map NARRABEEN - Sales Statistics (Houses) Year # Sales Median Growth Low High 1998 188 $ 09,500

More information

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.

County of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1. County of Orange Resources and Development Management Department Harbors, Beaches and Parks Strategic Plan HBP Strategic Plan Workshop 1 v18 PRESENTATION OUTLINE Harbors, Beaches & Parks (HBP) History

More information

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years).

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years). Bicycle Crashes The City of Fort Collins is well known for its bike culture, and there is a strong focus on encouraging increased riding. Bike safety is an important component of supporting these efforts.

More information

DATE: FY2016 PB Cycle February PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY End Cost

DATE: FY2016 PB Cycle February PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY End Cost BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE SHIPBUILDING AND CONVERSION, NAVY/BA 5 Auxiliaries, Craft and Prior Year Program Costs BLI: 5139 (Dollars

More information

2018 Program 20/10/17

2018 Program 20/10/17 DAY DATE CLUB EVENT ZONE 10 EVENT RNSW BOWLS EVENT BOWLS AUS EVENT REMARKS. 01-Jan New Year's Day New Year's Day 02-Jan Fours Entries Open 03-Jan 04-Jan 05-Jan 06-Jan 07-Jan 08-Jan 09-Jan 10-Jan 11-Jan

More information

Hospitality Outlook Asheville, NC

Hospitality Outlook Asheville, NC Hospitality Outlook Asheville, NC Chad Church STR cchurch@str.com 2018 STR, Inc. All Rights Reserved. Any reprint, use or republication of all or a part of this presentation without the prior written approval

More information

ECONOMIC CALENDAR 2010

ECONOMIC CALENDAR 2010 J.P. Morgan ECONOMIC CALENDAR 2010 Release dates for US economic indicators and Treasury auctions J.P. Morgan ECONOMIC CALENDAR 2010 Release dates for US economic indicators and Treasury auctions This

More information

English for Academic Purpose - 20 weeks. ATMC CDU Fed Uni USC. Available Intakes. Orientation Date. English for Academic Purpose - 15 weeks

English for Academic Purpose - 20 weeks. ATMC CDU Fed Uni USC. Available Intakes. Orientation Date. English for Academic Purpose - 15 weeks ELICOS Intake s for Courses Leading to University of The Sunshine Coast (USC) and Federation University Australia (FedU) and Charles Darwin University (CDU) Programs in 2017-2018 MELBOURNE August 2016

More information

Performance Measures Year End 2015

Performance Measures Year End 2015 Performance Measures Year End 2015 Priorities and Objectives 1. Earn and Retain the Community s Trust 2. Provide Excellent Customer Service 3. Enable Organizational Success 4. Exemplify Financial Stewardship

More information

Encouraging Taxi Drivers to Behave: Grafton Bridge Taxi and Bus Lane Trial. Rob Douglas-Jones Tim Segedin, Edin Ltd.

Encouraging Taxi Drivers to Behave: Grafton Bridge Taxi and Bus Lane Trial. Rob Douglas-Jones Tim Segedin, Edin Ltd. Encouraging Taxi Drivers to Behave: Grafton Bridge Taxi and Bus Lane Trial Rob Douglas-Jones Tim Segedin, Edin Ltd. 2.1km 12 mins Hospital 1.5km 9 mins To Newmarket 5 500 bikes per day 500 pedestrians

More information

Conference Welcome and Introduction

Conference Welcome and Introduction Conference 2013 Welcome and Introduction Housing stock Present day Owner occupation Private renting 17.5m 4m 66% 15.1% Housing associations Council housing 2.8m 2.2m 26.5m 10.6% 8.3% > 2.8m Social Housing

More information

LAUREL SENIOR FRIENDSHIP CLUB 9/28/ CALENDAR DATE ACTIVITY TIME TYPE MEAL ROOM DATE ACTIVITY TIME TYPE MEAL ROOM

LAUREL SENIOR FRIENDSHIP CLUB 9/28/ CALENDAR DATE ACTIVITY TIME TYPE MEAL ROOM DATE ACTIVITY TIME TYPE MEAL ROOM JAN 1 NEW YEARS DAY 2 HOLIDAY/CTR CLOSED 11:30-12:30 CLASS ARTS/CRAFT 3 LSFC BINGO 12-3 GAME GREAT RM 4 LSFC EXECUTIVE COMMITTEE 9-10:30 MEETING CONF RM LSFC CHAIR COMM. 10:30-12:30 MEETING CONF RM 9-13

More information

PROPOSED EP BOWLS CALENDAR; January 2019 Version 2 Approved 22 November 2018

PROPOSED EP BOWLS CALENDAR; January 2019 Version 2 Approved 22 November 2018 PROPOSED EP BOWLS CALENDAR; January 2019 Version 2 Approved 22 November 2018 Jan 19 Monday Tuesday Wednesday Thursday Friday Saturday Sunday 1 2 3 4 5 6 Week 1 NEW YEARS DAY EP Bowls Coaching Course EP

More information

2018 COURT CALENDAR CUMBERLAND COUNTY, PENNSYLVANIA DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

2018 COURT CALENDAR CUMBERLAND COUNTY, PENNSYLVANIA DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2018 COURT CALENDAR 2017 2018 CUMBERLAND COUNTY, PENNSYLVANIA DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Civil Court Last Day for Setting Down Cause For Trial List 8 30 20 Call of Civil Trial

More information

Joint Procurement Plan for Investment Component. Documents submitted to the Bank. Plan VS Actual

Joint Procurement Plan for Investment Component. Documents submitted to the Bank. Plan VS Actual Public Disclosure Authorized Ukraine Urban Infrastructure Project - 2 (LA 8391-UA and TF017112) APPROVED Minregion UIP-2 Coordinator E.B. Kruglyak 1. Project information: Ukraine has received financing

More information

KC Scout Kansas City s Bi-State Transportation Management Center

KC Scout Kansas City s Bi-State Transportation Management Center KC Scout Kansas City s Bi-State Transportation Management Center Operations Report August- 215 This report contains statistical and operational data of activities at the Scout TMC for the period Saturday,

More information

Active Development Applications Deemed Complete After December 12, 2017 (Effective August 16, 2018)

Active Development Applications Deemed Complete After December 12, 2017 (Effective August 16, 2018) Page 1 of 6 Ward 1 UHOPA-18-005* ZAC-18-012 235 Main St. W., 22-Dec-17 n/a 19-Jan-18 n/a n/a 20-Jul-18* UHOPA-18-015* ZAC-18-035 Ward 2 UHOPA-17-041* ZAC-17-090 UHOPA-18-004* ZAC-18-009 ZAC-18-013 69 Sanders

More information

Note # US$1 Mil Total for Other Cost - ESTIMATE SH: <US$100 K Total for Other Cost - ACTUALS DC: None

Note # US$1 Mil Total for Other Cost - ESTIMATE SH: <US$100 K Total for Other Cost - ACTUALS DC: None Plan vs./ ctual Note # May, 206 Type of Cost Name of ssignment/ 2 3 4 Thresholds for Procurement of Goods, orks and Non-Consulting services: OTHER COSTS Procurement Method Procurement Prior Review P Operating

More information

Swim Ireland INTERNATIONAL & NATIONAL PROGRAMME PROVINCIAL/REGIONAL PROGRAMME CAMPS & NOTES

Swim Ireland INTERNATIONAL & NATIONAL PROGRAMME PROVINCIAL/REGIONAL PROGRAMME CAMPS & NOTES 31 Th 104 UK Schools Games (Loughborough) Day 1 Sep-17 1 F 103 UK Schools Games (Loughborough) Day 2 2 S 102 UK Schools Games (Loughborough) Day 3 3 S 101 UK Schools Games (Loughborough) Day 4 04-Sep 4

More information

Site Description: Tower Site

Site Description: Tower Site Wind Resource Summary for Elizabeth Site Final Report Colorado Anemometer Loan Program Monitoring Period: 7/3/6 /15/7 Report Date: December 22, 7 Site Description: The site is.6 miles northeast of the

More information

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013 CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant February 5, 2013 Service Overview Study Overview East Cooper Service Analysis Provide additional analysis as a follow up

More information

Parish of St. Stephen, Port Kembla

Parish of St. Stephen, Port Kembla WUA History Records of the following Illawarra parishes: All Saints, Figtree; St. Andrews, Warrawong; St. Matthew's, Primbee; Mission Hall, Kembla Heights; Mission to Seamen; St. Paul's, Cringila; St Peter's,

More information

2018 COURT CALENDAR CUMBERLAND COUNTY, PENNSYLVANIA DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

2018 COURT CALENDAR CUMBERLAND COUNTY, PENNSYLVANIA DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2018 COURT CALENDAR 2017 2018 CUMBERLAND COUNTY, PENNSYLVANIA DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Civil Court Last Day for Setting Down Cause For Trial List 8 30 20 Call of Civil Trial

More information

ARMENIA: Second Education Quality and Relevance Project (APL2) Procurement Plan. As of March 15, Measu rement Unit.

ARMENIA: Second Education Quality and Relevance Project (APL2) Procurement Plan. As of March 15, Measu rement Unit. No According o he Cos Tables No of Packages Procuremen Mehod Review by WB PRIOR/ Pos Inviaion losure Auhorized Public Disclosure Auhorized Public Disclosure Auhorized Public Disclosure Auhorized Expeced

More information

Greater Manchester Police Hate Crime and Hate Incident Data 01/04/14 to 31/03/15

Greater Manchester Police Hate Crime and Hate Incident Data 01/04/14 to 31/03/15 Greater Manchester Police Hate Crime and Hate Incident Data 01/04/14 to 31/03/15 The data within this document is taken from a live database, and there is the potential that the information contained within

More information

DEC DASHBOARD. Positive Response Compliance DEC. Compliant Tickets : On-Time Performance Analysis. December % Late.

DEC DASHBOARD. Positive Response Compliance DEC. Compliant Tickets : On-Time Performance Analysis. December % Late. Positive Response Compliance 215 Compliant 215 Non-Compliant 216 Compliant 216 Non-Compliant 1% 87% 96% 86% 96% 88% 97% 89% 97% 89% 98% 88% 97% 86% 96% 92% 97% 93% 97% 94% 97% 96% 97% 94% 97% 8% 6% 4%

More information

Discounted Cash Flow Analysis. Basic Information. Smith Investment Group. Property Address: 456 Sample St, Sampletown, SA, Year Built: 1995

Discounted Cash Flow Analysis. Basic Information. Smith Investment Group. Property Address: 456 Sample St, Sampletown, SA, Year Built: 1995 Discounted Cash Flow Analysis Prepared For: Company: Prepared By: Company: Mr. John Smith Smith Investment Group Sample Underwriter Sample Analysis Basic Information Property Name: Sample Retail Property

More information

Olympic Agenda th IOC Session. 5-6 February 2014

Olympic Agenda th IOC Session. 5-6 February 2014 Olympic Agenda 2020 126 th IOC Session 5-6 February 2014 Five clusters of ideas The uniqueness of the Olympic Games Athletes: at the heart of the Olympic Movement Olympism in action: keep Olympism alive

More information