3.8 TRANSPORTATION/TRAFFIC

Size: px
Start display at page:

Download "3.8 TRANSPORTATION/TRAFFIC"

Transcription

1 3.8 TRANSPORTATION/TRAFFIC This sction dscribs th xisting transportation and traffic stting for th projct sit and vicinity, as wll as th various rlvant rgulations and policis that govrn transportation in th ara. Th gnral and sit-spcific discussion containd hrin provids th nvironmntal baslin by which nvironmntal impacts ar idntifid and masurd. Environmntal impacts ar discussd in Sction REGULATORY SETTING STATE Caltrans Caltrans manags intrrgional transportation, including th managmnt and construction of th California highway systm. In addition, Caltrans is rsponsibl for th prmitting and rgulation of stat roadways. Th projct ara includs two roadways that fall undr Caltrans jurisdiction, Intrstat (I- ) and 80 (I-80). LOCAL REGULATORY SETTING City of Richmond Gnral Plan Th Circulation and Growth Managmnt Elmnts of th City of Richmond s (City) Gnral Plan (994) stablishs policis and standards for traffic LOS. Th LOS standards ar dfind in Sction Applicabl goals and polics ar as follows: Gnral Plan Updat Th City is currntly updating its Gnral Plan and anticipats rlasing th Draft Gnral Plan to th public in Dcmbr of 2008 (Vlasco, 2007). Th City has dvlopd a working draft of th Transportation Elmnt that includs guidlins for th dvlopmnt of th final vrsion of th Transportation Elmnt to b includd in th Gnral Plan Updat (City of Richmond, 2007b). Gnral Plan (994) Goals and Policis Circulation and Growth Managmnt Elmnt Goals CIR-A Srv th xisting and futur arrangmnt of land uss with fficint, saf, convnint, and conomic transportation systms for th movmnt of all popl and goods. CIR-B CIR-C CIR-D Provid a balancd, saf, attractiv, and fficint transportation systm for automobil/truck usrs, transit passngrs, pdstrians and bicyclists. Dvlop and ncourag th ffctiv us of multi-modal circulation systms. Coordinat transportation systm planning and rlatd land us planning with othr affctd jurisdictions and agncis. Analytical Environmntal Srvics 3.8- Point Molat Mixd-Us Tribal Dstination

2 Policis CIR-A.3 Apply consistnt traffic control installation masurs to mitigat traffic problms. CIR-A.4 Establish standards for strt improvmnts and nw construction consistnt with xisting and anticipatd transportation dmands and land us charactristics whil mting safty considrations. CIR-A.5 Promot accss to th City s rcrational aras, shorlin ara and community facilitis. CIR-B.3 Maintain a saf, ffctiv and attractiv bicycl and pdstrian circulation systm, with particular mphasis on th San Francisco Bay and th Bay Ara Ridg Trails and nsuring that nw or xisting dvlopmnts ar intrconnctd. CIR-B.4 Facilitat ancillary multi-modal transportation improvmnts (.g., bus stops, bus shltrs, transportation hubs, frry trminals, bik racks) as part of th City s dvlopmnt procss. CIR-C. Balanc th nd for parking with th nd to promot th us of altrnativ mods and transit. CIR-C.2 Promot th us of altrnativs to th singl-occupant automobil to satisfy community transportation nds. CIR-C.3 Provid a ntwork of bicycl routs offring saf and asy accss to all portions of th City. CIR-C.4 Intgrat bicycl facilitis in nw roadways. CIR-D. Work with othr affctd agncis to nsur that transportation facilitis ar dvlopd, and maintaind, to th highst possibl standard. CIR-D.3 Maintain lvl of srvic standards which comply with rquirmnts of County-wid Transportation Masur C. CIR-D.4 Maintain lvl of srvic standards which comply with th Wst Contra Costa Transportation Committ s Action Plan standards for rgional routs. CIR-D.5 Encourag any proposd BART xtnsion to: ) utiliz th xisting Richmond BART station; 2) minimiz impacts on Richmond and surrounding communitis: and 3) provid dirct srvic to th Hilltop Mall rtail facilitis. GM-C.2 Continu to rquir transportation-rlatd mitigation attributabl to a spcific dvlopmnt as idntifid through rquird traffic analyss. GM-D.6 Rquir an analysis of traffic impacts on all rgional routs and signalizd intrsctions of basic routs, for all dvlopmnt anticipatd to gnrat ovr 00 pak-hour vhicl trips. GM-D.8 Includ capital projcts in Richmond s Capital Improvmnt Program which ar ncssary to maintain and improv traffic oprations. Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

3 Gnral Plan (994) Ara Spcific Guidlins Wst Shorlin Ara Spcific Guidlins ar outlind for th shorlin in th City s Gnral Plan (994), and ar as follows: No. No.2 No.3 Promot mor ffctiv movmnt of popl to and within th shorlin aras by: () incrasd public transit srvic linkd to BART; and (2) dvlopmnt of convnint bicycl and foot trails. Promot circulation facilitis in th shorlin aras that will assist inland rsidnts in taking advantag of th shorlin. rss that th dsign of ths facilitis should not block accss to th watrfront. Encourag dvlopmnt of a systm of hik/bik trails throughout th shorlin ara. Countywid Comprhnsiv Transportation Plan Th 2009 Countywid Comprhnsiv Transportation Plan (CTP, 2009a) stablishd th following goals for th Contra Costa County transportation systm:. Enhanc th movmnt of popl and goods on highways and artrial roads, 2. Manag th impacts of growth to sustain Contra Costa s conomy and prsrv its nvironmnt, 3. Expand saf, convnint and affordabl altrnativs to th singl-occupant vhicl, and 4. Maintain th transportation systm ENVIRONMENTAL SETTING ROADWAY TRANSPORTATION Existing Circulation Ntwork Th routs to and from th projct sit ar dscribd blow. Figur 3.8- shows th projct study ara and study intrsctions locations. Intrstat (I-) - is situatd in clos proximity to th projct sit. This frway bgins in San Joaquin County at a junction with Intrstat 5 (I-5) and passs through th San Francisco Bay Ara (Bay Ara), which includs th citis of Livrmor, Plasanton, and Oakland. I- conncts with I-80 whr it srvs th southast Bay Ara, thn continus north past th projct sit to connct with US-0 in Marin County. This frway bcoms th Richmond/San Rafal Bridg, wst of th Wstrn Driv offramp at th toll plaza. In th immdiat vicinity of th projct sit, I- has a total of six lans, thr in ach dirction. Thos travling wstbound on I- can xit at Wstrn Driv to accss th Projct Sit. Currntly thr is no dirct accss to Wstrn Driv travling ast on I-. If travling ast on I- accss to th projct sit would b via th Castro Avnu xit. Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

4 Intrstat 80 (I-80) - is a major ast-wst rgional rout that travrss in a north-south dirction in th vicinity of th projct sit. Currnt accss to th projct sit is by xiting I-80 at Richmond Parkway or I- wstbound. Unitd ats 0 (U.S. 0) - is currntly six lans in th vicinity of I-, but is plannd to b ight lans (thr lans plus a high occupancy vhicl lan in ach dirction) with nw auxiliary lans. U.S. 0 is th major north-south frway in Marin County xtnding into Sonoma County to th north and continuing south to San Francisco and points byond. Richmond/San Rafal Bridg - is a 5.5-mil-long bridg spanning th southrn nd of San Pablo Bay. Th Bridg conncts th City of Richmond with th City of San Rafal along I-. Thr ar two wstbound uppr lvl bridg dcks and on lowr lvl bridg dck. Richmond/San Rafal Bridg Toll Plaza - oprats in th wstbound dirction and has a total of svn toll lans/booths. Fiv of th svn lans/booths ar dsignatd for auto cash/fastrak. On lan oprats as a dsignatd carpool/fastrak lan and th rmaining lan oprats as a Fastrak-only lan. Richmond Parkway - xtnds from Castro rt and conncts with I-80. This roadway is classifid as an xprssway, and varis in th numbr of lans. In th vicinity of I-, Richmond Parkway has two lans in ithr dirction, both of which mrg with Castro rt. Castro rt conncts with Wstrn Driv. San Pablo Avnu - provids paralll accss to I-80 from Oakland to Hrculs. San Pablo Avnu is a four-lan rgional artrial, providing north-south accss, dsignatd by th County as a Rout of Rgional Significanc. San Pablo Avnu provids an altrnativ accss point to th projct sit via Richmond Parkway. Canal Boulvard - is a north-south roadway varying from four (south of Cutting Boulvard) to six lans (north of Cutting Boulvard) and xtnds from th Richmond Parkway (south of I-) to th Point Potrro ara. Barrtt Avnu - is a cross-town artrial running ast wst through Richmond and varis from two to six lans through Richmond and El Crrito. Barrtt Avnu passs through cntral Richmond, whr it has six-lans with Class II bik lans. Wst Macdonald Avnu - is locatd south of th Richmond Bay Ara Rapid Transit (BART) station and has historically srvd as th City s main strt, which provids accss to downtown and th civil cntr complx. This four-lan artrial road parallls Barrtt Avnu to th south, bginning at San Pablo Avnu in th ast and trminating at Richmond Parkway/Grrard Boulvard in th wst. Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

5 Cutting Boulvard - xtnds from Arlington Boulvard in El Crrito wst to Garrard Avnu. This fourlan artrial road crosss I- onc. Cutting Boulvard provids ast-wst rout through th City. 23 rd rt - is a major north-south rout that runs through th City. South of Cutting Boulvard, 23 rd rt bcoms Marina Bay Parkway and outsid of th City it bcoms San Pablo Avnu. Btwn Bissll Avnu and Brooks Avnu, 23 rd rt is a on-way road. Wstrn Driv - is th only road that dirctly accsss th projct sit. This road is two-lans that varis btwn 20 to 30 ft in width, with no pavd shouldrs, curbs, guttrs, sidwalks, or bicycl lans. Wstrn Driv dos not currntly mt th City s dsign standards. Wstrn Driv is th accss road to th projct sit and also provids dirct accss to th Caltrans maintnanc station and indirct accss to th Chvron (Dutra Matrials) Quarry and th Rd Rock Cov sit. To th north of th projct sit, Wstrn Driv provids dirct accss to Chvron s pistol and rifl rang and th Point San Pablo Yacht Harbor, whr th road trminats. Th road provids indirct accss to Chvron s Rod and Gun Club (via Drowly Driv) and th Port of Richmond s Trminal No. 4. Wstrn Driv biscts th projct sit. udy Intrsctions Intrsctions ar th critical locations for incrasd traffic congstion and poor oprations. Th following 3 intrsctions, prsntd in Figur 3.8-, wr slctd in consultation with th City, Caltrans, and nighboring jurisdictions, as likly to b impactd by th Proposd Projct:. Richmond Parkway (Castro rt) and Rdwood Way/WB I- On/Off 2. Marin rt and EB I On/Off Ramps 3. Garrard Boulvard/Canal Boulvard and WB I- On/Off 4. Garrard Boulvard/Canal Boulvard and EB O- On/Off 5. Cutting Boulvard and WB I On/Off Ramp 6. Cutting Boulvard and EB I- Off-Ramp/Hoffman Boulvard 7. Harbour Way and WB I- Off-Ramp 8. Cutting Boulvard and S. Harbour Way 9. Marina Bay Parkway and WB I- On/Off Ramps 0. Marina Bay Parkway and EB I- On/Off Ramps. Cutting Boulvard and Marina Bay Parkway/23 rd rt 2. Erlandson rt and WB I- On/Off Ramps 3. Rgatta Boulvard and EB I- On/Off Ramps/Mad rt 4. Carlson Boulvard and Cutting Boulvard 5. Cutting Boulvard and S. 49 th rt 6. Cutting Boulvard and WB I-80 Off-Ramp 7. Macdonald Avnu and Harbour Way South Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

6 W ay n Toll Plaza 27 2 E IN AR ST M RE W DW Y OO D ) oo dh W. CUTTING BLVD 6 ST 7 ALD CA RL SO N 4 BLVD CUTTING 2 POTRERO 6 BL VD M EA 80 DE ST LO PAB 3 N O R TH Y SCALE 0 3,200 ± RO TRE PO N SA BLVD 5 PKW t Dr un rr D San Clmn A BAY RIN 0 0 SOURCE: DMJM Harris AECOM, 2/2007; AES, 2009 MA wy OHIO MACDON S 49TH ST DR CANAL BLVD dw Av RN T REGATTA g TE BARRET 23RD ST OS (CA STR Nlln Av Richmond-San Rafal BridgBrid 8 9MACDONALD D ES ON W BARRETT R (G ICH AR M RA ON RD D BL HM M SO VD BL in O LAN ON GT lvd Rich Sminol Av Laksid Dr HENSLEY LIN k B R ch RILL PKWY 20 vd a p E PAB Bl E RYD McB 23RD r ST rn N 2 POINT MOLATE ir Ram RD 3TH P RIC t ns bur 0 K GERTRUDE ky ra C sa SAN SA S. HARBOUR WY in l or 28 Dra DAM O PABL AR ncis EL PORTAL KW Y Dr Sh Fra DR br D BLV LO PAB Sir La Cum D 29 T)P n BLV RICHMOND vd rro no Way PROJECT SITE Bl Au o rs 0 va sc Rd d AP a ci An PARR Y W N PIA PITTSBURG r an Irwin ad Na 22 M u M CH RI 80 HILLTOP DR RUM US 0 AND I- INTERCHANGE SAN D ON GOODRICK t Y W PK ST t 24 Y Bay ts al S R LD D ERA FITG 3 KW Y DR Dr LO Av DP BLUM ria vu 26 WY r Bll Bach Ln ON PK W 0 Do Dr on ht Can Fr ig o sly HM r ck M Fr llo rt to ci RIC Dr POINT SAN PABLO Bi Ha n Lo 23 M ai Dunfris T Rd nt 0 t ir Fa dland A v Br y wa Av t Rd nd Jwll S Ramp 3rd rt Mann D t ln Av t 2nd n Av 4th S 0 da hla Dr Kn tc Linco r and hl Hig Main Dr Manzan ita Av Hig Ma PABLO SAN APP IAN n Av nd v gnolia A Knig nv Dr lla Vi San Rafal Briarwood Co nas Av LN SER E MO Paradis Dr Point Molat Mixd-Us Tribal Dstination Rsort and Casino / Figur 3.8- Transportation udy Ara and Intrsctions

7 8. Richmond Parkway (Garrard Boulvard) and W. Macdonald Avnu 9. Richmond Parkway (Garrard Boulvard) and W. Barrtt Avnu 20. Richmond Parkway (Castro rt) and Hnsly rt 2. Richmond Parkway and Grtrud Avnu 22. Richmond Parkway and Parr Boulvard 23. Richmond Parkway and San Pablo Avnu 24. Richmond Parkway and Blum Driv/WB I-80 On/Off Ramps 25. Richmond Parkway/Fitzgrald Driv and NB I-80 On/Off Ramps 26. San Pablo Avnu and Appian Way/Pinol Avnu 27. Wstrn Driv and Chvron Accss 28. Sir Francis Drak Boulvard and Andrson Driv 29. Richmond Parkway and Pittsburg Avnu 30. Richmond Parkway and Goodrick Avnu 3. Richmond Parkway and I-80 Carpool On/Off-Ramps Th traffic control and intrsction lan configurations ar prsntd in th Transportation Impact Analysis (TIA) providd in Appndix S. I- and US 0 Ramps ar analyzd as frway sgmnts in Sction 4.8 and ar discussd in th Supplmntal Traffic Impact Analysis (STIA) providd in Appndix S. Bicycl and Pdstrian Facilitis Currntly thr ar no bicycl or pdstrian facilitis within th projct sit or along Wstrn Driv. Th narst bicycl/pdstrian facility is a Class I bik path that bgins northwst of th I-/Wstrn Driv intrchang and passs undr th Richmond/San Rafal Bridg. Th bik path thn travrss southwst. This bicycl/pdstrian path is part of th Bay Trail, which is proposd to ring th Bay with a combination of bicycl and pdstrian trails. Figur shows th Bay Trail as wll as bicycl and pdstrian facilitis in th projct ara. Transit Transit srvic in th rgion is currntly providd by fiv privat and public facilitis, as dscribd blow. Currntly no dirct transit srvic is providd to th projct sit. Goldn Gat Transit and AC Transit provid srvic on thr routs nar th projct sit. Bus Srvics AC Transit oprats local and xprss bus routs within th City. Only on AC Transit rout provids srvic nar th projct sit. Goldn Gat Transit oprats bus srvic in Marin, San Francisco, and Marin Countis. Goldn Gat Transit buss oprat srvic from th BART rail stations at El Crrito Dl Nort and Richmond to th vicinity of th projct sit. WstCAT provids bus srvic from th wstrn Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

8 County to th El Crrito Dl Nort and Richmond BART stations. BART oprats bus trminals adjacnt to th Richmond and El Crrito Dl Nort stations, which srvs th City and County. Rail Srvics BART oprats rgional rail srvic that links th City to othr citis in th Bay Ara. Figur shows th xtnt of srvic that is providd by BART. Th Richmond BART station srvs approximatly 3,200 daily passngrs daily, whil th narby El Crrito Dl Nort BART station srvs approximatly 7,000 daily passngrs. Frry Transportation Frry srvic in San Pablo and San Francisco Bays ar providd by both public and privat ntitis, locatd in th citis of Valljo, Oakland, Alamda (two trminals), Larkspur, Tiburon, Sausalito, and San Francisco (two trminals). Figur illustrats th xisting frry srvic in th Bay Ara. Th Goldn Gat Frry District (Goldn Gat) and th City of Valljo provid public frry srvic within th vicinity of th Point Molat pir, whil th Blu and Gold Flt and th Rd and Whit Flt ar privat srvic providrs. Goldn Gat Transit owns and oprats svn frris with a capacity of,50 passngrs. Th frris oprat btwn Larkspur and San Francisco, and Sausalito and San Francisco. Th Larkspur trminal has,600 parking spacs, typically usd Monday through Friday. Th City of Valljo oprats th Baylink frry srvic btwn downtown Valljo and th Frry Building in San Francisco. Th Blu and Gold Flt and th Rd and Whit Flt provid srvic from Valljo and Bay Farm Island to th San Francisco Frry Building. Th Blu and Gold flt has tn ships with a total capacity of,090 passngrs. Th Blu and Gold Flt has providd a lttr, providd in Appndix S, of intnt to provid frry srvic to and from th projct sit. Th San Francisco Watr Transportation Authority (WTA) had authority ovr frry srvics in th Bay Ara. Howvr, th WTA casd to xist in th yar 2008 and th San Francisco Bay Ara Watr Emrgncy Transportation Authority (SFBAWETA) took its plac. Th SFBAWETA is taskd with xpanding xisting frry srvics in th San Francisco Bay Ara. Toll Plaza Th Richmond-San Rafal Bridg (Bridg) spans th San Francisco Bay from th City of Richmond to Marin County. Thr lans of wstbound I- ntr th toll plaza and two lans xit th toll plaza on to th Bridg. Th toll plaza is undr th jurisdiction of Caltrans. Th toll plaza currntly has svn toll lans; two FasTrak lans, on carpool lan, and four manual paymnt/ FasTrak lans (rfr to STIA for lan dfinition, Appndix S). Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

9 LEGEND BAY TRAIL: Complt NORTH SCALE 0 /2mi mi Point Wilson Incomplt CONNECTOR TRAILS: Complt Point Pinol Rgional Shorlin UP rail corrido Atlas Road r Incomplt Parks/Opn Spac Watr Bodis R ichmond Parkway San Pab lo Av nu Point San Pablo Point Molat Ws Castro Point Richmond-San Rafal Bridg Point San Pablo Yacht Harbor PROJECT SITE Driv Chvron Txaco Long Wharf Millr-Knox Rgional Shorlin Wst County Landfill Wildcat Crk Viwpoint Kllr Bach Frry Point B rn a n Dr D o Parr Castro rt Garrard Blvd rickyard Cov Cutting Blvd Canal Sacliff Dr Sa n Pablo Cr k Wildcat Crk Grtrud Wst Macdonald Ohio Av Hnsly Hof Point Potrro fman Harbour Wy South Brooks Island Rgional Prsrv Trail Pnnsylvania Hall Lucrtia Edwards Park SAN PABLO Davis Park 23rd rt Richmond BART ation Rgatta Marina Bay Vincnt Park San Pablo Avnu RICHMOND Cntral Richmond Grnway Marina Wy Marina Bay Pkwy Marina Bay Park M k r Tid al C r k Shimada Park Eastshor at Park Point Isabl Rgional Shorlin 80 El Crrito dl Nort BART ation Ohlon Grnway Trail Cntral SOURCE: TRAC, 7//2007; AES, 2008 Point Molat Mixd-Us Tribal Dstination Rsort and Casino / Figur Proposd Bay Trail

10 LEGEND BART AMTRAK Capitol Corridor/ San Joaquin Goldn Gat Transit AC Transit 7 AC Transit 70 AC Transit 7 AC Transit AC Transit AC Transit AC Transit 72 72M 72R 74 AC Transit 76 AC Transit 376 AC Transit L Vally Transit Authority Wstcat J JX 30Z RICHMOND BART / AMTRAK STATION PROJECT SITE EL CERRITO DEL NORTE BART STATION SOURCE: DMJM Harris AECOM, 2/2007; AES, 2008 Point Molat Mixd-Us Tribal Dstination Rsort and Casino / Figur Transit Systms

11 Novato 0 37 San Pablo 5(0) 37 Bay VALLEJO 780 Bnicia Suisun Bay Martinz San Rafal PROJECT SITE 80 Hrculs Concord LARKSPUR 6 2(5) Richmond 680 Walnut 24 TIBURON 7 4(8) Brkly 0 SAUSALITO 4 5 6(5) 9(6) San Francisco (0) 3(6) Oakland JACK LONDON SQUARE Pacific Ocan BAY FARM ISLAND Daly City Oakland Intrnational Airport Hayward LEGEND P San Francisco EXISTING FERRY ROUTES CROSSING Intrnational TIME San Airport. Valljo - San Francisco Bruno min. 2. Alamda / Oakland - San Francisco Millbra min. Burlingam 3. Harbor Bay Isl - San Francisco 25 min. 4. Sausalito - San Francisco min Tiburon - San Francisco 5-30 min. 6. Larkspur - San Francisco min. San Mato 7. Angl Island - Tiburon 0-5 min. 92 0(5) = Round Trips Wkdays (Wknds) NORTH San Francisco Bay NOT TO SCALE Union City SOURCE: DMJM Harris AECOM, 2/2007; AES, 2008 Point Molat Mixd-Us Tribal Dstination Rsort and Casino / Figur Existing Frry Srvic

12 METHODOLOGY Analysis Mthodologis Th xisting traffic conditions for th projct study ara ar prsntd in this sction as providd in th TIA and th STIA (Appndix S). Pak traffic congstion in th rgion tnds to occur during th commut priods btwn 7:00 and 9:00 AM and 4:00 and 6:00 PM. Th pak hour is dfind as th highst on hour priod during ach of th two hour tim priods. Pak hour counts wr collctd in lat May and arly Jun (bfor school summr vacation priod) 2007 by DMJM Harris/AECOM for 29 study intrsctions. Th California Dpartmnt of Transportation (Caltrans) providd 2007 avrag daily traffic (ADT) information for th US 0 frway mainlin and intrchang ramps. Th daily mainlin volums wr calibratd with Caltrans pak hour volum data. Abrams and Associats prformd traffic counts at th Richmond/San Raphal Bridg Toll Booth Plaza in Dcmbr 2008, at th intrsction of Richmond Parkway/Grtrud Avnu in March 2009, and at th intrsction of Richmond Parkway/I-80 On/Off Carpool Ramps in April Existing conditions for th study intrsctions wr analyzd using th Contra Costa County Transportation Authority (CCTA) LOS program. LOS is both a quantitativ and qualitativ grading systm to charactriz traffic flow conditions. Ranging from LOS A to F, with A rprsnting th optimal oprating conditions whr roadways ar uncongstd and fr flowing to F dpicting th worst oprating conditions whr traffic xcds capacity and has stop-and-go flow conditions. Th CCTS LOS program was dvlopd basd on mthodologis rportd in th Transportation Rsarch Board (TRB), Circular 22, Intrim Matrials on Highway Capacity, 980. Th TRB is a planning-lvl mthodology that projcts in CCTA jurisdiction us to dvlop LOS and dlay paramtrs. Tabl 3.8- prsnts th CCTA LOS dfinitions for signalizd intrsctions. Tabl prsnts th 2000 Highway Capacity Manual (HCM) LOS dfinitions for unsignalizd intrsctions. Tabl prsnts th 2000 HCM LOS for basic frway sgmnts, mrg and divrg aras, and waving sgmnts. Th HCM is prpard by th TRB and provids a collction of stat-of-th-art tchniqus for stimating th capacity and dtrmination of th LOS for transportation facilitis. Toll Plaza Th xisting condition at th toll plaza was dtrmind using traffic counts conductd at th toll plaza in Dcmbr Background conditions wr dtrmind using th traffic from rasonably forsabl projcts, which ar providd in th STIA (Appndix S). INTERSECTION OPERATIONS Traffic oprations at th study intrsctions wr analyzd and th rsults ar prsntd in Tabl Th following intrsctions ar shown to hav poor LOS in th xisting traffic nvironmnt: Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

13 TABLE 3.8- CCTA SIGNALIZED INTERSECTION LEVEL OF SERVICE DEFINITIONS LOS Intrprtation V/C Ratio A Uncongstd oprations; all quus clar in a singl cycl. Lss than 0.60 B Vry light congstion; an occasional approach phas is fully utilizd to 0.69 C Light congstion; occasional backups on critical approachs to 0.79 D E Significant congstion on critical approachs, but intrsction is functional. Cars rquird to wait through mor than on cycl during short paks. No long-standing quus formd. Svr congstion with som long-standing quus on critical approachs. Blockags of intrsction may occur if traffic signal dos not provid for protctd turning movmnts. Traffic quu may block narby intrsction(s) upstram of critical approach(s) to to 0.99 F Total brakdown, stop-and-go approach(s)..00 and gratr Nots: Sourc: V/C = volum to capacity. Traffic Impact Analysis, (Appndix S). LOS TABLE HCM UNSIGNALIZED INTERSECTION LEVEL OF SERVICE DEFINITIONS Dfinition of Traffic conditions Avrag Dlay (sconds/vhicl) A Littl or no dlay for stop-controlld approachs. <0.0 B Oprations with minor dlay. 0 to 5 C Oprations with modrat dlays. 5 to 25 D Oprations with incrasing dlays. 25 to 35 E Oprations with high dlays, and long quus. 35 to 45 F Oprations with xtrm congstion, with vry high dlays >50 Sourc: Highway Capacity Manual, LOS Frway Sgmnt Dnsity Rang (pc/mi/ln) TABLE HCM FREEWAY LEVEL OF SERVICE Mrg and Divrg Aras Dnsity Rang (pc/mi/ln) Waving Sgmnts Dnsity Rang (pc/mi/ln) A 0 to 0 to 0 0 to 0 B > to 8 >0 to 20 >0 to 20 C >8 to 26 >20 to 28 >20 to 28 D >26 to 35 >28 to 35 >28 to 35 E >35 to 45 >35 >35 to 43 F >45 Dmand Excd Capacity >43 Sourc: Highway Capacity Manual, Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

14 NO Richmond Parkway (Castro rt)/ Rdwood Way/WB I- On/Off TABLE PEAK HOUR INTERSECTION OPERATIONS - EXISTING CONDITIONS Wkday AM Wkday PM Saturday PM Intrsctions LOS Critical V/C LOS Critical V/C LOS Critical V/C A 0.37 B 0.64 A Marin rt/eb I- On/Off Ramps A 0.23 B 0.69 A Garrard Boulvard/Canal Boulvard/ WB I- On/Off A 0.44 A 0.37 A Garrard Boulvard/Canal Boulvard/EB I- On/Off A 0.45 A 0.36 A Cutting Boulvard/WB I- On/Off Ramp A 0.46 A 0.7 A Cutting Boulvard/EB I- Off- Ramp/Hoffman Boulvard A 0.23 A 0.20 A Harbour Way/WB I- Off-Ramp B 0.4 B 0.9 A Cutting Boulvard/S. Harbor Way A 0.45 A 0.45 A Marina Bay Parkway/WB I- On/Off Ramps A 0.35 A 0.37 A Marina Bay Parkway/EB I- On/Off Ramps A 0.23 A 0.32 A 0.6 Cutting Boulvard/Marina Bay Parkway/23 rd rt A 0.52 A 0.50 A Erlandson rt and WB I- On/Off Ramps B 0.0 B 0.7 A 9. 3 Rgatta Boulvard/EB I- On/Off Ramps/Mad rt A 0.22 A 0.5 A Carlson Boulvard /Cutting Boulvard A 0.39 A 0.36 A Cutting Boulvard/S. 49 th rt A 0.30 A 0.30 A Cutting Boulvard/WB I-80 Off-Ramp A 0.45 A 0.45 A MacDonald Avnu/S. Harbor Way A 0.36 A 0.39 A Richmond Parkway/Garrard Boulvard/W. MacDonald Avnu A 0.40 A 0.35 A Richmond Parkway/Garrard Boulvard/W. Barrtt Avnu A 0.46 A 0.38 A Richmond Parkway/Castro rt/hnsly rt A 0.32 A 0.59 A Richmond Parkway/Grtrud Avnu C 0.7 C 0.76 A Richmond Parkway/Parr Boulvard B 0.70 B 0.67 A Richmond Parkway/San Pablo Avnu C 0.79 C 0.7 A Richmond Parkway/Blum Driv/WB I-80 On/Off Ramps B 0.67 D 0.88 D Richmond Parkway/Fitzgrald Driv/NB I-80 On/Off Ramps A 0.9 A 0.58 A San Pablo Avnu/Appian Way/Pinol Avnu B 0.65 C 0.7 A Wstrn Driv/Chvron Accss - N/A - N/A - N/A 28 Sir Francis Drak Blvd./Andrson Driv E 45.5 F E Richmond Parkway/Pittsburg Avnu A 0.56 C 0.76 A Richmond Parkway/Goodrick Avnu A 0.53 C 0.7 A I-80Carpool On-Ramp/Richmond Parkway A 0.24 A 0.58 A 0.33 Nots: 2000 Highway Capacity Manual, Unsignalizd Intrsction Mthodology, worst-cas dlay pr vhicl rportd. V/C = volum to capacity; Bold txt = poor LOS.. Sourc: DMJM Harris/AECOM, TIA, 2008; Abrams and Associats, STIA, 2009 (Appndix S). Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

15 Sir Francis Drak Boulvard and Andrson Driv Traffic volums for th study intrsctions during th wkday AM and PM and Saturday PM pak hour ar prsntd in th TIA, Appndix S. FREEWAY OPERATIONS Traffic oprations on frway sctions, on/off ramps, and wav sgmnts wr analyzd and th rsults ar prsntd in Tabl Th following frway sctions ar shown to hav poor LOS in th xisting traffic nvironmnt. Sgmnt TABLE EXISTING CONDITIONS FREEWAY LEVEL OF SERVICE AM Pak Hour PM Pak Hour No of Dir. Lns Dnsity Volum (pc/mi/ln) 4 LOS Volum Dnsity (pc/mi/ln) I- at Marin rt Off-Ramp 2 EB 2 2,6 28. D 3, E I- Wstrn Driv to Castro rt EB 3 2, B 2, B I- Wav Btwn Castro rt 3 and Canal Blvd. EB 3 2, B 2, B I- Canal Blvd. to Cutting Blvd. EB 3 2, B 2, B I- Canal Blvd. to Castro rt WB 3 2, C 3, C I- at Castro rt On-Ramp 2 WB 3 2, C 3, C I- Castro rt to Wstrn Driv WB 3 3, C 3, C I- Wstrn Driv Off-Ramp 2 WB 3 3, C 3, C I-80 at Richmond Parkway On- 2 Ramp EB 4 3, B 5,565 * F I-80 at Richmond Parkway Off- 2 Ramp WB 4 6, C 4, B SB U.S. 0 Off-Ramp to EB I- 2 # SB 2, F, C WB I- On-Ramp to NB U.S. 0 2 # WB, D, F WB I- Richmond/San Rafal Bridg EB I- Richmond/San Rafal Bridg Not: Bold txt = poor LOS. Frway Sction 2 On/Off Ramp 3 Wav Sgmnt 4 pc/mi/ln = passngr cars pr mils pr lans. * Dnsity not rportd for lvl of srvic F # Providd in th Supplmntal TIA. Sourc: DMJM Harris/AECOM, TIA, 2008; Abrams and Associats, STIA, 2009 (Appndix S). WB 2 3, E 3, E EB 2 2, C 2, C LOS Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

16 SB U.S. 0 Off-Ramp to EB I- (AM pak hour). WB I- On-Ramp to NB U.S. 0 (PM pak hour). Th SB U.S. 0 Off-Ramp to EB I- and WB I- On-Ramp to NB U.S. 0 currntly oprat at LOS F and ar anticipatd to continu oprating at LOS F aftr ramp improvmnts du to high traffic volums on mainlin U.S. 0 (STIA, Appndix S). TOLL BOOTH OPERATIONS Undr th currnt configuration of th toll plaza (54 prcnt fasttrak vhicls) th capacity is 4,225 vhicls pr lan pr hour (vplph). Tabl 9 of th STIA (providd in Appndix S) shows th currnt wstbound traffic volum at th toll plaza is 3,768 vhicls in th AM pak hour and 3,828 vhicls in th PM pak hour. Tabl 0 of th STIA shows th xisting LOS wstbound through th toll plaza. Undr th xisting conditions th toll plaza oprats at an accptabl LOS. Analytical Environmntal Srvics Point Molat Mixd-Us Tribal Dstination

3.8 TRANSPORTATION/TRAFFIC

3.8 TRANSPORTATION/TRAFFIC 3.8 TRANSPORTATION/TRAFFIC This sction dscribs th xisting transportation and traffic stting for th projct sit and vicinity, as wll as th various rlvant rgulations and policis that govrn transportation

More information

TRANSPORTATION IMPACT STUDY HYATT PLACE HOTEL EXPANSION AND OLD DAVIS ROAD EXTENSION

TRANSPORTATION IMPACT STUDY HYATT PLACE HOTEL EXPANSION AND OLD DAVIS ROAD EXTENSION TRANSPORTATION IMPACT STUDY HYATT PLACE HOTEL EXPANSION AND OLD DAVIS ROAD EXTENSION Prpard for: Submittd by: 2990 Lava Ridg Ct. Suit 200 Rosvill, CA. 95661 TABLE OF CONTENTS 1. Introduction... 1 Projct

More information

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS The capacity of the toll plaza was estimated based on data from numerous studies as well as traffic counts conducted at the toll plaza

More information

A. Proposed Bicycle Routes

A. Proposed Bicycle Routes A. Proposed Bicycle Routes Table A 1 Central Richmond Routes Condensed Project List Segment # Name From To Class Distance NORTH SOUTH ROUTES score (20 points total) CR NS 1 Richmond Parkway Gertude Ave

More information

Exposition Corridor Transit Neighborhood Plan

Exposition Corridor Transit Neighborhood Plan Potntial Strtscap Sgmnts ra to Mo d tson l na tio Na B s Ro 5 s lm Pa d V PALMS 7 on gt rin Cla 6 CULVER CITY d A B nic vd Bl n to ng hi as Cu l r nal tio Na d ra to Mo DR Exposition Light Rail Lin 7 l

More information

Selection Protocol BC Snowboard Provincial Freestyle Team July 15, 2015

Selection Protocol BC Snowboard Provincial Freestyle Team July 15, 2015 Slction Protocol 2015-2016 BC Snowboard Provincial Frstyl Tam July 15, 2015 Background Th BC Snowboard Provincial Frstyl Tam Slction Protocol is dsignd to outlin tam slction for th rstructurd BC Snowboard

More information

PRELIMINARY ROAD DESIGN

PRELIMINARY ROAD DESIGN SCAL: VR X SPAC (. ha) County of ssex.m RSRV TO OTCT ACCSS.m RSRV TO OTCT ACCSS TO.C. ROW SPAC (. ha) POTNTIAL MBANKMNT. ha POTNTIAL MBANKMNT Town of Tecumseh CANADIAN PACIFIC RAILWAY. ha LIMIT OF STUDY

More information

SUMMARY Estimated Future Tax Evasion under the Income Tax System and Prospects for Tax Evasion under the FairTax: New Perspectives

SUMMARY Estimated Future Tax Evasion under the Income Tax System and Prospects for Tax Evasion under the FairTax: New Perspectives SUMMARY Estimatd Futur Tax Evasion undr th Incom Tax Systm and Prospcts for Tax Evasion undr th FairTax: Nw Prspctivs By Richard J. Cbula, Ph.D. Fiorntina AngjllariDajci, Ph.D. March 1, 2017 Purpos of

More information

Structural design and motion analysis of Hexapod Bionic walking. device. Zhu Zhifang12

Structural design and motion analysis of Hexapod Bionic walking. device. Zhu Zhifang12 4th Intrnational Confrnc on Machinry, Matrials and Computing Tchnology (ICMMCT 016) Structural dsign and motion analysis of Hxapod Bionic walking dvic Zhu Zhifang1 1.Jiangxi Provinc Ky Laboratory of prcision

More information

Appendix B. Public Life Public Space - Cycling Findings

Appendix B. Public Life Public Space - Cycling Findings Appndix B. Public Lif Public Spac - Cycling Findings No: Th cycling findings ar incorporad ino Chapr 2.3 Mulimodal Opraions: Bicycl. Th full rpor on cycling, as prpard by Ghl Archics, is providd hrin.

More information

Figure shows the existing roadway network in Daly City.

Figure shows the existing roadway network in Daly City. The following section presents a description of various transportation system components within Daly City. Interstate 280 (I-280), State oute (S-), Skyline Boulevard (S-) and Mission Street (S-82) all

More information

On the decomposition of life expectancy and limits to life

On the decomposition of life expectancy and limits to life On th dcomposition of lif xpctancy and limits to lif Ls Mayhw and David Smith Faculty of Actuarial Scinc Cass Businss School ARC Confrnc 2014 Santa Barbara Som ky dmographic issus What do trnds in lif

More information

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Changes from Committee Review Draft 2017 Multimodal Transportation

More information

SNIBSTON COUNTRY PARK

SNIBSTON COUNTRY PARK SNIBSTON COUNTRY PARK Licstrshir County Council hav bn dvloping proposals to dlivr th rgnration of Snibston. Th thoughts of th local community ar important in furthr dvloping th dsign and w would wlcom

More information

Charleswood Area Transportation Study

Charleswood Area Transportation Study Wlcom Charlswood ra Transportation Study Public Intractiv Display Sssion Octobr 10, 2012 1 EF P nd ffctivly nd goods within innipg, a saf, sustainabl s rquird as Proposd ad twork - Southwst Winnipg cd,

More information

4 CIRCULATION ELEMENT

4 CIRCULATION ELEMENT 4 The purpose of the Circulation lement is to establish goals, policies and actions to regulate and improve the den Area s transportation systems. This lement balances the need to move people and goods

More information

Research Article Modeling the Perceptions and Preferences of Pedestrians on Crossing Facilities

Research Article Modeling the Perceptions and Preferences of Pedestrians on Crossing Facilities Discrt Dynamics in Natur and Socity, Articl ID 949475, 8 pags http://dx.doi.org/10.1155/2014/949475 Rsarch Articl Modling th Prcptions and Prfrncs of Pdstrians on Crossing Facilitis Hongwi Guo, 1 Fachng

More information

4.12 TRANSPORTATION Executive Summary. Setting

4.12 TRANSPORTATION Executive Summary. Setting 4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Rail Station Fact Sheet CityLine/Bush Station

Rail Station Fact Sheet CityLine/Bush Station Rail Station Fact Sheet CityLine/Bush Station Station Overview CityLine/Bush Station is located just south of the President George Bush Turnpike and east of US 75 in Richardson. The station opened in 00

More information

APPENDIX KK. Phased Transportation Study for Proposed Urban Casinos in West Contra Costa County Dowling Associates, Inc., 2007

APPENDIX KK. Phased Transportation Study for Proposed Urban Casinos in West Contra Costa County Dowling Associates, Inc., 2007 APPENDIX KK Phased Transportation Study for Proposed Urban Casinos in West Contra Costa County Dowling Associates, Inc., 2007 FINAL REPORT - Phased Transportation Study for Proposed Urban Casinos in West

More information

CONTACT US. NOW LEASING Crossings at El Dorado NEW SHOPPING CENTER DEVELOPMENT PADS AVAILABLE. Phase II. Phase III

CONTACT US. NOW LEASING Crossings at El Dorado NEW SHOPPING CENTER DEVELOPMENT PADS AVAILABLE. Phase II. Phase III 11 4 10 33 23 7 Jan. Mn L Suit A 2,900 s.f. Suit B 2,700 s.f. NEW SHOPPING CENTER DEVELOPMENT PADS AVAILABLE 5 k H a i n g t o n at El Dorao 0 60' 200' 20 k 115 stalls 100 ALLS P-2 PAD BLDG'S ALLS Driv

More information

This document describes the process and outcome of the pedestrian planning effort conducted in Richmond, Overview. Study Area

This document describes the process and outcome of the pedestrian planning effort conducted in Richmond, Overview. Study Area CHAPTER 1 Introduction: Overview San Pablo Bay 580 Study Area West Richmond Parkway Hilltop Central Richmond 80 El Sobrante Valley The map shows planning areas in Richmond as defined in the City s forthcoming

More information

On the decomposition of life expectancy and limits to life

On the decomposition of life expectancy and limits to life On th dcomposition of lif xpctancy and limits to lif Ls Mayhw and David Smith Faculty of Actuarial Scinc Cass Businss School Longvity 10 Sptmbr 2014 Santiago Chil Som ky dmographic issus What do trnds

More information

TECHNICAL ADVISORY COMMITTEE MEETING NOTICE & AGENDA

TECHNICAL ADVISORY COMMITTEE MEETING NOTICE & AGENDA El Cerrito Hercules TECHNICAL ADVISORY COMMITTEE MEETING NOTICE & AGENDA Pinole Richmond San Pablo DATE & TIME: Thursday, November 16, 2017 9:00 AM 11:00 PM LOCATION: WCCTAC Offices 6333 Potrero Ave. at

More information

UPDATING THE WEST COUNTY ACTION PLAN

UPDATING THE WEST COUNTY ACTION PLAN UPDATING THE WEST COUNTY ACTION PLAN Presentation to the WCCTAC Technical Advisory Committee Presented By: In Association With: DKS CH2M HILL Dyett & Bhatia Eisen Letunic February 14, 2013 The Consultant

More information

10. Funding and implementation

10. Funding and implementation 10. Funding and implementation This section addresses BTA requirements (j): A description of the projects proposed in the plan and a listing of their priorities for implementation, and (k): A description

More information

Rail Station Fact Sheet Downtown Carrollton Station

Rail Station Fact Sheet Downtown Carrollton Station Rail Station Fact Sheet Downtown Carrollton Station Station Overview Downtown Carrollton Station is located at East Belt Line Road and Broadway Street near the historic Downtown Carrollton Square. The

More information

The current document is revised based on the comments received on:

The current document is revised based on the comments received on: General Overview 1 Introduction Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current

More information

5.3 TRAFFIC, CIRCULATION AND PARKING

5.3 TRAFFIC, CIRCULATION AND PARKING 5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May

More information

TELL US WHAT YOU THINK ABOUT THE BEDDINGTON NORTH TRANSPORT FOR LONDON (TfL) MAJOR SCHEME

TELL US WHAT YOU THINK ABOUT THE BEDDINGTON NORTH TRANSPORT FOR LONDON (TfL) MAJOR SCHEME ABOUT THE PROJECT TELL US WHAT YOU THIK ABOUT THE BEDDIGTO ORTH TRASPORT FOR LODO (TfL) MAJOR SCHEME BEDDIGTO Th is focusd on improving. It includs projcts to rduc th impact of high traffic volums on th

More information

City of Richmond Bicycle Master Plan

City of Richmond Bicycle Master Plan City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with Eisen Letunic City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with

More information

Congestion Management Program 2015 Monitoring Report

Congestion Management Program 2015 Monitoring Report Congestion Management Program 2015 Monitoring Report Prepared by Iteris. Inc August, 2015 TABLE OF CONTENTS Executive Summary... 1 Introduction... 3 1.1 CMP Network... 3 1.2 CMP Requirements... 6 1.3 Updates

More information

Jupiter Farms Shopping Center. Jupiter, FL

Jupiter Farms Shopping Center. Jupiter, FL Jupitr Farms Shopping Cntr Jupitr, FL Jupitr Farms Shopping Cntr 10142 INDIANTOWN ROAD JUPITER, FL 33478 VISIT THE PROPERTY WEBSITE DDESANTIS@STRATEGICREALTY.COM FOR LEASING CONTACT: DOUGLAS L. DESANTIS,

More information

GETTING STARTED INSTALLATION GUIDE HID CONVERSION KIT. Please make sure all parts are included in your HID kit.

GETTING STARTED INSTALLATION GUIDE HID CONVERSION KIT. Please make sure all parts are included in your HID kit. v1.0 030718 HI ONVRSION KIT INSTLLTION UI Profssional installation is rcommndd. LL HI KITS R INSTLL T YOUR OWN RISK! OPT7 and its affiliats will not b hld liabl for any damag or cost associatd with installation

More information

Planning Committee STAFF REPORT

Planning Committee STAFF REPORT Planning Committee STAFF REPORT Meeting Date: December 7, 2011 Subject Summary of Issues Recommendations Financial Implications Options Attachments Applications Received through the CC TLC and PBTF Call

More information

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis TRAFFIC OPERATIONS ANALYSIS REPORT Pacheco Boulevard Alignment Study and Alternatives Analysis PREPARED FOR: CITY OF MARTINEZ AND CONTRA COSTA COUNTY OCTOBER 2016 FINAL REPORT Prepared By: under contract

More information

Funded Safe Routes to Transit Projects

Funded Safe Routes to Transit Projects Funded Safe Routes to Transit s CYCLE 1 AC Transit Bicycle arking lan $100,000 C BART BART C2 Railcar Reconfiguration $581,000 C City of Albany, City of El Cerrito El Cerrito/Albany Ohlone Greenway Safety

More information

ACTIVITY SHAPING THE TALLEST PEAK ON EARTH

ACTIVITY SHAPING THE TALLEST PEAK ON EARTH gography standards 1, 4, 7, 17; scinc standard d-3; social studis standard 3 ACTIVITY SHAPIG THE TALLEST PEAK O EARTH 1H MOUT EVEREST, PART OF THE HIMALAYA MOUTAI RAGE, was cratd 30 to 50 million yars

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

GETTING STARTED HID CONVERSION KIT INSTALLATION GUIDE. Please make sure all parts are included in your HID kit.

GETTING STARTED HID CONVERSION KIT INSTALLATION GUIDE. Please make sure all parts are included in your HID kit. v1.0.031318 HI ONVRSION KIT INSTLLTION UI Profssional installation is rcommndd. LL HI KITS R INSTLL T YOUR OWN RISK! OPT7 and its affiliats will not b hld liabl for any damag or cost associatd with installation

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current Existing and Future Conditions

More information

Kids Sea Camp. Please see the Kids Sea Camp dive agenda attached.

Kids Sea Camp. Please see the Kids Sea Camp dive agenda attached. Wlcom to Kids Sa Camp Thank you for choosing to di with Scuba St. Lucia. Th following information is about our oprating procdurs and schdul. Bfor diving with us, plas rviw this pamphlt thoroughly. Fill

More information

CONTRA COSTA. Countywide Bicycle and Pedestrian Plan. Executive Summary. July Contra Costa Countywide Bicycle & Pedestrian Plan

CONTRA COSTA. Countywide Bicycle and Pedestrian Plan. Executive Summary. July Contra Costa Countywide Bicycle & Pedestrian Plan CONTRA COSTA Countywide Bicycle and Pedestrian Plan Executive Summary July 2018 i The preparation of this report has been financed through a grant from the U.S. Department of Transportation and the Federal

More information

Health Advice on Eating Fish You Catch

Health Advice on Eating Fish You Catch Fingr Laks Rgion Halth Advic on Eating Fish You Catch MAP INSIDE Including Allgany, Broom, Cayuga, Chmung, Cortland, Livingston, Monro, Onondaga, Ontario, Schuylr, Snca, Stubn, Tioga, Tompkins, Wayn, and

More information

3.3 TRANSPORTATION, TRAFFIC, CIRCULATION, AND PARKING

3.3 TRANSPORTATION, TRAFFIC, CIRCULATION, AND PARKING Chapter 3.0. Affected Environment and Environmental Consequences Draft EA 3.3 Transportation, Traffic, Circulation, and Parking January 2013 3.3 TRANSPORTATION, TRAFFIC, CIRCULATION, AND PARKING This section

More information

3.3 TRANSPORTATION, TRAFFIC, CIRCULATION, AND PARKING

3.3 TRANSPORTATION, TRAFFIC, CIRCULATION, AND PARKING Chapter 3.0. Affected Environment and Environmental Consequences Final EA 3.3 Transportation, Traffic, Circulation, and Parking November 2013 3.3 TRANSPORTATION, TRAFFIC, CIRCULATION, AND PARKING This

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

August 3, Bay Trail Connection With The Community

August 3, Bay Trail Connection With The Community Ms. Lina Velasco, Senior Planner City of Richmond Planning Division P.O. Box 4046 Richmond, CA 94804 Dear Ms. Velasco: August 3, 2009 73 Belvedere Ave. Richmond, CA 94801 Phone/Fax: 510-235-2835 Email:tracbaytrail@earthlink.net

More information

HUDDERSFIELD NEW COLLEGE FURTHER EDUCATION CORPORATION

HUDDERSFIELD NEW COLLEGE FURTHER EDUCATION CORPORATION HUDDERSFIELD NEW COLLEGE FURTHER EDUCATION CORPORATION Stakholdr Engagmnt Framwork Huddrsfild Nw Collg Corporation blivs that it is ssntial to know th viws and xprincs of studnts, thir parnts, staff and

More information

I-80 Corridor Overhaul

I-80 Corridor Overhaul I-80 Corridor Overhaul MTC Horizon Transformative Projects 15 November, 2018 Megan Gee Arup Vision A rightsized freeway network future-proofs the region for population growth, new mobility innovations,

More information

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program City of El Cerrito San Pablo Avenue Specific Plan Capital Improvement Program May 2015 San Pablo Avenue Intersection Improvements San Pablo Avenue and Hill Street/Eastshore Boulevard Background Existing

More information

THE VALUE ADDED OF CONDUCTING REGIONAL VERSUS LOCAL STAKEHOLDER INVOLVEMENT IN EVALUATING TECHNOLOGY ACCEPTANCE

THE VALUE ADDED OF CONDUCTING REGIONAL VERSUS LOCAL STAKEHOLDER INVOLVEMENT IN EVALUATING TECHNOLOGY ACCEPTANCE 7536Y6--ay PNL-SA-25948 THE VALUE ADDED OF CONDUCTNG REGONAL VERSUS LOCAL STAKEHOLDER NVOLVEMENT N EVALUATNG TECHNOLOGY ACCEPTANCE G. H. McCab s Jun 1995 Prsntd at th Air and Wast Managmnt Association

More information

San Ramon City Center - City of San Ramon Draft Subsequent EIR Transportation Table (Cont.): Existing Intersection Levels of Service No. Inters

San Ramon City Center - City of San Ramon Draft Subsequent EIR Transportation Table (Cont.): Existing Intersection Levels of Service No. Inters San Ramon City Center - City of San Ramon Draft Subsequent EIR Table 4.12-3 (Cont.): Existing Intersection Levels of Service No. Intersection AM Peak Hour PM Peak Hour V/C Ratio LOS V/C Ratio LOS 29 Bollinger

More information

1 Welcome. Ways to Participate: Welcome to the first open house for Regina s new Transportation Master Plan

1 Welcome. Ways to Participate: Welcome to the first open house for Regina s new Transportation Master Plan 1 Welcome Welcome to the first open house for Regina s new Transportation Master Plan We re here today to: Introduce the study Present and receive feedback on the draft Transportation Directions Hear from

More information

Circulation and Mobility

Circulation and Mobility SECTION 4 Circulation and Mobility OVERVIEW The first phase of the circulation analysis is to address specific concerns regarding the circulation system in the vicinity of the Gateway Specific Plan area

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

PRELIMINARY AND FINAL SITE PLAN DAR-UL-ISLAH, 320 FABRY TERRACE TAX LOT 10 & 11, BLOCK 4402 TOWNSHIP OF TEANECK, BERGEN COUNTY, NEW JERSEY

PRELIMINARY AND FINAL SITE PLAN DAR-UL-ISLAH, 320 FABRY TERRACE TAX LOT 10 & 11, BLOCK 4402 TOWNSHIP OF TEANECK, BERGEN COUNTY, NEW JERSEY PRLIMINARY AND FINAL SIT PLAN, 320 FABRY TRRAC TAX LOT 10 & 11, BLOCK 4402 TOWNSHIP OF TANCK, BRGN COUNTY, NW JRSY SIT DSIGND BY 2 PR NG. RPORTS AND BOARD APPROVAL A A 09/22/09 PR ZONING RPORT DATD 09/02/09

More information

4.13 TRANSPORTATION AND TRAFFIC

4.13 TRANSPORTATION AND TRAFFIC 4.13 This chapter describes the regulatory framework and existing conditions in the vicinity of the Project site related to transportation and traffic, and the potential impacts of the proposed Project

More information

Applications for Funding

Applications for Funding Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

CITY OF LARKSPUR, CALIFORNIA GENERAL PLAN CHAPTER 4, CIRCULATION

CITY OF LARKSPUR, CALIFORNIA GENERAL PLAN CHAPTER 4, CIRCULATION CITY OF LARKSPUR, CALIFORNIA GENERAL PLAN CONTENTS CHAPTER 4, CIRCULATION Chapter 4, Circulation Roadway Circulation How Congested are the Roads? The Level of Service Concept Signalized Intersections Unsignalized

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

WELCOME. Please participate today by: Filling out an attendee profile form. Viewing the story boards about the study

WELCOME. Please participate today by: Filling out an attendee profile form. Viewing the story boards about the study KIG DWD ST D JOS IZL WY PIPLI D 1 WLCO Wlcom to th KICK-OFF VT for th Chif Pguis Trail xnsion Wst from ain Strt to Brooksid Boulvard Th City of Winnipg is initiating a study to gain insight into th us

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Hydraulic modeling summary for Sodom Dam Alternatives Feasibility Study

Hydraulic modeling summary for Sodom Dam Alternatives Feasibility Study Tchnical Mmorandum DATE: Novmbr 24, 2009 TO: FROM: SUBJECT: Ms. Dnis Hoffrt-Hay Sodom Dam Projct Managr Calapooia Watrshd Council Rivr Dsign Group, Inc. 311 SW Jffrson Avnu Corvallis, Orgon 97333 Hydraulic

More information

7.0 Preferred Alternative with Service Road Concept

7.0 Preferred Alternative with Service Road Concept .0 Preferred Alternative with Service Road Concept This section evaluates the traffic operations for all of the study years for the Build conditions as related to the Preferred Alternative with Service

More information

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

(304) WVPEBD (304) Manor Group (267)

(304) WVPEBD (304) Manor Group (267) SMS: Brin Storag Tanks - Fibrglass Catgory: Tanks Projct ID #: 1004161901 Strt Addrss: Multipl Locations Charlston WV Valu 25305 County: Kanawha Stag: SUBBIDS: ASAP Bid Dat: 10/13/2016, 01:30PM Architct:

More information

LOCAL GROWTH FUND HIGHWAY WORKS: LONGBRIDGE RAIL STATION

LOCAL GROWTH FUND HIGHWAY WORKS: LONGBRIDGE RAIL STATION LONGBRIDG RAIL STATION Delivered in Partnership by Centro, Birmingham City Council, Network Rail and London Midland Regional transport co-ordinating body Centro, Birmingham City Council, Network Rail and

More information

Bedford Springs / Koon Lake

Bedford Springs / Koon Lake Bdford Springs / Koon Lak Bdford Springs Start Starting at th Bdford Springs, this bik loop is approximatly 42 mils long with th highlight bing Lak Koon and Lak Gordon Ths two watr rsrvoirs, about 2 mils

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

4 Level of Service Results: HOV and Express Lanes

4 Level of Service Results: HOV and Express Lanes 4 Level of Service Results: HOV and Express Lanes Considering the importance of managed lanes (such as HOV and express lanes) in improving the overall performance of a corridor, Alameda CTC started monitoring

More information

4. Mobility and Transportation Element. Page Bikes and Pedestrians

4. Mobility and Transportation Element. Page Bikes and Pedestrians Below are the specific General Plan text changes proposed for A-16-015 and the proposed changes to Figure MT-2 Paths and Trails. In general changes consist of removing references to the Bicycle, Pedestrian

More information

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House October 28, 2010 Presented to San Mateo County residents and interested parties by Lauren Ledbetter, Alta Planning + Design Matt Haynes,

More information

Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING

Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING Heading 1 Heading 2 Heading 3 HADING Welcome 4 Heading 5 Normal Normal Less Spacing Public Meeting Normal No Spacing Strong mphasis Intense mphasis To Do List ullet List ullet Last List ullet 2 CÞ List

More information

Owner s Manual. Model Number: 73654

Owner s Manual. Model Number: 73654 Ownr s Manual Modl Numbr: 73654 Fishr-Pric, Inc., a subsidiary of Mattl, Inc., East Aurora, NY 14052 U.S.A. 2002 Mattl, Inc. All Right Rsrvd. and dsignat U.S. tradmarks of Mattl, Inc. Printd in China.

More information

Psychometric Properties of the Level of Knowledge Use Survey (LOKUS) Tool

Psychometric Properties of the Level of Knowledge Use Survey (LOKUS) Tool Psychomtric Proprtis of th Lvl of Knowldg Us Survy (LOKUS) Tool (Shrya Tlang, Machiko Tomita, Vathsala Ston) Prsntr: Vathsala I. Ston vston@buffalo.du Univrsity at Buffalo/Cntr on Knowldg Translation for

More information

I-105 Corridor Sustainability Study (CSS)

I-105 Corridor Sustainability Study (CSS) I-105 Corridor Sustainability Study (CSS) Metro Streets and Freeways Subcommittee March 21, 2019 Gary Hamrick Cambridge Systematics, Inc. I-105 CSS Project History & Background Funded by Caltrans Sustainable

More information

3.13 Parcel 52 Bldg 699 Army/Air Force Exchange Services Gas Station

3.13 Parcel 52 Bldg 699 Army/Air Force Exchange Services Gas Station Final Sit Invstigation Rport Fort Monmouth July 2008 3.13 Parcl 52 Bldg 699 Army/Air Forc Exchang Srvics Gas Station 3.13.1 Sit Dscription Bldg 699 is a full-srvic gas station and convninc stor locatd

More information

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS 01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED

More information

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed

More information

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016 Dumbarton Transportation Corridor Study San Francisco Bay ITE November 2016 Dumbarton Corridor Source: Wikipedia 2 Dumbarton Corridor 3 Growth Imbalance Jobs-housing imbalance Major employers driving growth

More information

HCM Sixth Edition. Plus More. Rahim (Ray) Benekohal University of Illinois at Urban Champaign,

HCM Sixth Edition. Plus More. Rahim (Ray) Benekohal University of Illinois at Urban Champaign, HCM Sixth Edition What s New in the HCM Sixth Edition Plus More Rahim (Ray) Benekohal University of Illinois at Urban Champaign, 65 th Traffic Engineering and Safety Conference October 19 20, 2016 Institute

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010 Policy and Procedures Develop and Implement a Complete Streets Policy to comply with DD-64-R1 and AB1358 Commencing January 1, 2011, AB1358 requires that the legislative body of a city or county, upon

More information

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

East 12 th Street Bikeway Feasibility Study

East 12 th Street Bikeway Feasibility Study Final Report East 12 th Street Bikeway Feasibility Study Prepared for: City of Oakland Public Works Agency Submitted by: 180 Grand Avenue, Suite 250 Oakland, CA 94612 Phone: (510) 839-1742; Fax: (510)

More information

Power Supply in Package (PSiP) Power Supply on Chip (PwrSoC) Update 2010

Power Supply in Package (PSiP) Power Supply on Chip (PwrSoC) Update 2010 Powr Supply in Packag (PSiP) Powr Supply on Chip (PwrSoC) Updat 2010 Controllr Protction Drivr Drivr By Arnold Aldrman, Anagnsis, Inc. And Cian O Mathuna, Tyndall National Institut Controllr Outlin 1.

More information

NEPA and CEQA Transportation Operation Analysis

NEPA and CEQA Transportation Operation Analysis 3.1 Introduction Chapter 3 Transportation Operation Analysis This chapter includes a transportation analysis of the operational impacts of the following: The National Environmental Policy Act (NEPA) Alternatives

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

TRAC. March 2, Mayor Gayle McLaughlin and City Councilors City of Richmond P.O. Box 4046 Richmond, CA 94804

TRAC. March 2, Mayor Gayle McLaughlin and City Councilors City of Richmond P.O. Box 4046 Richmond, CA 94804 TRAC Trails for Richmond Action Committee 73 Belvedere Avenue Richmond, CA 94801 Phone/Fax 510-235-2835 tracbaytrail@earthlink.net March 2, 2011 Mayor Gayle McLaughlin and City Councilors City of Richmond

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016

More information