CITY OF ELK GROVE CITY COUNCIL STAFF REPORT
|
|
- Anne Gibbs
- 6 years ago
- Views:
Transcription
1 CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO AGENDA TITLE: Bike Lane Installation Project Update MEETING DATE: April 26, 2017 PREPARED BY: Ryan D. Chapman P.E., Traffic Engineer DEPARTMENT HEAD: Robert Murdoch, Public Works Director / City Engineer RECOMMENDED ACTION: Receive this report regarding: 1. Bike lane installation to Laguna Boulevard between Santorini Drive and Dwight Road; and 2. The Green Bike Lane Pilot Project that will provide green bike lanes at conflict points at the intersections of Laguna Boulevard at Neosho / Santorini Drives and Elk Grove Boulevard between Auto Center Drive and East Stockton Boulevard / Emerald Vista Drive. BACKGROUND INFORMATION: On January 11, 2017 the City Council directed Public Works Staff to investigate adding bike lanes on Laguna Boulevard between Santorini Drive and Dwight Road over the railroad tracks, provide information on the practice of placing green bike lane markings along roadways and the estimated cost of implementing the improvements. Laguna Boulevard Bike Lane Currently there is no bike lane for westbound traffic on Laguna Boulevard between Santorini Drive and Dwight Road, and the bike lane for eastbound traffic is narrower than the five foot standard width. Staff evaluated several alternatives and determined that adjusting the existing vehicle and bike lane striping as shown in Attachment 2 would be the best solution to add the missing westbound bike lane and bring the existing eastbound bike lane up to standard. The striping plan would shift the existing vehicle and bike lane markings for both east and west bound directions to create five- 1
2 Elk Grove City Council April 26, 2017 Page 2 of 4 foot bike lanes. This will reduce the travel lanes from 12 feet to 11 feet (10.5 feet for a portion of the east bound number 2 lane) and only allows for a one-foot inside shoulder adjacent to the center median, as the road currently has no inside shoulder. The plan also includes green bike lanes in areas of conflict between vehicles and cyclists. The estimated cost of these improvements is approximately $80,000 and can be completed in three to six months depending on weather. Staff also considered long term alternatives such as modifying the existing bridge and installing a new secondary parallel bridge. However, the cost of these alternatives was estimated at $7 to $8 million and could take a number of years to complete, depending on funding availability. At the February 13, 2017 Trails Committee meeting, staff presented the alternatives and recommended that the attached striping plan be implemented as a short term solution. During discussions, the Trails Committee requested that staff look into creating a striped shared bike and right turn lane for the westbound approach to Santorini Drive. Staff has reviewed current industry practices and found a detail from the National Association of City Transportation Officials (NACTO) for a shared bike and right turn lane (Attachment 3). Since this striping and signage detail is not currently used in California and is not included in the California Manual of Traffic Control Devices (CaMUTCD), a request to experiment would need to be approved by the California Traffic Control Devices Committee (CTC) prior to implementing. Public works staff is working with the CTCDC to get this on a future agenda for consideration. If approved by the CTCDC for experimental use, the shared bike and right turn lane could be installed in the next six to nine months. Implementing the Laguna Boulevard Bike Lane would cost $80,000. Striping the shared bike and right turn lane would cost an additional $3,000. Current fiscal year Gas Tax funds are available in the Road Maintenance account to complete this work. The work would be completed as part of typical roadway maintenance. Staff is in discussions with Apple Inc. about financially participating in this project. If Apple participates, the cost to the City would be reduced. 2
3 Elk Grove City Council April 26, 2017 Page 3 of 4 Green Bike Lane Pilot Project With respect to green bike lanes, Staff researched the current practices used by other cities and found that there have been two approaches used. 1. Marking the entire bike lane green The intent is to create a contrast between the bike lane and the vehicle lane. 2. Marking the transition conflict areas green The intent is to raise awareness of potential conflict points such as right turns at intersections and driveways. This approach occasionally includes marking through the intersection and high volume driveways. Staff could not find any documentation that revealed a reduction in the number of collisions involving cyclists after placing green markings in the pavement. The main benefit of using green markings appear to be driver awareness of cyclists, especially within transition conflict areas. Paint, thermoplastic, and methacrylate are several types of applications used to mark green bike lanes. Approximate installation costs and durability are shown in the table below. Material Approximate Cost (Installed) Durability Paint $4/SQFT 6 months to 2 years Thermoplastic $5/SQFT 5 years Methacrylate $8/SQFT 5-7 years The methacrylate is typically used in areas with high vehicle traffic since it lasts longer than the other materials and requires less maintenance. Staff evaluated the cost to install green bike lanes on Elk Grove Boulevard from I-5 to Elk Grove-Florin Road with the following results: Approach 1 - $1,200,000 - Using the thermoplastic material along the bike lanes and methacrylate in the transitions areas. Approach 2 - $400,000 - Using methacrylate material only at the intersection approaches, transitions for right turn lanes, and through the intersections. This would also include some high volume driveways. Under this approach green markings would not be applied outside of the transition areas. These costs are for the initial installation and do not include repairs and/or scheduled maintenance of the markings every five years. Assuming a fiveyear life, the annualized maintenance cost would be $240,000 for Approach 1 and $80,000 for Approach 2. 3
4 Elk Grove City Council April 26, 2017 Page 4 of 4 Given the cost and limited resources, staff recommends that a pilot program be implemented to evaluate the effectiveness of green bike lanes at conflict points (Approach 2). Staff reviewed collision patterns involving cyclists and identified two locations: (1) the intersections of Laguna Boulevard at Neosho/Santorini Drives (a portion would be completed as part of the restriping of Laguna Boulevard west of the intersection); and (2) Elk Grove Boulevard between Auto Center Drive and East Stockton Boulevard/Emerald Vista Drive. This pilot program would last at least three years to determine the effectiveness of green bike lane markings. The Trails Committee received this report at its February 13, 2017 meeting and supported pursuing the pilot program. FISCAL IMPACT: Implementing the Laguna Boulevard Bike Lane is estimated to cost $80,000. Striping the shared bike and right turn lane is estimated to cost an additional $3,000. Current FY Gas Tax funds are available in the Road Maintenance account to complete this work as part of ongoing roadway maintenance. Staff is in discussions with Apple, Inc. about financially participating in this project. If Apple participates, the cost to the City would be reduced. Implementing the pilot green bike lane program would cost $67,000 and Staff will request the funds as part of the FY budget. This work would also be done as part of ongoing roadway maintenance. ATTACHMENTS: 1. Vicinity Map 2. Laguna Boulevard Striping Plan 3. Shared bike and right turn lane exhibit 4. Green Bike Lane Striping Details 4
5 SANTORINI DR DWIGHT RD ATTACHMENT 1 CALVINE RD LAGU IL TO N NA B RD LVD RA NT LI NE RD BRADSHAW RD W G WATERMAN RD BOND RD BILBY RD DR PROJECT LOCATION ON KAMMERER RD NEOSHO DR BS WY D PK BA LAR WIL WHITELOCK PKWY ELK GROVE FLORIN RD BRUCEVILLE RD BLVD FRANKLIN A BLVD BIG HORN LAGUN BLVD SHELDON RD VICINITY MAP EM ERA L DV IST AD R (CITY OF ELK GROVE) 5 ATTACHMENT 1 LAGUNA BLVD AND - BICYCLE LANE IMPROVEMENTS PROJECT LOCATION MAP CITY OF ELK GROVE PUBLIC WORKS DEPARTMENT 8401 LAGUNA PALMS WAY ELK GROVE, CALIFORNIA EMERALD OAK DR AUTO CENTER DR
6 6
7 SANTORINI DR DWIGHT RD ATTACHMENT 1 CALVINE RD LAGU IL TO N NA B RD LVD RA NT LI NE RD BRADSHAW RD W G WATERMAN RD BOND RD BILBY RD DR PROJECT LOCATION ON KAMMERER RD NEOSHO DR BS WY D PK BA LAR WIL WHITELOCK PKWY ELK GROVE FLORIN RD BRUCEVILLE RD BLVD FRANKLIN A BLVD BIG HORN LAGUN BLVD SHELDON RD VICINITY MAP EM ERA L DV IST AD R (CITY OF ELK GROVE) 7 ATTACHMENT 1 LAGUNA BLVD AND - BICYCLE LANE IMPROVEMENTS PROJECT LOCATION MAP CITY OF ELK GROVE PUBLIC WORKS DEPARTMENT 8401 LAGUNA PALMS WAY ELK GROVE, CALIFORNIA EMERALD OAK DR AUTO CENTER DR
8 8 ATTACHMENT 3 SHARED RIGHT TURN LANE - BICYCLE LANE
9 9 ATTACHMENT 3 SHARED RIGHT TURN LANE - BICYCLE LANE
10 10 CITY OF ELK GROVE PUBLIC WORKS DEPARTMENT 8401 LAGUNA PALMS WAY ELK GROVE, CALIFORNIA ATTACHMENT 4 GREEN BIKE LANE EXHIBIT 1 LAGUNA BLVD - SANTORINI DR/NEOSHO DR (PAGE 1)
11 AUTO CENTER DR EMERALD VISTA DR CITY OF ELK GROVE PUBLIC WORKS DEPARTMENT 8401 LAGUNA PALMS WAY ELK GROVE, CALIFORNIA ATTACHMENT 4 GREEN BIKE LANE EXHIBIT 2 - AUTO CENTER DR TO E STOCKTON BLVD (PAGE 2)
3.0 PROJECT DESCRIPTION
The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationcby1,ly STAFF REPORT Meeting Date: February 6, 2018 To:
cby1,ly STAFF REPORT Meeting Date: February 6, 2018 To: Honorable Mayor & City Council From: Aaron Kunz, Deputy Director of Transportation Subject: North Santa Monica Boulevard Bicycle Lanes Attachments:
More informationTRANSIT SERVICES JULY 4, 2018 BLUE SHUTTLE RED SHUTTLE
WYMARK GAGE BIG TIMBER SCHOOL ST KENT ST WILLIAMSON COLTON DAYFLOWER DR CLARKE FARMS DR TRANSIT SERVICES JULY 4, 2018 BLUE SHUTTLE SABRINA EMERALD SUPERB CIR BACKER RANCH CIVIC CENTER EMERALD PLAZA THE
More informationBroadway Complete Streets Project
Broadway Complete Streets Project Megan Johnson, P.E. Associate Civil Engineer James Pangburn, P.E. Consultant Project Manager After the construction of the highway system, Broadway was cut off
More informationCITY OF LOMITA CITY COUNCIL REPORT
CITY OF LOMITA CITY COUNCIL REPORT TO: FROM: City Council Ryan Smoot, City Manager Item No. SCH 12 PREPARED BY: Mark A. McAvoy, P.E., Public Works Director/City Engineer MEETING DATE: August 1, 2017 SUBJECT:
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More information2.0 LANE WIDTHS GUIDELINE
2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:
More informationTORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018
1 TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018 2 AGENDA 1. Pedestrian Safety Countermeasures 2. Cyclist Safety Countermeasures
More informationJ Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation
J Street and Folsom Boulevard Lane Conversion Project (T15125400) Before and After Traffic Evaluation Prepared by Transportation Division June 2014 Executive Summary On February 12, 2013, the City of Sacramento
More informationPublic Information Centre
WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City
More informationComplete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER
Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:
More informationCITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study
CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final
More informationTRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations
More informationProposed Grant Funding
Proposed Grant Funding Congestion Management Air Quality Funding About the funding Funding may be competitive There are mandatory requirements Tied to o Congestion Management o Pedestrians o Bicycles o
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More information2.0 Existing Conditions
20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural
More informationDear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President
December 17, 2012 Mr. Steve Tweed City of Long Beach, Department of Public Works Traffic & Transportation Bureau, 10 th Floor City Hall 333 West Ocean Boulevard Long Beach, CA 90802 Subject: Broadway and
More informationProject Goals and Objectives
Project Goals and Objectives Goal 1: Goal 2: Goal 3: Transform Coast Highway into a Complete Street that accommodates all roadway users (pedestrians, bicyclists, and autos) Objectives: Improve the pedestrian
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More informationAtwood Avenue Fair Oaks Avenue Cottage Grove Road
Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House
More informationWELCOME Public Information Centre
WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background
More informationNEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE
The City of Vaughan 2141 Major Mackenzie Drive Vaughan, Ontario Canada L6A 1T1 Tel (905) 832-2281 NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE REVISED JUNE 2010 APPLICABILITY The Neighbourhood
More informationSOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM
SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee
More informationStrategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018
Strategies for Maintaining & Renewing Innovative Street Projects Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018 1 OUR ASSETS $12B in Assets $20B Replacement Cost $372M Capital
More informationThe Ridge and Costco Transportation Impact Analysis
The Ridge and Costco Transportation Impact Analysis Elk Grove, California Prepared For: Costco Wholesale, Inc. Prepared By: Kittelson & Associates, Inc. Project No. 1997 February 216 The Ridge and Costco
More informationCyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists
Cyclists and Bikeways: What s your match? guide to bikeway options for a variety of cyclists The workshop and this resource were made possible by funding from the Province of Ontario via the Ministry of
More informationOn Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review.
Memorandum CITY OF DALLAS DATE December 9, 2011 TO subject Honorable Members of the Transportation & Environment Committee: Linda Koop (Chair), Sheffie Kadane (Vice Chair), Pauline Medrano, Vonciel Jones
More informationFields of St. Croix HOA Meeting. October 27, 2016
Fields of St. Croix HOA Meeting October 27, 2016 Welcome! Why are we here? Update on Manning Avenue Phase 2 Project: Project Design Schedule Project Background Importance of Manning Avenue: Primary north-south
More informationProtected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL
Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA 10 14 2011 NACTO Workshop - Chicago IL San Francisco 2 nd Highest Density in the U.S. 47 square miles Mild Climate Market Population ~810,000
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,
More informationCITY OF ELK GROVE CITY COUNCIL STAFF REPORT
CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 10.1 AGENDA TITLE: Provide Guidance on Proposed e-tran Service Modifications MEETING DATE: PREPARED BY: DEPARTMENT HEAD: Jean Foletta, Transit
More informationLessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice
Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationAmericans with Disabilities Act Transition Plan for Public Right-of-Way Improvements
Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3
More informationRoad Diets: Reconfiguring Streets for Multi-Modal Travel
Road Diets: Reconfiguring Streets for Multi-Modal Travel Tom Grant, P.E., PTOE What is a Road Diet? Reconfiguration of travel lanes to benefit all roadway users (i.e., Complete Street) Reclaiming the space
More informationToronto and East York Community Council. Director, Transportation Services, Toronto and East York District
No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity
More informationAGENDA ITEM G-2 Public Works
AGENDA ITEM G-2 Public Works STAFF REPORT City Council Meeting Date: 12/6/2016 Staff Report Number: 16-214-CC Regular Business: Approve the Oak Grove University Crane Bike Improvement Concept Plan, authorize
More informationAUTHORIZE BID ADVERTISEMENT
STAFF REPORT MEETING DATE: May 17, 2016 TO: City Council FROM: Petr Skala, Assistant Engineer PRESENTER: Russell Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More informationAll-way stop control request at the intersection of Stevenson Road North at Fairglen Avenue
Public Report To: From: Report Number: Community Services Committee Ron Diskey, Commissioner, Community Services Department CS-18-40 Date of Report: May 25, 2018 Date of Meeting: May 31, 2018 Subject:
More information4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:
4404 St. Peter Street New Orleans, LA 70119 (504) 861-4022 info@bikeeasy.org April 13 th, 2014 To Whom It May Concern: We are writing to present a design solution for Lakeshore Drive. Earlier this month,
More informationCITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division
CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division TO: Chair and Members Public Works Committee COMMITTEE DATE: June 18, 2018 SUBJECT/REPORT NO:
More informationOn Road Bikeways Part 1: Bicycle Lane Design
On Road Bikeways Part 1: Bicycle Lane Design Presentation by: Nick Jackson Bill Schultheiss, P.E. September 04, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar
More informationCo-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department
28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator
More informationCITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: June 26, 2013
CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: June 26, 2013 TO: VIA: FROM: City Council Gus Vina, City Manager Glenn Pruim, Director of Engineering and Public Works Rob Blough, City Traffic
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More informationRichmond-Adelaide Cycle Tracks
Public Drop-In Event Richmond-Adelaide Cycle Tracks June 25, 2018 12:00 p.m. 3:00 p.m. 4:30 p.m. 7:30 p.m. Metro Hall, Rotunda 55 John Street 1 Purpose of Event In Scope Communicate an update about the
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More informationEdenbrook Hill Drive Traffic Calming Study
WELCOME Public Information Centre Edenbrook Hill Drive Traffic Calming Study Fletchers Meadow Secondary School Wednesday January 20, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming
More informationImplementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015
Implementing Complete Streets in Ottawa October 1, 2015 The Essentials Complete Streets Implementation Framework will become part of the routine delivery of City transportation projects Approach uses every
More informationCITY OF VANCOUVER ADMINISTRATIVE REPORT
CITY OF VANCOUVER ADMINISTRATIVE REPORT Report Date: May 31, 2007 Author: Paul Storer Phone No.: 604.873.7693 RTS No.: 06348 VanRIMS No.: 13-5000-20 Meeting Date: June 12, 2007 TO: FROM: SUBJECT: Standing
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationAppendix D: Planning Level Cost Calculator
Appendix D: Planning Level Cost Calculator Network Costs by Facility Type Facility Type Total Miles of Facility Total Number of Intersections Cost per feature or per mile Total Cost Bicycle Boulevard 52.14
More informationWest Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road
West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,
More informationTransportation Development Act Grant Center Avenue Pedestrian Signal Project
CITY OF MARTINEZ CITY COUNCIL AGENDA April 15, 2015 TO: FROM: SUBJECT: DATE: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Center Avenue Pedestrian Signal Project
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationCOUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca
OCTOBER 2014 Municipal Class Environmental Assessment COUNTY ROAD 22 HORSESHOE VALLEY ROAD Project A Truck Climbing Lanes Project B Intersection Improvements simcoe.ca CORPORATE COMMUNICATIONS DEPARTMENT
More information1 st and 2 nd Street Couplet FAQ s
1 st and 2 nd Street Couplet FAQ s Q. Will the proposed roundabout at Flume/2nd/1 st Streets affect access to businesses nearby?... 2 Q. What if the project isn t received well by the community after construction?...
More informationLaurier Segregated Bike Lane Pilot Project July 2013 update
Laurier Segregated Bike Lane Pilot Project July 2013 update Presentation Overview Background Pilot Monitoring Results Mitigation Recommendations Next Steps Laurier 2 Background Laurier Avenue Segregated
More informationFEDERAL HIGHWAY ADMINISTRATION APPLICATION
FEDERAL HIGHWAY ADMINISTRATION APPLICATION REQUEST FOR PERMISSION TO EXPERIMENT WITH A BICYCLE BOX INTERSECTION TREATMENT Submitted by: City of Columbus Department of Public Service Date: June 26, 2009
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationPERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4
PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,
More informationTRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION
TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction
More informationUPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS
UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving
More informationCity of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program
City of El Cerrito San Pablo Avenue Specific Plan Capital Improvement Program May 2015 San Pablo Avenue Intersection Improvements San Pablo Avenue and Hill Street/Eastshore Boulevard Background Existing
More informationHidden Oaks Elementary School
Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationSaskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening
Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project
More informationREPORT TO FRESNO COUNCIL OF GOVERNMENTS STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER
REPORT TO FRESNO COUNCIL OF GOVERNMENTS DATE: APRIL 2012 TO: FROM: FRESNO COG POLICY BOARD STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER SUBJECT:
More informationHarbord Street and Hoskin Avenue Bicycle Lane Upgrades
STAFF REPORT ACTION REQUIRED and Bicycle Lane Upgrades Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services 19 and
More informationOrange Center Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More informationThe 2012 AASHTO Bike Guide: An Overview
The 2012 AASHTO Bike Guide: An Overview Presentation by: Jennifer Toole, AICP, ASLA Peter Lagerwey August 10, 2012 {Enter Module Name on Master Slide} WEBINAR #1: OVERVIEW OF 2012 AASHTO BIKE GUIDE Today
More informationDowney Road. Transportation Improvement Study
Downey Road Transportation Improvement Study Workshop 2 Participant Handbook Workshop 1 May 18 and 19, 2016 Workshop 2 June 23 and 28, 2016 Prepared By: City of Guelph Paradigm Transportation Solutions
More informationINNOVATIVE INTERSECTION DESIGN
INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and
More informationAppendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan
Appendix A Knoxville TPO Greenway Signage Guidelines 75 Overview: Adequate signing and marking are essential on shared-use paths, especially to alert bicyclists to potential conflicts and to convey regulatory
More informationAppendix 3 Roadway and Bike/Ped Design Standards
Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationGovernance and Priorities Committee Report For the July 2, 2015 Meeting
CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The
More information4 COMMUNITY SAFETY ZONES WALTER SCOTT PUBLIC SCHOOL AND ROSELAWN PUBLIC SCHOOL TOWN OF RICHMOND HILL
4 COMMUNITY SAFETY ZONES WALTER SCOTT PUBLIC SCHOOL AND ROSELAWN PUBLIC SCHOOL TOWN OF RICHMOND HILL The Transportation Services Committee recommends the adoption of the recommendations contained in the
More informationUniversity of California, Davis Transit Signal Priority Implementation Study
Proposal University of California, Davis Transit Signal Priority Implementation Study Prepared for: Prepared by: University of California, Davis 2990 Lava Ridge Court Suite 200 Roseville, CA 95661 November
More informationCITY OF ELK GROVE TRAILS COMMITTEE
CITY OF ELK GROVE TRAILS COMMITTEE Committee Members: Mark Doty, Chair Mark Mendenhall, Vice Chair Erika Smith Sharon Anderson Aaron Silva Regular Meeting of the Trails Committee Monday, October 19, 2015
More informationCaltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns
Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various
More informationCrosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans. Presentation to Sanibel City Council July 16, 2013
Crosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans Presentation to Sanibel City Council July 16, 2013 Outline Crosswalk Policy Revisions Minimum Standards Goals and Objectives Pedestrian
More informationA copy of the draft plan is available at:
To: From: Re: Mayor and City Council Patricia Nilsson, AICP, Comprehensive Planning Manager Boise Central Bench Neighborhood Pedestrian and Bicycle Plan Date: August 24, 2012 Requested Action Provide comments
More informationTransportation Development Act Grant Radar Check Speed Signs
City Council Agenda January 18, 2017 To: From: Subject: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Radar Check Speed Signs Date: January 10, 2017 Recommendation
More informationCITY MANUALS AND STANDARDS REVIEW
GEORGETOWN SIDEWALK MASTER PLAN CITY MANUALS AND STANDARDS REVIEW RESOURCES AND STANDARDS As part of the Master Plan process, a review and evaluation of current City documents and policies relevant to
More informationChapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT
Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationACTIVE TRANSPORTATION SUMMIT. Active Transportation in Small Urban and Rural Communities Bicycles
ACTIVE TRANSPORTATION SUMMIT Active Transportation in Small Urban and Rural Communities Bicycles Presented by: Robin McCleave, V.P. Risk Manager, Public Sector, JLT Canada 23 May 2018 When creating or
More informationBD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1
BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner
More informationNEED FOR ADDITIONAL FUNDING
Measure B BACKGROUND 2013: Vision for a supplement to Measure A that prioritizes local roads & regional capital projects Plan developed by Professional Advisory Group Consensus recently built on RT O&M
More informationItem 08M 1 of 9
MEETING DATE: December 20, 2017 PREPARED BY: Christopher L. Magdosku, City Engineer DEPT DIRECTOR: Brenda Wisneski DEPARTMENT: Development Services CITY MANAGER: Karen P. Brust SUBJECT: Interim North Coast
More information