1 BEVERLY CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION September 3, 2015 TO: FROM: SUBJECT: Traffic & Parking Commission Aaron Kunz, Deputy Director of Transportation North Santa Monica Boulevard Construction Mitigation At its August 6, 2015 meeting, the Traffic & Parking Commission scheduled two public outreach meetings to receive public input on mitigation measures for the Santa Monica Boulevard reconstruction project as follows: September 30, 2015 at 6:30 pm. October 1, 2015 at 12:30 pm. The recommended format for the meetings includes a 30-minute open house to provide the public an opportunity to learn about the project and ask questions of the project team. The open house will be followed by a presentation by the Psomas Team and then public comment. After public comment on September 30th the Commission will leave the comment period open and adjourn until October 1. Following public comment on October 1, 2015, time permitting, the Commission will discuss traffic mitigation issues and the public input received and will develop recommendations to City Council. Attached is a draft PowerPoint presentation prepared for the public outreach meetings for Commission review. Staff seeks input on the content of the presentation at the September 3, 2015 meeting. Staff will also draft display materials for the open houses and have those available for Commission review on September 30th Staff suggests that the Commission refrain from making specific recommendations on mitigation measures until after receiving comment at the public outreach meetings. In addition, an inter-departmental team will coordinate emergency response and evacuation planning related to the reconstruction project and will report back to the Commission.

2

3 . PSOMAS HEF III Jff City of Beverly Hills North Santa Monica Blvd Reconstruction Community Meeting Presentation September 30 & October 7, 2015

4 1PSAS Meeting Agenda

5 : PSOMAS Project Description

6 North Santa Monica Boulevard Project Timeline

7 North Santa Monica Boulevard Project Timeline i iil_j

8 North Santa Monica Boulevard Project Timeline - I

9 North Santa Monica Boulevard Project Timeline

10 a) a) L.2 0

11 PS 0 MA S Key Mitigation Strategies Public Information Program to encourage through traffic to use preferred alternate routes (e.g., Olympic Blvd.) Measures to prevent diversion to residential streets Measures to maintain busi4riangle access on South Santa Monic blrrd 9

12 PublIc information Program

13 Construction Stages All Lanes Open (two through lanes each direction, plus left turn lanes) construction on edges of roadway Four Lanes Open (two 10 lanes each direction, no left turns) creates room for work in roadway Three Lanes Open (two w4l4jr)ci one eastbound) when additional rocii needed for construction in roadway 14 11

14 PS OMAS Four Lanes Open

15 PSOMAS Three Lanes Open ) Two Westbound Through Lanes, One Eastbound Lane Rationale = Transition at Moreno Drive facilitates eastbound traffic Left Turns Prohibited Redirect eastbound traffic to SSMB Detour westbound lefts to Park Way for Business Triangle access Westbound Through Traffic Diversi Likely to occur at start of construc n eg ent If at Doheny, prevent diversion to iie II further west, prevent right turns onto n-s tre th intersect Carmelita Eastbound Through Traffic Diversion Less potential for diversion north of NSMB Likely diversion to SSMB Options for SSMB mitigation 13

16 Two Lanes Open L,,-., 4 4 N Ca 4 I b

17 Existing SSMB Lane Configurations

18 Existing Cross Section DRAFT South Santa Monica Boulevard Striping Options During the North Santa Monica Construction Between Beverly and Wilshire typical block- Not at intersections Existing: Parking 7.0 EB lane2 9 EBlanel 9 WB lane; 9 WB lane 2 Parking 9, 7.0 NTS - North 13 spaces on the southside 26 spaces on the northside 1 Passenger loading 40-Total -k

19 South Santa Monica Blvd Options ) Option A: Remove Parking South Side and Restripe During Entire Construction ) Option B: Remove Parking South Side and Restripe Only During Period of Heaviest Construction ) Increases SSMB Capacity appro ately 9-16% 17

20 PS 0 MA $ Options A or B South Santa Monica Boulevard Striping Options During the North Santa Monica Construction Between Beverly Drive and Wilshire BI. Options A and B: The removal of parking on the south side during the construction of NSM. 11 LB Iane2 EB lane 1 WBlanel WB lane 2 11 Parking B NTS - North No spaces on the southside 26 spaces on the northside 1 Passenger loading B: possible to add on the nothside 35-Total DEPARTMENT OF COMMUNITY DEVELOPMENT-TRANSPORTATION By

21 South Santa Monica Blvd Options (continued)

22 Option C South Santa Monica Boulevard Striping Options During the North Santa Monica Construction Option C Between Beverly Drive and Wilshire BI. The removal of parking on both sides and complete restriping F 10.5 EB Iane2 EB lane Turning lane 10 - Sc? WB lane WB lane NTS North 27 spaces along the north side of the Street and 13 spaces along the south side would be removed. o spaces on the southside o spaces on the northside -40 Center turn lane could be operated as third eastbound lane

23 South Santa Monica Blvd Options (continued) u 1

24 C 0 0 * Cd,.9 c 4JQ Co, D, LQ >0 0c ccu Qv-j C Ct ctz 0D C 0 t a) a) C 0 z U 0.0 U 0. a) -c C a) a) > 0) C 0) a) a) C 0 a. 0 z N C,-1 a) C a) a) C a) cc w N a) C Ca cc U AII ri P0 Iz 1 C., C 0 4-, -D -c 0L C C L. 0. C a] a a] C a) -c 0. C 0 U I 0, C 0U Ca).9 C - a)a) a)c I 0.

25 Mitigation for Parking Removal

26 North-South Streets Crossing/Accessing the Boulevard., :

27 V. Traffic Mitigation on Residential Streets PSOMAS

28 Other Potential Mitigation Measures -

29 Traffic Mitigation Tool Box : Public PSOMAS Information on Construction Activities SUMMAIT ESSENTIALS WHAT TO EXPECT N Cthy.kdy IL 2019 WNOL WIA.C.flfl,.. WHIT G.I.&21111*0,.. A.J.29...!,u.. NOTtWOITUY 22,1.F,.W19I9I 213.O2-6*13 -% / - CONTACT US o 2U C4L Ry o t f4l4 01j7I1pO11113 Metro

30 Traffic [. iver Ternporar I -

31 Traffic Mitigation Toot Box Barricades to Restrict Traffic Movements 3 1 A

32 r PSOMAS Traffic Mitigation Tool Box Signs Posting Turn or Parking Restrictions

33 PS OMAS Traffic Mitigation Tool Box Signal System Adjustments I

34 Other Requirements of Contractor PSOMAS Specified Minimum Number of Advance Warning Signs Real Time traffic data, detour information via website Traffic management staffin Hot line for complaints 32

35 Construction Contracting

36 Next Steps

City of Beverly Hills North Santa Monica Blvd Reconstruction. Community Meeting Presentation September 30 and October 1, 2015

City of Beverly Hills North Santa Monica Blvd Reconstruction. Community Meeting Presentation September 30 and October 1, 2015 City of Beverly Hills North Santa Monica Blvd Reconstruction Community Meeting Presentation September 30 and October 1, 2015 1 Project Description Complete reconstruction of boulevard (pavement, curbs,

More information

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments 1 City of Beverly Hills Samer Elayyan, Project Manager Mark

More information

UPDATED AGENDA. CITY HALL 455 North Rexford Drive 4th Floor Conference Room A. Beverly Hills, CA Tuesday, December 12, :00 PM AGENDA

UPDATED AGENDA. CITY HALL 455 North Rexford Drive 4th Floor Conference Room A. Beverly Hills, CA Tuesday, December 12, :00 PM AGENDA UPDATED AGENDA Beverly Hills City Council Liaison I Traffic & Parking Commission Committee will conduct a Special Meeting, at the following time and place, and will the agenda listed below: address CITY

More information

AGENDA REPORT. Subject: CONSIDERATION OF SANTA MONICA BOULEVARD BLUE RIBBON COMMITTEE RECOMMENDATIONS

AGENDA REPORT. Subject: CONSIDERATION OF SANTA MONICA BOULEVARD BLUE RIBBON COMMITTEE RECOMMENDATIONS Item Number: To: From: F i AGENDA REPORT Honorable Mayor & City Council Susan Healy Keene, AICP, Director of Community Development Aaron Kunz, AICP, Deputy Director of Transportation Subject: CONSIDERATION

More information

SANTA MONICA BOULEVARD CORRIDOR

SANTA MONICA BOULEVARD CORRIDOR CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly

More information

cby1,ly STAFF REPORT Meeting Date: February 6, 2018 To:

cby1,ly STAFF REPORT Meeting Date: February 6, 2018 To: cby1,ly STAFF REPORT Meeting Date: February 6, 2018 To: Honorable Mayor & City Council From: Aaron Kunz, Deputy Director of Transportation Subject: North Santa Monica Boulevard Bicycle Lanes Attachments:

More information

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014 MOBILITY WORKSHOP Joint City Council and Transportation Commission May 5, 2014 Review of General Plan M-1 Develop world-class transit system M-3 Maintain/enhance pedestrian-oriented City M-4 Create comprehensive

More information

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation J Street and Folsom Boulevard Lane Conversion Project (T15125400) Before and After Traffic Evaluation Prepared by Transportation Division June 2014 Executive Summary On February 12, 2013, the City of Sacramento

More information

Meeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05. Coordination See attached sign-in sheet

Meeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05. Coordination See attached sign-in sheet Meeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05 Coordination Attendees See attached sign-in sheet Location Great Hall, Holland Tunnel Route 139 Contract 2 PANYNJ Coordination

More information

Attachment 8: Fehr & Peers Supplemental Traffic Analysis (January 3, 2013)

Attachment 8: Fehr & Peers Supplemental Traffic Analysis (January 3, 2013) Attachment 8: Fehr & Peers Supplemental Traffic Analysis (January 3, 2013) FEHR~~ PEERS Date: January 3, 2013 MEMORANDUM To: From: Subject: Abe Leider, AICP CEP, Rincon Consultants, Inc. Tamar Fuhrer,

More information

CITY OF BEVERLY HILLS RECREATION AND PARKS COMMISSION TO: FROM: SUBJECT: June 26, Recreation and Parks Commission. Mark Odell, Urban Designer

CITY OF BEVERLY HILLS RECREATION AND PARKS COMMISSION TO: FROM: SUBJECT: June 26, Recreation and Parks Commission. Mark Odell, Urban Designer CITY OF BEVERLY HILLS RECREATION AND PARKS COMMISSION TO: FROM: SUBJECT: Recreation and Parks Commission Mark Odell, Urban Designer Historic Route 66 Signage June 26, 218 The purpose of this meeting with

More information

Meeting of March 5, Traffic Engineering Activities October 2014 through February 2015 (Bolded: New activities for this Quarter)

Meeting of March 5, Traffic Engineering Activities October 2014 through February 2015 (Bolded: New activities for this Quarter) BEVERLY HILLS CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION Meeting of March 5, 2015 TO: Traffic & Parking Commission FROM: Bijan Vaziri, Senior Transportation Engineer SUBJECT: Traffic Engineer Quarterly

More information

Wilshire Boulevard Bus Rapid Transit Project

Wilshire Boulevard Bus Rapid Transit Project Los Angeles County Metropolitan Transportation Authority Wilshire Boulevard Bus Rapid Transit Project COMMUNITY MEETINGS November 2008 Agenda Introduction Proposed Project Overview Participating Agencies

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

CHAPTER 3 TRANSPORTATION

CHAPTER 3 TRANSPORTATION CHAPTER 3 TRANSPORTATION This chapter presents information on transportation impacts of Section 2 of the Project that have changed from those identified in the published Westside Subway Extension Final

More information

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION 5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs

More information

BEVERLY HILLS STAFF REPORT. To: From: Subject: INTRODUCTION DISCUSSION. Meeting Date: August 7, 2018

BEVERLY HILLS STAFF REPORT. To: From: Subject: INTRODUCTION DISCUSSION. Meeting Date: August 7, 2018 BEVERLY HILLS 9.4 STAFF REPORT Meeting Date: August 7, 218 To: From: Subject: Honorable Mayor & City Council Ryan Gohlich, AICP, City Planner / Assistant Director of Community Development Commemorative

More information

Lake Zurich Police Department Traffic Safety Division 200 Mohawk Trail Lake Zurich, IL 60047

Lake Zurich Police Department Traffic Safety Division 200 Mohawk Trail Lake Zurich, IL 60047 Lake Zurich Police Department Traffic Safety Division 200 Mohawk Trail Lake Zurich, IL 60047 Telephone (847) 719-1690 Fax (847) 719-1691 January 15, 2015 This report is being submitted regarding the implementation

More information

Chapter 8.0 Mitigation Monitoring and Reporting Program

Chapter 8.0 Mitigation Monitoring and Reporting Program and Reporting Program CEQA requires agencies that adopt EIRs and mitigated negative declarations (MNDs) to take affirmative steps to determine that approved measures are implemented subsequent to approval.

More information

FINAL GENERAL PLAN CIRCULATION COMMITTEE REPORT AND RECOMMENDATIONS JANUARY 2004

FINAL GENERAL PLAN CIRCULATION COMMITTEE REPORT AND RECOMMENDATIONS JANUARY 2004 FINAL GENERAL PLAN CIRCULATION COMMITTEE REPORT AND RECOMMENDATIONS JANUARY 2004 1 of 51 PREFACE Over a year and a half of meetings, studying traffic, circulation, and congestion improvements, the Circulation

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 Welcome! Meeting Agenda Project update presentation Up to 15 minutes for Pulse Q&A about project design. (Please reserve

More information

Trial Restriping Project. October 21, 2010

Trial Restriping Project. October 21, 2010 Arastradero Road Trial Restriping Project P t C t ti C it O t hm ti N 1 Post Construction Community Outreach Meeting No. 1 October 21, 2010 Agenda Staff Introductions Project Background Project Status

More information

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: June 26, 2013

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: June 26, 2013 CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: June 26, 2013 TO: VIA: FROM: City Council Gus Vina, City Manager Glenn Pruim, Director of Engineering and Public Works Rob Blough, City Traffic

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

Display Boards Including Five Refined Design Concepts

Display Boards Including Five Refined Design Concepts APPENDIX D Workshop Session 3 Sign-in sheets Agenda Booklet Display Boards Including Five Refined Design Concepts PowerPoint Presentation Questions Recorded Discussion of Preference Exercise AGENDA

More information

PARDON OUR DUST. Arlington Boulevard (Route 50), 10 th Street and Courthouse Road Interchange (ARRA) Project No. (FO) , C501, B612, B611

PARDON OUR DUST. Arlington Boulevard (Route 50), 10 th Street and Courthouse Road Interchange (ARRA) Project No. (FO) , C501, B612, B611 PARDON OUR DUST Arlington Boulevard (Route 50), 10 th Street and Courthouse Road Interchange (ARRA) Project No. (FO) 0050-000-728, C501, B612, B611 WELCOME Larry Tomlinson, P.E., L.S. Area Construction

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION Meeting of TO: FROM: Bijan Vaziri, Senior Transportation Engineer SUBJECT: Traffic Engineer Quarterly Report Traffic Engineering Activities January 2014

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN DRAFT OCTOBER 2015 Safe Streets Santa Monica, December 3, 2015 Beth Rolandson, AICP Principal Transportation Planner Strategic + Transportation Planning, Planning

More information

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 10.3 AGENDA TITLE: Bike Lane Installation Project Update MEETING DATE: April 26, 2017 PREPARED BY: Ryan D. Chapman P.E., Traffic Engineer DEPARTMENT

More information

Chapter 3 Transportation

Chapter 3 Transportation Figure 3-28. Station/Bus/Pedestrian-Bicycle Impact Analysis Westwood/UCLA On-Street Optional Station Draft Environmental Impact Statement/Environmental Impact Report 3-55 Figure 3-29. Station/Bus/Pedestrian-Bicycle

More information

IL Route 71 Construction Update

IL Route 71 Construction Update 100 Parkers Mill Oswego, IL. 60543 (630) 554-3618 4.20.16 IL 71 TRAFFIC ADVISORY: Tentatively scheduled for April 21st A new traffic pattern from Paradise to Wolf Crossing on IL 71 will be in use. The

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

EL CAMINO REAL BUS RAPID TRANSIT PROJECT

EL CAMINO REAL BUS RAPID TRANSIT PROJECT EL CAMINO REAL BUS RAPID TRANSIT PROJECT Would upgrade the current 522 Rapid Bus to BRT status by making changes to El Camino Real and The Alameda that make transit FAST, FREQUENT AND RELIABLE and make

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017 Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road October 3, 2017 Study Area (area within a ¼-mile radius of the study intersections) Route

More information

City of Los Angeles CALIFORNIA

City of Los Angeles CALIFORNIA DEPARTMENT OF CITY PLANNING 200 N. SPRING STREET, ROOM 2 LOS ANGELES, CA 90012-4801 AND 6262 VAN NUYS BLVD., SUITE 31 VAN NUYS, CA 91401 - CITY PLANNING COMMISSION WILLIAM ROSCHEN PRESIDENT REGINA M. FREER

More information

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015 Vehicular and Pedestrian Access to Herndon Metrorail Station Robert B. Boxer, Director John Stuart, Clark Nexen Project Location The project is located in the Town of Herndon along Herndon Parkway between

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE FORM GEN. 160A (Rev. 1/82) CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE 8150 W. Sunset Bl DOT Case No. CEN 16-44691 Date: July 26, 2016 To: Karen Hoo, City Planner Department of City Planning

More information

WELCOME. Traffic & Parking Commission Special Meeting May 30, Iteris, Inc. All rights reserved.

WELCOME. Traffic & Parking Commission Special Meeting May 30, Iteris, Inc. All rights reserved. WELCOME Traffic & Parking Commission Special Meeting May 30, 2018 WORKSHOP #2 CONCEPTS FOR IMPROVEMENT MAY 30, 2018 Agenda 1. Welcome 10 min 2. Project Presentation 25 min 3. Roundtable Dialogue 50 min

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN DRAFT OCTOBER 2015 City Council, February 23, 2016 Beth Rolandson, AICP Principal Transportation Planner Mobility Division, Planning and Community Development

More information

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street Welcome and Introduction Sign-in and comment sheets Restrooms and exits Meeting agenda and timeline Meeting goals / expectations Provide input to guide study recommendations Actively participate throughout

More information

MEMORANDUM - CITY OF PASADENA Department Of Transportation DATE: OCTOBER 21, 2008 TO: ENVIRONMENTAL ADVISORY COMMISSION FROM: ~ FRED C. DOCK, DIRECTOR OF TRANSPORTATION SUBJECT: UPDATE ON DEPT. OF TRANSPORTATION

More information

California Water Service. PV Peninsula Water Reliability Project

California Water Service. PV Peninsula Water Reliability Project California Water Service PV Peninsula Water Reliability Project 1 What We ll Cover Cal Water Overview Project Background and Need Project Timeline and Next Steps 2 About California Water Service (Cal Water)

More information

PUBLIC SERVICE DEPARTMENT

PUBLIC SERVICE DEPARTMENT PUBLIC SERVICE DEPARTMENT Engineering Division 732 City Hall 124 West Michigan Avenue Lansing, Michigan 48933 (517) 483-4455 FAX: (517) 483-6082 http://publicservice.cityoflansingmi.com March 30, 2011

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

MEETING NOTES North Santa Monica Blue Ribbon Committee

MEETING NOTES North Santa Monica Blue Ribbon Committee ATTACHMENT 5 MEETING NOTES North Santa Monica Blue Ribbon Committee Date: November 7, 2013 Location: City of Beverly Hills Library Meeting Room -444 North Rexford Drive, Beverly Hills, CA 90210 Subject:

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report Study Schedule C Municipal Class Environmental Assessment Prepared By: BT Engineering 100 Craig Henry Drive, Suite 201 Ottawa, ON K2G 5W3 (613) 228-4813 (855) 228-4813 Toll free Executive Summary Executive

More information

Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center

Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center 35 Rock Road - Monday thru Friday EASTBOUND Effective: November 26, 2018 & Valley Industries 5:01A 5:07A 5:17A 5:28A 5:23A 5:30A 5:40A 5:51A 5:47A 5:54A 6:04A 6:16A 5:35A 5:41A 5:51A 5:58A 6:10A 6:17A

More information

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,

More information

City of Los Angeles CALIFORNIA

City of Los Angeles CALIFORNIA DEPARTMENT OF CITY PLANNING 00 N. SPRING STREET, ROOM 55 LOS ANGELES, CA 9001-4801 AND 66 VAN NUYS BLVD., SUITE 351 VAN NUYS, CA 91401 C CITY PLANNING COMMISSION WILLIAM ROSCHEN PRESIDENT REGINA M. FREER

More information

Metro Bike Program. Westside/Central Metro Service Council Meeting Wednesday, November 13, :00 7:00 pm

Metro Bike Program. Westside/Central Metro Service Council Meeting Wednesday, November 13, :00 7:00 pm Los Angeles County Metropolitan Transportation Authority Metro Bike Program Westside/Central Metro Service Council Meeting Wednesday, November 13, 2013 5:00 7:00 pm Tony Jusay Transportation Planning Manager

More information

Ocean Park Boulevard Green Street Project Community Workshop

Ocean Park Boulevard Green Street Project Community Workshop Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,

More information

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015). COUNCIL MEETING Meeting Date: March 10, 2015 Agenda Item #: 13.1 Wye Road Functional Planning Study (January 2015) Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January

More information

Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda

Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda CITY OF ROHNERT PARK Development Services Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda 5:30 PM, Monday, December 18, 2017 Rohnert Park City Hall, Conference Room 2A 130 Avram Avenue,

More information

Purple Line Extension Community Meeting

Purple Line Extension Community Meeting Purple Line Extension Community Meeting August 22, 2016 Agenda Introductions Meeting Goals Project Overview and Schedules Proposed Memorandum of Agreement Overview Stay in Touch! Q & A Meeting Goals Provide

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments! MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions

More information

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer Abstract The Exposition Corridor transit project is a light rail project

More information

LANE ELIMINATION PROJECTS

LANE ELIMINATION PROJECTS PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:

More information

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Interstate 66 Tier 1 Environmental Impact Statement (EIS) WELCOME Welcome to the second Citizen Information Meeting for the Tier 1 Environmental Impact Statement (EIS). As an integral part in the environmental study process, the study team is seeking your comments

More information

19 July 2016 OUR REF:

19 July 2016 OUR REF: 19 July 2016 OUR REF: 602263-01000 194168 Ontario Ltd. 320 McRae Street Ottawa, ON K1Z 5R8 Attention: Brian Casagrande Dear Brian: Re: 320 McRae/1976 Scott Redevelopment CTS Addendum #1 This Addendum has

More information

Technical Advisory Committee (TAC)

Technical Advisory Committee (TAC) Technical Advisory Committee (TAC) January 17, 2018 CareerSource Heartland Sebring, FL 1) ROLL CALL 2) PUBLIC COMMENT 3) APPROVAL OF MINUTES* October 18, 2017 Meeting 4) SR 710 Extension in Okeechobee

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K. TRAFFIC AND TRANSPORTATION

IV. ENVIRONMENTAL IMPACT ANALYSIS K. TRAFFIC AND TRANSPORTATION IV. ENVIRONMENTAL IMPACT ANALYSIS K. TRAFFIC AND TRANSPORTATION The information in this section is based primarily on the Traffic Impact Analysis Report prepared by Hirsch/Green Transportation Consulting,

More information

Detailed Description of Work

Detailed Description of Work Trail Items I-580 Eastbound Shoulder Running Lane and Bi-Directional Bike Lane Project Bay Area Toll Authority Task Order Contract with HNTB Corporation Effective May 12, 2014 Description of Work: Implement

More information

CLOSED. Highlights of the Final Concept Design:

CLOSED. Highlights of the Final Concept Design: The final Concept Design is the result of many months of listening, learning, creating, balancing, and understanding different needs and viewpoints, as well as incorporating technical requirements and

More information

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)? 1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)? The Los Angeles County Metropolitan Transportation Authority (Metro) is evaluating the development of a grade separation

More information

Purple Line Extension. La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit

Purple Line Extension. La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit Purple Line Extension La Brea Decking Phase II Bus Detours Metro 720/20, 212/312 LADOT DASH Fairfax, Antelope Valley Transit La Brea Station Decking Schedule *Dates and work activities subject to change

More information

Metro Bike/Bus Interface Study

Metro Bike/Bus Interface Study Metro Bike/Bus Interface Study Agenda 1. Background & Process 2. Corridors & Metrics 3. General Findings 4. Training Recommendations 5. Design Guidelines 6. Questions L.A. County Bus Service LA Metro 1,433

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road PW17.11 REPORT FOR ACTION Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road Date: November 4, 2016 To: Public Works and Infrastructure Committee From: Acting General Manager,

More information

Route 79/Davol Street Corridor Study

Route 79/Davol Street Corridor Study Route 79/Davol Street Corridor Study Fall River, MA Public Information Meeting #2 November 21, 2013 Fall River Heritage State Park Fall River, MA Agenda Welcome and Introductions Overview of Study Process

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project West Capitol Avenue Road Rehabilitation and Safety Enhancement Project Stakeholder Focus Group Meeting #2 Tuesday, August 28, 2018 7:00 8:00 a.m. West Sacramento City Hall 1110 West Capitol Avenue, West

More information

Responses to Comments

Responses to Comments Chapter 3 Responses to Comments This chapter contains the comments and written responses to each of the comments received on the Draft EIR/EA during the 45-day public review period from June 1, 21 through

More information

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Creating Great Streets Through Road Diets and Conversions The Charlotte Experience Topics to Discuss Charlotte s

More information

~EV~~LY STAFF REPORT. Meeting Date: January 13, Honorable Mayor & City Council

~EV~~LY STAFF REPORT. Meeting Date: January 13, Honorable Mayor & City Council ~EV~~LY Meeting Date: January 13, 2015 STAFF REPORT To: From: Subject: Honorable Mayor & City Council Aaron Kunz, Deputy Director of Transportation Martha Eros, Transportation Planner Bicycle Sharing Program

More information

El Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012

El Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012 El Camino Real Bus Rapid Transit Conceptual Engineering Los Altos Council Workshop January 24, 2012 Agenda Introduction Growth in the El Camino Real Corridor Benefits of BRT El Camino Real BRT Decision

More information

Columbia Pike Implementation Team (CPIT) Meeting

Columbia Pike Implementation Team (CPIT) Meeting Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal

More information

Station 1: Street & Sidewalk Upgrades

Station 1: Street & Sidewalk Upgrades Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 12a 9/8/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.

More information

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes Minutes Approved as Submitted Date: 2/8/18 Initials: EC BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes December 14, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m.

More information

April 10, Lathrup Village. Non-Motorized Transportation Improvement Program

April 10, Lathrup Village. Non-Motorized Transportation Improvement Program April 10, 2012 Lathrup Village Non-Motorized Transportation Improvement Program 2012 2017 www.birchlerarroyo.com OVERVIEW Complete Streets is a national movement to ensure that roadways are designed and

More information

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT: AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM

More information

University of California, Davis Transit Signal Priority Implementation Study

University of California, Davis Transit Signal Priority Implementation Study Proposal University of California, Davis Transit Signal Priority Implementation Study Prepared for: Prepared by: University of California, Davis 2990 Lava Ridge Court Suite 200 Roseville, CA 95661 November

More information

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement PROJECT OVERVIEW Project Goal and Description The goal of the Broadway Safety Improvement d St Van Ness Ave Project is to improve safety and comfort for all who Franklin St Hyde St Octavia St Gough St

More information

DRAFT. Memo. Range of the Alternatives Considered in the EIS

DRAFT. Memo. Range of the Alternatives Considered in the EIS Memo Date: Friday, December 09, 2016 Project: To: From: Subject: State Route 30 EIS UDOT Vince Izzo This memorandum summarizes the draft State Route (S.R.) 30 Level 1 screening results. A more detailed

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017 WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND

More information

City of Memphis On-Street Parking Modification Guidelines

City of Memphis On-Street Parking Modification Guidelines City of Memphis Effective Date: December 1, 2013 Bicycle/Pedestrian Program 125 N. Main Street Memphis, TN 38103 (901) 576-6710 www.bikepedmemphis.com City of Memphis Executive Summary It is current practice

More information