PARDON OUR DUST. Arlington Boulevard (Route 50), 10 th Street and Courthouse Road Interchange (ARRA) Project No. (FO) , C501, B612, B611
|
|
- Percival Griffin
- 5 years ago
- Views:
Transcription
1 PARDON OUR DUST Arlington Boulevard (Route 50), 10 th Street and Courthouse Road Interchange (ARRA) Project No. (FO) , C501, B612, B611
2 WELCOME Larry Tomlinson, P.E., L.S. Area Construction Engineer & Ken Connors, P.E., C.C.M., P.M.P Project Manager 2
3 Tonight s Agenda: Introduc of the onstruction eam Project Update Construction Elements Sequence of Construction Detours & Lane Closures Night Work Questions 3
4 Project Partners Virginia Department of Transportation Arlington County Flippo Construction Co. Inc. Citizens 4
5 Construction Team & Contact Information Project updates will be posted on VDOT s website at: 5 courthouse_road.asp VDOT Field Office Location: 1426 Columbia Pike, Arlington, VA VDOT Construction Management Contact Information: Shirley Reeves Project Inspector Shirley.Reeves@VDOT.Virginia.gov Jitender (Jay) Babra Construction Manager Jitender.Babra@VDOT.Virginia.gov Ken Connors, P.E.,PMP Project Manager Ken.Connors@vdot.virginia.gov Contractor: Flippo Construction Co., Inc. Contact Information Roger Shunnarah Project Manager rshunnarah@flippo.com Sean Igoe Office Engineer sigoe@flippo.con
6 Project Information Contract Amount: $ 21,434, New interchanges at both 10 th Street and Courthouse Road Adding C-D roads to both EB and WB Route bike trails on both sides of Route retaining walls (MSE and VDOT St d. RW) Art work on eight (8) retaining walls Two (2) new bridges Three (3) signalized intersections Lighting (roadway lighting and bridge LED accent lighting) Utility construction Special design SWM structures Landscaping 6
7 Project Location 7
8 Project Vicinity 8
9 Route th Street and Courthouse Rd. Interchanges Overview of Completed Project with New Traffic Signals 9
10 Phased Construction: Stage 1- Phase IA SPRING 2011 Pavement build-up night work. Lane closures during non-rush hours. Install construction signs and erosion control measures. 10
11 Phased Construction: Stage 1- Phase IB SPRING 2011 Pavement build-up night work. Lane closures during non-rush hours. Install drainage structures and pipe along Rt. 50 WB. 11
12 Phased Construction: Stage 1 - Phase II SUMMER/FALL 2011 Construction of North Fairfax Drive and Portion of Courthouse Road Retaining Wall (temporary shoring) Temporary Pavement Pedestrian Detour A Shift Rt. 50 WB traffic to new build-up section. 12
13 Phased Construction: Stage 1 - Phase III WINTER Closure of Ramp from WB 50 to Courthouse Road Closure of Fairfax Drive Detours 1 and 2 Temporary Signal from Courthouse to Rt. 50 WB. Construct CD road, Fairfax Drive & Courthouse Rd. ramps.
14 Phased Construction: Stage 2 - Phase I SPRING/SUMMER 2012 Construction of New Bridges 10th Street & Courthouse Road Retaining Walls (temporary shoring) Temporary Signal & Detours 3 and 4 Fairfax, Taft & Troy to reopen 14
15 Phased Construction: Stage 2 - Phase II Fall 2011 Open New Bridges 10 th Street & Courthouse Road Retaining Walls (temporary shoring) Temporary Signal & Detours 3 and 4 Demolition of old Courthouse Road Bridge 15
16 Phased Construction: Stage 2 - Phase III WINTER Retaining Walls (temporary shoring) Temporary Signal & Detours 3 and 4 Construct 10 th Street Bridge ramps Rt. 50 EB open from 10 th Street & Courthouse Road Overlay Rt. 50 EB
17 Phased Construction: Stage 3 - Phase I SPRING/SUMMER 2013 Construction of Ramp E From Rt. 50 EB to North Rolfe Street Finalize construction of EB Route 50 EB Trail 17
18 Phased Construction: Stage 3 - Phase II FALL 2013 Construction of Ramp E from Rt. 50 EB to North Rolfe Street Finalize construction of EB Route 50 EB Trail 18 Finish Retaining Walls
19 Traffic Detours During Construction Detour 1 (Winter 2011 to Spring 2012) Westbound Rt. 50 ramp to N. Courthouse Rd. closed. Signed detour will be 15th St. N. Westbound Rt. 50 to N. Fairfax Drive closed. Signed detour will be 10th St. N. to N. Barton. Detour 2 (Winter 2011 to Spring 2012) Fairfax Drive closed between N. Troy Street and N. Scott Street Signed detour will be N. Scott St. to 13th St. N. to N. Troy Street (Scott, Taft, Troy Streets remain open, only access to Fairfax Drive is closed).
20 Traffic Detours During Construction 20 Detour 3 (Spring 2012 to end Winter 2012/Spring 2011 Ramp from southbound 10th St. to eastbound Rt. 50 and Fairfax Drive closed. Signed detours (two) will be Washington Blvd. to N. Pershing to Rt. 50, and N. Barton to N. Pershing to Rt. 50
21 Traffic Detours During Construction Detour 4 (Fall 2012 to end Winter 2012/Spring 2013) Ramp from eastbound Rt. 50 to Courthouse Rd. closed. Signed detour will be Washington Blvd. to Garfield St. to Clarendon Blvd. 21
22 Limitations Of Operations Route 50 EBL & WBL's Day Open all lanes to traffic no later Reduce to 2 lane of traffic no earlier than than Monday 5:00 AM 11:00 PM Tuesday 5:00 AM 11:00 PM W ednesday 5:00 AM 11:00 PM Thursday 5:00 AM 11:00 PM Friday 5:00 AM NO LANE CLOSURES Saturday NO LANE CLOSURES NO LANE CLOSURES Sunday NO LANE CLOSURES 11:00 PM Route 50 EBL & WBL's Day Open all lanes to traffic no later Reduce to 2 lane of traffic no earlier than than Monday 3:00 PM 9:00 AM Tuesday 3:00 PM 9:00 AM W ednesday 3:00 PM 9:00 AM Thursday 3:00 PM 9:00 AM Friday 3:00 PM 9:00 AM Saturday NO LANE CLOSURES NO LANE CLOSURES Sunday NO LANE CLOSURES NO LANE CLOSURES 22
23 Typical Section 23
24 Aesthetic Retaining Walls Aesthetic MSE Wall Panels Art Pattern Walls Special Provision Artist Coordination Cast-in-Place Walls Rustication Treatment (Sine Wave Pattern) Special Pedestrian Handrail 24
25 25
26 26
27 Accent Lighting With Decorative Steel Facia Panels Backlit Panels Color LED Accent Lighting LED Lighting Controller 27
28 28 Question & Answer Session
Capital Beltway HOT Lanes Project
New Travel Choices Ahead Capital Beltway HOT Lanes Project Update January 2011 Major Milestones Reached in 2010 Project is 55% complete New bridge spans completed at every interchange; Second phase well
More informationCharlottesville Regional Chamber of Commerce. October 28, 2014
Charlottesville Regional Chamber of Commerce October 28, 2014 1 A. Rt. 29 Project Delivery Advisory Panel B. Contract Procurement Schedule Status C. Panel Recommendations D. Right of Way and Easements
More informationColumbia Pike Implementation Team (CPIT) Meeting
Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal
More informationRoute 1 and Harrison Road Intersection Improvements
Route 1 and Harrison Road Intersection Improvements April 27, 2016 Randy McKinney, P.E. Virginia Department of Transportation, Fredericksburg District Area Construction Engineer Route 1 and Harrison Road
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationCity of Fairfax, Virginia City Council Work Session
City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 12a 9/8/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE
More informationRio Intersection Traffic Restrictions Begin Monday
May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September
More informationCITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES
CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project
More informationInstitute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017
Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia
More informationCapital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report
Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered
More informationCapital Beltway HOT Lanes Project
Some things can t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead Some things can t wait for traffic Overview Two new lanes in each direction Carpool/HOV-3 lanes on the Beltway
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationCOMMUNITY WORKSHOP (CW) 3 February 21, 2015
QEW Improvements QEW Improvements COMMUNITY WORKSHOP (CW) 3 February 21, 2015 1 WORKSHOP PURPOSE MOVING FORWARD Review of Technically Preferred alternative Seeking feed back for progressing to next design
More informationCapital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report
Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationRoundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA
Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA VDOT & FHWA Roundabout Workshop September 17, 2013 Chris Tiesler, PE Presentation Outline US 15/US
More informationI-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT
I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate
More informationTransform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018
Transform I-66 Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform 66: Program Goals Improve multimodal mobility by providing diverse travel choices in a cost-effective manner Enhance transportation
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationPenrose Neighborhood Association Mr. Tom Greenfield Arlington View Civic Association Mr. George Figliozzi
Overview of 4 th Bridge Working Group Meeting For the Route 27/244 Interchange Modification Project (VDOT Project No. 0027-000-V01, UPC 13528) Held June 12, 2006 At the Carver Center, Arlington The fourth
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 15, 2013 DATE: June 4, 2013 SUBJECT: Request to authorize Advertisement of a Public Hearing to consider an Amendment to Chapter 14.2
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationUPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase
Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally
More informationPRESENTATION OUTLINE
November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationTRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE February 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-039 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationAttached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects
More informationWelcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.
BRIDGE REHABILITATION Welcome 53 Avenue Overpass over Whitemud Drive Rehabilitation Public Information Session Wednesday, March 9, 2016 4:30-8:00 p.m. Tonight you can: Learn about the 53 Avenue Overpass
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed
More informationTOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,
TOWN OF PALM BEACH DATE: November 9, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction & Traffic Highlights
More informationCincinnati Dayton Rd Widening
Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge
More informationOffset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico
Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016
More informationImportant Lane Closures for Jan , 2012
Jan. 19, 2011 CONTACT: Marcia McAllister T: 703-572-0506 C: 571-730-9117 marcia.mcallister@dullesmetro.com Important Lane Closures for Jan. 22-28, 2012 Bridge Construction along Median of Route 7 Continues,
More informationReplacement of N. Carlin Springs Road Bridge over George Mason Dr.
Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Approximate schedule with phases and proposed Maintenance of Travel (MOT) plans February 2017 Project Elements Removal of existing bridge
More informationI-95/Temple Avenue Improvements Project Colonial Heights, VA
I-95/Temple Avenue Improvements Project Colonial Heights, VA Pardon Our Dust Informational Meeting February 3, 2016 Harold Dyson, P.E. Construction Manager, Richmond District Tom Heil, P.E. Allan Myers
More informationIL Route 71 Construction Update
100 Parkers Mill Oswego, IL. 60543 (630) 554-3618 4.20.16 IL 71 TRAFFIC ADVISORY: Tentatively scheduled for April 21st A new traffic pattern from Paradise to Wolf Crossing on IL 71 will be in use. The
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of March 16, 2019
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of March 16, 2019 DATE: February 13, 2019 SUBJECT: Request to authorize Advertisement of a Public Hearing to consider an Amendment to Chapter
More informationAccess Routes from US 101 to the Richmond San Rafael Bridge
Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated
More informationACCELERATED CONSTRUCTION STRATEGIES. Selection and Impact
ACCELERATED CONSTRUCTION STRATEGIES Selection and Impact Accelerated Construction Strategies Why Use Accelerated Construction Strategies? Reduce construction time Promote innovative construction strategies
More informationMeeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10
Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of October 20, 2018
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 20, 2018 DATE: October 16, 2018 SUBJECT: Ordinance to Amend Chapter 14.2 (Motor Vehicles and Traffic), Section 14.2-12(a) of the Code
More informationMeade Street Bridge Design Alternative Study
Meade Street Bridge Design Alternative Study Preferred Alternative Presentation Stakeholder Meeting #3 June 23, 2011 Presented by: Dan Biggs, RLA Meeting Agenda Purpose: 1. Review Meeting #2 Feedback 2.
More informationPRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET
PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. MARKET I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT JANUARY 23, 2017 Public Meeting & Open House #2 TODAY S MEETING Purpose:
More informationEXHIBIT U THE SCOPE DOCUMENT
EXHIBIT U THE SCOPE DOCUMENT 1. Introduction 1.1 Purpose of the Scope Document The Scope Document provides an overview of the Route 495 HOT Lanes in Virginia Project as description of the Concessionaire
More informationCrystal City Citizen Review Council Meeting. July 10, 2013
Crystal City Citizen Review Council Meeting July 10, 2013 Topics to be covered Overview of Crystal City Transportation Projects Capital Program Investments Regional Coordination 9 Program Overview Crystal
More informationManaging Dulles Rail Construction in Tysons Corner
Managing Dulles Rail Construction in Tysons Corner National Association of Industrial and Office Properties Northern Virginia Chapter Richard Stevens Fairfax County Department of Transportation September
More informationThe Year Ahead: Virginia Department of Transportation Northern Virginia District
The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov
More informationGRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015
GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 Welcome! Meeting Agenda Project update presentation Up to 15 minutes for Pulse Q&A about project design. (Please reserve
More informationDULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director
DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion
More informationRoute 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015
Route 28 Corridor Safety and Operations Study Public Information Meetings July 20 and 22, 2015 1 Study Goals and Objectives Phase 1 Short-term Short-term improvements Ability to implement quickly Cost
More informationDulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements
More informationMcLEAN CITIZENS ASSOCIATION
McLEAN CITIZENS ASSOCIATION RESOLUTION DULLES RAIL SUPPLEMENTAL EIS With ATTACHMENT A - PEDESTRIAN AND BICYCLE ACCESS ISSUES DULLES CORRIDOR RAIL STATIONS IN TYSONS CORNER (Charts - 7 pages) Approved by
More informationMASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018
MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018 AGENDA Introductions Project Benefits Progress to Date Schedule for Remaining Work Phase 3 Activities, Impacts & Traffic Detours Phase 4 Activities
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationWelcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study
Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationMoPac South: Impact on Cesar Chavez Street and the Downtown Network
MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationPRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT
PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationPUBLIC INFORMATION MEETING
PUBLIC INFORMATION MEETING Bridge Rehabilitation Project Project Identification Number 5134.45 NY Route 5 Buffalo Skyway I-190 North Ramp, Pearl Street Ramp Wednesday, April 18, 2018 4:00 p.m. to 7:00
More informationProject Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationCrystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update
Enforcement Ordinance & Construction Update December 2015 Project Purpose Provide high-capacity, high-quality transit service Support redevelopment in Crystal City and in Potomac Yard in Alexandria and
More informationApplication to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.
September 7 th, 2007 Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. Acting District Administrator Mr. Morteza Salehi has endorsed
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationPublic Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018
Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationVehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015
Vehicular and Pedestrian Access to Herndon Metrorail Station Robert B. Boxer, Director John Stuart, Clark Nexen Project Location The project is located in the Town of Herndon along Herndon Parkway between
More informationInterstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017
EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses
More informationI-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016
I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 Susan Shaw, PE, Megaprojects Director, Virginia Department of Transportation Amanda Baxter, Special Projects
More informationDDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior
DDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior Overview How did we get to the DDI concept? What s
More informationTruck Climbing Lane Traffic Justification Report
ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:
More informationVDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations
VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationTECHNICAL MEMORANDUM. Introduction
TECHNICAL MEMORANDUM To: From: John M. Welsh Chris Furlong AHC, Inc. Andrew T. Smith, P.E. Edward Y. Papazian, P.E. Kimley-Horn and Associates, Inc. Date: July 6, 2017 Subject: 200 9 th reet South Redevelopment
More informationCSAH 101 Preliminary Design
CSAH 101 Preliminary Design Public Open House No. 2 January 29, 2013 CSAH 62 to Hutchins Drive Welcome / Introductions Hennepin County Craig Twinem, Transportation Maury Hooper, Transportation Nick Peterson,
More informationRoute 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council
Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: 0007-253-109 UPC 106573 Presentation to Town Council June 26, 2017 Council Decisions East Market Street / Battlefield
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationMeeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05. Coordination See attached sign-in sheet
Meeting Date 10/18/2005 Type Internal Team Progress Other Date of Issuance 10/25/05 Coordination Attendees See attached sign-in sheet Location Great Hall, Holland Tunnel Route 139 Contract 2 PANYNJ Coordination
More informationCITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT
Meeting Date: May 10, 2016 Department: Submitted By: Prepared By: Agenda Title: Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. CITY
More informationTransportation and General Civil Engineering Projects
Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM
More informationRoute 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT
More informationFairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells,
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE October 12 October 18, 2017 Gunnery Road and 8th Street SW Intersection
More informationTraffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas
ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest
More informationTysons-Old Meadow Road Bike/Ped Improvements
Tysons-Old Meadow Road Bike/Ped Improvements Design Workshop #1 Thursday, November 9, 2017, 7:00 pm to 9:00 pm Westgate Elementary School, Falls Church, VA Fairfax County Agenda Open house Presentation
More informationJoshua Jester, E.I., Florida Department of Transportation, District One
MEMORANDUM To: From: Joshua Jester, E.I., Florida Department of Transportation, District One Michael Garau, P.E., Kimley-Horn and Associates, Inc. Date: October 5, 2018 Subject: at Gulfstream Avenue Intersection
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationFY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices
FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family
More information72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting
72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME Public Information Meeting Project Goals About the Project The goal of this project is to address congestion along 72 Avenue and adjacent streets
More informationCasablanca Boulevard & GO Station Access
Casablanca Boulevard & GO Station Access Class Environmental Assessment STAKEHOLDER WORKSHOP Thursday September 27th, 2018 5:30PM 8:00PM 1 WORKSHOP PURPOSE Provide an overview of the Design Alternatives
More information