PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL PMH. PIKE McFARLAND HALL ASSOCIATES, INC. ARCHITECTS & PLANNERS

Size: px
Start display at page:

Download "PROPOSED CONVERSION OF MYRTLE BEACH MIDDLE SCHOOL TO MYRTLE BEACH ELEMENTARY SCHOOL PMH. PIKE McFARLAND HALL ASSOCIATES, INC. ARCHITECTS & PLANNERS"

Transcription

1 PIKE McFARLAND HALL ASSOCIATES, INC. ARCHITECTS & PLANNERS October 9, 2017

2 EXISTING INTERMEDIATE SCHOOL BUS ROUTE EXTENSION ELEMENTARY SCHOOL NEW SIDEWALK TO PEPPER GEDDINGS RECREATION CENTER NEW SIDEWALK TO JOIN EXISTING CITY SIDEWALK PEPPER GEDDINGS RECREATION CENTER MIDDLE SCHOOL DOUG SHAW MEMORIAL STADIUM HIGH SCHOOL PRIMARY SCHOOL EXISTING BUS ROUTE BUS ROUTE EXTENSION

3 NEW FIRE LANE NEW FIRE LANE ENERGY PLANT PLAYGROUND 28,520 SF NEW SIDE WALK EXISTING BUS LOOP NEW FIRE LANE SITE PLAN

4 NEW HVAC SYSTEM NEW FINISHES NEW CEILINGS NEW LIGHTS 100% NEW FIRE SPRINKLER 100% NEW FIRE ALARM EXISTING AREA RENOVATION AREAS PROPOSED RENOVATION FLOOR PLAN

5 3 rd = 18 x 21.5 = th = 17 x 24.5 = th = 17 x 24.5 = 416 1,219 Students ADMINISTRATION CIRCULATION & TOILETS CLASSROOMS = 6 (+2 POSS) INTERV = 2 ISS = 1 AP = 2 SELF CONT. = 4 GUIDANCE = 2 + CONF SPEECH = 1 ART = 1 MUSIC = 1 P.E. = 1 COMPUTER LAB = 1 ENCLOSED SQ. FT. 134,520 AP th th th th AP 4 th -5 4 th th th th - 9 SELF CONT COMP LAB 4 th th - 11 INTER INTER 5 th th th th th th th th th th th th th th th - 9 SELF CONT 5 th - 10 ART 5 th th th - 11 SELF CONT MUSIC MEDIA CENTER SUPPORT SPACES EXPLORATORY PROGRAMS FOOD SERVICE MUSIC GYM 5 th th th th SELF CONT SP ED CAFETERIA MEDIA CENTER ADMINISTRATION KIT COMPOSITE FLOOR PLAN

6 SCHEDULE

7 SCHEDULE

8 Opinion of Probable Costs based on discussions with Horry County Schools staff and evaluation of the existing Myrtle Beach Middle School to convert to new Myrtle Beach Elementary School (grades 3, 4 and 5): BASIC BUILDING RENOVATION SCOPE SITE WORK $ 1,156,859 Bus Loop Extension, Fire Lane Extension, Sidewalks, Site Utilities (Fire Line, Backflow Preventer, Heater, Power, FDC Connection, 6 Tap, Generator), Playground, Rough Grading, Signage, Contractors Overhead and Profit, Contingency (10%) BUILDING CONVERSIONS $ 6,361,164 Renovate Approximately 21,170 SF, New Millwork (52 Classrooms), Add Windows (8 Classrooms), Remove and replace existing Ceilings and Grid (22,871 SF), Electrical for Smartboards (14 Classrooms) HVAC (14 Classrooms), New Sinks (20 Classrooms), Paint (21,170 SF) Flooring (no wax in Corridors), Carpet / Base (52 Classrooms), Locker Removal Fire Sprinkler System (133,701 SF), ConvertAuditorium (into 2 Classrooms and 2 Intervention Rooms), New Gang Toilets, Water Source Heat Pump HVAC (Gym and 2 Classroom Wings), Energy Plant Building Contractor s Overhead and Profit, Contingency (10%) ESTIMATE

9 OTHER FACILITY-WIDE RENOVATIONS $ 2,116,203 Corridor Flooring, Gym Curtain Divider, Stage Curtains, Fire Alarm System Replace SCW doors in gang toilets with solid phenolic partitions, Add drinking fountains, Furniture Moving Allowance, Technology, Security / Surveillance / Access Control, HVAC Controls, Signage, Contractor s Overhead and Profit Contingency (10%) SOFT COSTS $ 2,995,820 Fixtures, Furnishings and Equipment (FFE), (new student desks and chairs) HCS Contingency (10%), A/E Fees, Surveying, Geotechnical Exploration, Special Inspections, Testing, etc. (15%) TOTAL $ 12,630,046 ESTIMATE

10 LONG RANG NEEDS Additional needs identified to be addressed in the near future - based on the Long Range Facilities Study. CONSTRUCTION $ 7,879,117 Replace Gym Floor, Paint Remainder of Building New Carpet (Administration), Replace Plumbing Fixtures Replace HVAC with Water Source Heat Pump (Remainder of Building), Replace Remainder of Ceilings and Grid, Replace Lights with LED Contingency (10%) SOFT COSTS $ 1,969,780 HCS Contingency (10%), A/E Fees, I.T., Special Inspections, Testing, etc. TOTAL $ 9,848,897 SUMMARY Basic Building Renovation Scope $ 12,630,046 Additional Needs $ 9,878,891 GRAND TOTAL $ 22,478,943 ESTIMATE

11 PIKE McFARLAND HALL ASSOCIATES, INC. ARCHITECTS & PLANNERS October 9, 2017

12 3 rd = 18 x 21.5 = th = 17 x 24.5 = th = 17 x 24.5 = 416 1,219 Students = 6 (+2 POSS) INTERV = 2 ISS = 1 AP = 2 SELF CONT. = 4 GUIDANCE = 2 + CONF SPEECH = 1 ART = 1 MUSIC = 1 P.E. = 1 COMPUTER LAB = 1 B E Square Footage Per Area: A = 19,323 S.F. B = 18,111 S.F. C = 12,623 S.F. D = 3,724 S.F. E = 20,389 S.F. F = 14,486 S.F. G = 12,256 S.F. H = 15,068 S.F. J = 11,500 S.F. K = 5,700 S.F. ENCLOSED SQ. FT. 134,520 G J K A C D F H EXISTING AREA RENOVATION AREAS PROPOSED RENOVATION FLOOR PLAN

Superintendent s Proposed Capital Improvements Program. Fiscal Years (Revised January 14, 2019)

Superintendent s Proposed Capital Improvements Program. Fiscal Years (Revised January 14, 2019) Superintendent s Proposed Capital Improvements Program Fiscal Years 20202025 (Revised January 14, 2019) FISCAL YEARS 20202025 SUMMARY SUPERINTENDENT'S PROPOSED CAPITAL IMPROVEMENTS PROGRAM FISCAL YEARS

More information

Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Status Update

Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Status Update 1 WRT 1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Status Update Presentation to Springfield School District School Board Meeting / Executive Session-

More information

WITTICH HALL RENOVATION

WITTICH HALL RENOVATION WITTICH HALL RENOVATION ROOM DATA SHEETS APPENDIX 4 DFD Project No. 14I20 FINAL DRAFT November 1, 2016 Page Intentionally Left Blank TABLE OF CONTENTS A. DEPARTMENTAL OFFICES - 2ND FLOOR B. DEPARTMENTAL

More information

East Tennessee State University. Johnson City, Tennessee

East Tennessee State University. Johnson City, Tennessee Johnson City, Tennessee East Tennessee State University ATHLETICS AND PHYSICAL EDUCATION MASTER PLAN REVISION - MAY 2004 TABLE OF CONTENTS HEERY INTERNATIONAL, INC. SPORTS FACILITY DESIGN AND MASTER PLAN

More information

Facility Condition Assessment Report

Facility Condition Assessment Report Facility Condition Assessment Report Facility: \Middle Schools\Redan Middle Address: 1775 Young Road, Lithonia, GA 30058 Attributes: Facility Code 0205 Super Cluster 3 General Information: Function: Middle

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

Charles Barrett. Support Educational Program. Charles Barrett Total. Support Educational Program

Charles Barrett. Support Educational Program. Charles Barrett Total. Support Educational Program Site CIP Category 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Grand Total Storm Water Management 110,000 110,000 Charles Barrett Cora Kelly Douglas MacArthur Francis C. Hammond George Mason Charles

More information

Facility Condition Assessment Report

Facility Condition Assessment Report Facility Condition Assessment Report Facility: \P-12 Schools\Fernbank Science Center Address: 156 Heaton Park Drive N.E., Atlanta, GA 30307 Attributes: Facility Code 1600 Super Cluster 0 General Information:

More information

MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018

MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018 MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018 May 3, 2018 Executive Summary: Highland Elementary School 3100 Medway Street Silver Spring, MD 20902 Round of Testing: Initial # of Outlets

More information

Northshore School District

Northshore School District Northshore School District 2018 Capital Bond Planning Task Force Meeting #6: March 9, 2017 AGENDA Minutes from 2/16/17 Review/Approve Growth Projects Update Building Condition Assessment Taking a deeper

More information

Unit # ± 5,514 SF Width ± 85' Depth ± 68' Plans produced by: ID Plans 10/12/2016 (813)

Unit # ± 5,514 SF Width ± 85' Depth ± 68' Plans produced by: ID Plans 10/12/2016 (813) ±50' Lease Line ±20' ±15' Lease Outline Drawing ±65' Lease Line ±68' Lease Line Sunnymead Plaza 24949 Sunnymead Blvd., Moreno Valley, CA 92553 Unit # 24949 ± 5,514 SF Width ± 85' Depth ± 68' Plans produced

More information

Facilities Services. School Board Workshop July 10, 2018

Facilities Services. School Board Workshop July 10, 2018 Facilities Services School Board Workshop July 10, 2018 Outline Capacity Planning 2 Status of February 2017 Plan 2018-19 Student Accommodation Plan Elementary Secondary Vacant Properties Impact Fees Surtax

More information

Tampa: Davis Islands Recreation Area

Tampa: Davis Islands Recreation Area 1) PROCESS a) Provide As-Built Documentation i) Elements Design Team completed measured as-built drawings as well as extensive photo documentation of the building. ii) Elements Design Team met and held

More information

ADVANCED FORENSIC INVESTIGATIONS FOR HAZARDOUS ENVIRONMENTS

ADVANCED FORENSIC INVESTIGATIONS FOR HAZARDOUS ENVIRONMENTS Host-Provided Resources The Point of Contact should provide participant information prior to the training start date so the instructors may become familiar with the participants skill sets. Site Access

More information

SWIMMING POOL & SPA DOCUMENT SUBMITTAL LIST

SWIMMING POOL & SPA DOCUMENT SUBMITTAL LIST SWIMMING POOL & SPA DOCUMENT SUBMITTAL LIST Completed Application for Construction or Use (Permit application). Application must include authorized signature from the property owner if it is not owner

More information

Bond Steering Committee Recommendation. Monday, July 17, 2017

Bond Steering Committee Recommendation. Monday, July 17, 2017 Bond Steering Committee Recommendation Monday, July 17, 2017 Committee Membership Tom Bainter Bryan Benton John Craft* Tim Dennis Patrick Farr Weldon Hafley Sarah Hollenstein Paul Jacobs* Bev Johnson Jeff

More information

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee 2100 Clarendon Boulevard, Suite 700, Arlington, VA 22201 TEL 703-228-3525 FAX 703-228-3543 www.arlingtonva.us

More information

Traffic Impact Memorandum. May 22, 2018

Traffic Impact Memorandum. May 22, 2018 BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared

More information

LAND FOR SALE RAVINIA PARK DEVELOPMENT SHERIDAN BLVD, ARVADA, CO Presented By:

LAND FOR SALE RAVINIA PARK DEVELOPMENT SHERIDAN BLVD, ARVADA, CO Presented By: Jamis Companies, Inc. 2140 Arapahoe St Denver, CO 80205 www.jamisco.com EXECUTIVE SUMMARY OFFERING SUMMARY Sale Price: $275,000 - $1,000,000 Lot Size: 1.0 Acres Zoning: B2 Market: Arvada Submarket: Ravinia

More information

Expectations Grid Middle Schools

Expectations Grid Middle Schools Expectations Grid Middle Schools School Setting School-wide Behavioral Expectations Year School Rules REYNOLDS MIDDLE SCHOOL Student Expectations Respect Others Manage Self Stay Safe Common Area Respect

More information

Generic VI Health & Safety Risk Assessment Recommendations for Schools

Generic VI Health & Safety Risk Assessment Recommendations for Schools Generic VI Health & Safety Risk Assessment Recommendations for Schools Please select the risk assessment recommendations that are appropriate to your school / VI pupil when compiling your school risk assessment.

More information

Ordinance No Exhibit A. Application

Ordinance No Exhibit A. Application PLANNING AND ZONING FEES: Application Fee Site plan/design review $100.00 Sign permit $ 50.00, plus $.50 per sq. ft. Conditional Use Permit $125.00 Zoning Amendment $250.00 Zoning Board of Appeals Variance

More information

Tippecanoe School Corporation Capital Acquisition Plan 2019

Tippecanoe School Corporation Capital Acquisition Plan 2019 Capital Acquisition Plan 2019 Pursuant to IC 20 40 18 6, the plan contains a listing of all proposed capital expenditures that exceed $. Asset Description Acquisition Amount 1 Ford F350 Truck w/utility

More information

Be respectful. Be responsible. Be safe

Be respectful. Be responsible. Be safe Classroom Expectations Use kind words and actions Wait quietly Follow directions Follow directions the first time they are given Give your best effort Be prepared for class Keep hands, feet and objects

More information

MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018

MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018 MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018 May 3, 2018 Executive Summary: Summit Hall Elementary School 101 West Deer Park Road Gaithersburg, MD 20877 Round of Testing: Initial # of Outlets

More information

Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)

Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013) Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013) Plan Check/PCIS Application No.: Date: Job Address: Zone: Plan Check Engineer: Telephone: E-mail: firstname.lastname@lacity.org

More information

Proposed E-SPLOST V Project Listing with Anticipated Start/Finish Dates (March 20, 2017)

Proposed E-SPLOST V Project Listing with Anticipated Start/Finish Dates (March 20, 2017) Proposed E-SPLOST V Project Listing with Start/s (March 20, 2017) $1,230,000 Feb. 2021 Feb. 2022 Feb. 2024 May. 2024 $0 $1,230,000 101. Sprinkler Installation A 102. Sprinkler Installation B 103. Sprinkler

More information

Campbell Union High School District Revised 4/11/18. Master Plan Construction Schedule Summary Measure AA, QZAB, and Capital Facilities TODAY

Campbell Union High School District Revised 4/11/18. Master Plan Construction Schedule Summary Measure AA, QZAB, and Capital Facilities TODAY Branham High School Project Status 1 Two Story Concrete Building 4 STEM Labs + 6 CRs (Bldg. J) Feb. 2018 Aug. 2019 2 Two Story Concrete Building 8 STEM Labs + 6 CRs (Bldg. S) Feb. 2018 Mar 2019 3 Two Story

More information

City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA Phone: Fax:

City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA Phone: Fax: City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA. 15801 Phone: 814-371-2000 Fax: 814-375-2307 Permit No. LOCATION OF PROPOSED WORK OR IMPROVEMENT Municipality: Tax Parcel

More information

The Public Safety Complex Southampton MA. a critical time

The Public Safety Complex Southampton MA. a critical time The Public Safety Complex Southampton MA a critical time April 7, 2015 1863: Southampton constructs a new school house 1927: Southampton discontinues use of facility as a school December 1946: Southampton

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered

More information

MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018

MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018 MONTGOMERY COUNTY PUBLIC SCHOOLS DRINKING WATER TESTING 2018 April 24, 2018 Executive Summary: East Silver Spring Elementary School 631 Silver Spring Avenue Silver Spring, MD 20910 Round of Testing: Initial

More information

SIZING OF WATER PIPING SYSTEM

SIZING OF WATER PIPING SYSTEM SIZING OF WATER PIPING SYSTEM (This appendix is informative and is not part of the code.) SECTION AP101 GENERAL AP101.1 Scope. AP101.1.1 This appendix outlines two procedures for sizing a water piping

More information

Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Status Update

Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Status Update 1 WRT 1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Status Update Presentation to Springfield School District School Board Meeting / Executive Session-

More information

ADA PRESENTATION (CURB RAMPS)

ADA PRESENTATION (CURB RAMPS) ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project

More information

VALPARAISO HIGH SCHOOL NEW NATATORIUM Valparaiso Community Schools

VALPARAISO HIGH SCHOOL NEW NATATORIUM Valparaiso Community Schools VALPARAISO HIGH SCHOOL NEW NATATORIUM DESIGN UPDATE PREPARED BY: GIBRALTAR DESIGN SUBMITTED TO: OF TRUSTEES School Board Meeting CONTENT 1 2 3 4 5 6 7 Introduction Summary Programming Pool Considerations

More information

City of Crystal Lake Community Development Department

City of Crystal Lake Community Development Department City of Crystal Lake Community Development Department 100 W. Woodstock Street Crystal Lake, IL 60014 www.crystallake.org Phone (815) 356-3605 Fax (815) 479-1647 building@crystallake.org STORABLE ABOVE

More information

CARMACKS. Summary of Facilities: Community Hall Curling Rink Gymnasium Swimming Pool Outdoor Rink Playground/Gazebo Boardwalk Golf Course

CARMACKS. Summary of Facilities: Community Hall Curling Rink Gymnasium Swimming Pool Outdoor Rink Playground/Gazebo Boardwalk Golf Course CARMACKS Yukon Government Community Services - 1 - March 2006 Summary of Facilities: Community Hall Curling Rink Gymnasium Swimming Pool Outdoor Rink Playground/Gazebo Boardwalk Golf Course CARMACKS Boardwalk

More information

PROPERTY EVALUATION AND RESERVE FUND STUDY ~UPDATE~

PROPERTY EVALUATION AND RESERVE FUND STUDY ~UPDATE~ 808 S. College, Ste. 225A McKinney, Texas 75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY ~UPDATE~ RIVERCHASE OF WYLIE

More information

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type: Village of South Elgin Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com SWIMMING POOL/HOT TUB PERMIT APPLICATION PROPERTY

More information

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. GZA GeoEnvironmental, Inc. Engineers and Scientists October 17, 2014 File No. 18.0171857.00 Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. 01929 DRAFT Re: Essex River

More information

Montgomery County Public Schools Lead in Drinking Water Testing 2018

Montgomery County Public Schools Lead in Drinking Water Testing 2018 Montgomery County Public Schools Lead in Drinking Water Testing 2018 April 27, 2018 Executive Summary: Rock View Elementary School 3901 Denfeld Avenue Kensington, Maryland 20895 Round of Testing: Initial

More information

May Re: Fiscal Year Budget and Maintenance Fees. Aloha, Owners of Kakela Makai Oceanview Community Association,

May Re: Fiscal Year Budget and Maintenance Fees. Aloha, Owners of Kakela Makai Oceanview Community Association, 1 Hawaiiana Management Company, Ltd. Kukui Grove Executive Center 4370 Kukui Grove Street, Suite #208 Lihue, Hawaii 96766 Tel: (808) 240-3218 Fax: (808) 245-6583 Internet: www.hmcmgt.com May 2017 Re: Fiscal

More information

Capital Projects Plan

Capital Projects Plan Perry Township Schools Capital Projects Plan 2019 through 2021 August 2018 http://www.perryschools.org/departments/business-services/ Pursuant to IC 20-40-18-6, the Perry Township Schools plan contains

More information

2018 BOND PROPOSAL TO CONSTRUCT AND RENOVATE SCHOOL FACILITIES AND IMPROVE SECURITY

2018 BOND PROPOSAL TO CONSTRUCT AND RENOVATE SCHOOL FACILITIES AND IMPROVE SECURITY 2018 BOND PROPOSAL TO CONSTRUCT AND RENOVATE SCHOOL FACILITIES AND IMPROVE SECURITY Dr. Chrys Sweeting, Superintendent Mr. Brian Lewis, Executive Director of Operations Bonds to Construct and Renovate

More information

overview editorial feature list readership and circulation geographical breakdown

overview editorial feature list readership and circulation geographical breakdown /designmideast /designmiddleeast /designmiddleeast /designmiddleeast OVERVIEW Design Midde East provides reliable, timely and insightful industry knowledge for the region s core design and build professionals.

More information

Cape Cod Community College Studio Theatre Approved Seating & Stage Configurations Tilden Arts Center, Lower Level West Barnstable, Massachusetts

Cape Cod Community College Studio Theatre Approved Seating & Stage Configurations Tilden Arts Center, Lower Level West Barnstable, Massachusetts Cape Cod Community College Studio Theatre Approved Seating & Stage Configurations Tilden Arts Center, Lower Level West Barnstable, Massachusetts This booklet demonstrates the approved theatre configurations

More information

Spokane Sportsplex - Ice Only (DRAFT) (Spokane, WA) Five-Year Operating Pro Forma

Spokane Sportsplex - Ice Only (DRAFT) (Spokane, WA) Five-Year Operating Pro Forma Spokane Sportsplex - Ice Only () (Spokane, WA) Five-Year Operating Pro Forma Date: October 2015 Developed for: Spokane Public Facilities District Note: SFA has no responsibility to update this financial

More information

School Rules and Behavioral Expectations

School Rules and Behavioral Expectations School Rules and Behavioral Expectations Common Area Be Safe Be Kind and Respectful Be Responsible All Common Areas Playground/ Recess Walk facing forward Keep hands, feet, and objects to self Get adult

More information

Final Sidewalk Feasibility Study

Final Sidewalk Feasibility Study Garfield Drive From Anastasia Drive to Elizabeth Place City of South Daytona July 23, 2009 Final Sidewalk Feasibility Study Prepared for: Prepared by: Final Sidewalk Feasibility Study Garfield Drive 2

More information

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type: Village of South Elgin Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com SWIMMING POOL/HOT TUB PERMIT APPLICATION PROPERTY

More information

CUSTODIAL Safety Inspection Checklist

CUSTODIAL Safety Inspection Checklist CUSTODIAL Safety Inspection Checklist Priority 1 Any condition which is life-threatening, or may cause injury, or permanent disability Priority 2 Any condition which may cause serious, but non-disabling

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION SHA CTP Project No. MO891A21, US 29, Fairland Road to Musgrove Road Interchange Improvement, Design Review

More information

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS City of Redding 777 Cypress Avenue Redding CA 96001 Telephone: (530) 225-4013 FAX: (530) 225-4360 A Swimming Pool is any body of water 18 inches

More information

Indoor Multi-Sport Facility Analysis Loudoun 10/31/2014

Indoor Multi-Sport Facility Analysis Loudoun 10/31/2014 Indoor Multi-Sport Facility Analysis Loudoun 10/31/2014 Background Earlier study of sports facilities was conducted by SportImpacts of St. Louis, MO. Previous study concluded that an indoor sports complex

More information

WHEATLAND-CHILI CENTRAL SCHOOL DISTRICT 13 Beckwith Avenue, Scottsville, NY 14546

WHEATLAND-CHILI CENTRAL SCHOOL DISTRICT 13 Beckwith Avenue, Scottsville, NY 14546 WHEATLAND-CHILI CENTRAL SCHOOL DISTRICT 13 Beckwith Avenue, Scottsville, NY 14546 Deborah Leh, Ed.D. Superintendent of Schools 585.889.6246 deborah_leh@wheatland.k12.ny.us SUPERINTENDENT S REPORT Board

More information

Walking & bicycling to school: Maximizing opportunities for physical activity. Nancy Pullen-Seufert April 25, 2013

Walking & bicycling to school: Maximizing opportunities for physical activity. Nancy Pullen-Seufert April 25, 2013 Walking & bicycling to school: Maximizing opportunities for physical activity Nancy Pullen-Seufert April 25, 2013 Are you? I m aware of Safe Routes to School. I m actively involved in promotion walking

More information

Basic Rules of Pedestrian Safety (Primary, Elementary)

Basic Rules of Pedestrian Safety (Primary, Elementary) Basic Rules of Pedestrian Safety (Primary, Elementary) Grouping Individual Pair Small Group Whole Class Purpose To provide students with the basic knowledge and skill practice necessary to be safe pedestrians

More information

Phasing and Cost Estimate of Downtown Oxford Master Plan Prepared By: Phasing and Cost Estimate of Downtown Oxford Master Plan Purpose of the Study The primary objective of this study is to identify priority

More information

Country Residential Lots from 1 Acre PLUS! TEXAS Country Living at it s VERY BEST! Builder: Phone

Country Residential Lots from 1 Acre PLUS! TEXAS Country Living at it s VERY BEST! Builder: Phone Country Residential Lots from 1 Acre PLUS! TEXAS Country Living at it s VERY BEST! Builder: david@majorleaguecustomhomes.com Phone 940-206-6603 Realtor: cathy@majorleaguecustomhomes.com Phone 817-228-9936

More information

City of Crystal Lake Community Development Department

City of Crystal Lake Community Development Department City of Crystal Lake Community Development Department 100 W. Woodstock Street Crystal Lake, IL 60014 www.crystallake.org Phone (815) 356-3605 Fax (815) 479-1647 building@crystallake.org ABOVE GROUND SWIMMING

More information

City of Temecula Capital Improvement Program FY CMAA Inland Empire Cities Update October 24, 2018

City of Temecula Capital Improvement Program FY CMAA Inland Empire Cities Update October 24, 2018 City of Temecula Capital Improvement Program FY 2018-23 CMAA Inland Empire Cities Update October 24, 2018 Introduction City Profile Population: 113,181 (up 1.9% from 2017) Median Age: Number of Households:

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

SIZING OF WATER PIPING SYSTEM

SIZING OF WATER PIPING SYSTEM SIZING OF WATER PIPING SYSTEM The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance. E101.1 Scope. SECTION E101 GENERAL E101.1.1 This appendix

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Chester A. Arthur Elementary School ULCS# 2480 Building

More information

MONTGOMERY COUNTY PUBLIC SCHOOLS LEAD IN DRINKING WATER TESTING 2018

MONTGOMERY COUNTY PUBLIC SCHOOLS LEAD IN DRINKING WATER TESTING 2018 MONTGOMERY COUNTY PUBLIC SCHOOLS LEAD IN DRINKING WATER TESTING 2018 Executive Summary: Clarksburg Elementary School 13530 Redgrave Pl, Clarksburg, MD 20871 Date of Test Report: 5/11/2018 Round of Testing:

More information

Montgomery County Public Schools Lead in Drinking Water Testing 2018

Montgomery County Public Schools Lead in Drinking Water Testing 2018 Montgomery County Public Schools Lead in Drinking Water Testing 2018 April 27, 2018 Executive Summary: Potomac Elementary School 10311 River Road Potomac, Maryland 20854 Round of Testing: Initial # of

More information

Performance of Revised Duct Design, Save Money and Cool Customers

Performance of Revised Duct Design, Save Money and Cool Customers Performance of Revised Duct Design, Save Money and Cool Customers RESNET February 24, 2010 ASU Technology Dept. and Energy Center Jeff Tiller, Sean Gray, Erica Porras, Andrew Windham, Bruce Davis Heating

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

FINDLAY TOWNSHIP BUILDING INSPECTION DEPT

FINDLAY TOWNSHIP BUILDING INSPECTION DEPT Page 1 of 7 FINDLAY TOWNSHIP BUILDING INSPECTION DEPT. RESIDENTIAL SWIMMING POOLS Permit application submittal requirements (As per the 2009 International Residential Code) NOTE: A building permit is required

More information

Lakeside Green Street Project Improvement. Public Works Committee February 27, 2018

Lakeside Green Street Project Improvement. Public Works Committee February 27, 2018 Lakeside Green Street Improvement Public Works Committee February 27, 2018 Construction of Lakeside Green Streets is currently underway Photo: Sergio Ruiz Photo: Sergio Ruiz 100% Do people biking on the

More information

OFFICE SAFETY. Environmental Health and Safety. Greg Hogan Oklahoma State University Environmental Health and Safety

OFFICE SAFETY. Environmental Health and Safety. Greg Hogan Oklahoma State University Environmental Health and Safety Current as of September 2017 OFFICE SAFETY Greg Hogan Oklahoma State University Environmental Health and Safety 405-744-7241 OBJECTIVE Recognize potential hazards in office environments and learn to eliminate

More information

SRTS IMPLEMENTATION COSTS

SRTS IMPLEMENTATION COSTS SRTS IMPLEMENTATION COSTS What Is a Estimate? A cost estimate establishes the anticipated budget required to implement the actions (the improvement projects and programs) identified in your School Travel

More information

DAILY FACILITIES AND PROGRAMMING SCHEDULE Thursday, April 11, :00am-11:00pm

DAILY FACILITIES AND PROGRAMMING SCHEDULE Thursday, April 11, :00am-11:00pm Informal Recreation Schedule: Badminton: 6am-1pm (Court 01 only 8:50am-1pm) Gym East and 5:45-11pm Volleyball Arena Court 03 Basketball: 6-7:55am & 11am-11pm (Court 01-03 only 4-7pm) Gym Central, 8-11am

More information

BILL OF QUANTITIES 1 PRELIMINARY WORKS / GENERAL OBLIGATIONS 2 MOBILIZATION AND SITE PREPARATION :

BILL OF QUANTITIES 1 PRELIMINARY WORKS / GENERAL OBLIGATIONS 2 MOBILIZATION AND SITE PREPARATION : BILL OF QUANTITIES PROJECT : Proposed Remodelling of ADB Country Office CLIENT : ADB, Liberia. LOCATION : Sofey Ice cream Junction ~Congo town DATE : May, 2017. 1 PRELIMINARY WORKS / GENERAL OBLIGATIONS

More information

PEPIN ACADEMIES OF PASCO COUNTY BOARD OF DIRECTORS MEETING

PEPIN ACADEMIES OF PASCO COUNTY BOARD OF DIRECTORS MEETING PEPIN ACADEMIES OF PASCO COUNTY BOARD OF DIRECTORS MEETING April 14, 2015 IN ATTENDANCE Board members: Pepin Academies of Pasco County 9804 Little Rd. New Port Richey, FL 34654 6pm Ed Hammant Amy Turner

More information

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary Ocean Avenue Corridor Design Project Public Workshop #2 Summary The second public workshop for the Ocean Avenue Corridor Design Project was held on Wednesday, May 14, 2014 from, 6 to 8 pm at Lick Wilmerding

More information

Owner's Letter of Assurance

Owner's Letter of Assurance Owner's Letter of Assurance Instructions Educational Facilities WELL Certification is determined by onsite Performance Verification and documentation, including Letters of Assurance from the appropriate

More information

Geary Bus Rapid Transit Project

Geary Bus Rapid Transit Project Geary Bus Rapid Transit Project Urban Forestry Council Planning and Funding Committee Meeting September 13, 2016 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATON AGENCY

More information

ARVILLE INDUSTRIAL PARK

ARVILLE INDUSTRIAL PARK ARVILLE INDUSTRIAL PARK 4375 & 4355 W RENO AVE. LAS VEGAS, NV 89118 Erik Sexton Advisor 702.527.7704 erik.sexton@svn.com Scott Oelke Advisor 702.527.7703 scott.oelke@svn.com SVN Resort Management, LLC.

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

Downtown St. Paul Facility Improvements

Downtown St. Paul Facility Improvements Downtown St. Paul Facility Improvements Transportation Committee Information Item December 10, 2012 Julie Quinn, Planner, Engineering & Facilities 1 Project Location/Context 2 Project Purpose, Scope, &

More information

MCPS RADON TESTING. Executive Summary: Olney Elementary School

MCPS RADON TESTING. Executive Summary: Olney Elementary School E N G I N E E R S P L A N N E R S S C I E N T I S T S C O N S T R U C T I O N M A N A G E R S 936 RIDGEBROOK ROAD SPARKS, MD 21152 410-316-7800 (FAX) 410-316-7935 MCPS RADON TESTING Executive Summary:

More information

Swimming Pool Requirements

Swimming Pool Requirements Swimming Pool Requirements 8040 S. 6th Street Oak Creek, WI 53154 (414) 766-7000 www.oakcreekwi.org Revised: August 8. 2017 PERMITS A permit from the Inspection Department is required prior to putting

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. 4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification

More information

For lease Speedway Commerce Center I

For lease Speedway Commerce Center I For lease Speedway Commerce Center I Rates from $0.42/s.f. NNN CAM s $0.102/s.f. Up to 69,998 s.f. available On-site property management Dock and/or grade level doors HVAC office Evaporative cooled warehouse

More information

Whitemud Equine Learning Centre Association Riding Arena Replacement Project SUMMARY

Whitemud Equine Learning Centre Association Riding Arena Replacement Project SUMMARY SUMMARY The Whitemud Equine Centre is a City of Edmonton facility operated by WELCA for the purpose of providing equine programs for the community. The existing riding arena with its attendant spaces is

More information

Special Presentation Capt. Stuart Ellis, Third District Commander, Arlington County Police

Special Presentation Capt. Stuart Ellis, Third District Commander, Arlington County Police Fairlington Citizens Association Executive Board Meeting Minutes Fairlington Community Center 3308 Stafford Street South, Arlington, VA February 11, 2015, as approved Board Members Present President Guy

More information

ARCHERSTOWN DEMESNE. ASHBOURNE, CO MEATH

ARCHERSTOWN DEMESNE.  ASHBOURNE, CO MEATH ARCHERSTOWN DEMESNE ASHBOURNE, CO MEATH www.archerstownhomes.ie WELCOME TO THE ELMS THE PERFECT HOME FOR YOU A superb development of 3 bedroom semi-detached A rated, energy efficient family homes in Archerstown

More information

PUBLIC REALM MASTER PLAN

PUBLIC REALM MASTER PLAN WESTSHORE BUSINESS DISTRICT PUBLIC REALM MASTER PLAN MASTER PLAN COMMITTEE MEETING MARCH 20, 2013 WESTSHORE BUSINESS DISTRCT PUBLIC REALM MASTER PLAN MACRO-SCALE CONCEPT: A PUBLIC REALM FRAMEWORK DEFINED

More information

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018 March 2, 2018 Traffic Assessment for Woodhaven Redevelopment City of Rome Oneida County, New York Prepared for: City of Rome 198 N. Washington Street Rome, NY 13440 Prepared by: C.T. MALE ASSOCIATES 50

More information

WORKING AT HEIGHT POLICY

WORKING AT HEIGHT POLICY WORKING AT HEIGHT POLICY Issue 4 October 2015 Approved by: Head Teacher Bailey s Court Primary School Date: October 2015 Authorised by: Chair of Full Governing Body Bailey s Court Primary School Date:

More information

Laboratory Safety Coordinator Meeting

Laboratory Safety Coordinator Meeting Laboratory Safety Coordinator Meeting SUMMER 2013 News and Updates Welcome! Welcome New LSCs! Joseph Barbercheck- Associate Director Research Safety Andrea Voehringer Research Safety Specialist Good Byes!

More information

Name. Procedures for adding feet and inches

Name. Procedures for adding feet and inches Name # Procedures for adding feet and inches. Line up columns 2. Find lowest common denominator of fractional parts if necessary. Add fractional parts first, then move to the left, adding each column as

More information

SWIMMING POOL BUILDING PERMIT REQUIREMENTS FOR THE UNINCORPORATED TERRITORY OF DOUGLAS COUNTY, KANSAS

SWIMMING POOL BUILDING PERMIT REQUIREMENTS FOR THE UNINCORPORATED TERRITORY OF DOUGLAS COUNTY, KANSAS SWIMMING POOL BUILDING PERMIT REQUIREMENTS FOR THE UNINCORPORATED TERRITORY OF DOUGLAS COUNTY, KANSAS ALL CONSTRUCTION SHALL BE BUILT IN ACCORDANCE WITH STANDARDS SET FORTH IN THE 2012 International Code

More information

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN CLACKAMAS COUNTY COMMUNITY HEALTH DIVISION ENVIRONMENT & HEALTH SERVICES APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN APPLICATION IS HEREBY MADE

More information

FUNDING OPTIONS FOR COMPLETE STREETS PROJECTS. Dean Ledbetter, PE Senior Planning Engineer NCDOT Division Eleven

FUNDING OPTIONS FOR COMPLETE STREETS PROJECTS. Dean Ledbetter, PE Senior Planning Engineer NCDOT Division Eleven FUNDING OPTIONS FOR COMPLETE STREETS PROJECTS Dean Ledbetter, PE Senior Planning Engineer NCDOT Division Eleven DIVISION ELEVEN PRESENTATION OVERVIEW Sample Complete Streets Projects in Division Eleven

More information

Pre-Application Meeting Request Form

Pre-Application Meeting Request Form From: To: Subject: Date: noreply@civicplus.com Site Development Pre-Application Meetings Online Form Submittal: Pre-Application Meeting Request Form Tuesday, January 22, 219 3:5: PM Pre-Application Meeting

More information