1 BEDFORD COUNTY COUNTY-OWNED BRIDGES Bedford County Commissioners 2018
2 Bedford County Bridge No. 1 Snyder Creek Road (T-609) over Potter Creek in Bloomfield Township P/S Adjacent Plank (Non-Composite), Single-Span Built: Span Length: 27'-0". Roadway Width: 22'-0". Posting: None required. Bedford County Bridge No. 2 Clubhouse Road (T-634) over Yellow Creek in Woodbury Township P/S Adjacent Box (Non-Composite), Single-Span Built: Span Length: 42'-7". Roadway Width: 15'-7". Posting: None Required.
3 Bedford County Bridge No. 3 Queen Road (T-701) over Beaverdam Creek in Kimmel Township R/C Girder/Floorbeam, Single-Span Built: Rehabbed: Span Length: 49'-10". Roadway Width: 15'-10". Posting: None required. Bedford County Bridge No. 4 Langdon Drive (T-655) over Yellow Creek in Hopewell Township Steel Truss with Steel Grid Deck, Single-Span Built: Rehabbed: Span Length: 104'-10½". Roadway Width: 11'-8". Posting: 13 Tons.
4 Bedford County Bridge No. 5 Polecat Hollow Road (T-526) over Yellow Creek in Hopewell Township Steel Beam with Timber Deck, Two-Span Built: Span Length: 127'-4". Roadway Width: 20'-0". Posting: 17 Tons. Bedford County Bridge No. 6 (Hall s Mill Covered Bridge) St. Paul s Church Road (T-539) over Yellow Creek in Hopewell Township Timber Truss with Steel Beams, Single-Span Built: 1884/1994. Span Length: 99'-4". Roadway Width: 10'-6". Posting: 12 Tons.
5 Bedford County Bridge No. 7 Yellow Creek Drive (T-557) over Yellow Creek in Hopewell Township Steel Beam with Timber Deck, Single-Span Built: Span Length: 79'-0". Roadway Width: 20'-5½". Posting: 19 Tons. Bedford County Bridge No. 8 Covered Bridge Road (T-575) over Bobs Creek in East St. Clair Township P/S Adjacent Box (Composite), Single-Span Built: Rehabbed: Span Length: 75'-10". Roadway Width: 26'-0". Posting: None Required.
6 Bedford County Bridge No. 9 (Snook s Covered Bridge) Fish Hatchery Road (T-578) over Dunning Creek in East St. Clair Township Timber Truss with Steel Beams, Single-Span Built: 1883/1994. Span Length: 84'-5¼". Roadway Width: 10'-3". Posting: 12 Tons. Bedford County Bridge No. 10 Gordon Hall Road (T-574) over Georges Creek in East St. Clair Township P/S Adjacent Box (Composite), Two-Span Built: Span Length: 75'-3". Roadway Width: 16'-1½". Posting: None Required.
7 Bedford County Bridge No. 11 Cider Press Road (T-565) over Dunning Creek in West St. Clair Township Steel Beam with FRP Composite Deck, Two-Span Reconstructed: Span Length: 93'-9". Roadway Width: 20'-3½". Posting: None Required. Bedford County Bridge No. 12 (Ryot Covered Bridge) Bowser Road (T-549) over Dunning Creek in West St. Clair Township Timber Truss with Steel Beams, Single-Span Built: 1867/1996/2004. Span Length: 81'-4". Roadway Width: 10'-8". Posting: 16 Tons.
8 Bedford County Bridge No. 13 Pigeon Hill Road (T-494) over Adams Run in East St. Clair Township Steel Beam with Timber Deck, Single-Span Built: Span Length: 53'-0". Roadway Width: 18'-0". Posting: None Required. Bedford County Bridge No. 14 Rose Road (T-473) over Shawnee Branch in Napier Township P/S Adjacent Box (Non-Composite), Single-Span Built: Span Length: 36'-2". Roadway Width: 26'-0". Posting: None Required.
9 Bedford County Bridge No. 15 (Colvin Covered Bridge) Mill Road (T-443) over Shawnee Branch in Napier Township Timber Truss with Steel Beams, Single-Span Built: 1866/1997. Span Length: 69'-0". Roadway Width: 10'-9". Posting: 13 Tons. Bedford County Bridge No. 16 (Jackson s Mill Covered Bridge) Covered Bridge Road (T-413) over Brush Creek in East Providence Township Timber Truss with Steel Beams, Three-Span Built: 1889/1992. Rehabbed: Span Length: 149'-0". Roadway Width: 10'-1". Posting: 10 Tons.
10 Bedford County Bridge No. 17 (McDaniel s Covered Bridge) McDaniel Road/Bennett Road (T-419) over Brush Creek in East Providence Township Timber Truss, Single-Span Built: Span Length: 118'-0". Roadway Width: 11'-1½". Closed. Burned down in Bedford County Bridge No. 18 (Turner Covered Bridge) Faupel Road (T-418) over Raystown Branch of Juniata River in Harrison and Napier Townships Timber Truss, Single-Span Built: Span Length: 89'-0". Roadway Width: 12'-0". Posting: 3 Tons.
11 Bedford County Bridge No. 19 Grasser Road (T-413) over Raystown Branch of Juniata River in Juniata Township P/S Adjacent Box (Non-Composite), Single-Span Built: Span Length: 76'-9". Roadway Width: 20'-9¾". Posting: None Required. Bedford County Bridge No. 20 Akers Road (T-386) over Shaffer Creek in Monroe Township P/S Adjacent Box (Non-Composite), Single-Span Built: Span Length: 73'-6". Roadway Width: 26'-0". Posting: None Required.
12 Bedford County Bridge No. 21 Harrieta Lane (T-357) over Cove Creek in Colerain Township P/S Adjacent Box (Non-Composite), Single-Span Built: Span Length: 41'-2". Roadway Width: 22'-2½". Posting: None Required. Bedford County Bridge No. 22 Cove Road (T-358) over Little Wills Creek in Londonderry Township P/S Spread Box, Single-Span Built: Span Length: 81'-7". Roadway Width: 22'-0". Posting: None Required.
13 Bedford County Bridge No. 24 Blue Gap Road (T-323) over Town Creek in Southampton Township P/S Adjacent Box (Composite), Two-Span Built: Span Length: 106'-6". Roadway Width: 24'-9¾". Posting: None Required. Bedford County Bridge No. 25 Moss Road (T-327) over Piney Creek in Mann Township P/S Adjacent Box (Non-Composite), Single-Span Built: Span Length: 66'-4". Roadway Width: 20'-9¾". Posting: None Required.
14 Bedford County Bridge No. 26 Purcell Road (T-324) over Piney Creek in Mann Township Steel Beam with Concrete Deck, Single-Span Built: Rehabbed: Span Length: 66'-0". Roadway Width: 20'-2". Posting: None Required. Bedford County Bridge No. 27 Silver Mills Road (T-319) over Sideling Hill Creek in Mann Township Steel Beam with Concrete Deck, Two-Span Built: Rehabbed: Span Length: 129'-6". Roadway Width: 20'-0". Posting: 24 Tons.
15 Bedford County Bridge No. 28 Barnes Road (T-314) over Crooked Run in Mann Township P/S Adjacent Box (Non-Composite), Single-Span Built: Span Length: 51'-8". Roadway Width: 24'-9". Posting: None Required. Bedford County Bridge No. 29 (Hewitt Covered Bridge) Covered Bridge Road (T-305) over Town Creek in Southampton Township. Timber Truss with Steel Beams, Single-Span Built: 1879/2000. Span Length: 79'-4". Roadway Width: 10'-5". Posting: 13 Tons.
16 Bedford County Bridge No. 30 Sulphur Springs Road (T-424) over Buffalo Run in Harrison Township P/S Adjacent Box (Composite), Single-Span Built: Span Length: 87'-9". Roadway Width: 24'-10¼". Posting: None Required. Bedford County Bridge No. 31 Sweetroot Road (T-408) over Shobers Run in Bedford Township P/S Adjacent Box (Non-Composite), Single-Span Built: 1940/1973. (Planned for rehab in 2018.) Span Length: 53'-9". Roadway Width: 22'-2". Posting: None Required.
17 Bedford County Bridge No. 32 Schellsburg Street (T-350) over Wills Creek in Hyndman Borough Steel Through Girder with Concrete Deck, Single-Span Built: Span Length: 101'-10". Roadway Width: 28'-0". Posting: None Required. Bedford County Bridge No. 33 Hazen Road (T-301) over Evitts Creek in Cumberland Valley Township Steel Beam with Corrugated Steel Deck, Single-Span Built: Span Length: 56'-0". Roadway Width: 17'-6". Posting: None Required.
18 Bedford County Bridge No. 35 Schoolhouse Hill Road (T-677) over Six Mile Run in Broad Top Township Steel Arch Culvert, Single-Span Built in Span Length: 35'-3". Roadway Width: 20'-0". Posting: None Required. Bedford County Bridge No. 36 Reed Road (T-584) over Barefoot Run in West St. Clair Township P/S Adjacent Box (Non-Composite), Single-Span Built: Span Length: 44'-5" Span Length. Roadway Width: 26'-3". Posting: None Required.
19 Bedford County Bridge No. 38 Madley Church Road (T-378) over Wolf Camp Run in Londonderry Township Twin Cell Box Culvert Built: Span Length: 44'-0". Roadway Width: 22'-0". Posting: None Required. Bedford County Bridge No. 40 Hench Street (T-579) over Barefoot Run in West St. Clair Township P/S Spread Box, Single-Span Built: Span Length: 53'-0". Roadway Width: 20'-0". Posting: None Required.
20 Bedford County Bridge No. 41 Shaffer Road (T-653) over Wills Creek in Londonderry Township Steel Through Girder with Timber Deck, Two-Span Built: Span Length: 148'-9". Roadway Width: 11'-10¾". Posting: None Required. Bedford County Bridge No. 42 (Herline Covered Bridge) Watson Road (S.R. 4007) over Raystown Branch of Juniata River in Harrison and Napier Townships Timber Truss with Steel Beams, Single-Span Built: 1902/1996. Span Length: 140'-4". Roadway With: 11'-8½". Posting: 12 Tons.
21 Osterburg-Bowser Covered Bridge Over Bob s Creek (adjacent to Covered Bridge Road) in East St. Clair Township Timber Truss, Single-Span Built: Rehabbed: Span Length: Roadway Width: Closed to traffic.
FY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationNotice. Classification of Wild Trout Streams Proposed Additions and Revisions January 2019
Notice Classification of Wild Trout Streams Proposed Additions and Revisions January 2019 Under 58 Pa. Code 57.11 (relating to listing of wild trout streams), it is the policy of the Fish and Boat Commission
More informationProposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017
Proposed FUL-SR 66 Relocation on to CR 24 Presentation to Archbold Village Council April 17, 2017 Robert J. Seaman, P.E., P.S. Village Engineer Andrew J. Langenderfer, P.E. Sr. Project Manager Agenda Stakeholders
More informationColdwater Heritage Partnership
Coldwater Heritage Partnership To provide leadership, coordination, technical assistance, and funding support for the conservation and protection Pennsylvania s coldwater streams and wild trout populations.
More informationWATER OBSTRUCTION AND ENCROACHMENT PERMIT
," /.@ Permit No. E36-813 Commonwealth of Pennsylvania Department of Environmental Protection Southcentral Regional Office Watershed Management Program Permitting and Technical Services Section WATER OBSTRUCTION
More information2005 Annual Report. Ashland County Engineer's Office & Highway Department
February 21, 2006 2005 Annual Report Ashland County Engineer's Office & Highway Department Ashland County Commissioners: Ashland, Ohio 44805 Your Honorable Body: This report from the Ashland County Engineer
More informationODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR
ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT
More informationDay 1 to Jasper Engines, Schwartz s Restaurant and Shoe Tree. 95 miles. Elevation gain/loss: 5648 feet.
Day 1 to Jasper Engines, Schwartz s Restaurant and Shoe Tree. 95 miles. Elevation gain/loss: 5648 feet. Today we will be touring through Crawford and Harrison counties. Our first stop will be a tour of
More informationN.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships
N.Y. / REGION INFRASTRUCTURE Going Up! A Bridge Makes Way for Bigger Ships By KATE ASCHERMARCH 21, 2014 Advertisement When it opened in 1931, the Bayonne Bridge with its parabolic arch connecting Staten
More informationStorm Damage Floating Culverts & Other Inlet Issues
Storm Damage Floating Culverts & Other Inlet Issues Mark Bailey, PE - Hydraulic Manager, INDOT Dale Sedler, PE - Sr. Hydraulic Engineer, INDOT Road School 2016 What causes a culvert to float? 1. Accumulation
More informationODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
More informationStructurally Deficient Bridges by State House District
District 86 Representative Mark Keller 5 2 3 4 6 Ownership Category: State Feature Carried: PA 7, SR 007 Intersects: Cocolamus Creek 2 Ownership Category: State Feature Carried: Front Street Intersects:
More informationforce tension suspension bridge anchorage cables compression caissons Towers deck
Before bridges in New York City existed, people relied on the waterways to get around and transport goods. The Brooklyn Bridge was the first steel-wire suspension bridge to be built in the world. A suspension
More informationGerald P. Oliveto, P.E. George Franz NJDOT
Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationAs described in Chapter VIII Project Prioritization Process, the LRTP 2044 projects were identified through several sources including:
As described in Chapter VIII Project Prioritization Process, the LRTP 2044 projects were identified through several sources including: Centre County LRTP 2040 Municipal/organization Input Public input
More informationTo Description County Division. US 25/US 70 - Widening (Marshall) from North Main Street (US 25/US70 Bus) to Brush Creek Rd (SR 1143)
nt Name Rank B150857 Bike and Ped improvement s to include Signal and Crossing treatments US 25 US 25/70 SR 1601 Deringer Drive/US 25/US70/Stu dent Dropoff Way improvements to include Signal - Crosswalk
More informationODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL
More informationBridge Failures in Alberta
Introduction Bridge Failures in Alberta Bridges are inspected for three primary reasons safety of bridge system maintenance of bridges management of bridge system Inventory or management of the system
More informationDeck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge
Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge US 1 NB & Ramps Chelsea September 11, 2017 Maurice J. Tobin Memorial Bridge Big Mystic Truss Current Project Little Mystic Truss Toll
More informationFinal Version Modified After June 2006 Adoption
DVRPC FY 27-21 Transportation Improvement Program for Pennsylvania Modified After June 26 Adoption Modified After June 26 Adoption Delaware Valley Regional Planning Commission DVRPC FY 27 Transportation
More informationPage 1 of 5 11/18/2013 9:17 AM
Refurbished H:\ACCOUNTING\BUDGETS\2014-2015 NEW\2014-2015 Budget Projection Worksheet.xlsx Page 1 of 5 11/18/2013 9:17 AM Total Annual Reserve Estima Remai Replacement Required ted ning and/or Refurbish
More informationROAD REPORT. Adelaide Metcalfe Council. Road Supervisor. DATE: April 18, 2017
ROAD REPORT TO: FROM: Adelaide Metcalfe Council Road Supervisor DATE: April 8, 7 ) Execulink Telecom has submitted a request to bury fiber optics from Poplar Hill, on various roads within the municipality,
More informationDIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)
More informationABC D BC ecision Ma ion trix
ABC Decision Matrix Presenters Timothy D. Fields, P.E. Transportation Principal Engineer Bridge Consultant Design Ashley Heredia Transportation Engineer II Bridge Design 1 Connecticut DOT s ABC Decision
More information2015 HDR, Inc., all rights reserved.
2015 HDR, Inc., all rights reserved. 2018 Michigan Bridge Conference INNOVATIVE ACCESS TECHNIQUES FOR BRIDGE INSPECTION HDR Engineering, Inc. - Tom Howell, PE & Jason Fogg, PE March 20, 2018 INTRODUCTION
More informationClassifying Roadways Policy. Approval Date: October 30 th, 2007 By-Law No.: Page No.: 1 of 5 Amendment: Preamble
Page No.: 1 of 5 Preamble POLICY Roadways within the Township of Lanark Highlands shall be Classified in accordance with Ontario Regulation 239/02 made under the Municipal Act and titled as Minimum Maintenance
More informationRECOMMENDATION: 1) that the existing Traffic Bridge be replaced with a modern steel truss bridge as outlined in this report;
E) Traffic Bridge Needs Assessment and Functional Planning Study Final Report (File: CK 6050 8; IS 6332 24; and IS 6050 2) RECOMMENDATION: 1) that the existing Traffic Bridge be replaced with a modern
More information7th Street Bridge Project. Public Presentation February 24, :30pm-8pm
7th Street Bridge Project Public Presentation February 24, 2014 6:30pm-8pm Public Meeting Agenda Welcome and introductions Judith Buethe Opening remarks - David Leamon, PE/Hans Strandgaard, PE Project
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More information03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
5 YEAR TIP LET LIST DIVISION 14 Let (B) TIP Sub No. Div County Let Type Description 10/14 I-5512 14 Division Design Raleigh Let (DDRL) I-40 REHABILITATE TUNNELS 15, 17, AND 104 12/14 W-5214M 14 Division
More informationDRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA
DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346
More informationCOUNTY OF HUNTERDON DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY
COUNTY OF 2 HUNTERDON 0 1 DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY 7 BOARD OF CHOSEN FREEHOLDERS COUNTY ADMINISTRATION BUILDING 71 MAIN STREET PO BOX 2900, FLEMINGTON, NJ
More informationinformation, please contact the District 9 Offices at or
O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More informationSPECIAL LAUNCHING METHODS
CHAPTER 18 SPECIAL LAUNCHING METHODS Special launching methods are needed when a restricted site prevents normal roller layout and launching by the standard skeleton launchingnose method. Space on either
More informationRoute 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the
More informationRequest for Authorization to Open Public Comment Period
Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New
More informationCTH M HIGHWAY PROJECT CTH Q to STH 113
CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING
More informationGOOD AFTERNOON, AND THANK-YOU FOR VISITING US AT D2! I AM LAURA HANSON BIKE/PED COORDINATOR HERE AT THE DISTRICT, AND I AM IN THE PROJECT DEVELOPMENT
GOOD AFTERNOON, AND THANK-YOU FOR VISITING US AT D2! I AM LAURA HANSON BIKE/PED COORDINATOR HERE AT THE DISTRICT, AND I AM IN THE PROJECT DEVELOPMENT SECTION. 1 HERE IS MA SHOWING THE SIX DISTRICTS AND
More informationKalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission
FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort
More informationThe Corporation of the County of Peterborough. Assumption of Township Bridges Amendment No. 1. By-law No Schedule A
The Corporation of the Assumption of Township Bridges Amendment No. 1 By-law No. 2013-78 Schedule A List of Bridges Assumed from Townships 1. Bensfort Otonabee River CR 2 14 4 Otonabee South- 002001 2.
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationKentucky Highway District 7
Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationName Roads Station Distance Miles
Name Roads Station Distance Miles Saw Mill to San Mateo 62+00 to 135+00 1.382575758 San Mateo to Alamo 135+00 to 261+50 2.395833333 Alamo to NM 599 261+50 to 305+00 0.823863636 Sidewalk and Curb Only Rabbit
More informationMountain Valley Pipeline Project. Docket No. CP Attachment DR5 Land Use 9
Response to Data Request Docket No. CP16-10-000 Mountain Valley Pipeline Project Docket No. CP16-10-000 Attachment DR5 Land Use 9 March 2017 DEIS TABLE 4.8.1-10 and of Visual Impacts Key Observation Points
More informationPED (OLD TWNS RD) over OTTER TAIL RIVER
2016 UDERWATER BRIDGE ISPECTIO REPORT BRIDGE # L0885 PED (OLD TWS RD) over OTTER TAIL RIVER DISTRICT: District 4 COUTY: Otter Tail CITY/TOWSHIP: MAIE STATE: Minnesota Date of Inspection: Equipment Used:
More informationDistrict 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID
77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES
NEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES BY NARINDER S. KOHLI, P.E. PRINCIPAL ENGINEER PAVEMENT DESIGN, NJDOT (609) 530 8140 NARINDER.KOHLI@DOT.STATE.NJ.US RIDE
More informationIDOT Suspends Non-Emergency Road Work for Memorial Day Holiday Weekend Lanes Opened to Improve Traffic Flow
State of Illinois Bruce Rauner, Governor Illinois Department of Transportation Randall S. Blankenhorn, Acting Secretary FOR IMMEDIATE RELEASE: CONTACT: May 21, 2015 Brian Williamsen 309.671.4854 Carson
More informationI-90 Corridor Performance Corridor Result
I-90 Corridor Performance Corridor Result Statewide Result 87.1% 86.9% 0% 3.2% Ride Quality Good--% of miles 65.4% 70.2% Ride Quality Poor--% of miles 0% 3.7% 73 MPH N/A Measure Corridor Context The corridor
More informationOCEAN TO SOUND RELAY SEPTEMBER 25, 2016 COURSE DESCRIPTION LEG 1
GENERAL DESCRIPTION: 5.9 MILES--ALL FLAT START: JONES BEACH STATE PARK FIELD #2 FINISH: CEDAR CREEK PARK (SEAFORD) OCEAN TO SOUND RELAY LEG 1 0.0 miles START ON BOARDWALK AT EAST END OF JONES BEACH PARKING
More informationCITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES
CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new
More informationThe Corporation of the County of Peterborough. Assumption of Township Bridges Amendment No. 2. By-law No Schedule A
The Corporation of the Assumption of Township Bridges Amendment No. 2 By-law No. 2017-15 Schedule A List of Bridges Assumed from Townships 1. Bensfort Otonabee River 002001 CR 2 14 4 Otonabee South-Monaghan
More informationBARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S
ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE
More informationSTUDY PROCESS & SCHEDULE
STUDY PROCESS & SCHEDULE Route Centennial Bridge Study KDOT Project No. -52 KA-3229-01 STUDY OVERVIEW STUDY SCHEDULE The Kansas Department of Transportation (KDOT) has identified a future need to replace
More informationI-70 NEW STANTON INTERCHANGE
I-70 NEW STANTON INTERCHANGE Westmoreland County, PA Submitted by: PROJECT DESCRIPTION Situated adjacent to the PA Turnpike (I-76) and Interstate 70 in Westmoreland County, New Stanton bills itself as
More informationPerched Box Caisson Overview. January 2014
Perched Box Caisson Overview January 2014 Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur
More informationCHAPTER 7 CIRCULATION
CHAPTER 7 CIRCULATION A township s transportation network links its population with the surrounding communities. Transportation networks, including public and private, provide the means by which township
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationRoute 58 Corridor Development Fund
Corridor Development Fund Appropriation Act Item 448 B.3 (2016) Report to the Chairmen of the Committees on Senate Finance and House Appropriations Virginia Department of Transportation 1401 East Broad
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - OTTER TAIL COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. L0885 TWP NO. 970 OVER THE OTTER TAIL RIVER DISTRICT 4 - OTTER TAIL COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,
More informationMILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO
MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve
More informationHARBOR INFRASTRUCTURE INVENTORIES Black Rock Lock & Tonawanda Harbor, NY
HARBOR INFRASTRUCTURE INVENTORIES Black Rock Lock & Tonawanda Harbor, NY Harbor Location: The Black Rock Channel and Tonawanda Harbor are located along the east side of the Niagara River in the City of
More informationAppendix I. Catalytic Infrastructure Opinions of Probable Cost
Appendix I Catalytic Infrastructure Opinions of Probable Cost : 6-Lane Bridge (Major Arterial) LEVEL: Planning LENGTH: Linear Feet DATE: January 205 MAJOR BRIDGE CROSSING AT WILSON CREEK Stonebridge Drive
More informationParewanui Road (RP ) 1960 Prog. Mar-18 Prog. May-18
RDC ROADING REPORT: FEBRUARY 2018 1. MAINTENANCE, OPERATIONS AND RENEWALS This year s resealing programme of 61 km has been completed. Pre-reseal repairs for the 2018/19 year have been programmed. Installing
More information2017 SPLOST TRANSPORTATION IMPROVEMENT PROGRAM CITIZENS PROJECT SELECTION COMMITTEE AGENDA JANUARY 24, 2017
2017 SPLOST TRANSPORTATION IMPROVEMENT PROGRAM CITIZENS PROJECT SELECTION COMMITTEE AGENDA JANUARY 24, 2017 I. Welcome and Introductions II. Approval of Agenda III. Approval of Minutes January 9, 2017
More informationDemo ID SAFETEA-LU # Approp DIST Bill_Description
MN101 27 House M Construction and right-of-way acquisition for interchange at TH 65 and TH 242 in Blaine, MN MN102 37 House 1 Construction of Gitchi-Gami State Trail from Cascade River to Grand Marais
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationCulvert Safety Inspection Report
Culvert Safety Inspection Report Facility Federal Structure ID Inspector Name Agency/Consultant Inspection Date LEGEND Haggerty Rd (South) N/A RL/JF GLEG 1/26/2016 9 New Feature Latitude Longitude Struc
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66513 14 th STREET (MSAS NO. 103) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationDELAWARE COUNTY START PERIOD
BASE Add Lane US 322: US 1 to Interstate 95 BASE Bridge Replacement Darby Paoli over Lower Darby Creek BASE Bridge Replacement Folcroft Avenue over AMTRAK BASE Bridge Replacement Station Road Bridge BASE
More informationB741 TEMPORARY CONCRETE BARRIERS - OPSS 741
B741 TEMPORARY S - OPSS 741 741.1 GENERAL Temporary concrete barriers (TCBs) are precast units that are installed with interlocking devices connecting consecutive sections. The following types of connections
More informationLegend. Lower Swatara Township DAUPHIN COUNTY. 1 inch = 100 feet 02/2017. Fairview Township YORK COUNTY
, Bore, HDD, Bore, HDD 3 33 3 YO-5 33 YO- 3 3 3 33 33 3 3 3 33 BB 3 Fairview Township YORK COUNTY 3 3 3 3 9 5 inch = feet Sheet of /7 Base Map; SPLP -, Roads from NRCS Geospatial Data Giveaway, -Year Floodplain
More informationODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR
ODOT DISTRICT 9 2018 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT
More informationNJTPA DRAFT Transportation Improvement Program Fiscal Years
County Route 6 Bridge (MA-14) Mileposts: 0.46 DBNUM: NS9811 The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient and functionally obsolete.
More information19 bv Countv and Township Names: Union County (continued) 282 Union County Hartleton Township 2 83 Hart ley Township
BOX Folder 19 bv Countv and Names: Union County (continued) 282 Union County Hartleton 2 83 Hart ley 284 Lewisburg, Union 285 Westmoreland County Allegheny River Bedford County Frankstown and Centre County
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More information09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:
MONTANA ROAD CONSTRUCTION REPORT 09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: US 191 - WARM SPRINGS CREEK BRIDGE MILE POST 10.0 TO 10.1 SITE IS 10 MILES NORTH OF LEWISTOWN, MT. CONTRACTOR
More informationCY2017 Summary of STP applications
CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More informationSwamp Road Residents Study
Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a
More informationHonorable City Council i. A / Richard A. Leahy, City Manager \~v Thomas E. Hansen, P.E., Public Works Director/ ;?:?-
----r 1: I To: From: By: Subject: CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US Honorable City Council i. A / Richard A. Leahy,
More informationTechnical Advisory Committee (TAC)
Technical Advisory Committee (TAC) January 17, 2018 CareerSource Heartland Sebring, FL 1) ROLL CALL 2) PUBLIC COMMENT 3) APPROVAL OF MINUTES* October 18, 2017 Meeting 4) SR 710 Extension in Okeechobee
More informationTHE I-79 CORRIDOR. I-79 provides motorists with connections to the following major highways: I-80, PA 358, PA 965 and PA 208.
The I-79 Corridor Pittsburgh to Erie Regional Thruway I-79 was constructed through Mercer County in the early 1960s. The portion north of PA 965 opened in 1961 and the segment south of PA 965 the following
More informationThe Corporation of the County of Peterborough. Assumption of Township Bridges. By-law No Schedule A. List of Bridges Assumed from Townships
The Corporation of the Assumption of Township Bridges By-law No. 2012-24 Schedule A List of Bridges Assumed from Townships 1. Bensfort Otonabee River 2001 CR 2 14 IV South Monaghan/ Otonabee 2. Keene 2002
More informationHYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10
HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 RACETRACK ROAD CULVERT OVER THE SPRING RUN & GREEN SPRINGS ROAD CULVERT OVER AN UNNAMED TRIBUTARY TO SPRING RUN BERWICK TOWNSHIP
More informationChapter 11. Culverts and Bridges Design Checklist for Culvert Design
Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional
More informationAppendix A: Special Routing Studies
Appendix A: Special Routing Studies The following section contains six different Trail alignments or routing alternatives, each drawn atop a digital aerial photograph (2000). Each alternative has been
More informationAppendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P (Version 2) Bikeway Projects in Currently Approved Plans Key: Removals Scope Changes Question Keep this in plan? = Included on map O = Not Included on map Planned Improvements from Sector &
More informationComplete Streets Funding Program Project Prioritization Plan
Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path
More informationChapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0
Chapter 3.6 Elementary School Z DeLand, FL Volusia County MPO March 2008 Page 13.0 Volusia County MPO Bicycle and Pedestrian School Safety Review Study Introduction Elementary School Z is a planned elementary
More informationNon-Motorized Overpass at SR 5/US1
Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com
More informationMINUTES OF THE POOLE HARBOUR BRIDGES OPERATING BOARD HELD AT COOBS QUAY ON 15 JANUARY DRAFT
MINUTES OF THE POOLE HARBOUR BRIDGES OPERATING BOARD HELD AT COOBS QUAY ON 15 JANUARY 2018 - DRAFT Present: John Rice () - Borough of Poole Ricard Marshall (RM) - MDL Cobbs Quay Dean Cluett (DC) - Poole
More information2008 REPORT OF THE HIGHWAY COMMISSIONER
Ozaukee County Highway Department 410 South Spring Street P.O. Box 994 Port Washington, Wisconsin 53074-0994 Robert Dreblow Highway Commissioner Phone 262-238-8331 Fax 262-238-8343 2008 REPORT OF THE HIGHWAY
More information