1 APPENDIX C Detailed Model Simulation Results for Proposed Situation Status Issue 2 Page 89 January 2013

2 Figure C-1 to C-15 complement the tabulated peak flood level and discharge predictions in Tables 4-3 and 4-4 (Section 4) for the proposed situation in the Mangapouri Stream and the unnamed watercourse draining the Racecourse Catchment. Figures C-1 to C-7 show water level hydrographs for selected flood cases above at the following locations: upstream of the old railway culvert on the Mangapouri Stream (Figure C-1) upstream of the new Expressway culvert on the Mangapouri Stream (Figure C-2) upstream of the existing SH1 culvert on the Mangapouri Stream (Figure C-3) within the remnant railway wetland area (Figure C-4) within the second wetland area (Figure C-5) upstream of the new Expressway / railway culvert on the unnamed watercourse draining the Racecourse Catchment (Figure C-6) Figure C-7 shows backwater profiles along the Mangapouri Stream for the same selected flood cases. Figures C-8 to C-14 show flood discharge hydrographs at: the old railway culvert on the Mangapouri Stream (Figure C-8) the existing SH1 culvert on the Mangapouri Stream (Figure C-9) total Rahui Road outflow overflow plus relief culvert outflow (Figure C-10) the remnant railway wetland outlet culvert (Figure C-11) the outlet culvert from the second wetland (Figure C-12) the new Expressway / railway culvert on the unnamed watercourse draining the Racecourse Catchment (Figure C-13) Status Issue 2 Page 90 January 2013

3 15.1 WL U/S Existing Railway Culvert - Proposed Situation Water Level :00:00 02:00:00 04:00:00 06:00:00 08:00:00 10:00:00 12:00:00 14:00:00 16:00:00 18:00:00 20:00:00 22:00:00 00:00:00 02:00:00 04:00:00 06:00:00 08:00:00 10:00:00 Figure C-1 Water level hydrographs for 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods upstream of old railway embankment on Mangapouri Stream WL u/s of Expressway Culvert - Proposed Situation Water Level 13.9 CC Figure C-2 Water level hydrographs for 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods in front of proposed Expressway culvert on Mangapouri Stream Status Issue 2 Page 91 January 2013

4 WL u/s SH1 - Proposed Situation Water Level CC :00:00 16:00:00 18:00:00 20:00:00 02:00:00 04:00:00 06:00:00 08:00:00 10:00:00 12:00:00 14:00:00 22:00:00 00:00:00 02:00:00 04:00:00 06:00:00 08:00:00 10:00:00 Figure C-3 Water level hydrographs for 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods upstream of SH1 culvert on Mangapouri Stream 19.8 WL within remnant railway wetland area - Proposed Situation Water Level CC Figure C-4 Water level hydrographs for 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods in remnant railway wetland area Status Issue 2 Page 92 January 2013

5 15.2 WL within the secondary wetland area - Proposed Situation Water Level 15.1 CC Figure C-5 Water level hydrographs for 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods in second railway wetland area for the proposed situation 15.1 WL u/s of the new expressway/railway culvert 'Race Cource Catchment' stream - Proposed Situation Water Level CC :00:00 02:00:00 04:00:00 06:00:00 08:00:00 10:00:00 12:00:00 14:00:00 16:00:00 18:00:00 20:00:00 22:00:00 00:00:00 02:00:00 04:00:00 06:00:00 08:00:00 10:00:00 Figure C-6 Water level hydrographs for 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods upstream of the new Expressway / railway culvert on the unnamed watercourse draining the Racecourse Catchment (Figure C-6) Status Issue 2 Page 93 January 2013

6 NZ Transport Agency Maximum 15.2 CC MANGAPOURI MANGAPOURI MANGAPOURI MANGAPOURI [m] Figure C-7 Backwater profiles along the Mangapouri Stream for the 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods [m^3/s] 4.6 Discharge through old railway culvert - Proposed Situation Discharge CC Figure C-8 Discharge hydrographs for the old railway culvert on the Mangapouri Stream for the 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods Status Issue 2 Page 94 January 2013

7 [m^3/s] 6.5 Discharge - Existing SH1 Culvert/Overflow - Proposed Situation Discharge CC Figure C-9 Discharge hydrographs for the existing SH1 culvert on the Mangapouri Stream for the 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods Figure C-10 Discharge hydrographs for the total Rahui Road outflow overflow plus relief culvert outflow for the 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods Status Issue 2 Page 95 January 2013

8 [m^3/s] 2.7 Discharge thorugh remnant wetland outlet culvert - Proposed Situation Discharge 2.6 CC Figure C-11 Discharge hydrographs for the remnant railway wetland outlet culvert for the 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods [m^3/s] 2.5 Discharge through outlet culvert from secondary wetland area - Proposed Situation Discharge CC Figure C-12 Discharge hydrographs for the outlet culvert from the second wetland for the 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods Status Issue 2 Page 96 January 2013

9 [m^3/s] 1.9 Discharge through the new expressway 'Racecourse Catchment' culvert - Proposed Situation Discharge CC Figure C-13 Discharge hydrographs for the new Expressway / railway culvert on the unnamed watercourse draining the Racecourse Catchment for the 1% AEP, 1% AEP + CC, 0.5% AEP + CC and 0.2% AEP + CC floods Status Issue 2 Page 97 January 2013

10 This page deliberately left blank. Status Issue 2 Page 98 January 2013

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa -

Stormwater Management Pond Design Brief. Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - Stormwater Management Pond Design Brief Greely Village Centre - Commercial Phase - Ultimate Conditions - - City of Ottawa - December 2008 Ref: 647-07 J.F. Sabourin and Associates Inc. Water Resources and

More information

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared

More information

City of Guelph. Hanlon Creek Business Park Stormwater Management Report Ponds 1, 2, 3 and 4

City of Guelph. Hanlon Creek Business Park Stormwater Management Report Ponds 1, 2, 3 and 4 City of Guelph Hanlon Creek Business Park Stormwater Management Report Ponds 1, 2, 3 and 4 City of Guelph Hanlon Creek Business Park Stormwater Management Report Ponds 1, 2, 3 and 4 Prepared by: AECOM

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

Evaluating Surge Potential in CSO Tunnels

Evaluating Surge Potential in CSO Tunnels 14 Evaluating Surge Potential in CSO Tunnels Karen E. Ridgway Tunnels are being proposed to control combined sewer overflow (CSO) in numerous cities in the United States and Canada. The tunnels are intended

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

Merkinch Greenspace. Merkinch Local Nature Reserve: Hydrological Assessment

Merkinch Greenspace. Merkinch Local Nature Reserve: Hydrological Assessment Merkinch Local Nature Reserve: Hydrological Assessment June 2011 EnviroCentre Craighall Business Park Eagle Street Glasgow G4 9XA t 0141 341 5040 f 0141 341 5045 w www.envirocentre.co.uk e info@envirocentre.co.uk

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

Identifying the Impact of Tidal Level Variation on River Basin Flooding

Identifying the Impact of Tidal Level Variation on River Basin Flooding Identifying the Impact of Tidal Level Variation on River Basin Flooding M. D. E. K. Gunathilaka, W. A. L. Wikramanayake and D. N. D. Perera Department of Surveying and Geodesy, Faculty of Geomatics, Sabaragamuwa

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc.

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed. December The Cadmus Group, Inc. Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Bass River Watershed December 2004 The Cadmus Group, Inc. Grand Valley State University Annis Water Resources Institute Submitted

More information

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL APRIL 2011 APRIL 2011 Page 1 Preface TIDEROUT 2, Build 1.22 dated June 29, 2006 is the current

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream

More information

Schedule for Culvert Works in or on the Bed or Bank of a Watercourse PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM

Schedule for Culvert Works in or on the Bed or Bank of a Watercourse PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM 10A Schedule for Culvert Works in or on the Bed or Bank of a Watercourse This form is to be used for applications to use, erect, place, extend, alter or replace a culvert in or on the beds or banks of

More information

Hydraulic Modelling of the Ngongotaha Stream

Hydraulic Modelling of the Ngongotaha Stream Hydraulic Modelling of the Ngongotaha Stream Prepared by Peter West, Environmental Engineer Environment Bay of Plenty Operations Publication 2007/03 June 2007 Addendum Updated from 2005/10 5 Quay Street

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

Experiment Instructions

Experiment Instructions Experiment Instructions Syphon Spillway Experiment Instructions Please read and follow the instructions before the first installation! Publication-no.: 917.000 36 A 160 02 (A) 01/2000, (DTP_2), 05/1999

More information

Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1

Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1 Ellis Y. Byeon, PE Bryan VanderGheynst, PE 1 Background Information: City of Trenton, Mercer County Assunpink Creek, Pond Run and Delaware River Lower 2.5 miles of the Assunpink Creek Lower 0.6 miles of

More information

Modelling a Stormcell Storage System Within The Micro Drainage Program Win Des - Source Control

Modelling a Stormcell Storage System Within The Micro Drainage Program Win Des - Source Control Modelling a Stormcell Storage System Within The Micro Drainage Program Win Des - Source Control There are probably several different ways of modelling Stormcell within Win Des - Source Control Module.

More information

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed.

Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed. Total Suspended Solids, Stable Flow, and Wet Weather Event Monitoring in the Unnamed Tributary to the Grand River Watershed December 2004 The Cadmus Group, Inc. Grand Valley State University Annis Water

More information

4/06/2014. Need for Guidance. East Coast Lows. Catchment and coastal flood events can combine! Project 18 ARR Review

4/06/2014. Need for Guidance. East Coast Lows. Catchment and coastal flood events can combine! Project 18 ARR Review Need for Guidance Development of Practical Guidance for Coincidence of Catchment Flooding and Oceanic Inundation Angela Toniato, NSW OEH Duncan McLuckie, NSW OEH Grantley Smith, Water Research Laboratory

More information

Section 5: Pond Outlets

Section 5: Pond Outlets Section : Pond Outlets Defining and calculating pond outlet devices 8 Minutes Press Space, PageDown, or Click to advance. Press PageUp to reverse. Esc to exit. Right-Click for other options. Outlets Introduction

More information

WATER OBSTRUCTION AND ENCROACHMENT PERMIT

WATER OBSTRUCTION AND ENCROACHMENT PERMIT ," /.@ Permit No. E36-813 Commonwealth of Pennsylvania Department of Environmental Protection Southcentral Regional Office Watershed Management Program Permitting and Technical Services Section WATER OBSTRUCTION

More information

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA, PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA, FLOOD OF FEBRUARY 1986 By J.C. Blodgett and J.B. Lucas U.S. GEOLOGICAL SURVEY Open-File Report 88-82 CO CM I m r-h CM Sacramento, California

More information

Storm Damage Floating Culverts & Other Inlet Issues

Storm Damage Floating Culverts & Other Inlet Issues Storm Damage Floating Culverts & Other Inlet Issues Mark Bailey, PE - Hydraulic Manager, INDOT Dale Sedler, PE - Sr. Hydraulic Engineer, INDOT Road School 2016 What causes a culvert to float? 1. Accumulation

More information

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM VWP CONSTRUCTION INSPECTION REPORT Inspection Date: August 22, 2016 VWP Permit No. 15-1268 SPGP RO Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM Impacts: PFO PEM PSS POW

More information

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed FPCI Sites funded by FIA Prepared for: Tolko Industries Ltd., Okanagan Regional Woodlands & British Columbia Timber Sales, Okanagan-Shuswap

More information

3.0 Basin and Watershed Characteristics

3.0 Basin and Watershed Characteristics 3.0 Basin and Watershed Characteristics 3.1 Basin Characteristics 3.1.1 Crystal Lake Crystal Lake, located in the cities of Burnsville and Lakeville (Dakota County), covers an area of approximately 292

More information

Environmental Review and Permitting for Wild Trout

Environmental Review and Permitting for Wild Trout Environmental Review and Permitting for Wild Trout Tom Shervinskie Wild Trout Summit Watershed Analysis Section August 26, 2017 Division of Environmental Services The mission of the Pennsylvania Fish and

More information

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA

Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA Quantifying Performance of Stream Simulation Culverts in the Chehalis Basin, WA AUTHORS: Joe Richards, Environmental Science Associates Jane Atha, Washington Department of Fish & Wildlife Colin Thorne,

More information

Large-scale Field Test

Large-scale Field Test Vaskinn 1 Large-scale Field Test Kjetil Arne Vaskinn kav@trh.statkraftgroner.no Statkraft Grøner AS SUMMARY The objective the controlled failure of large-scale embankment is to monitor and record the failure

More information

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 09/25/2018 DRAFT FEMA Region I PA H&H Study ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 Region I Federal Emergency Management Agency (FEMA) Public Assistance Hydrologic and Hydraulic (H&H)

More information

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS SITUATE IN: NORTH HUNTINGDON TOWNSHIP WESTMORELAND COUNTY, PENNSYLVANIA PREPARED FOR: North Huntingdon Township 11279 Center Highway North Huntingdon,

More information

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # 4602004 Prepared for Weyerhaeuser Company Ltd. Jason Ladyman R.P.F. 1550 Mission Flats Road PO Box 40 Kamloops BC V2C 5K3 Prepared

More information

Salmon Run G.C. Hole 3: Tributary & Wetland Restoration

Salmon Run G.C. Hole 3: Tributary & Wetland Restoration Salmon Run G.C. Hole 3: Tributary & Wetland Restoration Preliminary Project Design December 23, 2014 Prepared By: Curry Soil and Water Conservation District & Swanson Ecological Services, LLC Project Location:

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates

More information

Appendix 5. Case studies of urban river restoration and deculverting

Appendix 5. Case studies of urban river restoration and deculverting Appendix 5. Case studies of urban river restoration and deculverting A contribution to: Bradford s Becks a Plan for the 21 st Century Adam Broadhead and David Lerner January 2013 Pymmes Brook, London Before:

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase II October 2014

Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase II  October 2014 Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase II http://www.wildfishconservancy.org/maps October 2014 Water typing is the state-sanctioned process of mapping the

More information

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G Alternative Solutions Details TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Krosno Creek Flood Reduction Project PROJECT

More information

APPENDIX L DETAILED ANALYSIS OF EAST AND LATERAL RUNWAY SAFETY AREA ALTERNATIVES ON TIDAL CHANNEL GEOMORPHOLOGY

APPENDIX L DETAILED ANALYSIS OF EAST AND LATERAL RUNWAY SAFETY AREA ALTERNATIVES ON TIDAL CHANNEL GEOMORPHOLOGY APPENDIX L DETAILED ANALYSIS OF EAST AND LATERAL RUNWAY SAFETY AREA ALTERNATIVES ON TIDAL CHANNEL GEOMORPHOLOGY MEMORANDUM TO: Sheri Ellis (SWCA), Patti Sullivan (FAA), Allan Heese (JNU), Randy Vigil (ACOE),

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA TOPICS COVERED Aquatic Organism Passage (AOP) Benefits of AOP Crossings

More information

APPENDIX G : ON-SITE PLAN EXAMPLE A

APPENDIX G : ON-SITE PLAN EXAMPLE A DRAFT GUIDE : VOLUME 2 RESERVOIR SAFETY ADVICE APPENDIX G : ON-SITE PLAN EXAMPLE A 14/06/2006 APPENDIX G : EXAMPLE OF ON-SITE PLAN Example A Owner of single Consequence Class B dam ON-SITE PLAN FOR GOLF

More information

2D Modelling Series. Modelling Structures in Floodplains

2D Modelling Series. Modelling Structures in Floodplains 2D Modelling Series Modelling Structures in Floodplains Jessica Jefferys Products Manager XP Solutions XP-LIVE Webinars XP-LIVE educational program Webinars have been recorded and are available at http://www.xpsolutions.com/

More information

Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte

Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverted open water crossings, name of water crossing if known,

More information

7 8 Mahogany Creek views downstream and upstream along creek corridor from Manotick Main Street (1, 2), Bridgeport Avenue (3, 4) and Century Road

7 8 Mahogany Creek views downstream and upstream along creek corridor from Manotick Main Street (1, 2), Bridgeport Avenue (3, 4) and Century Road Appendix B Photos 1 2 3 4 5 6 7 8 Mahogany Creek views downstream and upstream along creek corridor from Manotick Main Street (1, 2), Bridgeport Avenue (3, 4) and Century Road East (5, 6). Storm sewer

More information

LONE TREE POCKET ESTUARY RESTORATION 2004 FISH SAMPLING AND PRE-RESTORATION PROJECT MONITORING REPORT

LONE TREE POCKET ESTUARY RESTORATION 2004 FISH SAMPLING AND PRE-RESTORATION PROJECT MONITORING REPORT Skagit River System Cooperative 11426 Moorage Way P.O. Box 368 LaConner, WA 98257-368 Phone: 36-466-7228 Fax: 36-466-447 www.skagitcoop.org LONE TREE POCKET ESTUARY RESTORATION 24 FISH SAMPLING AND PRE-RESTORATION

More information

Massachusetts Stream Crossing Case Studies

Massachusetts Stream Crossing Case Studies Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people

More information

SSO 700 Integrated Watershed Action Plan: Continuous Calibration of a Model

SSO 700 Integrated Watershed Action Plan: Continuous Calibration of a Model SSO 700 Integrated Watershed Action Plan: Continuous Calibration of a Model 5 Cities Plus August 16, 2017 Presented by Matt Spidare, P.E MSDGC Victoria Berry, P.E. CH2M Overview of Presentation Project

More information

Pigging as a Flow Assurance Solution Avoiding Slug Catcher Overflow

Pigging as a Flow Assurance Solution Avoiding Slug Catcher Overflow Pigging as a Flow Assurance Solution Avoiding Slug Catcher Overflow Aidan O'Donoghue, Pipeline Research Limited, Glasgow, UK This paper sets out to provide an initial method of assessing the bypass requirements

More information

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek City of Fairway, Kansas Fairway Stormwater Level of Service Study - Phase 2 Project No. 108200 Revision 1 12/6/2018 Stormwater

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011 OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011 APRIL 2011 Chapter 13 Culverts Table of Contents Foreword.3 13.1 Introduction.. 4 13.2 Policy 6 13.3 Passage

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

RISK AND STANDARDS BASED APPROACH TO RIP RAP DESIGN ALTERNATIVES FOR GRAHAMSTOWN DAM STAGE 2 AUGMENTATION

RISK AND STANDARDS BASED APPROACH TO RIP RAP DESIGN ALTERNATIVES FOR GRAHAMSTOWN DAM STAGE 2 AUGMENTATION RISK AND STANDARDS BASED APPROACH TO RIP RAP DESIGN ALTERNATIVES FOR GRAHAMSTOWN DAM STAGE 2 AUGMENTATION M. B. Barker 1 and D. Holroyde 2 ABSTRACT. A detailed study was completed for the Stage 2 works

More information

Modelling of Pressurised Pipes within InfoWorks ICM and CS

Modelling of Pressurised Pipes within InfoWorks ICM and CS Modelling of Pressurised Pipes within InfoWorks ICM and CS 1. Introduction Correctly modelling pressurised pipes, variously described as forcemains or rising mains, can be one of the more difficult aspects

More information

Transient Analyses In Relief Systems

Transient Analyses In Relief Systems Transient Analyses In Relief Systems Dirk Deboer, Brady Haneman and Quoc-Khanh Tran Kaiser Engineers Pty Ltd ABSTRACT Analyses of pressure relief systems are concerned with transient process disturbances

More information

Know Your River Conwy Salmon & Sea Trout Catchment Summary

Know Your River Conwy Salmon & Sea Trout Catchment Summary Know Your River Conwy Salmon & Sea Trout Catchment Summary Introduction This report describes the status of the salmon and sea trout populations in the Conwy catchment. Bringing together data from rod

More information

I-10 AT SCENIC LOOP RD. Open House

I-10 AT SCENIC LOOP RD. Open House I-10 AT SCENIC LOOP RD Open House General Information I-10 At Scenic Loop Rd KENDALL COUNTY OPEN HOUSE June 30, 2015 Currey Creek Baptist Church 35 Cascade Cavern 5:00 7:00 Boerne, TX 78015 2 Public Meeting

More information

22. Specialty Valves.

22. Specialty Valves. 22. Specialty Valves. a. Types of Specialty Valves. 1) Use of the following specialty valves is covered in this section: Altitude Valve, Pressure Reducing Valve, Pressure Relief Valve, Swing Check Valve,

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Appendix A Photo Set

Appendix A Photo Set Appendix A Photo Set Fish Habitat Inventory, Mattamy Richmond Lands, Spring 2009 Submitted To: Susan Murphy Mattamy Homes 123 Huntmar Drive Ottawa, Ontario K2S 1B9 KILGOUR & ASSOCIATES LTD. 1500 Bank Street,

More information

CLAIBORNE LOCK AND DAM PERTINENT DATA

CLAIBORNE LOCK AND DAM PERTINENT DATA CLAIBORNE LOCK AND DAM PERTINENT DATA GENERAL Location Clarke, Monroe, & Wilcox Counties, Alabama; Alabama River, river mile 72.5 Drainage area Millers Ferry to Claiborne sq. mi. 836 Total drainage area

More information

Lower Mekong Basin. John G. Williams. Petrolia, California.

Lower Mekong Basin. John G. Williams. Petrolia, California. Technical Comment on Sabo et al. Designing river flows to improve food security futures in the Lower Mekong Basin John G. Williams Petrolia, California jgwill@frontiernet.net Abstract: Sabo et al. (1)

More information

DOCUMENT CONTROL SHEET

DOCUMENT CONTROL SHEET HA09 Hydraulics Report - Clontarf Model DOCUMENT CONTROL SHEET Client Project Title Document Title Model Name OPW Eastern CFRAM Study IBE0600Rp0027_HA09 Hydraulics Report HA09_CLON15 Rev. Status Author

More information

Discussion on the Selection of the Recommended Fish Passage Design Discharge

Discussion on the Selection of the Recommended Fish Passage Design Discharge Discussion on the Selection of the Recommended Fish Passage Design Discharge Introduction The provision of fish passage is a requirement for most proposed culvert and bridge installations in Alberta, depending

More information

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research

More information

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT PRELIMINARY RISK ASSESSMENT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT RIDM PROJECT MAY 3, 2018 DAVID S. BOWLES AND LOREN R. ANDERSON RAC ENGINEERS AND ECONOMISTS, LLC AND UTAH STATE UNIVERSITY

More information

Water Storage for Agriculture

Water Storage for Agriculture Water Storage for Agriculture Ted van der Gulik, P.Eng. Partnership for Water Sustainability in BC Water Storage Options Dam! usually constructed within a watercourse! must follow the dam safety regulation!

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

MADISON COUNTY, ILLINOIS AND INCORPORATED AREAS

MADISON COUNTY, ILLINOIS AND INCORPORATED AREAS VOLUME 2 OF 2 MADISON COUNTY, ILLINOIS AND INCORPORATED AREAS * * * COMMUNITY COMMUNITY NAME NUMBER ALHAMBRA, VILLAGE OF 170270 ALTON, CITY OF 170437 BETHALTO, VILLAGE OF 170438 COLLINSVILLE, CITY OF 170439

More information

Dam Modification Report Stingy Run Fly Ash Reservoir Appendix E Spillway System Design Calculations E1: Spillway/Energy Dissipater Design for 100-year Event CHE8273 8 September 4, 2014 Written by: CJW

More information

DECEMBER 2003 Instream habitat assessment for the Waikanae River

DECEMBER 2003 Instream habitat assessment for the Waikanae River DECEMBER 3 Instream habitat assessment for the Waikanae River Laura Watts Resource Investigations Department Executive Summary An instream habitat investigation of the Waikanae River was performed to assess

More information

Design Assessment Checklist: Infiltration / Detention Basin

Design Assessment Checklist: Infiltration / Detention Basin Design Assessment Checklist: Infiltration / Detention Basin Objectives This checklist can be used by the organisation approving the drainage scheme (drainage approving body) to help assess submissions

More information

Numerical investigation of transition between free surface flow and pressurized flow for a circular pipe flowing full upstream

Numerical investigation of transition between free surface flow and pressurized flow for a circular pipe flowing full upstream Numerical investigation of transition between free surface flow and pressurized flow for a circular pipe flowing full upstream Tanjina Afrin 1, Abdul A. Khan 2, Nigel B. Kaye 3 AUTHORS: 1 Assistant Professor,

More information

Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen

Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen Technical Symposium for ESCIR and MRC on Social Impact Assessment in River Basin Management Sothea KHEM, HENG

More information

Wanganui Rd Flood Modelling Investigation

Wanganui Rd Flood Modelling Investigation Wanganui Rd Flood Modelling Investigation Greater Shepparton City Council July 2017 Document Status Version Doc type Reviewed by Approved by Date issued 01 Draft Ben Tate Ben Tate 27/07/2017 Project Details

More information

What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows

What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Paul Schweiger, P.E., CFM, Gannett Fleming, Inc.

More information

APPENDIX C. Fluvial and Tidal Hydraulics Report

APPENDIX C. Fluvial and Tidal Hydraulics Report APPENDIX C Fluvial and Tidal Hydraulics Report BUENA VISTA LAGOON ENHANCEMENT PROJECT FLUVIAL AND TIDAL HYDRAULICS ANALYSES Prepared for: SANDAG 401 B Street, Suite 800 San Diego, California 92101 Contact:

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.015.003 Report issued: July 03, 2017 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Picture Spring Branch Hydrologic and Hydraulic Analysis Report. Prepared for: Anne Arundel County. Final

Picture Spring Branch Hydrologic and Hydraulic Analysis Report. Prepared for: Anne Arundel County. Final Picture Spring Branch Hydrologic and Hydraulic Analysis Report Prepared for: Anne Arundel County Final Date: November 30, 2017 Picture Spring Branch Hydrologic and Hydraulic Analysis Report November 30,

More information

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013 Program - Aquatic Organisms and Stream Crossings Ecological Connectivity A watershed is a network of channels that drain a common boundary. Channel characteristics formed by interaction of precipitation,

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

a. Next, lift the lever on pressure reducing valve to allow street pressure water into the system.

a. Next, lift the lever on pressure reducing valve to allow street pressure water into the system. Step 1 f. First attach a garden hose to drain, open the diverter valve and drain valve to allow flow out through hose to a bucket placed outdoors. a. Next, lift the lever on pressure reducing valve to

More information

FISH PASSAGE DESIGN FOR UNNAMED CREEK

FISH PASSAGE DESIGN FOR UNNAMED CREEK EA3330 FISH PASSAGE DESIGN FOR UNNAMED CREEK Prepared by: M.N. Gaboury environmental research associates 9768 Second Street Sidney, BC V8L 3Y8 Prepared for: BC Hydro Fish and Wildlife Compensation Program

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2018-00168-MVM Applicant: City of Lino Lakes Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil

More information

EVALUATION OF RAINBOW TROUT SPAWNING MIGRATIONS IN BLUEBERRY, CHINA, AND MURPHY CREEKS FROM 1999 TO 2003

EVALUATION OF RAINBOW TROUT SPAWNING MIGRATIONS IN BLUEBERRY, CHINA, AND MURPHY CREEKS FROM 1999 TO 2003 COLUMBIA BASIN FISH & WILDLIFE COMPENSATION PROGRAM EVALUATION OF RAINBOW TROUT SPAWNING MIGRATIONS IN BLUEBERRY, CHINA, AND MURPHY CREEKS FROM 1999 TO 2003 PREPARED BY: STEVE ARNDT, M.SC. AND KIM KLASSEN,

More information

HEC-RAS Two-Dimensional Modeling: Lake Wausau, Wisconsin River and Tributaries Big Rib River and Eau Claire River January 2018

HEC-RAS Two-Dimensional Modeling: Lake Wausau, Wisconsin River and Tributaries Big Rib River and Eau Claire River January 2018 Final Report HEC-RAS Two-Dimensional Modeling: Lake Wausau, Wisconsin River and Tributaries Big Rib River and Eau Claire River City of Schofield, City of Wausau, Town of Rib Mountain, and Village of Rothschild,

More information

Illinois State Water Survey

Illinois State Water Survey Illinois State Water Survey HYDROLOGY DIVISION SWS Contract Report 508 COMPARISON OF 1987 AND 1989 BED PROFILE SURVEYS OF THE LOWER CACHE RIVER by Richard Allgire Office of Sediment and Wetland Studies

More information

MOP09 Measuring Infiltration Rates Page 1 of 7. Optional Activity: Measuring Infiltration Rates

MOP09 Measuring Infiltration Rates Page 1 of 7. Optional Activity: Measuring Infiltration Rates MOP09 Measuring Infiltration Rates Page 1 of 7 MAPPING OUR PARKS Optional Activity: Measuring Infiltration Rates Overview As you learned in Lesson 2, most rainwater that lands on natural landscapes such

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The

More information

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate. Goals for Gas Absorption Experiment: 1. Evaluate the performance of packed gas-liquid absorption tower. 2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate. 3. Consider

More information

Stephens Creek Culvert Replacement. CAC April 28, 2010

Stephens Creek Culvert Replacement. CAC April 28, 2010 Stephens Creek Culvert Replacement CAC April 28, 2010 1 Top of Bank Willamette Moorage Park Existing Culverts 50 ft Greenway Setback 200 ft Greenway Setback Existing Macadam Bay Access Stephens Creek Existing

More information

WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.)

WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.) Page 1 of 18 Water Monitoring Program WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.) No. 1 FLOW MONITORING Page 2 of 18 Water Monitoring Program Standard Operating Procedure No.

More information

Roads that are intended to be included in the VDOT system of maintained roadways must meet the standards and specifications prescribed by the VDOT.

Roads that are intended to be included in the VDOT system of maintained roadways must meet the standards and specifications prescribed by the VDOT. SECTION 1 - GENERAL 1-1 Purpose This Manual has been prepared to promote uniform design procedures for designers and technicians in the development of property and roads in the County of Henrico, Virginia.

More information