PURCHASE ADD KYTC UNSCHEDULED PROJECTS LIST DECEMBER 2010
|
|
- May Butler
- 5 years ago
- Views:
Transcription
1 BASE BALLARD US 60 BASE BALLARD KY 121 BASE BALLARD US 60 BASE BALLARD US 60 BASE BALLARD KY 286 ACTIVE BALLARD I-66 ACTIVE BALLARD US 51 ACTIVE BALLARD US 51 ACTIVE BALLARD US 51 PRI LOC 07 RANK07 RNK CONSTRUCT TURN LANES AT BALLARD COUNTY SCHOOLS 1,900 1 HI D RECONSTRUCT INTERSECTION AT KY 286 MAJOR WIDENING TO 4 LANES FROM PROPOSED BARLOW 4,000 HI 2 1 EASTERN BYPASS TO PROPOSED LA CENTER SOUTHERN BYPASS. SEE SEGMENT 4 IN APRIL, 1998 ADVANCE PLANNING STUDY. 20,850 5 HI MAJOR WIDENING TO 4 LANES FROM KY 1280 TO PROPOSED BARLOW EASTERN BYPASS. SEE SEGMENT 2 IN APRIL, ADVANCE PLANNING STUDY. 14,150 HI D0286 RECONSTRUCT INTERSECTIONS AT NORTH BALLARD CHURCH RD AND HERSCHEL JONES RD 2,200 2 HI 5 10 NEW INTERSTATE FACILITY FROM MISSOURI STATE LINE TO I- 24 AT PADUCAH. SEE CONVENTIONAL INTERSTATE DESIGN OPTION FOR ALTERNATE B IN MAY,1997 I-66 SOUTHERN KY A0066 CORRIDOR STUDY. SEE I-24 IN MCCRACKEN CO. FOR CONTINUATION OF I-66 ROUTING. 532,000 HI B RECONSTRUCT INTERSECTION AT KY 121 IN WICKLIFFE 2,550 MED B0051 ADD TURNING LANES AT THE ENTRANCE TO FORT JEFFERSON PARK 525 MED B0051 CONSTRUCT ENTRANCE TO INDUSTRIAL PARK NEAR WILLOW SLOUGH BRIDGE 825 MED ACTIVE BALLARD US B CORRECT SUBSTANDARD ROADWAY GEOMETRICS, INADEQUATE PASSING ZONES, IMPROVED OPERATING SPEEDS TO MINIMIZE DELAYS AND IMPROVE CONNECTIVITY FROM CARLISLE C/L TO RAILROAD OVERPASS IN WICKLIFFE. 18,500 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. INCLUDES KEVIL BYPASS. SEE DECEMBER, 2001 INTERMEDIATE PLANNING STUDY. 18,500 MAJOR WIDENING TO 4 LANES FROM PROPOSED LA CENTER SOUTHERN BYPASS TO 1.0 MI E OF DENIS JONES RD. SEE SEGMENT 6 IN APRIL, 1998 ADVANCE PLANNING STUDY. 10,500 NEW LA CENTER SOUTHERN BYPASS. SEE SEGMENT 5 IN APRIL, 1998 ADVANCE PLANNING STUDY. 16,600 4 MED NEW BARLOW EASTERN BYPASS. SEE SEGMENT 3 IN APRIL, 1998 ADVANCE PLANNING STUDY. 11,150 MED
2 PRI LOC 07 RANK07 RNK 09 ACTIVE BALLARD US 62 INACTIVE BALLARD US 51 IN INACTIVE BALLARD US 62 INACTIVE BALLARD KY 121 INACTIVE BALLARD KY 121 INACTIVE BALLARD KY 121 INACTIVE BALLARD KY 121 INACTIVE BALLARD KY 121 INACTIVE BALLARD KY MAJOR WIDENING TO 4 LANES FROM US 51 TO KY SEE SEGMENT 1 IN APRIL, 1998 ADVANCE PLANNING STUDY. 30,150 MED MAJOR WIDENING/RELOCATION FROM APPROX. 1.0 MI N OF WICKLIFFE TO OHIO RIVER BRIDGE NEAR CAIRO, ILL (SECTION L SCOPING STUDY) 39,250 LOW ADDRESS FUNCTIONALLY OBSOLETE OHIO RIVER BRIDGE NEAR CAIRO, ILL. AND ADDRESS ECONOMIC DEVELOPMENT, ACCESS AND SAFETY ISSUES. (SECTION K SCOPING STUDY) 226,000 LOW RECONSTRUCT INTERSECTION AT US 51\US 62 IN WICKLIFFE 2,750 3 MED CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND B0062 ADDRESS SAFETY ISSUES NEAR LOVELACEVILLE FROM CARLISLE COUNTY LINE TO MCCRACKEN COUNTY LINE. 10,350 HI B0051 CONSTRUCT BIKE LANE FOR MRT FROM CARLISLE C\L TO OHIO RIVER 7,250 LOW RECONSTRUCT INTERSECTION AT EAST CAIRO RD NEAR THE OHIO RIVER BRIDGE 1,750 LOW B NEW LOVELACEVILLE BYPASS 6,100 MED D0121 SPOT IMPROVEMENTS FROM WICKLIFFE TO KY 440 NEAR MAYFIELD. 14,000 MED RELOCATION FROM CARLISLE C\L TO KY 802. SEE SEGMENT D0121 3/PRIORITY 6 IN FEBRUARY, 2000 KY 121 CORRIDOR PLANNING STUDY. 12,000 LOW D D RELOCATION FROM KY 802 TO WICKLIFFE-BLANDVILLE RD. SEE SEGMENT 4/PRIORITY 5 IN FEBRUARY, 2000 KY 121 CORRIDOR PLANNING STUDY. 15,000 LOW RELOCATION FROM WICKLIFFE-BLANDVILLE RD TO KY 286. SEE SEGMENT 5/PRIORITY 4 IN FEBRUARY, 2000 KY 121 CORRIDOR PLANNING STUDY. 16,000 LOW RELOCATION FROM KY 286 TO US 51 N OF WICKLIFFE. SEE SEGMENT 6/PRIORITY 3 IN FEBRUARY, 2000 KY 121 CORRIDOR PLANNING STUDY. 17,200 LOW D D RECONSTRUCT INTERSECTION AT KY LOW BASE CALLOWAY KY D CORRECT ROADWAY GEOMETRICS AND ADDRESS CONGESTION AND ACCESS ISSUES ON KY-1327 AT CALLOWAY COUNTY SCHOOLS AND MSU AG EXPO CENTER. 1,
3 BASE CALLOWAY KY 748 BASE CALLOWAY CS-1047 BASE CALLOWAY KY 822 ACTIVE CALLOWAY US 641 ACTIVE CALLOWAY US 641 ACTIVE CALLOWAY US 641 PRI LOC 07 RANK07 RNK D0748 BRINN RD - MAJOR WIDENING TO 3 LANES FROM CHESTNUT ST (KY 1327) TO KY 121 IN MURRAY 5,400 2 HI CORRECT SUBSTANDARD GEOMETRY AND ADDRESS E9999 CONGESTION AND ACCESS ISSUES FROM KY-121 TO KY-80 IN MURRAY. 14, D B B B CORRECT SUBSTANDARD INTERSECTION GEOMETRICS AT KY-822 &KY-821 IN URRAY TO ADDRESS CONGESTION AND SAFETY ISSUES. 1, MAJOR WIDENING TO 4 LANES FROM TENN. STATE LINE TO KY SEE ALTERNATE 2, PRIORITY SECTION 3 IN DECEMBER 2002 ALTERNATIVES STUDY. 11,800 MAJOR WIDENING TO 4 LANES FROM KY 1828 TO MIDDLE FORK OF CLARKS RIVER BRIDGE. SEE ALTERNATE 2, PRIORITY SECTION 2 IN DECEMBER 2002 ALTERNATIVES STUDY. 16,700 RECONSTRUCT INTERSECTION AT KY 893 NEAR TENNESSEE STATE LINE IN HAZEL 2,000 LOW ADDRESS DIEWALK NEEDS ON US-641 (12TH ST) BETWEEN ACTIVE CALLOWAY US B SYCAMORE AND GLENDALE STREETS IN MURRAY TO IMPROVE ACCESS AND PEDESTRIAN SAFETY. 1,550 ACTIVE CALLOWAY US B Address safety and congestion issues at US 641 and KY 94 in Murray 1, SOUTH 4TH ST - CONSTRUCT URBAN INTERSECTION AT ACTIVE CALLOWAY US 641X B0641X SYCAMORE ST IN MURRAY 1,850 LOW ACTIVE CALLOWAY NEW ACTIVE CALLOWAY NEW ACTIVE CALLOWAY NEW C C C ADDRESS CONGESTION, FREIGHT MOVEMENT, ACECSS ISSUES AND NEED FOR EASTERN BYPASS AROUND MURRAY FROM US-641S TO US-641N. 59,000 5 MED ADDRESS CONGESTION, FREIGHT MOVEMENT, ACECSS ISSUES AND NEED FOR EASTERN BYPASS AROUND MURRAY FROM US-641S TO US-641N. 59,250 6 LOW Address congestion, safety, access and freight movement issues on the east side of Murray from KY121/US641X to KY 94. 5,200 1 HI 4 ACTIVE CALLOWAY NEW ACTIVE CALLOWAY KY C D Address congestion, access and connectivity issues west of Murray from KY 94 (near Doran Road) to Bailey Road (near KY 121). 6,550 3 HI 13 CORRECT ROADWAY GEOMTRICS AND ADDRESS SAFETY, AND ACCESS ISSUES FROM KY-0121 IN NEW CONCORD TO PRIMROSE DR AT KY-LAKE. 20, MED
4 ACTIVE CALLOWAY KY 732 ACTIVE CALLOWAY KY 783 ACTIVE CALLOWAY KY 822 ACTIVE CALLOWAY KY 1327 ACTIVE CALLOWAY KY-1550 INACTIVE CALLOWAY US 641 INACTIVE CALLOWAY KY 121 INACTIVE CALLOWAY KY 464 BASE CARLISLE US 51 BASE CARLISLE US 62 BASE CARLISLE US 51 BASE CARLISLE US 62 BASE CARLISLE US 62 BASE CARLISLE US 62 BASE CARLISLE US 62 ACTIVE CARLISLE US 51 ADDRESS SAFETY ISSUES WITH SUBSTANDARD ROADWAY D0732 GEOMETRICS AND SIGHT DISTANCE FROM BRIDLE PATH TO BEANE RD. 3,000 7 MED D0783 ADDRESS ACCESS ISSUES TO THE AIRPRT FROM KY-121 TO THE NEW KY 80, NEAR KY ,000 9 HI 16 TH STREET - ADD TURN LANES, SIDEWALKS AND GUARDRAILS BETWEEN KY 1550 (GLENDALE RD) AND KY 821 (SYCAMORE ST) IN MURRAY 6,750 4 HI D D D CHESTNUT STREET - RECONSTRUCT INTERSECTION AT 16TH ST\KY 774\KY 748 IN MURRAY 3,950 CORRECT ROADWAY GEOMETRICS AND ADDRESS CONGESTION AND SAFETY ISSUES AT KY-1550 AND ROBERTSON RD NEAR MURRAY 1,200 CONSTRUCT NEW GRADE SEPARATED INTERCHANGE AT B PLANNED RELOCATION OF THE KY 94\KY 121 ROUTING N OF MURRAY 20, D0121 MAJOR WIDENING FROM KY 894 TO ELM ST IN MURRAY (INCLUDES SOUTH 4TH ST) 19,000 LOW D REALIGN "S" CURVE AT CALLOWAY\GRAVES C\L 1,100 8 HI PRI LOC 07 RANK07 RNK 09 CORRECT GEOMETRIC DEFICIENCEIS AT INTERSECTION OF US-51.US-62/FRONT ST/ELM ST IN BARDWELL TO ADDRESS FLOW, SAFETY AND ACCESS ISSUES B RECONSTRUCT INTERSECTION AT KY 307 4,250 2 HI RECONSTRUCTION TO 2 LANE STANDARDS THROUGH BARDWELL WITH URBAN SECTION AND TURN LANES FROM KY 1377 TO TRUMAN CREEK BRIDGE 12,000 1 HI B0062 SPOT IMPROVEMENTS BETWEEN WILSON BRANCH RD AND KY ,500 3 HI B SPOT IMPROVEMENTS BETWEEN KY 121 AND KY ,000 5 HI B SPOT IMPROVEMENTS BETWEEN KY 1372 AND POLIVICK RD 4,000 4 HI B SPOT IMPROVEMENTS BETWEEN KY 1181 AND KY ,100 HI CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND IMPROVE SAFETY ACCESS AND IONAL CONNECTIVITY FROM HICKMAN C/L TO KY-1377 NEAR BARDWELL. 32,500
5 ACTIVE CARLISLE US 51 ACTIVE CARLISLE KY 121 ACTIVE CARLISLE KY 1377 ACTIVE CARLISLE KY 1377 INACTIVE CARLISLE US 51 INACTIVE CARLISLE US 51 INACTIVE CARLISLE US CORRECT SUBSTANDARD ROADWAY GEOMETRICS INADEQUATE PASSING ZONES AND IMPROVED OPERATING SPEEDS TO MINIMIZE DELAYS AND IMPROVE CONNECTIVITY FROM TRUMAN CREEK BRIDGE IN BARDWELL TO BALLARD C/L. 24,500 RECONSTRUCT INTERSECTION AT KY 408. SEE SEGMENT D0121 8/PRIORITY 8 IN FEBRUARY, 2000 KY 121 CORRIDOR PLANNING STUDY. 2,950 MED D RECONSTRUCTION FROM KY 80 TO KY ,875 LOW D RECONSTRUCTION FROM KY 1371 TO US 51 18,500 LOW CONSTRUCT TURN LANES AT SITE OF PROPOSED BARDWELL INDUSTRIAL PARK 2,250 LOW RECONSTRUCT INTERSECTION AT KY 80 IN ARLINGTON 2,500 MED NEW BARDWELL EASTERN BYPASS. SEE 1995 US 51 SCOPING STUDY. 10,000 PRI LOC 07 RANK07 RNK 09 INACTIVE CARLISLE US 51 INACTIVE CARLISLE KY 80 INACTIVE CARLISLE KY 1022 BASE FULTON KY 1099 BASE FULTON KY 166 RECONSTRUCTION TO 2 LANE STANDARDS FROM TRUMAN CREEK BRIDGE TO ILLINOIS CENTRAL RAILROAD BRIDGE AT WICKLIFFE. SECTIONS H,I,J & K US 51 SCOPING STUDY. 30,000 MED D0080 RECONSTRUCT INTERSECTION AT KY 1371 & KY 1377 IN MILBURN 1,350 LOW D1022 RECONSTRUCT INTERSECTION AT STANLEY RD TO CORRECT VERTICAL ALIGNMENT ISSUES 1,000 LOW D RECONSTRUCT INTERSECTION AT KY 125 IN HICKMAN 3,000 2 HI D RECONSTRUCT INTERSECTION AT KY 125 2,200 1 HI BASE FULTON KY 166 BASE FULTON KY D D ADDRESS SUBSTANDARD ROADWAY GEOMETRICS ON KY-166 FROM KY-125 TO KY-1127 TO ALLOW PREFERREED TRUCK TRAVEL AND BETTER ACCESS TO THE PURCHASE PARKWAY (I-69) AND THE HICKMAN FULTON COUNTY RIVERPORT. 16,500 3 ADDRESS SUBSTANDARD ROADWAY GEOMETRICS ON KY-166 FROM KY-1127 TO KY-239 TO ALLOW PREFERREED TRUCK TRAVEL AND BETTER ACCESS TO THE PURCHASE PARKWAY (I-69) AND THE HICKMAN FULTON COUNTY RIVERPORT. 12,500 4
6 PRI LOC 07 RANK07 RNK 09 BASE FULTON KY 166 BASE FULTON KY 166 BASE FULTON US 51 ACTIVE FULTON I-69 ACTIVE FULTON US 45 ACTIVE FULTON US 45 ACTIVE FULTON US 51 ACTIVE FULTON NEW ACTIVE FULTON KY 94 ACTIVE FULTON KY 94 ACTIVE FULTON KY 94 ACTIVE FULTON KY 94 ACTIVE FULTON KY 125 ACTIVE FULTON KY D ADDRESS SUBSTANDARD ROADWAY GEOMETRICS ON KY-166 FROM KY-239 TO KY-1125 TO ALLOW PREFERREED TRUCK TRAVEL AND BETTER ACCESS TO THE PURCHASE PARKWAY (I-69) AND THE HICKMAN FULTON COUNTY RIVERPORT. 20,500 ADDRESS SUBSTANDARD ROADWAY GEOMETRICS ON KY FROM KY-1125 TO MYATT RD IN FULTON TO ALLOW PREFERREED TRUCK TRAVEL AND BETTER ACCESS TO THE PURCHASE PARKWAY (I-69) AND THE HICKMAN FULTON COUNTY RIVERPORT. 19,500 6 RECONSTRUCTION TO 2 LANE STANDARDS FROM PURCHASE D B PKY. AT FULTON TO HICKMAN C\L 21,300 HI 7 ADDRESS INTERSTATE CONNECTIVITY, ACCESS, ECONOMIC DEVELOPMENT, AND FREIGHT MOVEMENT FROM I-24 IN A0069 MARSHALL COUNTY TO THE END OF THE PURCHASE PARKWAY IN FULTON COUNTY. 473,500 HI B RECONSTRUCT INTERSECTION AT KY 307 IN FULTON 3,750 MED CORRECT GEOMETRIC ALIGNMENTS AT INTERSECTION OF US- 45 AND KY-1718 AT THE ICR RAILROAD OVERPASSES IN B0045 FULTON AND ADDRESS SAFETY AND SIGHT DISTANCE ISSUES. 1, B0051 RECONSTRUCT INTERSECTION AT KY 94. INCLUDES NEW US UNDERPASS. 4,800 MED C NEW CONNECTOR BETWEEN US 51 AND KY 307 IN FULTON 7,250 4 HI D RECONSTRUCT FROM TENNESSEE STATE LINE TO KY ,000 LOW D0094 RECONSTRUCT INTERSECTION AT KY 1282 AND RAILROAD CROSSING 1,950 MED D0094 RECONSTRUCT FROM RR CROSSING NEAR KY 1282 TO SYCAMORE RD 23,600 LOW D0094 RECONSTRUCT IN THE RUNNING SLOUGH AREA W OF HICKMAN 24,150 MED D D CORRECT SUBSTANDARD ROADWWAY GEOMETRICS AND ADDRESS SAFETY ISSUES AND FREIGHT ACCESS FROM TN STATE LINE TO KY ,500 CORRECT SUBSTANDARD ROADWWAY GEOMETRICS AND ADDRESS SAFETY ISSUES AND FREIGHT ACCESS FROM KY- 166 TO KY-1099 IN HICKMAN. 22,000
7 ACTIVE FULTON KY 307 ACTIVE FULTON KY 1099 ACTIVE FULTON KY 1648 ACTIVE FULTON KY 9003 ACTIVE FULTON KY 9003 PRI LOC 07 RANK07 RNK D RECONSTRUCT KY 307 FROM J.P.P. TO HOLLAND LN 5,000 3 HI D RECONSTRUCT INTERSECTION AT KY 309 IN HICKMAN 1,550 LOW STEPHEN BEALE DR - RECONSTRUCTION WITH URBAN D1648 SECTION FROM WEST SECOND ST TO FULTON CITY HIGH SCHOOL IN FULTON 3,800 LOW D9003 JACKSON PURCHASE PKY - RECONSTRUCT INTERCHANGE AT US 51 IN FULTON 25,000 MED D9003 JACKSON PURCHASE PKY - RECONSTRUCT INTERCHANGE AT KY 307 IN FULTON 25,000 LOW INACTIVE FULTON US 45 INACTIVE FULTON KY 94 INACTIVE FULTON KY 94 INACTIVE FULTON KY 125 INACTIVE FULTON KY 166 INACTIVE FULTON KY 307 INACTIVE FULTON KY 1129 BASE GRAVES KY-58 BASE GRAVES KY-121 BASE GRAVES KY 121 BASE GRAVES KY 303 BASE GRAVES KY B RECONSTRUCT US 45 BETWEEN THE TWO RR OVERPASSES TO IMPROVE APPROACH ROAD SIGHT DISTANCE 6,500 LOW D RECONSTRUCTION FROM 0.5 MI E OF ROPER ROAD TO US 51 74,300 LOW D0094 RELOCATE KY 94 FROM THE INTERSECTION OF KY 1099 & KY EAST TO FULTON CO H.S. 12, D RECONSTRUCTION FROM TENNESSEE STATE LINE TO KY 94 34,150 MED D RECONSTRUCTION FROM KY 125 TO FULTON 51,200 5 HI D RECONSTRUCT RR UNDERPASS NEAR MEARS ST IN FULTON 9,400 MED D1129 RAISE GRADE IN TWO LOCATIONS NEAR MUD CREEK BRIDGES AND E OF MCCLELLAN RD 10,750 LOW D0058 CORRECT DRAINAGE ISSUES ON KY-58 FROM TICE RD TO KY BYPASS 1, SAFETY IMPROVEMENTS TO ADDRESS NIGHT TIME VISIBILITY D0121 CONCERNS AT THE INTERSCETION OF KY-121 BYPASS AND KY-58 IN MAYFIELD D D D SAFETY IMPROVEMENTS TO ADDRESS NIGHT TIME VISIBILITY CONCERNS AT THE INTERSCETION OF KY-121 BYPASS AND KY-464 IN MAYFIELD HI 3 5 MAJOR WIDENING TO 3 LANES WITH URBAN SECTION FROM KESS CREEK TO FARTHING STREET IN MAYFIELD 9,500 4 HI CORRECT SUBSTANDARD ROADWAY GEOMETRICS FROM KY- 58 TO KY-483 TO IMPROVE SAFETY AND IMPROVE TRUCK ACCESS. 24,000 5
8 BASE GRAVES KY 131 BASE GRAVES KY 131 BASE GRAVES KY 131 BASE GRAVES KY 121 ACTIVE GRAVES NEW ACTIVE GRAVES KY 58 ACTIVE GRAVES KY 58 ACTIVE GRAVES KY 97 ACTIVE GRAVES KY 97 ACTIVE GRAVES KY 121 ACTIVE GRAVES KY 121 ACTIVE GRAVES KY 121X ACTIVE GRAVES KY 9003 ACTIVE GRAVES KY 9003 ACTIVE GRAVES KY 9003 ACTIVE GRAVES KY 9003 INACTIVE GRAVES KY D D D D C PRI LOC 07 RANK07 RNK 09 CORRECT SUBSTANDARD ROADWAY GEOMETRICS FROM KY- 483 TO KY-849 TO IMPROVE SAFETY AND IMPROVE TRUCK ACCESS. 26,000 6 CORRECT SUBSTANDARD ROADWAY GEOMETRICS FROM KY- 849 TO KY-348 IN SYMSONIA TO IMPROVE SAFETY AND IMPROVE TRUCK ACCESS. 19,500 7 CORRECT SUBSTANDARD ROADWAY GEOMETRICS FROM KY- 348 IN SYMSONIA TO MCCRACKEN C/L TO IMPROVE SAFETY, ACCESS AND FREIGHT MOVEMENT ISSUES. 11,000 8 ADDRESS SAFETY, CONGESTION AND FUTURE CAPACITY ISSUES TO ACCOMMODATE INCREASED TRUCK TRAFFIC FROM HARRIS LN TO KY ,500 7 HI 9 NEW MAYFIELD SOUTHERN BYPASS FROM KY 303 S OF MAYFIELD NORTHWEST TO PURCHASE PKY. 10,000 RECONSTRUCT WITH URBAN SECTION AND TURN LANES D0058 FROM 0.5 MI W OF THE PURCHASE PKY TO THE ECL OF MAYFIELD 30, LOW D RECONSTRUCTION FROM THE ECL OF MAYFIELD TO KY ,500 LOW D ADDRESS SCHOOL ACCESS SAFETY ISSUES AND SUBSTANDARD ROADWAY GEOMTRICS FROM KY-94 TO KY- 339/KY-381 IN SEDALIA. 36,000 ADDRESS SCHOOL ACCESS SAFETY ISSUES AND SUBSTANDARD ROADWAY GEOMETRICS FROM KY-339/KY-381 IN SEDALIA TO KY-121 BYPASS AT MAYFIELD.. 36, D D0121 GEOMETRIC CONFIGURATION IMPROVEMENTS TO THE INTERSECTION OF KY-121 AND KY-400 NEAR MAYFIELD. 1, D0121 GEOMETRIC CONFIGURATION IMPROVEMENTS TO THE INTERSECTION OF KY-121 AND KY ,300 8 HI WIDEN TO 3 LANES WITH CONTINUOUS CENTER TURN LANE D0121X FROM COLLEGE STREET TO KY 58 IN MAYFIELD 8,250 6 HI D9003 JACKSON PURCHASE PKY - RECONSTRUCT INTERCHANGE AT KY ,500 LOW D9003 JACKSON PURCHASE PKY - RECONSTRUCT INTERCHANGE AT KY 80 IN MAYFIELD 23,750 9 MED D9003 JACKSON PURCHASE PKY - RECONSTRUCT INTERCHANGE AT US 45 N OF MAYFIELD 34,500 LOW D9003 JACKSON PURCHASE PKY - RECONSTRUCT INTERCHANGE AT KY ,000 LOW D RECONSTRUCTION FROM WATER VALLEY TO PILOT OAK 31,000 LOW
9 INACTIVE GRAVES KY 97 INACTIVE GRAVES KY 129 INACTIVE GRAVES KY 131 INACTIVE GRAVES KY 131 INACTIVE GRAVES KY 1820 INACTIVE GRAVES KY 9003 INACTIVE GRAVES KY 9003 BASE HICKMAN US 51 BASE HICKMAN US 51 BASE HICKMAN KY 307 BASE HICKMAN KY 307 BASE HICKMAN KY 307 ACTIVE HICKMAN US 51 ACTIVE HICKMAN US 51 ACTIVE HICKMAN KY 58 ACTIVE HICKMAN KY 58 PRI LOC 07 RANK07 RNK D0097 RECONSTRUCTION FROM KY 94 TO KY 121 BYPASS AT MAYFIELD 62,250 3 MED D RECONSTRUCTION FROM DUKEDOM TO KY 94 AT PILOT OAK 14,400 LOW D RECONSTRUCTION FROM KY 58 TO KY 348 AT SYMSONIA 62,350 1 HI D RECONSTRUCTION FROM KY 348 AT SYMSONIA TO KY ,700 2 HI D RECONSTRUCTION FROM US 62 TO KY ,700 LOW D JACKSON PURCHASE PKY - NEW INTERCHANGE AT KY 58 33,500 LOW D JACKSON PURCHASE PKY - NEW INTERCHANGE AT KY ,000 Correct Substandard roadway geometrics and improve safety, B0051 access, and regional connectivity from Bayou De Chein Bridge to Martin Rd. 12,700 2 HI B D D D B B D D Correct Substandard roadway geometrics and improve safety, access, and regional connectivity from Hickman CL Cane Creek Bridge 13,800 1 HI CORRECT GEOMETRIC ALIGNMENTS WITH KY-307 AND THE ICR RAILROAD OVERPASS TO ADDRESS SAFETY AND ACCESS ISSUES. 4, CORRECT SUBSTANDARD ROADWAY GEOMETRICS TO ADDRESS SIGHT DISTANCE AND SAFETY ISSUES AT INTERSECTION OF KY-307 AND KY , CORRECT SUBSTANDARD ROADWAY GEOMETRICS TO ADDRESS SIGHT DISTANCE AND SAFETY ISSUES AT INTERSECTION OF KY-307 ROSE RD. 1, Correct Substandard roadway geometrics and improve safety, access, and regional connectivity from Martin Rd. to KY-703 in Clinton 14,500 LOW Correct Substandard roadway geometrics and improve safety, access, and regional connectivity from KY-703 in Clinton (Hickman Co) to.160 miles south of Obion Creek Bridge 44,200 MED RECONSTRUCTION\SPOT IMPROVEMENTS FROM COLUMBUS TO KY ,300 5 HI CORRECT FUNCTIONALLY OBSOLETE BRIDGES AND ADDRESS SAFETY, TOURISM, AND ECONOMINC DEVELOPMENT ISSUES FROM KY-1772 TO KY ,900 LOW
10 ACTIVE HICKMAN KY 58 ACTIVE HICKMAN KY 58 ACTIVE HICKMAN KY 80 ACTIVE HICKMAN KY D ADDRESS SAFETY, TOURISM, AND ECONOMIC DEVELOPMENT ISSUES FROM KY-1540 TO CANE CREEK 7,600 LOW CORRECT SUBSTANDARD ROADWAY GEOMETRICS, REPLACE FUNCTIONALLY OBSOLOETE BRIDGES AND ADDRESS SAFETY, D TOURISM, AND ECONOMIC DEVELOPMENT ISSUES FROM CANE CREEK TO WCL OF CLINTON (KY 123) 9,900 LOW D RECONSTRUCTION FROM COLUMBUS TO CARLISLE C\L 12,500 LOW D RECONSTRUCTION FROM KY 80 N OF COLUMBUS TO CARLISLE C\L 7,000 LOW PRI LOC 07 RANK07 RNK 09 ACTIVE HICKMAN KY 1037 INACTIVE HICKMAN US 51 INACTIVE HICKMAN KY 123 INACTIVE HICKMAN KY 307 BASE MCCRACKEN KY 1286 BASE MCCRACKEN US 60 BASE MCCRACKEN US 62 BASE MCCRACKEN US 62 BASE MCCRACKEN NEW REPLACE FUNCTIONALLY OBSOLETE BRIDGE AND D APPROACEHS (MP 0.47) OVER THE ILLINOIS CENTRAL RAILROAD,.I WEST OF THE KY-780 JUNCTION NEAR CLINTON. 5,400 3 MED B0051 NEW CLINTON EASTERN BYPASS. SEE 1995 US 51 SCOPING STUDY. 26,500 LOW D RECONSTRUCTION FROM ECL OF CLINTON TO KY ,200 LOW D0307 RECONSTRUCTION FROM FULTON C\L TO KY 58. INCLUDES BRIDGE AND INTERSECTION IMPROVEMENTS. 33,600 4 HI D B UPGRADE BY STRAIGHTENING CURVES AND WIDEN TO 3 LANES FROM US 45 TO NEW HOLT RD IN PADUCAH. SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION STUDY. 24,000 1 HI MAJOR WIDENING FROM KY 998 TO 0.1 MI E OF I-24 IN PADUCAH. SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION STUDY. 19,950 2 HI MAJOR WIDENING FROM KY 998 TO MASSAC CHURCH B ROAD/PADUCAH INFORMATION AGE PARK. SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION STUDY. 15,400 3 HI B RECONSTRUCT INTERSECTION WITH KY ,600 5 HI ADDRESS FUTURE CONGESTION, ACCESS, AND ECONOMIC DEVELOPMENT ISSUES FOR WESTERN MCCRACKEN COUNTY FROMKY-994 TO US ,700 6 HI 5 BASE MCCRACKEN KY D CORRECT SUBSTANDARD ROADWAY GEOMETRICS ON KY- 131 FROM GRAVES C/L TO KY-284 IN REIDLAND TO IMPROVE SAFETY ACCESS AND FREIGHT MOVEMENT ISSUES. 22,500 6
11 ACTIVE MCCRACKEN I-24 ACTIVE MCCRACKEN I-24 ACTIVE MCCRACKEN I-24 ACTIVE MCCRACKEN I-24 ACTIVE MCCRACKEN US 45 ACTIVE MCCRACKEN US 60 ACTIVE MCCRACKEN US 62 ACTIVE MCCRACKEN US 62 ACTIVE MCCRACKEN US 62 ACTIVE ACTIVE MCCRACKEN NEW MCCRACKEN NEW A A A A ADDRESS FUTURE SERVICE CONDITION AND ASAFETY ISSUES FROM PADUCAH US-68 AT EXIT 16, TO WENDELL H FORD WEST KY PARKWAY AT EDDYVILLE EXIT 42 TO ACCOMOADTE FUTURE I-66/I-69 CONCURRENT ROUTING. 722,000 MED MAJOR WIDENING TO 6 LANES (4 TO 6 LANES) FROM US 60 TO US 68 IN PADUCAH. SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION STUDY. 111,500 LOW RECONSTRUCT FOR URBAN INTERCHANGE AT US 60 IN PADUCAH. SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION STUDY. 46,000 LOW ADD SLIP RAMPS BETWEEN US 62 AND US 45 IN PADUCAH. SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION STUDY. 11,750 LOW 28 TH STREET - OPERATIONAL IMPROVEMENTS WITH BIKE LANES FROM US 60 (JACKSON ST) TO US 60X (PARK AVE) IN B PADUCAH. SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION PLAN. 11,500 LOW B RECONSTRUCT INTERSECTION OF 21ST ST & JACKSON ST 8,000 LOW B B B WIDEN TO 3 LANES FROM US 45 TO I-24 IN PADUCAH. SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION STUDY. 17,000 LOW RELOCATION OF US 62 FROM US 60 DEPARTURE TO KY 1887 (PARK ROAD). SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION STUDY. 5,500 CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND ADDRESS SAFETY ISSUES ON US-62 FROM THE BALLARD COUNTY LINE TO THE PADAUCAH INFORMATION AGE PARK IN ORDER TO PROVIDE BETTER CONNECTIVITY BETWEEN BARDWELL AND PADUCAH 55,500 MED PADUCAH OUTER LOOP\MASSAC CREEK PKY - NEW CONSTRUCTION FROM US 62 TO NEW US 60 W OF I-24 IN PADUCAH. INCLUDES NEW INTERCHANGES AT US 62 AND NEW US 60. SEE ALT.1, SECT.1 IN NOVEMBER, 1999 SCOPING STUDY. SEE ALSO MARCH 2002 STUDY. 27,300 PADUCAH OUTER LOOP\MASSAC CREEK PKY - NEW CONSTRUCTION FROM KY 1322 TO US 62 W OF I-24 IN PADUCAH. INCLUDES NEW INTERCHANGES AT KY 1322 AND US 62. SEE ALT.1, SECT. 2 IN NOVEMBER, 1999 SCOPING STUDY. SEE ALSO MARCH 2002 STUDY. 5,300 PRI LOC 07 RANK07 RNK 09
12 ACTIVE ACTIVE ACTIVE ACTIVE MCCRACKEN NEW MCCRACKEN NEW MCCRACKEN NEW MCCRACKEN NEW ACTIVE MCCRACKEN KY D PADUCAH OUTER LOOP\MASSAC CREEK PKY - NEW CONSTRUCTION FROM US 45 TO KY 1322 W OF I-24 IN PADUCAH.INCLUDES NEW INTERCHANGES AT US 45, KY 339 AND KY SEE ALT. 1, SECT. 3 IN NOVEMBER 1999 SCOPING STUDY. SEE ALSO MARCH 2002 STUDY. 29,000 PADUCAH OUTER LOOP\MASSAC CREEK PKY - NEW CONSTRUCTION FROM NEW US 60 TO I-24\KY 305 I-CHG IN PADUCAH. INCLUDES NEW I-CHG AT NEW US 60. SEE ALT.1, SECT. 4 IN NOV STUDY. SEE KY 305 LISTING FOR SECTION 5. SEE ALSO 03\02 STUDY. 41,000 4 HI ADDRESS FUTURE CONGESTION, ACCESS, AND ECONOMIC DEVELOPMENT ISSUES FROM THE I-24/KY-1954 INTERCHANGE TO KY 1954 INTERCHANGE TO KY , MED Improve access to the proposed Riverport West Industrial Complex near Paducah from the intersection of KY 305 & Shaffer Road to Bobo Road. 14,000 7 HI PADUCAH OUTER LOOP\MASSAC CREEK PKY - MAJOR WIDENING TO 5 LANES WITH URBAN SECT. FROM I-24 TO US 45 IN PADUCAH. INCLUDES NEW CONNECTOR TO THE US 45 OHIO RIVER BRIDGE. SEE ALT. 1, SECT. 5 IN NOV STUDY. SEE ALSO MARCH 2002 STUDY 41,000 LOW PRI LOC 07 RANK07 RNK 09 ACTIVE MCCRACKEN KY 339 ACTIVE MCCRACKEN KY D D CLINTON ROAD - MINOR WIDENING WITH SPOT IMPROVEMENTS FROM US 45 TO OLD FARM RD IN PADUCAH 16,000 9 HI MINOR WIDENING AND SPOT IMPROVEMENTS TO REMOVE CLEAR ZONE OBSTACLES FROM GRAVES C\L TO KY ,600 LOW ACTIVE MCCRACKEN KY 731 ACTIVE MCCRACKEN KY 1310 INACTIVE MCCRACKEN I-24 INACTIVE MCCRACKEN US 45 INACTIVE MCCRACKEN US 68 INACTIVE MCCRACKEN NEW D D A SAFETY IMPROVEMENTS FROM US45\US 62 INTERSECTION TO BUCKNER LANE\32TH ST INTERSECTION IN PADUCAH 12,700 MED CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND ADDRESS SAFETY AND SERVICE ISSUES FROM US-45 TO KY- 994 IN PADUCAH. 12,250 MED CONSTRUCT NEW WELCOME CENTER ON EB I-24 BETWEEN ILLINOIS STATE LINE AND PADUCAH 14,000 LOW MAJOR WIDENING FROM KY 1322 TO US 62 IN PADUCAH. SEE MARCH, 2002 PADUCAH-MCCRACKEN CO. TRANSPORTATION STUDY. 75,000 LOW RECONSTRUCTION FROM KY 284 TO THE PURCHASE PARKWAY 62,000 LOW B B TH ST EXTENSION FROM US 45 TO CAIRO RD IN PADUCAH 4,100
13 INACTIVE MCCRACKEN KY 131 INACTIVE MCCRACKEN KY 994 INACTIVE MCCRACKEN KY 6040 BASE MARSHALL NEW BASE MARSHALL I-24 PRI LOC 07 RANK07 RNK D0131 RECONSTRUCTION TO 3 LANES OF KY 284 & KY 131 FROM US TO US 62 24,250 LOW D RECONSTRUCTION FROM KY 348 TO BERGER RD IN PADUCAH 49,500 MED D6040 Improve access to KY 6040 from KY 1954 to enhance economic development. 3,750 LOW ADDRESS ECONOMIC DEVELOPMENT AND INTERMODL C0000 ACCESS ISSUES TO THE MARSAHLL COUNTY -CALVERT CITY RIVERPORT. 12,200 3 HI A RECONSTRUCT INTERCHANGE AT PURCHASE PKY 34,700 1 HI BASE MARSHALL US ADDRESS SAFETY, ACCESS AND CONDITION ISSUES BEWEEN KY-1824 AND COPE RD, NEAR BENTON PHARMACY. 11,250 3 BASE MARSHALL US 641 BASE MARSHALL US 641 BASE MARSHALL US 641 BASE MARSHALL US 641 ACTIVE MARSHALL I-24 ACTIVE MARSHALL US 62 ACTIVE MARSHALL US 62 ACTIVE MARSHALL US 68 ACTIVE MARSHALL US 68 ACTIVE MARSHALL US ADDRESS SAFETY, ACCESS AND CONDITION ISSUES BEWEEN COPE RD, NEAR BENTON PHARMACY, TO 17TH ST IN BENTON. 11,250 4 SAFETY IMPROVEMENTS FROM 17TH ST TO KY 348 IN BENTON CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND 13,000 5 HI ADDRESS SAFETY, SERVICE AND CONGESTION ISSUES FROM THE CLARKS RIVER BRIDGE IN BENTON TO BENTON BAPTIST TEMPLE RD/HAPPY HOLLOW RD. CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND 12,500 6 ADDRESS SAFETY, SERVICE AND CONGESTION ISSUES FROM BENTON BAPTIST TEMPLE RD/HAPPY HOLLOW RD TO US IN DRAFFENVILLE. 17, A0024 ADD MERGE LANE TO WESTBOUND LANE OF I-24 AT THE PURCHASE PKY INTERCHANGE 6,000 MED B RECONSTRUCT INTERCHANGE AT US ,750 LOW B MAJOR WIDENING FROM JACKSON PURCHASE PKY TO US ,000 LOW IMPROVEMENTS TO US 68 TO PROVIDE LEFT TURNS FOR B0068 MARSHALL COUNTY HIGH SCHOOL AND CHRISTIAN FELLOWSHIP HIGH SCHOOL 8, B RECONSTRUCT INTERSECTION AT KY 408 2,750 MED CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND B0068 ADDRESS SIGHT DISTNACE AND SAFETY ISSUES AT THE INTERSECTION OF US-68 AND BARGE ISLAND RD/KY ,250
14 ACTIVE MARSHALL US 68 ACTIVE MARSHALL US 68 ACTIVE MARSHALL US 68 ACTIVE MARSHALL KY 95 ACTIVE MARSHALL KY 402 ACTIVE MARSHALL KY 1523 ACTIVE MARSHALL KY 9003 ACTIVE MARSHALL KY 9003 INACTIVE MARSHALL I-24 INACTIVE MARSHALL US 68 INACTIVE MARSHALL US 641 INACTIVE MARSHALL US 641 INACTIVE MARSHALL US 641 INACTIVE MARSHALL US 641 INACTIVE MARSHALL NEW INACTIVE MARSHALL KY 95 INACTIVE MARSHALL KY 905 NEW BRIDGE OVER KENTUCKY LAKE. ADDITIONAL FUNDS NEEDED IN ADDITION TO FUNDS SCHEDULED IN 6YP ITEMS B AND SEE SEGMENT 8 IN FEBRUARY, 1998 ADVANCE PLANNING STUDY. 78, B RECONSTRUCT INTERSECTION AT KY 95 1,800 MED B RECONSTRUCT INTERSECTION AT US 641 IN DRAFFENVILLE 5,350 MED D RECONSTRUCT INTERSECTION AT KY ,550 LOW PRI LOC 07 RANK07 RNK D CORRECT GEOMETRIC CONFIGURATION AND ADDRESS SAFETY ISSUES AT THE INTERSECTION OF KY-402 AND KY-58. 2,450 LOW ADDRESS SAFETY ISSUES WITH TRUCK ACCESS TO THE CALVERT CITY INDUSTRIAL COMPLEX AND THE MARSAHLL D1523 COUNTY-CALVERT CITY RIVERPORT FROM I-24 TO US-62/KY INTERSECTION. 37,000 MED D9003 JACKSON PURCHASE PKY - RECONSTRUCT INTERCHANGE AT US 68 32,500 LOW SAFETY IMPROVEMENTS TO ADDRESS NIGHT TIME VISIBILITY D9003 CONCERNS AT US-68/PURCHASE PARKWAY INTERCHANGE IN DRAFFENVILLE. 525 LOW A CONSTRUCT NEW INTERCHANGE AT KY ,450 SPOT IMPROVEMENTS BETWEEN KY 408 AND KY B0068 INCLUDES RECONSTRUCTION OF KY 962 AND BARGE ISLAND RD INTERSECTIONS. 9,250 LOW MAJOR WIDENING FROM B STREET TO US 68 AT DRAFFENVILLE 37,400 2 HI NEW INTERCHANGE AT KY ,000 LOW MAJOR WIDENING FROM KY 1824 TO 17TH ST. IN BENTON 22,500 4 HI RECONSTRUCT INTERSECTION AT KY 58\KY 795 1,650 LOW C0000 NEW ROUTE CONNECTING KY 282 TO RELOCATED US 62 AT THE KY DAM PROJECT 3, D RECONSTRUCT INTERSECTION AT KY ,150 LOW D RECONSTRUCT RR CROSSING AT KY 1824 IN HARDIN 500 LOW
COST (1000s) NEW INTERSTATE FACILITY FROM MISSOURI STATE LINE TO I-24 AT PADUCAH. SEE CONVENTIONAL INTERSTATE DESIGN A0066 BALLARD
NEW INTERSTATE FACILITY FROM MISSOURI STATE LINE TO I-24 AT PADUCAH. SEE CONVENTIONAL INTERSTATE DESIGN 01 004 A0066 BALLARD OPTION FOR ALTERNATE B IN MAY,1997 I-66 SOUTHERN KY CORRIDOR STUDY. SEE I-24
More information2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. B0060 1.10 BALLARD US 60 3.700 INCLUDES KEVIL BYPASS.
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationMulti Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY
Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More information2040 Long Range Plan Projects Draft October 2011
Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationTransportation Committee Project Priority List
Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000
More informationList of Display Boards
List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationSouthwestern RPO Prioritization Local Input Points for Division Needs Funding
H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern
More informationReplace Bridge 51 on Blackiston Mill Dr. over Silver Creek,
INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the
More informationPERFORMANCE ACTIVITY 405 LIMB MANAGEMENT
PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationTRASBURG RANSPORTATION
TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More informationFI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway
TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationTRANSPORTATION IMPROVEMENT PLAN
Administration -- $675,000 $692,000 $709,000 -- -- 1 Interfund Transfer (Rural Roads) -- $1,280,000 $1,296,000 $1,312,000 -- -- 2 Economic Development Fund -- $7,000,000 -- -- -- -- 3 City of Cottleville
More informationUS 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)
US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations
More informationDESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP
DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationPEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES
PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility
More informationPlanned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle
More informationSOUTHWEST SHEPHERDSVILLE SMALL AREA TRANSPORTATION STUDY
SOUTHWEST SHEPHERDSVILLE SMALL AREA TRANSPORTATION STUDY Final Report October 2008 Prepared for: City of Shepherdsville, Kentucky Prepared by: ACKNOWLEDGEMENTS Project Steering Committee Members Sherman
More informationI-95/Temple Avenue Improvements Project Colonial Heights, VA
I-95/Temple Avenue Improvements Project Colonial Heights, VA Pardon Our Dust Informational Meeting February 3, 2016 Harold Dyson, P.E. Construction Manager, Richmond District Tom Heil, P.E. Allan Myers
More informationIH 20 RANGER HILL PUBLIC MEETING
IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the
More informationA: PLANNED P ROJECTS PROJECTS
Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of
More informationINTERSTATE 540 IMPROVEMENT STUDY
INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group
More informationEXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative
EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of
More informationAppendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P (Version 2) Bikeway Projects in Currently Approved Plans Key: Removals Scope Changes Question Keep this in plan? = Included on map O = Not Included on map Planned Improvements from Sector &
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationState Highway 44/State Street High Capacity Corridor
Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities
More informationShort and Long Term Needs
Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation
More informationGuidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions
ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way
More informationAccess Routes from US 101 to the Richmond San Rafael Bridge
Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationCity of Wilsonville 5 th Street to Kinsman Road Extension Project
City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour
More informationRegional Goals. Goal 1: Reduce congestion and impact of incidents on I-81 and I-64.
Regional Goals Goal : Reduce congestion and impact of incidents on I- and I-. Goal : Strengthen transportation linkages between the Valley and the surrounding regions (Alleghany Highlands, New River Valley,
More informationSwamp Road Residents Study
Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a
More informationI-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design
I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,
More informationROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP
Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc ALBEMARLE COUNTY TRANSPORTATION PRIORITIES (DRAFT) April, 0: The following are the counties strategies priorities
More informationFrequently Asked Questions
Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how
More informationDesigning with the Railroad
Designing with the Railroad 23 CFR 646.214 (b)(2) requires that crossings be evaluated when they are within limits or near terminus of Federally Funded project. Some rough numbers for planning: Active
More informationFY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationFreeway System Considerations
Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings
More informationRegional Goals. Goal 1: Increase the safety of the transportation system.
Regional Goals Goal : Increase the safety of the transportation system. Goal : rotect and enhance the natural, historic, and neighborhood environment while making improvements to the existing system or
More informationEXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %
Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south
More informationDescription: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.
I-71 KIPDA ID # 130 Project Type: ROADWAY CAPACITY Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles. Purpose: Improve capacity and level of service along I-71 in the project
More informationSTATION #3 INITIAL ALTERNATIVES
www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way
More information!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!
MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions
More informationWELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018
WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis
More information91
90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 As previously depicted in Exhibit 4-J, vehicular accidents are shown along Forrester Road. The contributing factors may be due to its current two
More informationAppendix D: Concept Screening
Concept Description Concept #1 Route 288 Roadway Widening This concept consists of constructing a third lane on northbound and southbound Route 288 between Powhite Parkway and US 360. This improvement
More informationRoute 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT
More informationCOWETA HIGH SCHOOL AND EAST HIGHWAY 51
COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to
More informationRED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21,
RED BANK CORRIDOR Community Partners Committee Meeting Madisonville Recreation Center May 21, 2013 RED BANK CORRIDOR PROJECT Create a balance of mobility and access to better serve local communities, businesses
More informationOldham County Major Thoroughfare Plan
Prepared for: Oldham County Planning & Zoning Commission Prepared by: December 2003 Table of Contents I. INTRODUCTION...1 A. Contents of Report...1 B. Purpose of Study...2 C. Related Project Documents...2
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationGwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.
June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationBicycle and Pedestrian Plans and Improvements
Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review
More informationAPPENDIX I-A Kings County Regional Transportation Plan. Appendix A Page A-1 STATE ROUTES
APPENDIX I-A STATE ROUTES Interstate 5 SR 33 SR 41 SR 43 SR 137 SR 198 SR 269 (See under City of Avenal) (See Figure 4-2 and 4-3 for Rural and Urban Functional Classifications) Appendix A Page A-1 INTERSTATE
More informationNorthwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)
Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a
More informationRoute 58 Corridor Development Fund
Corridor Development Fund Appropriation Act Item 448 B.3 (2016) Report to the Chairmen of the Committees on Senate Finance and House Appropriations Virginia Department of Transportation 1401 East Broad
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationProject Description Form 6V
Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington
More informationSTUDY ADVISORY COMMITTEE. October 8, 2015
STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming
More informationProposed Project I 35 from Denton to Cooke County Line
Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity
More informationState Route 160 (Blue Diamond Highway)
State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.
More informationCHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW
HPTER 3 STUY RE OPERTIONL OVERVIEW This chapter describes the overall traffic operations within the study area under existing and future conditions and focuses on individual intersections not directly
More informationGrade Separated Intersection
Grade Separated Intersection Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Classification of Intersection 2 2.1 Grade Separated Intersection...........................
More informationInterstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017
EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses
More informationCincinnati Dayton Rd Widening
Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge
More informationBlair/Williamson Intersection Expressed Needs
Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson
More informationCARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM,
PROJECT NAME: Glade Road/Clark Creek Bridge PROJECT #: CB101 PROJECT DESCRIPTION: Safety improvements of Estimated Cost: 8,316,364 section of Glade Road from Misty Valley Drive to County: Brandy Lane including
More informationPREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036
HAM-32F-0.00 PID 86461 PREFERRED ALTERNATIVE IMPLEMENTATION PLAN Prepared for Ohio Department of Transportation, District 8 505 South SR 741 Lebanon, Ohio 45036 Prepared by URS Corporation 564 White Pond
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationWelcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study
Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question
More informationHighway 1 Kamloops to Alberta Four-Laning Program
Highway 1 Kamloops to Alberta Four-Laning Program COMMUNITY ENGAGEMENT DISCUSSION GUIDE AND FEEDBACK FORM February 7 March 1, 2013 www.bchwy1.ca 1 FEEDBACK FORM INSIDE HOW INPUT WILL BE CONSIDERED FAST
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.
More informationTransportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners
Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation
More informationYELLOWHEAD TRAIL / 149 STREET INTERCHANGE
YELLOWHEAD TRAIL / 149 STREET INTERCHANGE WELCOME Today we are introducing the concept planning project for a new gradeseparated interchange at Yellowhead Trail and 149 Street PURPOSE Provide information
More informationVT15 / Allen Martin Drive Intersection Scoping Study
VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives
More informationRecommended Roadway Plan Section 2 - Land Development and Roadway Access
Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines
More informationAlleviate Traffic Congestion and Improve Operational Reliability of the Route 17 Corridor
Project Purpose PURPOSE AND NEED STATEMENT Route 17 Bottleneck Project, MP 10.19 to 12.04 Alternatives Analysis and Preliminary Engineering Borough of Maywood, Township of Rochelle Park, and Borough of
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationJONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY
JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State
More information