2 TRAFFIC COTROL GEERAL OTES ======================== TRAFFIC COTROL PHASIG OTES (COT'D.) ============================== 1. WORK ZOE TRAFFIC COTROL WILL BE I ACCORDACE WITH THE MAUAL O UIFORM TRAFFIC COTROL DEVICES (MUTCD) AD THE GOVERIG STADARDS AD SPECIFICATIOS REFERECED O THE KEY. 2. LAE CLOSURES ARE PERMITTED BETWEE 8:00 PM AD 7:00 AM. 3. I ACCORDACE WITH STADARD SPECIFICATIOS 8-6.4, SUSPESIO OF COTRACTOR'S OPERATIOS - HOLIDAYS AD SPECIAL EVETS, SPECIAL EVET DAYS ICLUDE: TBD. 4. POSTED SPEED LIMITS: = 40 MPH WEST SA CARLOS AVE. = 25 MPH EAST SA CARLOS AVE. = 20 MPH SR A1A (SA MARCO AVE.) = 25 MPH SR A1A (MAY ST.) = 30 MPH PHASE II W. SA CARLOS AVEUE -. OF EXISTIG 1. PLACE ADVACE WARIG SIGS AD TRAFFIC COTROL DEVICES AS SHOW I TCP PLAS. 2. MAITAI TWO-LAE, TWO-WAY TRAFFIC ALOG EXISTIG W. SA CARLOS AVEUE WAY. RE-MARK EXISTIG PAVEMET TO FACILITATE PROPOSED COSTRUCTIO. MIIMUM LAE WIDTH 10'. TRAFFIC TO BE COTROLLED I ACCORDACE WITH PLAS AD IDEXES 601, 602, AD 607. PEDESTRIA TRAFFIC COTROLLED I ACCORDACE WITH PLAS AD IDEX COMPLETE ALL PHASE II COSTRUCTIO WITH A MIIMUM OF TWO LAES OF PROPOSED W. SA CARLOS AVEUE WAY UP TO THE FRICTIO COURSE AS SHOW I THE TCP PLA. SA MARCO AVEUE / MAY STREET - ITERSECTIO REALIGMET TRAFFIC COTROL PHASIG OTES ======================== PHASE I, SHOULDER, AD DRAIAGE OUTFALL - PHASE IA 1. PLACE ADVACE WARIG SIGS AD TRAFFIC COTROL DEVICES AS SHOW I TCP PLAS. 2. MAITAI TRAFFIC ALOG ACCORDIG TO PLAS AD IDEXES 612 AD 613. MAITAI TRAFFIC ALOG W. SA CARLOS AVEUE ACCORDIG TO PLAS AD IDEX 602. MAITAI PEDESTRIA ACCESS ACCORDIG TO PLAS AD IDEX COSTRUCT STORM SEWER OUTFALL PIPE AD DRAIAGE STRUCTURES ALOG EAST SIDE OF. PIPE COSTRUCTIO UDER TO BE ACCOMPLISHED BY OPE CUT METHODS. STEP 1: MAITAI TRAFFIC ALOG ISIDE LAES FOR PIPE COSTRUCTIO UDER OUTSIDE LAES ACCORDIG TO PLAS AD IDEXES 612 & 613. STEP 2: MAITAI TRAFFIC ALOG OUTSIDE LAES FOR PIPE COSTRUCTIO UDER THE LEFT TUR AD MEDIA AREA ACCORDIG TO PLAS AD IDEXES 612 & COSTRUCT AD PAVED SHOULDER ALOG EAST SIDE OF AS SHOW I PLAS. 5. COSTRUCT EW LIFT STATIO I LIBRARY PARKIG LOT AD FIRE HYDRAT I ACCORDACE WITH JPA PROJECT TUR LAE - PHASE IB 1. REMARK EXISTIG PAVEMET WITH REMOVABLE PAVEMET MARKIGS TO FACILITATE PROPOSED COSTRUCTIO, ISTALL S AD TEMPORARY BARRIER AS SHOW I THE PLAS, AD REROUTE TRAFFIC TO TEMPORARY PATTER. TRAFFIC TO BE COTROLLED I ACCORDACE WITH THE PLAS AD IDEXES 611, 612 AD COSTRUCT SOUTHBOUD LEFT TUR LAE AD TRAFFIC SEPARATOR AS SHOW I THE PLAS. SA MARCO AVEUE PIPE BURSTIG - PHASE IC 1. MAITAI TRAFFIC I ACCORDACE WITH IDEXES 602, 603, AD 607. PEDESTRIA TRAFFIC TO BE COTROLLED I ACCORDACE WITH IDEX PERFORM PIPE BURSTIG ACTIVITIES ALOG SA MARCO AVEUE AT THE LOCATIOS DEPICTED I THE JPA PLAS ( ). 1. PLACE ADVACE WARIG SIGS AD TRAFFIC COTROL DEVICES AS SHOW I TCP PLAS. 2. MAITAI EXISTIG TRAFFIC PATTER ALOG EXISTIG SA MARCO AVEUE WAY. CLOSE E. SA CARLOS AVEUE AT SA MARCO AVEUE. RE-MARK EXISTIG MAY STREET TO FACILITATE PROPOSED COSTRUCTIO AS SHOW I THE PLAS. MIIMUM LAE WIDTH 10'. TRAFFIC TO BE COTROLLED I ACCORDACE WITH PLAS AD IDEXES 601, 602, AD 607. PEDESTRIA TRAFFIC COTROLLED I ACCORDACE WITH PLAS AD IDEX COSTRUCT EW WAYS WITHI THE PHASE II WORK ZOES AS SHOW I THE PLAS, EXCLUDIG THE FRICTIO COURSE. REMOVE EXISTIG PAVEMET ALOG E. SA CARLOS AVEUE AD COSTRUCT TEMPORARY DRY RETETIO AREA. 3. ISTALL TEMPORARY ASPHALT PATH AD PEDESTRIA WALKWAY AS DEPICTED I THE TCP PLAS. 4. ISTALL TEMPORARY SIGALIZATIO AT THE SA MARCO AVEUE ITERSECTIO WITH W. SA CARLOS AVEUE. ADJUST FOR PHASE III TRAFFIC PATTER. PHASE III W. SA CARLOS AVEUE 1. COTIUE PHASE II COSTRUCTIO AS ECESSARY. MAITAI PHASE II WORK ZOES AD TRAFFIC PATTER. SA MARCO AVEUE 1. ISTALL ADVACE WARIG SIGS AD TRAFFIC COTROL DEVICES AS SHOW I TCP PLAS. 2. REMOVE EXISTIG PAVEMET MARKIGS AD RE-MARK SA MARCO AVEUE AS SHOW. TRAFFIC TO BE COTROLLED I ACCORDACE WITH PLAS AD IDEXES 601, 602, AD 607. PEDESTRIA TRAFFIC COTROLLED I ACCORDACE WITH PLAS AD IDEX ACTIVATE TEMPORARY SIGALIZATIO AT THE W. SA CARLOS ITERSECTIO. ROUTE ORTHBOUD TRAFFIC THROUGH SLIP LAE COSTRUCTED I PHASE II. 4. COSTRUCT EW CURB AD GUTTER AD TRECH DRAI ALOG WEST EDGE OF PAVEMET AS SHOW I THE PLAS. COSTRUCT EW MEDIA ALOG ORTHBOUD SLIP LAE. COSTRUCT EW SIGALIZATIOS AT THE RE-ALIGED MAY STREET ITERSECTIO. 5. MILL AD RESURFACE SA MARCO AVEUE AS SHOW I THE PLAS. TRAFFIC TO BE COTROLLED I ACCORDACE WITH IDEX OS. 603, 604, 605, AD 607. MAY STREET 1. ISTALL ADVACE WARIG SIGS AD TRAFFIC COTROL DEVICES AS SHOW I TCP PLAS. 2. PLACE PAVEMET MARKIGS AS SHOW I THE PLAS. TRAFFIC TO BE COTROLLED I ACCORDACE WITH PLAS AD IDEXES 601, 602, AD 607. PEDESTRIA TRAFFIC COTROLLED I ACCORDACE WITH PLAS AD IDEX ROUTE TWO-WAY THROUGH TRAFFIC TO EW SOUTH LEG OF OFFSET ITERSECTIO AS SHOW. 4. ROUTE WESTBOUD RIGHT TUR TRAFFIC TO EW ORTH LEG OF OFFSET ITERSECTIO AS SHOW. 5. COMPLETE COECTIO ACROSS MAY STREET AS EEDED. REMOVE EXISTIG MAY STREET PAVEMET. COMPLETE COSTRUCTIO OF PROPOSED IFIELD STORMWATER TREATMET AREA. COSTRUCT CUL-DE-SAC O E. SA CARLOS AVEUE. OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID GEERAL OTES 69 12:54:02 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCGRD01

3 TRAFFIC COTROL PHASIG OTES (COT'D.) ============================== PHASE IV W. SA CARLOS AVEUE 1. PLACE SIGS, WARIG AD S, AD MARK PHASE II PAVEMET I ACCORDACE WITH THE PLAS. REROUTE TRAFFIC TO PHASE II PAVEMET. TRAFFIC TO BE COTROLLED I ACCORDACE WITH PLAS AD IDEXES 601, 602, AD 607. PEDESTRIA TRAFFIC COTROLLED I ACCORDACE WITH PLAS AD IDEX COSTRUCT REMAIIG PORTIO OF W. SA CARLOS AVEUE WAY UP TO THE FRICTIO COURSE, ICLUDIG CURB,, DRIVEWAY OPEIGS, AD DRAIAGE AS SHOW I THE PLAS. SA MARCO AVEUE 1. ADJUST WARIG AD S, AD MARK PHASE III PAVEMET I ACCORDACE WITH THE PLAS. MAITAI TRAFFIC O PHASE III PAVEMET. TRAFFIC TO BE COTROLLED I ACCORDACE WITH PLAS AD IDEXES 601 AD 602. PEDESTRIA TRAFFIC COTROLLED I ACCORDACE WITH PLAS AD IDEX RE-COFIGURE TEMPORARY SIGAL AT W. SA CARLOS AVEUE ITERSECTIO AS SHOW I THE PLAS TO ACCOMMO PHASE IV TRAFFIC MOVEMETS. ACTIVATE EW SIGAL AT MAY STREET ITERSECTIO. 3. COSTRUCT SPLITTER ISLAD O ORTH SIDE OF W. SA CARLOS AVEUE ITERSECTIO. MAY STREET 1. ISTALL ADVACE WARIG SIGS AD TRAFFIC COTROL DEVICES AS SHOW I TCP PLAS. 2. PLACE PAVEMET MARKIGS AS SHOW I THE PLAS. TRAFFIC TO BE COTROLLED I ACCORDACE WITH PLAS AD IDEXES 601, 602, AD 607. PEDESTRIA TRAFFIC COTROLLED I ACCORDACE WITH PLAS AD IDEX ROUTE FIAL, OE-WAY WESTBOUD TRAFFIC SCHEME THROUGH ORTH LEG OF OFFSET ITERSECTIO AS SHOW. 4. ROUTE FIAL, OE-WAY EASTBOUD TRAFFIC SCHEME THROUGH SOUTH LEG OF OFFSET ITERSECTIO AS SHOW. 5. COSTRUCT SPLITTER ISLAD AD PEDESTRIA CROSSIG O MAY STREET. ACTIVATE HAWK SIGALIZATIO. PHASE V 1. PLACE TEMPORARY MARKIGS AD ROUTE TRAFFIC TO FIAL COFIGURATIO I ACCORDACE WITH THE PLAS. MAITAI TRAFFIC I ACCORDCE WITH IDEX OS. 607 AD 619 AS APPLICABLE. 2. ADJUST TEMPORARY SIGALIZATIO AT W. SA CARLOS AVEUE AD SA MARCO AVEUE ITERSECTIO FOR FIAL TRAFFIC COFIGURATIO. 3. COSTRUCT ISLAD AD SIGAL ASSEMBLY AT W. SA CARLOS AVEUE AD SA MARCO AVEUE ITERSECTIO. 4. ACTIVATE EW SIGAL AT W. SA CARLOS AVEUE AD SA MARCO AVEUE ITERSECTIO. REMOVE TEMPORARY SIGALIZATIO. PHASE VI 1. COSTRUCT FRICTIO COURSE OVER FIAL PAVEMET SURFACES OF W. SA CARLOS AVEUE, SA MARCO AVEUE, AD MAY STREET AS SHOW I THE PLAS. 2. APPLY FIAL STRIPIG AS SHOW I THE SIGIG AD PAVEMET MARKIG PLAS. MAITAI TRAFFIC I ACCORDACE WITH IDEXES 607 AD 619 AS APPLICABLE. OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID GEERAL OTES 70 12:54:02 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCGRD01

4 SURVEY SR 5 R/W (') R/W (') EXIST. PHASE 1A - STEP I 2' TEMP LAE CLOSURE 7.5' 7.5' MAITAI EXISTIG B TRAFFIC PATTER PARKIG LAE EXIST. COCRETE PROPOSED 36" OUTFALL PIPE EXIST. R/W (') PROPOSED 36" OUTFALL PIPE TYPICAL SECTIO - 2' TEMP LAE CLOSURE PHASE IA - STEP 1.T.S. LEFT SIDE SHOW. RIGHT SIDE SIMILAR BUT OPPOSITE HAD PHASE 1A - STEP 2 SURVEY SR 5 PHASE IA - STEP 2 2' TEMP LAE CLOSURE TYPICAL SECTIO -.T.S. R/W (') PARKIG LAE EXIST. OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID SR TYPICAL SECTIOS 71 12:54:03 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCTYRD01

5 SURVEY SR 5 R/W (') R/W (') PHASE 1B EXIST. 0-2' 2' EXIST. PROPOSED LOW PROFILE BARRIER WALL LOW PROFILE BARRIER WALL TYPICAL SECTIO - PHASE IB.T.S. COST. W. SA CARLOS AVE R/W VARIES (33.5' MI.) R/W VARIES (35.15' MI.) COST. MAY ST. PHASE II EXISTIG WAY 2' 10' 10' EXIST. R/W VARIES (25.00' MI.) R/W VARIES (31.39' MI.) PHASE II EXISTIG WAY PHASE II VARIES (20' - 30') 2' 10' 10' 2' TYPICAL SECTIO - W. SA CARLOS AVE. TYPICAL SECTIO - SR A1A (MAY STREET) PHASE II & PHASE III PHASE II.T.S..T.S. OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID SR TYPICAL SECTIOS 72 12:54:03 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCTYRD01

6 COST. SA MARCO COST. SLIP LAE EXIST. R/W VARIES (31.24' MI.) 2' R/W VARIES PHASE II DRY POD MATCH LIE MATCH LIE DRY POD R/W VARIES COST. MAY ST COECTOR R/W VARIES (49.83' MI.) PHASE II TYPICAL SECTIO - SR 5A (SA MARCO AVE.) PHASE II.T.S. PROPOSED OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID SR TYPICAL SECTIOS 73 12:54:03 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCTYRD01

7 COST. SA MARCO COST. SLIP LAE EXIST. PHASE III 2' R/W VARIES (31.24' MI.) 10' 10' 10' 2' PHASE III 2' 2' PHASE III MATCH LIE A & B MATCH LIE A PHASE III TYPICAL SECTIO - SR 5A (SA MARCO AVE) & MAY ST. COECTOR PHASE III.T.S. COST. MAY ST COECTOR 5' STA TO STA MATCH LIE B PHASE III PROPOSED COST. MAY ST COECTOR R/W VARIES (49.83' MI.) 2' STA TO STA PROPOSED OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID SR TYPICAL SECTIOS 74 12:54:03 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCTYRD01

8 COST. R/W VARIES (33.5' MI.) R/W VARIES (26.96' MI.) PROPOSED PHASE IV 10' 10' 5' TYPICAL SECTIO - W. SA CARLOS AVE. PHASE IV.T.S. EXIST. OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID SR TYPICAL SECTIOS 75 12:54:03 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCTYRD01

9 FOR IFO: COMPLETIO: FOR IFO: COMPLETIO: FOR IFO: COMPLETIO: FOR IFO: COMPLETIO: 1 ' 1 ' 1 PRE-COSTRUCTIO MESSAGE: 1 MESSAGE 1: DURIG COSTRUCTIO MESSAGE: MESSAGE 1: MAILIE EXISTIG STOP LOCATIO WORK W20-1F PRESET WHE WORKERS DOUBLED SPEEDIG FIES MOT W21-1 PROJECT IFORMATIO SIG 5' X 4'-6" 1-(800) xxx-xxxx SEASO YEAR SR xxx WORK ED G20-2 ' 1' 1' ' ED COSTRUCTIO STA ED PROJECT STA STA BEGI COSTRUCTIO STA BEGI PROJECT STA STA ' 1' 1' ' ' ED WORK G20-2 W. SA CARLOS AVEUE 1-(800) xxx-xxxx SEASO YEAR SR xxx W21-1 SPEEDIG FIES DOUBLED WHE WORKERS PRESET MOT WORK W20-1F 1 ED COSTRUCTIO SR A1A (SA MARCO AVE.) STA PROJECT IFORMATIO SIG 5' X 4'-6" STA WORK W20-1F PRESET WHE WORKERS DOUBLED SPEEDIG FIES MOT W21-1 PROJECT IFORMATIO SIG 5' X 4'-6" 1-(800) xxx-xxxx SEASO YEAR SR xxx BEGI COSTRUCTIO WORK ED G20-2 ' 1' 1' ' SR A1A (SA MARCO AVE.) SR 5A (SA MARCO AVEUE) SR 5A (SA MARCO AVEUE) ' 1' 1' ' ' ED WORK BEGI COSTRUCTIO SR A1A (MAY ST.) STA (800) xxx-xxxx SEASO YEAR SR xxx W21-1 SPEEDIG FIES DOUBLED WHE WORKERS PRESET MOT G20-2 WORK PROJECT IFORMATIO SIG 5' X 4'-6" W20-1F ' COST MESSAGE 2: BEGIS XX-XX-XX W ORK W20-1F ' PROJECT IFORMATIO SIG 5' X 4'-6" ' 1-(800) xxx-xxxx DEAD WORK FOR IFO: SEASO YEAR ED ED COMPLETIO: SR xxx G20-2 W14-1 1' WORK ED G20-2 W21-1 1' COST MESSAGE 2: USE CAUTIO SPEEDIG FIES DOUBLED W HE W ORKERS PRESET MOT ' SR A1A (MAY STREET) E. SA CARLOS AVEUE 2 W ORK W20-1F ' PRE-COSTRUCTIO MESSAGE: MESSAGE 1: E SA CARLOS AT A1A MESSAGE 2: BEGIS 1 XX-XX-XX 2 ' MAGOLIA AVE. ED WORK G20-2 ' SIDESTREET 100' SPEEDIG FIES DOUBLED WHE WORKERS PRESET MOT ' WORK W20-1F TYPICAL SIDESTREET SIG LAYOUT MATAZAS MISSOURI MATAZAS SR AIA (SA MARCO AVE.) MISSOURI SR AIA (SA MARCO AVE.) DISMUKES DISMUKES SR AIA (SA MARCO AVE.) ELMAR SR AIA (SA MARCO AVE.) DUFFERI SR AIA (SA MARCO AVE.) 2 ' 2 DURIG COSTRUCTIO MESSAGE: 2 MESSAGE 1: E SA CARLOS AT A1A MESSAGE 2: USE ALT ROUTE OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID ADVACE WARIG SIGS 76 12:54:04 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCDTRD01

10 FEC RAIL BEGI PROJECT STA MP SURVEY SR BEGI PROJECT EXIST MARKIGS STA (TO REMAI)(TYP) MP " RCP PCMS TYPE III LOGITUDIAL B BEGI EW STA ' LT. BEGI COSTRUCTIO STA ' TBM2 WETLAD LIE BEGI COSTRUCTIO STA W20-5R RIGHT LAE ADVACE WARIG ARROW PAEL 200' 200' W4-2R OLD TOW TROLLEY TOURS SURVEY SR 5 B STA EXIST MARKIGS (TO REMAI)(TYP) 18" RCP PCMS MESSAGE 1: RT LAE PCMS MESSAGE 2: USE CAUTIO COST. 5' AVE. MATAZES FEC EXIST. 320' TAPER EXIST. DEVICE 10' FUTCH'S POWER DEPOT FEC AVE. MISSOURI FEC R/W DEVICES 25' SPACIG (TYP) WETLAD LIE (TYP) DEVICES (TYP) STA FEC RAIL FIRST COAST POWER SPORTS SURVEY STA SURVEY STA W SURVEY STA ' (BUFFER) COST STA W DEVICE 25' MATCH LE STA THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IA- STEP :54:06 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD0

11 " RCP TO REMAI MATCH LIE STA EXIST. R/W LIE 25' COST. 5' SPACIG (TYP) FIRST COAST POWER SPORTS EXISTIG MAST ARM SURVEY SR EXIST. SURVEY STA = COST TYPE F C&G SURVEY STA W. SA CARLOS AVE SURVEY STA = FEC RAIL ' RT ' RT ' RT COST STA W. SA 305' CARLOS (BUFFER) AVE DEVICE 25' BEGI FULL DEPTH COSTRUCTIO STA DEVICES (TYP) ' RT BEGI 5' PAVED SHOULDER MATCH EXIST STA , 31.' RT COST W. SA CARLOS AVE FEC RAIL COST 40' OF GUIDERAIL IDEX 870 EXTED EDGEBEAM TO EXIST GRADE CR-A ISTALL DETECTABLE WARIG SURFACE COST 5' COC ' RT PROPOSED MAST ARM R ' LT PROPOSED PROPOSED MAST 41.' ARM RT 49.' PEDESTRIA RT ' RT 25' R FEATURE (TYP) COST CARLOS AVE. R 30' W. SA ' LT ' LT S ' LT 10' 10' (TYP) 38.00' RT R 30' ' LT ' LT ' RT W. SA CARLOS AVE ' LT ' LT EXISTIG MAST ARM 3.' RT ' RT COST. 8" PLAI CEMET COC. PAVEMET 167' OF 29"x45" PIPE ' RT 38.00' RT CR-A COST 1 OF 36" PIPE ABADO EXIST. 16 LF OF 18" PIPE I PLACE (GROUT FILL) BM2 COST 5' SHOULDER PC STA SEPARATOR ABADO EXIST. 110 LF OF 15" PIPE I PLACE (GROUT FILL) ' RT. R11-1 SURVEY SR 5 PROPOSED R/W PROPOSED MAST ARM WETLAD LIE FEC S-2 BEGI 8" PLAI CEMET COC. PAVEMET , 7.' LT. 4' TYPE II TRAFFIC EX-01 18" RCP TO REMAI 6" PVC CURVE BL1 FEC COST 8" PLAI CEMET COC. PAVEMET ST. JOHS COUTY PUBLIC LIBRARY COST. 22' OF 36"PIPE COST. 5' COST. 5' SHOULDER COST. 176' OF 36"PIPE COST. 8"PLAI CEMET COC. PAVEMET 4' TYPE II TRAFFIC SEPARATOR EXIST MARKIGS 49.' (LT) (TO REMAI)(TYP) ' (LT) ' (LT) EXIST. FEC RAIL R 25' S-3 R 25' S-4 R 25' R 25' STA ' LT. COST. 13' OF 36"PIPE COST. 220' OF 36"PIPE ED EW ' RT 7.' RT ' (LT) TBM ' (LT) CURVE DATA BL ' (LT) PI STA TYPE III PI STA. = STA WETLAD LIE ' (LT) ED 5' PAVED SHOULDER MATCH EXISTIG STA , 36.' LT ED 8"PLAI CEMET COC. PAVEMET +.00, 7.' LT. LOGITUDIAL 305' (BUFFER) DEVICE 25' (TYP) MATCH LIE STA CURVE BL1 SURVEYSR 5 THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IA - STEP :54:06 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD0

12 RIGHT LAE F.E.C. FEC W4-2R W20-5R COST. 13' OF 36"PIPE COST. 220' OF 36"PIPE MATCH LIE STA ' (BUFFER) DEVICE 25' (TYP) S FLORIDA ATIOAL GUARD 13' X 15' RUBBLE RIP-RAP EXIST. (2) 36"X30"RCP TOREMAI EXIST. PT STA ED PROJECT ED COSTRUCTIO STA MP STA SURVEY SR 5 25' SPACIG (TYP) DISMUKES ST. EXIST MARKIGS (TO REMAI)(TYP) 320' TAPER DEVICE 10' T. GREGORY IMPORTS B ADVACE WARIG ARROW PAEL PCMS MESSAGE 1: BEST WESTER RT LAE PCMS MESSAGE 2: USE CAUTIO STA ' 200' 100' TYPE III LOGITUDIAL B PCMS THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IA - STEP :54:07 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD0

13 BEGI PROJECT STA MP PCMS TYPE III LOGITUDIAL C BEGI COSTRUCTIO STA ' W20-5L LEFT LAE OLD TOW TROLLEY TOURS 200' 200' W4-2R SURVEY SR 5 C STA PCMS MESSAGE 1: ADVACE WARIG ARROW PAEL LT LAE PCMS MESSAGE 2: USE CAUTIO AVE. MATAZES 5 320' TAPER DEVICE 10' FUTCH'S POWER DEPOT COUTY ST. JOHS FIACIAL PROJECT ID FEC DEVICES (TYP) AVE. MISSOURI FEC RAIL STA ' (BUFFER) DEVICE 25' FIRST COAST POWER SPORTS PHASE IA - STEP 2 MATCH LE STA THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. 12:54:07 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD0

14 STA ' (BUFFER) DEVICE 25' MATCH LE STA FIRST COAST POWER SPORTS REMOVABLE TAPE, PAVEMET MARKIGS, WHITE 25' SPACIG (TYP) ' (BUFFER) DEVICE 25' FEC RAIL CARLOS AVE. W. SA R11-1 R11-1 FEC SURVEY SR 5 COST W. SA CARLOS AVE 10' SPACIG (TYP) ST. JOHS COUTY PUBLIC LIBRARY EXIST MARKIGS (TO REMAI)(TYP) TYPE III LOGITUDIAL MATCH LIE STA THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IA - STEP :54:08 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD0

15 LEFT LAE FEC W4-2R W20-5L MATCH LIE STA ' (BUFFER) DEVICE 25' FLORIDA ATIOAL GUARD STA SURVEY SR 5 DEVICES (TYP) DISMUKES ST. EXIST MARKIGS (TO REMAI)(TYP) T. GREGORY IMPORTS 320' TAPER DEVICE 10' EXIST MARKIGS (TO REMAI)(TYP) ED PROJECT ED COSTRUCTIO STA MP C PCMS MESSAGE 1: ADVACE WARIG ARROW PAEL BEST WESTER LT LAE PCMS MESSAGE 2: USE CAUTIO STA ' 200' 100' TYPE III LOGITUDIAL C PCMS THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IA - STEP :54:08 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD0

16 BEGI PROJECT STA MP BEGI COSTRUCTIO STA EXIST MARKIGS (TO REMAI)(TYP) TYPE III LOGITUDIAL OLD TOW TROLLEY TOURS D SURVEY SR 5 PCMS MESSAGE 1: LAE SHIFT PCMS MESSAGE 2: USE CAUTIO EXIST MARKIGS (TO REMAI)(TYP) AVE. MATAZES FUTCH'S POWER DEPOT FEC AVE. MISSOURI PCMS D FEC RAIL W1-4BR STA ' FIRST COAST POWER SPORTS MATCH LE STA THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IB 83 12:54:09 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD0

17 STA STA FEC 130' (TAPER) COST W. SA CARLOS AVE FIRST COAST POWER SPORTS FEC RAIL 130' (TAPER) REMOVABLE TAPE, PAVEMET MARKIGS, WHITE WHITE REMOVABLE TAPE, PAVEMET MARKIGS, SURVEY SR BARRIER WALL STA REMOVABLE TAPE, PAVEMET MARKIGS, YELLOW REMOVABLE TAPE, PAVEMET MARKIGS, WHITE BEGI LOW PROFILE OM1-1 COST CARLOS AVE. W. SA W1-4BL STA WHITE +13 LOW PROFILE BARRIER WALL REMOVABLE TAPE, PAVEMET MARKIGS, LOW PROFILE BARRIER WALL REMOVABLE TAPE, PAVEMET MARKIGS, YELLOW W1-4BL REMOVABLE TAPE, PAVEMET MARKIGS,YELLOW ST. JOHS COUTY PUBLIC LIBRARY ED LOW PROFILE BARRIER WALL STA OM STA ED LOW PROFILE BARRIER WALL STA ' C/C (TYP) 130' (TAPER) STA STA "WHITE PREFORMED TAPE TYPE III 25' C/C (TYP) LOGITUDIAL MATCH LIE STA THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IB 84 12:54:09 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD0

18 PCMS FEC W1-4BR 130' (TAPER) 200' REMOVABLE TAPE, PAVEMET MARKIGS, YELLOW MATCH LIE STA ED PROJECT ED COSTRUCTIO STA MP STA FLORIDA ATIOAL GUARD REMOVABLE TAPE, PAVEMET MARKIGS, WHITE ADVACE WARIG ARROW PAEL SURVEY SR 5 DISMUKES ST. EXIST MARKIGS (TO REMAI)(TYP) T. GREGORY IMPORTS STA ' D D STA BEST WESTER PCMS MESSAGE 1: LAE SHIFT PCMS MESSAGE 2: USE CAUTIO TYPE III LOGITUDIAL THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IB 85 12:54:10 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD0

19 DISMUKES ST. PREFORMED TAPE 6" W HITE MATCH LIE STA REMOVABLE TAPE, PAVEMET MARKIGS, WHITE REMOVABLE TAPE, PAVEMET MARKIGS, YELLOW +80 REMOVABLE TAPE, PAVEMET MARKIGS, YELLOW REMOVABLE TAPE, PAVEMET MARKIGS, WHITE TYPE III +23 LOGITUDIAL REMOVABLE TAPE, PAVEMET MARKIGS, WHITE FEC ED PROJECT ED COSTRUCTIO STA MP FLORIDA ATIOALGUARD +86 SURVEY SR 5 EXISTIG MARKIGS (TO REMAI) EXISTIG MARKIGS (TO REMAI) OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE II 86 12:54:11 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

20 BUSIESS BUSIESS SR A1A(MAYST.) 202 FEC RAIL FEC EXISTIG MARKIGS (TO REMAI) SURVEY SR 5 6"WHITE PREFORMED TAPE 10'-30' SKIP WHITE PREFORMED TAPE COST EXISTIG MARKIGS (TO REMAI) OPE CUT FOR PIPE COST. MAITAI TRAFFIC PER STD. IDEX 603 PROPOSED MAST ARM PROPOSED PEDESTRIA FEATURE EXISTIG LIFT STATIO (TOBE REMOVED) 24"WHITE (PARTIAL) TOP GRATE EL FL-0.60 MATCH LIE STA "WHITE COST. TEMP DBI TYPE C W/ PERMAET S-7 P-BOTTOM +59 FIRST COAST POWER SPORTS W20-7 USE DURIG ILET COSTRUCTIO W ' 10' 6"WHITE C/C (TYP) MAITAI EXISTIG DRIVEWAYCOECTIO 6"DBLYELLOW W/ 40' DAVEPORT PARK PROPOSED +26 W. SA CARLOS AVE. COST W.SA CARLOS AVE 6"WHITE TYPE III LOGITUDIAL STRAI POLE SIGAL COST TEMPORARY STA DEVICES MATCH 25' (TYP) SR A1A (SA MARCO AVE.) DUKI DOUTS DUFFERI ST. OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE II 87 12:54:12 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

21 R9-11 CROSS HERE W ILLIAMS ST. MATAZES AVE. (TOREMAI) SR A1A SURVEY SA MARCO AVE TYPE III LOGITUDIAL F BEGI COSTRUCTIO SR A1A(SA MARCOAVE.) STA PRE-COSTRUCTIO MESSAGE 1: E SA CARLOS TO BE MESSAGE 2: BEGIIG XX-XX-XX PCMS MESSAGES: SA MARCO AVE. EXISTIG MARKIGS OLD TOW DURIG LAE COSTRUCTIO: MESSAGE 1: E SA CARLOS MESSAGE 2: USE ALT ROUTE PCMS F MISSOURI AVE. MATCH LIE STA DUFFERI ST. RED TRAI TOURS DUKI DOUTS E. SA CARLOS AVE. CORTESSE'S BISTRO OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. 5 COUTY ST. JOHS FIACIAL PROJECT ID PHASE II 88 12:54:12 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

22 205 BUSIESS MATCH LIE STA RED TRAI TOURS EXISTIG MARKIGS (TO REMAI) +30 DUFFERI ST +80 CORTESSE'S BISTRO PROPOSED OVERHEAD SIG 6"DBLYELLOW W/ 40' MOT TYPE III 6"WHITE LOGITUDIAL BUSIESS BUSIESS DETOUR M04-09BR R11-1 IACTIVATE EAST FACIG SIGAL HEADS DUKI DOUTS R9-10 CROSS HERE E. SA CARLOS AVE. COST TEMPORARY STRAI POLE SIGAL REMOVE EXSTIG MAST ARM WHE TEMP SIGALIZATIO ACTIVATED COST PROPOSED MAST ARM +78 MATCH LIE STA "WHITE " WHITE TEMPORARY SHALLOW RETETIO AREA BOTTOM EL "WHITE DAVEPORT PARK EXISTIG MARKIGS R11-1 TEMP 5' ASPHALT PATH SEE DETAIL 200 (TOREMAI) 201 COST SLIP LAE MATCH EXISTIG MARKIGS STA M04-09BR COST TEMPORARY STRAI POLE SIGAL 10' (TYP) 6" DBL YELLOW W/ Y/Y 40' R11-1 COST MAY ST DETOUR 25' (TYP) REMOVE EXIST COC SEPARATOR R ' 10' 13 SR A1A (MAY ST.) EXIST MAST ARM (TO REMAI) EXISTIG MARKIGS (TOREMAI) EXISTIG MARKIGS (TOREMAI) R11-1 6" WHITE R ' (TYP) ED COSTRUCTIO SR A1A (MAY ST.) STA COST MAY ST COECTOR SURVEY SA MARCO AVE COST SA MARCO AVE 25' (TYP) EXIST MAST ARM (TO REMAI) SR A1A(SA MARCOAVE.) R11-1 (TOREMAI) 204 LOGITUDIAL (LCD) 2" MISC ASPHALT 6" WHITE PROPOSED MAST ARM EXISTIG MARKIGS 4' MI 1' 5' 1' 132 TEMPORARY ASPHALT DETAIL BUSIESS MOT LOGITUDIAL DEVICE (LCD) MATCH LIE STA OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID TRAFFFIC COTROL PLA PHASE II 89 12:54:13 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

23 DISMUKES ST. RICHBOURG CERIFIED CAR CARE MATCH LIE STA AGELA'S RESTAURAT SUPPLIES FLORIDA ATIOAL GUARD ' (TYP) ELMAR AVE. F PCMS TYPE III LOGITUDIAL F SURVEY SA MARCO AVE SA MARCO TERRACE PRE-COSTRUCTIO MESSAGE 1: E SA CARLOS TO BE MESSAGE 2: BEGI PCMS MESSAGES: MESSAGE 1: MESSAGE 2: SR A1A(SA MARCOAVE.) DURIG LAE COSTRUCTIO: E SA CARLOS USE ALT ROUTE ED COSTRUCTIO SR A1A (SA MARCO AVE.) STA MILTO ST. ATIGUA VETERIARY PRACTICE PERPALL ST OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE II 90 12:54:13 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

24 DISMUKES ST. MAITAI MARKIGS PER PHASE II MATCH LIE STA FEC RAIL MAITAI MARKIGS PER PHASE II TYPE III LOGITUDIAL FEC ED PROJECT ED COSTRUCTIO STA MP FLORIDA ATIOALGUARD OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE III 91 12:54:14 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

25 BUSIESS BUSIESS DAVEPORT PARK A1A A1A FEC RAIL MAITAI MARKIGS PER PHASE II FEC W. SA CARLOS AVE. FIRST COAST POWER SPORTS ST. JOHS COUTY PUBLIC LIBRARY 10' SPACIG(TYP) DAVEPORT PARK SURVEY SR 5 COST MATCH LIE STA ' SPACIG (TYP) COST W. SA CARLOS AVE PHASE II SPACIG(TYP) 10' 10' PROPOSED 25' MAITAI MARKIGS PER PHASE II TYPE III 6"WHITE LOGITUDIAL SURVEY SA MARCO AVE STA ' MATCH LIE SPACIG (TYP) SR A1A (SA MARCO AVE.) DUKI DOUTS MAY ST. COECTOR E. SA CARLOS AVE. DUFFERI ST. OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE III 92 12:54:15 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

26 SURVEY SA MARCO AVE W ILLIAMS ST. AVE. MATAZES SR A1A(SA MARCOAVE.) PCMS TYPE III LOGITUDIAL BEGI COSTRUCTIO SR A1A(SA MARCOAVE.) MATCH EXISTIG MARKIGS STA G G PCMS MESSAGE 1: EW T R A F F I C P A T T E R PCMS MESSAGE 2: S R A 1 A TO V I L A O 18" WHITE EXISTIG MARKIGS (TOREMAI) OLD TOW 6" WHITE 18" WHITE MISSOURI AVE. 6" DBL YELLOW 6" WHITE MATCH LIE STA RED TRAI TOURS DUFFERI ST DUKI DOUTS E. SA CARLOS AVE. CORTESSE'S BISTRO OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. 5 COUTY ST. JOHS FIACIAL PROJECT ID PHASE III 93 12:54:16 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

27 205 MATCH LIE STA RED TRAI TOURS 6"DBLYELLOW DUFFERI ST CORTESSE'S BISTRO "WHITE TYPE III 6"WHITE SIGALIZATIO (TO REMAI) DUKI DOUTS LOGITUDIAL EXIST MAST ARM R9-10 EXIST STRAI POLE CROSS HERE E. SA CARLOS AVE. 128 MATCH LIE STA ' SPACIG (TYP) DAVEPORT PARK 28 24" WHITE 29 10' " WHITE " WHITE " DBL YELLOW REMOVE TEMP ASPHALT PATH 18" WHITE 6" WHITE ' SPACIG (TYP) STA R3-1 6" WHITE +74 R5-1 COST MAY ST ED COSTRUCTIO SR A1A (MAY ST.) STA MATCH EXISTIG MARKIGS 10' 10' ETER SURVEY SA MARCO AVE DO OT COST SLIP LAE R11-1 6" WHITE SR A1A (MAY ST.) ' SPACIG (TYP) A1A A1A REMOVE EXIST MAST ARM SLIP LAE 100' PCMS G +01 W ' SPACIG (TYP) G REMOVE EXIST MAST ARM COST SA MARCO AVE COST MAY ST COECTOR +03 PCMS MESSAGE 1: 204 A1A - TO ST AUG STAY LT PCMS MESSAGE 2: ALT US 1 ORTH EXT RT OPE CUT FOR PIPE COST. MAITAI TRAFFIC PER STD. IDEX 603 COST PROPOSED MAST ARM +01 6" WHITE COST PROPOSED MAST ARM BUSIESS YIELD R2-1 BUSIESS 25' SPACIG (TYP) +44 YEILD MARKIG MATCH LIE STA OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE III 94 12:54:16 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

28 DISMUKES ST. RICHBOURG CERIFIED CAR CARE FLORIDA ATIOAL GUARD MATCH LIE STA YEILD MARKIG 10' SPACIG (TYP) 6" DBL YELLOW OPE CUT FOR PIPE COST. MAITAI TRAFFIC PER STD. IDEX 603 AGELA'S RESTAURAT SUPPLIES 10' SPACIG (TYP) 10' 10' " WHITE 6" WHITE ELMAR AVE. PROPOSED OVERHEAD SIG SR A1A(SA MARCOAVE.) 25' SPACIG (TYP) BUSIESS BUSIESS +15 PCMS H 6" WHITE 6" DBL YELLOW +61 SA MARCO TERRACE H PCMS MESSAGE 1: TO MAY ST A1A PCMS MESSAGE 2: USE EW SIGAL ED COSTRUCTIO. MATCH EXISTIG MARKIGS SR A1A (SA MARCO AVE.) STA SR A1A(SA MARCOAVE.) MILTO ST. SURVEY SA MARCO AVE ATIGUA VETERIARY PRACTICE TYPE III LOGITUDIAL PERPALL ST OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE III 95 12:54:17 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD1

29 DISMUKES ST MATCH LIE STA TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS TYPE III TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS LOGITUDIAL ED PROJECT ED COSTRUCTIO STA MP FLORIDA ATIOALGUARD OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IV 96 12:54:17 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD2

30 BUSIESS BUSIESS BUSIESS BUSIESS BUSIESS BUSIESS BUSIESS BUSIESS DAVEPORT PARK 202 SU MARC ST. JOHS COUTY PUBLIC LIBRARY 12 AD PAVEMET MARKIG PLACED PER SIGIG TEMORARY MARKIGS SLIP LAE PLAS TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS FIRST COAST POWER SPORTS ST. JOHS COUTY PUBLIC LIBRARY DAVEPORT PARK SURVEY SR 5 COST MATCH LIE STA MOT " WHITE 6" DBL YELLOW 6" WHITE W/ Y/Y 40' MOT ' 10' MOT W. SA CARLOS AVE. S 25' SPACIG TAGET (TYP) 10' SPACIG RADUIS (TYP) COST W. SA CARLOS AVE PROPOSED TYPE III MOT LOGITUDIAL 20' SPACIG (TYP) STA MATCH LIE A1A SR A1A (SA MARCO AVE.) 201 DUKI DOUTS MAY ST. COECTOR E. SA CARLOS AVE. DUFFERI ST. OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IV 97 12:54:18 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD2

31 A1A BEGI COSTRUCTIO SR A1A(SA MARCOAVE.) MATCH EXISTIG MARKIGS STA SURVEY SA MARCO AVE CROSS HERE W ILLIAMS ST. TYPE III LOGITUDIAL AVE. MATAZES SR A1A(SA MARCOAVE.) PCMS I I PCMS MESSAGE 1: TO W E S T S A C A R L O S PCMS MESSAGE 2: USE L E F T LAE OLD TOW EXISTIG MARKIGS (TOREMAI) MISSOURI TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS AVE. MATCH LIE STA DUFFERI ST. RED TRAI TOURS DUKI DOUTS E. SA CARLOS AVE. CORTESSE'S BISTRO OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. 5 COUTY ST. JOHS FIACIAL PROJECT ID PHASE IV 98 12:54:19 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD2

32 205 MATCH LIE STA RED TRAI TOURS MOT SR A1A SA MARCO AVE. DUFFERI ST CORTESSE'S BISTRO BUSIESS BUSIESS TYPE III LOGITUDIAL EXISTIG MAST ARM SIGAL MOT (TO REMAI) REMOVE EAST FACIG ARM 25' SPACIG (TYP) 6"WHITE TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS OPE CUT FOR PIPE COST. MAITAI TRAFFIC PER STD. IDEX 603 DUKI DOUTS J EXIST STRAI POLE SIGALIZATIO (TO REMAI) BUSIESS PCMS MESSAGE 1: TO PCMS MESSAGE 2: USE BUSIESS LEFT LAE 128 WEST SA CARLOS MATCH LIE STA DAVEPORT PARK A1A TYP) STA R3-1 DEVICES 25' SPACIG COST MAY ST MATCH EXISTIG MARKIGS J DEVICES TYP) COST SLIP LAE 20' SPACIG 10' SPACIG SR A1A (MAY ST.) TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS SIDEW ALK ED COSTRUCTIO SR A1A (MAY ST.) STA PCMS L 1 1 SURVEY SA MARCO AVE COST SA MARCO AVE TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS A1A COST MAY ST COECTOR L A1A A1A 204 PCMS MESSAGE 1: EW PCMS MESSAGE 2: SR A1A(SA MARCOAVE.) TRAFFIC PATTER USE CAUTIO 132 MATCH LIE STA OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IV 99 12:54:20 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD2

33 DISMUKES ST. RICHBOURG CERIFIED CAR CARE FLORIDA ATIOAL GUARD ED COSTRUCTIO. MATCH EXISTIG MARKIGS SR A1A (SA MARCO AVE.) STA PERPALL ST AGELA'S RESTAURAT SUPPLIES ELMAR AVE. A1A A1A TYPE III LOGITUDIAL K TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS PCMS SA MARCO TERRACE K SR A1A(SA MARCOAVE.) PCMS MESSAGE 1: VILAO BEACH VIA A1A PCMS MESSAGE 2: USE 2D SIGAL MILTO ST. SURVEY SA MARCO AVE ATIGUA VETERIARY PRACTICE OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE IV :54:21 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD2

34 DISMUKES ST MATCH LIE STA PLAS TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG TYPE III TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS LOGITUDIAL ED PROJECT ED COSTRUCTIO STA MP FLORIDA ATIOALGUARD OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE V :54:21 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD2

35 PUBLIC LIBRARY SUR MARC ST. JOHS COUTY PUBLIC LIBRARY DAVEPORT PARK SLIP LAE 202 AD PAVEMET MARKIG PLACED PER SIGIG TEMORARY MARKIGS PLAS FIRST COAST POWER SPORTS ST. JOHS COUTY PUBLIC LIBRARY DAVEPORT PARK SURVEY SR 5 COST MATCH LIE STA W. SA CARLOS AVE. COST W. SA CARLOS AVE TEMORARYMARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS PROPOSED TYPE III LOGITUDIAL STA MATCH LIE A1A SR A1A (SA MARCO AVE.) 201 DUKI DOUTS MAY ST. COECTOR E. SA CARLOS AVE. DUFFERI ST. OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE V :54:22 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD2

36 A1A SURVEY SA MARCO AVE W ILLIAMS ST. BEGI COSTRUCTIO SR A1A(SA MARCOAVE.) STA AVE. MATAZES SR A1A SA MARCO AVE. OLD TOW TYPE III LOGITUDIAL EXISTIG MARKIGS (TOREMAI) TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS MISSOURI AVE. MATCH LIE STA DUFFERI ST. RED TRAI TOURS DUKI DOUTS E. SA CARLOS AVE. CORTESSE'S BISTRO OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE V :54:22 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD2

37 205 MATCH LIE STA RED TRAI TOURS TEMORARYMARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS DUFFERI ST CORTESSE'S BISTRO TYPE III LOGITUDIAL DUKI DOUTS TEMPORARYSTRAI POLE SIGALIZATIO TOBE REMOVED WHE EW ARM I SERVICE E. SA CARLOS AVE. 128 MATCH LIE STA DAVEPORT PARK A1A TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS MATCH EXISTIG MARKIGS STA COST MAY ST COST PROPOSED MAST ARM 10' SPACIG TYP) TEMORARYMARKIGS PLAS SR A1A (MAY ST.) TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS PLACED PER SIGIG AD PAVEMET MARKIG COST SLIP LAE TEMORARY MARKIGS PLACED PER SIGIG AD PAVEMET MARKIG PLAS ED COSTRUCTIO SR A1A (MAY ST.) STA SURVEY SA MARCO AVE PLAS SR A1A(SA MARCOAVE.) 1 1 COST SA MARCO AVE TEMORARYMARKIGS PLACED PER SIGIG AD PAVEMET MARKIG A1A A1A A1A MATCH LIE STA OTICE: THE OFFICIAL RECORD OF THIS IS THE ELECTROIC FILE DIGITALLY SIGED AD SEALED UDER RULE 61G , F.A.C. COUTY FIACIAL PROJECT ID PHASE V :54:23 PM I:\14jobs\14H0034\02_US_1_San_Carlos_Intersection_Imp\ \roadway\TCPLRD2

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION)

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION) RAMOA FOOTHILL MEIECKE MILL 1" = 350' TRAFFIC DIVERTER MEIECKE BETO MURRAY SATA ROSA SERRAO MISSIO CETER WEST VEABLE MISSIO MISSIO ALMOD MOUTAI VIEW CETER LICOL CETER LICOL COCEPT ALTERATIVE 1 ( O WITH

More information

WATER VALVES REPLACEMENT PROJECT

WATER VALVES REPLACEMENT PROJECT WATER VALVES REPLACEMET PROJECT BROWSVILLE, TEXAS BID o B026-17 PUBLIC B R O W S V I L L E UTILITIES B OARD Brownsville - Board of Directors RAFAEL VELA...CHAIR RAFAEL S. CHACO...VICE-CHAIR MARTI C. ARAMBULA...SECRETARY/TREASURER

More information

Downtown Connector Trail

Downtown Connector Trail December 27, 2010 Updated January 10, 2012 1 ew Broadway / 9th Street Downtown Connection I-77 East 34th RTA Station I-490 Job Ready Development Parcel Morgana Run Steel Warehouse Washington Reservation

More information

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal.

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal. CR166916b02 20 Jue 2017 Melida Dodso Melida Dodso Architects PO Box 5635 Hughes ACT 2605 Email: mdodso@melidadodsoarchitects.com.au Dear Melida, Project: Dickso Apartmets Lowrie St Re: Statemet o Parkig

More information

7.0 Nonmotorized Facilities

7.0 Nonmotorized Facilities 7.0 Nomotorized Facilities 7.1 Sectio Overview This sectio describes the existig coditios ad ay idetified future impacts with the project o omotorized facilities withi the study area. Data were collected

More information

RCP TO RCP CONNECTION DETAIL NO SCALE

RCP TO RCP CONNECTION DETAIL NO SCALE CAUTIO STADARD SYMBOLS EXISTIG RCP EW RCP TEMPORARY EASEMET PROPERTY LIE AD/OR RIGHT OF WAY PAVED STRUCTURE AOTATIO OTES VARIES COECT TO EXISTIG RCP VARIES SOIL BORIG EXISTIG CULVERT - STA/OFFSET TO CETER

More information

Greenman-Pedersen, Inc. C-2. Engineering and Construction Services

Greenman-Pedersen, Inc. C-2. Engineering and Construction Services ITEM O DESCRIPTIO UIT ESTIMATED QUATITY 201.06 CLEARIG AD GRUBBIG LS EC 203.02 UCLASSIFIED EXCAVATIO AD DISPOSAL CY 710 203.03 EMBAKMET I-PLACE CY 1695 203.07 SELECT GRAULAR FILL CY 400 C205.01 YSERDA

More information

Overview. Creating Walkable, Bikeable Communities Developing Effective Active Transportation Projects and Programs. Add photo or photos

Overview. Creating Walkable, Bikeable Communities Developing Effective Active Transportation Projects and Programs. Add photo or photos Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs Add photo or photos Sposored by Caltras ad [local sposors] Overview Effective itervetios that ca improve

More information

Held under the sanction of USA Swimming, issued by North Carolina Swimming, Inc. Sanction No. NC11117

Held under the sanction of USA Swimming, issued by North Carolina Swimming, Inc. Sanction No. NC11117 The Greesboro Swimmig Associatio's 2011 Joh Gordo Dewey Ivitatioal Swim Meet November 19-20, 2011 The Greesboro Aquatic Ceter 1921 West Lee Street, Greesboro, NC 27403 SANCTION: HOST: FACILITY: Held uder

More information

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED.

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED. SLIDE COMPOETS: DUROLAW MAT WITH STAKES & ZIPTIES: x 4 PRE-MITRED LOG BORDER: x 14.6 lin.m [48 lin.ft] 254mm [10"] S.D.W.S. FASTEER: x 5 DRILL BIT FOR FASTEERS: x 1 STRUCTURAL FILL, SOOTUBES, COCRETE,

More information

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED.

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED. SLIDE COMPOETS: ATURE'S ISTRUMETS I-PG-1002-01 TRIPLE RAIL HILL SLIDE. I PACKAGE ICLUDES:- HT. SLIDE FRAME: x 1 WITH PRE-ATTACHED SLIDE AD COLLAR WIG WALL POST: x 2 PRE-ASSEMBLED WIG WALL RAILIGS: x 2

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

DOWNINGTON AVENUE CURB & GUTTER PARK STRIP SIDEWALK PROPERTY LINE UNIT A SETBACK MAIN ENTRY MAIN ENTRY DUMBWAITER F.F WH F.F. STEP 4422.

DOWNINGTON AVENUE CURB & GUTTER PARK STRIP SIDEWALK PROPERTY LINE UNIT A SETBACK MAIN ENTRY MAIN ENTRY DUMBWAITER F.F WH F.F. STEP 4422. 0'-0" MI. 0'-0" MI. '-8 /8" 7'-0" SITE LEGED FLOOD COTROL EASEMET SURVEYED AVERAGE FROT SETBACK REQUIRED SETBACK RIPARIA ZOE FLOOD COTROL ELEVATIO SEWER EASEMET 300 EAST CURB & GUTTER PARK STRIP SIDEWALK

More information

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

SERIES FP4000 FLOW RATES TABLE B** RANGE MODEL RANGE MODEL SERIES FP2000 FLOW RATES TABLE A** RANGE MODEL RANGE MODEL

SERIES FP4000 FLOW RATES TABLE B** RANGE MODEL RANGE MODEL SERIES FP2000 FLOW RATES TABLE A** RANGE MODEL RANGE MODEL Data Sheet Field IT Variable Area Flowmeters Acrylic VA Flowmeter Series FP Easy to read Eglish or Metric Scales Water rages from 4CCM to 20GPM Air rages from 50 CCM to 4000 LPM Threaded brass iserts for

More information

ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE

ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE Case Study of Mihag District i Shaghai, Chia Yue Wag, Daocheg Su 2 School of Traffic ad Trasportatio Egieerig, Togi Uiversity, Shaghai, Chia ABSTRACT

More information

City of El Cerrito. Active Transportation Plan

City of El Cerrito. Active Transportation Plan City of El Cerrito Active Trasportatio Pla DRAFT August 2015 Ackowledgemets This pla has bee prepared by the City of El Cerrito with fuds from the Metropolita Trasportatio Commissio (MTC) Trasportatio

More information

Headfirst Entry - Diving and Sliding

Headfirst Entry - Diving and Sliding 5/31/2011 Safe divig board use, safe slide use, usi Headfirst Etry - Divig ad Slidig POOLALARMS.COM HOME POOL SAFETY PRODUCTS POOL SAFETY ARTICLES & REPORTS POOL SAFETY LINKS & RESOURCES POOLALARMS.COM

More information

MEETING PURPOSE WHAT WILL WE DO TODAY? WHAT WILL WE LEARN TODAY? GATHER INPUT ABOUT THE TYPE OF IMPROVEMENTS YOU WOULD LIKE TO SEE

MEETING PURPOSE WHAT WILL WE DO TODAY? WHAT WILL WE LEARN TODAY? GATHER INPUT ABOUT THE TYPE OF IMPROVEMENTS YOU WOULD LIKE TO SEE MEETIG PURPOSE PLAED IMPROVEMETS FOR SYRACUSE STREET We value your feedback. We are reaching out to you this evening to learn more about the project and provide feedback on the upcoming planned improvements.

More information

NORTH DOWNTOWN N EAST WEST

NORTH DOWNTOWN N EAST WEST ORTH DOWTOW CHURCH STREET ALTERATE o. 1 BIKE LAES, O-STREET PARKIG, SIDEWALK AD MULTI-USE PATH This alternate incorporates a 5-foot sidewalk along the eastern side of Church Street, a 10-foot Multi-Use

More information

The purpose of today s information session is to provide project information about the Fermor Avenue Bridge Rehabilitation and Roadworks.

The purpose of today s information session is to provide project information about the Fermor Avenue Bridge Rehabilitation and Roadworks. Fermor Avenue Bridge Rehabilitation and Roadworks WELCOME The purpose of today s information session is to provide project information about the Fermor Avenue Bridge Rehabilitation and Roadworks. Representatives

More information

City of Valdez REQUEST FOR QUOTES. Project Name: Lowe River Levee Certification Groin 1 Freeboard Repairs PO Number: Cost Code:

City of Valdez REQUEST FOR QUOTES. Project Name: Lowe River Levee Certification Groin 1 Freeboard Repairs PO Number: Cost Code: ---July 19, 2017--- Dear Contractor: City of Valdez REQUEST FOR QUOTES Project ame: Lowe River Levee Certification Groin 1 Freeboard Repairs PO umber: 74818 Cost Code: 30-070-000 This project includes,

More information

Halsey. Street Conceptual Design Project. Final Report. April, Prepared by: Cogan Owens Cogan, LLC SERA Architects, Inc. Falconi Consulting

Halsey. Street Conceptual Design Project. Final Report. April, Prepared by: Cogan Owens Cogan, LLC SERA Architects, Inc. Falconi Consulting Halsey Street Coceptual Desig Project Fial Report Prepared by: Coga Owes Coga, LLC SERA Architects, Ic. Falcoi Cosultig TABLE OF CONTENTS Backgroud ad Objectives... 1 Study Area Overview... 2 Physical

More information

PROPOSALS BUS RAPID TRANSIT SPRINT - A34 WALSALL TO BIRMINGHAM STOP BUS BUS STOP PROJECT KEY NO ENTRY

PROPOSALS BUS RAPID TRANSIT SPRINT - A34 WALSALL TO BIRMINGHAM STOP BUS BUS STOP PROJECT KEY NO ENTRY ISO A1 594mm x 841mm A34-01 WALSALL COUCIL RAPID TRASIT SPRIT - A34 BIRMIGHAM EXISTIG S I DARWALL STREET AD TOWER STREET MAY EED TO BE RELOCATED ACCOMMODATE SPRIT MOVEMET WALSALL STATIO MII ROUDABOUT TO

More information

MARION STREET MULTIFAMILY

MARION STREET MULTIFAMILY MARIO STREET MULTI-FAMILY BUILDIG, BLOCK 49, EVASTO BROADWAY ADDITIO. SITUATED THE SOUTHWEST QUARTER, SECTIO 35, TOWSHIP 4 SOUTH, RAGE 68 WEST OF THE SIXTH PRICIPAL MERIDIA, CITY OF EGLEWOOD, COUTY OF

More information

19th Avenue Park Presidio Neighborhood Transportation Plan

19th Avenue Park Presidio Neighborhood Transportation Plan SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 9th Aveue Park Presidio Neighborhood Trasportatio Pla DRAFT FINAL REPORT Holloway Aveue with Ehacemets trasportatio cosultig Holloway Aveue Thumbail BUS STOP

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

n UL Listed and FM Approved for n Solenoid control n Quick pressure relief valve 73Q n Pressure sustaining & reducing valve 723

n UL Listed and FM Approved for n Solenoid control n Quick pressure relief valve 73Q n Pressure sustaining & reducing valve 723 Pressure Relief/Sustaiig Valve Prioritizig pressure zoes Esurig cotrolled pipelie fill-up Prevetig pipelie emptyig Pump overload & cavitatio protectio Safeguardig pump miimum flow Excessive lie pressure

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER DESIGN DESIGNATION A.A.D.T - = V = M.P.H MISSOURI AND TRANSPORTATION PLANS FOR PROPOSED HIGHWAY INDE OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET --------------------------- 1 TYPICAL SECTIONS (TS) (1

More information

Version IV: April a publication from

Version IV: April a publication from Versio IV: April 2013 a publicatio from AWRF Associated Wire Rope Fabricators Recommeded Practice ad Guidelie Disclaimer for AWRF Recommeded Guidelie Swager Safety Guide Associated Wire Rope Fabricators

More information

VIEW FROM ZILKER PARK TWO EXPRESS LANES IN EACH DIRECTION + A DOWNTOWN DIRECT CONNECTION

VIEW FROM ZILKER PARK TWO EXPRESS LANES IN EACH DIRECTION + A DOWNTOWN DIRECT CONNECTION VIEW FROM ZILKER PARK TWO EXPRESS LAES I EACH DIRECTIO + A DOWTOW DIRECT COECTIO DOWTOW ACCESS GEERAL PURPOSE & EXPRESS LAES A & ROY BUTLER HIKE & BIKE TRAIL (LADY BIRD LAKE TRAIL) LAKE AUSTI BOULEVARD

More information

at 2 Foot (0.6 m) Point Begin Mainline Shoulder 1:25 Paved Shoulder Transition S.T. or P.T. 250 ft (75 m) shoulder width Paved ramp 16 ft (4.

at 2 Foot (0.6 m) Point Begin Mainline Shoulder 1:25 Paved Shoulder Transition S.T. or P.T. 250 ft (75 m) shoulder width Paved ramp 16 ft (4. CSE I egi ailie Shulder at 2 Ft (0.6 ) it CSE I: Tw ra laes erge t e lae ra rer. Csider use tw lae ras whe a tw lae erge is t required t btai a desired level f service. 0 aved gre t 22 ft (6.6 ) width

More information

CITY OF ROSEVILLE DESIGN STANDARDS

CITY OF ROSEVILLE DESIGN STANDARDS CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR

More information

WhisperFit EZ Ventilation Fans

WhisperFit EZ Ventilation Fans FV-08-11VF5, FV-08-11VFM5, FV-08-11VFL5 FV-08-11VF5 FV-08-11VFM5 FV-08-11VFL5 (with 3" duct adapter) Ideal for remodelig ad hotel ew costructio or reovatio Pick-A-Flow Speed Selector oe fa, you choose

More information

DRAFT EIS - CONCEPTUAL DESIGN I-5 ALTERNATIVE APRIL 2015 SHEET KEY

DRAFT EIS - CONCEPTUAL DESIGN I-5 ALTERNATIVE APRIL 2015 SHEET KEY SHEET KEY 99 SOUND TRANSIT FEDERAL WAY LINK EXTENSION Sheet No. Drawing No. Sheet Title 94 I5-A00-GX00 COVER SHEET 95 I5-A00-GX01 SHEET INDEX 96 I5-A00-GX02 SHEET INDEX KEYMAP 97 I5-A1-PP01 TRACK PLAN

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for

More information

550 PHARR ROAD ATLANTA, GEORGIA SHEET NO Birch Street Newport Beach, CA Tel: Fax:

550 PHARR ROAD ATLANTA, GEORGIA SHEET NO Birch Street Newport Beach, CA Tel: Fax: /EGIEER SEAL LYO REALTY ADVISORS, IC DEVELOPMET KEY PLA O. DATE ISSUED FOR BY 550 PHARR ROAD ATLATA, GEORGIA SHEET O. MAPLE RD E /EGIEER SEAL IFORMATIO DATA SHEET IDEX AP: 1700610010101 SITE AREA: 1.13

More information

0 CITY OF SANTA ANA 0

0 CITY OF SANTA ANA 0 : A traffic control plan (Plan) is required whenever work is to be performed within the public right-of-way and is deemed necessary by the City of Santa Ana's (City) Traffic Engineer. Work cannot start

More information

4 Alternatives. Alternatives Packaging Alternatives were packaged into four general categories, which are presented in detail in this chapter:

4 Alternatives. Alternatives Packaging Alternatives were packaged into four general categories, which are presented in detail in this chapter: 4 Alteratives The aalysis of existig ad future trasportatio coditios i the study area idetified areas of the trasportatio etwork that require improvemets, either ifrastructure or system maagemet improvemets.

More information

Inspector MUST Sign and Date Each Inspection

Inspector MUST Sign and Date Each Inspection Work Area: Applicant: Mercer County Department of Transportation - Highways Division Application and Permit for Road Work in Mercer County, New Jersey NO. East Windsor Ewing Hamilton Hopewell Lawrence

More information

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut

More information

DRAFT EIS CONCEPTUAL DESIGN SR 99 ALTERNATIVE APRIL 2015 SHEET KEY

DRAFT EIS CONCEPTUAL DESIGN SR 99 ALTERNATIVE APRIL 2015 SHEET KEY DRAFT EIS CONCEPTUAL DESIGN SHEET KEY 99 Sheet No. Drawing No. Sheet Title KENT/DES MOINES HC CAMPUS STATION OPTION 50 SR99-F00-GX02 SHEET INDEX KEYMAP 1 SR99-A00-GX00 COVER SHEET 51 SR99-F1-PP03 TRACK

More information

Schaumburg Bikeways Plan - Updated February 2012

Schaumburg Bikeways Plan - Updated February 2012 Schaumburg Bikeways Pla - Updated February 2012 schaumburg bikeways etwork toolkit «Bike lae Establishes space o road exclusively for bicycle travel. Bicycle laes are striped ad marked with a bicycle symbol

More information

APPENDIX 2 PROPOSED AMENDMENTS TO PARKING REGULATIONS MILL STREET

APPENDIX 2 PROPOSED AMENDMENTS TO PARKING REGULATIONS MILL STREET APPEDIX PROPOSED AMEDMETS TO PARKIG REGULATIOS MILL REET Street ame Side Between South A point 0 metres east of Trinity Street and Cherry Street orth Cherry Street and a point 40 metres west orth A point

More information

Series 600 Accessories

Series 600 Accessories Series 600 Geeral These accessories are a rage of devices for completig a peumatic circuit. These valves, with their special fuctios, are iserted betwee two valves, betwee a valve ad a cylider, or followig

More information

CITY OF PASADENA PEDESTRIAN SAFETY STUDY AT SIGNALIZED INTERSECTIONS

CITY OF PASADENA PEDESTRIAN SAFETY STUDY AT SIGNALIZED INTERSECTIONS CITY OF PASADENA PEDESTRIAN SAFETY STUDY AT SIGNALIZED INTERSECTIONS Prepared for: City of Pasadea Submitted by: FEHR & PEERS 201 Sata Moica Blvd., Suite 500 Sata Moica, Califoria 90401 (310) 458-9916

More information

Non-Motorized Overpass at SR 5/US1

Non-Motorized Overpass at SR 5/US1 Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

More information

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. Financial Project ID: 409870-1-52-01 LAKE COUNTY DESIGN ALTERNATIVE STUDY FOR MULTI-USE PATH Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION District

More information

Footwork is the foundation for a skilled basketball player, involving moves

Footwork is the foundation for a skilled basketball player, involving moves The Complete Book of Offesive Basketball Drills Basic Footwork ad Cuts Drills 2 Equipmet 16 chairs (or less) Persoel The etire team Basic Footwork ad Cuts Drills Two coaches How to Ru the Drill Five feet

More information

2) What s the Purpose of Your Project?

2) What s the Purpose of Your Project? Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs Overview: Tools ad Strategies to Predict ad Documet Bicyclig ad Walkig Rates 1) Why Documet the Need for

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

A0.1 LUCAS RANCH LOT 3 3D AERIAL VIEW APPLICANT PROJECT INFORMATION ARBORIST ENGINEER ARCHITECT GENERAL NOTES LOT 3 PROJECT SITE N.T.S

A0.1 LUCAS RANCH LOT 3 3D AERIAL VIEW APPLICANT PROJECT INFORMATION ARBORIST ENGINEER ARCHITECT GENERAL NOTES LOT 3 PROJECT SITE N.T.S LUCA RACH D AERIAL VIEW DRC COMMET - 09//07 PROJECT IFORMATIO APPLICAT ARBORIT VICIITY MAP HEET IDEX PROJECT COPE: EW 7,79 F. IGLE FAMILY REIDECE. PROJECT LOCATIO: - LUCA RACH TATE PROJECT IFO: AP: 8-080-09.

More information

-H- Note. Flow control valve. Key features

-H- Note. Flow control valve. Key features Flow cotrol valves Flow cotrol valves Key features Fuctio Flow cotrol or oe-way flow cotrol valves regulate the pisto speed of peumatic drives durig advace ad retur strokes. This is doe through suitable

More information

Product Features Product Benefits Application

Product Features Product Benefits Application lamps are compact UVC (germicidal) lamps used i residetial water ad air disifectio uits. The compact size of the lamp allows for a small system desig ad desig flexibility. lamps offer costat UV output

More information

ADA PRESENTATION (CURB RAMPS)

ADA PRESENTATION (CURB RAMPS) ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS DESCRIPTION TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES (QU) (1 SHEET)--------

More information

Town of Mooresville, North Carolina Comprehensive Transportation Plan Amendments Addendum Report

Town of Mooresville, North Carolina Comprehensive Transportation Plan Amendments Addendum Report Tow of, North Carolia Comprehesive Trasportatio Pla Amedmets Addedum Report Adopted April 4, 2013 Tow of Developmet Services Departmet Tow of CTP Amedmets Adopted April 4, 2013 Executive Summary The curret

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES:

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES: WELCOME! CAMBIE BRIDGE ITERIM IMPROVEMETS The City of Vancouver is planning to make interim improvements to Cambie Bridge to make it safer and more comfortable for people of all ages and abilities to walk

More information

ICC WORLD TWENTY ( WORLD CUP-2014 )- A CASE STUDY

ICC WORLD TWENTY ( WORLD CUP-2014 )- A CASE STUDY INTERNATIONAL JOURNAL OF MATHEMATICAL SCIENCES AND APPLICATIONS Volume 5 Number 1 Jauary-Jue 215 ICC WORLD TWENTY2-214 ( WORLD CUP-214 )- A CASE STUDY Bhavi Patel 1 ad Pravi Bhathawala 2 1 Assistat Professor,

More information

Welcome to the world of the Rube Goldberg!

Welcome to the world of the Rube Goldberg! Welcome to the world of the Rube Goldberg! Sice 1988, tes of thousads of studets have competed i our aual Rube Goldberg Machie Cotests where they are challeged to build the wackiest workig Rube Goldberg

More information

Tract or Parcel Project Name PCN Checked By Date

Tract or Parcel Project Name PCN Checked By Date Tract or Parcel Project Name PCN Checked By Date City of Escondido Public Works Department Signing & Striping Plan Review Checklist The following checklist is a guideline for new CIP and development construction

More information

GENERAL LEGEND 12"CMP

GENERAL LEGEND 12CMP PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET

More information

CW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)

CW20-1D 48 X 48 (Flags- See note 1) G  X 24 (See note 2) CK: DW: CK: x for mph or less mph devices may be omitted if the work area is a minimum of from the nearest traveled way. (See notes 4 & 5) x for mph or less Work Space mph x for mph or less mph (See notes

More information

Appendix Work Zone Traffic Control

Appendix Work Zone Traffic Control ppendix Work Zone Traffic Control The purpose of this appendix is to present basic guidelines for work zone traffic control and to supplement the Highway Work Zone Safety Checklist. This appendix presents

More information

Available online at ScienceDirect. Procedia Engineering 113 (2015 )

Available online at  ScienceDirect. Procedia Engineering 113 (2015 ) Available olie at www.sciecedirect.com ScieceDirect rocedia Egieerig 3 (205 ) 30 305 Iteratioal Coferece o Oil ad Gas Egieerig, OGE-205 The twi spool efficiecy cotrol Michuri A.I. a *, Avtoomova I.V. a

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

M3P. Safety Data Sheet TABLE OF CONTENTS IDENTIFICATION OF THE SUBSTANCE/MIXTURE AND OF THE COMPANY/UNDERTAKING 2 SECTION 2 HAZARDS IDENTIFICATION 2

M3P. Safety Data Sheet TABLE OF CONTENTS IDENTIFICATION OF THE SUBSTANCE/MIXTURE AND OF THE COMPANY/UNDERTAKING 2 SECTION 2 HAZARDS IDENTIFICATION 2 Accordig to the Hazard Commuicatio Stadard (CFR29 1910.1200) HazCom 2015 TABLE OF CONTENTS SECTION 1 IDENTIFICATION OF THE SUBSTANCE/MIXTURE AND OF THE COMPANY/UNDERTAKING 2 SECTION 2 HAZARDS IDENTIFICATION

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. C. Refer to the Advertisement For Bids, change as follows:

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. C. Refer to the Advertisement For Bids, change as follows: McKee and Associates Architecture and Interior Design Addendum o. TWO Date: 07.3.7 `Project: A EW TRASPORTATIO FACILITY FOR AAA COOPER TRASPORTATIO BOOE COUTY, KETUCKY A2. GEERAL PROJECT O. 6-207 A. The

More information

Welcome. Moturoa Shops Minor Safety Improvements. Community Consultation on Options. Please complete the feedback form.

Welcome. Moturoa Shops Minor Safety Improvements. Community Consultation on Options. Please complete the feedback form. Moturoa Shops Minor Safety Improvements Community ultation on Options Welcome We are investigating options for minor safety improvements on State Highway 44 (SH44) at the Moturoa Shops. Please have a look

More information

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Page 634 2009 Edition Notes for Figure 6H-1 Typical pplication 1 Work eyond the Shoulder 1. If the work space is in the median of a divided

More information

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council GRANT COUNTY WASHINGTON TIB NO.: 3-E-164(003)-1 CITY OFFICIALS Kathleen Allstot Bruce Reim Mayor William Coe Stephanie Knitter Valli Millard Matthew Moore Tony Mora, Jr. City Council Mark Wanke Leslie

More information

Climbing/Rappelling NATIONAL STANDARDS BOY SCOUTS OF AMERICA

Climbing/Rappelling NATIONAL STANDARDS BOY SCOUTS OF AMERICA 2007 Climbig/Rappellig NATIONAL STANDARDS BOY SCOUTS OF AMERICA These stadards apply to coucil ad district climbig/rappellig activities. Climb O Safely, No. 20-099B, applies to uit activities. Toppig Out,

More information

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION Field Operations Director 003513 Sr. Community Educator 003542 Asst. Field Operations Director 001046 Stormwater Operations Analyst 003833 Special Projects

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way

More information

9 Placerville Airport and Environs

9 Placerville Airport and Environs Chapter 9 Placerville Airport ad Eviros BACKGROUND DATA EL DORADO COUNTY Airport Lad Use Compatibility Pla 9 Backgroud Data: Placerville Airport ad Eviros INTRODUCTION Placerville Airport is a public-use

More information

Engineering Design Criteria & Standard Drawings

Engineering Design Criteria & Standard Drawings Engineering Design Criteria & Standard Drawings (January 2018) APPENDIX A STANDARD DRAWINGS Engineering Design Criteria & Standard Drawings APPENDIX A STANDARD DRAWINGS FOREWORD The Standard Drawings presented

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

COMPLETE STREETS DURING CONSTRUCTION

COMPLETE STREETS DURING CONSTRUCTION COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

More information

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,

More information

CIVIL INDEX LANDSCAPE INDEX ELECTRICAL INDEX STRUCTURAL INDEX COVER SHEET G.101, 1 OF 55 LEGEND,ABBREVIATIONS, AND GENERAL NOTES G.

CIVIL INDEX LANDSCAPE INDEX ELECTRICAL INDEX STRUCTURAL INDEX COVER SHEET G.101, 1 OF 55 LEGEND,ABBREVIATIONS, AND GENERAL NOTES G. CIVIL INDEX LANDSCAPE INDEX COVER SHEET LEGEND,ABBREVIATIONS, AND GENERAL NOTES TRAFFIC CONTROL AND PHASING REQUIREMENTS TYPICAL SECTIONS CORROSION PROTECTION DETAILS TEMPORARY PEDESTRIAN WALKWAY DETAIL

More information

» WYOMING s RIDE 2013

» WYOMING s RIDE 2013 » WYOMING s RIDE 2013 WYOMING S RIDE 2013 preseted by First Iterstate Bak of Wyomig bikemswyomig.org 1 We are people who wat to do somethig about ow.» Our Wyomig Bike MS Ride Two-Day Wyomig Ride: To view

More information

ADA & Public Rights of Way

ADA & Public Rights of Way ADA & Public Rights of Way Overview of Current and Up-coming Requirements FDOT Design Training Expo 2012 Orlando, FL Dean Perkins, RA - ADA Coordinator Florida Department of Transportation Office of Design,

More information

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018 REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL Ginger Quinn & Paul Kelley April 11, 2018 ADA & District Traffic Engineer Added in various sections Work Zone Pedestrian and Bicycle Guidance document VDOT

More information

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Development Engineering 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 Engineering Services Division REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Phone: 916-808-8300 Fax: 916-808-1984 Preparation

More information

FOR LOOP RAMPS-TAPERED DECELERATION LANE

FOR LOOP RAMPS-TAPERED DECELERATION LANE 6" WHITE DOTTED LINE: 5 MARK, 20 SKIP 6" WHITE CRYSTAL MONO-DIRECTIONAL MAIN LINE END (EVERY 50 FEET) 50 FEET BEYOND LAST CRYSTAL PAVEMENT MARKER 5 AMBER MONO-DIRECTIONAL 50 FEET BEFORE LAST CRYSTAL PAVEMENT

More information

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS 4901 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS 'HYHORSPHQW (QJLQHHULQJ 5LFKDUGV %OYG UG )ORRU 6DFUDPHQWR &$ Phone: 916-808-8300 Fax: 916-808-1984 (QJLQHHULQJ 6HUYLFHV 'LYLVLRQ CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS