1 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 9th Aveue Park Presidio Neighborhood Trasportatio Pla DRAFT FINAL REPORT Holloway Aveue with Ehacemets trasportatio cosultig Holloway Aveue Thumbail BUS STOP 7 Former curb lie CLEAR KEEP CLEAR KEEP 2 Advace limit lie Re-cofigure itersectio to reduce corer radii Advace limit lie CLEAR KEEP Specially marked crosswalk 2 CLEAR KEEP Nieteeth Aveue CLEAR KEEP MUNI M-Lie MUNI Platform STOP BUS 5 7 Former curb lie 3 Thumbail N Add bus shelter ad bulb Former curb lie Leged:. Specially marked crosswalk 2. Advaced limit lie 3. Add bus shelter 4. Low-growig media platigs 5. Add bus bulb 6. Add edgelie 7. Thumbail 8. Add tree 9. ADA upgrades 0. New street lights, pedestria ad traffic sigals o colored poles April 3, 2008

2

3 Ackowledgemets The Authority would like to thak: INTER-AGENCY TECHNICAL ADVISORY COMMITTEE MEMBERS SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY (SFMTA) Richard Cho, Bria Dusseault, Kevi Keck, Matthew Lee, Frak Markowitz, Cristia Olea, Ricardo Olea, Javad Mirabdal, Peter Straus, Maito Velasco SAN FRANCISCO DEPARTMENT OF PUBLIC WORKS (SFDPW) Kris Opbroek, Joh Thomas SAN FRANCISCO RECREATION AND PARK DEPARTMENT (SFPRD) Daiel LaForte SAN FRANCISCO PUBLIC UTILITIES COMMISSION (SFPUC) Marla Jurosek TECHNICAL CONSULTANTS Michael Eisema, Nelso\Nygaard Cosultig Associates David Parisi, Parisi Associates

4

5 Table of Cotets EXECUTIVE SUMMARY. STUDY OVERVIEW. Backgroud: The Need for Balace Study Area: Distict Segmets Iter-Agecy Coordiatio: Respodig to a History of Needs Approach: From Needs to Prioritized Improvemets ad Early Actios EXISTING CONDITIONS AND NEEDS ASSESSMENT 2. Pedestria Safety, Circulatio, ad Friedliess Corridor Crossigs Corridor Pedestria-Friedliess Trasit Operatios ad Rider Experiece Auto Traffic Operatios Parkig Bicycle Circulatio Summary of Needs RECOMMENDED IMPROVEMENTS 3. Itersectio Prototype Process Sigal Upgrade Project Improvemets Additioal Ehacemets Coceptual Ehacemet Plas Corridor-Wide Proposal ad Estimated Costs Eforcemet Educatio IMPLEMENTATION 4. Iter-Agecy Coordiatio Cost ad Prioritizatio Implemetatio Schedule Table of Figures Figure -. Study Corridor...-2 Figure 2-. Peak-Hour Pedestrias Walkig Alog ad Across 9th Aveue/Park Presidio Boulevard Figure th PPB Bus Stop Activity for Lies 28 ad 28L Figure 2-3. Schedule ad Headway Adherece for Lies 28, 28L Figure 2-4. Peak Period Hourly Vehicle Volumes for Park Presidio Boulevard ad 9 th Aveue Figure 3-. Study Itersectios ad Six Prototype Locatios Table 3-. Improvemet Toolkit Figure 3-2. Coceptual Desig for Park Presidio Boulevard ad Geary Boulevard Figure 3-3. Coceptual Desig for Park Presidio Boulevard ad Balboa Street Figure 3-4. Coceptual Desig for 9th Aveue ad Licol Way Figure 3-5. Coceptual Desig for 9th Aveue ad Noriega Street Figure 3-6. Coceptual Desig for 9th Aveue ad Taraval Street Figure 3-7. Coceptual Desig for 9th Aveue ad Holloway Aveue Table 3-2. Proposed Bus Stop Locatios Table 3-3. Estimated Uit Costs Table 3-4. Estimated Costs for Ehacemets to 9 th Aveue ad Park Presidio Boulevard Table 4-. Prioritizatio for Other Ehacemets (excludig Sigal Upgrade improvemets) Table th Aveue / Park Presidio Boulevard Trasportatio Pla Fudig ad Implemetatio Matrix Table of Cotets ad Table of Figures i

6

7 EXECUTIVE SUMMARY 9 TH AVENUE PARK PRESIDIO NEIGHBORHOOD TRANSPORTATION PLAN DRAFT FINAL REPORT APRIL 3, 2008 CONTENTS Executive Summary... ES- EXECUTIVE SUMMARY Executive Summary The 9 th Aveue/Park Presidio Boulevard (9 th PPB) Trasportatio Pla is a focused look at ways to improve travel coditios for the street s multiple types of users, from pedestrias ad trasit users to motorists ad trucks. The uderlyig theme of this pla is improvig the balace i the way the street provides fuctios to these various users. Sa Fracisco s 9th PPB is a key ad multi-faceted trasportatio corridor. Desigated as Califoria State Route, it is a essetial ad heavily used gateway for vehicles, movig traffic ito ad out of the wester part of the city as well as that headig ultimately to the Golde Gate Bridge ad poits orth. The arterial s six laes carry more tha 85,000 vehicles per day. The corridor also serves high umbers of trasit users. Mui s 28, 28L ad 9-Owl bus lies operate alog the corridor, carryig more tha 4,000 passegers per weekday, ad more tha 20 bus ad light rail lies cross it, makig 9 th PPB a major trasfer locatio. Fially, 9 th PPB also fuctios as a major local City street, with a dese ad diverse array of adjacet lad uses that icludes siglefamily, multi-uit, ad assisted livig resideces, parks, local busiesses, the Stoestow Galleria Shoppig Ceter, schools, ad the Sa Fracisco State Uiversity ES-

8 DRAFT FINAL REPORT campus. As part of this fuctio, the corridor serves early 80,000 daily pedestria trips ad supplies mucheeded o-street parkig alog much of its legth. I part because of such heavy usage of the street by these modes, the orth-south bicycle route through this area is provided o a parallel street oe block from the corridor for the legth of the study area. The pla s approach icluded a techical aalysis of existig coditios data, modelig ad simulatio, ad iput from a multi-agecy techical advisory committee. I additio, the pla cosulted with Califoria Departmet of Trasportatio (Caltras) staff to review feasibility ad streamlie the desig approval ad implemetatio process to follow. Curret coditios alog the corridor poit to several issue areas. They iclude slow traffic from heavy volumes, low trasit speed ad reliability resultig from heavy traffic, high o-street parkig demad ad ecroachmet oto the sidewalk, difficult pedestria crossigs, ad a pedestria-ufriedly streetscape eviromet that lacks desig features suitable for a city gateway facility. Workig with the commuity ad parter agecies, this study has prioritized four mai areas of eed: Improve Pedestria Safety: Reduce the rate of pedestria collisios ad improve safety for the people who walk o the corridor every day. Improve Pedestria/Streetscape Coditios: create a more attractive ad comfortable street to ecourage walkig, icludig addressig the parkig sidewalk ecroachmet problem. Improve Trasit Operatios: Improve reliability ad efficiecy for the Lie 28, 28L, ad 9-Owl buses that serve 9th Aveue, as well as the 20 other lies that cross the corridor. Maage ad Calm Traffic Operatios: Improve pedestria ad trasit coditios without sigificatly degradig vehicular capacity. O this basis, the 9 th PPB pla proposes applyig the followig improvemets to 32 itersectios alog the corridor: Toolkit Item Improve pedestria safety Improve streetscape coditios Improve trasit operatios Maage ad calm traffic operatios ADA upgrades* New traffic sigal (with pedestria coutdow)* Advaced limit lie* New street/decorative lightig* Edge lie Special crosswalk stripig/pavig Media platig Bus bulb Corer pedestria bulb Thumbail New trasit shelter** New tree** New sidewalk** Trasit boardig islad** *These improvemets will be istalled with the ogoig ad separately-fuded Sigal Upgrade Project. **These improvemets are proposed at a limited umber of locatios to address special coditios. ES-2 9th Aveue Park Presidio Neighborhood Trasportatio Pla

9 The pla developed coceptual drawigs of six prototypical itersectios to illustrate o how the improvemets would look o the street. The exact improvemets proposed at each itersectio vary with the itersectio s existig coditios, costraits, ad eeds as expressed by trasit activity, pedestria volumes, vehicular traffic, ad collisio history. Excludig those to be icluded i the Sigal Upgrade Project, the total estimated cost for these improvemets is approximately $4.5 millio. To facilitate fudig, speed implemetatio ad address the highest eeds first, the corridor s itersectios were prioritized ito three groups, cosiderig a itersectio s pedestria volumes, trasit ridership, vehicle traffic, ad collisio history. Group, represetig the highest priority, will cost $5.9 millio. Group 2 will cost $3.6 millio ad Group 3 will cost $4.9 millio. Prop K provides some fudig for improvemets i the corridor but ot eough for all idetified improvemets. The Authority will work with other agecies to pursue other sources of fudig to leverage Prop K fuds, icludig future regioal grat programs, state programs, ad private ad federal sources. all ifrastructure ehacemets beyod the Sigal project ad the Edge Lie project. SFDPW will determie ad carry out the ecessary evirometal clearace. SFDPW will also maage costructio of the ehacemet projects. The Sa Fracisco Recreatio ad Park Departmet, which has jurisdictio over the area where the pla proposes a bus stop relocatio at Licol Way ad Crossover Drive, will facilitate approvals for that chage. Caltras will review the proposed improvemets to clear the projects for implemetatio. Because 9th Aveue ad Park Presidio Boulevard are part of the Califoria State highway system, Caltras retais jurisdictio over the corridor s desig. All improvemets to 9th Aveue ad Park Presidio Boulevard must be approved by Caltras. I aticipatio of this implemetatio step, the City agecies have already iitiated a discussio with Caltras staff about the improvemets proposed by this pla, ad dialogue is ogoig to determie the feasibility of approvig these improvemets. To move the improvemets forward, roles ad resposibilities will be shared amog the parter agecies as follows. The Trasportatio Authority will provide overall oversight o the etire desig ad costructio process, icludig the desig process, the approval process with Caltras, ad costructio maagemet. The Sa Fracisco Muicipal Trasportatio Agecy (SFMTA) will provide oversight o ad iformatio to iform the desig process, implemet the traffic- ad operatios-related portios of the recommeded strategies from this pla, ad oversee the submittal process for Caltras approval. SFMTA will also desig ad implemet the edge lie project. Fially, SFMTA will lead implemetatio of a Early Actio Pla for targeted educatio, eforcemet, ad operatioal efforts to improve safety. The Sa Fracisco Departmet of Public Works (SFDPW) will coduct the desig process for EXECUTIVE SUMMARY ES-3

10

11 . STUDY OVERVIEW 9 TH AVENUE PARK PRESIDIO NEIGHBORHOOD TRANSPORTATION PLAN DRAFT FINAL REPORT APRIL 3, 2008 CONTENTS. Backgroud: The Need for Balace Study Area: Distict Segmets Iter-Agecy Coordiatio: Respodig to a History of Needs Approach: From Needs to Prioritized Improvemets ad Early Actios Backgroud: The Need for Balace The 9 th Aveue/Park Presidio Boulevard (9 th PPB) Trasportatio Pla is a focused look at ways to improve travel coditios for the street s multiple types of users, from pedestrias ad trasit users to motorists ad trucks. The uderlyig theme of this pla is improvig the balace i the way the street provides fuctios to these various users. Sa Fracisco s 9th PPB is a key ad multi-faceted trasportatio corridor. Desigated as Califoria State Route, it is a essetial ad heavily used gateway for vehicles, movig traffic ito ad out of the wester part of the city as well as that headig ultimately to the Golde Gate Bridge ad poits orth. The arterial s six laes carry more tha 85,000 vehicles per day. The corridor also serves high umbers of trasit users. Mui s 28 ad 28L bus lies operate alog the corridor, carryig more tha 4,000 passegers per weekday, ad more tha 20 bus ad light rail lies cross it, makig 9 th PPB a major trasfer locatio. Fially, 9 th PPB also fuctios as a major local City street, with a dese ad diverse array of adjacet lad uses that icludes sigle-family, multi-uit, ad assisted livig resideces, parks, local. STUDY OVERVIEW -

12 L BX 28L 9 28 DRAFT FINAL REPORT busiesses, the Stoestow Galleria Shoppig Ceter, schools, ad the Sa Fracisco State Uiversity campus. As part of this fuctio, the corridor serves early 80,000 daily pedestria trips ad supplies much-eeded ostreet parkig alog much of its legth. I part because of such heavy usage of the street by these modes, the orth-south bicycle route through this area is provided o a parallel street oe block from the corridor for the legth of the study area. Curret coditios alog the corridor poit to several issue areas. They iclude slow traffic from heavy volumes, low trasit speed ad reliability resultig from heavy traffic, high o-street parkig demad ad ecroachmet oto the sidewalk, difficult pedestria crossigs, ad a pedestria-ufriedly streetscape eviromet. This pla idetifies strategies to strike a better balace to serve the eeds of 9 th PPB s multiple users. The pla focuses o improvig coditios for pedestrias ad trasit users while also accommodatig vehicles... STUDY AREA: DISTINCT SEGMENTS The 9th PPB Trasportatio Pla study area stretches approximately five miles ad icludes Park Presidio Boulevard from Lake Street to Fulto Street, Park Presidio By-Pass Drive ad Crossover Drive from Fulto Street to Licol Way, ad 9th Aveue from Licol Way to Juipero Serra Boulevard (See Figure - below). Figure -. Study Corridor 2 3 6AX 29 LINCOLN WAY VICENTE ST IRVING ST WAWONA ST JUDAH ST N CALIFORNIA ST AX KIRKHAM ST 9TH AVE SLOAT BLVD 23 9 CLEMENT ST 2 LAWTON ST OCEAN AVE EUCALYPUS DR K 38BX GEARY BLVD PARK PRESIDIO BLVD 38 38L MORAGA ST ANZA ST BALBOA ST CABRILLO ST 3AX L NORIEGA ST ORTEGA ST PACHECO ST 8 29 JUNIPERO SERRA BLVD 5 48 QUINTARA ST Sa Fracisco State Uiversity CROSSOVER DR Golde Gate Park 44 SANTIAGO ST RIVERA ST HOLLOWAY AVE 26 M TARAVAL ST L AX 6BX ULLOA ST 88 Study Area Parks Mui Routes Bike Routes Public Schools Private Schools 2 3 Study Area 9th Aveue Neighborhood Trasportatio Pla I This map is iteded for plaig purposes oly. Map Produced: 0/2/2006 KNS Miles th Aveue Park Presidio Neighborhood Trasportatio Pla

13 Differet portios of the corridor have distict characteristics, which have strog implicatios for the kids of improvemets that are appropriate for the particular locatio alog the corridor. It ca be thought of as three segmets. The Park Presidio Boulevard (PPB) portio o the corridor s orther ed, orth of Golde Gate Park, lies i the Richmod district, a residetial eighborhood with local-servig busiess districts that cross the corridor at Clemet ad Geary. The character of PPB is essetially that of a parkway or liear park. A pedestria path ad beches withi a swath of trees ad grass border the street o either side. This portio of the corridor is arrower tha the more souther portios, with three travel laes i each directio ad o o-street parkig. A small, raised media cotais street lights ad occasioal ladscapig. South of Golde Gate Park, i the Suset ad Parkside eighborhoods, the character of the corridor chages. I this segmet, which is 9 th Aveue roughly betwee Licol Way ad Eucalyptus Drive, lad uses are directly adjacet to the corridor with o setback, icludig houses, eighborhood retail, ad schools. This portio of the corridor is wider tha the portio orth of the Park, with three travel laes i each directio ad o-street parkig. The street here is flaked by a cotiuous but arrow sidewalk ad frequet driveways. While the raised media cotiues here, there is o ladscapig i this segmet i the media or the sidewalks. Local-servig busiess districts cross the corridor at Irvig, Noriega, ad Taraval. A fial chage i the character of the corridor defies the very souther ed of 9 th Aveue. Here, south of Eucalyptus Drive, lie two major adjacet lad uses that affect the streetscape: the Stoestow Galleria Shoppig Ceter ad Sa Fracisco State Uiversity. Some adjacet ladscapig exists here, ad while some buildigs are set back from the street, the shoppig ceter ad uiversity geerate high pedestria traffic. Much of this pedestria traffic is associated with Mui s M Ocea View light rail lie, which rus i the ceter of 9 th Aveue here ad boards at statios i the media, as well as with the o-street parkig supplied by the corridor. A local-servig busiess district crosses the corridor at Ocea. At multiple cross-streets i this portio, icludig Rossmoor ad Buckigham (orth ad south), itersectios are right-i, right-out oly ad do ot allow traffic to cross the media. Crespi is a three-way itersectio with right-i oly. While some data are preseted for these itersectios, the proposals for improvemets do ot iclude them. These distict segmets poit to differet commuity eeds i the differet portios of the corridor.. STUDY OVERVIEW..2 INTER-AGENCY COORDINATION: RESPONDING TO A HISTORY OF NEEDS A added layer of complexity for this pla stems from the ature of goverace for the corridor. 9 th PPB lies withi the City ad Couty of Sa Fracisco ad serves people who live ad work i Sa Fracisco. As a result, several agecies ad departmets withi the city have vested iterests i how the corridor ca be improved. But as a State Highway, 9 th PPB is uder the owership ad jurisdictio of the Califoria Departmet of Trasportatio (Caltras). Caltras retais desig ad maagemet authority over the corridor. Ay chages to it must be approved by that agecy. May of the proposals made by the City of Sa Fracisco to improve pedestria safety ad trasit o the corridor do ot comply with the roadway desig stadards set forth i the Califoria Highway Desig Maual. Therefore, pedestria safety ad trasit improvemets will require further egotiatio with Caltras. To facilitate the iteragecy cooperatio eeded to make effective improvemets, the 9 th PPB pla worked closely with the followig agecies ad departmets: Sa Fracisco Departmet of Public Works (SFDPW) Sa Fracisco Muicipal Trasportatio Agecy (SFMTA) Sa Fracisco Recreatio ad Park Departmet (SFRPD) Sa Fracisco Public Utilities Commissio (SFPUC) Califoria Departmet of Trasportatio (Caltras) These agecies ad departmets have already idetified umerous eeds ad improvemets for 9th Aveue ad Park Presidio Boulevard. Amog the efforts to aalyze coditios ad develop improvemets are the followig. Sigal Upgrade Project, SFMTA ad Caltras, ogoig. Some of the traffic cotrol equipmet alog the corridor dates to the mid-twetieth cetury. Upgrades will allow for better sigal coordiatio ad pedestria sigal improvemets. This project is expected to istall ew traffic sigals, pedestria coutdow sigals, ADAcompliat curb ramps, ad re-striped crosswalks at 34 corridor itersectios from Lake Street i the orth to Juipero Serra Boulevard i the south. Audible pedestria sigals will be istalled at a subset of selected locatios. Streetscape Improvemet Project, SFDPW, ogoig. SFDPW is workig i coordiatio with the Mayor s Office of Greeig to implemet ladscape ad other streetscape improvemets at -3

14 DRAFT FINAL REPORT key itersectios ad mid-block locatios alog the corridor to ehace the pedestria eviromet. The Streetscape project will coordiate with ad follow the recommedatios of the 9 th PPB pla. Trasit Preferetial Streets Treatmets for 9 th Aveue, SFMTA, ogoig. These improvemets cosist of outfittig the traffic sigals ad buses with techology that allows the sigals to provide a gree light for approachig buses. SFMTA is implemetig these treatmets o its Rapid Network, which icludes 9 th Aveue. Fudig for the treatmets is prioritized citywide. Trasit Effectiveess Project (TEP), SFMTA, ogoig. The TEP is a comprehesive review of Sa Fracisco s trasit system ad performace treds that aims to idetify ways to ehace the system, icrease ridership, ad lower costs. Trasit Priority Streets Study, SFMTA, This city-wide study idetified improvemets to the operatio of Mui s 28 ad 28L bus lies alog 9 th PPB, icludig trasit speed ad delay, vehicle occupacy, bus stop coditios, ad Mui patroage data i relatio to potetial improvemets to bus stop locatio, sigal pre-emptio, istallatio of bus/carpool laes, ad other service ad stop modificatios. Livable Streets Study, SFMTA, SFMTA coducted a citywide study that idetified potetial locatios or re-locatios of driveways, utilities, curb extesios, ad bus stops. Neighborhood-Based Plas (fuded i part through city grats) by: the Suset Parkside Educatio ad Actio Committee, 2003; Frieds for a Safer Suset, 2004; Park Presidio Neighbors, All developed proposals to address pedestria safety ad ladscape improvemets, icludig high-visibility crosswalks, corer bollards, itersectio ladscape platigs, ad pedestria-scale lightig. Traffic Egieerig Techical Assistace Program, Pedestria ad Traffic Safety Study, SFMTA, This study examied collisio data for itersectios alog the 9 th PPB corridor for treds ad patters i collisio factors. 9 th Aveue Streetscape Improvemets Feasibility Study, SFDPW, 200. This study aalyzed the feasibility of improvig the corridor s streetscape with ladscapig i the media ad sidewalks, otig especially that because of the arrow rightof-way available, platigs would be most feasible i cojuctio with sidewalk bulb-outs. The study also proposed streetscape elemets such as special pavig ad street furiture at the eighborhood commercial districts alog the corridor. This pla icorporates the various eeds ad improvemets previously idetified ito the multimodal eeds aalysis ad the fial improvemet recommedatios. The pla has also coordiated with the Sigal Upgrade Project by reviewig the proposed upgrades ad providig iput i a effort to maximize compatibility ad cotiuity betwee that project ad this pla s recommeded improvemets. -4 9th Aveue Park Presidio Neighborhood Trasportatio Pla

15 .2 Approach: From Needs to Prioritized Improvemets ad Early Actios To develop a comprehesive ad prioritized list of ifrastructure chages ad other actios to improve coditios i the corridor, the 9 th PPB Trasportatio Pla first assessed existig coditios ad eeds. The pla coducted a literature review, icludig the studies as refereced above ad other relevat plas relatig to bicyclig ad trasit. Additioal data were also collected to assess existig coditios regardig trasit ridership, trasit operatios, trasit speed ad delay, vehicle traffic volumes ad delays, ad pedestria volumes. Field surveys were take to assess coditios relatig to streetscape elemets ad o-street parkig. Fially, the pla used the Authority s travel demad model ad SFMTA s Sychro traffic aalysis tool to supplemet existig coditios iformatio ad aalyze curret eeds. The plaig process solicited commuity iput as part of the eeds assessmet. The Authority commuicated iformatio to the public via the web ad a distributio list that grew to more tha 20 citizes ad commuity groups. I additio, the pla coducted two sets of commuity workshops, each set featurig oe workshop i the Suset district ad o i the Richmod district ad preceded by postcard mailigs to resideces alog the corridor. The first set of workshops focused o corridor eeds from the commuity s perspective. A commo theme from this set of workshops was the eed for improved pedestria safety. The secod set of workshops focused o proposed improvemets for the corridor. Attedace at these workshops averaged approximately 60 commuity members. The pla the applied the set of agreed-upo improvemets from the six prototype itersectios to all itersectios withi the corridor to obtai a comprehesive list of desired improvemets. The pla also developed a list of early actios relatig to educatio, eforcemet, ad egieerig that could be doe to improve coditios i the short term. The results of the 9 th PPB Trasportatio Pla, preseted i Chapter 4, iclude this set of proposed improvemets prioritized ito three Groups, with Group as the highest priority. It also cotais the fudig ad implemetatio pla for the recommeded improvemets, icludig roles ad resposibilities of the parter agecies. Usig the results of the existig coditios ad eeds assessmet, the pla idetified a toolbox of improvemets that to address key eeds. Six prototypical itersectios were selected to represet the rage of itersectio types ad coditios alog the corridor. These six itersectios served as the test sites for coceptual desigs that deployed the toolbox of improvemets. The pla preseted ad icorporated iput o the six coceptual desig prototypes from the commuity ad parter agecies.. STUDY OVERVIEW -5

16

17 2. EXISTING CONDITIONS AND NEEDS ASSESSMENT 9 TH AVENUE PARK PRESIDIO NEIGHBORHOOD TRANSPORTATION PLAN DRAFT FINAL REPORT APRIL 3, 2008 CONTENTS 2. Pedestria Safety, Circulatio, ad Friedliess Corridor Crossigs Corridor Pedestria-Friedliess Trasit Operatios ad Rider Experiece Auto Traffic Operatios Parkig Bicycle Circulatio Summary of Needs EXISTING CONDITIONS AND NEEDS ASSESSMENT This chapter summarizes pedestria, auto, trasit, ad bicycle coditios ad eeds o the 9th Aveue/Park Presidio Boulevard Corridor. It draws o data from a umber of previous studies, origial data collectio, ad commuity iput. The coditios summarized here form the basis of the plaed improvemets described i later sectios of this pla. Several improvemet areas have log bee idetified for 9 th PPB. The pedestria collisio history alog 9th Aveue ad Park Presidio demostrates a clear eed for desig improvemets that make walkig safer. Ad because the corridor is part of the city s Trasit Preferetial Streets etwork, SFMTA is studyig the best ways to improve trasit travel time ad level of service. Additioally, aesthetic improvemets have bee sought for years by Corridor residets ad busiesses. Workig with the commuity ad parter agecies, this study has prioritized four mai areas of eed: Improve Pedestria Safety: Reduce the rate of pedestria collisios ad improve safety for the people who walk o the corridor every day. Improve Pedestria/Streetscape Coditios: create a more attractive ad comfortable street to ecourage walkig. 2-

18 DRAFT FINAL REPORT Improve Trasit Operatios: Improve reliability ad efficiecy for the 28 ad 28L buses that serve 9th Aveue, as well as the 20 other lies that cross the corridor. Maage ad Calm Traffic Operatios: Improve pedestria ad trasit coditios without sigificatly degradig vehicular capacity. Figure 2-. Peak-Hour Pedestrias Walkig Alog ad Across 9th Aveue/Park Presidio Boulevard Peak-Hour Volume Itersectio Lake Califoria Clemet Geary Aza Balboa Cabrillo Fulto Crossover** MLK Licol* Irvig Judah Kirkham Lawto Moraga Noriega* Ortega Pacheco Quitara* Rivera Satiago Taraval* Ulloa Vicete* Wawoa Sloat Ocea Eucalyptus Stoestow Wisto Buckigham Holloway Crespi Juipero Serra* Cross-Street Crossigs 9th/PPB Crossigs * Deotes source as MTC TETAP Report, 2003 ** Deotes o data available Source: Sa Fracisco Couty Trasportatio Authority Pedestria Volume Cout Data, February ad March th Aveue Park Presidio Neighborhood Trasportatio Pla

19 2. Pedestria Safety, Circulatio, ad Friedliess Almost 80,000 pedestrias use the corridor everyday to get to school, work, shoppig, parks, ad other activities. As a importat cross-tow route, it serves as a trasfer poit for may trasit passegers, ivolvig a short walk to ad from trasit stops o 9 th PPB ad the crossig street. Figure 2- shows the distributio of pedestria volumes at the corridor s itersectios for those walkig alog the corridor ad those crossig it. Not surprisigly, the highest volumes are see at Holloway, the locatio of Sa Fracisco State Uiversity, ad at Eucalyptus, Wisto, ad Buckigham, the locatios of the Stoestow Galleria Shoppig Ceter. There are also otably high volumes at Califoria, Clemet, Geary, Irvig, Judah, ad Taraval, of which may are eighborhood commercial districts. The relative split of pedestrias crossig versus walkig alog the corridor varies from locatio to locatio, but corridor-wide, 40 percet are walkig alog 9 th PPB while 60 percet are crossig the corridor. To ivestigate pedestria coditios i the corridor, this study focused o two key aspects of pedestria travel: the ease ad safety of the corridor s crossigs the pedestria friedliess of the corridor s walkig eviromet 2.. CORRIDOR CROSSINGS Addressig the safety of pedestria crossigs across ad alog the 9 th PPB corridor is a key elemet of this pla. I 2007, pedestria fatalities o 9 th Aveue received sigificat press attetio, raisig the profile of the corridor as a pedestria safety problem ad eergizig commuity groups to advocate for pedestria safety improvemets. Measured i terms of collisio rate per 00,000 residets, the eighborhoods surroudig the corridor do ot exhibit the highest rate i the city, accordig to the Sa Fracisco Departmet of Public Health. However, because there are such high volumes of pedestrias ad vehicles usig the corridor, ad because it is desirable to do whatever is possible to improve coditios for pedestrias, this pla icluded assessmet of collisio data to idetify key treds ad develop potetial coutermeasures. SFMTA has completed a aalysis of the corridor s collisio history betwee 2002 through Usig the Statewide Itegrated Traffic Records System (SWITRS) maitaied by the Califoria Highway Patrol, SFMTA aalyzed ijury-causig collisios with a focus o pedestria-ivolved collisios. 2. EXISTING CONDITIONS AND NEEDS ASSESSMENT Overall, the tred of aual pedestria collisios appears steady betwee 2002 ad 2006, at a average of about 2 per year. Table 2- below shows the umber of pedestria collisios for each itersectio alog the corridor. Table 2-. Pedestria Collisios, Number of 9 th Aveue / Park Presidio Boulevard at: Pedestria Collisios Lake 4 Califoria Clemet 2 Geary 2 Aza 2 Balboa 2 Cabrillo Fulto 0 Crossover 0 MLK Jr. 0 Licol Irvig 3 Judah 3 Kirkham 0 Lawto 2 Moraga 0 Noriega 4 Ortega 2 Pacheco Quitara 8 Rivera Satiago 0 Taraval 8 Ulloa Vicete Wawoa 0 Sloat 2 Ocea Eucalyptus 3 Wisto 4 Buckigham (south) Holloway 2 Crespi 3 Juipero Serra Total 62 Source: Califoria Highway Patrol, Statewide Itegrated Traffic Records System (SWITRS),

20 DRAFT FINAL REPORT SFMTA aalyzed the data for treds, fidig the followig. Regardig time of day, the bulk of collisios have occurred durig peak travel hours, most of which are i daylight, idicatig that isufficiet light may ot be a pricipal cause of collisios. Two-thirds of the collisios were preceded by tur movemets, split evely betwee right ad left turs. Ad of the Califoria Vehicle Code violatios oted, more tha 57 percet are for driver failure to yield to pedestria i the crosswalk while makig a tur. These fidigs poit to the importace of focusig attetio toward the tur movemets for all crossigs of the itersectios. Of the pedestria collisios ivolvig vehicles goig straight, the collisio history does ot show a domiat cause. Numerous factors are cited, icludig red light ruig ad pedestrias crossig agaist the light or crossig before vehicles cleared the itersectio. The oly coclusio that ca be draw from the collisio reports is that half the collisios are classified as the fault of the pedestria. A survey of the corridor reveals that much of the ifrastructure meat to aid with pedestria crossigs could be improved. Give the results of the pedestria collisio aalysis, the followig are improvemets that may help to address the key treds. May itersectios do ot iclude pedestria sigal heads ad lack coutdow sigals. Where coutdow sigals have bee istalled, pedestria collisio totals have geerally decreased. I this corridor, pedestria coutdow sigals that iform pedestrias how much time remais to cross the street before the light turs red may improve crossig decisios ad decrease the risk of beig caught i the itersectio whe the lights chage. There are also potetial idirect beefits; lookig at side street coutdow idicatios ca provide pedestrias with a estimate of how much time remais before they receive the walk phase, perhaps discouragig them from crossig before that phase. With some exceptios, most of the crossigs alog 9 th PPB do ot feature curb ramps. Istallig ramps would brig the corridor to Americas with Disabilities Act (ADA) stadards, helpig the visually impaired, as well as ayoe usig a wheelchair or stroller. At a few locatios (Irvig, Judah, Sloat, ad Eucalyptus), yellow stripes mark the crosswalks, geerally where schools are earby. Otherwise, crossigs are marked oly with the stadard parallel white lies. Usig special markigs for the crosswalks will icrease the visibility of pedestrias 2-4 withi them, improvig safety. The special markigs may also exert a traffic calmig effect o drivers, helpig to slow traffic. Forty-oe percet of all collisios alog the corridor (both vehicle-pedestria ad vehiclevehicle) are attributable to excessive speed. The City has requested that Caltras review the existig 35 mile-per-hour speed limit. Caltras has agreed to coduct a ew speed survey ad determie if a chage to a lower speed limit is appropriate. I additio, the corridor may be suitable for a trial istallatio of automated speed eforcemet cameras, which could supplemet the routie efforts coducted by the Sa Fracisco Police Departmet. At 9 th ad Sloat, the City has istalled a eastboud-to-orthboud left tur gree arrow at the ed of the Sloat Boulevard gree phase. This chage is expected to facilitate that movemet, allowig turig vehicles to pay more attetio to pedestrias. Addig a all-red phase creates a brief pause betwee the time the sigal light turs yellow for oe approach ad the time the light turs gree for the cross street. They allow more time for pedestrias ad vehicles to clear a itersectio before the cross street sees a gree light. SFMTA staff will review the corridor for potetial icreases i all-red phases. Istallig thumbails at the tip of the crosswalks may icrease the comfort level for pedestrias who are ot able to complete the crossig durig the walk phase ad ed up stuck i the media as traffic moves by o 9 th Aveue. Thumbails may have the effect of ecouragig pedestrias to remai i the media for the duratio of the sigal cycle rather tha attempt to cross agaist the light. See Figure 3-3 for a coceptual drawig. See Sectio 3.6 for details o a Early Actio Pla to address the key collisio treds. 9th Aveue Park Presidio Neighborhood Trasportatio Pla

21 2..2 CORRIDOR PEDESTRIAN-FRIENDLINESS Beyod the crossigs, the pedestria friedliess of the corridor is dictated by some key desig aspects of the street, icludig: cotiuous sidewalks of sufficiet width, direct sidewalk access to trasit stops, the presece of trees ad ladscapig, pedestria-scale lightig, a sufficiet buffer betwee pedestrias ad passig traffic, ad properly sited streetscape items such as poles, garbage receptacles ad ewspaper racks. Park Presidio Boulevard, beig a parkway settig, features greespace o either side of the corridor rather tha immediately adjacet lad uses, as well as low-growig media platigs ear the itersectios. This sectio of the corridor lacks cotiuous sidewalk throughout. Exceptios are bus stops at key itersectios alog the corridor, which are coected to side streets by paved pedestria path. The corridor s lower-ridership stops cosist oly of a pole desigatig the stop that is accessed via a footpath i the grass. Sidewalk extesios to the stops would improve both the walkig ad trasit experiece, although this pla does ot propose to provide cotiuous sidewalk alog Park Presidio Boulevard. is studyig ladscape improvemets at key itersectios ad mid-block locatios i coordiatio with the Mayor s Office of Greeig. Lightig alog the corridor is curretly provided by street lights istalled i the sidewalk ad the media. The high istallatio height ad utilitaria desig of the lights are derivative of the stadard safety lightig practice orieted for motorists. While pedestrias would beefit from more, lower, ad more decorative lightig, this pla does ot propose as such. Istead, this pla calls for decorative lightig to be istalled at itersectios i cojuctio with the replacemet of existig traffic sigal poles. I cotrast to Park Presidio Boulevard, 9 th Aveue is a urba arterial with adjacet lad uses abuttig the street. While there is cotiuous sidewalk i this sectio of the corridor, there are issues of sufficiet width. Total average sidewalk width is 0 feet. That width must serve both as walkig space ad as space for streetscape elemets such as bus stops ad shelters, poles, trash receptacles, ladscapig ad trees, leavig a clear width of betwee 5 ad 8 feet for walkig. Moreover, much of the sidewalk width is curretly take by parked cars that ecroach oto the sidewalk from o-street parkig spots. Cars are beig parked i a way that straddles the curb, with two wheels o the street ad two wheels o the sidewalk. This parkig problem is also addressed i Sectio 2.4 below, but because it also affects pedestrias ad ladscapig, o-street parkig ecroachmet is a key problem that must be resolved to free up sidewalk space for pedestria use ad streetscape elemets. See Sectio 2.4 for cocepts to address the parkig ecroachmet problem. There is miimal ladscapig alog 9 th Aveue, limited to a few tree wells i the sidewalk ad ladscapig o some adjacet private property. Its absece is particularly otable at itersectio approaches. At this poit, because of the curret lack of available sidewalk space, there is o room for ladscapig beyod the locatios where it curretly exists. The 9 th PPB pla does propose ladscapig i the media. More detail ad fudig for these improvemets are beig provided by SFDPW, which 2. EXISTING CONDITIONS AND NEEDS ASSESSMENT 2-5

22 DRAFT FINAL REPORT Figure th PPB Bus Stop Activity for Lies 28 ad 28L Lake Califoria Clemet Geary Aza Balboa Cabrillo Fulto Crossover MLK Jr. Licol Irvig Judah Kirkham Lawto Moraga Noriega Ortega Pacheco Quitara Rivera Satiago Taraval Ulloa Vicete Wawoa Sloat Ocea Eucalyptus Stoestow Wisto Buckigham Holloway Crespi Juipero Serra Bus Stop Daily Boardigs Source: SFMTA Trasit Effectiveess Project, th Aveue Park Presidio Neighborhood Trasportatio Pla

23 2.2 Trasit Operatios ad Rider Experiece Mui Lie 28 provides all-day service alog the Project Corridor, Lie 28L provides limited stop service durig peak times, ad Lie 9-Owl provides late ight ad early morig service alog the corridor. Additioally, over twety lies cross the Corridor, poitig to the importace of trasfers. Ridership o the 9th Aveue bus lies is just above average systemwide, with about 4,000 boardigs per day ad more tha 4.5 millio passegers per year. The busiest stops are clustered i the south, aroud Holloway. Park Presidio Boulevard stops are the ext busiest, followed by the cluster ear Irvig. The rest of the corridor sees lower bus passeger activity, with exceptios at Noriega, Quitara, ad Taraval, where other Mui lies itersect 9 th Aveue. Key factors affectig the rider experiece iclude operatig reliability ad the waitig experiece at trasit stops. Mui s o-time performace o Lie 28 is above the system average for adherig to both the published schedules ad headways, but remais well below Mui s performace target of 85%. Its performace i both measures has varied widely over the past four years. Schedule adherece stood at 62% i 2006, while headway adherece was 66%. Lie 28L is below the system average for both schedule ad headway adherece; its performace, particularly i headway adherece, has worseed drastically sice I 2006, schedule adherece stood at 63% ad headway adherece was just 58%. Both lies are cosiderably below Mui s o-time ad headway adherece stadards of 85%. This aalysis poits to the eed to improve the efficiecy ad reliability of trasit o the corridor. The greatest eed is for improvemets to trasit reliability. I part, the performace problems of the 28 ad 28L are associated with sigal delay ad the difficulty of operatig i mixed-flow traffic o a busy vehicular corridor. Despite the heavy traffic coditios, bus schedule ad headway adherece ca be improved i the followig ways. First, bus stops ca be cosolidated to reduce the umber of times a bus must stop for passeger boardig ad alightig. Curretly, Lie 28 buses stop o almost every block, although some are flag stops oly, where buses stop i the lae of traffic to facilitate passeger activity because these locatios do ot have a desigated bus zoe. To brig Lie 28 closer to Mui s bus stop spacig stadards ad to improve travel time o the corridor, SFMTA collected data o stops ad stop usage ad has developed a proposal for revised stop locatios based o such factors as stop usage, distace from previous stop, ad street grade. This proposal removes a small umber of existig stops, which will improve travel times slightly, as follows: Ocea, both directios Satiago, southboud stop Rivera, orthboud stop Secod, a combiatio of traffic sigal priority for buses ad far-side bus stops ca improve trasit travel times sigificatly. Uder this scheme, bus stops are located at the far side of a itersectio, after the light, istead of the ear side, ad specialized traffic sigal equipmet is istalled that detects ad provides a gree light for approachig buses. This scheme aims to eable the followig trasit operatio: a bus approaches a itersectio, proceeds through it uimpeded via a gree light provided by the sigal priority equipmet, stops o the Figure 2-3. Schedule ad Headway Adherece for Lies 28, 28L Source: SFMTA 2. EXISTING CONDITIONS AND NEEDS ASSESSMENT 2-7

24 DRAFT FINAL REPORT far side of the itersectio, boards ad de-boards passegers, ad cotiues o. SFMTA is curretly workig to istall trasit sigal priority equipmet alog 9 th Aveue as a separate project. May of the bus stops alog 9 th Aveue are curretly ear-side stops; where feasible, the 9 th PPB pla proposes to move stops to far-side. See Sectio 3.4 for details. Third, istallig bus bulbs would allow buses to board ad de-board passegers without pullig completely out of the curbside travel lae ad, therefore, subsequetly eedig to wait for a gap i traffic to pull back ito the travel lae. To a certai extet, this operatio occurs by default because the travel lae ad parkig widths are too arrow to allow the operators to pull completely out of traffic. This operatio is i effect especially o Park Presidio Boulevard, where o parkig lae exists ad the buses operate i the curbside travel lae. The 9 th PPB Pla proposes locatig bus bulbs alog 9 th Aveue (but ot Park Presidio Boulevard) to facilitate this procedure wherever possible. See Sectio 3.4 for details. Bus bulbs have multiple beefits beyod improvig trasit operatios. They provide more waitig room for high-activity bus stops. They also decrease the crossig distace for pedestrias. Uder this scheme, two bulbs would be istalled per itersectio, thereby reducig the distace of both crossigs of 9 th Aveue. I additio, bus bulbs work syergistically with the stripig of the parkig lae as also proposed by this pla (see Sectio 2.4 for details). Fially, these bulbs reduce the perceived width of the street for motorists, leadig to a traffic calmig effect. This pla also explored the potetial for dedicatig a existig mixed-flow travel lae solely for trasit ad high-occupat vehicles (HOV), usig the Authority s travel demad model ad a itersectio-level aalysis tool to estimate the effects of re-distributig traffic i this way. The modelig foud that such a sceario would ot improve coditios eough to warrat such a treatmet. The high umber of itersectios, ad resultig delays from stoplights, degrade through-travel coditios to the poit at which a dedicated lae would ot result i sigificat improvemets to travel time. As a result, this pla is ot proposig restrictig ay traffic laes for bus or HOV-oly use. I additio to the performace of trasit operatios o the corridor, improvemets ca be made alog several dimesios to ehace the rider experiece. Curretly, trasit shelters are ot lit ad some bus stops feature arrow clear spaces where there are streetscape elemets such as poles ad trash bis. Real-time arrival iformatio provided at the bus stop would also improve the rider experiece. The 9 th PPB pla proposes ew shelters, with the bus arrival iformatio feature, at some stops; specific recommedatios vary by itersectio, depedig o the proposed bus stop cofiguratio. See Sectio 3.4 for details. Beyod the improvemets proposed i this pla, specific efforts to improve trasit operatios o the corridor will also be icluded i the SFMTA s Trasit Efficiecy Project (TEP), due for release durig the first quarter of These trasit reliability improvemets deviate from the stadards set forth i the Califoria Highway Desig Maual. The improvemets will therefore eed to be preseted to Caltras uder its desig exceptio process for approval th Aveue Park Presidio Neighborhood Trasportatio Pla

25 2.3 Auto Traffic Operatios The 9 th PPB corridor, icludig 9th Aveue from Licol to Juipero Serra Boulevard, Cross Over Drive through Golde Gate Park, ad Park Presidio Boulevard betwee the Park ad Lake Street, is oe of the busiest thoroughfares i Sa Fracisco. As Califoria Route, the Project Corridor acts as a regioal roadway likig Iterstate 280 (I-280) to US 0 ad the Golde Gate Bridge; ad Sa Mateo ad Mari Couties. Cross Over Drive, a critical lik, is the oly through access across Golde Gate Park, makig the 9 th PPB corridor the city s oly through orth-south route west of the Missio-Va Ness corridor. I additio to its importat through-traffic fuctios, the corridor is also a key arterial servig local orth-south trips o the wester half of the City, providig access to the street s commercial lad uses, resideces, ad major destiatios. These destiatios iclude: Sa Fracisco State Uiversity, Lowell High School, Stoestow Galleria Shoppig Ceter, Ster Grove, ad the Sa Fracisco Zoo. Figure X below shows peak-hour vehicle volumes o the corridor, icludig through traffic, traffic o the corridor s cross streets, ad tur movemets icludig right turs off the corridor ad left ad right turs oto the corridor (left turs off the corridor are prohibited at early all itersectios). As expected, the figure shows sigificat through volumes alog the etire legth of the corridor, with slightly higher traffic ear Golde Gate Park ad slightly less aroud the Stoestow Galleria Shoppig Ceter. Crossstreet through volumes vary widely, with otable peaks at Califoria, Geary, Fulto, Licol, ad Sloat. Tur movemets also vary widely, at times higher tha the itersectio s cross-street movemets. Tur movemets are high from the corridor s orther ed through Irvig, droppig off util Sloat ad locatios south, where they are the highest i the corridor. The mai challege o the Corridor is to balace trasportatio throughout with the local street eviromet ad the Trasit First priorities of the City. The corridor must provide adequate vehicular capacity, safe ad coveiet pedestria access, ad adequate ad reliable trasit throughput. Icreasig cogestio impacts both vehicular traffic ad trasit service, ad auto cogestio has bee idetified as the major cause of trasit delays ad ureliable service. While the upcomig Sigal Upgrade Project will work to improve coditios for motorists, this pla deals with traffic ad parkig coditios primarily with respect to their impact o pedestria safety ad comfort ad o trasit operatios. The coditios described above highlight the eed maage ad calm traffic operatios without degradig the vehicular level of service. The strategies proposed i this pla ited to slow traffic at itersectios, improvig the visibility of pedestrias to drivers, especially at crosswalks, ad improve driver behavior. The bulb-outs, ladscapig, edge lie, crosswalk treatmets, ad thumbails proposed i Chapter 3 are iteded to slow traffic ad improve pedestria visibility. Some egieerig treatmets are proposed to improve driver behavior. For istace, suspedig ew vehicle traffic sigals from horizotal mast arms over the travel laes may raise their visibility to drivers, reducig uitetioal red-light ruig. The pla also icludes a Early Actio Pla that focuses o targeted educatio, eforcemet, ad traffic operatios solutios to calm traffic ad improve pedestria safety. Left turs are prohibited at all itersectios alog 9th Aveue ad Park Presidio Boulevard except at Sloat Boulevard i the southboud directio ad Wisto Drive i the orthboud directio. These prohibitios improve through-traffic flow, as well as elimiate a critical poit of coflict betwee pedestrias ad vehicles. But by forcig left-turig vehicles to make several turs istead of oe, these prohibitios also have egative impacts, such as pushig traffic oto side ad parallel streets. 2. EXISTING CONDITIONS AND NEEDS ASSESSMENT 2-9

26 DRAFT FINAL REPORT Figure 2-4. Peak Period Hourly Vehicle Volumes for Park Presidio Boulevard ad 9 th Aveue Peak Period Hourly Volume -,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 Cross Street Lake Califoria Clemet Geary Aza Balboa Cabrillo Fulto Crossover MLK Jr. Licol Irvig Judah Kirkham Lawto Moraga Noriega Ortega Pacheco Quitara Rivera Satiago Taraval Ulloa Vicete Wawoa Sloat Ocea Eucalyptus Wisto Holloway Crespi Juipero Serra Mailie Through Cross Through Turs Source: Sa Fracisco Couty Trasportatio Authority, th Aveue Park Presidio Neighborhood Trasportatio Pla

27 2.4 Parkig Parkig is curretly ot permitted o Park Presidio Boulevard or Crossover Drive. O 9 th Aveue, o-street parkig is permitted for free ad uregulated from Licol to Taraval. From Taraval to Eucalyptus, parkig is restricted to permits or a two-hour-limit. No comprehesive aalysis of o-street parkig supply or demad has bee completed for this study. However, some key poits ca be made from field visits ad aecdotal kowledge. I the residetial areas, o-street parkig is geerally used to capacity durig peak demad periods, icludig eveig, overight, ad weekeds. Most driveways have limited visibility, makig it challegig for most residets to use their driveways. Cosequetly, most residets use o-street parkig eve if they have offstreet parkig available. For commercial areas, parkig is also geerally highly utilized. I the area surroudig Sa Fracisco State Uiversity, demad for free parkig o 9th Aveue is sigificatly greater tha the supply, although paid parkig o campus has sigificat spare capacity at most times of day. A potetial solutio for movig parked cars off the sidewalk is to better defie the parkig lae with a edge lie stripe that clearly delieates the space iteded for parkig from the space iteded for travel. This way, drivers i the right-most travel lae are more likely to provide parked cars with more clearace. Reducig the perceived width of the lae will also have a traffic calmig effect. The stripe will provide a clear idicatio about how much room is available for parkig cars. A edge lie will also work syergistically with bus ad corer bulb-outs; the bulb-outs ca puctuate the begiig of the edge lie at each itersectio, providig further delieatio of the parkig lae. A proposal for stripig a edge lie o 9 th Aveue betwee Licol Aveue ad Juipero Serra Boulevard is therefore icluded i this pla. As part of its Master Pla, Sa Fracisco State Uiversity is cosiderig several optios for reducig vehicle trips to campus ad accommodatig those who do drive. These strategies iclude improved bicycle, pedestria, ad trasit facilities ad service, ad possibly a shared parkig agreemet with Stoestow Shoppig Ceter. The parkig lae o 9th Aveue is curretly simply part of the approximately 7-foot right-most travel lae. Because of the high volumes of fast-movig traffic i that lae, drivers ofte park their cars partially o the sidewalk, with two wheels o the road ad two o the sidewalk, to provide more space betwee themselves ad movig traffic whe gettig ito or out of their vehicle ad to avoid havig their vehicle side-swiped. While this behavior is techically illegal, citatios are issued o a complait basis. Complaits are hadled by a limited staff of parkig cotrol officers charged with resolvig all illegal parkig issues citywide. As a result, sustaied eforcemet is ofte difficult. This coditio reduces the clear width of the sidewalk for walkig, dimiishig the eviromet for pedestrias. 2. EXISTING CONDITIONS AND NEEDS ASSESSMENT 2-

28 DRAFT FINAL REPORT 2.5 Bicycle Circulatio As a high-volume, high-speed vehicular traffic roadway, the 9 th PPB corridor is ot prioritized as a bike route. Because of the fast movig traffic ad limited street space available, few bicyclists curretly use the corridor. There are o desigated bikeways o the corridor itself. However, more tha te bikeways cross or ru parallel to the corridor. Perhaps the most importat is Route 75, which parallels the corridor alog 23rd Aveue orth of Golde Gate Park ad alog 20th Aveue south of the Park. Bike Route 75 cotiues south to the Daly City BART statio. Bike Route 69 cotiues orth from the Corridor to Washigto Street, with coectig bike routes leadig to the Golde Gate Bridge. Additioally, several bikeways cross the Corridor, formig a grid etwork i the wester portio of the city. This pla focuses o pedestria safety ad trasit improvemets, ad does ot iclude improvemets that specifically address bicycle circulatio. Istead, the Authority ad its parters will keep abreast of ay bicycle-related proposals i the area, such as potetial bicycle improvemets cotaied i the Sa Fracisco State Uiversity s Campus Master Pla curretly uder developmet. 2.6 Summary of Needs Drawig from the commuity outreach process ad key improvemet eeds idetified here, several goals have bee idetified for the corridor. These goals are as follow: Improve pedestria safety Improve pedestria streetscape coditios Improve trasit operatios Maage ad calm traffic The remaider of this pla presets improvemet strategies ad cocepts that address these goals ad prioritizes them based o implemetatio-ready criteria th Aveue Park Presidio Neighborhood Trasportatio Pla

29 3. RECOMMENDED IMPROVEMENTS 9 TH AVENUE PARK PRESIDIO NEIGHBORHOOD TRANSPORTATION PLAN DRAFT FINAL REPORT APRIL 3, 2008 CONTENTS 3. Itersectio Prototype Process Toolkit of Improvemets Sigal Upgrade Project Improvemets Additioal Ehacemets Coceptual Ehacemet Plas Corridor-Wide Proposal ad Estimated Costs Eforcemet Educatio RECOMMENDED IMPROVEMENTS This chapter describes the improvemets that are recommeded for the 9 th PPB corridor. Recommeded improvemets iclude both ifrastructure projects as well as efforts for targeted educatio, eforcemet, ad operatioal adjustmets. This pla ackowledges ad icorporates the work of the Sigal Upgrade Project, which will improve vehicle operatios o the corridor as well as provide much-eeded pedestria improvemets. It will replace ad istall sigals ad poles, pedestria coutdow sigals, vehicle detectors, cotroller assemblies, ad safety lightig at itersectios. The project will coect the sigals alog the Corridors with fiber optics, eablig improved sigal coordiatio, ad sigal preemptio techology for trasit ad emergecy respose vehicles. Where relevat, these improvemets are idetified i this chapter as beig part of the Sigal Upgrade Project. Some commo treatmets, such as bus bulbs, are ot curretly permitted o 9th Aveue because they are ot allowed uder the Califoria Highway Desig Maual. Nevertheless, the pla proposes some of these improvemets, icludig curb extesios. The City is curretly meetig with Caltras to develop a ew desig ad maagemet agreemet for the Corridor which would allow area specific improvemets. 3-

30 L BX 28L 9 28 DRAFT FINAL REPORT 3. Itersectio Prototype Process This pla used a prototypig process to develop the recommeded improvemets. Rather tha developig coceptual desigs for every oe of the corridor s 34 itersectios, the pla selected six prototype itersectios o which to focus heavy desig attetio. The improvemets desiged for these prototypes were the applied corridor-wide to result i a full, detailed corridor proposal. The 9 th Aveue Park Presidio Boulevard corridor, from Lake Aveue to Juipero Serra Boulevard, is over 7.5 miles log ad cosists of 34 itersectios (ote that right-i/right-out itersectios at Buckigham, Rossmoor, ad Crespi, which do ot allow traffic to cross the media of 9 th Aveue, are ot icluded i this pla s improvemets). Each itersectio alog the corridor is uique, but may share commo characteristics. For these reasos, a subgroup of prototypical itersectios represetig all study itersectios was selected for prelimiary aalysis. Each of the prototypes represets key differetiatig characteristics: locatio alog the corridor, traffic volumes, traffic lae cofiguratio, traffic sigal phasig, provisio of bus stops ad/or light rail stops, adjacet lad uses, pedestria facilities, ad pedestria collisio history. Of the six prototype itersectios selected by the multiagecy study team for aalysis, four are located alog 9 th Aveue ad two are located alog Park Presidio Boulevard, as follows: Park Presidio Boulevard ad Geary Boulevard Balboa Street 9 th Aveue ad Licol Way Noriega Street Taraval Street Holloway Aveue Each of the other 26 itersectios alog the corridor has similarities to oe or more of the six prototypical itersectios. For example, Park Presidio Boulevard s itersectio with Califoria Street shares may commoalities with the Geary Boulevard itersectio, while Park Presidio s itersectio with Clemet Street is similar to the Balboa Street itersectio. I additio, over a doze itersectios alog 9 th Aveue have features similar to the Noriega Street itersectio, while 9 th Aveue s itersectios with Licol Way, Taraval Street, ad Holloway Aveue are comparable to just oe or two other itersectios alog the highway. Figure 3- illustrates the corridor s 32 study itersectios, icludig the six prototypical itersectios. Figure 3-. Study Itersectios ad Six Prototype Locatios BX CALIFORNIA ST CLEMENT ST ANZA ST BALBOA ST GEARY BLVD CABRILLO ST 5 CROSSOVER DR Golde Gate Park 7 Study Area Parks 3AX PARK PRESIDIO BLVD AX L AX 6BX Mui Routes Bike Routes Study Area 9th Aveue Neighborhood Trasportatio Pla 6AX 29 IRVING ST JUDAH ST KIRKHAM ST ORTEGA ST L PACHECO ST SANTIAGO ST TARAVAL ST Public Schools Private Schools LINCOLN WAY 9TH AVE N LAWTON ST MORAGA ST NORIEGA ST QUINTARA ST RIVERA ST L ULLOA ST VICENTE ST WAWONA ST SLOAT BLVD OCEAN AVE EUCALYPUS DR 8 29 HOLLOWAY AVE Sa Fracisco State Uiversity Miles M JUNIPERO SERRA BLVD 9 K I This map is iteded for plaig purposes oly. Map Produced: 0/2/2006 KNS 3-2 9th Aveue Park Presidio Neighborhood Trasportatio Pla

31 3.2 Toolkit of Improvemets Usig the results of the eeds assessmet, this pla defies a toolkit of improvemets to improve coditios alog 9 th PPB. These improvemets were the applied to the six prototype locatios. The followig figure illustrates how the chose improvemets fulfill the four over-archig goals of the pla. The proposed improvemets are described i detail below. SIGNAL UPGRADE PROJECT IMPROVEMENTS ADA Upgrades Upgrades to coform to Americas with Disabilities Act (ADA) guidelies cosist of curb ramps, detectable warig surfaces, accessible push buttos, ad other features. These items eable access betwee the sidewalk ad the highway for people usig wheelchairs or strollers, ad for pedestrias with mobility impairmets who have trouble steppig up to ad dow from high curbs. Detectable warig surfaces use raised trucated domes to iform visually impaired pedestrias of potetial hazards i the area immediately ahead. Accessible pedestria sigals supplemet pedestria sigal idicatios with audible ad vibro-tactile iformatio. Pushbuttos will be istalled so that pedestrias ca request a walk sigal if oe does ot appear automatically. Table 3-. Improvemet Toolkit Toolkit Item Improve pedestria safety Improve streetscape coditios ADA upgrades* New traffic sigal (with pedestria coutdow)* Advaced limit lie* Improve trasit operatios Maage ad calm traffic operatios New street/decorative lightig* Edge lie Special crosswalk stripig/pavig Media platig Bus bulb Corer pedestria bulb Thumbail New trasit shelter** New tree** New sidewalk** Trasit boardig islad** *These improvemets will be istalled with the ogoig ad separately-fuded Sigal Upgrade Project. **These improvemets are proposed at a limited umber of locatios to address special coditios. 3. RECOMMENDED IMPROVEMENTS 3-3

32 DRAFT FINAL REPORT Street Lightig Additioal lightig is proposed at itersectios to ehace security ad pedestria safety ad comfort. The Sigal Upgrade Project will be istallig ew poles at each itersectio corer to hold the ew traffic sigals; these poles will also support a streetlight lumiaire. This ew lightig also represets a opportuity to beautify the street; therefore, this pla proposes that a decorative fixture be chose for the ew lightig. ADDITIONAL ENHANCEMENTS Edge Lie Traffic Sigals with Pedestria Coutdow Sigals The Sigal Upgrade Project will covert the existig traffic sigals that are located o vertical poles alog 9 th Aveue ad Park Presidio Boulevard with sigals o horizotal mast arms. This move is iteded to icrease the visibility of the sigals for motorists. The project will also istall coutdow sigals that idicate how much time is left for pedestrias to cross the highway, aimed at reducig the umber of pedestrias straded i the crosswalk whe the light chages. Fially, istallig ew street ifrastructure as promiet as poles represets a opportuity for beautificatio. This pla therefore proposes that the sigal poles ad arms be paited. Advaced Limit Lie This improvemet refers to a white lie ca be placed four or more feet i advace of crosswalks to ecourage motorists to stop farther away from the crosswalk ad to icrease pedestria visibility. Marked edge lies are proposed alog 9 th Aveue to provide visual separatio betwee the outside travel laes ad the curbside parkig lae. Provisio of marked edge lies could decrease the likelihood of sideswipe collisios ad provide greater divisio betwee movig ad parked vehicles. Edge lie stripig also works well with bulb-outs (see below), as both preserve a visual idicator of the edge of the travel lae. Sice Park Presidio has o parkig, this ehacemet is proposed oly for 9 th Aveue. Specially Marked Crosswalk Two differet types of specially marked crosswalks ca provide higher visibility for approachig motorists tha the stadard two logitudial stripes delieatig the width of the crosswalk. First, various styles of crosswalk stripig could be applied to cofer more promiece. With SFMTA ad SFDPW iput, this pla proposes a staggered cotietal style, which cosists of wide stripes parallel to the directio of vehicle travel, with gaps provided where through-traffic vehicle tires would track. This stripig style provides the higher visibility while mitigatig the maiteace cost of re-paitig stripes that are wor away by tire cotact. Secod, colored or textured pavemet betwee the crosswalk lies ca also be used, although at higher cost. This pla proposes special pavig for high-activity itersectios ad special stripig for the remaiig itersectios. Media Platig Low-growig media platigs are proposed alog 9 th Aveue medias withi 00 feet of each cross-street Park Presidio Boulevard already icludes media platig. The platigs will coform to Caltras desig stadards for height i order to preserve sight lies. I additio to beautifyig the street, the platigs could have a traffic calmig effect alog the corridor, particularly at the itersectios th Aveue Park Presidio Neighborhood Trasportatio Pla

33 Trasit Shelter Provisio of moder trasit shelters is proposed at some trasit stops alog 9 th Aveue ad Park Presidio Boulevard, icludig seatig areas, trasit maps ad schedules, ad displays with real-time trasit arrival iformatio. Shelters are proposed where trasit ridership is highest. I some cases, a proposed relocatio of a bus stop cofers a higher priority o a replacemet shelter. The cost of these shelters is expected to be covered by a existig SFMTA program to replace ad build ew trasit shelters city-wide. Tree Bulb-Out: Bus Bulb ad Corer Pedestria Bulb Bulb-outs at itersectio corers exted the sidewalk ito the parkig lae to arrow the distace of the street that a pedestria has to cross. They also improve the visibility of pedestrias waitig to cross by brigig them closer to the ceter of the driver s coe of visio. Bus bulb-outs are distiguished from corer pedestria bulbs by their loger legth ad locatio at bus stops. They provide the same advatages for pedestrias as corer bulb-outs ad also eable buses to take the lae while boardig ad de-boardig passegers, istead of havig to pull out of the travel lae ad the wait for a gap to eter agai after stoppig for passegers. Bus bulb-outs eable more efficiet loadig ad uloadig of buses, reducig delay. I may cases, bus stops ad bulb-outs are proposed to be located o the far side of a itersectio istead of a ear side. Sice bulb-outs are oly appropriate where there is a o-street parkig lae, this treatmet is oly proposed alog 9 th Aveue. Thumbail New trees ca be provided where they do ot block sight distace requiremets, iterfere with sidewalks, or coflict with utilities. Provisio of ew trees, i accordace with Departmet of Public Works guidelies, would assist i beautifyig the corridor ad eablig a traffic calmig effect. Because of Caltras horizotal clearace requiremets, trees ca ot be provided withi the corridor s ceter media. Sidewalk Improvemet This improvemet refers to extesios of sidewalks where they do ot curretly exist to provide access to bus stops. Alog Park Presidio Boulevard, the pla proposes extedig the sidewalks oly to reach the bus stops from the street corers. I additio, a ew sidewalk is proposed alog the east side of Crossover Drive betwee Marti Luther Kig Jr. Drive ad Licol Way to provide access to the relocated trasit stop alog Crossover Drive. Trasit Boardig Islad New separated ad raised trasit boardig islads are proposed for Mui light rail stops to provide safer boardig coditios. This improvemet is specifically proposed for Taraval Street. This improvemet refers to providig thumbail or media ose curbs i the crosswalks at the medias of 9 th Aveue ad Park Presidio Boulevard. These thumbails ca chaelize left-turig traffic so that those vehicles do ot cut across the media, slowig them as they make the tur. These thumbails ca also provide some comfort for pedestrias to wait outside of the traveled way if they fid themselves caught i the middle of the crossig at the ed of the walk sigal phase. They are particularly useful to persos with mobility disabilities, very old or very youg pedestrias who walk at slower speeds, ad persos i wheelchairs. 3. RECOMMENDED IMPROVEMENTS 3-5

7.0 Nonmotorized Facilities

7.0 Nonmotorized Facilities 7.0 Nomotorized Facilities 7.1 Sectio Overview This sectio describes the existig coditios ad ay idetified future impacts with the project o omotorized facilities withi the study area. Data were collected

More information

2) What s the Purpose of Your Project?

2) What s the Purpose of Your Project? Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs Overview: Tools ad Strategies to Predict ad Documet Bicyclig ad Walkig Rates 1) Why Documet the Need for

More information

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal.

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal. CR166916b02 20 Jue 2017 Melida Dodso Melida Dodso Architects PO Box 5635 Hughes ACT 2605 Email: mdodso@melidadodsoarchitects.com.au Dear Melida, Project: Dickso Apartmets Lowrie St Re: Statemet o Parkig

More information

City of El Cerrito. Active Transportation Plan

City of El Cerrito. Active Transportation Plan City of El Cerrito Active Trasportatio Pla DRAFT August 2015 Ackowledgemets This pla has bee prepared by the City of El Cerrito with fuds from the Metropolita Trasportatio Commissio (MTC) Trasportatio

More information

Active Travel The Role of Self-Selection in Explaining the Effect of Built Environment on Active Travel

Active Travel The Role of Self-Selection in Explaining the Effect of Built Environment on Active Travel Active Livig Research Buildig Evidece to Prevet Childhood Obesity ad Support Active Commuities RESE ARCH brief Fall 2009 activelivigresearch.org Active Travel The Role of Self-Selectio i Explaiig the Effect

More information

CITY OF PASADENA PEDESTRIAN SAFETY STUDY AT SIGNALIZED INTERSECTIONS

CITY OF PASADENA PEDESTRIAN SAFETY STUDY AT SIGNALIZED INTERSECTIONS CITY OF PASADENA PEDESTRIAN SAFETY STUDY AT SIGNALIZED INTERSECTIONS Prepared for: City of Pasadea Submitted by: FEHR & PEERS 201 Sata Moica Blvd., Suite 500 Sata Moica, Califoria 90401 (310) 458-9916

More information

n Mix of public, private and NGO respondents Overview n Understanding Walking & Biking Trips n Informing Project Development through:

n Mix of public, private and NGO respondents Overview n Understanding Walking & Biking Trips n Informing Project Development through: Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs ATP Needs & Challeges Survey Mix of public, private ad NGO respodets 96% from orgaizatios/agecies servig

More information

Overview. Creating Walkable, Bikeable Communities Developing Effective Active Transportation Projects and Programs. Add photo or photos

Overview. Creating Walkable, Bikeable Communities Developing Effective Active Transportation Projects and Programs. Add photo or photos Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs Add photo or photos Sposored by Caltras ad [local sposors] Overview Effective itervetios that ca improve

More information

THE LATENT DEMAND METHOD

THE LATENT DEMAND METHOD THE LATENT DEMAND METHOD Bruce W. Ladis, Russell M. Otteberg, Vekat R. Vattikuti SCI, Ic., 18115 U.S. Highway 41North, Suite 600, Lutz, FL 33549, USA Email: bladis@sciworld.et Travel patters i a metropolita

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 11 DIVISION: Transit Services BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving the installation of traffic and parking modifications along

More information

CITY OF DOWNEY BICYCLE MASTER PLAN

CITY OF DOWNEY BICYCLE MASTER PLAN CITY OF DOWNEY BICYCLE MASTER PLAN AUGUST 2014 PREPARED BY FEHR & PEERS City of Dowey Bicycle Master Pla 2 August 2014 DRAFT CONTENTS 1. Itroductio... 6 Bicycle Master Pla Overview: Goals ad Objectives...6

More information

Policy sensitivity analysis of Karachi commuters

Policy sensitivity analysis of Karachi commuters Policy sesitivity aalysis of Karachi commuters A. Q. Memo 1 & K. Sao 2 1 Departmet of Civil Egieerig, NED Uiversity of Egieerig ad Techology, Karachi, Pakista 2 Departmet of Civil ad Evirometal Egieerig,

More information

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION)

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION) RAMOA FOOTHILL MEIECKE MILL 1" = 350' TRAFFIC DIVERTER MEIECKE BETO MURRAY SATA ROSA SERRAO MISSIO CETER WEST VEABLE MISSIO MISSIO ALMOD MOUTAI VIEW CETER LICOL CETER LICOL COCEPT ALTERATIVE 1 ( O WITH

More information

Schaumburg Bikeways Plan - Updated February 2012

Schaumburg Bikeways Plan - Updated February 2012 Schaumburg Bikeways Pla - Updated February 2012 schaumburg bikeways etwork toolkit «Bike lae Establishes space o road exclusively for bicycle travel. Bicycle laes are striped ad marked with a bicycle symbol

More information

ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE

ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE Case Study of Mihag District i Shaghai, Chia Yue Wag, Daocheg Su 2 School of Traffic ad Trasportatio Egieerig, Togi Uiversity, Shaghai, Chia ABSTRACT

More information

WATER VALVES REPLACEMENT PROJECT

WATER VALVES REPLACEMENT PROJECT WATER VALVES REPLACEMET PROJECT BROWSVILLE, TEXAS BID o B026-17 PUBLIC B R O W S V I L L E UTILITIES B OARD Brownsville - Board of Directors RAFAEL VELA...CHAIR RAFAEL S. CHACO...VICE-CHAIR MARTI C. ARAMBULA...SECRETARY/TREASURER

More information

TRANSIT. WATS Transit Routes. Regular Fixed Route Service

TRANSIT. WATS Transit Routes. Regular Fixed Route Service TRANSIT The Wausau Area Trasit System (WATS) provides public trasportatio services i the Wausau area. WATS is the oly itra-city trasit service available to the geeral public withi the MPA. WATS is owed

More information

4 Alternatives. Alternatives Packaging Alternatives were packaged into four general categories, which are presented in detail in this chapter:

4 Alternatives. Alternatives Packaging Alternatives were packaged into four general categories, which are presented in detail in this chapter: 4 Alteratives The aalysis of existig ad future trasportatio coditios i the study area idetified areas of the trasportatio etwork that require improvemets, either ifrastructure or system maagemet improvemets.

More information

P h o t o g r a p h i c L i g h t i n g ( 1 1 B )

P h o t o g r a p h i c L i g h t i n g ( 1 1 B ) 9 1 5 9 P h o t o g r a p h i c L i g h t i g ( 1 1 B ) 30S/30E/30M A Photography Course 9 1 5 9 : P h o t o g r a p h i c L i g h t i g ( 1 1 B ) 3 0 S / 3 0 E / 3 0 M Course Descriptio This course focuses

More information

20 th Avenue Neighborway Project August 2, Second Open House

20 th Avenue Neighborway Project August 2, Second Open House 20 th Avenue Neighborway Project August 2, 2018 - Second Open House General Comments We love the plan in general and appreciate the SFMTA looking out for walkers and bikers. Can we get better traffic enforcement

More information

Footwork is the foundation for a skilled basketball player, involving moves

Footwork is the foundation for a skilled basketball player, involving moves The Complete Book of Offesive Basketball Drills Basic Footwork ad Cuts Drills 2 Equipmet 16 chairs (or less) Persoel The etire team Basic Footwork ad Cuts Drills Two coaches How to Ru the Drill Five feet

More information

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts

Golden Gate Park. Project Goal and Description. Lower Great Highway Facts PROJECT OVERVIEW Project Goal and Description The goal of the is to increase pedestrian safety and comfort along Lower Great Highway by evaluating and implementing near- and medium-term pedestrian improvements

More information

Acknowledgments Shasta County BTP ii

Acknowledgments Shasta County BTP ii Ackowledgmets Shasta Couty Board of Supervisors Les Baugh (District 5) Lida Hartma (District 4) Gle Hawes (District 3) Leoard Moty (District 2) David A. Kehoe (District 1) Shasta Couty Staff Da Little,

More information

SPH4U Transmission of Waves in One and Two Dimensions LoRusso

SPH4U Transmission of Waves in One and Two Dimensions LoRusso Waves travelig travellig from oe medium to aother will exhibit differet characteristics withi each medium. Rules A wave of fixed frequecy will have a shorter wavelegth whe passig from a fast medium to

More information

Simulation Study of a Bus Signal Priority Strategy Based on GPS/AVL and Wireless Communications

Simulation Study of a Bus Signal Priority Strategy Based on GPS/AVL and Wireless Communications Simulatio Study of a Bus Sigal Priority Strategy Based o GPS/AVL ad Wireless Commuicatios Che-Fu Liao* Ceter for rasportatio Studies ad the Itelliget rasportatio Systems Istitute Uiversity of Miesota 200

More information

SFMTA PROJECT TIMELINE

SFMTA PROJECT TIMELINE SFMTA PROJECT TIMELIE Internal SFMTA Processes Opportunities for Public Input Data Collection and Analysis Car and bike volumes, safety (collision) data Roadway and intersection geometry June 2016 Pop

More information

n UL Listed and FM Approved for n Solenoid control n Quick pressure relief valve 73Q n Pressure sustaining & reducing valve 723

n UL Listed and FM Approved for n Solenoid control n Quick pressure relief valve 73Q n Pressure sustaining & reducing valve 723 Pressure Relief/Sustaiig Valve Prioritizig pressure zoes Esurig cotrolled pipelie fill-up Prevetig pipelie emptyig Pump overload & cavitatio protectio Safeguardig pump miimum flow Excessive lie pressure

More information

Travel Demand Management Implementation in Bandar Lampung

Travel Demand Management Implementation in Bandar Lampung Travel Demad Maagemet Implemetatio i Badar Lampug Rahayu Sulistyorii 1, a, 1 Lampug Uiversity Istitute Techology of Sumatera a Keywords: Traffic

More information

Transit Development Plan December 2011

Transit Development Plan December 2011 Trasit Developmet Pla December 2011 Table of Cotets Chapter Oe - Ivetory Itroductio... 1-1 Data Sources... 1-1 Settig the Stage... 1-2 Service Area... 1-3 Fixed Route Service Routes... 1-4 Overall Ridership

More information

Outline. Changing needs in Urban Traffic. Introduction The starting point Basic principles Analysis Facts Changes Context Solutions Key messages

Outline. Changing needs in Urban Traffic. Introduction The starting point Basic principles Analysis Facts Changes Context Solutions Key messages Chagig eeds i Urba Traffic Rob Methorst Chair COST 358 Pedestrias Quality Needs Cetre for Trasport ad Navigatio 27th of October 2011 Outlie Itroductio The startig poit Basic priciples Aalysis Facts Chages

More information

draft final report NGSIM Arterial-Lane Selection Mode Federal Highway Administration Cambridge Systematics, Inc.

draft final report NGSIM Arterial-Lane Selection Mode Federal Highway Administration Cambridge Systematics, Inc. NGSIM Arterial-Lae Selectio Mode draft fial report prepared for Federal Highway Admiistratio prepared by Cambridge Systematics, Ic. with Itelliget Trasportatio Systems Laboratory Massachusetts Istitute

More information

Halsey. Street Conceptual Design Project. Final Report. April, Prepared by: Cogan Owens Cogan, LLC SERA Architects, Inc. Falconi Consulting

Halsey. Street Conceptual Design Project. Final Report. April, Prepared by: Cogan Owens Cogan, LLC SERA Architects, Inc. Falconi Consulting Halsey Street Coceptual Desig Project Fial Report Prepared by: Coga Owes Coga, LLC SERA Architects, Ic. Falcoi Cosultig TABLE OF CONTENTS Backgroud ad Objectives... 1 Study Area Overview... 2 Physical

More information

Welcome to the world of the Rube Goldberg!

Welcome to the world of the Rube Goldberg! Welcome to the world of the Rube Goldberg! Sice 1988, tes of thousads of studets have competed i our aual Rube Goldberg Machie Cotests where they are challeged to build the wackiest workig Rube Goldberg

More information

Equipment. Rackets are fragile. Handle the shuttlecocks carefully and only by their rubber tips.

Equipment. Rackets are fragile. Handle the shuttlecocks carefully and only by their rubber tips. Badmito Overvie ad History Badmito is a racket sport that is played o a court divided by a et five feet high. The game is played ith a shuttlecock ( bird ). Ca be played as sigles or doubles. The object

More information

2013 Watauga County Comprehensive Transportation Plan

2013 Watauga County Comprehensive Transportation Plan 2013 Watauga Couty Comprehesive Trasportatio Pla Table of Cotets Executive Summary... i I. Aalysis of the Existig ad Future Trasportatio System...I-1 Aalysis Methodology ad Data Requiremets...I-1 Roadway

More information

» WYOMING s RIDE 2013

» WYOMING s RIDE 2013 » WYOMING s RIDE 2013 WYOMING S RIDE 2013 preseted by First Iterstate Bak of Wyomig bikemswyomig.org 1 We are people who wat to do somethig about ow.» Our Wyomig Bike MS Ride Two-Day Wyomig Ride: To view

More information

Draft White-tailed Deer Management Policy for Ontario

Draft White-tailed Deer Management Policy for Ontario Draft White-tailed Deer Maagemet Policy for Otario Otario Miistry of Natural Resources ad Forestry March 2017 Cette publicatio est dispoible e fraçais. Pour obteir de l aide e fraçais, veuillez commuiquer

More information

THE EFFECTS OF COUPLED INDUCTORS IN PARALLEL INTERLEAVED BUCK CONVERTERS

THE EFFECTS OF COUPLED INDUCTORS IN PARALLEL INTERLEAVED BUCK CONVERTERS THE EFFECTS OF COUPED INDUCTORS IN PARAE INTEREAVED BUCK CONVERTERS Paul Seria, David Fi ad Geoff Walker pseria@itee.uq.edu.au School of Iformatio Techology ad Electrical Egieerig Uiversity of Queeslad

More information

Headfirst Entry - Diving and Sliding

Headfirst Entry - Diving and Sliding 5/31/2011 Safe divig board use, safe slide use, usi Headfirst Etry - Divig ad Slidig POOLALARMS.COM HOME POOL SAFETY PRODUCTS POOL SAFETY ARTICLES & REPORTS POOL SAFETY LINKS & RESOURCES POOLALARMS.COM

More information

8.5. Solving Equations II. Goal Solve equations by balancing.

8.5. Solving Equations II. Goal Solve equations by balancing. 8.5 Solvig Equatios II Goal Solve equatios by balacig. STUDENT BOOK PAGES 268 271 Direct Istructio Prerequisite Skills/Cocepts Solve a equatio by ispectio or systematic trial. Perform operatios usig itegers,

More information

Trails and Greenways Master Plan Update

Trails and Greenways Master Plan Update s ad Greeways Master Pla Update Prepared by City of Rock Hill Plaig Services ad Parks, Recreatio, & Tourism Departmets with assistace from the Catawba Regioal Coucil of Govermets Pla Adopted: Jue 16, 2003

More information

9 Placerville Airport and Environs

9 Placerville Airport and Environs Chapter 9 Placerville Airport ad Eviros BACKGROUND DATA EL DORADO COUNTY Airport Lad Use Compatibility Pla 9 Backgroud Data: Placerville Airport ad Eviros INTRODUCTION Placerville Airport is a public-use

More information

Load Calculation and Design of Roller Crowning of Truck Hub Bearing

Load Calculation and Design of Roller Crowning of Truck Hub Bearing Sed Orders for Reprits to reprits@bethamsciece.ae 106 The Ope Mechaical Egieerig Joural, 2015, 9, 106-110 Ope Access Load Calculatio ad Desig of Roller Crowig of Truck Hub Bearig Xitao Xia,1, Shujig Dog

More information

A SECOND SOLUTION FOR THE RHIND PAPYRUS UNIT FRACTION DECOMPOSITIONS

A SECOND SOLUTION FOR THE RHIND PAPYRUS UNIT FRACTION DECOMPOSITIONS Fudametal Joural of Mathematics ad Mathematical Scieces Vol., Issue, 0, Pages -55 This paper is available olie at http://www.frdit.com/ Published olie November 9, 0 A SECOND SOLUTION FOR THE RHIND PAPYRUS

More information

MINNESOTA DEER MANAGEMENT

MINNESOTA DEER MANAGEMENT MINNESOTA DEER MANAGEMENT A study of huter opiios about deer populatios ad maagemet: Blocks H H5 Fial Report A cooperative study coducted by: Miesota Cooperative Fish ad Wildlife Research Uit Miesota Departmet

More information

Comprehensive Transportation Plan. Vance County

Comprehensive Transportation Plan. Vance County Comprehesive Trasportatio Pla Vace Couty November 2012 Comprehesive Trasportatio Pla for Vace Couty Prepared by: I Cooperatio with: Laure Nicholls, Project Egieer Scott Walsto, Triagle Plaig Group Supervisor

More information

» COLORADO s RIDE 2013

» COLORADO s RIDE 2013 » COLORADO s RIDE 2013 COLORADO S RIDE 2013 bikemscolorado.org 1 We are people who wat to do somethig about ow.» COlorado 2-Day Ride Caledar of Evets o back 2 2013 Bike MS COLORADO MS Society Missio Statemet

More information

ELIGIBILITY / LEVELS / VENUES

ELIGIBILITY / LEVELS / VENUES ELIGIBILITY / LEVELS / VENUES 10U - SQUIRT MINOR '09 & MAJOR '08 Eligibility: Top six teams i the league at each level will qualify based o regular seaso league play. Format: Divisioal crossover with semi-fial

More information

ELIGIBILITY / LEVELS / VENUES

ELIGIBILITY / LEVELS / VENUES ELIGIBILITY / LEVELS / VENUES 10U - SQUIRT MINOR '09 & MAJOR '08 Eligibility: Top six teams i the league at each level will qualify based o regular seaso league play. Format: Divisioal crossover with semi-fial

More information

Riverton Active Transportation Plan FINAL PLAN NOVEMBER 2016

Riverton Active Transportation Plan FINAL PLAN NOVEMBER 2016 Riverto Active Trasportatio Pla FINAL PLAN NOVEMBER 2016 TITLE STEERING COMMITTEE & CONSULTANT TEAM: PROJECT RIVERTON CITY Be Dayley, Parks ad Recreatio Jared Bowlig, Public Works Bria Moore, Public Works

More information

Southside Pilot Proposal

Southside Pilot Proposal To improve bicycle access and mobility to UC Berkeley, Downtown Berkeley, and the Southside area, a pilot project could include a two-way parking-protected cycle track. Turn pockets and island bus stops

More information

AN ESTIMATION OF INTER-ZONAL BUS DEMAND ON COLOMBO - KALUTARA TRANSPORT CORRIDOR

AN ESTIMATION OF INTER-ZONAL BUS DEMAND ON COLOMBO - KALUTARA TRANSPORT CORRIDOR AN ESIMAION OF INER-ZONAL BUS DEMAND ON COLOMBO - KALUARA RANSPOR CORRIR Sama J. Widaapathiraage ad Amal S. Kumarage Departmet of Civil Egieerig, Uiversity of Moratuwa, Sri Laka. ABSRAC- I the past, it

More information

Flygt low-speed mixers. Outstanding efficiency

Flygt low-speed mixers. Outstanding efficiency Flygt low-speed mixers Outstadig efficiecy INTRODUCTION Eergy-efficiet mixig Advatages of Flygt low-speed mixers Risig to the mixig challege All mixig applicatios require varyig degrees of both small-scale

More information

ELIGIBILITY / LEVELS / VENUES

ELIGIBILITY / LEVELS / VENUES ELIGIBILITY / LEVELS / VENUES 10U - SQUIRT MINOR '08 & MAJOR '07 Eligibility: Top six teams i the league at each level will qualify based o regular seaso league play. Format: Divisioal crossover with semi-fial

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

ELIGIBILITY / LEVELS / VENUES

ELIGIBILITY / LEVELS / VENUES ELIGIBILITY / LEVELS / VENUES 10U - SQUIRT MINOR '08 & MAJOR '07 Eligibility: Top six teams i the league at each level will qualify based o regular seaso league play. Format: Divisioal crossover with semi-fial

More information

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES:

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES: WELCOME! CAMBIE BRIDGE ITERIM IMPROVEMETS The City of Vancouver is planning to make interim improvements to Cambie Bridge to make it safer and more comfortable for people of all ages and abilities to walk

More information

Precautions for Total Hip Replacement Patients Only

Precautions for Total Hip Replacement Patients Only Precautios for Total Hip Replacemet Patiets Oly The followig is a list of precautios to keep you from dislocatig your hip. Dislocatig meas to move a body part out of its usual positio. Durig your stay

More information

Climbing/Rappelling NATIONAL STANDARDS BOY SCOUTS OF AMERICA

Climbing/Rappelling NATIONAL STANDARDS BOY SCOUTS OF AMERICA 2007 Climbig/Rappellig NATIONAL STANDARDS BOY SCOUTS OF AMERICA These stadards apply to coucil ad district climbig/rappellig activities. Climb O Safely, No. 20-099B, applies to uit activities. Toppig Out,

More information

PHASE II W. SAN CARLOS AVENUE - N. OF EXISTING PHASE III W. SAN CARLOS AVENUE SAN MARCO AVENUE MAY STREET

PHASE II W. SAN CARLOS AVENUE - N. OF EXISTING PHASE III W. SAN CARLOS AVENUE SAN MARCO AVENUE MAY STREET TRAFFIC COTROL GEERAL OTES ======================== TRAFFIC COTROL PHASIG OTES (COT'D.) ============================== 1. WORK ZOE TRAFFIC COTROL WILL BE I ACCORDACE WITH THE MAUAL O UIFORM TRAFFIC COTROL

More information

Modelling Lane Changing Behaviour of Heavy Commercial Vehicles

Modelling Lane Changing Behaviour of Heavy Commercial Vehicles Modellig Lae Chagig Behaviour of Heavy Commercial Vehicles Modellig Lae Chagig Behaviour of Heavy Commercial Vehicles Sara Moridpour 1, Majid Sarvi 2, Geoff Rose 3 1 Post Graduate Studet, Moash Uiversity,

More information

DAMAGE ASSESSMENT OF FIBRE ROPES FOR OFFSHORE MOORING

DAMAGE ASSESSMENT OF FIBRE ROPES FOR OFFSHORE MOORING RECOMMENDED PRACTICE DNV-RP-E304 DAMAGE ASSESSMENT OF FIBRE ROPES FOR OFFSHORE MOORING APRIL 2005 FOREWORD (DNV) is a autoomous ad idepedet foudatio with the objectives of safeguardig life, property ad

More information

Town of Mooresville, North Carolina Comprehensive Transportation Plan Amendments Addendum Report

Town of Mooresville, North Carolina Comprehensive Transportation Plan Amendments Addendum Report Tow of, North Carolia Comprehesive Trasportatio Pla Amedmets Addedum Report Adopted April 4, 2013 Tow of Developmet Services Departmet Tow of CTP Amedmets Adopted April 4, 2013 Executive Summary The curret

More information

Intersleek Pro. Divers Manual. Our World is Water CONTENTS

Intersleek Pro. Divers Manual. Our World is Water CONTENTS Itersleek Pro Divers Maual CONTENTS Itroductio.......................................2 Expectatios for Itersleek Pro........................3 I-Water Maiteace...............................4 Haulig the

More information

The budget for the London 2012 Olympic and Paralympic Games

The budget for the London 2012 Olympic and Paralympic Games The budget for the Lodo 2012 Olympic ad Paralympic Games REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 612 Sessio 2006-2007 20 July 2007 The Natioal Audit Office scrutiises public spedig o behalf of

More information

1 Bike MS: 2013 Proposal

1 Bike MS: 2013 Proposal 2013 partership proposal 1 Bike MS: 2013 Proposal Visio Statemet For cyclists ad all those seekig a persoal challege ad a world free of MS, Bike MS is the premier fudraisig cyclig series i the atio. With

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Adopting Conceptual Proposal for Streetscape Improvements to Broadway,

More information

Downtown Connector Trail

Downtown Connector Trail December 27, 2010 Updated January 10, 2012 1 ew Broadway / 9th Street Downtown Connection I-77 East 34th RTA Station I-490 Job Ready Development Parcel Morgana Run Steel Warehouse Washington Reservation

More information

Coal Pulveriser. Global Solutions

Coal Pulveriser. Global Solutions Coal Pulveriser. Global Solutios > Worm Gears > Gear Uits > Coupligs & Freewheels Global Coal Pulveriser Solutios Reold is a global egieerig group with over 130 years of experiece i the desig ad maufacture

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

Version IV: April a publication from

Version IV: April a publication from Versio IV: April 2013 a publicatio from AWRF Associated Wire Rope Fabricators Recommeded Practice ad Guidelie Disclaimer for AWRF Recommeded Guidelie Swager Safety Guide Associated Wire Rope Fabricators

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

San Francisco 2009 Collisions Report April 21, 2011

San Francisco 2009 Collisions Report April 21, 2011 San Francisco 29 Collisions Report April 21, 211 City and County of San Francisco San Francisco Municipal Transportation Agency 1 South Van Ness Avenue, 7 th Floor San Francisco CA 9413 CONTENTS About

More information

Energy-efficient mixing

Energy-efficient mixing Flygt Mixers INTRODUCTION Eergy-efficiet mixig Advatages of Flygt low-speed mixers Risig to the mixig challege All mixig applicatios require varyig degrees of both small-scale turbulece ad bulk flow. With

More information

Available online at ScienceDirect. Procedia Engineering 113 (2015 )

Available online at  ScienceDirect. Procedia Engineering 113 (2015 ) Available olie at www.sciecedirect.com ScieceDirect rocedia Egieerig 3 (205 ) 30 305 Iteratioal Coferece o Oil ad Gas Egieerig, OGE-205 The twi spool efficiecy cotrol Michuri A.I. a *, Avtoomova I.V. a

More information

Range St. Dev. n Mean. Total Mean % Competency. Range St. Dev. n Mean. Total Mean % Competency

Range St. Dev. n Mean. Total Mean % Competency. Range St. Dev. n Mean. Total Mean % Competency CSWE Core Competecies - MSW 2013 MSW Program Dual Degree MSW/JD Program* *Due to the curret limited umber of Dual Degree studets, the MSW outcomes data represets outcomes for both programs. 1 : Idetify

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

MEETING PURPOSE WHAT WILL WE DO TODAY? WHAT WILL WE LEARN TODAY? GATHER INPUT ABOUT THE TYPE OF IMPROVEMENTS YOU WOULD LIKE TO SEE

MEETING PURPOSE WHAT WILL WE DO TODAY? WHAT WILL WE LEARN TODAY? GATHER INPUT ABOUT THE TYPE OF IMPROVEMENTS YOU WOULD LIKE TO SEE MEETIG PURPOSE PLAED IMPROVEMETS FOR SYRACUSE STREET We value your feedback. We are reaching out to you this evening to learn more about the project and provide feedback on the upcoming planned improvements.

More information

Seated valves (PN 16) VF 2-2-way valve, flange VF 3-3-way valve, flange

Seated valves (PN 16) VF 2-2-way valve, flange VF 3-3-way valve, flange Data sheet Seated valves (PN 16) VF 2-2-way valve, flage VF 3-3-way valve, flage Descriptio Features: Bubble tight desig 15-80, 200-300 Sap mechaical coectio together with AMV(E) 335, AMV(E) 435 Dedicated

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009 Van Ness Avenue BRT Overview and Scoping Process Geary BRT CAC January 8, 2009 VAN NESS AVENUE S ROLE Identified in Prop K for BRT treatment Muni 47 and 49; 19 operates on Polk 20,000 daily riders on Van

More information

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010 Masonic Ave Street Design Study Community Workshop 3 September 30, 2010 Introduction MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3 SF Municipal Transportation Agency Javad Mirabdal, Project Manager

More information

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Better Market Street Project Update. Urban Forestry Council September 17, 2014 Better Market Street Project Update Urban Forestry Council September 17, 2014 Project Area Limits Better Market Street Schedule Market Street City s busiest transit corridor Over 85 buses per hour 14 surface

More information

KEARNY MESA COMMUNITY PLAN UPDATE

KEARNY MESA COMMUNITY PLAN UPDATE KEARNY MESA COMMUNITY PLAN UPDATE January 18, 2018 SUBCOMMITTEE MEETING Mobility Concepts and Urban Design Presentation Outline Mobility Concepts: Multimodal Planning Toolbox Presentation and Activities

More information

MARION STREET MULTIFAMILY

MARION STREET MULTIFAMILY MARIO STREET MULTI-FAMILY BUILDIG, BLOCK 49, EVASTO BROADWAY ADDITIO. SITUATED THE SOUTHWEST QUARTER, SECTIO 35, TOWSHIP 4 SOUTH, RAGE 68 WEST OF THE SIXTH PRICIPAL MERIDIA, CITY OF EGLEWOOD, COUTY OF

More information

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED.

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED. SLIDE COMPOETS: ATURE'S ISTRUMETS I-PG-1002-01 TRIPLE RAIL HILL SLIDE. I PACKAGE ICLUDES:- HT. SLIDE FRAME: x 1 WITH PRE-ATTACHED SLIDE AD COLLAR WIG WALL POST: x 2 PRE-ASSEMBLED WIG WALL RAILIGS: x 2

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

WIND TUNNEL EXPERIMENT ON THE EFFECT OF WIND ON SMOKE EXHAUST SYSTEMS FOR A HIGH RISE BUILDING

WIND TUNNEL EXPERIMENT ON THE EFFECT OF WIND ON SMOKE EXHAUST SYSTEMS FOR A HIGH RISE BUILDING WIND TUNNEL EXPERIMENT ON THE EFFECT OF WIND ON SMOKE EXHAUST SYSTEMS FOR A HIGH RISE BUILDING K.C. Chug Mechaical Egieerig, Natioal Yuli Uiversity of Sciece ad Techology Touliu City, Yuli 4, Taiwa ABSTRACT

More information

IRS ISSUES PROPOSED REGULATIONS FOR COMPARATIVE EFFECTIVENESS RESEARCH FEES

IRS ISSUES PROPOSED REGULATIONS FOR COMPARATIVE EFFECTIVENESS RESEARCH FEES HUMAN CAPITAL PRACTICE ALERT: HEALTH CARE REFORM BILL July 2012 www.willis.com IRS ISSUES PROPOSED REGULATIONS FOR COMPARATIVE EFFECTIVENESS RESEARCH FEES The Comparative Effectiveess Research (CER) fee

More information

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018 Better Market Street Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018 1 Market Street Market Street - San Francisco by rulenumberone2 2 Market Street is the... City s busiest pedestrian

More information

Catenary Analysis and Calculation Method of Track Rope of Cargo Cableway with Multiple Loads

Catenary Analysis and Calculation Method of Track Rope of Cargo Cableway with Multiple Loads MATEC Web of Cofereces 8, 01008 (016) DOI: 10.1051/ mateccof/016801008 DME 016 Cateary Aalysis ad Calculatio Method of Track Rope of Cargo Cableway with Multiple Loads Jia Qi a, Ju Che, Liag Qiao, Jiacheg

More information

FOLSOM-HOWARD STREETSCAPE OVERVIEW

FOLSOM-HOWARD STREETSCAPE OVERVIEW FOLSOM-HOWARD STREETSCAPE OVERVIEW SoMa residents should have the same kinds of amenities that other neighborhoods have. The Folsom- Howard Streetscape Project will make SoMa more livable by making it

More information

"The twisting movement of any hoof should, for physiological reasons, not be hindered by Shoeing." (Lungwitz 1884)

The twisting movement of any hoof should, for physiological reasons, not be hindered by Shoeing. (Lungwitz 1884) Volume 15: Issue 2 Shoeig for Rotatioal Deviatio of the Equie Limb by Michael J. Wildestei CJF, FWCF (Hos) Examiatio of a horse prelimiary to shoeig should be made while the aimal is at rest ad afterwards

More information

EQUIPEX NAOS WP5 : Deep oxygen floats in the North- Atlantic

EQUIPEX NAOS WP5 : Deep oxygen floats in the North- Atlantic EQUIPEX NAOS WP5 : Deep oxyge floats i the North- Atlatic Virgiie Thierry Guillaume Maze, Herlé Mercier, Cécile Cabaes, Virgiie Racapé Laboratoire d Océaographie Physique et Spatiale UMR 6523 CNRS / IFREMER

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

The new name for... Mines Rescue Service

The new name for... Mines Rescue Service Health ad Safety Traiig for all Idustries The ew ame for... Mies Rescue Service Expert traiig providers i: High Risk Etry ad Rescue Workig i Cofied Spaces Workig at Height Health ad Safety First Aid Fire

More information

Controlling noise at work

Controlling noise at work Health ad Safety Cotrollig oise at work The Cotrol of Noise at Work Regulatios 2005 Guidace o Regulatios This is a free-to-dowload, web-friedly versio of L108, (Secod editio, published 2005). This versio

More information

Pedestrian and Bicycle Improvements in Balboa Park Station Area

Pedestrian and Bicycle Improvements in Balboa Park Station Area Pedestrian and Bicycle Improvements in Balboa Park Station Area Jamie Parks & Jen Wong, SFMTA, Livable Streets December 15, 2015 Balboa Park Station CAC Monthly Meeting Vision Zero SF Zero traffic deaths

More information

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting PROJECT OVERVIEW The Masonic Avenue Streetscape Project is an effort to improve safety for everyone travelling on Masonic Avenue between Geary Boulevard and Fell Street. This project will bring a variety

More information

Current as of September 20, 2013 (red items are new entries since last TAAHC meeting)

Current as of September 20, 2013 (red items are new entries since last TAAHC meeting) Tag Allocatio ad Applicatio Hut Committee Topic List Reiitiated i December 0 Nevada Board of Wildlife Documet prit size 8/ x 4 of Category Applicatio Hut (A) Curret as of September 0, 0 (red items are

More information