1 Halsey Street Coceptual Desig Project Fial Report Prepared by: Coga Owes Coga, LLC SERA Architects, Ic. Falcoi Cosultig

2 TABLE OF CONTENTS Backgroud ad Objectives... 1 Study Area Overview... 2 Physical Features ad Coditios... 2 Existig ad Future Lad Uses... 3 Trasportatio Facilities ad Coditios... 6 Plaig Process... 9 Proposed Cocept Pla Eleets Couity-Specific Stadards ad Facilities Fairview Wood Village Troutdale Ipleetatio ad Cost Appedix A. Public Workshop Suaries...A1 Figures Figure 1. Existig Lad Uses... 4 Figure 2. Coprehesive Pla Desigatios... 5 Figure 3. Mior Arterial Stadards, Multoah Couty... 7 Figure 4. Trasportatio Coditios ad Facilities... 8 Figure 5. Coercial Streetscape Figure 6. Residetial Streetscape Figure 7. Lightig Stadards Halsey Street Coceptual Desig Project Fial Report i

3 Figure 8. Fairview Street Desig Cross-Sectio Figure 9. Fairview Street Desig Cross-Sectio Figure 10. Cocept Pla Map Fairview Figure 11. Wood Village Street Desig Cross-Sectio Figure 12. Wood Village Street Desig Cross-Sectio Figure 13. Cocept Pla Map Wood Village Figure 14. Troutdale Street Desig Cross-Sectio Figure 15. Troutdale Street Desig Cross-Sectio Figure 16. Cocept Pla Map Troutdale Tables Table 1. Suary of Cost Estiates by Jurisdictio Table 2. Jurisdictio/Project Characteristics Table 3. Cost Eleets by Jurisdictio Table 4. Sidewalk Characteristics Halsey Street Coceptual Desig Project Fial Report ii

4 BACKGROUND AND OBJECTIVES This report describes the proposed coceptual desig for the portio of Halsey Street that goes through the couities of Fairview, Troutdale ad Wood Village betwee 223rd Aveue ad the Historic Colubia River Highway (HCRH). The pla has bee prepared for Multoah Couty, with assistace fro the cosultig tea of Coga Owes Coga, Falcoi Cosultig ad SERA Architects, ad a techical advisory coittee (TAC) that icludes represetatives of the couty, the three cities, TriMet, Metro ad the Orego Departet of Trasportatio (ODOT). Residets ad property owers participated i the plaig process ad provided guidace durig two public workshops coducted i Jauary ad March, The plaig process grew out of earlier plaig efforts associated with the Fairview Village project. Prior to plaig for that project, this sectio of Halsey Street had bee classified as a ajor arterial street, desiged for five laes of traffic. Durig that project, the City of Fairview ad other jurisdictios requested reclassificatio of the street to a three-lae ior arterial street. The cities ad Couty also recoeded a desig that would eable icreased use by pedestrias, bicycles ad trasit users, while preservig adequate traffic capacity alog the street. Traffic odelig udertake at that tie idicated that Halsey Street would operate at acceptable level of service as a ior arterial, presuig that capacity would ot be coproised o parallel facilities. No additioal odelig was coducted for this project. I additio to the overall goal of developig a ulti-odal pla for Halsey Street, other objectives of the plaig process icluded the followig: Ivolve the public i desigig the streetscape for Halsey Street i Troutdale, Fairview ad Wood Village. Create a corridor that liks the older portios of Wood Village, Fairview ad Troutdale with ewer portios, while visually supportig the character of each. Create sese of idetity ad etryway to each couity. Explore the potetial to icorporate gree-street desigs i the streetscape. Miiize the eed for acquisitio of additioal eeded public right-of-way. This Coceptual Desig described i this report is expected to be ipleeted over tie as developet occurs, lad uses chage ad/or fudig becoes available. Overall, the pla ay take a uber of years to coplete. Soe sectios ay be ipleeted ore quickly tha others, depedig o how quickly specific areas develop or chage i use. Halsey Street Coceptual Desig Project Fial Report 1

5 STUDY AREA OVERVIEW Physical Features ad Coditios As oted previously, the project area icludes portios of the cities of Fairview, Wood Village ad Troutdale. Most of the lad directly adjacet to Halsey Street is relatively flat. I the easter half of the study area, lad slopes uphill to the south ad dowhill to the orth to soe degree, particularly just east of 244 th Aveue. Farther fro the street, the lad slopes ore sigificatly uphill to the south. Large trees are scattered alog the corridor, with cocetratios/groves east of the apartet coplex orth of Halsey Street, east of 238 th Aveue, ad east ad west of 244 th Aveue. Three streas cross Halsey Street -- oe just east of 244 th Aveue, oe ear 223 rd Aveue, ad oe just east of 227 th Aveue. All three streas flow through culverts where they cross roadways. Data fro Metro ad Natioal Wetlads Ivetory (NWI) aps idicate several relatively large wetlads withi the study area; each is withi approxiately 400 feet of Halsey Street. Additioal iforatio provided by the Couty ad Cities of Fairview, Troutdale ad Wood Village idicate the presece of other wetlads, soe of which are withi feet of the roadway. The City of Wood Village Coprehesive Pla idicates that areas i the easter part of the city ear Halsey Street (betwee 238 th ad 244 th Aveues) have poor draiage ad a history of floodig. There are soe historic resources i the study area, ost otably the Edgefield Property ad the Couty Far. They are icluded i the Natioal Register of Historic Places. There is also a historic tree o the east side of 238 th Aveue i frot of a care facility. The origial or old Wood Village also is of historical sigificace as it was a copay tow for Reyolds Aluiu. This icludes City Hall ad the coercial coplex at the southeast quadrat of the itersectio of 238 th Aveue ad Halsey Street. Public couity facilities located alog Halsey Street withi or just outside the study area iclude the followig: Marily s Park (ortheast of 223 rd Aveue /Halsey Street) Doald L. Robertso City Park (southwest of 244 th Aveue/Halsey Street) Wood Village City Hall (orthwest of 238 th Aveue/Halsey Street) Couty Far property, orth of Halsey Street, east of 244 th Aveue Halsey Street Coceptual Desig Project Fial Report 2

6 Property surroudig Edgefield Maor south of Halsey Street that also icludes a couty jail (vacat) Arata School (ear Doald L. Robertso Park ad just south of the study area), which icludes the Edgefield Childre s Ceter Existig ad Future Lad Uses There is a ix of residetial, coercial, idustrial, couity, ad resource lad uses withi the study area. The wester portio of the study area (223 rd to 244 th Aveues) is ore itesely developed with a approxiately eve ix of residetial ad oresidetial uses. These uses iclude coercial ad idustrial uses just east of 223 rd ad priarily residetial uses south of Halsey betwee approxiately 229 th ad 244 th Aveues. North of Halsey betwee 229 th ad 244 th Aveues, there is a ix of residetial, coercial, ad couity uses that iclude the Mt. Hood Couity College/Head Start (apartet coplex) facility, Wood Village City Hall, ad several large coercial ad idustrial busiesses. The easter portio of the study area is less developed, particularly orth of Halsey Street ad withi ½ ile east of 244 th Aveue. The Edgefield Maor restaurat/brewpub/bed-ad-breakfast coplex is south of Halsey Street about 700 feet east of the 244 th Aveue. The area at the easter ed of the corridor is coprised of resideces, ope space, ad coercial ad idustrial use (at the far easter ed). The desity of residetial uses varies sigificatly fro relatively dese ulti-faily uits to sigle houses o large lots. Policies ad plas for future developet cotiue to evisio a ix of lad uses alog Halsey Street that is fairly siilar to the existig ix of uses, with the followig exceptios: Fairview s Couity Visio pla aticipates developet/extesio of a ixed-use tow ceter area betwee 223 rd Aveue ad approxiately 229 th Aveue. Much of this area orth of Halsey Street is curretly udeveloped. The area east of 244 th Aveue ad orth of Halsey (curretly udeveloped) is zoed ad expected to be used for light idustrial or coercial developet. The area both east ad west of Edgefield Maor is zoed for future coercial developet. Additioal, deser residetial ad ixed-use developet is aticipated at the easter ed of the corridor. Halsey Street Coceptual Desig Project Fial Report 3

7 SPENCE CREEKSIDE Figure 1 BRIDGE Halsey Street Coceptual Desig Pla Lad Use City Hall School N 3RD 2ND MATNEY 226TH HANCOCK SCHUYLER Fairview Woods Wetlads Park MHCC Head Start FAIRVIEW WOOD VILLAGE Wood Village City Hall 238TH 240TH ELM Acadey of Alteratives Doald L Robertso City Par Railroad Waterway Taxlot NCOLN 227TH HALSEY BIRCH Lad Use Sigle-Faily Residetial Multi-Faily Residetial Coercial Idustrial Vacat / Uiproved Tract Far 242d Coector ROW Gree Space BARR 223RD Marily's Park ARATA VILLAGE 231ST WALNUT ASH MAPLE CEDAR TROUTDALE 84 WOOD VILLAGE TROUTDALE EDGEFIELD COLUMBIA RIVER Feet C olu b ia Riv er Troutdale River 84 Fairview Halsey Street Doald L. Robertso City Park 244TH HALSEY 242ND CONNECTOR ROW HALSEY EDGEFIELD MEADOWS 257TH Hele A Gresha Wood Village Troutdale Miles

8 SPENCE CREEKSIDE Figure 2 BRIDGE MFR1 Halsey Street Coceptual Desig Pla Coprehesive Pla Desigatios City Hall School Railroad Waterway N 3RD NCOLN 2ND MFR1 SFR3 MATNEY 226TH HANCOCK SCHUYLER 227TH MFR1 MHCC Head Start FAIRVIEW WOOD VILLAGE HALSEY LM CN Wood Village City Hall 238TH BIRCH IH SFR ELM240TH Acadey of Alteratives LM CN POS Taxlot Coprehesive Pla Classificatio Sigle-Faily Residetial (20,000sf lots ad greater) Sigle-Faily Residetial (8,500-12,000sf lots) Sigle-Faily Residetial (7,500sf lots) Sigle-Faily Residetial (6,500-8,500sf lots) Multi-Faily Residetial (2-25 du/ac) Mixed-Use Geeral Coercial Neighborhood Coercial Light Idustrial Light Maufacturig Heavy Idustrial Public Facilities Parks ad Ope Space BARR 223RD MFR1 CG ARATA VILLAGE MUC1 231ST MFR1 WALNUT ASH MAPLE CEDAR TROUTDALE 84 IH WOOD VILLAGE TROUTDALE IL EDGEFIELD COLUMBIA RIVER CG Feet C olu b ia Riv er Troutdale River 84 Fairview Halsey Street LM CN 244TH HALSEY MFR1 SFR4 MFR1 HALSEY EDGEFIELD MEADOWS 257TH Gresha Wood Village Troutdale Miles CG POS SFR4

9 Trasportatio Facilities ad Coditios Halsey Street is classified as a ior arterial by the Couty ad Cities of Fairview ad Wood Village. The City of Troutdale defers to couty stadards for the road. Mior arterials are defied i the Couty s Fuctioal Classificatio Syste as streets that typically carry less traffic volue tha pricipal ad ajor arterial streets, but have a high degree of coectivity betwee couities. Mior arterial streets provide ajor liks i the regioal road ad bikeway etworks; provide for freight obility ad trasit corridors; ad ay serve as sigificat liks i the local pedestria syste, especially where they are desiged as couity boulevards. For ior arterials, couty stadards call for two to four travel laes (two preferred), bicycle laes, sidewalks, platig strips (optioal but preferred) ad a edia/ceter tur lae. The couty stadards provide for a rage of diesios for the width of each eleet of the street ad are illustrated i Figure 3. Halsey Street is classified as a bicycle, pedestria ad trasit route throughout the study area. Street classificatio stadards call for bicycle laes ad sidewalks alog the roadway throughout the study area. Withi the study area, bicycle laes curretly exist alog virtually the etire legth of Halsey Street o both sides of the road. Betwee 223 rd ad 238 th Aveues, there are sidewalks o both sides of the street. East of 238 th Aveue, there are several short, discotiuous sectios of sidewalk. The TSPs ad other plas of the couty ad cities withi the study area call for a variety of iproveets related to Halsey Street, icludig the followig: Wide Halsey Street to a ior arterial street i all three jurisdictios Coplete a cotiuous syste of bicycle laes ad sidewalks o both sides of the street Ipleet traffic calig, iproved crossigs, sigage ad other pedestria iproveets withi the city of Fairview (Fairview Couity Visio), icludig ehaced itersectio/crossig iproveet at the itersectio of 223 rd Aveue/Halsey Street Create directioal sigage for busiesses i Fairview Redesig the itersectio of Halsey Street/HCRH I additio, the City of Wood Village has recoeded cosideratio of additioal pedestria crosswalks, speed display sigs ad traffic-calig facilities to reduce traffic speeds ad iprove pedestria displays. TriMet also has discussed ehacig or icreasig the visibility of trasit stops i the area. Halsey Street Coceptual Desig Project Fial Report 6

10 Figure 3. Mior Arterial Stadards, Multoah Couty Halsey Street Coceptual Desig Project Fial Report 7

11

12 PLANNING PROCESS I developig a coceptual desig for Halsey Street, the cosultig tea worked with couty staff ad ebers of the TAC to coduct the followig activities: Obtaied, apped ad suarized data o existig coditios i the project area, icludig: Parcel boudaries ad owership Coprehesive pla, zoig ad desig overlay desigatios Existig lad use Topography Eviroetal features, icludig existig apped wetlads or riparia areas Historic features, icludig historic districts, structures or trees idetified i couty or city ivetories Existig right-of-way Travel lae width Itersectio cofiguratios icludig crosswalks Locatio ad width of bike lae ad sidewalks Existig trasit facilities Driveways ad other property Described trasportatio ad lad use plaig issues associated with differet potetial desig eleets of the street, icludig use ad desig of sidewalks, bicycle laes, edias, ceter tur-laes, trasit facilities, ladscapig, gateway features ad other eleets. Idetified exaples of street desigs used i siilar areas elsewhere i the Portlad etropolita regio ad other couities i Orego. Prepared graphics illustratig desig eleets, typical desig exaples ad related issues. Coducted a public workshop o Jauary 12, 2005 i Fairview to discuss possible plas for the future desig of Halsey Street. Idetified prefereces ad priorities for specific desig eleets i the corridor overall ad i each idividual couity. Halsey Street Coceptual Desig Project Fial Report 9

13 Prepared a draft Cocept Pla based o the results of the public workshop ad guidace fro the TAC. Preseted the draft Cocept Pla at a secod public workshop o March 10, 2005 i Fairview. Participats provided coets ad suggested revisios to the Pla. Reviewed results of the workshop ad proposed chages to the draft Cocept Pla with ebers of the TAC; revised the Cocept Pla accordigly. Prepared this Fial Report. PROPOSED CONCEPT PLAN ELEMENTS Developet of the Cocept Pla was drive priarily by the overall project objectives ad results of public workshops. I reviewig ad recoedig possible desig eleets, public workshop participats recoeded the followig: Cosistecy throughout the corridor is iportat for the look ad feel of the street desig, but preservig the uique qualities of each couity eeds to be a cosideratio. Chages i desig aog couities ca be subtle, rather tha proouced. For exaple, differet lightig stadards ay be used to differetiate aog the couities. O-street parkig should be provided where beeficial, such as i coercial areas, but is ot ecessarily desirable or eeded i other areas because of perceived ipacts to pedestria safety, eighborhoods ad driver visibility. I geeral, a ope ceter tur-lae is preferred to allow for traffic access ad akig turs oto both sides of the street, particularly for eergecy vehicles. Pedestria islads are recoeded i specific locatios such as id-block crossigs ear locatios with sigificat pedestria oveet. Ladscapig is desired but i a aer that will ot icrease aiteace work or costs. Tree wells ad platers are preferred. Most participats did ot favor cotiuous platig strips. However, ebers of the cosultig tea ad TAC ote the followig drawbacks with wide sidewalks that do ot iclude platig strips: Higher costructio costs More ipervious surface Halsey Street Coceptual Desig Project Fial Report 10

14 A ore urba look ad feel that would be icosistet with the existig ad proposed character of the study area i predoiatly residetial sectios. For these reasos, a ladscapig buffer strip i areas plaed for future residetial ad idustrial use is recoeded to accoplish other goals of the project such as iproved aesthetics, ore effective storwater aageet, lower costructio costs, ad cosistecy with eighborhood character. A pedestria-friedly eviroet is desired, ad ca be addressed with aeities such as lightig, ladscapig ad sidewalks that are at least six feet wide. Wider sidewalks are recoeded i coercial areas ad/or to accoodate street trees i tree wells. Workshop participats would like ore roo for buses (both school ad public) to pull out of traffic to ake stops. However, TriMet akes liited use of bus pullouts. Their geeral practice is to use iflow loadig where the bus picks up passegers while stopped i the right-of-way. This iproves trasit speed ad reduces coflicts betwee cars ad buses as buses pull ito the travel lae. I respose to these recoedatios, the Cocept Pla icludes the followig eleets (see Figures 10, 13 ad 16): Bicycle laes are provided throughout the legth of the corridor, cosistet with City ad couty stadards ad public coets. Sidewalks are located alog the full legth of the corridor. Sidewalks will be ie feet wide, icludig a ladscapig/furishig zoe i areas zoed for coercial use ad a ladscapig strip i areas zoed for residetial or idustrial use (see Figures 5 ad 6). O-street parkig will be provided i areas zoed for coercial use. Ostreet parkig will be provided oly o the side of the street adjacet to lad zoed for such use. Two travel laes (oe i each directio) will be provided, with a width of feet (per couty stadards). Halsey Street Coceptual Desig Project Fial Report 11

15 Figure 5. Coercial Streetscape Figure 6. Residetial Streetscape Halsey Street Coceptual Desig Project Fial Report 12

16 A cotiuous ceter tur-lae will be provided alog ost of the corridor. The ceter lae will iclude raised pedestria islads located at strategic poits i the corridor ear sigificat pedestria geerators. Three locatios are idetified: Just west of the etrace to the Fairview Oaks developet Adjacet to Doald L. Robertso City Park Adjacet to Edgefield Maor Two future possible locatios also have bee idetified, assuig a icrease i developet desity ad pedestria traffic. These locatios could vary, depedig o future coditios ad idetified couity eeds. They iclude: Betwee the Fairview/Wood Village city liits ad 238 th Aveue Approxiately halfway betwee Edgefield Maor ad the Historic Colubia River Highway Oraetal street lights will be added per city ad couty stadards. Lightig stadards for Multoah Couty will be used i Fairview ad Troutdale. City of Wood Village lightig stadards will be used i that couity (see Figure 7). Trasit stops will cotiue to be located throughout the corridor. Additioal bus shelters will be costructed based o couity eeds, ridership ad passeger pickup levels. Existig bus pullouts will be retaied ad a additioal pullout ay be located ear 244 th Aveue. Couty Stadard Wood Village Stadard Figure 7. Lightig Stadards Halsey Street Coceptual Desig Project Fial Report 13

17 Couity-Specific Stadards ad Facilities As oted above, desig stadards for Halsey Street are expected to vary, depedig o the type of plaed lad use adjacet to each side of the road. Because lad uses vary throughout the corridor, the desig varies withi each city. Cross-sectios have bee prepared for specific locatios withi the project area to illustrate typical desig crosssectios. The desig is described for each jurisdictio below ad o the accopayig figures. Fairview Throughout Fairview, the road will iclude the followig: Two 12-foot travel laes Oe 12-foot ceter tur lae, with pedestria crossig islads located just west of the etrace to the Fairview Oaks developet Two six-foot bike laes Oraetal street lights per couty stadards (see Figure 7 o page 13) Additioal features iclude: O the orth side of the road betwee 223 rd Aveue ad 227 th Aveue, a cobied ie-foot sidewalk ad furishig area ad a 8-foot-wide parkig lae (see Figure 8) O the orth side of the road betwee 227 th Aveue ad Wood Village city liits, a cobied ie-foot sidewalk ad furishig area ad o o-street parkig (see Figure 9) O the south side of the road betwee 223 rd Aveue ad the future Wood Village Boulevard, a cobied ie-foot sidewalk ad furishig area ad a 8-foot-wide parkig lae (see Figures 8 ad 9) Halsey Street Coceptual Desig Project Fial Report 14

18 Figure 8. Fairview Street Desig Cross-Sectio 1 Figure 9. Fairview Street Desig Cross-Sectio 2 Halsey Street Coceptual Desig Project Fial Report 15

19 Figure 10. Halsey Street Coceptual Desig Pla: Fairview Village PO DE T Fairview ES BRIDGE Typical Coercial Streetscape Exaple IN FAIRVIEW WOOD VILLAGE MA AR N ISO 227TH To be utilized alog Halsey Street withi the Fairview ad Troutdale city liits at locatios to be deteried Existig Educatio Facility Existig Bus Stop ARATA Proposed bus shelters at strategic locatios throughout the study area; bus pull-outs at locatios specified Proposed Street Tree Actual tree locatios ad spacig to be deteried Existig Taxlot Typical Coercial / Residetial Street Pla Exaple i et Park O-Stre Pedestria Refuge (Secod Phase) 223RD (Provided by Multoah Couty) Pedestria Refuge (First Phase) Multoah Couty Lightig Pole ALSEY 17' High Fairview Street Sectio #1 Fairview Street Sectio #2 H kig No Par O-S rkig treet Pa Typical Coercial Street Pla Exaple Fairview Street Sectio #1 BARR 400 Feet O-S 6TH rkig treet Pa C kig No Par OLN Marily's Park MHCC Head Start 4TH 5TH LIN ig O-Stre 3RD SC Typical Residetial Streetscape Exaple et Park ER HUYL 231ST 2ND R HAR HANCOCK CREEKSIDE MATNEY FUTURE VILLAGE EXTENSION CED 226TH Fairview Woods Wetlads Park Typical Residetial Street Pla Exaple Fairview Street Sectio #

20 Wood Village Throughout Wood Village, the road will iclude the followig: Two 12-foot travel laes Oe 12-foot ceter tur-lae, with pedestria crossig islads i the followig locatios: Just west of the etrace to the Fairview Oaks developet Betwee the Fairview/Wood Village city liits ad 238 th Aveue (secod phase) Adjacet to Doald L. Robertso City Park Two six-foot bike laes Oraetal street lights per City of Wood Village stadards (see Figure 7 o page 13) Additioal features iclude: O the orth side of the road betwee the Fairview/Wood Village city liits ad 244 th Aveue, a cobied ie-foot sidewalk ad furishig area ad a 8-foot-wide parkig lae (see Figures 11 ad 12) O the south side of the road betwee the Fairview/Wood Village city liits ad approxiately 235 th Aveue, ad betwee Birch Street ad the Fairview/Troutdale city liits, a cobied ie-foot sidewalk ad ladscapig area ad o o-street parkig (see Figure 11) O the south side of the road betwee approxiately 235 th Aveue ad Birch Street, a cobied ie-foot sidewalk ad furishig area ad a 8-foot-wide parkig lae (see Figure 12) Halsey Street Coceptual Desig Project Fial Report 17

21 Figure 11. Wood Village Street Desig Cross-Sectio 1 Figure 12. Wood Village Street Desig Cross-Sectio 2 Halsey Street Coceptual Desig Project Fial Report 18

22 NNECTOR ROW 240TH 238TH BIRCH H AS WALNUT 231ST FUTURE VILLAGE EXTENSION 242ND CO 227TH ig Wood Village Street Sectio #2 MAP LE Typical Coercial / Residetial Street Pla Exaple Typical Residetial Street Pla Exaple Wood Village Street Sectio #2 Existig Educatio Facility Existig Bus Stop 14-16' High 400 Feet Proposed bus shelters at strategic locatios throughout the study area; bus pull-outs at locatios specified Typical Residetial Streetscape Exaple Proposed Street Tree Actual tree locatios ad spacig to be deteried Existig Taxlot Wood Village Lightig Pole (Provided by City of Wood Village) To be utilized alog Halsey Street withi the Wood Village city liits at locatios to be deteried Typical Coercial Streetscape Exaple Doald L. Robertso City Park Wood Village Street Sectio #1 Y HALSE No Park ig No Park ARATA Typical Coercial Street Pla Exaple 226TH ig No Park ELM Pedestria Refuge (First Phase) ig et Park O-Stre Pedestria Refuge (Secod Phase) g t Parki e O-Stre Bus Pull-Out g Parki -Street O ig w io #1 Fairview Street Sectio #2 Y HALSE No Park O- arkig Street P g i No Park MHCC Head Start kig ig O-Stre SC Wood Village Bus City Hall Pull-Out et Park ER HUYL Wood Village Street Sectio #1 HANCOCK Pedestria Refuge (First Phase) Fairview Woods Wetlads Park FAIRVIEW WOOD VILLAGE TH WOOD VILLAGE TROUTDALE Figure 13. Halsey Street Coceptual Desig Pla: Wood Village

23 Troutdale Throughout Troutdale, the road will iclude the followig: Two 12-foot travel laes Oe 12-foot ceter tur-lae, with pedestria crossig islads located at Edgefield Maor ad approxiately halfway betwee Edgefield Maor ad the Historic Colubia River Highway Two six-foot bike laes Oraetal street lights per Multoah Couty stadards (see Figure 7 o page 13) Additioal features iclude: O the orth side of the road betwee the Wood Village/Troutdale city liits ad Edgefield Meadows, a cobied ie-foot sidewalk ad ladscapig strip ad o o-street parkig (see Figure 14) O the orth side of the road betwee Edgefield Meadows ad the Historic Colubia River Highway, a cobied ie-foot sidewalk ad furishig area ad a 8-foot-wide parkig lae (see Figures 8 ad 16) O the south side of the road betwee the Wood Village/Troutdale city liits ad Edgefield Meadows, a cobied ie-foot sidewalk ad ladscapig area ad o o-street parkig (see Figure 14) O the south side of the road betwee Edgefield Meadows ad the Historic Colubia River Highway, a cobied ie-foot sidewalk ad furishig area ad o o-street parkig (see Figure 8 ad 16) Halsey Street Coceptual Desig Project Fial Report 20

24 Figure 14. Troutdale Street Desig Cross-Sectio 1 Figure 15. Troutdale Street Desig Cross-Sectio 2 Halsey Street Coceptual Desig Project Fial Report 21

25 WOOD VILLAGE TROUTDALE Figure 16. Halsey Street Coceptual Desig Pla: Troutdale LD O t ee tr -S g ki r Pa 7T H S 25 NNECTOR 242ND CO EDGEFIELD MEADOW HALSEY ED G 244TH EFIE g ki r Pa Troutdale Street Sectio #2 No Parkig No Parkig Pedestria Refuge (First Phase) N No Parkig No Parkig g o Parki Hele Althaus Park ROW Wood Village Street Sectio #2 Doald L. Robertso City Park Y HALSE ig No Park g O et tre S - No Parkig Parkig Pedestria Refuge (Secod Phase) Troutdale Street Sectio #1 Pedestria Refuge (First Phase) COLUMBIA RIVER TH Typical Coercial Street Pla Exaple Typical Coercial / Residetial Street Pla Exaple Typical Residetial Street Pla Exaple Troutdale Street Sectio #1 Troutdale Street Sectio #2 Existig Educatio Facility Existig Bus Stop Proposed bus shelters at strategic locatios throughout the study area; bus pull-outs at locatios specified Typical Residetial Streetscape Exaple 17' High 400 Feet Proposed Street Tree Actual tree locatios ad spacig to be deteried Existig Taxlot Multoah Couty Lightig Pole (Provided by Multoah Couty) To be utilized alog Halsey Street withi the Fairview ad Troutdale city liits at locatios to be deteried Typical Coercial Streetscape Exaple

26 Ipleetatio ad Cost The iproveets described i this report ad accopayig Cocept Pla will be ipleeted over tie as fudig becoes available. Fudig ay coe fro a variety of sources, icludig Regioal Trasportatio Pla project fuds, state or federal grats, cotributios fro developers or property owers ade as properties are redeveloped, ad city ad couty trasportatio budgets. Iproveets are likely to be ade as chages i lad use occur, as properties redevelop ad as sufficiet fuds are available to costruct iproveets i eaigful-sized areas of the corridor. A uber of factors will eed to be cosidered as iproveets are ade, icludig: Cosistecy with existig lad use. Desigs i this pla are orieted to plaed future lad uses, which i soe areas differ fro existig use. Durig public workshops, a uber of participats coeted that soe features proposed for coercial areas (e.g., o-street parkig) are ot appropriate for existig residetial areas. It is expected that o-street parkig would ot be added util areas are coverted to coercial use. Maiteace issues. Participats i public eetigs voiced cocers about the cost ad ability to aitai ladscapig ad other aeities idetified i the street desig. I preparig detailed desigs for the street, low-aiteace ladscapig techiques should be cosidered ad adjacet property owers should be cosulted or have the ability to odify ladscapig if they desire. Trasit facilities. The Cocept Pla idetifies existig bus stops ad shelters. Additioal shelters are expected to be costructed over tie, with locatios based o ridership ad passeger pickup data. The proposed street desig icludes adequate space for bus shelters. Plaig level cost estiates have bee prepared for the proposed iproveets to Halsey Street. It is assued that the existig roadway base ad surface are adequate to accoodate future eeds. Cost estiates have bee prepared for sidewalk, ladscapig, lightig, ad pedestria islad iproveets, as well as eeded stripig. Costs are suarized i Tables 1-4. It is expected that these cost estiates will be refied as part of future detailed plaig ad egieerig studies for specific idividual projects withi the study area. Cost estiate assuptios iclude: No roadway work (wideig, etc.) was icluded Spacig for the lightig poles was provided by couty staff Cost estiates for trees are $200/each; this is slightly higher tha estiates used by Frieds of Trees ad the City of Portlad (to be coservative) Uit prices are based o ODOT Regio 1 typical biddig pricig Halsey Street Coceptual Desig Project Fial Report 23

27 All estiates are rouded to the earest $500, except those uder $200 Table 1. Suary of Cost Estiates by Jurisdictio City ad Ite Uits Cost Total Cost Fairview Stripig Liear foot $0.07 $500 9' sidewalks Square foot $3.02 $70,000 6' sidewalks Square foot $3.02 $9,000 Trees Tree $ $4,500 Curb ad gutter Liear foot $8.95 $27,000 ADA rap Rap $ $3,000 Pedestria Crossig sigs Sig $18.58 $0 Street Lights Sig $4, $153,000 Sod Square yard $5.20 $1,000 Cocrete Islads Square foot $6.59 $0.00 Tree Grates Tree grate $85.20 $2,000 Fairview Total $270,000 Wood Village Wide paveet to 3 laes Liear foot Stripig Liear foot $0.07 $1,500 9' sidewalks Square foot $3.02 $92,500 6' sidewalks Square foot $3.02 $66,000 Trees Tree $ $11,000 Curb ad gutter Liear foot $8.95 $67,000 ADA rap Rap $ $8,500 Pedestria Crossig sigs Sig $18.58 $111 Street Lights Light $4, $373,500 Sod Square yard $5.20 $6,500 Cocrete Islads Square foot $6.59 $9,500 Tree Grates Tree grate $85.20 $5,000 Speed Sigs Sq ft-sig $19.72 $75 No parkig Sigs Sq ft-sig $14.70 $50 Street Base To $13.60 $38,000 Asphalt To $16.57 $21,000 Wood Village Total $700,236 Troutdale Wide paveet to 3 laes Liear foot Stripig Liear foot $0.07 $2,000 9' sidewalks Square foot $3.02 $42,500 6' sidewalks Square foot $3.02 $160,000 Trees Tree $ $14,000 Curb ad gutter Liear foot $8.95 $91,000 ADA rap Rap $ $4,000 Pedestria Crossig sigs Sig $18.58 $75 Street Lights Sig $4, $508,500 Sod Square yard $5.20 $15,500 Cocrete Islads Square foot $6.59 $6,500 Tree Grates Tree grate $85.20 $6,000 Halsey Street Coceptual Desig Project Fial Report 24

28 City ad Ite Uits Cost Total Cost Speed Sigs Sq ft-sig $19.72 $75 No parkig Sigs Sq ft-sig $14.70 $150 Street Base To $13.60 $106,500 Asphalt To $16.57 $59,000 Troutdale Total $1,015,800 Project Total $1,986,036 Table 2. Jurisdictio/Project Characteristics Project Site Total Legth (ft) Without Itersectios Fairview 1,567 1,510 Wood Village 4,067 3,740 Troutdale 5,200 5,083 Table 3. Cost Eleets by Jurisdictio Ite Fairview Wood Village Troutdale ADA raps Trees Refuges P-sigs Lights Sod (sq.yrd) 167 1,211 2,944 NP sigs 3 10 Speed Sigs 4 4 Wideig (sq ft) 38, ,160 Table 4. Sidewalk Characteristics Couity/Desig Total Legth (ft) Square Footage Square Footage Platig 9' Sidewalks & Tree Wells Fairview 2, ,103 Wood Village 3,400 30,600 Troutdale 1, ,103 6' Sidewalks & 3' Platig Strips Fairview 500 3,000 1,500 Wood Village 3,633 21,798 10,899 Troutdale 8,833 52,998 26,499 Halsey Street Coceptual Desig Project Fial Report 25

29 APPENDIX A. PUBLIC WORKSHOP SUMMARIES The Halsey Street Cocept Pla was iflueced sigificatly by the results of two public workshops held with property owers ad citizes i the study area. Results of those workshops are briefly suarized o pages 10 ad 11 of this report ad described i detail i the followig pages. Halsey Street Coceptual Desig Project Fial Report Appedix A A1

30 PUBLIC WORKSHOP #1 JANUARY 12, :30 PM FAIRVIEW COMMUNITY CENTER 300 HARRISON STREET SUMMARY Multoah Couty, with the cosultig tea of Coga Owes Coga, Falcoi Cosultig ad SERA Architects, coducted a public workshop o Jauary 12 i Fairview to discuss possible plas for the future desig of the portio of Halsey Street that goes through the couities of Fairview, Troutdale ad Wood Village betwee 223rd Aveue ad the Historic Colubia River Highway. Nearly 25 residets atteded ad the three couities were fairly evely represeted. Couty ad cosultat tea represetatives provided a overview of the project, icludig its history, goals ad expected outcoes. They the worked with participats i sall groups to idetify desired street desig eleets ad priorities for the etire study area, as well as for specific couities. Groups were orgaized by couity for Fairview, Troutdale or Wood Village. The suggestios that participats ost agreed upo are listed below. Etire Corridor Participats geerally agreed o the followig: Cosistecy throughout the corridor is iportat for the look ad feel of the street desig, but preservig the uique qualities of each couity eeds to be a cosideratio. Chages i desig aog couities ca be subtle, rather tha proouced. O-street parkig is fie where beeficial, such as i coercial areas, but is ot ecessarily desirable or eeded i other areas because of perceived ipacts to pedestria safety, eighborhoods ad driver visibility. Slightly ore participats favored a ope iddle tur lae to allow for traffic access to both sides of the street, particularly eergecy vehicles, to ake turs. Those that prefer a edia do so for safety reasos ad recoed pedestria islads i specific locatios such as id-block crossigs ear locatios with sigificat pedestria oveet. Halsey Street Coceptual Desig Project Fial Report Appedix A A2

31 Ladscapig is desired but i a aer that will ot icrease aiteace work or costs. Tree wells ad platers were suggested. Most participats did ot favor cotiuous platig strips. A pedestria-friedly eviroet is desired, ad ca be addressed with aeities such as lightig, ladscapig ad sidewalks that are at least six feet wide. Wider sidewalks are recoeded i coercial areas ad/or to accoodate street trees i tree wells. Participats would like ore roo for buses (both school ad public) to pull out of traffic to ake stops. Resposes to recoedatios: While soe participats expressed cocers about safety associated with o-street parkig pedestria, o-street parkig ca iprove safety for people walkig by bufferig the fro traffic. Sidewalks ay eed to be wider throughout the corridor to accoodate tree wells if o cotiuous platig strips are desired. Typically, the Couty eters ito a agreeet with the appropriate city for aitaiig a give sectio of a street like Halsey. The city the has the resposibility for aitaiig it or copesatig the couty for doig so. Requireets for property ower aiteace will be clarified with idividual cities. While participats oted cocers about the cost of aitaiig ladscapig strips, alog Halsey ad recoeded a wide sidewalk that icorporates trees i tree wells, there are several drawbacks to this approach, icludig: Higher costructio costs More ipervious surface A ore urba look ad feel that would be icosistet with the existig ad possibly proposed character of the study area i predoiatly residetial sectios. For these reasos, we propose a ladscapig buffer strip i residetial areas to accoplish other goals of the project such as iproved aesthetics, ore effective storwater aageet, lower costructio costs, ad cosistecy with eighborhood character. We ca work with the couty ad city to idetify platigs that would have lower aiteace costs. Fairview For the itersectio of Halsey ad 223 rd, participats recoed the followig: Wider sidewalks Reduce ladscapig ear itersectio (about 100 ) Tur laes to aitai capacity, with a right-had tur fro 223 rd, south to Halsey, west A safer bus stop Ladscapig features -- plater boxes ad seasoal decoratios. Halsey Street Coceptual Desig Project Fial Report Appedix A A3

32 Pedestria crosswalks are eeded. If pedestria islads are used, icorporate soe ladscapig for safety, but high visibility reflectors, cotrastig paveets. Maitai the optio to add additioal laes without ovig sidewalks. Resposes to recoedatios: Maitaiig the optio to add ore laes is ot ecessarily cosistet with the overall objective of creatig a three-lae road. A separate traffic aalysis at the itersectio of 223 rd is recoeded to deterie the eed for tur laes recoeded above. Troutdale Build ore sidewalks ow i aticipatio of future growth. Create arked crosswalks or lighted itersectios to accoodate areas that are already pedestria ad bicycle-friedly, such as Edgefield. Tree wells are the preferred ethod of ladscapig. Use atural ladscapig to reflect the atural eviroet. Make sure the desig icorporates the ew sceic byway desigatio of Halsey betwee Troutdale ad 238 th. Cosider o-street parkig oly if the beefits will outweigh the costs. For exaple, it ay be beeficial i coercial areas but ot i other areas, particularly where topography is a challege. More participats i this group favored a tur lae over a edia i the iddle lae of Halsey to provide access, especially i aticipatio of ore developet. Resposes to recoedatios: Pedestria islads also are recoeded at selected locatios. This would iprove pedestria safety ad copleet the City s Mai Street desig. Wood Village Reduce cogestio at the itersectio of Halsey ad 223 rd. Iclude bicycle laes. Beautificatio ad cotiuity are iportat. Exercise coo sese i desigig iproveets. Cosider o-street parkig where ecessary for retail but ot i areas with oly residetial. Most favor a turig lae for the followig reasos: To provide access to trucks at 244 th To provide a breakdow lae for trucks Halsey Street Coceptual Desig Project Fial Report Appedix A A4

33 Soe other participats favor a edia or pedestria islads for the followig reasos: To address access aageet coflicts To possibly icrease property value To iprove pedestria safety ad obility Cosider roudabouts, particularly at 244 th ad the extesio of Wood Village Boulevard. (recoeded by oe group eber) Resposes to recoedatios: Istallatio of a roudabout at 244 th is ot recoeded by the cosultig tea due to cocers about potetial ipacts o traffic capacity, right-of-way ad truck oveet. However, a roudabout or soe other gateway feature at oe or ore other key itersectios i Wood Village could help establish a couity idetity for Wood Village. More traffic aalysis (through a separate project) would be eeded to deterie the feasibility of this. May participats coets seeed to be orieted ore towards existig coditios, rather tha future plas, icludig deser ad ore coercial developet i certai portios of Wood Village. Halsey Street Coceptual Desig Project Fial Report Appedix A A5

34 PUBLIC WORKSHOP #2 MARCH 10, :30 PM FAIRVIEW COMMUNITY CENTER 300 HARRISON STREET SUMMARY Multoah Couty, with the cosultig tea of Coga Owes Coga, Falcoi Cosultig ad SERA Architects, coducted the secod of two public workshops o March 10 i Fairview to discuss the future desig of the portio of Halsey Street that goes through the couities of Fairview, Troutdale ad Wood Village betwee 223rd Aveue ad the Historic Colubia River Highway. This purpose of this workshop was to preset a possible desig that icorporated public coets received at the first workshop o Jauary 12. Sixtee residets atteded ad all three couities were represeted. Couty ad cosultat tea represetatives provided a overview of the project, icludig its history, goals ad expected outcoes. They the preseted a possible desig for Halsey Street ad explaied how public coets were icorporated ito that desig. The followig desig aspects were icluded based o the public coets fro the first workshop: No edia, but a cotiuous ad ope left tur lae. Cotiuity i desig throughout the corridor. O street parkig i coercial areas. Pedestria islads i specific locatios, such as id-block crossigs ear locatios with sigificat pedestria oveet. Street trees. Wide sidewalks, lightig ad ladscapig. Tie for questios ad further coets was provided followig the presetatio. Participat coets are listed below. Soe participats were cocered that allowig o street parkig o Halsey Street i the residetial area betwee 222 d ad 224 th would attract crie. The couty ad cosultat tea explaied that the area, which is curretly residetial, is zoed for future coercial use ad that it is ulikely that parkig would be allowed util coercial uses were i place. Participats restated soe cocers about the cost ad aiteace of ladscapig strips. These setiets were cosistet with coets provided at the first public Halsey Street Coceptual Desig Project Fial Report Appedix A A6

35 workshop. However, the cosultig tea recoeded the platig strip i residetial areas to give the a ore residetial feel, iprove appearaces, reduce costructio costs ad assist with filterig ad aagig storwater. Platig strips would ot be used i coercial areas. There was agreeet that if property owers have to aitai vegetatio i the platig strip, the they should be able to choose ad/or chage what type of vegetatio is plated. Ideas for platigs icluded shrubs istead of trees to iprove visibility ad plats that do t eed uch water to save aiteace costs for property owers. Most participats who coeted were supported the idea of icorporatig a slightly eaderig sidewalk. This idea received the strogest support i the portio of Halsey frotig Edgefield. Two features o the Draft Cocept Pla ap eed to be relocated, icludig oe bus stop ad the Acadey of the Alteratives, which recetly oved. Resposes to coets: Cocers about locatig o-street parkig i residetial areas where residets have cocers ca be addressed i ipleetig laguage for the Pla. Resposes to cocers about aiteace of ladscapig areas are described above. After coets fro this workshop are icorporated, a fial desig will be preseted to the Fairview, Troutdale ad Wood Village City Coucils, as well as to the Multoah Board of Couty Coissioers for approval ad adoptio. Halsey Street Coceptual Desig Project Fial Report Appedix A A7

7.0 Nonmotorized Facilities

7.0 Nonmotorized Facilities 7.0 Nomotorized Facilities 7.1 Sectio Overview This sectio describes the existig coditios ad ay idetified future impacts with the project o omotorized facilities withi the study area. Data were collected

More information

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal.

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal. CR166916b02 20 Jue 2017 Melida Dodso Melida Dodso Architects PO Box 5635 Hughes ACT 2605 Email: mdodso@melidadodsoarchitects.com.au Dear Melida, Project: Dickso Apartmets Lowrie St Re: Statemet o Parkig

More information

2) What s the Purpose of Your Project?

2) What s the Purpose of Your Project? Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs Overview: Tools ad Strategies to Predict ad Documet Bicyclig ad Walkig Rates 1) Why Documet the Need for

More information

THE LATENT DEMAND METHOD

THE LATENT DEMAND METHOD THE LATENT DEMAND METHOD Bruce W. Ladis, Russell M. Otteberg, Vekat R. Vattikuti SCI, Ic., 18115 U.S. Highway 41North, Suite 600, Lutz, FL 33549, USA Email: bladis@sciworld.et Travel patters i a metropolita

More information

Town of Mooresville, North Carolina Comprehensive Transportation Plan Amendments Addendum Report

Town of Mooresville, North Carolina Comprehensive Transportation Plan Amendments Addendum Report Tow of, North Carolia Comprehesive Trasportatio Pla Amedmets Addedum Report Adopted April 4, 2013 Tow of Developmet Services Departmet Tow of CTP Amedmets Adopted April 4, 2013 Executive Summary The curret

More information

Overview. Creating Walkable, Bikeable Communities Developing Effective Active Transportation Projects and Programs. Add photo or photos

Overview. Creating Walkable, Bikeable Communities Developing Effective Active Transportation Projects and Programs. Add photo or photos Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs Add photo or photos Sposored by Caltras ad [local sposors] Overview Effective itervetios that ca improve

More information

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION)

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION) RAMOA FOOTHILL MEIECKE MILL 1" = 350' TRAFFIC DIVERTER MEIECKE BETO MURRAY SATA ROSA SERRAO MISSIO CETER WEST VEABLE MISSIO MISSIO ALMOD MOUTAI VIEW CETER LICOL CETER LICOL COCEPT ALTERATIVE 1 ( O WITH

More information

Active Travel The Role of Self-Selection in Explaining the Effect of Built Environment on Active Travel

Active Travel The Role of Self-Selection in Explaining the Effect of Built Environment on Active Travel Active Livig Research Buildig Evidece to Prevet Childhood Obesity ad Support Active Commuities RESE ARCH brief Fall 2009 activelivigresearch.org Active Travel The Role of Self-Selectio i Explaiig the Effect

More information

19th Avenue Park Presidio Neighborhood Transportation Plan

19th Avenue Park Presidio Neighborhood Transportation Plan SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 9th Aveue Park Presidio Neighborhood Trasportatio Pla DRAFT FINAL REPORT Holloway Aveue with Ehacemets trasportatio cosultig Holloway Aveue Thumbail BUS STOP

More information

City of El Cerrito. Active Transportation Plan

City of El Cerrito. Active Transportation Plan City of El Cerrito Active Trasportatio Pla DRAFT August 2015 Ackowledgemets This pla has bee prepared by the City of El Cerrito with fuds from the Metropolita Trasportatio Commissio (MTC) Trasportatio

More information

n Mix of public, private and NGO respondents Overview n Understanding Walking & Biking Trips n Informing Project Development through:

n Mix of public, private and NGO respondents Overview n Understanding Walking & Biking Trips n Informing Project Development through: Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs ATP Needs & Challeges Survey Mix of public, private ad NGO respodets 96% from orgaizatios/agecies servig

More information

Schaumburg Bikeways Plan - Updated February 2012

Schaumburg Bikeways Plan - Updated February 2012 Schaumburg Bikeways Pla - Updated February 2012 schaumburg bikeways etwork toolkit «Bike lae Establishes space o road exclusively for bicycle travel. Bicycle laes are striped ad marked with a bicycle symbol

More information

9 Placerville Airport and Environs

9 Placerville Airport and Environs Chapter 9 Placerville Airport ad Eviros BACKGROUND DATA EL DORADO COUNTY Airport Lad Use Compatibility Pla 9 Backgroud Data: Placerville Airport ad Eviros INTRODUCTION Placerville Airport is a public-use

More information

MARION STREET MULTIFAMILY

MARION STREET MULTIFAMILY MARIO STREET MULTI-FAMILY BUILDIG, BLOCK 49, EVASTO BROADWAY ADDITIO. SITUATED THE SOUTHWEST QUARTER, SECTIO 35, TOWSHIP 4 SOUTH, RAGE 68 WEST OF THE SIXTH PRICIPAL MERIDIA, CITY OF EGLEWOOD, COUTY OF

More information

SPH4U Transmission of Waves in One and Two Dimensions LoRusso

SPH4U Transmission of Waves in One and Two Dimensions LoRusso Waves travelig travellig from oe medium to aother will exhibit differet characteristics withi each medium. Rules A wave of fixed frequecy will have a shorter wavelegth whe passig from a fast medium to

More information

TRANSIT. WATS Transit Routes. Regular Fixed Route Service

TRANSIT. WATS Transit Routes. Regular Fixed Route Service TRANSIT The Wausau Area Trasit System (WATS) provides public trasportatio services i the Wausau area. WATS is the oly itra-city trasit service available to the geeral public withi the MPA. WATS is owed

More information

CITY OF PASADENA PEDESTRIAN SAFETY STUDY AT SIGNALIZED INTERSECTIONS

CITY OF PASADENA PEDESTRIAN SAFETY STUDY AT SIGNALIZED INTERSECTIONS CITY OF PASADENA PEDESTRIAN SAFETY STUDY AT SIGNALIZED INTERSECTIONS Prepared for: City of Pasadea Submitted by: FEHR & PEERS 201 Sata Moica Blvd., Suite 500 Sata Moica, Califoria 90401 (310) 458-9916

More information

WATER VALVES REPLACEMENT PROJECT

WATER VALVES REPLACEMENT PROJECT WATER VALVES REPLACEMET PROJECT BROWSVILLE, TEXAS BID o B026-17 PUBLIC B R O W S V I L L E UTILITIES B OARD Brownsville - Board of Directors RAFAEL VELA...CHAIR RAFAEL S. CHACO...VICE-CHAIR MARTI C. ARAMBULA...SECRETARY/TREASURER

More information

2013 Watauga County Comprehensive Transportation Plan

2013 Watauga County Comprehensive Transportation Plan 2013 Watauga Couty Comprehesive Trasportatio Pla Table of Cotets Executive Summary... i I. Aalysis of the Existig ad Future Trasportatio System...I-1 Aalysis Methodology ad Data Requiremets...I-1 Roadway

More information

Comprehensive Transportation Plan. Vance County

Comprehensive Transportation Plan. Vance County Comprehesive Trasportatio Pla Vace Couty November 2012 Comprehesive Trasportatio Pla for Vace Couty Prepared by: I Cooperatio with: Laure Nicholls, Project Egieer Scott Walsto, Triagle Plaig Group Supervisor

More information

VIEW FROM ZILKER PARK TWO EXPRESS LANES IN EACH DIRECTION + A DOWNTOWN DIRECT CONNECTION

VIEW FROM ZILKER PARK TWO EXPRESS LANES IN EACH DIRECTION + A DOWNTOWN DIRECT CONNECTION VIEW FROM ZILKER PARK TWO EXPRESS LAES I EACH DIRECTIO + A DOWTOW DIRECT COECTIO DOWTOW ACCESS GEERAL PURPOSE & EXPRESS LAES A & ROY BUTLER HIKE & BIKE TRAIL (LADY BIRD LAKE TRAIL) LAKE AUSTI BOULEVARD

More information

4 Alternatives. Alternatives Packaging Alternatives were packaged into four general categories, which are presented in detail in this chapter:

4 Alternatives. Alternatives Packaging Alternatives were packaged into four general categories, which are presented in detail in this chapter: 4 Alteratives The aalysis of existig ad future trasportatio coditios i the study area idetified areas of the trasportatio etwork that require improvemets, either ifrastructure or system maagemet improvemets.

More information

Transit Development Plan December 2011

Transit Development Plan December 2011 Trasit Developmet Pla December 2011 Table of Cotets Chapter Oe - Ivetory Itroductio... 1-1 Data Sources... 1-1 Settig the Stage... 1-2 Service Area... 1-3 Fixed Route Service Routes... 1-4 Overall Ridership

More information

25k June 2014

25k June 2014 o c. e g e l l a h c o i u d a r g. w ww 25k 28-29 Jue 214 k k 5 1 28-29 Jue 214 Walk it, Jog it, or Ru it - a NEW edurace challege alog a historic route. It s 1 k, 5 k, or 25 k o the Grad Uio Caal towpath,

More information

Trails and Greenways Master Plan Update

Trails and Greenways Master Plan Update s ad Greeways Master Pla Update Prepared by City of Rock Hill Plaig Services ad Parks, Recreatio, & Tourism Departmets with assistace from the Catawba Regioal Coucil of Govermets Pla Adopted: Jue 16, 2003

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Acknowledgments Shasta County BTP ii

Acknowledgments Shasta County BTP ii Ackowledgmets Shasta Couty Board of Supervisors Les Baugh (District 5) Lida Hartma (District 4) Gle Hawes (District 3) Leoard Moty (District 2) David A. Kehoe (District 1) Shasta Couty Staff Da Little,

More information

CITY OF DOWNEY BICYCLE MASTER PLAN

CITY OF DOWNEY BICYCLE MASTER PLAN CITY OF DOWNEY BICYCLE MASTER PLAN AUGUST 2014 PREPARED BY FEHR & PEERS City of Dowey Bicycle Master Pla 2 August 2014 DRAFT CONTENTS 1. Itroductio... 6 Bicycle Master Pla Overview: Goals ad Objectives...6

More information

PROPOSALS BUS RAPID TRANSIT SPRINT - A34 WALSALL TO BIRMINGHAM STOP BUS BUS STOP PROJECT KEY NO ENTRY

PROPOSALS BUS RAPID TRANSIT SPRINT - A34 WALSALL TO BIRMINGHAM STOP BUS BUS STOP PROJECT KEY NO ENTRY ISO A1 594mm x 841mm A34-01 WALSALL COUCIL RAPID TRASIT SPRIT - A34 BIRMIGHAM EXISTIG S I DARWALL STREET AD TOWER STREET MAY EED TO BE RELOCATED ACCOMMODATE SPRIT MOVEMET WALSALL STATIO MII ROUDABOUT TO

More information

May 20, 2014 LINCOLN CORRIDOR DESIGN SEGMENTS

May 20, 2014 LINCOLN CORRIDOR DESIGN SEGMENTS LICOL CORRIDOR DESIG SEGMETS LICOL CORRIDOR LA Lincoln Corridor West lan Enhancements to Willow Street art of Future roject Buckingham ark Interim Median End to Accommodate Truck Turning Movements into

More information

2014 Avery County Comprehensive Transportation Plan

2014 Avery County Comprehensive Transportation Plan 2014 Avery Couty Comprehesive Trasportatio Pla This page itetioally left blak. This page itetioally left blak. Table of Cotets Executive Summary...i Chapter 1: Aalysis of the Existig ad Future Trasportatio

More information

Held under the sanction of USA Swimming, issued by North Carolina Swimming, Inc. Sanction No. NC11117

Held under the sanction of USA Swimming, issued by North Carolina Swimming, Inc. Sanction No. NC11117 The Greesboro Swimmig Associatio's 2011 Joh Gordo Dewey Ivitatioal Swim Meet November 19-20, 2011 The Greesboro Aquatic Ceter 1921 West Lee Street, Greesboro, NC 27403 SANCTION: HOST: FACILITY: Held uder

More information

» WYOMING s RIDE 2013

» WYOMING s RIDE 2013 » WYOMING s RIDE 2013 WYOMING S RIDE 2013 preseted by First Iterstate Bak of Wyomig bikemswyomig.org 1 We are people who wat to do somethig about ow.» Our Wyomig Bike MS Ride Two-Day Wyomig Ride: To view

More information

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED.

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED. SLIDE COMPOETS: ATURE'S ISTRUMETS I-PG-1002-01 TRIPLE RAIL HILL SLIDE. I PACKAGE ICLUDES:- HT. SLIDE FRAME: x 1 WITH PRE-ATTACHED SLIDE AD COLLAR WIG WALL POST: x 2 PRE-ASSEMBLED WIG WALL RAILIGS: x 2

More information

draft final report NGSIM Arterial-Lane Selection Mode Federal Highway Administration Cambridge Systematics, Inc.

draft final report NGSIM Arterial-Lane Selection Mode Federal Highway Administration Cambridge Systematics, Inc. NGSIM Arterial-Lae Selectio Mode draft fial report prepared for Federal Highway Admiistratio prepared by Cambridge Systematics, Ic. with Itelliget Trasportatio Systems Laboratory Massachusetts Istitute

More information

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED.

STRUCTURAL FILL, SONOTUBES, CONCRETE, GRAVEL, CLEAR SILICONE, ENGINEERED WOOD FIBRE (E.W.F.), GEO-TEXTILE, SOIL, PLANTS & MULCH ARE NOT SUPPLIED. SLIDE COMPOETS: DUROLAW MAT WITH STAKES & ZIPTIES: x 4 PRE-MITRED LOG BORDER: x 14.6 lin.m [48 lin.ft] 254mm [10"] S.D.W.S. FASTEER: x 5 DRILL BIT FOR FASTEERS: x 1 STRUCTURAL FILL, SOOTUBES, COCRETE,

More information

.grandunionchallenge.com www 100km, 50km or 25km! June 2015

.grandunionchallenge.com www 100km, 50km or 25km! June 2015 o c. e g lle a h c io u d a r www.g! k 5 2 r o k 0 5, 100k 27-28 Jue 2015 27-28 Jue 2015 Walk it, Jog it, or Ru it - a edurace challege alog a historic route. It s 100k, 50k, or 25k o the Grad Uio Caal

More information

ELIGIBILITY / LEVELS / VENUES

ELIGIBILITY / LEVELS / VENUES ELIGIBILITY / LEVELS / VENUES 10U - SQUIRT MINOR '08 & MAJOR '07 Eligibility: Top six teams i the league at each level will qualify based o regular seaso league play. Format: Divisioal crossover with semi-fial

More information

PHASE II W. SAN CARLOS AVENUE - N. OF EXISTING PHASE III W. SAN CARLOS AVENUE SAN MARCO AVENUE MAY STREET

PHASE II W. SAN CARLOS AVENUE - N. OF EXISTING PHASE III W. SAN CARLOS AVENUE SAN MARCO AVENUE MAY STREET TRAFFIC COTROL GEERAL OTES ======================== TRAFFIC COTROL PHASIG OTES (COT'D.) ============================== 1. WORK ZOE TRAFFIC COTROL WILL BE I ACCORDACE WITH THE MAUAL O UIFORM TRAFFIC COTROL

More information

ELIGIBILITY / LEVELS / VENUES

ELIGIBILITY / LEVELS / VENUES ELIGIBILITY / LEVELS / VENUES 10U - SQUIRT MINOR '08 & MAJOR '07 Eligibility: Top six teams i the league at each level will qualify based o regular seaso league play. Format: Divisioal crossover with semi-fial

More information

MINNESOTA DEER MANAGEMENT

MINNESOTA DEER MANAGEMENT MINNESOTA DEER MANAGEMENT A study of huter opiios about deer populatios ad maagemet: Blocks H H5 Fial Report A cooperative study coducted by: Miesota Cooperative Fish ad Wildlife Research Uit Miesota Departmet

More information

Downtown Connector Trail

Downtown Connector Trail December 27, 2010 Updated January 10, 2012 1 ew Broadway / 9th Street Downtown Connection I-77 East 34th RTA Station I-490 Job Ready Development Parcel Morgana Run Steel Warehouse Washington Reservation

More information

ELIGIBILITY / LEVELS / VENUES

ELIGIBILITY / LEVELS / VENUES ELIGIBILITY / LEVELS / VENUES 10U - SQUIRT MINOR '09 & MAJOR '08 Eligibility: Top six teams i the league at each level will qualify based o regular seaso league play. Format: Divisioal crossover with semi-fial

More information

ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE

ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE ASSESSMENT SCORING SYSTEM OF ROAD SAFETY INFRASTRUCTURE Case Study of Mihag District i Shaghai, Chia Yue Wag, Daocheg Su 2 School of Traffic ad Trasportatio Egieerig, Togi Uiversity, Shaghai, Chia ABSTRACT

More information

Riverton Active Transportation Plan FINAL PLAN NOVEMBER 2016

Riverton Active Transportation Plan FINAL PLAN NOVEMBER 2016 Riverto Active Trasportatio Pla FINAL PLAN NOVEMBER 2016 TITLE STEERING COMMITTEE & CONSULTANT TEAM: PROJECT RIVERTON CITY Be Dayley, Parks ad Recreatio Jared Bowlig, Public Works Bria Moore, Public Works

More information

Welcome to the world of the Rube Goldberg!

Welcome to the world of the Rube Goldberg! Welcome to the world of the Rube Goldberg! Sice 1988, tes of thousads of studets have competed i our aual Rube Goldberg Machie Cotests where they are challeged to build the wackiest workig Rube Goldberg

More information

ELIGIBILITY / LEVELS / VENUES

ELIGIBILITY / LEVELS / VENUES ELIGIBILITY / LEVELS / VENUES 10U - SQUIRT MINOR '09 & MAJOR '08 Eligibility: Top six teams i the league at each level will qualify based o regular seaso league play. Format: Divisioal crossover with semi-fial

More information

NORTH DOWNTOWN N EAST WEST

NORTH DOWNTOWN N EAST WEST ORTH DOWTOW CHURCH STREET ALTERATE o. 1 BIKE LAES, O-STREET PARKIG, SIDEWALK AD MULTI-USE PATH This alternate incorporates a 5-foot sidewalk along the eastern side of Church Street, a 10-foot Multi-Use

More information

8.5. Solving Equations II. Goal Solve equations by balancing.

8.5. Solving Equations II. Goal Solve equations by balancing. 8.5 Solvig Equatios II Goal Solve equatios by balacig. STUDENT BOOK PAGES 268 271 Direct Istructio Prerequisite Skills/Cocepts Solve a equatio by ispectio or systematic trial. Perform operatios usig itegers,

More information

GENETICS 101 GLOSSARY

GENETICS 101 GLOSSARY GENETICS 101 This documet is iteded to provide a basic uderstadig of caie geetics to the America Eskimo Dog (AED) ower ad breeder. It is simplified from scietific facts ad uderstadig. It is ot iteded to

More information

Andover YMCA Swim Lessons Schedule

Andover YMCA Swim Lessons Schedule Adover YMCA Swim Lessos Schedule 2018 Early Fall September 10 - October 28 (763) 230-9622 www.adoverymca.org ABOUT Y SWIM LESSONS The Y strives to help all ages lear how to swim, so they ca stay safe aroud

More information

Travel Demand Management Implementation in Bandar Lampung

Travel Demand Management Implementation in Bandar Lampung Travel Demad Maagemet Implemetatio i Badar Lampug Rahayu Sulistyorii 1, a, 1 Lampug Uiversity Istitute Techology of Sumatera a Keywords: Traffic

More information

West St Paul YMCA Swim Lessons Schedule

West St Paul YMCA Swim Lessons Schedule West St Paul YMCA Swim Lessos Schedule 2018 Early Fall September 10 - October 28 (651) 457-0048 www.weststpaulymca.org ABOUT Y SWIM LESSONS The Y strives to help all ages lear how to swim, so they ca stay

More information

Headfirst Entry - Diving and Sliding

Headfirst Entry - Diving and Sliding 5/31/2011 Safe divig board use, safe slide use, usi Headfirst Etry - Divig ad Slidig POOLALARMS.COM HOME POOL SAFETY PRODUCTS POOL SAFETY ARTICLES & REPORTS POOL SAFETY LINKS & RESOURCES POOLALARMS.COM

More information

Policy sensitivity analysis of Karachi commuters

Policy sensitivity analysis of Karachi commuters Policy sesitivity aalysis of Karachi commuters A. Q. Memo 1 & K. Sao 2 1 Departmet of Civil Egieerig, NED Uiversity of Egieerig ad Techology, Karachi, Pakista 2 Departmet of Civil ad Evirometal Egieerig,

More information

Footwork is the foundation for a skilled basketball player, involving moves

Footwork is the foundation for a skilled basketball player, involving moves The Complete Book of Offesive Basketball Drills Basic Footwork ad Cuts Drills 2 Equipmet 16 chairs (or less) Persoel The etire team Basic Footwork ad Cuts Drills Two coaches How to Ru the Drill Five feet

More information

WIREMOLD. Innovative Aluminum Raceway Profile Provides Increased Wiring Capacity Available Factory Prewired. Aluminum Raceway Systems

WIREMOLD. Innovative Aluminum Raceway Profile Provides Increased Wiring Capacity Available Factory Prewired. Aluminum Raceway Systems WIREMOLD Alumium Raceway Systems Iovative Alumium Raceway Profile Provides Icreased Wirig Capacity Available Factory Prewired Itroducig the ext geeratio i iovative surface raceway systems. ALDS4000 Series

More information

550 PHARR ROAD ATLANTA, GEORGIA SHEET NO Birch Street Newport Beach, CA Tel: Fax:

550 PHARR ROAD ATLANTA, GEORGIA SHEET NO Birch Street Newport Beach, CA Tel: Fax: /EGIEER SEAL LYO REALTY ADVISORS, IC DEVELOPMET KEY PLA O. DATE ISSUED FOR BY 550 PHARR ROAD ATLATA, GEORGIA SHEET O. MAPLE RD E /EGIEER SEAL IFORMATIO DATA SHEET IDEX AP: 1700610010101 SITE AREA: 1.13

More information

MEETING PURPOSE WHAT WILL WE DO TODAY? WHAT WILL WE LEARN TODAY? GATHER INPUT ABOUT THE TYPE OF IMPROVEMENTS YOU WOULD LIKE TO SEE

MEETING PURPOSE WHAT WILL WE DO TODAY? WHAT WILL WE LEARN TODAY? GATHER INPUT ABOUT THE TYPE OF IMPROVEMENTS YOU WOULD LIKE TO SEE MEETIG PURPOSE PLAED IMPROVEMETS FOR SYRACUSE STREET We value your feedback. We are reaching out to you this evening to learn more about the project and provide feedback on the upcoming planned improvements.

More information

A SECOND SOLUTION FOR THE RHIND PAPYRUS UNIT FRACTION DECOMPOSITIONS

A SECOND SOLUTION FOR THE RHIND PAPYRUS UNIT FRACTION DECOMPOSITIONS Fudametal Joural of Mathematics ad Mathematical Scieces Vol., Issue, 0, Pages -55 This paper is available olie at http://www.frdit.com/ Published olie November 9, 0 A SECOND SOLUTION FOR THE RHIND PAPYRUS

More information

(612)

(612) Shoreview YMCA Swim Lessos Schedule Late Sprig 2019 - April 15 - Jue 2 (612) 230-9622 www.shoreviewymca.org ABOUT Y SWIM LESSONS The Y strives to help all ages lear how to swim, so they ca stay safe aroud

More information

Wondering where to start?

Wondering where to start? Ridgedale YMCA Swim Lessos Schedule 2019 Witer Jauary 1 - February 24 (952) 544-7708 www.ridgedaleymca.org ABOUT Y SWIM LESSONS The Y strives to help all ages lear how to swim, so they ca stay safe aroud

More information

» COLORADO s RIDE 2013

» COLORADO s RIDE 2013 » COLORADO s RIDE 2013 COLORADO S RIDE 2013 bikemscolorado.org 1 We are people who wat to do somethig about ow.» COlorado 2-Day Ride Caledar of Evets o back 2 2013 Bike MS COLORADO MS Society Missio Statemet

More information

Climbing/Rappelling NATIONAL STANDARDS BOY SCOUTS OF AMERICA

Climbing/Rappelling NATIONAL STANDARDS BOY SCOUTS OF AMERICA 2007 Climbig/Rappellig NATIONAL STANDARDS BOY SCOUTS OF AMERICA These stadards apply to coucil ad district climbig/rappellig activities. Climb O Safely, No. 20-099B, applies to uit activities. Toppig Out,

More information

DAMAGE ASSESSMENT OF FIBRE ROPES FOR OFFSHORE MOORING

DAMAGE ASSESSMENT OF FIBRE ROPES FOR OFFSHORE MOORING RECOMMENDED PRACTICE DNV-RP-E304 DAMAGE ASSESSMENT OF FIBRE ROPES FOR OFFSHORE MOORING APRIL 2005 FOREWORD (DNV) is a autoomous ad idepedet foudatio with the objectives of safeguardig life, property ad

More information

THE EFFECTS OF COUPLED INDUCTORS IN PARALLEL INTERLEAVED BUCK CONVERTERS

THE EFFECTS OF COUPLED INDUCTORS IN PARALLEL INTERLEAVED BUCK CONVERTERS THE EFFECTS OF COUPED INDUCTORS IN PARAE INTEREAVED BUCK CONVERTERS Paul Seria, David Fi ad Geoff Walker pseria@itee.uq.edu.au School of Iformatio Techology ad Electrical Egieerig Uiversity of Queeslad

More information

Available online at ScienceDirect. Procedia Engineering 113 (2015 )

Available online at  ScienceDirect. Procedia Engineering 113 (2015 ) Available olie at www.sciecedirect.com ScieceDirect rocedia Egieerig 3 (205 ) 30 305 Iteratioal Coferece o Oil ad Gas Egieerig, OGE-205 The twi spool efficiecy cotrol Michuri A.I. a *, Avtoomova I.V. a

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

ELIGIBILITY / LEVELS / VENUES

ELIGIBILITY / LEVELS / VENUES ELIGIBILITY / LEVELS / VENUES 10U - SQUIRT MINOR '08 & MAJOR '07 Eligibility: Top six teams i the league at each level will qualify based o regular seaso league play. Format: Divisioal crossover with semi-fial

More information

Load Calculation and Design of Roller Crowning of Truck Hub Bearing

Load Calculation and Design of Roller Crowning of Truck Hub Bearing Sed Orders for Reprits to reprits@bethamsciece.ae 106 The Ope Mechaical Egieerig Joural, 2015, 9, 106-110 Ope Access Load Calculatio ad Desig of Roller Crowig of Truck Hub Bearig Xitao Xia,1, Shujig Dog

More information

RIVERSIDE SKATE PARK Located at 109th Street in Riverside Park Borough of Manhattan

RIVERSIDE SKATE PARK Located at 109th Street in Riverside Park Borough of Manhattan RIVERSIDE SKATE PARK Located at 109th Street in Riverside Park Borough of Manhattan Community Board 7 July 5, 2016 Parks Capital Design W Architecture & Landscape Architecture California Skateparks HERY

More information

Eagan YMCA Swim Lessons Schedule

Eagan YMCA Swim Lessons Schedule Eaga YMCA Swim Lessos Schedule 2018 Early Fall September 10 - October 28 (651) 456-9622 www.eagaymca.org ABOUT Y SWIM LESSONS The Y strives to help all ages lear how to swim, so they ca stay safe aroud

More information

Precautions for Total Hip Replacement Patients Only

Precautions for Total Hip Replacement Patients Only Precautios for Total Hip Replacemet Patiets Oly The followig is a list of precautios to keep you from dislocatig your hip. Dislocatig meas to move a body part out of its usual positio. Durig your stay

More information

Equipment. Rackets are fragile. Handle the shuttlecocks carefully and only by their rubber tips.

Equipment. Rackets are fragile. Handle the shuttlecocks carefully and only by their rubber tips. Badmito Overvie ad History Badmito is a racket sport that is played o a court divided by a et five feet high. The game is played ith a shuttlecock ( bird ). Ca be played as sigles or doubles. The object

More information

DFC NIST DIGITAL MASS FLOW CONTROLLERS. DFC with optional LCD readout PROG RS485. Programmable Mass Flow Controller with Digital Signal Processing

DFC NIST DIGITAL MASS FLOW CONTROLLERS. DFC with optional LCD readout PROG RS485. Programmable Mass Flow Controller with Digital Signal Processing Programmable Mass Flow Cotroller with Digital Sigal Processig Microprocessor drive digital flow cotrollers allow oe to program, record, ad aalyze flow rates of various gases with a computer via a RS-485

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Our club has a rich history that dates back to the turn of the 20th century.

Our club has a rich history that dates back to the turn of the 20th century. M E MB E R SHIP IN F O RM AT IO N 9 7 8-7 7 9-6 9 1 9 t h e i t e r at i o a l. c o m 1 5 9 B a l lv i l l e R d, B o lto, MA 01740 Dear Prospective Member Thak you for your iterest i membership at The

More information

BRISTOL TEMPLE QUARTER ENTERPRISE ZONE: Sustainable Urban Mobility Plan

BRISTOL TEMPLE QUARTER ENTERPRISE ZONE: Sustainable Urban Mobility Plan BRISTOL TEMPLE QUARTER ENTERPRISE ZONE: Sustaiable Urba Mobility Pla The Bristol Temple Quarter Eterprise Zoe is developig to icorporate 17,000 ew jobs over the ext 25 years. ii Bristol Temple Quarter

More information

Natural Resource Conservation and Preservation. Lesson Plan: NRES A1-2

Natural Resource Conservation and Preservation. Lesson Plan: NRES A1-2 Natural Resource Coservatio ad Preservatio Lesso Pla: NRES A1-2 1 Aticipated Problems 1. Why are coservatio ad preservatio importat? 2. What are some importat historic evets ad people associated with wildlife

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES:

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES: WELCOME! CAMBIE BRIDGE ITERIM IMPROVEMETS The City of Vancouver is planning to make interim improvements to Cambie Bridge to make it safer and more comfortable for people of all ages and abilities to walk

More information

Wondering where to start?

Wondering where to start? Bursville YMCA Swim Lessos Schedule 2018 Witer Jauary 8 - February 25 (952) 898-9622 ymcam.org/bursville ABOUT Y SWIM LESSONS The Y strives to help all ages lear how to swim, so they ca stay safe aroud

More information

City of Valdez REQUEST FOR QUOTES. Project Name: Lowe River Levee Certification Groin 1 Freeboard Repairs PO Number: Cost Code:

City of Valdez REQUEST FOR QUOTES. Project Name: Lowe River Levee Certification Groin 1 Freeboard Repairs PO Number: Cost Code: ---July 19, 2017--- Dear Contractor: City of Valdez REQUEST FOR QUOTES Project ame: Lowe River Levee Certification Groin 1 Freeboard Repairs PO umber: 74818 Cost Code: 30-070-000 This project includes,

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

number in a data set adds (or subtracts) that value to measures of center but does not affect measures of spread.

number in a data set adds (or subtracts) that value to measures of center but does not affect measures of spread. Lesso 3-3 Lesso 3-3 Traslatios of Data Vocabulary ivariat BIG IDEA Addig (or subtractig) the same value to every umber i a data set adds (or subtracts) that value to measures of ceter but does ot affect

More information

Emma B. Howe YMCA Swim Lessons Schedule

Emma B. Howe YMCA Swim Lessons Schedule Emma B. Howe YMCA Swim Lessos Schedule 2018 Summer Jue 4 - September 9 (763) 785-7882 ymcam.org/emmabhowe ABOUT Y SWIM LESSONS The Y strives to help all ages lear how to swim, so they ca stay safe aroud

More information

Rochester YMCA Swim Lessons Schedule

Rochester YMCA Swim Lessons Schedule Rochester YMCA Swim Lessos Schedule 2018 Early Fall September 10 - October 28 (507) 287-2260 www.ymcam.org/rochester ABOUT Y SWIM LESSONS The Y strives to help all ages lear how to swim, so they ca stay

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

BB&T BALLPARK - HOME OF THE CHARLOTTE KNIGHTS 2012 UMUD-O REZOING PETITION FOR SIGNAGE 324 S. MINT STREET CHARLOTTE, NC 28202

BB&T BALLPARK - HOME OF THE CHARLOTTE KNIGHTS 2012 UMUD-O REZOING PETITION FOR SIGNAGE 324 S. MINT STREET CHARLOTTE, NC 28202 BB&T BALLPARK - HOME OF THE CHARLOTTE KIGHTS 0 UMUD-O REZOIG PETITIO FOR SIGAGE 34 S. MIT STREET CHARLOTTE, C 80 CHARLOTTE, C COSULTAT Third Floor Charlotte, C 808 (T) 704-44-000 (F) 704-44- www.odell.com

More information

AN ESTIMATION OF INTER-ZONAL BUS DEMAND ON COLOMBO - KALUTARA TRANSPORT CORRIDOR

AN ESTIMATION OF INTER-ZONAL BUS DEMAND ON COLOMBO - KALUTARA TRANSPORT CORRIDOR AN ESIMAION OF INER-ZONAL BUS DEMAND ON COLOMBO - KALUARA RANSPOR CORRIR Sama J. Widaapathiraage ad Amal S. Kumarage Departmet of Civil Egieerig, Uiversity of Moratuwa, Sri Laka. ABSRAC- I the past, it

More information

City of Birmingham Draft Multi-modal Transportation Plan

City of Birmingham Draft Multi-modal Transportation Plan City of Birmingham Draft Multi-modal Transportation Plan City Commission Public Hearing Monday, November 25, 2013 7:30 pm Norman Cox, PLA, ASLA The Greenway Collaborative, Inc. Ann Arbor, Michigan The

More information

Dra Design and Land Use Op ons Booklet

Dra Design and Land Use Op ons Booklet Dra Design and Land Use Op ons Booklet March, 2015 This page was inten onally le blank. 2 Commercial-Vista Corridor Plan This booklet summarizes the street design and land use alterna ves for the Commercial

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Controlling noise at work

Controlling noise at work Health ad Safety Cotrollig oise at work The Cotrol of Noise at Work Regulatios 2005 Guidace o Regulatios This is a free-to-dowload, web-friedly versio of L108, (Secod editio, published 2005). This versio

More information

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan STEERING COMMITTEE MEETING June 17, 2015 Streetscape Overview Burlington Comprehensive Master Plan 1 Introduction Slide This slide show was presented to the Burlington Steering Committee on June 17, 2015

More information

This appendix provides a full summary of input received from the public throughout the Master Plan development process.

This appendix provides a full summary of input received from the public throughout the Master Plan development process. Appedix A Appedix A Public Outreach ad Iput This appedix provides a full suary of iput received fro the public throughout the Master Pla developet process. Olie Survey Questio 1 How do you rate the followig

More information

STREETS ENTRY ROADS E1 E2 RING ROAD R1 R2 R3 R4 R5 R6 R7 CIVIC STREETS C2 C3 B-DOUBLE ROADS B1 LOCAL STREETS LANEWAY LA1 ISSUE

STREETS ENTRY ROADS E1 E2 RING ROAD R1 R2 R3 R4 R5 R6 R7 CIVIC STREETS C2 C3 B-DOUBLE ROADS B1 LOCAL STREETS LANEWAY LA1 ISSUE STREETS ETRY ROADS E1 E2 RIG ROAD R1 R2 R3 L3 L1 R4 R5 R6 R7 CIVIC STREETS R7 C1 R6 C4 L2 C2 C3 E1 LA1 LA1 R1 E2 C4 B-DOUBLE ROADS B1 L2 LA1 R5 C3 C1 C2 R2 B1 LOCAL STREETS L1 L2 L3 LAEWAY LA1 R3 R4 31

More information

Wondering where to start?

Wondering where to start? New Hope YMCA Swim Lessos Schedule 2018 Early Fall September 10 - October 28 (763) 535-4800 www.ewhopeymca.org ABOUT Y SWIM LESSONS The Y strives to help all ages lear how to swim, so they ca stay safe

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information