HYCU OMS Solution for Nutanix

Size: px
Start display at page:

Download "HYCU OMS Solution for Nutanix"

Transcription

1 USER GUIDE HYCU OMS Slutin fr Nutanix Prduct versin: 2.0 Prduct release date: May 2018 Dcument editin: First

2 Legal ntices Cpyright ntice HYCU. All rights reserved. This dcument cntains prprietary infrmatin, which is prtected by cpyright. N part f this dcument may be phtcpied, reprduced, distributed, transmitted, stred in a retrieval system, mdified r translated t anther language in any frm by any means, withut the prir written cnsent f HYCU. Trademarks HYCU lgs, names, trademarks and/r service marks and cmbinatins theref are the prperty f HYCU r its affiliates. Other prduct names are the prperty f their respective trademark r service mark hlders and are hereby acknwledged. Azure, Micrsft, and Windws are either registered trademarks r trademarks f Micrsft Crpratin in the United States and/r ther cuntries. Enterprise Clud Platfrm, Nutanix, and Prism are trademarks f Nutanix, Inc. in the United States and/r ther jurisdictins. Redfish is a registered trademark f Distributed Management Task Frce, Inc. (DTMF). Disclaimer The details and descriptins cntained in this dcument are believed t have been accurate and up t date at the time the dcument was written. The infrmatin cntained in this dcument is subject t change withut ntice. HYCU prvides this material "as is" and makes n warranty f any kind, expressed r implied, including, but nt limited t, the implied warranties f merchantability and fitness fr a particular purpse. HYCU shall nt be liable fr errrs and missins cntained herein. In n event shall HYCU be liable fr any direct, indirect, cnsequential, punitive, special r incidental damages, including, withut limitatin, damages fr lss and prfits, lss f anticipated savings, business interruptin, r lss f infrmatin arising ut f the use r inability t use this dcument, r any actin taken based n the infrmatin cntained herein, even if it has been advised f the pssibility f such damages, whether based n warranty, cntract, r any ther legal thery. The nly warranties fr HYCU prducts and services are set frth in the express warranty statements accmpanying such prducts and services. Nthing herein shuld be cnstrued as cnstituting an additinal warranty. 2

3 Ntice This dcument is prvided in cnnectin with HYCU prducts. HYCU may have cpyright, patents, patent applicatins, trademark, r ther intellectual prperty rights cvering the subject matter f this dcument. Except as expressly prvided in any written license agreement frm HYCU, the furnishing f this dcument des nt give yu any license t these patents, trademarks, cpyrights, r ther intellectual prperty n HYCU prducts. Use f underlying HYCU prduct(s) is gverned by their respective Sftware License and Supprt Terms. Imprtant: Please read Sftware License and Supprt Terms befre using the accmpanying sftware prduct(s). HYCU 3

4 Cntents Intrductin 6 Abut HYCU OMS Slutin fr Nutanix 6 Prduct architecture 8 Abut Nutanix 8 Abut Micrsft Operatins Management Suite 9 Installatin and cnfiguratin 10 Installatin prerequisites 10 Installing OMS Data Cllectr fr Nutanix 12 Cnfiguring OMS Data Cllectr fr Nutanix 13 Cnfiguring OMS settings 14 Cnfiguring Nutanix Prism settings 15 Perfrming prduct licensing tasks 16 Cnfiguring custm prts fr inbund traffic 19 Cnfiguring the prduct t use a prxy server 20 Cnfiguring cluster nde-specific Redfish credentials 21 Enabling Nutanix system lg frwarding (ptinal) 21 Enabling system lg frwarding by using GUI 22 Enabling system lg frwarding by using CLI 24 Deplying OMS Slutin fr Nutanix 26 Uninstallatin 27 Uninstalling OMS Data Cllectr fr Nutanix 27 Remving slutins frm the OMS wrkspace 27 Usage 28 Data Cllectr 28 Cnfiguratin GUI: the Dashbard page 28 Cnfiguratin GUI: cnfiguratin wizard 29 Slutins 30 General slutin infrmatin 30 4

5 Nutanix Clusters 31 Nutanix Hardware 31 Nutanix Hardware Sensrs 32 Nutanix Lg and Event Analytics 32 Nutanix Strage 32 Nutanix Virtual Machines 33 Trubleshting 34 General trubleshting guidelines 34 OMS Data Cllectr fr Nutanix lg files 34 Prblems and slutins 35 Yu cannt reach OMS Data Cllectr fr Nutanix cnfiguratin GUI 35 Micrsft OMS settings d nt appear t be saved 36 An errr related t lcal time cnfiguratin is reprted when saving Micrsft OMS settings 36 Befre cntacting HYCU Custmer Supprt 37 HYCU Custmer Supprt and infrmatin 38 Custmer Supprt 38 Cmpany website and vide channel 38 General infrmatin 39 Feedback 39 5

6 Chapter 1 Intrductin This chapter intrduces HYCU OMS Slutin fr Nutanix and explains hw it interacts with Nutanix Enterprise Clud Platfrm and Micrsft Operatins Management Suite. Abut HYCU OMS Slutin fr Nutanix HYCU OMS Slutin fr Nutanix (OMS Slutin fr Nutanix) is an availability, perfrmance management, and analysis slutin that extends end-t-end service mnitring capabilities f OMS t include n-premises Nutanix appliances. It includes multiple slutins (als referred t as OMS Slutin fr Nutanix functinal areas) with a predefined set f views t fully integrate Nutanix data, events, and lgs int the OMS prtal. This way, it prvides the peratin verview and lg analytics acrss the Nutanix infrastructure and enables delivery f effective business service management. OMS Slutin fr Nutanix als prvides pssibility t generate alerts accrding t availability, perfrmance, cnfiguratin, r security cnditins that are identified. It enables yu t mnitr, detect, trublesht, remediate, and prevent prblems frm ccurring in yur Nutanix appliance. OMS Slutin fr Nutanix prvides the fllwing majr features: Discvery and visualizatin: Autmatic discvery and visualizatin f Nutanix clusters, hsts, strage, and virtual machines (VMs) by using histrical charts and predefined queries. It als includes predefined queries fr Nutanix lg and event analytics. Centralized mnitring f the discvered Nutanix envirnment, lg and event analytics ver the OMS prtal. Health, availability, and perfrmance mnitring: Mnitring f the Nutanix infrastructure health state frm perfrmance issues t utilizatin, latency, lad, and availability. Detectin f perfrmance degradatin befre it affects end users Mnitring f Nutanix infrastructural cmpnents and tasks: Autmatic detectin f Nutanix infrastructural cmpnents, such as: Clusters: Strage, CPU, and memry capacity and utilizatin, I/O latency, IOPS, I/O bandwidth, blcks, hsts, number f VMs. Virtual machines: Number f VMs (per cluster, pwered n/pwered 6

7 Intrductin ff/suspended/paused VMs), ttal CPU and memry utilizatin, ttal VM I/O latency, IOPS. Hardware: Hst CPU and memry utilizatin, number f hsted VMs, hst I/O latency and IOPS, blcks per cluster, Nutanix hardware editins, and number f SSD drives, number f HDD drives. Hardware sensrs: Fans and fan rtatin speeds, cmpnents and cmpnent temperatures, pwer supply and pwer cntrl units, their vltages and wattages. Strage: Strage utilizatin, strage pls, cntainers. Nutanix lg analytics: Prvisin f a central pint fr investigating lgs. Cllectin f, crrelatin f, and search in lg and perfrmance data generated by perating systems and applicatins. Usage f predefined queries t help remediate prblems ccurring in Nutanix clusters. Prblem identificatin and reslutin mechanism: Prvisin f infrmatin that can help yu identify the prblem and its rt cause. Alert-based ntificatin abut increased resurce utilizatin. 7

8 Intrductin Prduct architecture OMS Slutin fr Nutanix uses a sphisticated cmpnent called HYCU OMS Data Cllectr fr Nutanix (OMS Data Cllectr fr Nutanix r simply Data Cllectr) that is installed n a system f yur chice (Data Cllectr system). Data Cllectr cnnects t ne r mre Nutanix appliances by using the Nutanix REST API interface and sends the cllected perfrmance data t OMS by using its HTTP Data Cllectr API. Data Cllectr can als act as a syslg server and can frward Nutanix system lg files t OMS. The fllwing diagram shws hw OMS Slutin fr Nutanix cnnects the OMS platfrm and the Nutanix infrastructure. Figure 1 1: High-level verview f the OMS Slutin fr Nutanix envirnment Abut Nutanix Nutanix delivers enterprise cmputing and strage featuring built-in virtualizatin. Nutanix hypercnverged infrastructure natively integrates servers, strage netwrk, and strage int a single x86-based server deplyed in scale-ut clusters. Ndes (hst systems) that are part f the enterprise-scale clusters run industry-standard r native hypervisrs and the Nutanix perating system (AOS, frmerly knwn as NOS). Each server cntains x86-64 prcessrs, memry, slid state drives (SSDs), and traditinal hard disk drives 8

9 Intrductin (HDDs) that aggregate strage resurces int a single strage pl. Capacity is added by adding ndes t the cmputing cluster. Built-in virtualizatin allws applicatins and data t mve freely between n-premises envirnments and public cluds. All data, metadata, and peratins are distributed acrss the entire cluster cmbining physical and virtual strage. Such cmbined functinality eliminates perfrmance bttlenecks, enables predictable scalability withut limits, reduces pwer and space cnsumptin, and eliminates strage cmplexity. Nutanix Enterprise Clud Platfrm features predictable perfrmance, clud-like infrastructure cnsumptin, rbust security, and applicatin mbility fr a brad range f enterprise applicatins withut infrastructure cnstraints. The infrastructure is truly invisible, shifting fcus back t applicatins. Abut Micrsft Operatins Management Suite Micrsft Operatins Management Suite (OMS) is a clud-based IT management slutin that helps yu manage and prtect yur n-premises and clud infrastructure. Yu can benefit frm the fllwing majr value areas f OMS: Insight and analytics Autmatin and cntrl Prtectin and recvery Security and cmpliance In additin t prviding valuable services n its wn, OMS can integrate with Micrsft System Center cmpnents such as System Center Operatins Manager t extend yur existing management investment int the clud. System Center and OMS can wrk tgether t prvide a full hybrid management experience. 9

10 Chapter 2 Installatin and cnfiguratin This chapter cntains instructins n hw t install and cnfigure OMS Slutin fr Nutanix fr bth the Nutanix appliance and OMS sides. T install and cnfigure the prduct, cmplete these tasks: 1. Ensure that the installatin prerequisites are fulfilled. Fr details, see Installatin prerequisites belw. 2. Install OMS Data Cllectr fr Nutanix n a Linux system. Fr details, see Installing OMS Data Cllectr fr Nutanix n page Cnfigure OMS Data Cllectr fr Nutanix. Fr details, see Cnfiguring OMS Data Cllectr fr Nutanix n page Optinal. Enable Nutanix cluster ndes t prvide system lgs fr OMS. Fr details, see Enabling Nutanix system lg frwarding (ptinal) n page Deply OMS Slutin fr Nutanix. Fr details, see Deplying OMS Slutin fr Nutanix n page 26. t Tip In aid f tasks 3 and 4 f the prcess, yu can use the cnfiguratin wizard included in Data Cllectr. In the Data Cllectr cnfiguratin GUI, click Help in the main tlbar and then select Cnfiguratin Wizard frm the drp-dwn menu. Fr mre infrmatin, see Cnfiguratin GUI: cnfiguratin wizard n page 29. Installatin prerequisites Befre installing OMS Slutin fr Nutanix, make sure that the fllwing prerequisites are fulfilled: Prduct requirements dcumented in HYCU OMS Slutin fr Nutanix Release Ntes are met. Nutanix Enterprise Clud Platfrm prerequisites: Fr each Nutanix cluster that yu plan t mnitr, a Nutanix user accunt is selected. HYCU recmmends that yu select accunts that have Viewer rle assigned in Nutanix Prism: they can nly view infrmatin (and cllect mnitring data). Mandatry fr lw-level hardware mnitring. Fr each Nutanix cluster, a user accunt is selected that can access hardware sensrs n the cluster ndes thrugh 10

11 Installatin and cnfiguratin their Redfish API implementatin. OMS Slutin fr Nutanix supprts cnfiguratins with different user accunts fr different cluster ndes. HYCU recmmends that yu select an accunt that has ReadOnlyUser rle assigned: it can nly view infrmatin (and cllect mnitring data). Credentials f the default Redfish user accunt n Nutanix cluster ndes are usually as fllws: User name: ADMIN Passwrd: ADMIN OMS Slutin fr Nutanix uses these credentials by default, but yu can adjust that as part f prduct cnfiguratin. Adjustment may als be required with clusters that are based n nn-nutanix hardware. OMS platfrm prerequisites: The OMS wrkspace ID and primary key are knwn. T acquire the OMS wrkspace ID and primary key, d the fllwing: 1. Open a web brwser, g t the Overview Micrsft Operatins Management Suite webpage and then click Sign in. 2. On the Sign in t yur accunt webpage, prvide yur access credentials, and then sign in t the OMS prtal. 3. Click Settings. 4. In the Overview page, select Cnnected Surces > Windws Servers. Lcate the Wrkspace ID and Primary Key fields and cpy their cntents. Name reslutin fr the fully qualified dmain name that includes the wrkspace ID is functining. T verify this, n the Data Cllectr system, pen a cmmand shell and run the fllwing cmmand: nslkup <WrkspaceID>.ds.pinsights.azure.cm In this instance, <WrkspaceID> is the wrkspace ID f yur wrkspace. The cmmand utput shuld resemble the fllwing sample utput: Server: <DNSfqdn> Address: <DNSipAddress> Nn-authritative answer: <WrkspaceID>.ds.pinsights.azure.cm cannical name = pinsightsweuds.trafficmanager.net. pinsightsweuds.trafficmanager.net cannical name = pinsightsweu-ds-b.cludapp.net. Name: pinsights-weu-ds-b.cludapp.net Address: <IPaddress> 11

12 Installatin and cnfiguratin Data Cllectr system prerequisites: Firewall is cnfigured t enable inbund netwrk traffic n the required prts OMS Slutin fr Nutanix is precnfigured t use the fllwing prts: 8080 (HTTP) 8443 (HTTPS) (syslg) Fr instructins n hw t cnfigure different prt numbers, see sectin Cnfiguring custm prts fr inbund traffic n page 19. Web brwser prerequisites: A cmpatible web brwser is used t access the OMS Data Cllectr fr Nutanix cnfiguratin GUI. Fr a list f the cmpatible web brwsers, see the HYCU OMS Slutin fr Nutanix Cmpatibility Matrix. The web brwser must be set t allw JavaScript executin. Fr infrmatin n Nutanix Enterprise Clud Platfrm and the OMS platfrm (fr example, hardware and sftware requirements, perating system supprt, and installatin and cnfiguratin prcedures), see the Nutanix and Micrsft dcumentatin. Installing OMS Data Cllectr fr Nutanix T install OMS Data Cllectr fr Nutanix, d the fllwing: 1. G t the OMS Slutin fr Nutanix - HYCU webpage and sign in with yur accunt credentials. If yu d nt have an accunt yet, apply fr it at the fllwing address: supprt@hycu.cm 2. When yu are signed in, under Prduct dwnlad, click HYCU OMS Slutin fr Nutanix. 3. Read thrugh the Sftware License and Supprt Terms text. If yu agree with the terms, click Accept and prceed. 4. In the Prduct dwnlad link line, click Dwnlad t transfer the prduct release archive and save it n the lcal system.. 5. Lcate the HYCU.OMS.Slutin.Nutanix.<Versin>.zip file and extract its cntents. In this instance, <Versin> is the prduct release versin. 6. Cpy the extracted hycu-ms-dc-nutanix-<versin>.x86_64.rpm file t the Linux system designated t hst OMS Data Cllectr fr Nutanix. In this instance, <Versin> is versin f the RPM package. 7. Lg n t the future OMS Data Cllectr fr Nutanix hst system. 8. Open a cmmand shell and change the current directry t the directry with the installatin package. 12

13 Installatin and cnfiguratin 9. Run the fllwing cmmand by using a user accunt that has privileges t install RPM packages: rpm -i hycu-ms-dc-nutanix-<versin>.x86_64.rpm T verify that OMS Data Cllectr fr Nutanix was installed successfully, d the fllwing: 1. Verify that the hycumsdc service is started. Run the fllwing cmmand: service hycumsdc status The cmmand utput shuld resemble the fllwing: hycumsdc is running... PID=<PrcessID> t Tip Yu can use the fllwing cmmands t manage the hycumsdc service: service hycumsdc start stp status restart Cnfiguring OMS Data Cllectr fr Nutanix T cnfigure OMS Data Cllectr fr Nutanix, cmplete the fllwing tasks in the OMS Data Cllectr fr Nutanix cnfiguratin GUI: 1. Cnfigure OMS settings. Data Cllectr uses these settings t determine yur OMS wrkspace it shuld frward data t. 2. Cnfigure Nutanix Prism settings. Data Cllectr uses these settings t determine its data surces (Nutanix clusters). 3. Cnfigure Nutanix syslg frwarding settings. Data Cllectr uses these settings t set up syslg frwarding fr yur Nutanix clusters. 4. Perfrm prduct licensing tasks. Data Cllectr starts cllecting and relaying data after it successfully verifies a lcally installed license file. In specific circumstances, additinal cnfiguratin tasks are required: 1. Cnfigure custm prts fr inbund traffic fr OMS Data Cllectr fr Nutanix. Prt recnfiguratin is needed when a firewall blcks inbund netwrk traffic n the default (predefined) prts. 2. Cnfigure the prduct t use a prxy server. Prxy server must be used when direct cmmunicatin between OMS Data Cllectr fr Nutanix and OMS is nt pssible. 3. Cnfigure Nutanix cluster nde-specific Redfish credentials. A special cmmand-line tl set_redfish_credentials must be used t cnfigure Redfish credentials fr individual cluster ndes. 13

14 Installatin and cnfiguratin Cnfiguring OMS settings T cnfigure OMS settings, d the fllwing: 1. Open a web brwser and g t webpage f the OMS Data Cllectr fr Nutanix cnfiguratin GUI. Example Cnfiguratin GUI webpage URL: The HYCU OMS Data Cllectr fr Nutanix cnfiguratin wizard windw appears. 2. T let Data Cllectr cnfiguratin wizard guide yu thrugh the prcess, click Start and fllw instructins f the wizard (see the rest f this prcedure fr descriptins f the data yu must supply). Else, click Exit Wizard and prceed t the next step f this prcedure. 3. In the Data Cllectr cnfiguratin GUI, click Micrsft OMS Settings. Figure 2 1: Micrsft OMS Settings page 4. In the main tlbar, click Edit. 5. In the WORKSPACE ID and PRIMARY KEY text bxes, enter the wrkspace ID and primary key yu acquired frm the OMS prtal. 6. Click Save. 14

15 Installatin and cnfiguratin Cnfiguring Nutanix Prism settings T cnfigure Nutanix Prism settings, d the fllwing: 1. T let Data Cllectr cnfiguratin wizard guide yu thrugh the prcess, fllw instructins f the wizard (see the rest f this prcedure fr descriptins f the data yu must supply). Else, click Exit Wizard and prceed t the next step f this prcedure. 2. In the Data Cllectr cnfiguratin GUI, click Nutanix Prism Settings. 3. In the main tlbar, click Add. Figure 2 2: Nutanix Prism Settings page 4. In the Add Nutanix Data Surce dialg bx, specify the Nutanix cluster that yu plan t mnitr. T d s, fllw the steps: a. Enter the fllwing data: In the NUTANIX CLUSTER HOST NAME text bx: hst name r IP address f the Nutanix cluster's virtual system In the PORT text bx: prt number (default value: 9440) In the USER NAME and PASSWORD text bxes: credentials f the Prism user accunt cnfigured t be used fr cnnectin t OMS Data Cllectr fr Nutanix HYCU recmmends that yu select an accunt that has privileges nly fr cllecting (reading) data. 15

16 Installatin and cnfiguratin In the REDFISH USER NAME and REDFISH PASSWORD text b. Click Save. bxes: credentials fr accessing hardware sensrs n cluster ndes thrugh Redfish API implementatin n the ndes (IPMI web interface credentials, default values: ADMIN, ADMIN) HYCU recmmends that yu select an accunt that has privileges nly fr cllecting (reading) data. i Imprtant The specified Redfish credentials are used fr all cluster ndes. If Redfish API implementatins n different cluster ndes use different credentials, an additinal cnfiguratin step is required later in this prcedure. 5. If needed, cnfigure different Redfish API implementatin credentials fr individual cluster ndes. Fr instructins, see Cnfiguring cluster nde-specific Redfish credentials n page Repeat steps 3 t 5 fr each additinal Nutanix cluster that yu plan t mnitr using OMS Slutin fr Nutanix. Perfrming prduct licensing tasks OMS Slutin fr Nutanix subscriptin-based licenses (licenses fr purchase) are issued fr and bund t a specific Data Cllectr system. They are time-limited. Each license limits the ttal number f CPU sckets in all Nutanix clusters frm where data is cllected by the OMS Data Cllectr fr Nutanix instance installed n the Data Cllectr system. If the number f actual sckets in the mnitred clusters des nt exceed the number specified in the license, the license is treated as valid. Subscriptin-based licenses are issued based n the license specificatin that is sent in scpe f yur license rder. Timely renewal f yur licensees ensures cntinuity f prduct peratin. OMS Slutin fr Nutanix sftware evaluatin licenses can be used n any Data Cllectr system. n Nte The system where OMS Data Cllectr fr Nutanix is installed des nt require Internet cnnectivity when the prduct license is activated (the license key is applied). Requesting license activatin keys and activating licenses T request an OMS Slutin fr Nutanix license fr ne OMS Data Cllectr fr Nutanix instance, and activate the instance s that it starts cllecting and relaying mnitring data, d the fllwing: 1. T let Data Cllectr cnfiguratin wizard guide yu thrugh the prcess, fllw instructins f the wizard (see the rest f this prcedure fr descriptins f the data 16

17 Installatin and cnfiguratin yu must supply). Else, click Exit Wizard and prceed t the next step f this prcedure. 2. In the Data Cllectr cnfiguratin GUI, click Prduct License. Figure 2 3: Prduct License License Manager page 3. If yu are evaluating the prduct and have received evaluatin license (the License.dat file), skip t step 11. If yu purchased the prduct, cntinue with step In the License Manager pane, click Generate t generate a custmized license specificatin that matches yur OMS Data Cllectr fr Nutanix cnfiguratin. 5. When the license specificatin is ready, click Save t save it t the License.req file. 6. Open a web brwser and g t the Licensing Prtal HYCU webpage t submit a license request 7. If yu already have a licensing prtal accunt, click Sign in and enter yur user name and passwrd. Else, create it first by filling in the request frm n the website. 8. T generate the perpetual license key, click Activate perpetual licenses, enter yur purchase rder number (PO number), and then click Next. 9. T uplad the license request file, click Chse file, brwse t the flder with the License.req file, and select the file. Click Send Request. 10. In the Activate permanent licenses page, review the list f clusters and the number f required CPU sckets within each cluster fr which yu want t activate the license. 11. Click Activate Licenses. 17

18 Installatin and cnfiguratin Within a few minutes, yu shuld receive an frm HYCU Custmer Supprt with a license activatin file (License.dat) attached. 12. Save the license activatin file t a lcatin n the system frm where yu are cnnected t the OMS Data Cllectr fr Nutanix cnfiguratin GUI. 13. In the Data Cllectr cnfiguratin GUI, in the License Manager pane, click Brwse. 14. Navigate t the flder with the License.dat file, select it, and click Open. 15. Click Uplad and allw a few mments fr OMS Data Cllectr fr Nutanix t restart. Yur OMS Data Cllectr fr Nutanix instance n this system is activated. Checking prduct licensing status Data Cllectr cnfiguratin GUI presents infrmatin related t prduct licensing in the Licensing Status widget f the Dashbard page. Figure 2 4: Dashbard page with the Licensing Status widget in the lwer right crner The fllwing infrmatin is displayed: Licensing status: Messages have the meaning as fllws: EXCEEDED NUMBER OF SOCKETS The license is invalid in terms f hw many CPU sckets (Nutanix clusters and hsts) are being mnitred and hw many CPU sckets are licensed. 18

19 Installatin and cnfiguratin T make yur license valid again, repeat the prcedure dcumented in Requesting license activatin keys and activating licenses n page 16. LICENSE IS INVALID The licensed perid expired. Cntact HYCU Custmer Supprt fr assistance. Absence f any message dentes that licensing fr this OMS Data Cllectr fr Nutanix instance is cvered. License expiratin date, number f days until expiratin Numbers f actual CPU sckets and licensed CPU sckets Cnfiguring custm prts fr inbund traffic T cnfigure OMS Data Cllectr fr Nutanix t listen n custm (nn-predefined) prts, d the fllwing: 1. On the Data Cllectr system, pen a cmmand shell and run the fllwing cmmand t stp OMS Data Cllectr fr Nutanix: service hycumsdc stp 2. Change the current directry t /pt/hycu/nutanix-ms/cnf and pen the cnfiguratin.jsn file in a plain text editr. 3. Change the main prt number used by OMS Data Cllectr fr Nutanix. T d s, lcate the servercnfig bject, and change the value f the fllwing attributes: webserverprt, fr HTTP websecureserverprt, fr HTTPS Lines that define default attribute values f servercnfig are as fllws: "servercnfig": { "startwebserver": true, "webserverprt": 8080, "startsecurewebserver": true, "websecureserverprt": 8443 }, 4. Change the prt number used fr Nutanix system lg frwarding. T d s, lcate the syslgcnfig bject, and change the value f the prt attribute: Lines that define default attribute values f syslgcnfig are as fllws: "servercnfig": { "prt": 54100, "startonstartup": true, }, 5. Save yur changes. 19

20 Installatin and cnfiguratin 6. In a cmmand shell, run the fllwing cmmand t start OMS Data Cllectr fr Nutanix: service hycumsdc start 7. If yu changed the prt number used fr Nutanix syslg frwarding while Nutanix system lgs were already being frwarded, prpagate the changes t Nutanix clusters: Using the GUI: perfrm the prcedure dcumented in Enabling system lg frwarding by using GUI n page 22. In step 4 f the prcedure, click Edit Mdules and then cmplete the crrespnding sequence f substeps withut changing the detailed cnfiguratin. Using the CLI: perfrm the prcedure dcumented in Enabling system lg frwarding by using CLI n page 24 by using the new prt number. Cnfiguring the prduct t use a prxy server OMS Data Cllectr fr Nutanix autmatically uses an HTTP prxy server fr cmmunicatin with OMS when the prxy server is set in the interactive cmmand shell cnfiguratin fr the user accunt that runs OMS Data Cllectr fr Nutanix. If a prxy server is nt set, yu must update the cnfiguratin yurself. T set a prxy server fr OMS Data Cllectr fr Nutanix, d the fllwing: 1. Open the ~/.bashrc file in a plain text editr. 2. Add the fllwing line t the file: exprt HTTP_PROXY=<PrxyServerFQDN>:<PrxyServerPrt> In this instance, the placehlders have the meanings as fllws. <PrxyServerFQDN> <PrxyServerPrt> Fully qualified dmain name f the system that acts as a prxy Prt number that the prxy server is using Example A line added t.bashrc: exprt HTTP_PROXY=prxy.cmpany.cm: Save yur changes. 4. Open a cmmand shell and run the fllwing cmmand t restart OMS Data Cllectr fr Nutanix: service hycumsdc restart 20

21 Installatin and cnfiguratin Cnfiguring cluster nde-specific Redfish credentials T cnfigure different Redfish API implementatin credentials fr individual ndes f a Nutanix cluster, d the fllwing: 1. On the Data Cllectr system, pen a cmmand shell and run the fllwing cmmand t stp OMS Data Cllectr fr Nutanix: service hycumsdc stp 2. Change the current directry as fllws: cd /pt/hycu/nutanix-ms/bin/tls 3. Run the fllwing cmmand t list cnfigured Nutanix clusters and their ndes:./set_redfish_credentials -l 4. Run the fllwing cmmand t cnfigure r change Redfish credentials fr a cluster nde in the Data Cllectr's data surce cnfiguratin:./set_redfish_credentials -a <RedfishAddress> In this instance, the placehlder has the meaning as fllws. <RedfishAddress> IP address f the Redfish API implementatin n the cluster nde Alternatively, run the fllwing cmmand instead:./set_redfish_credentials -n <HstName> In this instance, the placehlder has the meaning as fllws. <HstName> Hst name f the Nutanix cluster nde 5. Supply the credentials as prmpted by the cmmand. 6. Repeat steps 4 and 5 fr each additinal cluster nde that uses different Redfish credentials. 7. Run the fllwing cmmand t start OMS Data Cllectr fr Nutanix: service hycumsdc start Enabling Nutanix system lg frwarding (ptinal) T utilize the OMS lg analytics functinality, yu must enable frwarding f system lgs frm the Nutanix appliances t OMS Data Cllectr fr Nutanix. Cumulative size f the 21

22 Installatin and cnfiguratin frwarded lgs affects the cst f yur OMS license, and may grw very large. Yu shuld therefre carefully plan and decide abut the fllwing: Which systems t cllect the lgs frm Lg entries f which severity levels t include Enabling system lg frwarding by using GUI T enable Nutanix system lg frwarding fr a specific Nutanix cluster, by using cnfiguratin GUI f OMS Data Cllectr fr Nutanix, d the fllwing: 1. Open a web brwser and g t webpage f the Data Cllectr cnfiguratin GUI. Example Cnfiguratin GUI webpage URL: The HYCU OMS Data Cllectr fr Nutanix cnfiguratin wizard windw appears. 2. T let Data Cllectr cnfiguratin wizard guide yu thrugh the prcess, fllw instructins f the wizard (see the rest f this prcedure fr descriptins f the data yu must supply). Else, click Exit Wizard and prceed t the next step f this prcedure. 3. In the left pane, click Nutanix Syslg Frwarding. A list f cnfigured data surces (Nutanix clusters) appears. i Imprtant Data Cllectr uses default Nutanix credentials fr SSH cnnectins t ppulate the list. Indicatrs in the SSH REACHABLE clumn infrm yu abut cnnectin success. Cnnectin failure may indicate the SSH credentials were changed n that Nutanix cluster. 4. On the left side f the main pane, click in the line f the data surce yu wish t recnfigure syslg frwarding fr. The main pane shws the fllwing infrmatin fr each discvered data surce: Nutanix cluster name An indicatr f whether the cluster is nline Syslg frwarding destinatin system An indicatr f whether the syslg server that is running in the cluster can be reached by using SSH Current syslg frwarding status (enabled, disabled) The lwer pane shws current cnfiguratin f syslg frwarding in the selected data surce (Nutanix cluster): Syslg frwarding destinatin system User name cnfigured fr SSH cnnectin 22

23 Installatin and cnfiguratin Current syslg frwarding status Infrmatin fr each Nutanix mdule: Whether its related syslg entries are currently frwarded Severity level threshld (minimum) fr the included lg entries Figure 2 5: Nutanix Syslg Frwarding page t Tip Selectin f multiple Nutanix clusters allws enabling r disabling syslg frwarding in general nly. T select all r multiple clusters, click the apprpriate check bxes n the left side f the main pane. The lwer pane shws infrmatin abut the last selected cluster. 5. D ne f the fllwing: T enable r disable syslg frwarding, click Enable Selected r Disable Selected in the tlbar, respectively. Allw sme time fr Data Cllectr t apply new settings. T change credentials that Data Cllectr uses t cnnect t the Nutanix cluster, click Set SSH Credentials: a. In the dialg bx, enter new user name and passwrd that yu want t use. b. Click Save. T change detailed syslg frwarding cnfiguratin, click Edit Mdules: a. Pick a Nutanix mdule fr which yu want t adjust syslg frwarding. b. in the LOG SEVERITY LEVEL clumn, select frm the drp-dwn list the minimum severity level f syslg entries that shuld be frwarded fr the mdule. c. In the TOGGLE FORWARDING clumn, tggle the switch t enable r disable 23

24 Installatin and cnfiguratin syslg frwarding fr the mdule. d. Repeat steps a t c fr each additinal Nutanix mdule yu plan t recnfigure with regards t syslg frwarding. e. Click Save and allw sme time fr Data Cllectr t apply new settings. n Nte The DESTINATION SYSTEM prperty is autmatically set t the fully qualified dmain name f the system that hsts the Data Cllectr yu are recnfiguring. Enabling system lg frwarding by using CLI T enable Nutanix system lg frwarding fr a specific Nutanix cluster, by using perating system's CLI, d the fllwing: 1. Open a cmmand shell and run the cmmands as specified in the cntinuatin f the prcedure. 2. Cnnect t the Nutanix cluster by using SSH: ssh nutanix@<clustername> In this instance, the placehlders have the meanings as fllws. nutanix <ClusterName> One f Nutanix cluster's default (predefined) user names Hst name f the Nutanix cluster 3. Start the Nutanix cmmand-line interface: ncli 4. Stp the rsyslg service and prevent it frm being autmatically started in the future: rsyslg-cnfig set-status enable=false 5. Enable lg frwarding t OMS Data Cllectr fr Nutanix: rsyslg-cnfig add-server name=<hstname> ip-address=<ipaddress> prt=54100 netwrk-prtcl=udp In this instance, the placehlders have the meanings as fllws. <HstName> <IPaddress> Fully qualified dmain name f the system where OMS Data Cllectr fr Nutanix is installed IP address f the system where OMS Data Cllectr fr Nutanix is installed 24

25 Installatin and cnfiguratin Example A cmmand line that enables syslg frwarding in general fr the cmputer.cmpany.cm system: rsyslg-cnfig add-server name=cmputer.cmpany.cm ipaddress= prt=54100 netwrk-prtcl=udp 6. Specify Nutanix mdules frm which yu plan t cllect lgs and the lg severity levels. Fr each mdule, yu can select a different level. Fr each Nutanix mdule, run the fllwing cmmand: rsyslg-cnfig add-mdule server-name=<hstname> mdulename=<mdulename> level=<level> include-mnitr-lgs=true In this instance, the placehlders have the meanings as fllws. <HstName> <MduleName> <Level> Fully qualified dmain name f the system where OMS Data Cllectr fr Nutanix is installed A Nutanix mdule name; available mdules are: cassandra, cerebr, curatr, genesis, prism, stargate, zkeeper One f the fllwing severity levels: INFO, WARNING, ERROR, FATAL; the specified level defines the minimum severity level that is still included in data frwarding i Imprtant Cnfigured severity level affects the size f the frwarded lgs. T avid verlading OMS, cnsider setting a higher minimum severity level. Example Cmmand lines that enable syslg frwarding fr all Nutanix mdules: rsyslg-cnfig add-mdule server-name=cmputer.cmpany.cm mdulename=cassandra level=warning include-mnitr-lgs=true rsyslg-cnfig add-mdule server-name=cmputer.cmpany.cm mdulename=cerebr level=warning include-mnitr-lgs=true rsyslg-cnfig add-mdule server-name=cmputer.cmpany.cm mdulename=curatr level=warning include-mnitr-lgs=true rsyslg-cnfig add-mdule server-name=cmputer.cmpany.cm mdulename=genesis level=warning include-mnitr-lgs=true rsyslg-cnfig add-mdule server-name=cmputer.cmpany.cm mdulename=prism level=warning include-mnitr-lgs=true rsyslg-cnfig add-mdule server-name=cmputer.cmpany.cm mdulename=stargate level=warning include-mnitr-lgs=true 25

26 Installatin and cnfiguratin rsyslg-cnfig add-mdule server-name=cmputer.cmpany.cm mdulename=zkeeper level=warning include-mnitr-lgs=true 7. Start the rsyslg service: rsyslg-cnfig set-status enable=true Deplying OMS Slutin fr Nutanix Depending n the data yu want t view n the OMS prtal, yu must add all r specific slutins t yur OMS wrkspace. T add slutins t yur OMS wrkspace, d the fllwing: 1. Sign in t the Azure prtal. 2. In the New blade under Marketplace, select the Mnitring + management grup. 3. In the Mnitring + Management blade, click See all. 4. T the right f Management Slutins, click Mre. 5. In the Management Slutins blade, select ne f the fllwing management slutins that yu want t add t a wrkspace: Nutanix Clusters Nutanix Hardware Nutanix Hardware Sensrs Nutanix Lg and Event Analytics Nutanix Strage Nutanix Virtual Machines 6. In the management slutin blade, review infrmatin, and then click Create. 7. In the blade f the added management slutin, select a wrkspace t assciate the slutin with. 8. Review ther ptins and click Create. 9. Repeat steps 2 t 8 fr each additinal slutin that yu want t use. 26

27 Chapter 3 Uninstallatin This chapter cntains instructins n hw t cmpletely uninstall OMS Slutin fr Nutanix frm yur envirnment. T uninstall OMS Slutin fr Nutanix, cmplete these tasks: 1. Uninstall OMS Data Cllectr fr Nutanix frm its hst system. Fr details, see Uninstalling OMS Data Cllectr fr Nutanix belw. 2. Remve included slutins frm OMS prtal. Fr details, see Remving slutins frm the OMS wrkspace belw. Uninstalling OMS Data Cllectr fr Nutanix T uninstall OMS Data Cllectr fr Nutanix, d the fllwing: 1. On the Data Cllectr system, pen a cmmand shell. 2. Run the fllwing cmmand by using a user accunt that has privileges t remve RPM packages: rpm -e hycu-ms-dc-nutanix Remving slutins frm the OMS wrkspace T remve slutins frm the OMS wrkspace, d the fllwing: 1. Sign in t the Azure prtal. 2. Navigate t Lg Analytics > Subscriptins > <YurWrkspaceName>. In this instance, <YurWrkspaceName> is the name f the OMS wrkspace yu are using. 3. In the <YurWrkspaceName> blade, click Slutins. 4. In the slutin list, select the slutin fr remval. 5. In the slutin blade, click Delete, and then click Yes t cnfirm the deletin. 6. Repeat steps 4 and 5 fr each additinal cmpnent f OMS Slutin fr Nutanix. 27

28 Chapter 4 Usage This chapter describes specific features f OMS Data Cllectr fr Nutanix (Data Cllectr) and OMS functinal areas f OMS Slutin fr Nutanix (slutins). Data Cllectr This sectin describes the fllwing features f the Data Cllectr cnfiguratin GUI: the Dashbard page, cnfiguratin wizard. Cnfiguratin GUI: the Dashbard page Dashbard prperty page in the Data Cllectr cnfiguratin GUI displays an infrmative view f the cnfigured data surces, data cllectin statistics, and the Data Cllectr inner wrkings. The infrmatin is presented in fur widgets: Cnfigured Clusters This widget presents infrmatin abut the cnfigured data surces (Nutanix clusters), their availability, and their current syslg frwarding status. Data Cllectr System Infrmatin This widget presents infrmatin abut the system n which the Data Cllectr is running and utilizatin f its resurce types: cmpute, memry, and strage. Data Cllectr Statistics This widget presents infrmatin n the recent data flw twards the Micrsft OMS wrkspace. Licensing Status This widget reprts the current status f prduct licensing and the license expiratin date. 28

29 Usage Figure 4 1: Dashbard page t Tip Yu can rearrange the widgets n the Dashbard page. T d s, fllw the steps: 1. Pint int the widget t be mved. A "mve" icn appears in the upper right crner f the widget. 2. Click the "mve" icn, hld the muse buttn, and drag the widget t a new psitin. Cnfiguratin GUI: cnfiguratin wizard Cnfiguratin wizard is a feature f the Data Cllectr cnfiguratin GUI that aids yu in cnfiguring OMS Data Cllectr fr Nutanix. A sequential series f visual hints guide yu thrugh bth mandatry and ptinal cnfiguratin steps, excluding special steps required in specific circumstances. Cnfiguratin f OMS settings Cnfiguratin f Nutanix Prism settings (data surces) Optinal. Cnfiguratin f Nutanix syslg frwarding Perfrming prduct licensing tasks 29

30 Usage Figure 4 2: Cnfiguratin wizard assists with adding data surces With a newly installed Data Cllectr that yu have nt cnfigured yet, the wizard autmatically starts when yu access the Data Cllectr cnfiguratin GUI. T start the wizard at any time, click Help in the main tlbar and then select Cnfiguratin Wizard frm the drp-dwn menu. Slutins This sectin describes each f the slutins included in OMS Slutin fr Nutanix. Fr cnceptual and usage infrmatin n OMS, see its prduct dcumentatin. General slutin infrmatin All OMS Slutin fr Nutanix functinal areas share a cmmn feature: ability t mnitr Nutanix appliances frm an OMS wrkspace. Each functinal area includes a set f predefined views that cver specific area f the mnitred Nutanix infrastructure. These views are based n precnfigured queries. Sme f the functinal areas als include a set f predefined alerts, based n precnfigured semaphres. Even when an alert is enabled (switched n), it is nt active until yu cnfigure its alert rule s that it autmatically perfrms at least ne actin, depending n hw yu prefer t be ntified. i Imprtant Only alerts f critical severity are enabled by default, but they are inactive their alert rules are nt cnfigured. 30

31 Usage Yu can always add new r custmize the predefined views and alerts. Fr alerts, yu can change their general settings (fr example, severity, search query, and time windw), their schedules, and their actins. Fr mre infrmatin, see the Understanding alerts in OMS Lg Analytics webpage n the Micrsft Dcs website. Nutanix Clusters This slutin prvides an verview f the health status and perfrmance fr Nutanix clusters. It includes the fllwing views: STORAGE CAPACITY (Strage Capacity by Cluster) CPU POWER (CPU Pwer by Custer) MEMORY SIZE (Memry Size by Cluster) RESOURCE UTILIZATION (STORAGE, MEMORY, CPU) (Strage Utilizatin, Memry Utilizatin, CPU Utilizatin) CLUSTER-WIDE PERFORMANCE (Cluster-wide IOPS, Cluster-wide Average I/O Latency, Cluster-wide I/O Bandwidth) VIRTUAL MACHINE COUNT (Ttal VMs) NUTANIX ALERT COUNT (Ttal Number f Alerts in All Clusters) LIST OF QUERIES The slutin includes the fllwing alerts: ClusterCPUusage_80 rule ClusterCPUusage_90 rule ClusterMEMUsage_80 rule ClusterMEMUsage_90 rule ClusterSTORUsage_80 rule ClusterSTORUsage_90 rule Nutanix Hardware This slutin prvides a summary f the health status and perfrmance fr Nutanix hardware. It includes the fllwing views: HOST CPU USAGE (CPU Usage Over Time) HOST MEMORY USAGE (Memry Usage Over Time) HOSTS BY NUMBER OF HOSTED VMS (VMs per Hst Over Time) HOST DISK AVERAGE I/O LATENCY (Hst Disk Average I/O Latency Over Time) HOST DISK IOPS (Hst Disk IOPS Over Time) ATTACHED STORAGE DRIVES (HDD, SSD) LIST OF QUERIES The slutin includes the fllwing alerts: 31

32 Usage HstCPUusage_70 rule HstCPUusage_90 rule HstMEMusage_70 rule HstMEMusage_90 rule Nutanix Hardware Sensrs This slutin extends Nutanix hardware mnitring beynd disks and hsts by using DMTF s Redfish standard specificatin and schema implementatins, and ffers management f scalable platfrm hardware t cllect lw-level infrmatin frm hardware cmpnent sensrs. The slutin includes the fllwing views: FANS (Ttal Fans) FAN SPEEDS (Fan Speeds Over Time) VOLTAGE SENSORS (Ttal Vltage Sensrs) VOLTAGES (Vltages Over Time) TEMPERATURE SENSORS (Ttal Temperature Sensrs) TEMPERATURES (Temperatures Over Time) POWER LEVELS (INPUT VOLTAGE OVER TIME, OUTPUT POWER OVER TIME, CONSUMED POWER OVER TIME) LIST OF QUERIES Nutanix Lg and Event Analytics This slutin prvides a central pint fr Nutanix lg and event cllectin and analytics. It als prvides predefined queries n the Nutanix lg files and events t help trublesht varius Nutanix alerts and issues. The slutin includes the fllwing views: SYSLOG MESSAGES (Number f All Messages) EVENTS (Events by Severity) LIST OF QUERIES Nutanix Strage This slutin prvides a summary f the health status and perfrmance fr Nutanix strage. It includes the fllwing views: CLUSTER STORAGE OVERVIEW (Strage Utilizatin by Cluster Over Time) STORAGE POOL SSD VS HDD RATIO (SSD vs HDD Rati Over Time) STORAGE POOL DISK PERFORMANCE (Strage Pl Disk Average I/O Latency Over Time, Strage Pl Disk I/O Bandwidth Over Time, Strage Pl Disk IOPS Over Time) CONTAINER SSD VS HDD RATIO (SSD vs HDD Rati Over Time) 32

33 Usage CONTAINER PERFORMANCE (Cntainer Average I/O Latency Over Time, Cntainer I/O Bandwidth Over Time, Cntainer IOPS Over Time) LIST OF QUERIES Nutanix Virtual Machines This slutin prvides a summary f the health status and perfrmance fr virtual machines hsted n Nutanix clusters. It includes the fllwing views: VMS PER CLUSTER (VMs Per Cluster Over Time) VM CPU UTILIZATION (VM CPU Utilizatin Over Time) VM MEMORY UTILIZATION (VM Memry Utilizatin Over Time) VM AVERAGE I/O LATENCY (VM Average I/O Latency Over Time) VM I/O BANDWIDTH (VM I/O Bandwidth Over Time) VM IOPS (VM IOPS Over Time) CONTROLLER VM CPU UTILIZATION (CVM CPU Utilizatin Over Time) CONTROLLER VM MEMORY UTILIZATION (CVM Memry Utilizatin Over Time) LIST OF QUERIES The slutin includes the fllwing alerts: NutanixCVMCPUusage_70 rule NutanixCVMCPUusage_90 rule NutanixCVMMEM_70 rule NutanixCVMMEM_90 rule NutanixVMCPU_70 rule NutanixVMCPU_90 rule NutanixVMMEM_70 rule NutanixVMMEM_90 rule 33

34 Chapter 5 Trubleshting If yu encunter prblems when using OMS Slutin fr Nutanix, yu can ften slve them yurself. This chapter cntains infrmatin that may help yu in such cases. General trubleshting guidelines When investigating an issue, first verify that: All installatin prerequisites are fulfilled and the prduct is cnfigured accrding t the prvided instructins. Yu are nt running int a knwn prduct limitatin. Fr a list f the limitatins, see the HYCU OMS Slutin fr Nutanix Release Ntes. Yur issue is nt related t third-party sftware r hardware (Nutanix r Micrsft). Otherwise, cntact the respective vendr fr assistance. Yu have the latest perating system and sftware applicatin patches installed n the affected systems. The affected systems are nt running ut f memry r strage space. OMS Data Cllectr fr Nutanix lg files OMS Data Cllectr fr Nutanix recrds ccurrences f unexpected behavir (errrs) int its lg files. Yu can brwse thrugh the mst recent lg entries in the Data Cllectr Lg page f the Data Cllectr cnfiguratin GUI. 34

35 Trubleshting Figure 5 1: Data Cllectr Lg Recent Lg Entries page T dwnlad the cmplete set f lg files with an entire errr histry and further errr details, click Dwnlad Entire Lg in the main tlbar. Prblems and slutins This sectin lists symptms f cmmn prblems that yu may encunter while using OMS Slutin fr Nutanix, tgether with prpsed actins reslutin steps. Yu cannt reach OMS Data Cllectr fr Nutanix cnfiguratin GUI Symptm Webpage f the OMS Data Cllectr fr Nutanix cnfiguratin GUI is inaccessible. Actin Verify the status f the hycumsdc service n the Data Cllectr system. D the fllwing: 1. Open a cmmand shell and run the fllwing cmmand: service hycumsdc status 35

36 Trubleshting 2. Depending n the cmmand utput that yu get, d ne f the fllwing: hycumsdc is nt running... Run the fllwing cmmand t start it: service hycumsdc start hycumsdc is running... PID=<PrcessID> In this instance, <PrcessID> is the prcess identificatin number f the Data Cllectr prcess. This means that the service is running, but unrespnsive. Run the fllwing cmmand t restart it: service hycumsdc restart Micrsft OMS settings d nt appear t be saved Symptm In the Micrsft OMS Settings page f the OMS Data Cllectr fr Nutanix cnfiguratin GUI, nthing happens after yu attempt t save cnfiguratin fr which a valid wrkspace ID and a primary key are specified. Actin Inspect the OMS Data Cllectr fr Nutanix lg fr the fllwing errr it may indicate that OMS Data Cllectr fr Nutanix is nt able t establish a direct cnnectin t OMS: "message":"culd nt prcess web request t OMS.","stack":"Errr: cnnect ETIMEDOUT <OMSwrkspaceAddress>:443" In this instance, <OMSwrkspaceAddress> is the URL f yur OMS wrkspace. If yu find this errr, set the HTTP prxy server in the perating system's cnfiguratin n the Data Cllectr system. Fr instructins, see sectin "Cnfiguring the prduct t use a prxy server" n page 1. An errr related t lcal time cnfiguratin is reprted when saving Micrsft OMS settings Symptm In the Micrsft OMS Settings page f the OMS Data Cllectr fr Nutanix cnfiguratin GUI, after yu attempt t save cnfiguratin fr which a valid wrkspace ID and a primary key are specified, the fllwing errr is reprted: The wrkspace key culd nt be validated due t the lcal system time nt matching the time in Azure. 36

37 Trubleshting Actin Inspect the OMS Data Cllectr fr Nutanix lg fr the fllwing errr it indicates that the lcal time n the OMS Data Cllectr fr Nutanix hst system is set incrrectly: Please check that the lcal system time is accurate and the crrect time zne is set. The request time was <RequestDateTime> while the service prcessed the request at <ActinDateTime>. The difference in time was <TimeDifference> and the maximum allwed difference is 00:15:00. If yu find this errr, adjust time settings n the OMS Data Cllectr fr Nutanix hst system t reflect accurate date and time (in yur lcal time zne). Befre cntacting HYCU Custmer Supprt If yu cannt slve yur issue, reprt it. Befre cntacting HYCU Custmer Supprt, make sure that: Yu perfrm the general checks. Fr details, see sectin General trubleshting guidelines n page 34. Yu verify that yur prblem is nt dcumented in this chapter. Fr details, see sectin Prblems and slutins n page 35. Yu cllect relevant data that might be required t send t HYCU Custmer Supprt: a descriptin f yur prblem, cnfiguratin specificatin f yur envirnment, and similar infrmatin. Fr details, see sectin Custmer Supprt n page 38. The HYCU Custmer Supprt team will prvide yu with further instructins. Amng ther things, yu may be asked t perfrm diagnstic peratins in yur envirnment and cllect specific data frm yur systems and send it t HYCU. n Nte The HYCU Custmer Supprt team is nt qualified t slve the issues related t third-party sftware r hardware. Fr infrmatin n hw t reach HYCU Custmer Supprt, see part HYCU Custmer Supprt and infrmatin n page

38 HYCU Custmer Supprt and infrmatin Use the cmmunicatin channels listed in this sectin if yu need: Help with the prduct licensing prcess Assistance while using the prduct Additinal infrmatin abut this prduct Infrmatin abut ther HYCU prducts Custmer Supprt Shuld yu require additinal infrmatin r assistance while using the prduct, cntact the vendr that shipped it. If yu have purchased the prduct directly frm HYCU, and are experiencing a prblem, search fr a slutin n the fllwing webpage: supprt.hycu.cm In the absence f an article addressing yur prblem, ask HYCU Custmer Supprt fr assistance: n the webpage, click Submit a request and fill in the request frm. Yu must be signed in with a valid accunt prir t submissin. Apply fr an accunt at the fllwing address: supprt@hycu.cm Imprtant: Befre submitting a request t the Custmer Supprt department, perfrm a health check n all systems that are in failed (critical, red) state and have the fllwing infrmatin ready: Symptms Sequence f events leading t the prblem Cmmands and ptins that yu used Messages yu have received (a descriptin with the date and time) Fr a cmplete list f pieces f required supprt infrmatin, check trubleshting sectins in the prduct dcumentatin. Cmpany website and vide channel Fr mre infrmatin abut ur cmpany and ther prducts we ffer, visit HYCU website at: 38

Comtrade OMS Solution for Nutanix USER GUIDE PRODUCT VERSION: 1.0 PRODUCT RELEASE DATE: MAY 2017 DOCUMENT EDITION: FIRST

Comtrade OMS Solution for Nutanix USER GUIDE PRODUCT VERSION: 1.0 PRODUCT RELEASE DATE: MAY 2017 DOCUMENT EDITION: FIRST Cmtrade OMS Slutin fr Nutanix USER GUIDE PRODUCT VERSION: 1.0 PRODUCT RELEASE DATE: MAY 2017 DOCUMENT EDITION: FIRST LEGAL NOTICES COPYRIGHT NOTICE 2017 Cmtrade Sftware. All rights reserved. This dcument

More information

Users Requirements Statement

Users Requirements Statement Mnday, March 29, 2004 http://www.prjectdevelper.cm Cntents Agreement s Purpse... 2 Applicatin s Descriptin... 2 Applicatin s Input/Output Summary... 4 Business Rules... 8 Applicatin Develpment Cmpletin

More information

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full BaseStatin 1000 Irrigatin Cntrller Keeping a Pnd r Cistern Full If yu have a pnd r a cistern that is fed frm an external water surce, yu can use a Baseline bisensr sil misture sensr with yur Baseline cntrller

More information

STIOffice Summer School Grade Setup and Entry

STIOffice Summer School Grade Setup and Entry STIOffice Summer Schl Grade Setup and Entry Exprting Students int Summer Schl Each student wh will be attending summer schl at a site ther than his/her hme schl must be exprted t the summer schl database.

More information

How to start the Daisy Chain Configuration Tool

How to start the Daisy Chain Configuration Tool Hw t start the Daisy Chain Cnfiguratin Tl Questin Hw t start the daisy chain cnfiguratr tl? Why shuld I install the standalne versin f the Daisy-Chain Cnfiguratin Tl? Where can I get the Daisy Chain Cnfiguratin

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins 2. Specificatins and main dimensins 3. Parts included 4. Cntrl bx 5. Installatin 6. Adjusting the strke length f the lift 7. Operatin mdes

More information

European Roulette Game Rules

European Roulette Game Rules Eurpean Rulette Game Rules Cntents Game Overview Placing Bets Aut Adjust Bet Bet Types Payuts Favrite Bets Statistics and Billbard Game Functins Game Setting Optins Return t Player Additinal Infrmatin

More information

Researcher s Guide to IRBManager

Researcher s Guide to IRBManager Researcher s Guide t IRBManager This guide includes infrmatin abut hw t use IRBManager t submit an xfrm (IRB applicatin) fr bth new studies and thse requiring subsequent review (mdificatin, cntinuing review).

More information

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill. OBJECTIVE 32: UNANNOUNCED EXERCISE OR DRILL OBJECTIVE Demnstrate the capability t carry ut emergency respnse functins in an unannunced exercise r drill. INTENT This bjective is derived frm NUREG-0654,

More information

Process Safety Management Program for Contractors

Process Safety Management Program for Contractors Page 1 f 7 Sect: 1.0 Purpse This sectin cntains requirements fr Ardent (Cntract Emplyer) and ur subcntractrs fr assisting ur clients in preventing r minimizing the cnsequences f catastrphic releases f

More information

TDM on the Web. How To Use TDM On The Web. Below is information and instructions for using the scheduling modules in TDM

TDM on the Web. How To Use TDM On The Web. Below is information and instructions for using the scheduling modules in TDM TDM n the Web Fr 2014 turnaments, Turnament Directrs will nly be able t run turnaments using TDM n the web. As lng as there is an internet cnnectin, ne can access TDM n the web. Please nte that TDM n the

More information

Concept 305 P. Pre-installation Guide IMPORTANT!

Concept 305 P. Pre-installation Guide IMPORTANT! Pre-installatin Guide Cncept 305 P IMPORTANT! Please fllw the instructins in this guide when preparing the installatin site prir t arrival and installatin f the equipment December 8th, 2017 Editin AA,

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specificatin Gen DB MF Cnslidatin and Gas Burn Reprt UI/API Dc ID: GNFDMDEHU6BB-46-53 Page 1 f 18 Disclaimer All infrmatin cntained in this draft Business Requirements Specificatin

More information

A template mass rescue operations plan

A template mass rescue operations plan The Internatinal Maritime Rescue Federatin Mass Rescue Operatins Prject: A template mass rescue peratins plan Cntents This paper prvides a template fr a mass rescue peratins plan. 1 Overview 1.1 Fr a general

More information

Visit Leader Emergency Action Card

Visit Leader Emergency Action Card Visit Leader Emergency Actin Card If an Establishment decides t adpt this card, it shuld be carried by all staff accmpanying a visit. It is recmmended that this is printed, laminated, and als placed in

More information

Fume Hood User Guidelines

Fume Hood User Guidelines Fume Hd User Guidelines 1. Intrductin A fume hd cabinet is an enclsed wrking chamber fitted with an exhaust ventilatin system. The primary functin f the fume hd cabinet is t prtect individuals wrking with

More information

Plain Language Summary

Plain Language Summary Pennsylvania Envirnmental Quality Bard New Regulatins fr Oil and Gas Well Casing and Cementing (Amendments t Chapter 78) Plain Language Summary In this dcument, the wrds rules and regulatins have the same

More information

PRE-FILL INSPECTION OF CUSTOMER OWNED CYLINDERS

PRE-FILL INSPECTION OF CUSTOMER OWNED CYLINDERS PRE-FILL INSPECTION OF CUSTOMER OWNED CYLINDERS IGC Dc 182/13/E EUROPEAN INDUSTRIAL GASES ASSOCIATION AISBL AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel: +32 2 217 70 98 Fax: +32 2 219 85 14 E-mail: inf@eiga.eu

More information

Taxidermy Registry. Before you start you will need. Step 1 Check for an existing profile. What do I need to submit a Grizzly Bear Registry Report?

Taxidermy Registry. Before you start you will need. Step 1 Check for an existing profile. What do I need to submit a Grizzly Bear Registry Report? What d I need t submit a Grizzly Bear Registry Reprt? What Infrmatin d I need t prvide? Yu will need a Fish and Wildlife Prfile and an active Taxidermist/Tanner Credential. Yu must be 19 years f age r

More information

Running a Raffle. There are 3 types of Legal Wisconsin Raffles

Running a Raffle. There are 3 types of Legal Wisconsin Raffles Running a Raffle Thank yu fr yur interest in running a raffle t benefit United Way f Prtage Cunty. We knw that raffles make great special events. Raffles cnducted t benefit United Way f Prtage Cunty must

More information

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission Philadelphia City Planning Cmmissin INSTRUCTIONS This Checklist is an implementatin tl f the Philadelphia Cmplete Streets Handbk (the Handbk ) and enables City engineers and planners t review prjects fr

More information

USTA Atlanta Combo Doubles Registration Information Play begins in late April

USTA Atlanta Combo Doubles Registration Information Play begins in late April Serving Cbb, Fultn, Dekalb, Gwinnett and Frsyth cunties USTA Atlanta Cmb Dubles Registratin Infrmatin Play begins in late April Spring 2011 League Infrmatin and Dates NEW! Team Match Frmat: Each team match

More information

Weather Balloon Altitude Control System. Tim Basta, Trevor Clark, Scott Miller Date: 9/15/2014

Weather Balloon Altitude Control System. Tim Basta, Trevor Clark, Scott Miller Date: 9/15/2014 Dcument: Functinal Analysis Prject: Weather Balln Altitude Cntrl System Submitted t: Hngwei Ga Submitted by: Tim Basta, Trevr Clark, Sctt Miller Date: 9/15/2014 Intrductin The fllwing functinal specificatin

More information

URGENT MEDICAL DEVICE RECALL : /29/ C Z

URGENT MEDICAL DEVICE RECALL : /29/ C Z Custmer Cde Number: ##### Custmer Address City, State, Zip Cuntry Attentin: Risk Management Attentin: Reference: URGENT MEDICAL DEVICE RECALL March 09, 2012 Risk Management, Operating Rm Directr, Operating

More information

Technical Documentation

Technical Documentation Quality f the future. Technical Dcumentatin Manual Black Bx Light Order-N.: 0255-004 Sparkasse Pfrzheim Calw (BLZ 666 500 85) Kt.-Nr. 791326 UniCredit Bank AG Karlsruhe (BLZ 660 202 86) Kt.-Nr. 15653957

More information

Who s Your School Breakfast Star? Writing Contest Official Rules

Who s Your School Breakfast Star? Writing Contest Official Rules Wh s Yur Schl Breakfast Star? Writing Cntest Official Rules Abut the Writing Cntest As part f SNA s Natinal Schl Breakfast Week 2013, students will have the pprtunity write abut a special breakfast with

More information

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p Exercise 2: Reviewing the Wrkplace Inspectin Checklist (30 min) p. 19-20 Part One: Behaviurs vs. Cnditins (15 min) Wrking individually: Think f 3 r 4 incidents that have ccurred r have the ptential t ccur

More information

Document Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE

Document Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE Dcument Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE Dcument Number PO-WHS-03 Dcument Status Authr Manager Human Resurces August 2012 Apprving Authrity Management Cmmittee August 2012

More information

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3 Supplement t Plicy 7 - Rep Hckey Date Revised: July 2017 Versin 1.3 1 Table f Cntents Table f Cntents 1 Rep Tryut Prcedure Guidelines 2 Intrductin: 2 Rep Tryut Objectives: 2 Purpse f Player Evaluatin and

More information

Equipment Strategy for Post Type High Voltage Current Transformers and Metering Units

Equipment Strategy for Post Type High Voltage Current Transformers and Metering Units ASM-STR-A2281256 Versin: 2.0 Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Metering Units Current versin: 20/06/2018

More information

User Guide. Honglei Liu.

User Guide. Honglei Liu. User Guide Hnglei Liu liuhnglei@gmail.cm Overview This package includes the implementatin f the anchr based clustering algrithm (ASC) and an integrated fast mtif discvery tl ASC+MEME. ASC+MEME prvides

More information

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work Field Instructin 5.2 Ples Inspectin and Supprt Prir t Cmmencement f Wrk Purpse This instructin utlines the minimum inspectin and supprting requirements fr wrk n ples. Safety Befre cmmencement f wrk, a

More information

Topic Sheet No. 5 Safe rigging of rope access equipment

Topic Sheet No. 5 Safe rigging of rope access equipment Dc. N.: HS-085ENG Date f Issue: 16/05/17 Issue N.: 001 Page 1 f 5 Tpic Sheet N. 5 Safe rigging f rpe access A tpic sheet prepared by IRATA Internatinal (2017) SAFETY AND HEALTH TOPIC SHEET NO. 5: SAFE

More information

To enforce and defend our rights to Handicap and Course Rating terminology and services as deferred through the agreement with the USGA.

To enforce and defend our rights to Handicap and Course Rating terminology and services as deferred through the agreement with the USGA. TO: Glf Canada Bard f Directrs DATE: September 17, 2012 FROM: Karen Hewsn, Dave Lafleur RE: Cease and Desist Prcess Objective T enfrce and defend ur rights t Handicap and Curse Rating terminlgy and services

More information

Nordson AP-300/600 Plasma Systems Operational Manual July 2017

Nordson AP-300/600 Plasma Systems Operational Manual July 2017 Nrdsn AP-300/600 Plasma Systems Operatinal Manual July 2017 User s Manual Page 1 A. 2.1 System Start-up T start the system first check the fllwing: 1. The pump in the back is turned n and running 2. Check

More information

GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS

GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS 1. Intrductin 1.1 The gverning bdy f Grve Schl has adpted this plicy t help the schl meet its respnsibilities fr safeguarding and educating

More information

Instructions for use. turbomax pro 24 E 28/2 E

Instructions for use. turbomax pro 24 E 28/2 E nstructins fr use turbmax pr 4 E 8/ E GB Table f cntents; General infrmatin Table f cntents General infrmatin....................... Fr yur infrmatin........................... Key t symbls...............................

More information

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan Swim Arund Lid Key Saturday, April 22, 2017 Race and Safety Plan This dcument utlines the details abut the race and safety plans fr ur 7-mile pen water race n Lid Key, Flrida. It cntains the fllwing: Race

More information

CITY OF SACRAMENTO. Regulatory Compliance Program

CITY OF SACRAMENTO. Regulatory Compliance Program CITY OF SACRAMENTO Regulatry Cmpliance Prgram Tpic: Ergnmics Prgram Effective Date: 05/19/09 Frm: T: Human Resurces Department Risk Management Divisin Department Directrs/Divisin Managers Supersedes: 03/03

More information

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field COLORS Object: Successfully run yur chice f ne f the tw ver-lapping mini-agility curses n the same field Scring: All bstacles must be perfrmed successfully t qualify unless within the faults allwed Levels

More information

CHAPTER FIFTEEN CURB AND GUTTER ITEMS

CHAPTER FIFTEEN CURB AND GUTTER ITEMS CHAPTER FIFTEEN CURB AND GUTTER ITEMS 15 CURB AND GUTTER ITEMS 1 5 OVERVIEW Curb and gutter items have different dcumentatin requirements fr each unit f measure (UOM). All curb and gutter items must be

More information

Lab rotation on vacuum techniques and thermal imaging

Lab rotation on vacuum techniques and thermal imaging Lab rtatin n vacuum techniques and thermal imaging Objectives Manually perate a high vacuum system thrugh pump dwn and vent rutines. Learn apprpriate vacuum system terminlgy rughing, backing, freline,

More information

AUTOMATED EXTERNAL DEFIBRILLATOR (AED) PROTOCOL

AUTOMATED EXTERNAL DEFIBRILLATOR (AED) PROTOCOL Sectin 2.6.2 (Reg.) AUTOMATED EXTERNAL DEFIBRILLATOR (AED) PROTOCOL Camden Cunty Schl System is cmmitted t reducing death and disability frm cardivascular disease and strke by imprving the chain f survival

More information

Safety Folder Quick Start Guide

Safety Folder Quick Start Guide Safety Flder Quick Start Guide Intrductin Hw Hw Where t Safety Management Systems t get started the system will help yu cmply with the law and hw t get help Safety Flder Intrductin t Safety Management

More information

Opportunity for Public Participation. Plain Language Summary

Opportunity for Public Participation. Plain Language Summary Opprtunity fr Public Participatin Pennsylvania Envirnmental Quality Bard Prpsed Regulatins fr Oil and Gas Well Casing and Cementing (Amendments t Chapter 78) Plain Language Summary In this dcument, the

More information

INSTRUCTIONS Sanctioning a 3PAR Competition

INSTRUCTIONS Sanctioning a 3PAR Competition INSTRUCTIONS Sanctining a 3PAR Cmpetitin The Natinal Three-Psitin Air Rifle Cuncil sanctins three-psitin air rifle matches t 1) fficially recgnize cmpetitins cnducted under the Natinal Standard Three-Psitin

More information

Rev B Medivators Inc.

Rev B Medivators Inc. Site Requirements MEDIVATORS, RAPICIDE, and ADVANTAGE are registered trademarks f Medivatrs Inc. ADASPOR is a registered trademark f Medivatrs Inc. Windws is a registered trademark f Micrsft Crpratin.

More information

Come Back to Ground! 1. Introduction

Come Back to Ground! 1. Introduction Cme Back t Grund! 1. Intrductin Many ships, particularly small tugs and supply bats have used a neutral grunded distributin system fr 120 vlt single phase htel and dmestic lads. This system is identical

More information

Opus Refrigeration Control System User Guide

Opus Refrigeration Control System User Guide Opus Refrigeratin Library Opus Refrigeratin Cntrl System User Guide Table f Cntents Table f Cntents...1 Overview and General Cncepts...2 Interactive Screens...3 Autmatic Creatin f Data Lgs and Alarms...3

More information

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE Are the emplyees r cntractrs wh wrk in yur facility expsed t cnfined space hazards? Have yu cnducted a thrugh assessment f yur facility

More information

VOLTMAX Design Specifications

VOLTMAX Design Specifications VOLTMAX Design Specificatins Revisin 0 May 2017 The VOLTMAX line f electric bilers was develped t efficiently supply hydrnic heating systems in cmmercial, institutinal and industrial applicatins. The biler

More information

R15 MEMBER USER GUIDE

R15 MEMBER USER GUIDE 1 R15 MEMBER USER GUIDE CONTENTS CLICK ON ANY OF THE SECTION TITLES BELOW TO GO TO THAT SECTION Welcme!... 2 Getting Started... 2 Internal Member Benefits... 4 External Member Benefits... 5 Frequently

More information

PLEASE REVIEW ALL INFORMATION CAREFULLY!

PLEASE REVIEW ALL INFORMATION CAREFULLY! NATIONAL TATTOO PRACTICAL EXAMINATION CANDIDATE INFORMATION BULLETIN (CIB) EXAMINATION CONTENT AND IMPORTANT ADMINISTRATION INSTRUCTIONS Please visit yur fficial examinatin prvider website OR www.nictesting.rg,

More information

The Race Director Version 2017nhancements Major Enhancements

The Race Director Version 2017nhancements Major Enhancements The Race Directr Versin 2017nhancements Majr Enhancements Reprts New Partnerships. Race Directr has added Race Result and Agee Race Timing t the list f supprted chip systems. Added the IPICO UHF and Trident

More information

Grade 11 Performance Task

Grade 11 Performance Task Thermmeter Crickets 1. Classrm Activity 2. Student Task 3. Task Specificatins 4. Scring Rubric Classrm Activity Nte: Since perfrmance tasks span different parts f the assessment system (summative, interim,

More information

First Aid Policy Version 2.0

First Aid Policy Version 2.0 First Aid Plicy Versin 2.0 Cntents Definitins Page 3 Ratinale & Scpe Page 3 Guiding Principles Page 3 Relevant Legislatin Page 3 Plicy Statements Page 4 1. Respnse t injuries and illness Page 4 2. First

More information

Europak ExeFlexx Variable Speed Booster Sets WRAS Approved Product (Approval Number )

Europak ExeFlexx Variable Speed Booster Sets WRAS Approved Product (Approval Number ) Eurpak ExeFlexx Variable Speed Bster Sets WRAS Apprved Prduct (Apprval Number 1312078) Upt 6 pumps n a single package as standard, custm build sets available Upt 480 m³/hr as standard Main Benefits: Delivered

More information

SETTING UP A CLUB. Westmorland County Football Association Limited. Contacts. Chief Executive Peter Ducksbury

SETTING UP A CLUB. Westmorland County Football Association Limited. Contacts. Chief Executive Peter Ducksbury Westmrland Cunty Ftball Assciatin Limited SETTING UP A CLUB Cntacts Chief Executive Peter Ducksbury Ftball Develpment Officer James Pattisn Assistant Ftball Develpment Officer/ Cmmunity Cach Graeme Blair

More information

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG Livermre Harley Owners Grup RIDING WITH LIVERMORE HOG 2010 Riding with Livermre HOG Table f Cntents Page 1 Welcme Page 2 Ride Planning Page 2 Rad Captains Page 2 Grup Ride Basics Page 3 Grup Riding Prcedures

More information

OPERATIONS CHALLENGE 2017

OPERATIONS CHALLENGE 2017 OPERATIONS CHALLENGE 2017 COLLECTION SYSTEM EVENT During the event, yur team will cmplete the fllwing: The event simulates cnnecting a 4-inch PVC lateral sewer t an existing 8-inch PVC sewer pipe while

More information

CE Marking FPC Manual For New Century Doors Limited

CE Marking FPC Manual For New Century Doors Limited Overview This manual, including the dcumentatin and recrds referenced by it, cnstitutes the Factry Prductin Cntrl (FPC) system established by NEW CENTURY DOORS LIMITED, LEIGHTON BUZZARD, BEDFORDSHIRE.

More information

ESF #5 Emergency Management Annex (1.0)

ESF #5 Emergency Management Annex (1.0) ESF #5 Emergency Management Annex (1.0) DCCCD Emergency Management Apprval and Implementatin Dallas Cunty Cmmunity Cllege District Emergency Supprt Functin #5 Emergency Management Annex This Emergency

More information

UCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD.

UCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD. FORENSICS OPERATING MANUAL 1 2731 Bartram Rd Bristl, PA 19007 USA POSITIVE PRESSURE MANIFOLD POSITIVE PRESSURE MANIFOLD MANUAL POSITIVE PRESSURE EXTRACTION OPERATION INSTRION Thery f Operatin 2 The Psitive

More information

Badminton New Zealand Sanctioned Events Information and Time-lines

Badminton New Zealand Sanctioned Events Information and Time-lines Badmintn New Zealand Sanctined Events Infrmatin and Time-lines Updated January 2017 A Badmintn New Zealand (BNZ) sanctined event means that the event is part f the BNZ Player Pints system (with the exceptin

More information

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS This Infrmatin Sheet prvides guidance n what t cnsider when undertaking an Out f Hurs Wrking risk assessment and deciding the cntrls

More information

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff FACILITIES MANAGEMENT Ht Wrk Plicy fr Wrk Perfrmed By University Emplyees 03/13/18 - Last Revisin INTENT: The intended purpse f this Plicy is t prvide a safe wrk/learning envirnment in University buildings

More information

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents Installatin Manual fr VersaScreen Pr and VersaScreen IceBlaster Gutter Prtectin Prducts Table f Cntents VersaScreen/VersaScreen Pr Installatin p. 2-4 VersaScreen IceBlaster p. 5-7 IceBlaster RE p. 5-6

More information

Down and Out Mount Assembly & Installation Directions

Down and Out Mount Assembly & Installation Directions Dwn and Out Munt Assembly & Installatin Directins Munting the Dwn and Out Munt crrectly takes a lt f thught and a lt f planning. Please read the directins thrughly and plan ut hw the munt wuld be installed

More information

Complex Care Hub Manual: High Flow Nasal Prong (HFNP) Oxygen Therapy

Complex Care Hub Manual: High Flow Nasal Prong (HFNP) Oxygen Therapy Cmplex Care Hub Manual: High Flw Nasal Prng (HFNP) Oxygen Therapy Table f Cntents 1. What is High Flw Therapy?... 2 2. Humidificatin... 2 2.1 What is humidificatin?... 2 2.2 Mechanical humidificatin...

More information

Construction Design and Management

Construction Design and Management Cnstructin Design and Management GUIDANCE ON THE CONSTRUCTION PHASE PLAN Veritas Cnsulting Safety Services 42 Haslucks Crft, Shirley, Slihull, B90 2EQ Tel: 0121 249 1281 Mb: 07814 203 977 www.veritas-cnsulting.c.uk

More information

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature Fire Chief Signature Date Effective: 01apr13 Revised: Page: 1 f 5 Purpse: T establish standards fr GFD peratins when facilitatings ice r water rescue incidents,including safety cnsideratins, respnsibility,

More information

U00306: Maintain a safe and secure working environment

U00306: Maintain a safe and secure working environment U00306: Unit Descriptr: This unit describes the cmpetence required t maintain a safe and secure wrking envirnment. The unit describes the essential abilities f: Cmmunicating effectively Wrking in a safe

More information

A Guide to Relocating Hazardous Materials

A Guide to Relocating Hazardous Materials A Guide t Relcating Hazardus Materials Created: March 2001 Last revisin: March 2018 TABLE OF CONTENTS Intrductin Online Resurces 3 Helpful Cntact Infrmatin 3 Planning fr the Mve Wh t Ntify f the Mve 4

More information

SPI-SAF-40 Flammable Gas Procedure

SPI-SAF-40 Flammable Gas Procedure 1. PURPOSE This prcedure is designed t prevent flash fires r explsins frm unintentinal ignitin f an explsive mixture f flammable gas and air. 2. SCOPE This prcedure applies t Ontari Mining Operatins, where

More information

Warranty & Service Information Proprietary Notice: Limited Warranty: Service Support:

Warranty & Service Information Proprietary Notice: Limited Warranty: Service Support: Operatins Manual PHI Management Inc. PO Bx 369 Prt Richey Flrida 34654 (813) 507-4429 Warranty & Service Infrmatin Prprietary Ntice: Infrmatin cntained in this dcument is cpyrighted by PHI MGMT, and may

More information

Glide into Spring Beyond the Basics Figure Skating Club of Southern Maryland (FSCSM) Saturday, May 20, 2017

Glide into Spring Beyond the Basics Figure Skating Club of Southern Maryland (FSCSM) Saturday, May 20, 2017 Glide int Spring Beynd the Basics Figure Skating Club f Suthern Maryland (FSCSM) Saturday, May 20, 2017 The Glide Int Spring Beynd the Basics cmpetitin will be cnducted in accrdance with the rules and

More information

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work. Field Instructin 10.3 Specialised Insulated Plant fr Vegetatin Management Purpse This instructin utlines the minimum requirements and safe apprach distances (SADs) fr specialised insulated plant peratrs

More information

MECHANICS & TECHNIQUES 3PO

MECHANICS & TECHNIQUES 3PO MECHANICS & TECHNIQUES 3PO FIBA Main Cmpetitins Summer 2014 2 This material includes mre practical apprach and detailed techniques fr sme key situatins n the curt and it is based n FIBA Referees Manual

More information

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC OBJECTIVE 14: IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC OBJECTIVE Demnstrate the capability and resurces t implement

More information

MODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations:

MODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations: INSTALLATION AND MAINTENANCE MANUAL Explsin Prf Lw Prfile Linear LED Light EPL-24-50LED Series MODELS 2 & 4 Versins SUITABLE FOR WET LOCATIONS in the fllwing lcatins r unclassified lcatins: Fr Use In:

More information

IEC Functional Safety Assessment

IEC Functional Safety Assessment IEC 61508 Functinal Safety Assessment Prject: 2052 Series Actuatrs Cmpany: Fisher Cntrls Internatinal LLC, Inc. (an Emersn Prcess Management cmpany) Marshalltwn, IA USA Cntract Number: Q13/05-046 Reprt

More information

The Race Director 2019 Enhancements

The Race Director 2019 Enhancements Majr Enhancements Race Day Scring. Race Day Scring is the applicatin that will ultimately replace Race Directr. In this RD release, a way f exprting an entire Race Directr race fully enabled fr a RDS imprt

More information

PA-65-x Multi-Range Air Differential Pressure Transmitter

PA-65-x Multi-Range Air Differential Pressure Transmitter Date f Issue: 06/01/2015 Page 1 f 5 PA-65-x Multi-Range Air Differential Pressure Transmitter Features: Benefits: Field selectable multi-ranges Field selectable multi-utput Simple 5 step set-up LCD Display

More information

SENIOR STARS HOCKEY LEAGUE

SENIOR STARS HOCKEY LEAGUE SENIOR STARS HOCKEY LEAGUE 2014 SUMMER SEASON June - September 2013 The Senir Stars Hckey League (SSHL), the fficial adult hckey league f the Dallas Stars, is ready t light the lamp fr its 2014 summer

More information

WISE STUDENT MONITORING, TUTORING AND ASSESSMENT SYSTEM T E C H N I C A L D E S C R I P T I O N

WISE STUDENT MONITORING, TUTORING AND ASSESSMENT SYSTEM T E C H N I C A L D E S C R I P T I O N T E C H N I C A L D E S C R I P T I O N WISE STUDENT MONITORING, TUTORING AND ASSESSMENT SYSTEM MPRI Simulatins Grup MPRI, a divisin f L3 Services Grup Inc. 2961 West Califrnia Avenue Salt Lake City, Utah

More information

Year 1 for New School Counselors

Year 1 for New School Counselors Year 1: Envirnment and Schl Cunselr Practice Red Clay Cnslidated Schl District s Cmprehensive Inductin Prgram (CIP) 2015-2016 Required Wrkshps: Year 1 fr New Schl Cunselrs New Educatr Orientatin (nly if

More information

The. Guidelines: Printing. Instructions: Model Parts: print on both. every-day printer. prefer to print on. (each have their own preferences).

The. Guidelines: Printing. Instructions: Model Parts: print on both. every-day printer. prefer to print on. (each have their own preferences). The Wicked Wench Instructins: When printing these instructins, yu shuld print n bth sides f the sheets t save paper. Yu can als print in black & white t save clr ink/tner. Sme peple prefer nt t print,

More information

Workflow Description Racket Control WORKFLOW DESCRIPTION CALL AREA AND RACKET CONTROL/TESTING

Workflow Description Racket Control WORKFLOW DESCRIPTION CALL AREA AND RACKET CONTROL/TESTING Wrkflw Descriptin Racket Cntrl WORKFLOW DESCRIPTION CALL AREA AND RACKET CONTROL/TESTING 01.01.2017 1 Wrkflw Descriptin Racket Cntrl Table f Cntents 1. CALL AREA... 3 1.1. Delivery f scre sheet and team

More information

TELUS WISE footprint comic contest Create your own comic strip and enter for a chance to win

TELUS WISE footprint comic contest Create your own comic strip and enter for a chance to win TELUS WISE ftprint cmic cntest Create yur wn cmic strip and enter fr a chance t win TELUS WISE ftprint is a prgram that engages Canadian yuth (ages 7 thrugh 14) in learning hw t keep their digital ftprint

More information

Lohstr Hemer / Postfach Hemer Telefon: Fax: DEUTSCHLAND. Operating Manual.

Lohstr Hemer / Postfach Hemer Telefon: Fax: DEUTSCHLAND. Operating Manual. Lhstr. 13-58675 Hemer / Pstfach 4063-58663 Hemer Telefn: +49 2372 9274-0 Fax: +49 2372 3304 DEUTSCHLAND Operating Manual Sausage Warmer art.-n. 00-00326 + 00-00327 www.neumaerker.de 1. General Infrmatin

More information

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020.

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020. Nrth Halifax Grammar Schl First Aid Plicy Apprved by: Principal Date apprved: Nvember 2017 Next review: Autumn Term 2020 Plicy wner: Schl Welfare Officer Created April 2014 General The Academy is required

More information

Kennecott Utah Copper Corporation Safety and Health Standards

Kennecott Utah Copper Corporation Safety and Health Standards Revisin N. 3 12/2004 Page 1 f 7 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N.: 16.4 CRANES AND HOISTS 16.4.1 INTRODUCTION 16.4.1.1 The purpse f this standard is t prvide requirements

More information

Impact resistance of fiberboard shipping containers

Impact resistance of fiberboard shipping containers T 801 m-94 SUGGESTED METHOD 1944 OFFICIAL STANDARD 1971 OFFICIAL TEST METHOD 1983 REVISED 1988 1994 TAPPI The infrmatin and data cntained in this dcument were prepared by a technical cmmittee f the Assciatin.

More information

Effective Date: 15-March Table of Contents

Effective Date: 15-March Table of Contents Versin: 3 Page: 1 f 9 Table f Cntents 1.0 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 1.3 Definitins... 2 1.4 Respnsibilities... 2 Envirnmental Health and Safety Office (EHSO)... 2 Campus Services...

More information

SCALES NW BACK SAFETY PROGRAM

SCALES NW BACK SAFETY PROGRAM Purpse This safety prgram is designed t establish clear cmpany gals and bjectives with regard t back safety and will be cmmunicated t all required persnnel. The cmpany will review and evaluate this safety

More information

REGIONAL SWIMMING HUB STRATEGIC OVERVIEW

REGIONAL SWIMMING HUB STRATEGIC OVERVIEW REGIONAL SWIMMING HUB STRATEGIC OVERVIEW Updated 1 May 2017 P a g e 1 INDEX EXECUTIVE SUMMARY THE REQUIREMENT THE SOLUTION LAYING THE FOUNDATION THE GOALS THE IMPLEMENTATION POSITION DESCRIPTION HUB HEAD

More information

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013 Well Shut-in Practice - Attachment 1 Practice Owner: USA Divisin Safety Revisin N: 00 Date last revised: 01/14/2013 1.0 Applicability This practice applies t all Encana Oil & Gas (USA) Inc. (Encana) emplyees

More information

Topic Sheet No. 2 Near misses: Learning from failure

Topic Sheet No. 2 Near misses: Learning from failure Dc. N.: HS-082ENG Date f Issue: 16/05/17 Issue N.: 001 Page 1 f 5 Tpic Sheet N. 2 Near misses: Learning frm failure A tpic sheet prepared by IRATA Internatinal (2017) SAFETY AND HEALTH TOPIC SHEET NO.

More information

PXY88. Reference & Maintenance Manual. PXY88 Series Linear Positioning Stages (PLG110, PLG160, PLG210) S E R I E S

PXY88. Reference & Maintenance Manual. PXY88 Series Linear Positioning Stages (PLG110, PLG160, PLG210) S E R I E S PXY88 Series Linear Psitining Stages PXY88 S E R I E S Reference & Maintenance Manual (PLG110, PLG160, PLG210) Linear Psitining Rtary Psitining Mtin Cntrls Engineered Slutins 32114 Mallard Ave. PO Bx 409

More information

NORTH-EAST WALES NETBALL ASSOCIATION LEAGUE RULES

NORTH-EAST WALES NETBALL ASSOCIATION LEAGUE RULES STATEMENT ORGANISATION & ADMINISTRATION The league shall be gverned and managed by the Nrth-East Wales Netball Assciatin cmmittee which may delegate its pwers and authrity in this respect t any sub-cmmittee

More information