1 APPENDIX I HAZARDS AND HAZARDOUS MATERIALS DATA

2

3

4

5

6

7

8

9

10

11

12

13

14

15 September 30,2005 Mr. Wade Brown Project Director city of Laguna Beach 505 Forest Avenue Laguna Beach, California RE: Lifeguard Headquarters, Riverine Flooding at the Mouth Laguna Canyon Creek, Laguna Beach, California Dear Wade: I am writing you to summarize our findings regarding the above-mentioned project. We performed a hydraulic analysis of Laguna Canyon Creek at Pacific Coast Highway (PCH) in Laguna Beach, based on the best available data that we had. The following are my observations and assumptions: NAVD88 vertical datum assumed. Invert elevations of inlet and outlet are approximately 4.6 and 3.6, respectively. Low point of PCH road elevation is approximately The culvert outlet, which is currently boarded shut, is temporarily sealed and a major flood event will force the outlet open. Crossing PCH are 2-11'0" x 4'6" RCB, with a length of approximately 240 feet. Tailwater elevation assumed to be 15.4 based on newly adopted LOMR' and revised Zone VE BFEs; using closest cited elevation at Myrtle Street. Design flows: 4,500" and 6,910"'. Resulting headwater elevation is 15.6 so round to 16. Neither the National Flood Insurance Program (NFIP) Library nor Orange County Flood Control found any flood-related information relevant to this project. So we had to rely on our independent hydraulic analysis to determine the impacts of the lifeguard station on the riverine flooding potential. We applied the state-of-the-art one-dimensional culvert hydraulics model, HY~", to model this culvert system. The results are provided in the attached exhibit. Our conclusions and recommendations are as follows: Revise FIRM (LOMR process) SFHA Zone VE to extend up to PCH, thereby eliminating that confusing and misleading gap between Zones AE and VE. This is not critical to your project but should be done sometime in the near future. The PCH culvert system is submerged due to the coastal flooding Mill Creek Drive Suite 210 Laguna Hills, CA Tel: Fax:

16 Lifeguad Headquarters, Riverine Flooding at the Mouth Laguna Canyon Creek, Laguna Beach, California Since PCH is inundated by the coastal flooding (Zone VE), the riverine flooding (Zone AE) does not begin until the upstream side of PCH. The culvert hydraulic analysis revealed that outlet control prevails for the 100-year event. Hence, the riverine flooding is solely dependent on the tailwater characteristics, i.e., the coastal flood elevation. Therefore, the riverine is not impacted unless the Zone VE BFE is changed. Since the proposed Lifeguard Headquarters is located in Zone VE & whose finished floor elevation (FFE) will be constructed above the BFE of 15.4, the Zone VE should not be affected. The coastal engineer can verify this conclusion. I hope this report meets with your approval. Please let me know if you have any questions. Sincerely, RIVERTECH INC. - A. Tamim ~\a~ee, PE/ Vice President Enclosures ' Letter of Map Revision (LOUR), 1021-C, Case No P, October 21,2004. "lood Insurance Study (FIS), Orange County and Incorporated Areas, Federal Emergency Management Agency (FEMA), Volume 1 of 4, iii Lagum Canyon Channel Interim Study, Facility No. 102, Orange County Environmental Management Agency (OCEMA), June " FHWA Culvert Analysis, HY8, Version 6.1, Federal Highway Administration, Washington, DC.

17 1 CURRENT DATE: CURRENT TIME: 17:44:06 FILE DATE: FILE NAME: LGCYNPCH FHWA CULVERT ANALYSIS HY-8, VERSION 6.1 i SITE DATA i CULVERT SHAPE, MATERIAL, INLET i j INLET OUTLET CULVERT j BARRELS i I ELEV. ELEV. LENGTH I SHAPE SPAN RISE MANNING INLET I (ft) (ft) (ft) I MATERIAL (ft) (ft) n TYPE I RCB CONVENTIONAL^ I I I SUMMARY OF CULVERT FLOWS (cf s) ELEV (ft) TOTAL FILE : LGCYNPCH DATE: ROADWAY ITR OVERTOPPING SUMMARY OF ITERATIVE SOLUTION ERRORS FILE: LGCYNPCH DATE: HEAD ELEV (it) HEAD ERROR ( f t) TOTAL FLOW (cfs) FLOW ERROR (cfs) % FLOW ERROR

18 2 CURRENT DATE: CURRENT TIME: 17:44:06 FILE DATE: FILE NAME: LGCYNPCH PERFORMANCE CURVE FOR CULVERT 1-2( (ft) BY 4.50 (ft)) RCB DIS- HEAD- INLET OUTLET CHARGE WATER CONTROL CONTROL FLOW NORMAL CRIT. OUTLET TW OUTLET TW FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH DEPTH DEPTH VEL. VEL. (c~s) (ft) (ft) (ft) <F4> (ft) (ft) (ft) (ft) (fps) (fps) El. inlet face invert 4.60 ft El. outlet invert 3.60 ft El. inlet throat invert 0.00 ft El. inlet crest 0.00 ft ***** SITE DATA ***** CULVERT INVERT ************** INLET STATION 0.00 ft INLET ELEVATION 4.60 ft OUTLET STATION ft OUTLET ELEVATION 3.60 ft NUMBER OF BARRELS 2 SLOPE (V/H) CULVERT LENGTH ALONG SLOPE ft ***** CULVERT DATA SUMMARY... BARREL SHAPE BOX BARREL SPAN ft BARREL RISE 4.50 ft BARREL MATERIAL CONCRETE BARREL MANNING'S n INLET TYPE CONVENTIONAL INLET EDGE AND WALL SQUARE EDGE (30-75 DEG. FLARE) INLET DEPRESSION NONE

19 CURRENT DATE: CURRENT TIME: 17:44:06 FILE DATE: FILE NAME: LGCYNPCH TAILWATER CONSTANT WATER SURFACE ELEVATION ROADWAY OVERTOPPING DATA ROADWAY SURFACE EMBANKMENT TOP WIDTH CREST LENGTH OVERTOPPING CREST ELEVATION PAVED ft ft ft

20 Federal Emergency Management Agency Washington, D.C OCT CERTIFlEDMAIL, RETURN RECEIPT REQUESTED IN REPLY REFER TO: Case No.: P The Honorable Cheryl Kinsman Community City of Laguna Beach, CA Mayor, City of Laguna Beach Community No.: Forest Avenue Panels Affeded: 06059C0412 H, 0416 H, Laguna Beach, CA H, 0419 H, 0438 H, and 0501 H Effedve Date of 0 CT This Revision: Dear Mayor Kinsman: On April 24,2004, the Department of Homeland Seuuity's Federal Emergency Management Agency (FEMA) initiated a revision to the effective Flood Insurance Rate and Flood Insurance Study (FIS) report for Orange County, Calif& and Incorporated Areas (the effdve FIRM and F'IS report for your community), in accor&nce with Part 65 of the National Flood Jnsmmce regulations FEMA is revising the FIRM and FIS report to change a previous conversion of the FIRM from the National Geodetic Vertical Datum of 1929 the North American Vertical Datum of 1988 along the P d c Ocean coastline from approximately 700 feet west of the intersection of Riviera Drive and Monte Carlo Drive to approximately 600 feet south of the intersection of La Senda PIace and La Senda Drive. We have completed our review of the submitted data and the flood data shown on the effective FIRM and in the effective FLS qxnt We have revised the FIRM and FIS report to modify the elevations of the flood having a 1-percent chance of being equaled or exceeded in any given year (base flood) along the Paac Ocean coastline hm approximately 700 feet west of the intersection oeriviera Drive and Monte Carlo Drive to approximately 600 feet south of the intersection of La Sen& Place and La Senda Drive. As a result of the modifications, the Base Flood Elevations for the P d c Ocean decreased. The modifications are shown on the enclosed annotated copies of FIRM Panels 06059C0412 H, 06059C0416 H, 06059C0417 H, H, 06059C0438 H, and 06059C0501 H and afieded portions of the Summary of Pacific Ocean Wave Elevation Table. This Letter of Map Raision (LO=) hereby revises the above-referenced panels of the effective FIRM and the affeded portions of the FIS report, both dated February 18,2004. Because this revision request also affects the unincorporated areas of Orange County and the Cities of Dana Po& Huntington Beach, Newport Beach, San Clemente, and Seal Beach, separate L OW for these communities were issued on the same date as this LOMR. The modifications are effective as of the &te shown above. The map panels as listed above and as modified by this letter will be used for all tlood insurance policies and renewals issued for your community.

21 If you have any questions regarding floodplain managanent regulations far your community or the NFIP in general, please call the CCO for your community at the telephone number cited above. If you have any questions regaxding this LOMR, please call our Map Assistance Center, toll fke, at FEMA MAP ( ). Sincerely, Max H. Yuan, PE., Projed Engineer Hazard Identification Section Mitigation Division Emergency Preparedness and Response Dbectorate Enclosures For. Doug Bellom, P.E., CFM, Acting Chief Hazard Identification Section Mitigation Division Emergency Preparedness and Response Directorate cc: The Honorable Thomas Wilson Chairman, Orange County Board of Suparvisors The Honorable Joe Snyder Mayor, City of Dana Point The Honorable Cathy Green Mayor, City of Huntington Beach The Honorable Tom W. Ridgeway Mayor, City of Newport Beach The Honorable Susan Ritschel Mayor, City of San Clemente The Honorable Paul Yost Mayor, City of Seal Beach Mr. Steve May Director Department of Public Works City of Laguna Beach

22 Table 9. Summary of Pacific Ocean Wave Eldons (Cont'd) Wave Runup 500 Feet Southwest of Southan Intersection of Circle Drive and Pacific Coast Highway At 5* Avenue Extcnded Southwest At Seacliff Drive Extcnded Southwest At West Strcct Extcnded West Feet Northwest of Alisos Ctodr Fcet Southwest of lotdon of Pacific Coast Highway and Laguuita Line At upload Road Extended Southwest At Diamond Stt.ect Extaded At Mountain Road Extended At Park Avenue Storm Drain At Myale Stt.ect Extcnded Southwest At Bamnca Strut Extended At McKnight Drive Extended South Fat South of I n t ~ oof n Shamrock Road and pacific Coast Highway At Nigud Canyon Fcet Southwtst of lotdon of Circle and Emaad Point Drivts At Monte Carlo Drive Extended Southwest Wave Setup ~le~liccr (ket NAVDJ Elevation (Feet NAVD) 100h annual 1% annual 0.2% annual 100? annual 1% annual 0.2% annual chance c)lanct S!m!Z chanq chance &q 400 feet West of Intersdon of Riviera and Monte Carlo Drives REFLECT LOMR

23 Table 9. Summary of Pacific Ocean Wave Elevations (Cont'd) Wave Runup 400 Fed Southwest of East Garden Grove Wmtaburg Channd Dam At Sceptxe Lam Extended South At Weathaiy Lane Exteadad South ,200 Fect Southwest of btuscction of Wcathuiy Lane and Warner Avenue Wave Setup Ele~tion (Feet NAMj Elevation (Feet NAM) 10% annual.i% annual 0.2% annual lo?? annual 1% annual 92% annual &4EG &!Ss chance ~hance fiance chance At 14* street Exteadad Southwest At Andason Street Extaided Southwest At Huntington Harbor At intersection of M c Coad Hwy and Wama Avenue Philip Sh-eet Extended Southwest At Dolphin Avenue Extended Southuest At Anaheim Bay 7.2 At loq Street Extmded Southwest At 9 Street Extended Southwest Conflutnce with San Gabriel River 1. Avetage Elevation Along Coast in Vicinity of Each Location REVISED - - TO REFLECT ~ LOMR

24 Table 9a Inland Flooding Elevations (Cont'd) Elevation (Feet NAVD) 10% annual 1% annual 0.2% annual chance chance chance Huntfngton 8each Channel - East Banh Belween Banning Avenue. MagnoSa Street and Bermuda Cirde extended Between Levee. Newbnd Street. Hamilton Avenue, and Surveyor Cirde Between HmUton Avenue. Newland Sbveet. Atlanta Avenue. and Brenkm Lane Between Levee, Athnta Avenue. and Newbnd Skeet Between Atlanta Avenue. Newland Street, and Magnolia Street Beween Atlanta A-. khstef m. and Newland Street Between Munster Drive. Adams Avenue, and Waterfront Lane Between Waterfront Lane. Northport Drive. and Port Greenwich Lane as Elevation mt computed REVISED TO REFLECT LOi\JIR DATED OCT 2 I 2004

25

26

27

28

29

30

31

32

33

34

35

36

37

38

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Prepared For: Woodard & Curran 95 Cedar Street, Suite 100 Providence, RI 02903

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

Photo by: Darryl Hatheway, 2011

Photo by: Darryl Hatheway, 2011 Photo by: Darryl Hatheway, 2011 September 11, 2015 Presentation Discussion Examine PFD V-Zone Mapping in Wave Runup Dominated West Coast Application of PFD V-Zone Mapping Criteria in Pacific G&S PFD V-Zone

More information

APPENDIX D-2. Sea Level Rise Technical Memo

APPENDIX D-2. Sea Level Rise Technical Memo APPENDIX D-2 Sea Level Rise Technical Memo 2185 N. California Blvd., Suite 500 Walnut Creek, CA 94596 (925) 944-5411 Fax: (925) 944-4732 www.moffattnichol.com DRAFT MEMORANDUM To: From: Neil Nichols,

More information

VOLUME 2 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER

VOLUME 2 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER VOLUME 2 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER DAYTONA BEACH, CITY OF 125099 NEW SMYRNA BEACH, CITY OF 125132 DAYTONA BEACH SHORES, CITY OF 125100

More information

Sussex County, DE Preliminary Study Overview

Sussex County, DE Preliminary Study Overview Sussex County, DE Preliminary Study Overview Coastal study scope: 102 miles of entire County shoreline Revised 102 panels for coastal study Riverine study scope: 14 streams, 67.1 miles, within the Nanticoke

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS

WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS v. 8.4 WMS 8.4 Tutorial Hydraulics and Floodplain Modeling HY-8 Modeling Wizard Learn how to model a culvert using HY-8 and WMS Objectives Define a conceptual schematic of the roadway, invert, and downstream

More information

Ventura County. Open Pacific Coast Study. California Coastal Analysis and Mapping Project

Ventura County. Open Pacific Coast Study. California Coastal Analysis and Mapping Project Ventura County Open Pacific Coast Study California Coastal Analysis and Mapping Project December 2011 Project Name: Meeting: Date and Time: Location: California Coastal Analysis and Mapping Project (CCAMP)/Open

More information

MADISON COUNTY, ILLINOIS AND INCORPORATED AREAS

MADISON COUNTY, ILLINOIS AND INCORPORATED AREAS VOLUME 2 OF 2 MADISON COUNTY, ILLINOIS AND INCORPORATED AREAS * * * COMMUNITY COMMUNITY NAME NUMBER ALHAMBRA, VILLAGE OF 170270 ALTON, CITY OF 170437 BETHALTO, VILLAGE OF 170438 COLLINSVILLE, CITY OF 170439

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Indiana LTAP Road Scholar Core Course #10 Culvert Drainage Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd. Objectives Review culvert shapes, end sections, and materials

More information

APPENDIX C. Fluvial and Tidal Hydraulics Report

APPENDIX C. Fluvial and Tidal Hydraulics Report APPENDIX C Fluvial and Tidal Hydraulics Report BUENA VISTA LAGOON ENHANCEMENT PROJECT FLUVIAL AND TIDAL HYDRAULICS ANALYSES Prepared for: SANDAG 401 B Street, Suite 800 San Diego, California 92101 Contact:

More information

Open Pacific Coast Study. California Coastal Analysis and Mapping Project

Open Pacific Coast Study. California Coastal Analysis and Mapping Project Open Pacific Coast Study California Coastal Analysis and Mapping Project September 2012 California Open Coast Counties California Coastal Analysis and Mapping Project This publication is an initiative

More information

Federal Emergency Management Agency

Federal Emergency Management Agency Page 1 of 5 Date: May 31, 2012 COMMUNITY AND MAP PANEL INFORMATION COLLIER COUNTY, FLORIDA (Unincorporated Areas) LEGAL PROPERTY DESCRIPTION Multiple Properties, all recorded in the Office of the Clerk

More information

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL APRIL 2011 APRIL 2011 Page 1 Preface TIDEROUT 2, Build 1.22 dated June 29, 2006 is the current

More information

CHAPTER 5 CULVERT DESIGN

CHAPTER 5 CULVERT DESIGN CHAPTER 5 CULVERT DESIGN HYDRAULICS OF CULVERTS There are two major types of culvert flow: 1) flow with inlet control, and 2) flow with outlet control. For each type, different factors and formulas are

More information

Coastal Hazards Study

Coastal Hazards Study Coastal Hazards Study 2212 Beach Boulevard, Pacifica Prepared for: EXECUTIVE SUMMARY City of Pacifica 170 Santa Maria Ave Pacifica, CA 94044 Prepared by: moffatt & nichol 2185 N. California Blvd. Walnut

More information

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018 Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting May 14, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping Floodplain

More information

Citrus, Hernando, and Pasco Coastal Hazard Analysis. Flood Risk Review Meeting Citrus, Hernando, and Pasco Counties, Florida December 14, 2017

Citrus, Hernando, and Pasco Coastal Hazard Analysis. Flood Risk Review Meeting Citrus, Hernando, and Pasco Counties, Florida December 14, 2017 Citrus, Hernando, and Pasco Coastal Hazard Analysis Flood Risk Review Meeting Citrus, Hernando, and Pasco Counties, Florida December 14, 2017 Introductions Risk MAP Project Team FEMA Region IV RAMPP (study

More information

2016 NC Coastal Local Governments Annual Meeting

2016 NC Coastal Local Governments Annual Meeting 2016 NC Coastal Local Governments Annual Meeting Coastal Flood Study Modeling and Mapping 101 April 21, 2016 Tom Langan, PE, CFM Engineering Supervisor NCEM Floodplain Mapping Program FEMA Coastal Flood

More information

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA, PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA, FLOOD OF FEBRUARY 1986 By J.C. Blodgett and J.B. Lucas U.S. GEOLOGICAL SURVEY Open-File Report 88-82 CO CM I m r-h CM Sacramento, California

More information

St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting. May 2, 2018

St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting. May 2, 2018 St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting May 2, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

SANTA ROSA COUNTY, FLORIDA AND INCORPORATED AREAS

SANTA ROSA COUNTY, FLORIDA AND INCORPORATED AREAS VOLUME 1 OF 1 SANTA ROSA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME GULF BREEZE, CITY OF 120275 JAY, TOWN OF 120339 MILTON, CITY OF 120276 SANTA ROSA COUNTY, UNINCORPORATED AREAS COMMUNITY NUMBER

More information

The History of Coastal Flood Hazard Assessments in the Great Lakes

The History of Coastal Flood Hazard Assessments in the Great Lakes The History of Coastal Flood Hazard Assessments in the Great Lakes Brian A. Caufield, P.E., CFM June 23, 2016 2 The Great Lakes Some Statistics Courtesy of Great Lakes Information Network One-fifth of

More information

Physical Map Revisions in Connecticut due to Updated Coastal Flood Hazards F8: Maps in Transition

Physical Map Revisions in Connecticut due to Updated Coastal Flood Hazards F8: Maps in Transition Physical Map Revisions in Connecticut due to Updated Coastal Flood Hazards F8: Maps in Transition Brian Caufield, P.E., CFM Principal Engineer CDM Smith Kerry Bogdan, CFM Senior Engineer FEMA Region I

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The

More information

Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting. June 05, 2018

Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting. June 05, 2018 Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting June 05, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

U.S. Army Engineer Institute for Water Resources

U.S. Army Engineer Institute for Water Resources Sea Level Change Curve Calculator (2014.88) (DRAFT) U.S. Army Engineer Institute for Water Resources Table of Contents 1. INTRODUCTION... 2 1.1 BACKGROUND... 2 1.1.1 INFORMATION QUALITY ACT... 2 1.2 OVERVIEW...

More information

Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting. July 12, 2018

Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting. July 12, 2018 Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting July 12, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

SUPPLEMENTAL DOCUMENT SEA LEVEL RISE SCENARIO SELECTION AND DESIGN TIDE CALCULATION

SUPPLEMENTAL DOCUMENT SEA LEVEL RISE SCENARIO SELECTION AND DESIGN TIDE CALCULATION SUPPLEMENTAL DOCUMENT SEA LEVEL RISE SCENARIO SELECTION AND DESIGN TIDE CALCULATION FOR THE GUIDANCE FOR INCORPORATING SEA LEVEL RISE INTO CAPITAL PLANNING IN SAN FRANCISCO: ASSESSING VULNERABILITY AND

More information

Future Condi,ons coastal hazard modeling and mapping

Future Condi,ons coastal hazard modeling and mapping Future Condi,ons coastal hazard modeling and mapping Presented by Bob Ba:alio, PE Environmental Science Associates, Inc. (ESA) On behalf of the physical processes team (USGS, TerraCosta- Scripps, ESA)

More information

City of Del Mar Local Coastal Plan (LCP) Amendment for Sea Level Rise and Coastal Flooding

City of Del Mar Local Coastal Plan (LCP) Amendment for Sea Level Rise and Coastal Flooding City of Del Mar Local Coastal Plan (LCP) Amendment for Sea Level Rise and Coastal Flooding 6/22/17 Presentation to Sea Level Rise Stakeholder- Technical Advisory Committee (STAC) Nick Garrity, P.E. Lindsey

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting. August 21, 2017

Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting. August 21, 2017 Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting August 21, 2017 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

Bob Battalio, PE Chief Engineer, ESA September 8, 2016

Bob Battalio, PE Chief Engineer, ESA September 8, 2016 RELATING FUTURE COASTAL CONDITIONS TO EXISTING FEMA FLOOD HAZARD MAPS Technical Methods Manual Bob Battalio, PE Chief Engineer, ESA September 8, 2016 FMA 2016 Sacramento, California DWR-OST-SIO PILOTING

More information

LOCAL COASTAL PROGRAM UPDATE

LOCAL COASTAL PROGRAM UPDATE LOCAL COASTAL PROGRAM UPDATE Agenda Meeting #1 General Information (1 1:45 pm) Introductions and Background Grants involved What is a Local Coastal Program? What is required? LCP Update tasks and schedule

More information

OFFICE OF THE CITY ADMINISTRATOR

OFFICE OF THE CITY ADMINISTRATOR OFFICE OF THE CITY ADMINISTRATOR Gavin Newsom, Mayor Edwin M. Lee, City Administrator December 21, 2007 Mr. Eric Simmons, CFM National Flood Insurance Program Region IX, Mitigation Division U.S. Department

More information

WASHINGTON COUNTY, MAINE (ALL JURISDICTIONS)

WASHINGTON COUNTY, MAINE (ALL JURISDICTIONS) VOLUME 1 OF 1 WASHINGTON COUNTY, MAINE (ALL JURISDICTIONS) COMMUNITY NAME CID COMMUNITY NAME CID TOWN OF ADDISON 230132 TOWNSHIP OF BROOKTON 230470 TOWN OF ALEXANDER 230303 CITY OF CALAIS 230134 TOWN OF

More information

VOLUME 4 OF 6 LOS ANGELES COUNTY, CALIFORNIA AND INCORPORATED AREAS

VOLUME 4 OF 6 LOS ANGELES COUNTY, CALIFORNIA AND INCORPORATED AREAS VOLUME 4 OF 6 LOS ANGELES COUNTY, CALIFORNIA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER LOS ANGELES COUNTY UNINCORPORATED AREAS 065043 CITY OF CLAREMONT* 060109 CITY OF AGOURA HILLS

More information

Monterey County December 3, 2014

Monterey County December 3, 2014 Flood Risk Review Meeting: Open Pacific Coast Study Monterey County December 3, 2014 Welcome and Introductions Flood Risk Review Meeting Monterey County California Coastal Analysis and Mapping Project

More information

SEA LEVEL RISE IMPACT ASSESSMENT AND MITIGATION ALTERNATIVES DEVELOPMENT FOR BALBOA ISLANDS, CITY OF NEWPORT BEACH, CALIFORNIA

SEA LEVEL RISE IMPACT ASSESSMENT AND MITIGATION ALTERNATIVES DEVELOPMENT FOR BALBOA ISLANDS, CITY OF NEWPORT BEACH, CALIFORNIA SEA LEVEL RISE IMPACT ASSESSMENT AND MITIGATION ALTERNATIVES DEVELOPMENT FOR BALBOA ISLANDS, CITY OF NEWPORT BEACH, CALIFORNIA Ying Poon 1, Brett Sanders 2, Randy Mason 3 and Robert Stein 4 The City of

More information

JEFFERSON COUNTY, ARKANSAS AND INCORPORATED AREAS

JEFFERSON COUNTY, ARKANSAS AND INCORPORATED AREAS JEFFERSON COUNTY, ARKANSAS Community Name Community Number ALTHEIMER, CITY OF 050107 HUMPHREY, CITY OF 050108 JEFFERSON COUNTY 050440 (UNINCORPORATED AREAS) PINE BLUFF, CITY OF 050109 REDFIELD, CITY OF

More information

FEMA West Coast Sea Level Rise Pilot Study

FEMA West Coast Sea Level Rise Pilot Study FEMA West Coast Sea Level Rise Pilot Study Ed Curtis, P.E., CFM FEMA Region IX June 4, 2014 Presentation Objectives Present the goals of the FEMA West Coast Sea Level Rise Pilot Study Review the SLR Pilot

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

VOLUME 1 OF 1 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER

VOLUME 1 OF 1 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER VOLUME 1 OF 1 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER DAYTONA BEACH, CITY OF 125099 DAYTONA BEACH SHORES, CITY OF NEW SMYRNA BEACH, CITY OF 125132 125100

More information

VOLUME 1 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER

VOLUME 1 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER VOLUME 1 OF 5 VOLUSIA COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME NUMBER COMMUNITY NAME NUMBER DAYTONA BEACH, CITY OF 125099 DAYTONA BEACH SHORES, CITY OF NEW SMYRNA BEACH, CITY OF 125132 125100

More information

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector

More information

ST LEONARDS COASTAL HAZARD VULNERABILITY ASSESSMENT

ST LEONARDS COASTAL HAZARD VULNERABILITY ASSESSMENT Level 12, 333 Collins Street Melbourne VIC 3000 Australia Telephone: +61 3 8676 3500 Facsimile: +61 3 8676 3505 www.worleyparsons.com WorleyParsons Services Pty Ltd ABN 61 001 279 812 23 November 2011

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research

More information

San Luis Obispo County December 2, 2014

San Luis Obispo County December 2, 2014 Flood Risk Review Meeting: Open Pacific Coast Study San Luis Obispo County December 2, 2014 Welcome and Introductions Flood Risk Review Meeting San Luis Obispo County California Coastal Analysis and Mapping

More information

GALLATIN COUNTY, MONTANA AND INCORPORATED AREAS

GALLATIN COUNTY, MONTANA AND INCORPORATED AREAS GALLATIN COUNTY, MONTANA AND INCORPORATED AREAS Community Name Community Number * BELGRADE, CITY OF 300105 BOZEMAN, CITY OF 300028 GALLATIN COUNTY UNINCORPORATED AREAS 300027 * MANHATTAN, TOWN OF 300034

More information

Hydraulic Modeling Analysis

Hydraulic Modeling Analysis Final Report Photograph: http://www.newington-dover.com Newington to Dover, New Hampshire Prepared for: Vanasse Hangen Brustlin, Inc. 6 Bedford Farms Drive, Suite 607 Bedford, New Hampshire 03110-6532

More information

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 09/25/2018 DRAFT FEMA Region I PA H&H Study ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 Region I Federal Emergency Management Agency (FEMA) Public Assistance Hydrologic and Hydraulic (H&H)

More information

Project Incorporation of Sea Level Rise City of Newport Beach Approach for Balboa Islands, City of Newport Beach, California

Project Incorporation of Sea Level Rise City of Newport Beach Approach for Balboa Islands, City of Newport Beach, California Project Incorporation of Sea Level Rise City of Newport Beach Approach for Balboa Islands, City of Newport Beach, California Ying Poon, Everest International Consultants, Inc. CMANC Annual Winter Meeting

More information

The Basics of Culvert and Inlet Design

The Basics of Culvert and Inlet Design PDHonline Course C619 (8 PDH) The Basics of Culvert and Inlet Design Jerry D. Morrow, PE 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030 6658 Phone & Fax: 703 988 0088 www.pdhonline.org

More information

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G Alternative Solutions Details TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Krosno Creek Flood Reduction Project PROJECT

More information

WALTON COUNTY, FLORIDA

WALTON COUNTY, FLORIDA VOLUME 1 OF 1 WALTON COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME DEFUNIAK SPRINGS, CITY OF NUMBER 120318 FREEPORT, CITY OF 120319 PAXTON, TOWN OF 120423 WALTON COUNTY, UNINCORPORATED AREAS 120317

More information

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek City of Fairway, Kansas Fairway Stormwater Level of Service Study - Phase 2 Project No. 108200 Revision 1 12/6/2018 Stormwater

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

North Shore of Long Island, Feasibility Study

North Shore of Long Island, Feasibility Study North Shore of Long Island, Asharoken New York Asharoken, Feasibility Study Asharoken, NY Public Meeting June 30, 2015 US Army Corps of Engineers US Army Corps of Engineers New York BUILDING STRONG BUILDING

More information

CALIFORNIA SALMONID STREAM HABITAT RESTORATION MANUAL APPENDIX IX-A CULVERT CRITERIA FOR FISH PASSAGE INTRODUCTION

CALIFORNIA SALMONID STREAM HABITAT RESTORATION MANUAL APPENDIX IX-A CULVERT CRITERIA FOR FISH PASSAGE INTRODUCTION APPENDIX IX-A STATE OF CALIFORNIA RESOURCES AGENCY DEPARTMENT OF FISH AND GAME CULVERT CRITERIA FOR FISH PASSAGE For habitat protection, ecological connectivity should be a goal of stream-road crossing

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California HEC-RAS Version 3.1.3 May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California X X XXXXXX XXXX XXXX XX XXXX X X X X X X X X X X X X X X X X X X X XXXXXXX XXXX

More information

Storm Damage Floating Culverts & Other Inlet Issues

Storm Damage Floating Culverts & Other Inlet Issues Storm Damage Floating Culverts & Other Inlet Issues Mark Bailey, PE - Hydraulic Manager, INDOT Dale Sedler, PE - Sr. Hydraulic Engineer, INDOT Road School 2016 What causes a culvert to float? 1. Accumulation

More information

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS

JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS JACKTOWN ACRES FLOOD MITIGATION IMPROVEMENTS ANALYSIS SITUATE IN: NORTH HUNTINGDON TOWNSHIP WESTMORELAND COUNTY, PENNSYLVANIA PREPARED FOR: North Huntingdon Township 11279 Center Highway North Huntingdon,

More information

Dam Modification Report Stingy Run Fly Ash Reservoir Appendix E Spillway System Design Calculations E1: Spillway/Energy Dissipater Design for 100-year Event CHE8273 8 September 4, 2014 Written by: CJW

More information

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346

More information

Boothbay Harbor Rotary Club May 12, 2016

Boothbay Harbor Rotary Club May 12, 2016 Mapping Potential Sea Level Rise and Storm Surge in Boothbay Harbor, ME Boothbay Harbor Rotary Club May 12, 2016 Peter A. Slovinsky, Marine Geologist Maine Geological Survey S.M. Dickson, MGS Quickly,

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. 1.0 EXECUTIVE SUMMARY King Soopers #116, a grocery marketplace anchored commercial development, is proposed

More information

FEMA Region V. Great Lakes Coastal Flood Study. Pilot Study Webinar. Berrien County, Michigan. February 26, 2014

FEMA Region V. Great Lakes Coastal Flood Study. Pilot Study Webinar. Berrien County, Michigan. February 26, 2014 FEMA Region V Great Lakes Coastal Flood Study Pilot Study Webinar Berrien County, Michigan February 26, 2014 2 Pilot Study Webinar Agenda Great Lakes Coastal Flood Study Background Demonstration Project

More information

FEMA's new flood plain mapping could cost coastal Mainers dearly

FEMA's new flood plain mapping could cost coastal Mainers dearly July 5 FEMA's new flood plain mapping could cost coastal Mainers dearly Some communities in York and Cumberland counties hire a consultant to challenge the agency's findings. By Tux Turkeltturkel@mainetoday.com

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam

The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 28th, 1:30 PM The Hydraulic Design of an Arced Labyrinth Weir at Isabella Dam E. A. Thompson Sacramento District

More information

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario Technical Brief - Wave Uprush Analysis RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 October 31, 2014 Table of Contents Section Page Table of Contents... i List

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

Tsunamis. Tsunamis COMMUNITY EMERGENCY RESPONSE TEAM TSUNAMIS

Tsunamis. Tsunamis COMMUNITY EMERGENCY RESPONSE TEAM TSUNAMIS Tsunamis Tsunamis Tell the participants that tsunamis are ocean waves that are produced by underwater earthquakes or landslides. The word is Japanese and means harbor wave because of the devastating effects

More information

4.11 Transportation and Traffic

4.11 Transportation and Traffic 4.11.1 Introduction This section evaluates whether implementation of the Russian River Estuary Management Project (Estuary Management Project) would result in potential adverse impacts related to transportation

More information

Julebæk Strand. Effect full beach nourishment

Julebæk Strand. Effect full beach nourishment Julebæk Strand Effect full beach nourishment Aim of Study This study is a part of the COADAPT funding and the aim of the study is to analyze the effect of beach nourishment. In order to investigate the

More information

2017 Preliminary FEMA Flood Maps Old Orchard Beach Town Council Meeting. Old Orchard Beach, Town Hall July 18, 2017

2017 Preliminary FEMA Flood Maps Old Orchard Beach Town Council Meeting. Old Orchard Beach, Town Hall July 18, 2017 2017 Preliminary FEMA Flood Maps Old Orchard Beach Town Council Meeting Old Orchard Beach, Town Hall July 18, 2017 Overview Potential impacts of inaccurate Flood Insurance Rate Maps (FIRM) Why is appealing

More information

Federal Emergency Management Agency FLOOD INSURANCE STUDY NUMBER 48423CV001B. Smith County. Preliminary May 9, 2011

Federal Emergency Management Agency FLOOD INSURANCE STUDY NUMBER 48423CV001B. Smith County. Preliminary May 9, 2011 VOLUME 1 of 2 SMITH COUNTY, TEXAS Community Name Community Number Smith County ARP, CITY OF 480567 BULLARD, CITY OF* 480568 HIDEAWAY, CITY OF 480200 LINDALE, CITY OF 480569 NEW CHAPEL HILL, CITY OF 480157

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

Appendix 12 Consequences

Appendix 12 Consequences Appendix 12 Consequences Overview All of the consequence data used in the risk analysis was provided by the IPET Consequence team whose work is reported in Volume VII of the IPET report. The following

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Turn Lane Warrants: Concepts, Standards, Application in Review

Turn Lane Warrants: Concepts, Standards, Application in Review Turn Lane Warrants: Concepts, Standards, Application in Review David J. DeBaie P.E., P.T.O.E. 2004 ITE, District 1 Annual Meeting Burlington, Vermont Introduction Turning lanes at intersections reduce

More information

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10

HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 HYDROLOGIC AND HYDRAULIC REPORT PROPOSED CULVERT STRUCTURES SR 194, SECTION 10 RACETRACK ROAD CULVERT OVER THE SPRING RUN & GREEN SPRINGS ROAD CULVERT OVER AN UNNAMED TRIBUTARY TO SPRING RUN BERWICK TOWNSHIP

More information

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968 Submitted by EES Consulting 1155 North State

More information

Urgent Care Facilities

Urgent Care Facilities ALISO VIEJO 26831 Aliso Creek Rd Ste 200 CA 92656-5341 949-382-1909 ANAHEIM Anaheim Urgent Care 831 S State College Blvd CA 92806 714-533-2273 Clínica Médica 896 S Harbor Blvd CA 92805 714-491-1026 Hours:

More information

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301

More information

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 June 12, 2013 Table of Contents Section Page Table

More information

Pier 8 Wave Overtopping Analysis (65 Guise Street East) Our File:

Pier 8 Wave Overtopping Analysis (65 Guise Street East) Our File: Shoreplan Engineering Limited 55 Eglinton Avenue E., Suite 800 Toronto, ON Canada M4P 1G8 T) 416.487.4756 F) 416.487.5129 E) mail@shoreplan.com March 31, 2016 Mr. Ed English Senior Project Manager Waterfront

More information

The Storm Surge Hazard 2018 TS-8 Tropical Meteorology 2

The Storm Surge Hazard 2018 TS-8 Tropical Meteorology 2 The Storm Surge Hazard 2018 TS-8 Tropical Meteorology 2 Daniel Noah National Weather Service Tampa Bay daniel.noah@noaa.gov Tropical Cyclone Storm Surge Is a large dome of water, often 50 to 100 miles

More information

Rugraw, LLC is the Applicant for FERC Project No Lassen Lodge Hydroelectric Project (LLHP).

Rugraw, LLC is the Applicant for FERC Project No Lassen Lodge Hydroelectric Project (LLHP). November 16, 2015 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Subject: USFWS Letter dated Nov. 9, 2016 Re: FERC Project No. 12496 - Lassen

More information