Fuel Cycle: update on technical and procurement status. Alain Teissier Cryoplant & Fuel Cycle Project Team Manager Fusion For Energy
|
|
- Noel Reed
- 5 years ago
- Views:
Transcription
1 Fuel Cycle: update n technical and prcurement status Alain Teissier Cryplant & Fuel Cycle Prject Team Manager Fusin Fr Energy ITER Business Frum 2015, Fuel Cycle & Waste Management Wrkshp 26 th March
2 Scpe Fuel Cycle cmpnents t be prcured by F4E are part f the fllwing systems: Vacuum Pumping. Tritium Plant. Radilgical and Envirnmental Mnitring Systems. Waste Management Systems. Thse cmpnents are defined by IO at the cnceptual design, preliminary design r final design level and then prcured by F4E. Cnsequently F4E prcurement packages can be f three types: functinal specificatin (frm preliminary design t n-site delivery) r detailed design (frm final design t n-site delivery) r build-t-print (manufacturing and n-site delivery). The prcurement packages smetimes extend t n-site installatin and test. Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
3 Vacuum pumping (1/6) Equipment: Crypumps = vacuum pumps which trap gases and vapurs n a cld surface. Cld valve bxes and crylines. Duties: T prvide trus and crystat with clean, ultra high vacuum at large pumping speed. T pump the gas fed t the in surces and neutralizers f the neutral beams. T distribute helium t and frm the crypumps. Prcurement plan: Cntracts fr design. Cntracts fr manufacturing (including final design fr the cld valve bxes and crylines). Experience required: Fr design: vacuum, crygenics, cnstructin cdes. Fr manufacturing: welding and machining, helium leak detectin, metrlgy, cleanliness, cating, pressure equipment. Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
4 Vacuum pumping (2/6) Warm Regeneratin Lines Status: Cntract signed. Scpe: Prcurement includes final design, manufacturing and n-site delivery f apprx. 26 pieces crrugated lines f varius lengths and 28 field jints. 2.9m 4.5m 2.3m Level L3 20m Duty: transferring helium fr crypump regeneratin. 3m 9m 19.7m 6.6m 6.6m 4m 4m 4m 18.5m 20m 34.4m 6m 9.6m 7m 4m Level B1 4m 4m 7.5m 6.6m 4m 5m 3.6m 12.2 m 4m 107.2m 28.5m 4m 13.2m Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
5 Vacuum pumping (3/6) Cld Valve Bxes (CVBs) CVB Status: Call fr tender in preparatin. Scpe: Prcurement includes final design, manufacturing and n-site delivery f twelve CVBs and their auxiliaries. Duties: Cntrl the necessary supply and return f helium t the pumps s as t guarantee the n-demand cling and regeneratin. Prvide the necessary valves fr the safe peratin f the pumps. Main features: Netwrk f pipes and valves with perating temperatures frm 4.5 K t 470 K. Vacuum vessel f 1.8 m diameter, 2.3 m height. Twenty-five cntrl and n-ff valves, seventeen pressure relief valves, eight Jhnstn cuplings and a thermal shield. Fixed interfaces t match cnnecting lines and systems. CVB cmplex piping netwrk Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
6 Vacuum pumping (4/6) MITICA crypump (neutral beam crypump type) Status: Call fr tender in preparatin. MITICA crypump Scpe: Build-t-print prcurement fr MITICA test facility (Padva, Italy); will be prduced and tested s as t minimize any risk related t the neutral beam crypumps. Main features: A frame supprts panels that are cled dwn t 80 K (thermal shields) and t 4 K (crypanels). Thirty-tw pumping sectins: tp maniflds and supprt structures, stiffener brace, bttm maniflds. Fr each f the tw circuits, the panels are cnnected by means f maniflds and pipes. Inlet/utlet f the fluid is ensured thanks t Jhnstn cuplings welded n the main vacuum flange. Other sub-assemblies: the tp stiffener, the passive radiatin shields Tw crygenic circuits Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
7 Vacuum pumping (5/6) Pre-Prductin Crypump (Trus and crystat crypump type) Status: Cntract signed. Scpe: Build-t-Print prcurement; is being built and will be tested s as t minimize any risk related t the Trus and Crystat crypumps i.e., Address technlgical challenges; Specify the instrumentatin needs f these vacuum pumping systems; Analyze their perfrmance and incrprate safety prvisins. Main features: Cmpsed f tw crygenic circuits: Radiatin shields; Charcal cated crypanels. Panels enclsed in a vacuum chamber made up f: Pump casing; Pump plug; Frnt flange. A valve mves alng the vacuum chamber s axis in rder t islate the pump. Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
8 Vacuum pumping (6/6) Crypumps Scpe Design f the crypumps Pre-prductin crypump MITICA crypump Trus and crystat crypumps (x 8) Neutral Beam crypumps (x 4) Timescale - Call t be launched in: (dne; tasks cmpleted) (dne; manufacturing in prgress) End Cld valve bxes, crylines Scpe Cld valve bxes and auxiliaries preliminary design Warm regeneratin lines prcurement Cld valve bxes (x 12) and auxiliaries prcurement Timescale - Call t be launched in: (dne; task cmpleted) (dne; final design in prgress) 2016 Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
9 Tritium Plant (1/6) WDS large tanks Equipment: Water detritiatin system (WDS). Istpe separatin system (ISS). Duties: T prvide n-site interim strage f tritiated water. T detritiate water. T prduce pure deuterium as well as 90% tritium/10% deuterium mixture. Prcurement plan: Cntracts fr cnceptual design. Cntracts fr preliminary design. Cntracts fr final design and manufacturing. ITER Istpe Separatin System Cmpetences required: Chemical cmpnent separatin (crygenic distillatin, catalysts). Experience in handling f tritiated gases, large cmpnent manufacturing. Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
10 Tritium Plant (2/6) ITER WDS: System Layut Feeding Tanks 2x100 m 3 Emergency Tanks ISS LPCE-clumns TEP decay tanks Electrlyser units High level tritiated water hlding tanks 4x20 m 3 Tritiated Water Hlding Tanks Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
11 Tritium Plant (3/6) ITER WDS: 100 m 3 Emergency Tanks Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
12 Tritium Plant (4/6) ITER ISS: Schematics f System T expansin vlume Equilibratr (EQ) Reactins in the equilibratrs HT +D 2 DT + HD 2 DT D 2 + T 2 Clumn (CD) Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
13 Tritium Plant (5/6) ITER ISS: R&D n packing material ISS design needs ptimizatin t avid t high a tritium inventry in the clumns. Perfrmance tests have been carried ut n different packing types fr the ISS crygenic clumns. CY SULZER packing SULZER Heli-Pak C packing - SS Gauze structure - Diameter 50 mm - Vlume 5300 cm 3-5x5x0.3 mm - Material: stainless steel - Packing type: randm - Gemetry: helical Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
14 Tritium Plant (6/6) Water detritiatin system (WDS) Scpe WDS cnceptual design WDS Main preliminary design WDS tanks (2 x 100 m 3 and 4 x 20 m 3 ) prcurement WDS Main prcurement Timescale - Call t be launched in: (dne; task cmpleted) (dne; study in prgress) (dne; factry acceptance tests and n-site deliveries in prgress) 2017 Istpe separatin system (ISS) Scpe Timescale - Call t be launched in: ISS cnceptual design 2016 ISS preliminary design 2018 ISS prcurement 2020 Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
15 Radilgical and Envirnmental Mnitring System (REMS) (1/2) Equipment: Duties: Radilgical detectrs and prcess systems. Persnnel cntrl and envirnmental mnitring systems. Specific tritium detectrs. T prvide health and radilgical mnitring fr wrkers. T prvide envirnmental mnitring. T prvide tritium accident detectin mnitring. Prcurement plan: Many cmpnents are ff-the-shelf items but need t be adapted t ITER requirements. Prcurements split int tw phases: preliminary design; final design, manufacturing, n-site installatin and tests. Cmpetences required: Sensrs and detectrs fr nuclear use. Experience in radilgical and envirnmental safety. System integratin (electrnics, sftware). Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
16 Radilgical and Envirnmental Mnitring System (REMS) (2/2) Scpe REMS cnceptual design REMS preliminary design Envirnmental mnitrs Beryllium mnitrs Timescale - Call t be launched in: (dne; task cmpleted) (dne; task in prgress) HVAC mnitrs 2023 Nuclear mnitrs 2023 Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
17 Waste Management Systems (1/2) Equipment: Radwaste building prcess equipment fr lw and intermediate level-shrt lived (Type A radwaste). Site services building prcess equipment. Duty: T package and cnditin waste materials (Type-A) s that they d nt require any further prcessing prir t dispsal by the hst. Prcurement plan: Mstly industrial items t be adapted t ITER requirements. Prcurement split int three phases: preliminary design; final design; manufacturing, n-site installatin and tests. Cmpetences required: radiactive and activated waste management. Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
18 Waste Management Systems (2/2) Scpe WMS cnceptual design Radwaste preliminary design Radwaste final design Radwaste prcurement Timescale - Call t be launched in: (dne; task cmpleted) Fuel Cycle: update n technical and prcurement status Alain Teissier IBF
19 Fllw us n:
Lab rotation on vacuum techniques and thermal imaging
Lab rtatin n vacuum techniques and thermal imaging Objectives Manually perate a high vacuum system thrugh pump dwn and vent rutines. Learn apprpriate vacuum system terminlgy rughing, backing, freline,
More informationConstruction Design and Management
Cnstructin Design and Management GUIDANCE ON THE CONSTRUCTION PHASE PLAN Veritas Cnsulting Safety Services 42 Haslucks Crft, Shirley, Slihull, B90 2EQ Tel: 0121 249 1281 Mb: 07814 203 977 www.veritas-cnsulting.c.uk
More informationEquipment Strategy for Post Type High Voltage Current Transformers and Metering Units
ASM-STR-A2281256 Versin: 2.0 Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Metering Units Current versin: 20/06/2018
More informationWeather Balloon Altitude Control System. Tim Basta, Trevor Clark, Scott Miller Date: 9/15/2014
Dcument: Functinal Analysis Prject: Weather Balln Altitude Cntrl System Submitted t: Hngwei Ga Submitted by: Tim Basta, Trevr Clark, Sctt Miller Date: 9/15/2014 Intrductin The fllwing functinal specificatin
More informationEquipment Strategy For Earthing Transformers Strategy
ASM-STR-A683657 Versin: 2.0 Equipment Strategy Fr Earthing Transfrmers Strategy Equipment Strategy Fr Earthing Transfrmers Strategy Current versin: 28/06/2018 EXTERNAL USE Page 1 f 8 Next revisin due:
More informationEuropak ExeFlexx Variable Speed Booster Sets WRAS Approved Product (Approval Number )
Eurpak ExeFlexx Variable Speed Bster Sets WRAS Apprved Prduct (Apprval Number 1312078) Upt 6 pumps n a single package as standard, custm build sets available Upt 480 m³/hr as standard Main Benefits: Delivered
More informationGema s OptiColor System
Gema s OptiClr System The Gema OptiClr system is a simple, lw cst quick clr change slutin fr manual gun users that have multiple hppers set up t spray varius clrs. The OptiClr Manifld allws the user t
More informationVOLTMAX Design Specifications
VOLTMAX Design Specificatins Revisin 0 May 2017 The VOLTMAX line f electric bilers was develped t efficiently supply hydrnic heating systems in cmmercial, institutinal and industrial applicatins. The biler
More informationFume Hood User Guidelines
Fume Hd User Guidelines 1. Intrductin A fume hd cabinet is an enclsed wrking chamber fitted with an exhaust ventilatin system. The primary functin f the fume hd cabinet is t prtect individuals wrking with
More informationLiquid Nitrogen (LIN) Supply and Safety Plan. May 30, 2018
Liquid Nitrgen (LIN) Supply and Safety Plan May 30, 2018 Outline Backgrund CM-51, Plicy n Weather Related Emergency Prcedures fr LSUHSC-New Orleans Filling and Staging Dewars LIN/Dewar Rally Lcatins LIN
More informationDemonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals.
OBJECTIVE 20: MEDICAL SERVICES - TRANSPORTATION OBJECTIVE Demnstrate the adequacy f vehicles, equipment, prcedures, and persnnel fr transprting cntaminated, injured, r expsed individuals. INTENT This bjective
More informationCOMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission
Philadelphia City Planning Cmmissin INSTRUCTIONS This Checklist is an implementatin tl f the Philadelphia Cmplete Streets Handbk (the Handbk ) and enables City engineers and planners t review prjects fr
More informationPlain Language Summary
Pennsylvania Envirnmental Quality Bard New Regulatins fr Oil and Gas Well Casing and Cementing (Amendments t Chapter 78) Plain Language Summary In this dcument, the wrds rules and regulatins have the same
More informationCE Marking FPC Manual For New Century Doors Limited
Overview This manual, including the dcumentatin and recrds referenced by it, cnstitutes the Factry Prductin Cntrl (FPC) system established by NEW CENTURY DOORS LIMITED, LEIGHTON BUZZARD, BEDFORDSHIRE.
More informationDemonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.
OBJECTIVE 32: UNANNOUNCED EXERCISE OR DRILL OBJECTIVE Demnstrate the capability t carry ut emergency respnse functins in an unannunced exercise r drill. INTENT This bjective is derived frm NUREG-0654,
More informationBrazed Plate Heat Exchanger Operating & Instruction Manual U K Exchangers Ltd Unit 55, Stilebrook Road Olney Buckinghamshire MK46 5EA
Brazed Plate Heat Exchanger Operating & Instructin Manual U K Exchangers Ltd Unit 55, Stilebrk Rad Olney Buckinghamshire MK46 5EA Tel: (01234) 244320 Fax: (01234) 714978 Email: sales@ukeltd.cm Web: www.uk-exchangers.cm
More informationInstrumentation and monitoring systems for evaluation of plug responses in geological disposal demonstrations
Instrumentatin and mnitring systems fr evaluatin f plug respnses in gelgical dispsal demnstratins Dr.-Ing. Edgar Bhner VTT Technical Research Centre f Finland Ltd Presentatin at DOPAS Seminar 2016 Turku,
More informationBaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full
BaseStatin 1000 Irrigatin Cntrller Keeping a Pnd r Cistern Full If yu have a pnd r a cistern that is fed frm an external water surce, yu can use a Baseline bisensr sil misture sensr with yur Baseline cntrller
More informationNordson AP-300/600 Plasma Systems Operational Manual July 2017
Nrdsn AP-300/600 Plasma Systems Operatinal Manual July 2017 User s Manual Page 1 A. 2.1 System Start-up T start the system first check the fllwing: 1. The pump in the back is turned n and running 2. Check
More informationReview topics Natural hazards such as earthquakes, floods, weather-related consequences and possible overlaps
RSK catalgue f requirements, as at 30.03.2011 Nte: This is a translatin f the dcument entitled Anfrderungskatalg für anlagenbezgene Überprüfungen deutscher Kernkraftwerke unter Berücksichtigung der Ereignisse
More informationRev B Medivators Inc.
Site Requirements MEDIVATORS, RAPICIDE, and ADVANTAGE are registered trademarks f Medivatrs Inc. ADASPOR is a registered trademark f Medivatrs Inc. Windws is a registered trademark f Micrsft Crpratin.
More informationPolicy and Procedures
Plicy and Prcedures Yur farming system can be imprved thrugh clear plicies and prcedures. Clear plicies and prcedures will structure yur farming enterprise t enable the farm t perate withut the key persn.
More informationRBC Canadian Open. Practice Facility. RBC Canadian Open. 1 Championship Manual
Practice Facility RBC Canadian Open RBC Canadian Open 1 Practice Facility COMMITTEE DESCRIPTION The Practice Facility cmmittee is respnsible fr ensuring that the practice area(s) are running in a smth
More informationLab Pilot Fermenter Type LP351, 75 Liters OPERATING INSTRUCTIONS
Lab Pilt Fermenter Type LP351, 75 Liters OPERATING INSTRUCTIONS Befre yu start... 1. Autclave antifam and base slutin (in glass bttles) alng with three feeder tubing lines with hypdermic needles attached
More informationHydraulic accumulator cut-off and protection unit type B20
Hydraulic accumulatr cut-ff and prtectin unit type B20 NS20 up t 36 a D SHEE - OERION NUL WK 491 810 07.2016 LICION Hydraulic accumulatr prtectin and cut-ff unit is used fr cnnecting hydraulic accumulatr
More informationROCKAWAY PARK FORMER MANUFACTURED GAS PLANT SITE Rockaway Park, Queens County, New York
WATERLOO BARRIER SYSTEM INSTALLATION REPORT Subsurface Cntainment Barrier Wall Test Demnstratin - Sheet Piling With Sealed Interlcks ROCKAWAY PARK FORMER MANUFACTURED GAS PLANT SITE Rckaway Park, Queens
More informationProcess Safety Management Program for Contractors
Page 1 f 7 Sect: 1.0 Purpse This sectin cntains requirements fr Ardent (Cntract Emplyer) and ur subcntractrs fr assisting ur clients in preventing r minimizing the cnsequences f catastrphic releases f
More informationA Guide to Relocating Hazardous Materials
A Guide t Relcating Hazardus Materials Created: March 2001 Last revisin: March 2018 TABLE OF CONTENTS Intrductin Online Resurces 3 Helpful Cntact Infrmatin 3 Planning fr the Mve Wh t Ntify f the Mve 4
More informationManagement: Shop Coordinator, Shop Supervisor and Fire Safety Staff
FACILITIES MANAGEMENT Ht Wrk Plicy fr Wrk Perfrmed By University Emplyees 03/13/18 - Last Revisin INTENT: The intended purpse f this Plicy is t prvide a safe wrk/learning envirnment in University buildings
More information175 knm Torque Tool and Calibration Unit
Client Lg: Tag N Pages 1 f 9 Prject Title Lcatin 175 knm Trque Tl and Calibratin Unit Depr P N NA 01 31.05.2012 Issued fr infrmatin T.L R.Ø. K.N Rev. N. Date Reasn fr Revisin Prepared Checked Apprved Vendr
More informationEXPIRATION DATE: November 30, 2018 (FOR RENEWAL, SEE 49 CFR )
East Building, PHH-30 1200 New Jersey Avenue S.E. U.S. Department f Transprtatin Washingtn, D.C. 20590 Pipeline and Hazardus Materials Safety Administratin DOT-SP 14183 (FIFTH REVISION) EXPIRATION DATE:
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins 2. Specificatins and main dimensins 3. Parts included 4. Cntrl bx 5. Installatin 6. Adjusting the strke length f the lift 7. Operatin mdes
More informationpatient education program 4156 South 52 nd Street, Omaha, NE ChildrensOmaha.org/HomeHealthcare
patient educatin prgram 4156 Suth 52 nd Street, Omaha, NE 68117 800-747-7334 402-734-6741 ChildrensOmaha.rg/HmeHealthcare We knw children CHILDREN S HOME HEALTHCARE LTV 1150 Ventilatr Instructins Yur child
More informationIEC Functional Safety Assessment
IEC 61508 Functinal Safety Assessment Prject: 2052 Series Actuatrs Cmpany: Fisher Cntrls Internatinal LLC, Inc. (an Emersn Prcess Management cmpany) Marshalltwn, IA USA Cntract Number: Q13/05-046 Reprt
More informationPUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012
PUBLIC OPEN HOUSE Preliminary Engineering Study t Upgrade the Pembina Highway Underpass MAY 9, 2012 The number f nrthbund traffic lanes at the Pembina Highway Underpass need t be increased frm tw lanes
More informationLarge Diameter TECTITE Installation and Specifications Manual
Large Diameter TECTITE Installatin and Specificatins Manual TECTITE fittings are a heat free methd fr jining Cpper, CPVC and PEX tube. TECTITE prvides a clean and easy jining methd designed t save time
More informationDocument Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE
Dcument Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE Dcument Number PO-WHS-03 Dcument Status Authr Manager Human Resurces August 2012 Apprving Authrity Management Cmmittee August 2012
More informationPULSAR ZERO Flow sensitive Unloader valve
Ultim aggirnament: 20/04/18 PULSAR ZERO Flw sensitive Unlader valve Technical manual: E 267 Pressure regulating valve unlader type with zer setting n delivery line: at gun clsure the water flw is bypassed
More informationConfined Space Entry
Cnfined Space Entry What is a Cnfined Space? A space that: Is large enugh and s cnfigured that an emplyee can enter bdily and perfrm wrk; Has limited r restricted means f entry r exit; Is nt designed fr
More information23.1 Functions, Basic Configuration, and Interfaces
23 (6.6.D) SF 6 and Other Special Gases 23.1 Functions, Basic Configuration, and Interfaces 23.1.1 Functions The primary function performed by the SF 6 and other special gases system is to provide SF 6
More informationMECHANICAL SEALS & DRY SEALS
Training Title MECHANICAL SEALS & DRY SEALS Training Duratin 5 days Training Venue and Dates REF ME01 Mechanical Seals & Dry Seals 5 24-28 April 16 $4,250 Dubai, UAE Training will be held at any f the
More informationHow to Install a Toilet By See Jane DrillTM Copyright 2013, All Rights Reserved
Hw t Install a Tilet By See Jane DrillTM Cpyright 2013, All Rights Reserved Objective T learn hw t remve an existing tilet and install a new tilet. The steps described in these written instructins and
More informationTechnical Data Sheet EW1 Top coats
Tp cats Descriptin Wanda PU 2K HS is a single layer Plyurethane tpcat which ffers gd pacity, high glss, quick dry and gd weather resistance. It is suitable fr repair r verall re-sprays. 4 Wanda PU 2K HS
More information2016 AWWA/WEA Spring Conference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016
2016 AWWA/WEA Spring Cnference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016 Gal Discuss in detail the art f actuatrs retrfits fr the Water/Wastewater market
More informationCrane Mechanic (Limited Scope, Non-Commercial Lift) Competency Checklist and Employer Sign-off
Crane Mechanic (Limited Scpe, Nn-Cmmercial Lift) Cmpetency Checklist and Emplyer Sign-ff CRANE MECHANIC Date BC Crane Safety Number Name Signature EMPLOYER Date Cmpany Name Cmpany Address Name f Signing
More informationUCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD.
FORENSICS OPERATING MANUAL 1 2731 Bartram Rd Bristl, PA 19007 USA POSITIVE PRESSURE MANIFOLD POSITIVE PRESSURE MANIFOLD MANUAL POSITIVE PRESSURE EXTRACTION OPERATION INSTRION Thery f Operatin 2 The Psitive
More informationDivision of Training
Suthwest United Fire Districts Divisin f Training Minimum s Skills s Minimum s NFPA 1500 calls fr the establishment f an annual prficiency evaluatin fr all members f the department. These prficiencies
More informationLIGHTING & POWER UNIT TYPE LPU57
Title LIGHTING & POWER UNIT TYPE LPU57 USER MANUAL Dcument Number 40-374-12 Issue 03 03 DFCOM1 Added 2017.05.11 MC MC PC 02 Address and Lg Update 2017.03.23 CW CW PC 01 Original issue 2014.02.20 PC PC
More informationOwner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013
Well Shut-in Practice - Attachment 1 Practice Owner: USA Divisin Safety Revisin N: 00 Date last revised: 01/14/2013 1.0 Applicability This practice applies t all Encana Oil & Gas (USA) Inc. (Encana) emplyees
More informationCITY OF SACRAMENTO. Regulatory Compliance Program
CITY OF SACRAMENTO Regulatry Cmpliance Prgram Tpic: Ergnmics Prgram Effective Date: 05/19/09 Frm: T: Human Resurces Department Risk Management Divisin Department Directrs/Divisin Managers Supersedes: 03/03
More informationXR Pressure Regulators
Cat.N.C1-5 XR63 64 65 Pressure Regulatrs OUTLINE This is a pressure regulatr develped fr semicnductr prcess cntrl. Dust ccurrence and measuring fluid stagnancy are effectively prevented, assuring high
More informationField Instruction. Covers laid for mechanical protection of cables must always be removed by hand.
6.9 Undergrund Cables Purpse This instructin utlines the safe apprach distances (SADs) that must be maintained and the wrking requirements fr undergrund cables. Scpe This instructin utlining the safe apprach
More informationModelling transient leaks from pressure vessels including effects of safety systems
Mdelling transient leaks frm pressure vessels including effects f safety systems Jan Stene, Mike Harper and Henk W.M. Witlx, DNV GL - Sftware, Lndn, UK A new fast time-varying discharge mdel with safety
More informationE25 FATIGUE MANAGEMENT
E25 FATIGUE MANAGEMENT PURPOSE AND SCOPE This Prcedure prvides the requirements and guidance needed t manage fatigue fr Laing O Rurke railway peratins. It will need t be read in cnjunctin with the rail
More informationSPI-SAF-40 Flammable Gas Procedure
1. PURPOSE This prcedure is designed t prevent flash fires r explsins frm unintentinal ignitin f an explsive mixture f flammable gas and air. 2. SCOPE This prcedure applies t Ontari Mining Operatins, where
More informationGuidelines for Handling of Nuclear Gauges
Manitba STANDARD PROCEDURE INSTRUCTION Title Guidelines fr Handling f Nuclear Gauges Department Supersedes SPI Dated SPI 34-36 Effective Date Safety Health and Envirnment April 15, 2009 May 12, 2011 Guidelines
More informationTopic Sheet No. 5 Safe rigging of rope access equipment
Dc. N.: HS-085ENG Date f Issue: 16/05/17 Issue N.: 001 Page 1 f 5 Tpic Sheet N. 5 Safe rigging f rpe access A tpic sheet prepared by IRATA Internatinal (2017) SAFETY AND HEALTH TOPIC SHEET NO. 5: SAFE
More informationida Cer tification Ser vices
e ida Cer tificatin Ser vices IEC 61508 Functinal Safety Assessment Prject: 4660 High Lw Pressure Pilt Custmer: Fisher Cntrls Internatinal, LLC Marshalltwn, IA USA Cntract Number: Q12/09-016 Reprt N.:
More informationIMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC
OBJECTIVE 14: IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC OBJECTIVE Demnstrate the capability and resurces t implement
More informationRESOLUTION NO. WHEREAS, with action of June 16, 2015 the Council adopted Resolution No. 5521
RESLUTIN N. A RESLUTIN F THE CITY CUNCIL F THE CITY F SAUSALIT AUTHRIZING THE CITY MANAGER T EXECUTE A LEASE AGREEMENT WITH INDUSTRIAL SCIENTIFIC CRPRATIN FR PRVISIN F AN inet SUBSCRIPTIN FR INDUSTRIAL
More informationInstructions for use. turbomax pro 24 E 28/2 E
nstructins fr use turbmax pr 4 E 8/ E GB Table f cntents; General infrmatin Table f cntents General infrmatin....................... Fr yur infrmatin........................... Key t symbls...............................
More informationInstalling the ACT D MAND KONTROLS Systems
Installing the ACT D MAND KONTROLS Systems Mdel C1-100-PF fr Standard Piping (Nn-recirculating) Pre-Fab Systems Installatins shall be in accrdance with the manufacturer s instructins per the requirements
More informationADDITIONAL SOURCES OF INFORMATION ARE:
PREFACE The infrmatin n plicies and prcedures is intended fr the use f Texas Tech University Department f Intercllegiate Athletics. The manual supplements the Texas Tech University Operating Plicies and
More informationHYDROGEN SULFIDE (H2S)
Hustn Cntrls, Inc Dc N: Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 6 Purpse The purpse f this prgram is t establish minimum requirements fr site specific safety, which
More informationSAFE WORK METHOD STATEMENT FOR: Maintlink PTY LTD
MW Page 1 6/10/01 SAFE WORK METHOD STATEMENT FOR: PTY LTD 51 SYLVAN RIDGE DR ILLAWONG NSW 1, Australia www.maintlink.cm.au Tel: 0-954 6058 Fax: 0-954 9400 Task: GENERAL SWMS SWMS N. 001 Page 1 f 9 Tasks
More informationSponge-Jet Continuous VAC- Recovery System User Manual
Spnge-Jet Spnge Blasting System Spnge-Jet Cntinuus VAC- Recvery System User Manual Mdel CVR-P110 Headquarters/Manufactured By: Spnge-Jet, Inc. (USA) 14 Pattersn Lane, Newingtn, NH 03801 1-603-610-7950
More informationActivity: Energy In-Energy Out
Activity: Energy In-Energy Out Overview In this activity, participants will learn abut the imprtance f balancing energy in (fd eaten) with energy ut (energy used by the bdy t functin nrmally and during
More informationSideguard Assist. Dr. Andreas Schwarzhaupt Mannheim, 3rd of April 2017
Sideguard Assist Dr. Andreas Schwarzhaupt Mannheim, 3rd f April 2017 Accidents with pedestrians and cyclists number f severe accidents nt decreasing After AEBS and LDWS: Fcus n unprtected rad users Serius
More informationAppendix C. Travel Demand Forecasting Technical Memorandum
Appendix C Travel Demand Frecasting Technical Memrandum MEMORANDUM Date: T: Frm: Subject: Bb Watts, Twn f Castle Rck Karl Buchhlz, Muller Engineering Chris Sheffer, Nick VanderKwaak, Fehr & Peers Travel
More informationida Cer tification Ser vices
e ida Cer tificatin Ser vices IEC 61508 Functinal Safety Assessment Prject: 377 Series Trip Valves Custmer: Fisher Cntrls Internatinal, LLC Marshalltwn, IA USA Cntract Number: Q11/08-109 Reprt N.: EPM
More informationDevelopment of Fundamental Movement: Locomotor Skills
Develpment f Fundamental Mvement: Lcmtr Skills Gallahue, D.L., Ozmun, J.C., Gdway, J.D. (2012). Understanding Mtr Develpment. Bstn: McGraw-Hill. McGraw-Hill/Irwin 2012 McGraw-Hill Cmpanies. All Rights
More informationGuide to Good Thermal Insulation Practice
Guide t Gd Thermal Insulatin Practice FESI dcument 2 FEDERATION EUROPEENNE DES SYNDICATS D ENTREPRISES D ISOLATION EUROPEAN FEDERATION OF ASSOCIATIONS OF INSULATION CONTRACTORS May 2010 www.fesi.eu FESI
More informationPiston seal and material design EBA chromatography column - client Biotechflow Ltd. A case study presented by James Walker
Pistn seal and material design EBA chrmatgraphy clumn - client Bitechflw Ltd A case study presented by James Walker High Perfrmance Sealing Technlgy Intrductin Chrmatgraphy clumns are extensively emplyed
More informationDEUTECS - excellence Page 1
DEUTECS - excellence Page 1 Cpyright 2017 by DEUTECS GmbH Versin 2 DEUTECS - excellence Page 2 Table f Cntents DEUTECS Cnsulting... 4 R&D... 4 Engineering... 4 Cmmercial services... 5 Cntrlling... 5 Training
More informationSwim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan
Swim Arund Lid Key Saturday, April 22, 2017 Race and Safety Plan This dcument utlines the details abut the race and safety plans fr ur 7-mile pen water race n Lid Key, Flrida. It cntains the fllwing: Race
More informationTable of Contents. I. General Instructions. Task Information. Operator Qualification Checklist. Railroad Commission/Employer Record
LP-Gas Student Qualifying Field Activities Installatin & Maintenance f Prpane Appliances in Recreatinal Vehicles Table f Cntents I. General Instructins II. Task Infrmatin III. Operatr Qualificatin Checklist
More informationWORKSTATIONS mysite User Guide. mysite Workstation System User Guide
Wrkstatin System Issue 1 Page 1 f 6 Sectin 1 INTRODUCTION 1.1 Intrductin Precisin s wrkstatin system ffers a fresh lk in design, functinality and perfrmance, prviding a cmplete slutin fr any ffice. Fixed
More informationFootwear Technical Design Process
Ftwear Technical Design Prcess The Ftwear Technical design team wants t wrk cllabratively with all vendrs, agents and factries. Please BE VOCAL. We are here t wrk with yu. Reach ut t yur TD partners anytime.
More informationHow to set your saddle height in under 23 minutes without the guesswork
Hw t set yur saddle height in under 23 minutes withut the guesswrk Have yu ever wndered if yur saddle was the right height but didn t knw hw t check? This guide will help yu check and adjust yur saddle
More informationTechnical Documentation
Quality f the future. Technical Dcumentatin Manual Black Bx Light Order-N.: 0255-004 Sparkasse Pfrzheim Calw (BLZ 666 500 85) Kt.-Nr. 791326 UniCredit Bank AG Karlsruhe (BLZ 660 202 86) Kt.-Nr. 15653957
More informationTechnical Data Sheet DW1 Undercoats
Descriptin Wanda 8100 2K Primer ffers great filling and sanding prperties, excellent hld ut, fast dry, and gd adhesin n prperly prepared substrates. 4 Wanda 8100 2K Primer Wanda 2K Hardener Std 418.03093
More informationTransportation Border Working Group Portland March 3-4, CBSA Infrastructure Project Update
Transprtatin Brder Wrking Grup Prtland March 3-4, 2014 CBSA Infrastructure Prject Update CBSA Prject Status Update Envirnmental/Challenges Current Prjects Laclle Emersn and Nrth Prtal Aldergrve Small Prts
More informationUniversity of Delaware
University f Delaware Design & Cnstructin Technical Guidelines Envirnmental Health & Safety LABORATORY EQUIPMENT STANDARDS University Cntact: Department f Envirnmental Health & Safety (302) 831 8475 PART
More informationEuropean Roulette Game Rules
Eurpean Rulette Game Rules Cntents Game Overview Placing Bets Aut Adjust Bet Bet Types Payuts Favrite Bets Statistics and Billbard Game Functins Game Setting Optins Return t Player Additinal Infrmatin
More informationOPERATIONS CHALLENGE 2017
OPERATIONS CHALLENGE 2017 COLLECTION SYSTEM EVENT During the event, yur team will cmplete the fllwing: The event simulates cnnecting a 4-inch PVC lateral sewer t an existing 8-inch PVC sewer pipe while
More informationComplex Care Hub Manual: High Flow Nasal Prong (HFNP) Oxygen Therapy
Cmplex Care Hub Manual: High Flw Nasal Prng (HFNP) Oxygen Therapy Table f Cntents 1. What is High Flw Therapy?... 2 2. Humidificatin... 2 2.1 What is humidificatin?... 2 2.2 Mechanical humidificatin...
More informationFundamentals of Successful Pole Vaulting Anthony Bertoli University of Northern Iowa
Fundamentals f Successful Ple Vaulting Anthny Bertli University f Nrthern Iwa Overall Philsphy All fundamentals wrk twards prducing safe, cnsistent, & effective vaulting Basic Gals Cnsistent rhythmic apprach
More informationH 2 O Bubble Chamber Superheated Active Target System. Safety and Systems Overview B. DiGiovine
H 2 O Bubble Chamber Superheated Active Target System Safety and Systems Overview B. DiGiovine Physics Division and Bubble Chambers April 2009 First Bubble Chamber Received Full Operation Authorization
More informationCycling Strategy Group. Terms of Reference
Cycling Strategy Grup Terms f Reference 1. Cntext In May 2014 the Ecnmic and Envirnmental Wellbeing Scrutiny and Plicy Develpment Cmmittee cncluded its Cycling Inquiry. It set ut an ambitius visin fr cycling
More informationAll Students MUST fly with the assistance of a Club approved Instructor until such time as he/she has passed his/her Wings Test.
6 th Divisin Flyers/Orillia Aermdelers Wings Prgram The 6 th Divisin Flyers/Orillia Aermdelers Wings Prgram is an Instructin prgram with tried and prven methds f teaching newcmers t the hbby/sprt f aer
More informationMODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations:
INSTALLATION AND MAINTENANCE MANUAL Explsin Prf Lw Prfile Linear LED Light EPL-24-50LED Series MODELS 2 & 4 Versins SUITABLE FOR WET LOCATIONS in the fllwing lcatins r unclassified lcatins: Fr Use In:
More informationHSE Appendix of Procurement Contracts
HSE Appendix f Prcurement Cntracts 1. General requirements... 2 2. Pre-wrk HSE requirements... 3 3. Persnal cnditins... 5 4. Objective cnditins fr wrk perfrmance... 8 4.1 Requirements t wrking and prtective
More informationAgile Methodology in Game Development: Year 3. Clinton Keith CTO, High Moon Studios
Agile Methdlgy in Game Develpment: Year 3 Clintn Keith CTO, High Mn Studis What We ll Talk Abut: Histry f Agile at High Mn What is Agile? Why use it? Overview f Scrum, ne Agile Methdlgy Agile Planning
More informationINSTRUCTIONS FOR USE. TURBOmax Plus 824/2 E, 828/2 E THERMOcompact 615/2 E, 620/2 E, 624/2 E, 628/2 E
NSTRUTONS FOR USE TURBOmax Plus 824/2 E, 828/2 E THERMOcmpact 65/2 E, 62/2 E, 624/2 E, 628/2 E The cde f practice fr the installatin, cmmissining & servicing f central heating systems TABLE OF ONTENTS
More informationCHAPTER 4 VISION, GOALS AND OBJECTIVES
CHAPTER 4 VISION, GOALS AND OBJECTIVES Defining a visin, gals, and bjectives creates the structure fr a plan. T develp the visin fr this Plan, the team reviewed the 2012 MPO Cmprehensive Pathways Plan
More informationField Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.
Field Instructin 10.3 Specialised Insulated Plant fr Vegetatin Management Purpse This instructin utlines the minimum requirements and safe apprach distances (SADs) fr specialised insulated plant peratrs
More informationHot Work Policy and Procedures
1.0 Plicy Statement The University f New Haven has develped a ht wrk plicy and prcedure in accrdance with Occupatinal Health and Safety Administratin (OSHA) regulatins. 1.1 Purpse The University f New
More informationPrecautionary Statement ( )
Precautinary Statement (01-50-1506) Bimet Orthpedics, Inc. 01-50-1506 P.O. Bx 587 Date: 05/06 56 East Bell Drive Warsaw, Indiana 46581 USA Recmmendatins fr the Care and Handling Bimet Premier II Acetabular
More informationNATIONAL RUGBY LEAGUE LICENSING PROGRAM
NATIONAL RUGBY LEAGUE LICENSING PROGRAM REQUEST FOR PROPOSAL Official Licensee- Memrabilia Prgram The Australian Rugby League Cmmissin (ARLC) is currently seeking ffers frm cmpanies interested in acquiring
More informationPressure reducing valve. Type UZRB6
Pressure reducing valve type UZRB6 NS 6 up t21 MPa up t 30 DATA SHEET - OPERA RATION MANUA NUAL dm 3/min WK 424 770 03.2015 APPLICATION Pressure reducing valve fr subplate munting type UZRB6 is used t
More information