1 ROAD SAFETY AUDIT MAJOR HIGHWAY MEDIAN CROSS-OVER CRASHES I-95 ATTLEBORO/NORTH ATTLEBOROUGH Prepared for Prepared by MS Transportation Systems, Inc. Framingham, Massachusetts June 2009

2 ROAD SAFETY AUDIT MAJOR HIGHWAY MEDIAN CROSS-OVER CRASHES I-95 ATTLEBORO/NORTH ATTLEBOROUGH June 2009 Prepared for Massachusetts Highway Department Prepared by MS Transportation Systems, Inc. 300 Howard Street P.O. Box 967 Framingham, Massachusetts (fax)

3 TABLE OF CONTENTS Page INTRODUCTION 1 RSA PROCESS 3 ANALYSIS 8 SUMMARY OF RSA FINDINGS/POTENTIAL ACTIONS 12 RECOMMENDATIONS 22 APPENDIX 28 I-95 Attleboro/North Attleborough Road Safety Audit Page i

4 Introduction Lane departure crashes are one of the primary fatal crash types in Massachusetts. The Commonwealth exceeds the national average for the proportion of fatal lane departure crashes and was designated a lead state in lane departure crashes by the American Association of State Highway and Transportation Officials (AASHTO). The Massachusetts Highway Department (MassHighway) conducted a study of the problem and found that during , lane departure crashes accounted for 25 percent of all injury crashes and nearly half, 46 percent, of all fatal crashes. As part of the effort in implementing the safety plan and specifically reducing lane departure crashes, the MassHighway is completing a Road Safety Audit (RSA) Review Project specifically focused on median crossing (or median cross-over) crashes on its major highways. Road safety audits are a formal safety performance examination on existing or future roadways by an independent audit team. These specific audits are being conducted in locations where cross-over experience has been or has the potential to be of concern and where the RSA team has judged that factors exist that could affect the safety risk. During the audit, the RSA team works to identify opportunities for enhancing safety and to recommend specific enhancements intended to reduce median cross-over crashes and improve the overall safety along the highway. A RSA was conducted for I-95 in Attleboro/North Attleborough as part of this project. Figure 1 indicates the corridor section under study between Interchange No. 3 and Interchange No. 5. This section had experienced a number of median related crashes, including several cross-median crashes. The purpose of this I-95 Attleboro/North Attleborough RSA is to examine potential safety risk factors and identify opportunities to enhance safety conditions on I-95 and address the identified factors. Recommendations contained in this report reflect the overall consent of the RSA team and do not necessarily reflect the official views of MassHighway. MS Transportation Systems, Inc. Page 1

5 95 North Attleborough Robert Toner Boulevard Interchange No Interchange No. 4 Attleboro South Avenue Interchange No. 3 Route 1 95 Project Location W N E I-95 Road Safety Audit Attleboro/North Attleborough, Massachusetts MS Transportation Systems, Inc. Framingham, Massachusetts S 1 : 25,000 FIGURE 1

6 RSA Process The general process outlined in the guideline 1 was essentially followed although with some minor variations incorporated in the overall procedure. These were due in part to the project location being a high speed, high volume section of an access controlled highway. With these characteristics, there are limited areas to safely stop and gather as a group along the section without potentially hindering traffic flow or the safety of the RSA team. Given the team size and general character with the corridor, the team members who visited the site prior to the team meeting did so either individually or in smaller groups. A video recording of a drive-thru in both directions was collected by the RSA consultant and used at the meeting to review conditions as a group. Background material and plans were transmitted to the RSA consultant to compile and review prior to the initial RSA team meeting. Crash and traffic volume data were transmitted to RSA team members prior to the meeting as well. Once the initial RSA team meeting was conducted, the RSA consultant used the input, completed the analysis and prepared a draft document for team members to review. Data including summary crash records for the period, three (3) detailed crash descriptions of cross-over crashes, and available record highway plans were obtained and reviewed by the RSA consultant. Following a review of the draft, the RSA report was finalized. RSA Team The following individuals participated in of the I-95 Attleboro/North Attleborough Road Safety Audit: Bill Travers, MassHighway District 5, Maint. Lisa Schletzbaum, MassHighway Safety Timothy White, FHWA Major Arthur McLaughlin, Troop H Paul Nelson, EOT Planning Trooper Daniel O Sullivan Paul Mission, SRPEDD Robert Gregory, MassHighway District 5 Traffic Bonnie Polin, MassHighway Safety Alolade Campbell, MassHighway District 5 Adam Rerchia, SRPEDD Shundreka Givan, FHWA Ashish Patel, MassHighway Design William J. Scully, MS Transportation Systems (RSA Consultant) RSA Meeting A meeting was held on May 15, 2008 at the MassHighway District 5 Office. At the meeting, the RSA consultant provided a brief overview of the RSA purpose, a summary 1 MS Transportation Systems, Inc., Road Safety Audits, Median Cross-Over Crashes, Audit Guidelines, Prepared for MassHighway, October MS Transportation Systems, Inc. Page 3

7 of the roadway section s characteristics and results of the review to date. The RSA team listed above was present at the meeting. The video record of I-95 taken while driving the corridor was viewed. During and following the video, there were further discussions related to the possible factors related to the cross-median crashes and possible solutions to prevent or reduce similar characteristics in the future. The RSA team provided input on background supporting data, the key items observed in the field and those items that were listed on the RSA Median Cross-Over Prompt List. Key items noted at the meeting included: A major concern in the section is the movement of vehicles from I-95 southbound to I-295 westbound. There are vehicle queues that occur on this ramp back onto the I-95 mainline during peak times. There are peak hour vehicle queues that occur on the Interchange 5 (Route 152) ramps planning agency attempted to program major improvements but the City was opposed. A signal is currently planned. Signage for Exits 4 and 5 in southbound direction can be confusing as signage for Exit 4 occurs prior to signage for Exit 5 as a result, may not be adequate. If a barrier is considered, the State Police pointed out the need for periodic turnarounds for authorized vehicles only. Following the RSA meeting, the RSA consultant compiled the information, for inclusion on the analysis and in the development of recommendations. Analysis Procedures As previously indicated, the RSA analysis followed the procedure described in Guideline with some variations and also took into consideration the methods published by the Federal Highway Administration 2 and those included in training materials 3. The basic tasks included: Obtaining and reviewing crash and other traffic characteristic data and available record plans. 2 Federal Highway Administration, FHWA Road Safety Audit Guidelines, Publication No. FHWA SA-06-06, Washington, D.C., Federal Highway Administration, Resource Center, Road Safety Audits Mini-Workshop, Jeffrey Shaw, PE, PTOE, presented to New England ITE Section, September 19, MS Transportation Systems, Inc. Page 4

8 Conducting site reconnaissance and collecting a current record of condition via photos and video, identify potential hazardous issues, and Identify and evaluate potential actions to address the noted issues. In assessing the issues identified by the RSA Team, the relative seriousness and potential risk relative to crash frequency and severity were determined. Using the guidelines of FHWA 4 as input and considering characteristics of this specific RSA, the relative frequency criteria and severity criteria were identified and are presented in Table 1 and Table 2, respectively. ESTIMATED TABLE 1 FREQUENCY RATING EXPECTED CRASH FREQUENCY (PER AUDIT ITEM) FREQUENCY RATING Exposure Probability high high 5 or more crashes per year Frequent medium high high medium 1 to 4 crashes per year Occasional medium medium low high high low Less that 1 crash per year, but Infrequent more than 1 crash every 5 years low medium medium low Less than 1 crash every 5 years Rare low low Typical Crashes Expected (per audit item) High-speed crashes; head on and rollover crashes Moderate-speed crashes; fixed object or off-road crashes Crashes involving medium to low speeds; lane changing or sideswipe crashes Crashes involving low to medium speeds; typical of rear-end or sideswipe crashes TABLE 2 SEVERITY RATING Expected Crash Severity Probable fatality or incapacitating injury Moderate to severe injury Minor to moderate injury Property damage only or minor injury Severity Rating Extreme High Moderate Low 4 Federal Highway Administration, Resource Center, Road Safety Audits Mini-Workshop, Jeffrey Shaw, PE, PTOE, presented to New England ITE Section, September 19, MS Transportation Systems, Inc. Page 5

9 Taking into consideration both frequency and severity, the relative risk of a particular audit item was rated. The risk ratings are shown in Table 3. For each safety issue identified, the potential seriousness of the issue as well as possible mitigation measures have been indicated. TABLE 3 CRASH RISK ASSESSMENT Frequency Rating Severity Rating Low Moderate High Extreme Frequent C D E F Occasional B C D E Infrequent A B C D Rare A A B C Crash Risk Ratings: A: minimal risk level D: significant risk level B: low risk level E: high risk level C: moderate risk level F: extreme risk level RSA Field Audit Audits were conducted by the team members prior to the RSA meeting. Key notes from the field work are as follows: The inside shoulder is about 3-4 feet in width with some off-pavement leveling area provided (another 1-3 feet +/-) depending on the specific location. South of the rest (parking) area (south of I-495) where resurfacing occurred within the past few years, rumble strips exist on the inside edge. The rumble strip is located approximately 6 inches outside the edge line. A rumble strip is also in place on the outside shoulder. The outside shoulder appears to be 10 feet in width (plans later confirmed the width). The median topography changes along the section. North of Route 152, it is relatively flat or slightly depressed. South of I-295 the median generally slopes down west to east with the southbound direction at a higher elevation than the northbound side. There may be drainage structures in the center of the median (plans to be checked), Speed limit signs indicate 65 mph with observed motorists traveling above speed limit possibly 5 to 10 mph above. There are imbedded reflectors in the pavement along lane lines but not in edge line. Reflective delineators are generally not present along the median, The current pavement markings and surface are in generally good condition. MS Transportation Systems, Inc. Page 6

10 A truck parking area exists in southbound direction about 1 mile south of I Southbound direction at the Attleboro/North Attleborough townline is on a horizontal curve with the outside lane on the outside of the curve giving some level of discomfort to driver. This was also noted in the northbound direction on the curve south of the rest area. Evidence of numerous median entries (around 6-8) based on visual tire tracks. Most of them were in the section north of Int. 5. Skid marks were also noted in certain areas one area was prior to overpass in the southbound direction before Interchange 4 where visibility is somewhat constrained. It was also noted that relatively new tree plantings (i.e. last few years) were in place north of Interchange 5. MS Transportation Systems, Inc. Page 7

11 Analysis I-95 in Attleboro/North Attleborough is a major interstate highway that provides northsouth movement in Eastern Massachusetts connecting with Rhode Island on the south to New Hampshire to the north. In the section under study, it consists of three (3) travels lanes per direction. The roadway also has a full (10 foot) outside shoulder and an inside shoulder in the range of 3 to 4 feet. Rumble strips have been installed on both the inside and outside shoulders. The alignment is varying but can be characterized as gentle. It was noted that the speed limits are posted at 65 miles per hour (mph). The median width measured inside edge line to inside edge line is approximately 100 feet. The unpaved portion of the median width through the section ranges from approximately 88 to 94 feet. While the length of the study section is approximately 5.7 miles, a review of the corridor shows that the length of the open median in this section is approximately 2.5 miles. The topography of the median varies through the study section. South of I- 295 near the reservoir, the median slopes down from the SB direction to the NB direction. North of I-295 and through Interchange No. 5 (Route 152), the median is flatter but with a depressed type design. There are also areas where the median is heavily treed that effectively blocks crossing the median in these areas. Figures 2 through 4 present photographs that depict the current conditions along the study section. Figure 2 - I-95 Southbound approaching the Route 152 Interchange (Interchange No. 5) MS Transportation Systems, Inc. Page 8

12 Figure 3 - I-95 Southbound lanes south of I-295 on-ramp. Figure 4 - I-95 in northbound direction north of Interchange No. 3. MS Transportation Systems, Inc. Page 9

13 A review of available safety data was completed as part of this RSA. The review of data included crash data for median related crashes reported for the years 2004 to 2007 and police narratives for the cross-median events. The summary table and spot map, which notes only the crashes that were median related, are included in the appendix. Key aspects noted in the data included the following: A total of 33 median related crashes were noted during this period. Of the total median related crashes, 3 or 9% were cross median crashes. There were no fatal crashes reported, however, approximately 50% of the total reviewed crashes resulted in personal injuries. Two-thirds of the reviewed crashes occurred in the southbound direction. Thirty-three percent (33%) of median related crashes occurred during the non-light period (i.e. 9PM-5AM) No one significant or predominant crash reason given though 12 were noted as failure to keep in proper lane. In reviewing the crash reports for the section under study, driver error and collision avoidance are more predominant than the other two reasons. The traffic volumes observed on I-95 in this section exceed 100,000 on an average weekday, north of I-295. Between I-295 and Interchange No. 3, the average daily volume was observed to be 88,000. Figure 5 depicts the hourly volume by direction in August 2007 north of Route 152. As shown, peak period flows in the peak direction exceed 4,000 vehicles per hour. Figure 6 illustrates the variation in flow on I-95 over the year. The data shows a consistently high volume month to month. Figure 5 - I-95 Directional Volume August 28, 2007 MS Transportation Systems, Inc. Page 10

14 I-95 Monthly Traffic Volume 140, ,000 Average Daily Volume 100,000 80,000 60,000 40,000 20,000 0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month Figure 6 I-95 Monthly Traffic Volume North of I-295 In summary, the RSA I-95 in Attleboro/North Attleborough has identified a number of physical and operational characteristics as being potentially a contributing factors to increasing the risk of experiencing median related safety issues and the possibility of median crossings although each with varied levels of seriousness. The major ones include: Median is largely open, has a slope of 6:1 or flatter for the most part and was considered by the RSA team as highly crossable, High volumes (>88,000 to 100,000+) on average weekday depending on location, There is no barrier in median Queue backup onto I-95 SB from I-295. The next section will discuss these key issues and the potential actions to consider for addressing them. MS Transportation Systems, Inc. Page 11

15 Summary of RSA Findings/Potential Actions Based on the field review, the review of crash data and discussions among the RSA team members, the issues related to the safe operating conditions of the I-95 in the Attleboro/North Attleborough area were identified. There were a number of factors or issues of concern that were identified as potentially having an effect on the risk and these are listed in Table 4 along with the assigned risk rating. TABLE 4 SUMMARY OF FACTORS THAT POTENTIALLY AFFECT THE RISK OF SAFETY RELATED EVENTS Factor or Issue Significant amount of open median from north of Route 152 to south of I-295 with 6:1 slopes or flatter and considered as easily crossable Long queues in southbound direction from I-295 offramp extending several miles north Sight distance constraint exists in southbound direction north of the bridge over North Avenue Significant volume increase and weaving at the I-295 interchange Speed change lanes (acceleration, deceleration, weave areas) - markings and designation are minimal Adequacy motorist guidance southbound prior to Interchange Nos. 4 and 5 Motorist discomfort on outside lane of curve in open median area - northbound curve approaching rest area Motorist discomfort on outside lane of curve in open median area - southbound curve near town line Condition of non-paved area just off inside paved shoulder not smooth may affect recovery Condition of rumble strip and inside edge drop-off is significant in spots - could affect recovery Southbound rest area/truck area entry - merge Risk Rating D 1 E D D C B B B D C B 1 A risk rating of E would be assigned if based on total median entries. Based on the number of cross-median crashes a risk rating of D. Given the high traffic volume and the number of median entries, the open median factor could be assigned a higher risk factor. In other words, the operational and physical characteristics of the highway section under study is such that once a motorist makes a mistake or becomes errant and enters the median, there is a high probability that the motorist will cross the MS Transportation Systems, Inc. Page 12

16 median and enter the opposing direction of flow although recent reported crash data shows a small proportion of cross-median events. However, with the volumes in excess of 100,000 vehicles per day, this type of event becomes a greater possibility. Another significant factor noted by the RSA team concerns the I-95 southbound ramp to I-295 westbound movement. Combination of the volume, ramp geometry and merge design result in long vehicle queues and sluggish southbound movement that can typically extend back on I-95 for several miles. While this condition may result in nonmedian related incidents (i.e. rear end crash types instead), it may also result in increase lane-changing or quick, undesirable driver maneuvers that have the potential to result in median entries. Additionally, in the I-95/I-295 interchange area, there is a substantial increase in volumes as well as associated weaving and merging activity. Given this characteristic together with the queuing in the southbound direction, a relatively high risk rating was also unsigned to these factors. One sight distance issue was identified in the southbound direction as I-95 passes over North Avenue. While by itself, it is not a major sight distance constraint, but does become a greater factor if long queues and slow traffic exists approaching the I-95 offramp to I-295 westbound, then the constraint becomes more pronounced. During those times, motorists passing the overpass may come upon the queue too quickly resulting in quick moves to the left or stops that may force either motorist to maneuver left in order to avoid collision. Again, in a number of locations, once an errant motorist enters the median, there is a good possibility that a full crossing will occur. Consequently, a moderately high risk rating was assigned to this factor. The speed change lanes including acceleration lanes, deceleration lanes and the weave sections at I-295 appear to be short. In addition, guidance through the markings were less than optimum, which may have been due in part to less than standard lengths. This factor was assigned a risk rating of C. Signage in the southbound direction for Exits 4 and 5 were noted to be somewhat confusing that affects its adequacy. Specifically noted was that the Exit 4 overhead sign (2 mile notice) is placed just prior to the overhead guide sign for Exit 5 (1 mile notice). While noted that the confusion may contribute to some upstream lane changing if the motorist mixed the exits up, it was determined to have a small effect on cross median crashes. As a result, it was assigned a risk rating of B. In the southbound direction, there was a noticeable level of driver discomfort in the high speed (left most) travel lane on the outside of a curve leaning towards median. MS Transportation Systems, Inc. Page 13

17 There was also a similar, smaller amount, but noticeable of driver discomfort in the northbound direction on the curve approaching the rest area north of Interchange No. 5. This relates to travel in the high speed travel lane. Based on further review by MassHighway design staff who are participating on RSA team, it was determine that the inside (high speed) travel lane may have a cross slope towards the median slightly higher than desired. This condition in both locations contributes to the driver discomfort and potential median entries. This factor in both locations was assigned a B. The conditions of the rumble strip, pavement edge and surface of the off-pavement surface were all noted as being less than desirable. While the rumble strip addresses driver inattentiveness or driver fatigue, the edge drop off and off-pavement surface condition affects the recovery of the errant motorists. The condition of the off-pavement area was rated a D and the edge drop off factor and rumble strip were assigned a C. The last factor in the table relates to the rest/parking area in the southbound direction. The factor noted relates specifically to the parking area exit/merge area on I-95 with some open median in that section. Following further discussion of crash experience in that particular area, it was assigned a risk rating of B. Suggested actions in this program identified are intended to reduce or eliminate crossmedian crashes, injuries and fatalities related to them. In addition, the actions may serve to reduce the severity of all the crashes. The following paragraphs include discussion pertaining to the issues and the potential actions to consider for implement. Given that a primary objective of this RSA was in relation to cross median crashes, the evaluation of a median barrier was an initial action studied. The following section describes the evaluation of the median barrier. Consideration of a Median Barrier One of the more significant actions to be considered is to install median barriers in the current open areas. A barrier can be considered when there is a higher than desirable chance or a greater risk for median cross-over crashes to occur and that have or could result in fatalities and/or a high proportion of injury related crashes. In addition, a barrier could be considered when the consequences or severity of a crash are worse than if the barrier were in place. Factors that generally come into play in deciding on whether a median should be installed involve the following: High volumes and speeds Truck volumes and mix MS Transportation Systems, Inc. Page 14

18 Median Width: 100 feet ADT - 88, , AVERAGE DAILY TRAFFIC (thousands) BARRIER RECOMMENDED BARRIER CONSIDERED BARRIER OPTIONAL MEDIAN WIDTH (feet) Source: AASHTO Roadside Design Guide, Chapter 6, Updated 2006 Median Barrier Warrant Evaluation I-95 Road Safety Audit Attleboro/North Attleborough, Massachusetts MS Transportation Systems, Inc. Framingham, Massachusetts FIGURE 7

19 Narrow median History of cross-median crashes High risk of catastrophic event These items have been reviewed relative to the I-95 section under study. Figure 7 presents a review of the corridor in relation to the median warrant criteria presented in the AASHTO RDG 5. As can be seen in the diagram, with the median (as measured from edge line to edge line) is approximately 100 feet and a volume of over 100,000 vehicles on an average day north of I-295, the intersection of the two items is in the area of the chart where a barrier is optional. South of I-295, the daily volume is approximately 88,000, the criteria would still suggest optional. In addition to the chart and related warrant criteria, which is a guideline, further consideration was given to the following: The high volume presents a likelihood of greater number of errant vehicles entering the median, A relatively high number of median entries (33) over the four (4) year period and the median appears to be very crossable. The elevation difference between the southbound and northbound directions south of I-295 shorten the crossing. There was a general discomfort felt by many RSA team members when driving the fast (inside) lane. Consequently, based on the analysis of the data, the field drive-thru and discussion of the conditions by the RSA team members, it is suggested that a median barrier be installed in the section of the route that are currently open and crossable. Figure 8 shows the approximate locations of the proposed new barrier location. This will represent approximately 2.6 miles of barrier to be installed. The selection of the barrier is discussed in the next section. A. Barrier Selection There are a number of barrier types that can be considered in addressing the median cross-over crashes. These include the following: Weak post W-Beam Box Beam Generic Low Tension Cable High Tension Cable Barrier Strong post W-Beam Thrie Beam Concrete (Jersey) 5 American Association of State Highway and Transportation Officials, Roadside Design Guide, Washington, D.C., 2002, Chapter 6 Update MS Transportation Systems, Inc. Page 16

20 95 Location 4 4,800 ft. Interchange No. 5 Location 3 2,550 ft. Interchange No Location 2 2,250 ft. Location 1 4,000 ft. Interchange No. 3 - approximate locations of new barrier - interchanges Note: Total approximate barrier length is 2.6 miles NOT TO SCALE Proposed Locations for New Median Barrier I-95 Road Safety Audit Attleboro/North Attleborough, Massachusetts MS Transportation Systems, Inc. Framingham, Massachusetts FIGURE 8

21 In deciding on the type of barrier, recommended guidelines in selection are included in Table 5 taken from the AASHTO Roadside Design Guide 6. TABLE 5 CRITERIA FOR BARRIER SELECTION Criteria Comments 1. Performance Capability Barrier must be structurally able to contain and redirect design vehicle. 2. Deflection Expected deflection of barrier should not exceed available deflection distance. 3. Site Conditions Slope approaching the barrier and distance from traveled way may preclude use of some barrier types. 4. Compatibility Barrier must be compatible with planned end anchor and capable of transitioning to other barrier systems (such as bridge railings). 5. Cost Standard barrier systems are relatively consistent in cost, but high-performance railings can cost significantly more. 6. Maintenance A. Routine Few systems require a significant amount of routine maintenance. B. Collision Generally, flexible or semi-rigid systems require significantly more maintenance after a collision than rigid or high-performance railings. C. Material Storage The fewer different systems used, the fewer inventory items/storage space required. D. Simplicity Simpler designs, besides costing less, are more likely to be reconstructed properly by field personnel. 7. Aesthetics Occasionally, barrier aesthetics are an important consideration in selection. 8. Field Experience The performance and maintenance requirements of existing systems should be monitored to identify problems that could be lessened or eliminated by using a difference barrier type. Source: AASHTO, Roadside Design Guide, 2002, Chapter 5 Roadside Barriers. From a cost and aesthetic perspective, the cable (flexible) barrier has its advantages over the various guardrail systems or concrete barrier. The median slope and/or recovery area also affects the use and placement of any barrier including guardrail. With regard to the cable barrier, the RSA team has discussed two primary cable alternatives noted below. In addition to the cable barrier systems, team members also suggested that guardrail be considered in the evaluation. The alternative types of guardrail were reviewed for potential application on this route. 6 American Association of State Highway and Transportation Officials, Roadside Design Guide, Washington, D.C., 2002, Chapter 6 Update MS Transportation Systems, Inc. Page 18

22 Considerations included the volume of traffic, relative amount of truck traffic and travel speeds. Based on these, the most applicable types of guardrail for this route include the W-beam with strong post or the strong post thrie-beam. These rails are appropriate for high speed highways and high volumes with a relatively high proportion of truck traffic. Costs for each are similar. The weak post W-beam and box beam can be eliminated due to the slope and type of highway. The concrete barrier would generally be applicable in urban sections with limited median widths available. As a result, the median barrier options that are valid for consideration for I-95 in this section are the cable barrier and strong post guard rail. Maintenance issues are also an important consideration in decisions regarding median barrier installations. The maintenance issues that are of concern include: Barrier hits per mile Frequency of hits Cost recovery Cable downtime Repair effect on traffic Maintaining tension Final selection of the barrier type should be based on the costs, the ability to maintain a recovery zone, likely maintenance or repair requirements, and compatibility with future planned widening. The key points of the cable barrier or guardrail are summarized below. Cable Barrier While the low tension generic cable system has been in existence for more than 50 years, most of the recent cable system research and installation is focused on the high tension systems. There are currently six (6) manufacturers with systems approved by the Federal Highway Administration (FHWA) for use under certain conditions. There are 3-rope or 4-rope cable systems as shown in the following two photographs. This barrier type can be installed on slopes of 6:1 or flatter with little constraint on placement. There are certain systems (i.e. Brifen and Gibraltor 4 rope) that have been approved for slopes as steep as 4:1. In addition to the lower installation costs, the cable barrier can usually be located sufficiently away from the pavement area to allow for recovery zone and a minimal number of hits. MS Transportation Systems, Inc. Page 19

23 3 Cable CASS System on Route Rope Brifen System on I-495 Guardrail In general, guardrail could be placed toward or in the center of the median where slopes are 10:1 or flatter (i.e. I-93 Braintree) as well as at the edge of a steep slope or where minimal recovery zones exist. With the guardrail placed within several feet of the pavement edge, a clear zone (or recovery area) would be eliminated at least on one side of the median if guardrail is applied on only one side of the median. Per mile costs of the basic types of median barrier treatment to be considered for this route are summarized in Table 6. Shown in the table are estimated per mile costs of installing a cable barrier, a double faced W-beam guardrail and a double faced thriebeam guardrail. As can be seen, the cable barrier is expected to be the lower cost option. It should be noted that the estimated costs for the cable barrier are largely based on recent limited applications in the Commonwealth. Construction costs for cable installation could be substantially lower based on experience in other parts of the country (examples in Appendix). The W-beam rail is a lower cost option compared to the thriebeam, however, there is slightly greater deflection with the W-beam. TABLE 6 COMPARISON PER MILE COSTS Cable vs. Guardrail Costs/Mile Cable $144,000 W-beam $171,000 Thrie beam $213,000 MS Transportation Systems, Inc. Page 20

24 Based on the above costs, the installation of cable barrier in the identified sections is estimated to cost approximately $374,400 while use of thrie-beam would result in a cost of approximately $553,800. The next section outlines all of the RSA team recommendations including the median barrier. MS Transportation Systems, Inc. Page 21

25 Recommendations As a result of the RSA analysis and team input, a set of recommendations have been identified and are summarized in Table 7. It was the overall consensus of the I-95 Attleboro/North Attleborough RSA team that due to the high volumes of traffic, the traffic characteristics in the area of Interchange 4 and between Interchange Nos. 4 and 5 in the southbound direction that can influence lane changing behavior, a series of suggestions were appropriate in order to reduce the risk of median entry and cross median crashes in the study sections. These actions are intended to eliminate the chance of crossmedian crashes as well as reduce the severity of all crashes and improve the overall safety condition of this section of I-95 in Attleboro/North Attleborough. Identified in the table in addition to the risk factor and recommended action are the estimated costs and potential timeframe (i.e. short (0-1 year), medium (1-3 years) and long (>3 years). A major action suggested is the installation of a median barrier in several open sections. For several reasons including costs, maintaining a recovery area and aesthetics, it is recommended that a cable barrier be installed. Figure 8 previously illustrated the approximate locations of the new installation that totals about 2.6 miles in 4 different sections. Construction decisions can be made during design relative to retaining the existing small groves of trees or the recently planted trees in the northern area of the study section. Based on a unit cost of $144,000 per mile, installing the cable barrier is estimated at $374,400. Another major area of improvement suggested by the RSA team relates to the guidance and traffic design of the I-295 (Interchange No. 4) interchange with I-95. In an effort to reduce the peak period vehicle queuing back onto I-95, a new striping plan for the southbound section from the I-95 northbound on-ramp is suggested to smooth the I- 295 merging. It is also recommended that better advance warning caution signs be installed approaching the I-295 interchange in both directions. Figure 9 illustrates in concept the proposed marking plan while Figure 10 illustrates potential sign legends. Figure 11 provides information relative to the placement of the signs. The location of SIGN C would be two miles prior to Exit 4 (I-295) while SIGN B would be located at Station (Plan Reference Attleboro-Canton I-95 Project #601166). Also in the southbound direction, it is recommended that a queue detection system be put in place on the I-95 southbound on-ramp to I-295 with variable message sign (VMS) placed at approximately the North Avenue overpass. While this may be a longer tern option, this is intended to address the visibility constraint if long ramp queues and slow morning southbound traffic exists south of the overpass. MS Transportation Systems, Inc. Page 22

26 TABLE 7 SUMMARY OF RECOMMENDATIONS Risk Factor Significant amount of open median from north of Route 152 to south of I-295 with 6:1 slopes or flatter and considered as easily crossable Long queues in southbound direction from I-295 off-ramp extending several miles north Sight distance constraint exists in southbound direction north of the bridge over North Avenue Significant volume increase and weaving at the I-295 interchange Speed change lanes (acceleration, deceleration, weave areas) - markings and designation are minimal Adequate motorist guidance southbound prior to Interchange Nos. 4 and 5 Motorist discomfort on outside lane of curve in open median area - northbound curve approaching rest area Motorist discomfort on outside lane of curve in open median area - southbound curve near townline Risk Rating Recommended Action Estimated Cost (order of magnitude) Estimated Timeframe D 1 Install cable barrier $374,400 medium term E D D Modify pavement markings to indicate single lane on I-295 from I-95 NB on-ramp Widen I-295 SB on ramp to 2 lanes Install warning signage in SB direction north of I-295 Install static warning sign Install electronic queue detector VMS warning sign in SB direction Add safety warning signs Increase enforcement $5,000 TBD $20,000 $10,000 TBD $10,000 TBD C improve markings TBD (est. low cost) B B B combine 1 st sign for Exits 5 and 4 Improve delineation with posts, signage or markers Check superelevation Adjust during resurfacing Improve delineation with posts, signage or markers Check superelevation Adjust during resurfacing short term long term short term short term long term short term short term short term $20,000 short term $3,000 - short term short term medium to long term - short term short term medium to long term Condition of non-paved area just off inside paved shoulder not smooth may affect recovery Condition of rumble strip and inside edge drop-off is significant in spots could affect recovery Southbound rest area/truck area entry merge D C Provide more fill and regrade 1 A risk rating of E would be assigned if based on total median entries B Consider installing the angled safety edge Improve signage for merge and Yield control TBD (anticipate low cost) Estimated at 1 to 2 percent of total resurfacing short term long term as part of resurfacing $2,000 Short term MS Transportation Systems, Inc. Page 23

27

28 MERGING TRAFFIC 1100 FEET SIGN A EXPECT OFF-RAMP BACKUPS AT EXIT 4 EXPECT STOPPED TRAFFIC NEXT 2 MILES SIGN B SIGN C CONCEPTUAL ONLY - NOT TO SCALE Potential Sign Legends I-95 Road Safety Audit Attleborough, Massachusetts MS Transportation Systems, Inc. Framingham, Massachusetts Figure 10

29 95 c 5 B A 3 3 LEGEND A B c - (see Figure 8) - place northbound approx. Sta (see Figure 8) - place southbound approx. Sta (see Figure 8) - place southbound approx. Sta interchanges NOT TO SCALE Potential Major Sign Placement I-95 Road Safety Audit Attleborough, Massachusetts MS Transportation Systems, Inc. Framingham, Massachusetts FIGURE 11

30 Pavement markings at the interchanges could be improved. The use of dotted extension lines enhance motorist guidance. The current MUTCD depicts dotted lines as an option for deceleration lanes and weave sections between on- and off-ramps. The 2009 updated MUTCD is anticipated to include dotted extension lines for acceleration lanes as well. Examples of the markings are included in the Appendix. Addressing the driver discomfort issue and cross-slope of the inside travel lane in the noted southbound and northbound directions will require adjustments in future resurfacing projects following additional engineering analysis. Resurfacing will likely be medium to long term projects. Short term actions would include new delineator posts along the median and/or warning (guidance) signs. A short term action would also be to check the cross slope (superelevation). Other safety actions suggested for I-95 include using the flexible delineator posts along the inside edge of the highway, regrading portions of the unpaved median including addressing the edge drop off where its significant, improved warning and control signs at the southbound rest area and increase the level of enforcement of speeds and inappropriate lane changing behavior. MS Transportation Systems, Inc. Page 27

31 Appendix RSA Meeting Agenda RSA Attendees List Median Crash Diagram Crash Data Traffic Volume Data Samples of Lane Markings MS Transportation Systems, Inc. Page 28

32 Road Safety Audit N. Attleborough/Attleboro Interstate 95 Meeting Location: MassHighway District 5 Office 1000 County Street, Taunton Thursday, May 15, :00 AM 12:00 PM Type of meeting: Attendees: Please bring: Cross Median Road Safety Audit Invited Participants to Comprise a Multidisciplinary Team Thoughts and Enthusiasm!! 10:00 AM Welcome and Introductions 10:15 AM Introduction to Road Safety Audits and Cross Median Crashes 10:30 AM Review of Site Specific Material Crash & Volume Summaries provided in advance Existing Geometries and Conditions Video and Images 11:00 AM Completion of RSA Identification of Safety Concerns using RSA Prompt List as a guide Identification of Possible Countermeasures 12:00 PM Adjourn for the Day but the RSA has not ended Instructions for Participants: Before attending the RSA on May 15th participants are encouraged to drive Interstate 95 in N. Attleborough and Attleboro (Interchanges 3-6) and complete/consider elements on the RSA Prompt List with a focus on safety factors affecting cross median crashes. All participants will be actively involved in the process throughout. Participants are encouraged to come with thoughts and ideas, but are reminded that the synergy that develops and respect for others opinions are key elements to the success of the overall RSA process. After the initial RSA meeting, participants will be asked to comment and respond to the document materials to assure it is reflective of the RSA completed by the multidisciplinary team.

33 ROAD SAFETY AUDIT MEETING I-95 - Mya 15, 2008 MassHighway District 5 Offices, Attleboro/North Attleborough MA Attendance List Name Agency/Dept. William Scully MS Transportation Systems bscullyjr@mac.com William Travers MHD District 5 Maint. Bill.Travers@mhd.state.ma.us Timothy White FHWA Timothy.A.White@fhwa.dot.gov Paul Nelson EOTP Paul Mission SRPEDD pmission@srpedd.org Bonnie Polin MHD Safety Bonnie.Polin@state.ma.us Adam Rerchia SRPEDD arerchia@srpedd.org Ashish Patel MHD Design ashish.patel@mhd.state.ma.us Lisa Schletzbaum MHD Safety lisa.schletzbaum@mhd.state.ma.us Major Arthur McLaughlin Troop H Trooper Daniel O'Sullivan Troop H daniel.osullivan@pol.state.ma.us Robert Gregory MHD District 5 Traffic robert.gregory@mhd.state.ma.us Alolade Campbell MHD District 5 Alolade.Campbell@mhd.state.ma.us Shundreka Givan FHWA Shundreka.Givan@fhwa.dot.gov MS Transportation Systems, Inc.

34 LANDRY AVENUE SMITH STREET NORTH ATTLEBOROUGH I-95 Interchange Median Crashes LANDRY AVENUE 95 1 FRANCIS KELLY BOULEVARD ± ELM STREET Crash IDs between 5-13 JOHN L DIETSCH BOULEVARD 5 ") Crash IDs between NORTH AVENUE NORTH MAIN STREET ATTLEBORO MOUNT HOPE STREET ") Legend Type of Median Crash * HOLDEN STREET Major Roads Cross Median, Non-Fatal Crash Interstate Median, Fatal Crash Principal Arterial Median, Non-Fatal Crash Minor Arterial Municipal Boundary Collector Local WEST STREET * 2007 crash file has not yet been closed Miles

35 MASSACHUSETTS HIGHWAY SAFETY DIVISION CRASH SUMMARY ROADWAY: STUDY PERIOD: I-95 CITY: ATTLEBORO AND NORTH ATTLEBOROUGH 1/1/2004 TO 12/31/2007 LOCATION: BETWEEN EXITS #4 AND #6 NO. CRASH NUMBER TRAVEL LIGHT WEATHER ROAD REASON FOR VEHICLE MEDIAN OR CROSS DRIVER CONTRIBUTING CRASH LANES CONDITION CONDITION SURFACE RUNNING OFF ROAD LEFT MOVEMENT MEDIAN CRASHES CAUSE SEVERITY NB Dark - Not Lighted Clear Dry Lost control of vehicle and overturned Travel Lane to Trees in the Median Median Failure to keep in proper lane Non-Fatal Injury NB Dark - Not Lighted Clear Dry Vehicle struck another parked vehicle in the breakdown lane Travel Lane to Median Median Inattention Non-Fatal Injury SB Dark - Not Lighted Clear Dry Vehicle strike another vehicle in the rear, spun out and overturned Travel Lane to Median Median Exceeded Speed Limit and Alcohol Non-Fatal Injury SB Daylight Clear Dry Vehicle right rear tire blew out and overturned Travel Lane to Median Median No Improper Driving Property Damage Only SB Daylight Clear Dry Lost control of vehicle and traveled off the road Travel Lane to Trees in the Median Median Failure to keep in proper lane Property Damage Only SB Dark - Not Lighted Clear Dry Lost control of vehicle and overturned Travel Lane to Median Median Failure to keep in proper lane Non-Fatal Injury SB Dark - Not Lighted Clear Dry Vehicle changed lanes to an already occupied lane and strike the side of another vehicle Travel Lane to Trees in the Median Median Failure to keep in proper lane Property Damage Only SB Daylight Clear Dry Vehicles distracted due to box truck stuck in the median Travel Lane to Median Median Distracted Property Damage Only SB Daylight Clear Dry Vehicle load shifted and caused vehicle to overturn Travel Lane to Median Median No Improper Driving Non-Fatal Injury SB Dark - Not Lighted Cloudy Dry Lost control of vehicle and struck guardrail Travel Lane to Median Guardrail to Middle Median Median Failure to keep in proper lane Non-Fatal Injury SB Daylight Clear Dry Lost control of vehicle and swerved off the road S/B Travel Lanes to N/B Travel Lanes Cross Median Swerving in roadway Non-Fatal Injury SB Daylight Rain Dry Vehicle changed lanes to an already occupied lane and strike the left side of another vehicle Travel Lane to Median Median Failure to keep in proper lane Property Damage Only SB Daylight Cloudy Dry Vehicle changed lanes to an already occupied lane and overcorrected S/B Travel Lanes to N/B Travel Lanes Cross Median Over-correcting/Over-steering Property Damage Only SB Dark - Not Lighted Clear Dry Fallen asleep and vehicle drifted into median and overturned Travel Lane to Median Median Fatigued/Asleep Property Damage Only NB Daylight Clear Dry Vehicle intentionally forced another vehicle into the guardrail Travel Lane to Median Guardrail Median Operating vehicle in reckless manner Non-Fatal Injury NB Dark - Not Lighted Clear Dry Vehicle was cut-off by unknown vehicle Travel Lane to Median Jersey Barrier Median Swerving or avoiding due to vehicle in roadway Property Damage Only NB Dark - Not Lighted Clear Dry Vehicle was cut-off by unknown vehicle Travel Lane to Median Barrier Median Swerving or avoiding due to vehicle in roadway Property Damage Only NB Dark - Not Lighted Clear Dry Vehicle rear ended another vehicle and traveled off to the median Travel Lane to Median Median Followed too closely Non-Fatal Injury NB Dark - Not Lighted Clear Dry Vehicle hit another vehicle in right rear, lost control and struck the guardrail Travel Lane to Median Guardrail Median Alcohol Property Damage Only NB Daylight Rain Wet Vehicle rear ended another vehicle and struck the guardrail Travel Lane to Median Guardrail to Travel Lane Median Failure to keep in proper lane Non-Fatal Injury NB Daylight Snow Ice Lost control of vehicle in snow storm and bounced off guardrail hitting other vehicles Travel Lane to Median Guardrail to Travel Lane Median Swerving due to slippery surface in roadway Non-Fatal Injury NB Daylight Sleet, Hail, Freezing Rain Slush Lost control of vehicle in snowy condition, struck guardrail and spun around hitting other vehicles Travel Lane to Median Guardrail to Travel Lane Median Driving too fast for condition Non-Fatal Injury SB Daylight Clear Wet Lost control of vehicle and hit concrete bridge support pillars Travel Lane to Median Bridge Support Pillars Median Failure to keep in proper lane Property Damage Only SB Daylight Clear Dry Vehicle rear ended another vehicle and traveled off to the median Travel Lane to Median Median Followed too closely Non-Fatal Injury SB Daylight Clear Dry Vehicle swerved into travel lane and hit another vehicle Travel Lane to Median Median Failure to keep in proper lane Property Damage Only SB Daylight Clear Dry Vehicle steering locked up and caused vehicle to overturned Travel Lane to Median Median Operating defective equipment Property Damage Only SB Daylight Clear Dry Vehicle rear tire blew out and overturned Travel Lane to Median Median No Improper Driving Non-Fatal Injury SB Daylight Not Reported Dry Vehicle changed lanes to an already occupied lane and strike the side of another vehicle Travel Lane to Trees in the Median Median Failure to keep in proper lane Property Damage Only SB Daylight Clear Dry Vehicle changed lanes to an already occupied lane and strike the left side of another vehicle Travel Lane to Median Guardrail Median Failure to keep in proper lane Non-Fatal Injury SB Daylight Clear Dry Vehicle was cut-off by unknown vehicle and overturned Travel Lane to Median Median Operating vehicle in reckless manner Property Damage Only NB Daylight Cloudy Dry Vehicle changed lanes to an already occupied lane and caused another vehicle to strike guardrail Travel Lane to Right Guardrail to Median Median Swerving or avoiding due to vehicle in roadway Not Reported SB Daylight Clear Dry Vehicle rear ended another vehicle and traveled off to the median S/B Travel Lanes to N/B Right Guardrail Cross Median Exceeded Speed Limit Non-Fatal Injury NB Daylight Clear Dry Vehicle swerved into travel lane and hit other vehicle Travel Lane to Right Guardrail to Median Guardrail to Travel Lane Median Failure to keep in proper lane Property Damage Only TOTAL NO. LIGHT CONDITION WEATHER CONDITION DAYLIGHT DARK-NOT LIGHTED CLEAR CLOUDY RAIN SNOW SLEET, HAIL, FREEZING RAIN NOT REPORTED % 67% 33% 76% 9% 6% 3% 3% 3% ROAD SURFACE MEDIAN OR CROSS MEDIAN CRASH SEVERITY DRY WET ICE SLUSH MEDIAN CROSS MEDIAN PROPERTY DAMAGE ONLY NON-FATAL INJURY NOT REPORTED % 6% 3% 3% 91% 9% 48% 48% 3% DRIVER CONTRIBUTING CAUSE NO IMPROPER EXCEEDED SPEED EXCEEDED SPEED ALCOHOL DRIVING TOO FAST FOLLOWED TOO FAILURE TO KEEP IN PROPER LANE SWERVING OR AVOIDING DUE TO VEHICLE IN ROADWAY SWERVING IN DRIVING LIMIT LIMIT & ALCOHOL FOR CONDITION CLOSELY ROADWAY % 3% 3% 3% 3% 6% 36% 9% 3% DRIVER CONTRIBUTING CAUSE SWERVING DUE TO SLIPPERY OPERATING VEHICLE OVER-CORRECTING/ INATTENTION DISTRACTED FATIGUED/ SURFACE IN ROADWAY IN RECKLESS MANNER OVER-STEERING ASLEEP OPERATING DEFECTIVE EQUIPMENT % 6% 3% 3% 3% 3% 3% 2007 CRASH INFORMATION ARE NOT COMPLETE CRASH SUMMARY IS BASED ON CRASH REPORTS WITH STATE POLICE NARRATIVES

ROAD SAFETY AUDIT MAJOR HIGHWAY CROSS MEDIAN CRASHES ROUTE 3 HINGHAM AND WEYMOUTH

ROAD SAFETY AUDIT MAJOR HIGHWAY CROSS MEDIAN CRASHES ROUTE 3 HINGHAM AND WEYMOUTH ROAD SAFETY AUDIT MAJOR HIGHWAY CROSS MEDIAN CRASHES ROUTE 3 HINGHAM AND WEYMOUTH Prepared for Massachusetts Highway Department Prepared by MS Transportation Systems, Inc. Framingham, Massachusetts May

More information

ROAD SAFETY AUDIT MAJOR HIGHWAY MEDIAN CROSS-OVER CRASHES ROUTE 146 SUTTON. Prepared by MS Transportation Systems, Inc. Framingham, Massachusetts

ROAD SAFETY AUDIT MAJOR HIGHWAY MEDIAN CROSS-OVER CRASHES ROUTE 146 SUTTON. Prepared by MS Transportation Systems, Inc. Framingham, Massachusetts ROAD SAFETY AUDIT MAJOR HIGHWAY MEDIAN CROSS-OVER CRASHES ROUTE 146 SUTTON Prepared for Prepared by MS Transportation Systems, Inc. Framingham, Massachusetts March 2009 ROAD SAFETY AUDIT MAJOR HIGHWAY

More information

CROSS MEDIAN - ROAD SAFETY AUDIT

CROSS MEDIAN - ROAD SAFETY AUDIT CROSS MEDIAN - ROAD SAFETY AUDIT Route 140 New Bedford/Freetown/Lakeville November 20, 2009 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Introduction...1 RSA Process...3

More information

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio Road Safety Audit Course Participant Guidebook August 22 & 23, 2017 Cleveland Avenue Columbus, Ohio 1 2 Table of Contents Executive Summary... 5 Cleveland Avenue City of Columbus... 6 Road Location Details...

More information

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015 ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,

More information

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration Engineering Countermeasures for Transportation Safety Adam Larsen Safety Engineer Federal Highway Administration 360-619-7751 Adam.Larsen@DOT.GOV Countermeasure Selection Resources Manual for Selecting

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Lane Departure Road Safety Audit for Interstate 195 through Swansea, Massachusetts

Lane Departure Road Safety Audit for Interstate 195 through Swansea, Massachusetts Lane Departure Road Safety Audit for Interstate 195 through Swansea, Massachusetts Prepared by The Southeast Regional Planning & Economic Development District and The University of Massachusetts Traffic

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017

How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 Overview Design Vehicle Design Driver Potential Geometric Impacts of Autonomous Vehicles Connected Vehicles

More information

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2) October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT

More information

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation

More information

Road Safety Audit Report: Interstate 516

Road Safety Audit Report: Interstate 516 Road Safety Audit Report: Interstate 516 Interstate 516 from Veterans Pkwy to Montgomery St. (State Route 420 from Veterans Pkwy to City Street 115207) Table of Contents Introduction Road Safety Audit

More information

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program

Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program Roadway Departure Focus State Initiative Roadside Safety Systems Inspection, Maintenance & Designers Mentoring Program Why worry about the roadside? 18,586 deaths per year in the USA Annual U.S. Fatalities

More information

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT ROAD SAFETY AUDIT East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton May 11, 2016 Prepared For: MassDOT Prepared By: 101 Walnut Street Watertown, MA Road Safety Audit

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

Office of Highway Safety Road Safety Audit Review

Office of Highway Safety Road Safety Audit Review Office of Highway Safety Road Safety Audit Review Town: Londonderry Date Reviewed: August 21, 2018 Route: Town Highway 2: Thompsonburg, Main St Mile points: Entire Length Location Map 1 of 48 Office of

More information

Truck Tractor Trailer Crash Analysis

Truck Tractor Trailer Crash Analysis Building Tribal Traffic Safety Capacity Truck Tractor Trailer Crash Analysis Arizona Department of Transportation (ADOT) Motor Vehicle Crash (MVC) Data ITCA, Inc. 04/18/06 Truck Tractor Trailer Crash Analysis

More information

What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety

What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety Adam Larsen Safety Engineer Federal Highway Administration 360-619-7751 Adam.Larsen@DOT.GOV Adam Larsen TTP Safety Engineer

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

Road Safety Assessments. Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL.

Road Safety Assessments. Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL. Road Safety Assessments Lt. Bob McCurdy Williamson County Sheriff s s Office Marion, IL. Why Are We Here? 2005 US Traffic Fatalities = 43,443 1429 4329 1361 1616 1534 3504 1729 3543 Illinois Annual Fatallities

More information

Appendix A: Safety Assessment

Appendix A: Safety Assessment Appendix A: Safety Assessment Safety Assessment Appendix A A Statement of Philosophy The efficient and responsible investment of resources in addressing safety problems is a difficult task. Since crashes

More information

SUBJECT: I-82 Existing Conditions I-84 Boardman to Ontario Corridor Management Plan P

SUBJECT: I-82 Existing Conditions I-84 Boardman to Ontario Corridor Management Plan P 720 SW Washington St. Suite 500 Portland, OR 97205 503.243.3500 www.dksassociates.com MEMORANDUM DATE: March 30, 2017 TO: FROM: Laura Slater (ODOT Project Manager) ODOT PMT Group for I-84 Region 5 Corridor

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT County Street at Hart Street City of Taunton January 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street, 4 th Floor Boston,

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Washington Street (Route 53) at Pleasant Street Town of Pembroke June 26, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data... 1

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower

More information

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT ROAD SAFETY AUDIT Route 135 at Route 30 January 2016 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Road Safety Audit Route 135 at Route

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts

Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts Prepared by University of Massachusetts Traffic Safety Research Program Prepared for Massachusetts Highway

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Road Side Design: When is a Barrier Required?

Road Side Design: When is a Barrier Required? Road Side Design: When is a Barrier Required? Jennifer Schmidt, Ph.D., P.E. University of Nebraska-Lincoln Department of Civil Engineering Guide Rail Safety Symposium Brampton, ON October 24, 2017 Research

More information

Lane. Prepared by. and. Prepared for

Lane. Prepared by. and. Prepared for Lane Departure Road Safety Audit for Interstate 290 through Worcester, Massachusetts Prepared by Central Massachusetts Regional Planning Commission and University of Massachusetts Traffic Safety Research

More information

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by Toward Zero Deaths Regional SHSP Road Show Meeting presented by Virginia Strategic Highway Safety Plan December 1, 2016 1 Welcome & Introductions Purpose of the Meeting Objectives & Key Outcomes Agenda»

More information

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Jan 2006 SIGHT DISTANCE 28(i) Chapter Twenty-eight SIGHT DISTANCE Table of Contents Section Page 28-1 STOPPING SIGHT DISTANCE

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM. DATE June 2, 2011

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM. DATE June 2, 2011 BOSTON METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org Jeffrey

More information

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E. RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

Germanna Highway Route 3

Germanna Highway Route 3 Safety Assessment for Germanna Highway Route 3 (Two Lane section From: 0.30 miles west of Route 600 - west To: 0.21 miles east of 750) Total Distance: 4.62 miles Culpeper County Prepared by: VIRGINIA DEPARTMENT

More information

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of: ROAD SAFETY AUDIT Neponset Street Rotary/Pendergast Circle Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center Drive

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Welcome! Urban Work Zone Design. Training Course 0-1

Welcome! Urban Work Zone Design. Training Course 0-1 Welcome! Urban Work Zone Design Training Course 0-1 Instructor Instructor s Name Here 0-2 About This Course This material is based upon work supported by the Federal Highway Administration (FHWA) under

More information

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer 8 Toolbox of Countermeasures and Their to Make Intersections Safer Introduction Studies included in the NCHRP 17-18 (3), Guidance for Implementation of the AASHTO Strategic Highway Safety Plan, as well

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.

More information

Bicycle RSAs: How to Conduct Road Safety Audits and How to Use Them to Promote Bicyclist Safety. Dan Nabors, PE, VHB Bill DeSantis, PE, VHB

Bicycle RSAs: How to Conduct Road Safety Audits and How to Use Them to Promote Bicyclist Safety. Dan Nabors, PE, VHB Bill DeSantis, PE, VHB PBIC Webinar Bicycle RSAs: How to Conduct Road Safety Audits and How to Use Them to Promote Bicyclist Safety [IMAGE] Dan Nabors, PE, VHB Bill DeSantis, PE, VHB Sept. 26, 2013, 2 pm Today s Presentation

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

Lessons Learned from the Minnesota County Road Safety Plans. Richard Storm CH2M HILL

Lessons Learned from the Minnesota County Road Safety Plans. Richard Storm CH2M HILL Lessons Learned from the Minnesota County Road Safety Plans Richard Storm CH2M HILL May 21, 2014 Overview of the MN CRSP: Why Prepare Safety Plans for Local Systems? MAP-21: Requires states to address

More information

Final Report. Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd. FHWA Experimentation #4-329(E)

Final Report. Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd. FHWA Experimentation #4-329(E) Final Report Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd FHWA Experimentation #4-329(E) Marana, Arizona January 2009 Submitted To: Submitted By: FINAL REPORT EVALUATION

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville.

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville. ROAD SAFETY AUDIT South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville March 15, 2018 Prepared For: MassDOT On Behalf Of: Town of Plainville Prepared By: BETA

More information

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES 5.1 PURPOSE (1) The purpose of the Traffic Safety Studies chapter is to provide guidance on the data collection requirements for conducting a

More information

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway. Iowa Department of Transportation Office of Design Superelevation 2A-2 Design Manual Chapter 2 Alignments Originally Issued: 12-31-97 Revised: 12-10-10 Superelevation is the banking of the roadway along

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT ROAD SAFETY AUDIT State Road (Route 6) Corridor Town of Dartmouth March 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

DESIGN EXCEPTION MANUAL

DESIGN EXCEPTION MANUAL DESIGN EXCEPTION MANUAL 2004 U.S. Customary English Units DESIGN EXCEPTION PROCEDURE A. General When conditions warrant, a design exception may be granted for a project design that proposes one or more

More information

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon SR 53 Corridor Study Final Report Presentation Friday, October 3, 2014 10:00 AM to noon SR 53 Corridor Study Final Report Presentation Study Purpose: Investigate safety improvements along the SR 53 corridor

More information

Part-time Shoulder Use Guide

Part-time Shoulder Use Guide 1 Part-time Shoulder Use Guide FHWA Guide AASHTO SCOD, Baltimore, MD June 2016 DOTs Face Increasing Challenges 2 Performance Based Practical Design 3 PBPD is a decision making approach that helps agencies

More information

Geometric Design Tables

Geometric Design Tables Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements

More information

Work Zone Traffic Safety

Work Zone Traffic Safety Work Zone Traffic Safety Summary The Hazard: death or serious injury from being struck by vehicles or equipment in work zones. Who is at risk: streets/highways, utilities and other public works department

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Route 79/Davol Street Corridor Study

Route 79/Davol Street Corridor Study Route 79/Davol Street Corridor Study Fall River, MA Public Information Meeting #2 November 21, 2013 Fall River Heritage State Park Fall River, MA Agenda Welcome and Introductions Overview of Study Process

More information

ENGINEER S PRELIMINARY REPORT. for the #######-###### COLLISION

ENGINEER S PRELIMINARY REPORT. for the #######-###### COLLISION ENGINEER S PRELIMINARY REPORT for the #######-###### COLLISION By: Lance E. Robson, P.E. October 3, 2005 1 INVESTIGATION OF THE #######-###### COLLISION ENGINEER S PRELIMINARY REPORT October 3, 2005 ---------------------------------------------------------------------------------------------------------------

More information

Table of Contents. Introduction. Prompt List Arterials and Streets. Prompt List Interchange. Prompt List Intersections. Prompt List Limited Access

Table of Contents. Introduction. Prompt List Arterials and Streets. Prompt List Interchange. Prompt List Intersections. Prompt List Limited Access Table of Contents Introduction Prompt List Arterials and Streets Prompt List Interchange Prompt List Intersections Prompt List Limited Access Prompt List MOT Prompt List Pedestrian Bicyclist Prompt List

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

Maine Department Of Transportation - Traffic Engineering, Crash Records Section Crash Summary Report Report Selections and Input Parameters

Maine Department Of Transportation - Traffic Engineering, Crash Records Section Crash Summary Report Report Selections and Input Parameters Maine Department Of Transportation - Traffic Engineering, Crash Records Section Crash Summary Report Report Selections and Input Parameters REPORT SELECTIONS Crash Summary I - Single Node REPORT DESCRIPTION

More information

Pavement Markings (1 of 3)

Pavement Markings (1 of 3) Pavement Markings (1 of 3) DESCRIPTION AND DEFINITION Disadvantages Relatively high cost (over typical Crash reduction as yet unknown painted edge line) No tactile effect The STOP AHEAD pavement marking

More information

City of Vallejo Traffic Calming Toolbox

City of Vallejo Traffic Calming Toolbox City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing

More information

Memorandum. Exhibit 60 SSDP To: Jenny Bailey, Senior Planner. From: Bill Schultheiss, P.E. (WA. P.E. #46108) Date: June 20, 2017

Memorandum. Exhibit 60 SSDP To: Jenny Bailey, Senior Planner. From: Bill Schultheiss, P.E. (WA. P.E. #46108) Date: June 20, 2017 Memorandum To: Jenny Bailey, Senior Planner From: Bill Schultheiss, P.E. (WA. P.E. #46108) Date: June 20, 2017 Re: East Lake Sammamish Trail, Segment 2B Review King County has asked Toole Design Group

More information

ENTUCKY RANSPORTATION C ENTER

ENTUCKY RANSPORTATION C ENTER Research Report KTC-00-13 T K ENTUCKY RANSPORTATION C ENTER College of Engineering A-A HIGHWAY SAFETY STUDY Our Mission We provide services to the transportation community through research, technology

More information

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -

More information

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department ROAD SAFETY AUDIT Falmouth Road (Route 28)/Bearses Way Town of Barnstable May 2009 Prepared for: Massachusetts Highway Department Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA

More information

NEIGHBORHOOD TRAFFIC CALMING POLICY

NEIGHBORHOOD TRAFFIC CALMING POLICY NEIGHBORHOOD TRAFFIC CALMING POLICY I. PURPOSE The City of Kent continually strives to strengthen and protect its neighborhoods by improving the quality of life in residential areas. Traffic conditions

More information

Engineering Your Community Safe

Engineering Your Community Safe Engineering Your Community Safe Andi Bill Transportation Information Center thanks its partners for their support and assistance National Traffic Safety Goal Reasonable goal? Who s Involved? What can you

More information

Broadway Street Pedestrian Safety Study Cass Street to 700 Feet North of Randall Avenue

Broadway Street Pedestrian Safety Study Cass Street to 700 Feet North of Randall Avenue Broadway Street Pedestrian Safety Study Cass Street to 700 Feet North of Randall Avenue Prepared for: City of De Pere, Wisconsin Prepared by: June, 2017 Broadway Street Pedestrian Safety Study Cass Street

More information

Owl Canyon Corridor Project Overview and Summary

Owl Canyon Corridor Project Overview and Summary Owl Canyon Corridor Project Overview and Summary December 22, 2008 The Owl Canyon corridor (generally the connection between the I-25 / Larimer County Road 70 interchange and the US 287 / Larimer County

More information

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Mass Pike Interchange 6, I-291 and Burnett Road City of Chicopee November 4, 2013 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data...

More information

Modern Roundabouts: a guide for application

Modern Roundabouts: a guide for application Modern Roundabouts: a guide for application Kentucky Community Transportation Innovation Academy 2005 The contents of this booklet reflect the views of the authors who are responsible for the facts and

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

WELCOME Mission-Geneva Transportation Study

WELCOME Mission-Geneva Transportation Study WELCOME Mission-Geneva Transportation Study Study Process and Schedule 2005 2006 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Task 2 Develop Outreach Plan Task 3 Document Existing Conditions/ Prioritize

More information

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA PENN STATE TESC SESSION 8B MOVING PENNDOT AND PTC FORWARD DECEMBER 8, 2017 Agenda Define Active Traffic Management and describe

More information

Road Safety Facilities Implemented in Japan

Road Safety Facilities Implemented in Japan Road Safety Facilities Implemented in Japan 1 Road Safety Facilities 1.Guard Fence 2.Road Lighting 3.Other Road Safety Facilities 2 Road Safety Facilities 1.Guard Fence 2.Road Lighting 3.Other Road Safety

More information