ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville.

Size: px
Start display at page:

Download "ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville."

Transcription

1 ROAD SAFETY AUDIT South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville March 15, 2018 Prepared For: MassDOT On Behalf Of: Town of Plainville Prepared By: BETA Group, Inc.

2 Table of Contents Background... 1 Project Data... 1 Project Description... 2 Audit Observations and Potential Safety Enhancements... 5 Potential Safety Enhancements... 9 Summary of Road Safety Audit... 9 List of Appendices Appendix A. Appendix B. Appendix C. Appendix D. RSA Meeting Agenda RSA Audit Team Contact List Detailed Crash Data Speed Regulations List of Figures Figure 1. Location Map... 3 List of Tables Table 1. Participating Audit Team Members... 1 Table 2. Project Estimated Time Frame and Costs Breakdown... 9 Table 3. Potential Safety Enhancement Summary... 10

3 Background The Federal Highway Administration defines a Road Safety Audit (RSA) as the formal safety examination of an existing or future road or intersection by an independent, multidisciplinary team. The purpose of an RSA is to identify potential safety issues and possible opportunities for safety improvements considering all roadway users. A Road Safety Audit was scheduled for the intersection of South Street (Route 1A) with East Bacon Street (Route 106) and West Bacon Street because the intersection has been identified as a high crash location and a top 5% location within the Southeast Regional Planning and Economic Development District (SRPEDD) region. A project has been initiated to make traffic and safety improvements to the South Street corridor including this intersection (MassDOT File No ). The RSA is intended to identify potential short and long term safety improvements that can be made at the intersection, which can then be implemented through general maintenance for short term low cost improvements or incorporated into the future project to the greatest extent practicable. Project Data A Road Safety Audit for South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street in the Town of Plainville was held on February 12, 2018 at Plainville Department of Public Works in Plainville, MA. As indicated in Table 1, the audit team consisted of representatives from State, Regional and Local agencies and included a cross-section of engineering, planning, and emergency response expertise. Table 1. Participating Audit Team Members Audit Team Member Kevin Fitzgerald Elsa Chan Alex Duggan Bianca Marshall Luis de Oliveira James Alfred Justin Alexander Paul Scott Tyler de Ruiter Justin Curewitz Agency/Affiliation MassDOT Highway Division Safety Section MassDOT Highway Division Safety Section MassDOT Highway Division District 5 Projects MassDOT Highway Division District 5 Traffic SRPEDD Plainville Police Chief Plainville Fire Chief Plainville Department of Public Works Director BETA Group, Inc. BETA Group, Inc. Page 1

4 Project Description South Street (Route 1A), shown in Figure 1, is an Urban Minor Arterial under Town jurisdiction throughout the Town of Plainville. Route 1A follows a general north-south alignment and is signed as a north-south route. South Street provides a connection to Wrentham and Interstate 495 to the north, and to North Attleborough and Route 1 to the south. Land use along South Street in the vicinity of the intersection is primarily commercial, with residential homes along intersecting side streets. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street South Street (Route 1A), East Bacon Street (Route 106) and West Bacon Street form a four-legged intersection under traffic signal control. East Bacon Street is classified as an Urban Minor Arterial and West Bacon Street is classified as an Urban Collector, with both roadways under Town jurisdiction. The signal is owned and maintained by the Town of Plainville. East Bacon Street is a primary connection to Route 1 and Mansfield to the east. Land use in the area is commercial, with An Unlikely Story bookstore and café on the northeast corner, Plainville House of Pizza on the southeast corner, Queen s Nails & Spa on the northwest corner and an additional parking lot for the An Unlikely Story on the southwest corner. Adjacent businesses impact operations at the intersection, with most patrons utilizing the parking lot on the southwest corner. South Street provides a single travel lane in each direction at East and West Bacon Street, with turns accommodated from the single lane. A solid white edge line is provided to delineate a shoulder, but widths are not sufficient to safely accommodate bicycles. The northbound and southbound approaches are wide enough to allow through traffic to pass queued left-turning vehicles waiting at the intersection. It was noted that drivers show aggressive tendencies, bypassing queued vehicles when possible, when traveling through the intersection because of the lengthy traffic queues that exist northbound during the morning peak period and southbound during the afternoon peak period. The close proximity of buildings on the intersection corners creates tight turns for truck traffic. This is especially true for the northeast and southeast corners. East Bacon Street (Route 106) and West Bacon Street both provide a single lane in each direction. Route 106 begins at the intersection with South Street and follows East Bacon Street to the east. Image 1: South Street at E/W Bacon Street (looking north) Page 2

5 N SOUTH STREET (ROUTE 1A) AN UNLIKELY STORY EAST BACON STREET (ROUTE 106) QUEEN'S NAILS PLAINVILLE HOUSE OF PIZZA WEST BACON STREET PARKING LOT (FOR PATRONS) SOUTH STREET (ROUTE 1A) LEGEND PROJECT LOCATION SCALE IN FEET: 1"=200' Road Safety Audit South Street (Route 1A) at East Bacon St (Route 106) & West Bacon Street Plainville, MA Figure 1 Location Map

6 A solid white edge line is provided to delineate a shoulder, but widths are not sufficient to safely accommodate bicycles. The traffic signal provides a phase for the South Street approaches, an exclusive pedestrian phase, and a phase for the East and West Bacon Street approaches. An exclusive pedestrian phase is activated by pedestrian pushbutton on all four corners of the intersection. No Turn on Red restrictions are signed for all four approaches. Continuous sidewalks are provided along both sides of all roadways and marked crosswalks are provided across all four approaches. Crash Data Crash data provided by the Plainville Police Department show 40 crashes occurred at the intersection for the five year period from 2012 through A crash data summary and a collision diagram are included in the Appendix. Rear-end and angle crashes are both prevalent, with rear-end crashes comprising 43% of all crashes and angle crashes comprising 40% of all crashes. Rear-end crashes occurred on three of the four approaches; including thirteen southbound (eight involving two vehicles and five involving three vehicles), one involving three vehicles northbound, and two involving two vehicles westbound. Rear-end crashes were often a result of queued traffic and distracted/inattentive drivers. Angle crashes were also seen at the intersection with five crashes involving a northbound through vehicle and a westbound through vehicle, two involving a southbound through and a westbound through, and one involving a northbound through and an eastbound through. Six additional angle crashes involved turning vehicles: four crashes with vehicles making left-turns and two making right turns. A significant amount of these angle crashes are attributed to red light violations or vehicles using the clearance interval to navigate through the intersection due to heavy traffic volumes and queuing. Six sideswipe crashes in the same direction were seen at the intersection with at least one occurring on each approach. Sideswipe crashes were typically seen in periods of queued traffic, especially when vehicles were attempting to pass queued turning vehicles. Page 4

7 Audit Observations and Potential Safety Enhancements Following a brief introduction to the RSA process and a summary of existing geometry and crash information, the audit participants were asked to discuss safety issues at the intersection of South Street (Route 1A) with East Bacon Street (Route 106) and West Bacon Street. Audit participants then conducted a site visit as a group, at which time they offered observations on safety issues and concerns. A summary of those major safety considerations and the potential enhancements identified during the RSA is as follows: Safety Issue #1: Lack of Turning Lanes Observations: It was noted by audit participants that the intersection geometry results in traffic queuing and longer delays due to the lack of turn lanes for both approaches on South Street. Left turning vehicles often queue back waiting for acceptable gaps in traffic. Northbound and southbound approaches along South Street are wide enough to allow a through vehicle to pass by these queued left turning vehicles when they wait as close to the double yellow centerline as possible. Vehicles can then pass on the right of these left turning vehicles to continue through the intersection; however, these makeshift two lane approaches would be introducing the potential for sideswipe crashes that were noted as part of the crash history at the intersection as well as potential crashes for left turning vehicles not expecting a bypassing vehicle in the opposite direction. In addition, if a vehicle attempting to pass on the right suddenly realizes they do not have enough room, it could lead to potential rear-end crashes with the trailing vehicle. Yet, without this makeshift two lane approach the intersection experiences long queues in both peak periods: northbound during the morning and southbound during the afternoon. In addition to vehicular traffic, truck traffic was also noted as a concern at the intersection. Larger trucks access the intersection from local businesses including the Plainville Quarry and Aggregate Industries, as East Bacon Street is a primary connection to Route 1. Currently trucks must swing out and make wider turns to navigate the narrow intersection and often times cannot accept the same gaps that other vehicles can, resulting in longer delays. When trucks are waiting for an appropriate gap to turn, the entire lane is blocked and through vehicles will not be able to bypass, resulting in significant queuing. It was discussed during the meeting that trucks making a westbound right turn would often cross the South Street centerline, encroaching on the southbound approach and leading to potential angle crashes; however, there were no crashes listed that involved trucks turning at the intersection. The close proximity of buildings to the roadway also presents a challenge to accommodate larger truck turns and any widening of the intersection would need to be done on the west side. Driver aggression could also be a contributing factor in angle crashes where driver frustration and longer queues results in drivers accepting shorter gaps and utilizing clearance phases to complete turns. Enhancements: Consider providing dedicated left turn lanes on South Street. This enhancement would require widening South Street to provide left turn lanes for both northbound and southbound approaches, Page 5

8 while maintaining a shared through/right-turn lane in each direction and a shoulder accommodating bicycles. The installation of left turn lanes for both South Street approaches would help reduce the probability of sideswipe and angle crashes. Review truck turning paths, and consider the need for widening and/or realignment. This is of specific concern for the South Street southbound left turn, but should be reviewed for all turning movements. Any required widening of the intersection would need to be done on the west side of South Street due to the buildings at the back of sidewalk on the northeast and southeast corners. Consider adjusting the center and shoulder line striping to narrow the approach and departure lanes and discourage cars from passing on the right. This would have negative capacity impacts but would decrease conflicts in the intersection. Safety Issue #2: Pedestrian Accommodations Observations: Several issues related to pedestrian traffic and accommodations were noted by audit participants. The intersection experiences higher pedestrian traffic due to the local area businesses, with the An Unlikely Story bookstore and café generating a significant amount. The bookstore utilizes two parking lots, one behind its building on the northeast corner of the intersection and one on the southwest corner, which requires pedestrians to cross two legs of the intersection. Audit participants noted that pedestrians will typically push the button to cross and when displayed with the WALK symbol, they will cross diagonally through the intersection instead of using the crosswalks. This in turn eliminates the need to push two separate buttons and wait two cycles. It was noted that the current pedestrian clearance time is not long enough to allow for a diagonal crossing; however, pedestrians familiar with the intersection will still make the crossing. This crossing pattern was observed during the site visit on the day of the audit. In addition to the bookstore and café, functions are also held on the second floor of the building which has been seen to generate significant interest and higher than usual pedestrian traffic. Although the bookstore owns the southwest corner parking lot, Plainville House of Pizza and the Nail Salon also access the lot, requiring pedestrians to cross at the intersection. Placement of pedestrian pushbuttons was also noted as an issue. Currently, the southwest and northeast corners of the intersection have separate pushbuttons for each crosswalk, while the remaining two corners provide only a single pushbutton for crossing. Current MUTCD guidance requires one pushbutton for each wheelchair ramp to a crosswalk. Enhancements: Consider the installation of diagonal crosswalks at the intersection in addition to the four existing crosswalks. This would require updated clearance times to allow for the pedestrian to safely cross diagonally. Pedestrians would have the ability to cross within one cycle length instead of two and would help reduce delays and queuing from multiple pedestrian calls at the intersection. Page 6

9 Consider the installation of a raised intersection or color/textured pavement to allow for pedestrians to cross to all corners of the intersection when the pedestrian phase is called. This would bring attention to the intersection, specifically the significant pedestrian activity. Consider concurrent pedestrian phasing to allow pedestrian traffic to cross during vehicular phases. Evaluate the conflicting left and right turning movements to ensure concurrent pedestrian phasing will not result in unsafe conditions or crossing conflicts. Consider Leading Pedestrian Intervals (LPI) for concurrent phasing. If concurrent pedestrian phasing is decided on, consider including "Turning Vehicles Yield to Pedestrians" (R10-15) signs. Install countdown heads that display the time remaining in the Flashing Don t Walk interval, this can help pedestrians decide whether they have adequate time to cross the street. Consider installation of Accessible Pedestrian Signals (APS) including pushbuttons and signage for all crosswalks and their respective ramps. This should also include installation additional pushbuttons for the missing accommodations. These pushbuttons shall meet APS standards for placement of pushbuttons in relation to curb and crosswalk offset. Evaluate pedestrian desire lines to provide improved accommodations where increased pedestrian activity exists. These improvements could include reconstructed sidewalks and ramps, better defined/restriped crosswalks and flashing beacons for mid-block pedestrian desire lines. This can be applied to the intersection as well as the entire project corridor. Safety Issue #3: Driver Frustration Due to Traffic Congestion Observations: Traffic congestion was noted as an issue at the intersection. Heavy traffic volumes, especially during the morning and afternoon peak periods lead to increased driver frustration and aggression and could result in drivers accepting less than desirable gaps for turns or attempting to navigate through the intersection during yellow and red clearances. It was noted that southbound queues in the afternoon will often extend to the Plainville Public Safety Building, a distance of approximately 1,300 feet. Congestion could be a contributing factor in several of the crashes at the intersection. Another key factor in traffic congestion at the intersection is the significant pedestrian traffic and the increased calls of Image 2: Nail Salon Driveway Access the pedestrian phase at the intersection, exacerbating delays and extending queues further. It was noted that vehicles use the Nail Salon parking lot and driveways to bypass the intersection. The parking lot has access from both the southbound and eastbound approaches and vehicles have been seen using the lot as a cut through for both southbound right turns and eastbound left turns. Page 7

10 Enhancements: Consider time of day plans for signal timing to accommodate varying peak periods traffic volumes. Coordinate with Nail Salon property owner to prevent cut through traffic through added signage or reducing curb cuts for smaller driveway access. Consider adding a physical barrier within the parking lot to prevent cut through traffic. Consider evaluating signal phasing to include a leading protected left turn phase southbound. This would allow vehicles the chance to clear the intersection during each cycle and reduce them from queuing through multiple cycles. Consider adding retroreflective borders to the overhead back plates as well as adding back plates and borders to the post mounted signals. Safety Issue #4: Potentially Insufficient Clearance Times Observations: Yellow and red clearance times were noted to be potentially inadequate due to the history of red light running and vehicles remaining in the intersection during the clearance period. The issue of drivers remaining in the intersection is likely also related to previously noted congestion. The history of rear-end crashes on three of the four approaches can also be the result of inadequate clearance intervals. It was also suggested that pedestrian clearance intervals are inadequate at the intersection. Audit team members clarified that pedestrian signals are typically designed so that the Flashing Don t Walk (FDW) interval is long enough to allow a pedestrian to cross the street at an assumed typical walking speed, as dictated in the MUTCD. Enhancements: Study clearance times, and update if necessary. The existing yellow and all red clearance times should be determined from the existing traffic signal controller and compared to minimum requirements calculated based on the latest ITE and MassDOT guidance. If existing clearance times are insufficient, clearance times should be increased accordingly. This change in clearance times could reduce the number of rear-end or angle (red light running) crashes occurring at the intersection. Review pedestrian clearance times, and update if necessary. Pedestrian clearance times should be calculated based on the latest MUTCD and MassDOT guidance. Page 8

11 Safety Issue #5: Steep Westbound Grade and Speed Approaching Intersection Observations: It was noted by audit participants that the steep downhill grade westbound on East Bacon Street causes higher speeds approaching the intersection with South Street. These noted speeds make it difficult for opposing traffic to judge acceptable gaps. Enhancements: Consider installing additional warning signs or speed check signs heading westbound which will alert drivers to their increased speeds. Image 3: Westbound Downhill Grade (looking eastbound) Potential Safety Enhancements Following review of available materials and a discussion of existing safety issues, audit participants were asked to consider improvements. Audit participants were encouraged to consider both short and long term improvements for each issue. Each improvement considered has been categorized as short-term, midterm, or long-term based on the definitions shown in Table 2. Additionally, a cost category has been assigned to each improvement based on the parameters set forth in Table 2. Table 2. Project Estimated Time Frame and Costs Breakdown Time Frame Costs Short-Term <1 Year Low $10,000 Mid-Term 1-3 Years Medium $10,001-$50,000 Long-Term >3 Years High >$50,000 Summary of Road Safety Audit Table 3 summarizes potential recommendations discussed by the audit team. The recommendations are categorized based on the potential safety payoff, as well as by time frame and cost. The safety payoff is a qualitative judgment of the effectiveness of the potential safety improvements. Each recommendation has a responsibility assigned to it stating whether MassDOT or the Town of Plainville would be responsible for implementing the recommended improvement. The term Project refers to improvements that are assumed to be included or could reasonably be accommodated as part of planned improvements. Page 9

12 Table 3. Potential Safety Enhancement Summary Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Jurisdiction Lack of Turning Lanes Lack of Turning Lanes Lack of Turning Lanes Pedestrian Accommodations Pedestrian Accommodations Pedestrian Accommodations Consider Providing dedicated left turn lanes on South Street. Review truck turning paths, and consider the need for widening and/or realignment. Consider adjusting the center and shoulder line striping to narrow the departure lanes and discourage cars from passing on the right. Consider the installation of diagonal crosswalks at the intersection in addition to the four existing crosswalks. Consider the installation of a raised intersection or color/textured pavement to allow for pedestrians to cross to all corners of the intersection when the pedestrian phase is called. Consider concurrent pedestrian phasing to allow pedestrian traffic to cross during vehicular phases. Consider Leading Pedestrian Intervals (LPI) for concurrent phasing. If concurrent pedestrian phasing is decided on, consider including "Turning Vehicles Yield to Pedestrians" (R10-15) signs. High Mid-term High* Town Medium Mid-term Medium* Town Low Short-term Low* Town Low Short-term Low* Town Low Mid-term Meduim* Town Low Short-term Low* Town Page 10

13 Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Jurisdiction Pedestrian Accommodations Pedestrian Accommodations Pedestrian Accommodations Driver Frustration Due to Traffic Congestion Driver Frustration Due to Traffic Congestion Driver Frustration Due to Traffic Congestion Driver Frustration Due to Traffic Congestion Clearance Times Consider installation of Accessible Pedestrian Signals (APS) including pushbuttons and signage for all crosswalks and their respective ramps. Install countdown heads that display the time remaining in the Flashing Don t Walk interval, this can help pedestrians decide whether they have adequate time to cross the street. Evaluate pedestrian desire lines to provide improved accommodations where increased pedestrian activity exists. Consider time of day plans for signal timing to accommodate varying peak periods traffic volumes. Coordinate with Nail Salon property owner to prevent cut through traffic through added signage or reducing curb cuts for smaller driveway access. Evaluate signal phasing to include a leading protected left turn phase southbound. Consider adding retroreflective borders to the overhead back plates as well as adding back plates and borders to the post mounted signals. Study clearance times, and update if necessary. Medium Short-term Medium* Town Medium Short-term Medium* Town Medium Long-term Low* Town Medium Medium Short-term (Study) Low* Town Long-term (Implementation) Low* Town Medium Mid-term Low* Town/ Property Owner Low Short-term Low* Town Low Short-term Low* Town Medium Short-term Low Town Page 11

14 Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Jurisdiction Pedestrian Clearance Times Review pedestrian clearance times, and update if necessary. Medium Short-term Low Town Westbound Grade Consider installing additional warning signs or speed check signs heading westbound which will alert drivers to their increased speeds. Low Short-term Low Town * Improvements to be incorporated into the proposed project are assumed to be included as part of the overall project cost. Page 12

15 Appendix A. RSA Meeting Agenda

16 Road Safety Audit Plainville, MA South Street (Route 1A) at West Bacon Street & East Bacon Street (Route 106) Meeting Location: Department of Public Works 29 West Bacon Street, Plainville, MA Monday, February 12, :00 AM Noon Type of meeting: Attendees: Please bring: High Crash Location Road Safety Audit Invited Participants to Comprise a Multidisciplinary Team Thoughts and Enthusiasm!! 10:00 AM Welcome and Introductions 10:15 AM Discussion of Safety Issues 11:00 AM Site Visit Crash history, Speed Regulations provided in advance Existing Geometries and Conditions Drive or walk to the intersection of South Street at West Bacon Street & East Bacon Street As a group, identify areas for improvement 11:30 AM Discussion of Potential Improvements Discuss observations and finalize safety issue areas Discuss potential improvements and finalize recommendations 12:00 PM Adjourn for the Day but the RSA has not ended Instructions for Participants: Before attending the RSA on February 12th, participants are encouraged to drive/walk through the intersection and complete/consider elements on the RSA Prompt List with a focus on safety. All participants will be actively involved in the process throughout. Participants are encouraged to come with thoughts and ideas, but are reminded that the synergy that develops and respect for others opinions are key elements to the success of the overall RSA process. After the RSA meeting, participants will be asked to comment and respond to the document materials to assure it is reflective of the RSA completed by the multidisciplinary team.

17 Appendix B. RSA Audit Team Contact List

18 Participating Audit Team Members Date: February 12, 2018 Location: Plainville South Street (Route 1A) at W Bacon Street & E Bacon Street (Route 106) Audit Team Member Agency/Affiliation Address Phone Number Justin Curewitz BETA JCurewitz@BETA-Inc.com Tyler de Ruiter BETA TDeRuiter@BETA-Inc.com Luis de Oliveira SRPEDD ldeoliveira@srpedd.org Paul Scott Plainville DPW PScott@plainville.ma.us James Alfred Plainville Police JAlfred@police.plainville.ma.us Bianca Marshall MassDOT D5 Traffic Bianca.Marshall@dot.state.ma.us Alex Duggan MassDOT D5 Projects Alex.Duggan@state.ma.us Kevin Fitzgerald MassDOT Traffic Safety Kevin.T.Fitzgerald@state.ma.us Elsa Chan MassDOT Traffic Safety Elsa.Chan@state.ma.us Justin Alexander Plainville Fire JAlexander@fire.plainville.ma.us

19 Appendix C. Detailed Crash Data

20 COLLISION DIAGRAM Intersection: South Street (Route 1A) at West/East Bacon Street (Route 106) Date Range: January December 2016 SYMBOLS Moving Vehicle Backing Vehicle Non-Involved Vehicle Pedestrian Bicycle Parked Vehicle Fixed Object Fatal Accident Injury Accident COLLISION TYPES # Rear End Head On Side Swipe Out of Control Left Turn Right Angle Nighttime Crash

21 Crash Data Summary Table South Street (Route 1A) at West/East Bacon Street (Route 106), Plainville, MA January 1, December 31, 2016 Crash Diagram Crash Date Time of Day Manner of Collision Box 11 Light Condition Box 1 Weather Condition Box 2, 3 Road Surface Box 6 Driver Contributing Code Box 24 Ages Injury Status Box 32 Comments Ref # m/d/y hh:mm # Type # Type # Type # Type # Type D1 D2 D3 D4 # Type 1 6/16/12 18:49 2 Rear-end 1 Daylight 1 Clear 1 Dry 20 Distracted PDO "Looked Down" 2 8/31/12 11:19 4 Sideswipe, same direction 1 Daylight 1 Clear 1 Dry 19 Inattention PDO Passed on Right of a Turning Vehicle 3 9/9/12 11:31 2 Rear-end 1 Daylight 1 Clear 1 Dry 1 No Improper Driving Possible Injury "Foot slipped off brake" 4 9/19/12 10:12 3 Angle 1 Daylight 99 Unknown 1 Dry 3 Disregarded traffic signs, signals, road markings PDO WB Red Signal Disregarded traffic signs, signals, 5 11/2/12 13:23 3 Angle 1 Daylight 2 Cloudy 1 Dry 3 road markings Possible Injury 6 11/8/12 15:50 2 Rear-end 1 Daylight 3 Rain 2 Wet 19 Inattention PDO 7 12/7/12 20:04 3 Angle 4 Dark - lighted roadway 3 Rain 2 Wet 3 Disregarded traffic signs, signals, road markings PDO NB Red Signal 3 Year Old Passenger of V2 was evaluated but NOT transported. WB Red Signal 8 12/18/12 16:52 2 Rear-end 4 Dark - lighted roadway 3 Rain 2 Wet 19 Inattention PDO Failed Brakes 9 2/20/13 14:17 3 Angle 1 Daylight 1 Clear 1 Dry 2 Exceeded authorized speed limit PDO Left turn failed to yield ROW 10 6/24/13 17:29 2 Rear-end 1 Daylight 1 Clear 1 Dry 19 Inattention PDO 11 7/4/13 17:52 2 Rear-end 1 Daylight 1 Clear 1 Dry 19 Inattention PDO 12 7/24/13 10:17 1 Single Vehicle Crash 1 Daylight 1 Clear 1 Dry 1 No Improper Driving 59 5 PDO Traveling around construction zone, mirror clipped utility pole. 13 8/29/13 07:53 4 Sideswipe, same direction 1 Daylight 2 Cloudy 2 Wet 1 No Improper Driving PDO 14 9/9/13 16:31 2 Rear-end 1 Daylight 1 Clear 1 Dry 99 Unknown PDO Disregarded traffic signs, signals, 15 10/6/13 11:48 3 Angle 1 Daylight 3 Rain 2 Wet 3 road markings Incapacitating NB Red Signal 16 10/16/13 06:34 3 Angle 4 Dark - lighted roadway 1 Clear 1 Dry 99 Unknown PDO SB V1 failed to negotiate turn, struck EB V2 stopped on red Operating Vehicle in erratic, reckless, careless, negligent, or aggressive 17 11/2/13 15:59 3 Angle 1 Daylight 1 Clear 1 Dry 10 manner Incapacitating NB Red Signal. All transported to area hospitals 18 11/3/13 09:08 2 Rear-end 1 Daylight 2 Cloudy 1 Dry 99 Unknown PDO 19 12/12/13 14:40 2 Rear-end 1 Daylight 99 Unknown 1 Dry 21 Fatigued/asleep PDO Opp stated "may have fallen asleep" 20 2/6/14 20:38 4 Sideswipe, same direction 4 Dark - lighted roadway 1 Clear 1 Dry 1 No Improper Driving 32 Passed on Right, Hit and Run 21 2/24/14 07:51 2 Rear-end 1 Daylight 1 Clear 2 Wet 20 Distracted PDO School van (4 passengers) rear-ended another vehicle 22 3/3/14 13:55 3 Angle 1 Daylight 2 Cloudy 1 Dry 3 Disregarded traffic signs, signals, road markings Possible Injury NB Red Signal 23 3/11/14 17:45 2 Rear-end 1 Daylight 1 Clear 1 Dry 99 Unknown Non-Incapacitating 2 Injuries 24 4/15/14 14:07 3 Angle 1 Daylight 3 Rain 2 Wet 6 Made an improper turn Incapacitating 25 8/18/14 14:36 3 Angle 1 Daylight 1 Clear 1 Dry 1 No Improper Driving Incapacitating Motorcycle (V2) evasive maneuver, doesn't specify in report but suggests motorcyclist dumped his bike as part of the evasive maneuver. No collision between car and bike. 26 9/30/14 20:21 3 Angle 4 Dark - lighted roadway 2 Cloudy 2 Wet 19 Inattention PDO SB Red Signal 27 11/6/14 16:36 4 Sideswipe, same direction 4 Dark - lighted roadway 3 Rain 2 Wet 1 No Improper Driving PDO V3 Straddled DYCL to jump the EB queue. Sideswiped V1 (EB) and V2 (WB) vehicles. Crash reported unknown crash type as both "same dir" and "opposite dir" sideswipes occurred /15/14 15:12 2 Rear-end 1 Daylight 1 Clear 1 Dry 19 Inattention PDO 29 1/22/15 12:00 3 Angle 1 Daylight 1 Clear 1 Dry 4 Failed to yield right of way Possible Injury Police Vehicle with Emergency Lights, report states V2 entered intersection unsafey, no report of which approach had green signal / red signal. Both Transported 30 2/18/15 12:44 2 Rear-end 1 Daylight 1 Clear 3 Snow 19 Inattention PDO 31 5/4/15 16:24 2 Rear-end 1 Daylight 1 Clear 1 Dry 99 Unknown PDO 120 South Street (Long Signal Queue) 32 8/4/15 19:29 3 Angle 3 Dusk 1 Clear 1 Dry 4 Failed to yield right of way Non-Incapacitating V1 failed to yield ROW while making a left turn 33 11/28/15 16:24 2 Rear-end 4 Dark - lighted roadway 3 Rain 2 Wet 19 Inattention PDO 34 12/14/15 06:19 3 Angle 4 Dark - lighted roadway 1 Clear 1 Dry 3 Disregarded traffic signs, signals, road markings Non-Incapacitating SB Red Signal, Lost control and struck corner of House of Pizza. V1 Oper and V2 Pass Transported /29/15 06:54 3 Angle 1 Daylight 5 Sleet, Hail, Freezing Rain 3 Snow 99 Unknown PDO Both drivers claimed they had the green signal. 36 3/6/16 10:26 4 Sideswipe, same direction 1 Daylight 1 Clear 1 Dry 19 Inattention Possible Injury V2 tried to pass on the right of a right turning vehicle. Opp2 Transported 37 7/2/16 16:12 3 Angle 1 Daylight 1 Clear 1 Dry 19 Inattention Incapacitating V2 encroached NB lane while turning left. Struck and ran over a stopped V1 (Motorcycle) and its occupants dragging them underneath vehicle. Motorcyle occ transported /8/16 16:20 2 Rear-end 1 Daylight 3 Rain 2 Wet 97 Other improper action PDO Opp stated his flop flop was wet and foot slipped off brake. V2 Oper stated they may have had a seizure causing the crash. V2 Oper 39 11/13/16 20:31 2 Rear-end 4 Dark - lighted roadway 1 Clear 1 Dry 16 Illness Possible Injury Transported /17/16 17:14 4 Sideswipe, same direction 4 Dark - lighted roadway 1 Clear 1 Dry 9 Failure to keep in proper lane or running off road PDO V1 tried to form two lanes or pass on the right. Red codes updated based on narrative/diagram Summary based on Crash Reports obtained from the TOWN OF PLAINVILLE POLICE DEPARTMENT

22 Crash Data Summary Tables and Charts South Street (Route 1A) at West/East Bacon Street (Route 106), Plainville, MA 25% 20% 15% 10% 5% 0% CRASH MONTH 20% 15% 10% 10% 10% 8% 8% 8% 5% 3% 3% 3% J F M A M J J A S O N D 25% 20% 15% 10% 5% 0% CRASH DAY OF WEEK 20% 20% 15% 13% 13% 13% 8% Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30% CRASH TIME OF DAY 28% 20% 10% 0% 13% 6AM- 8AM 3% 8AM- 10AM 18% 15% 10% 10AM- 12PM 12PM- 2PM 5% 2PM- 4PM4PM- 6PM6PM- 8PM 10% 8PM- 10PM 0% 0% 0% 0% 10PM- 12AM 12AM- 2AM 2AM- 4AM4AM- 6AM 50% 40% 30% 20% 10% 0% CRASH MANNER OF COLLISION 43% 40% 15% 3% 0% 0% 0% 0% Single Rear-end Angle Sideswipe, Sideswipe, Head on Rear to Rear Unknown Vehicle same opposite Crash direction direction MassDOT RSA Crash Data Spreadsheet.xlsx 2 of 3 01/31/2018

23 Crash Data Summary Tables and Charts South Street (Route 1A) at West/East Bacon Street (Route 106), Plainville, MA 80% 60% 40% 20% 0% 73% 0% 3% CRASH LIGHT CONDITION 25% Daylight Dawn Dusk Dark - Lighted Roadway 0% 0% 0% 0% Dark - Roadway not lighted Dark - unknown roadway lighting Other Unknown 70% 60% 50% 40% 30% 20% 10% 0% 60% Clear 13% Cloudy CRASH WEATHER CONDITION 20% Rain 0% 3% 0% 0% 0% 0% Snow Sleet, Hail, Freezing Rain Fog, Smog, Smoke Severe Crosswinds Blowing sand, snow Other 5% Unknown 80% 60% 40% 20% 0% 30% 20% 10% 0% 68% 28% 5% CRASH ROAD SURFACE Dry Wet Snow Ice Sand, mud, dirt, oil, gravel 11% 19% 16% 0% 0% 0% 0% 0% 0% CRASH DRIVER AGES 20% Water (standing, moving) 15% 13% Slush Other Unknown 6% % MassDOT RSA Crash Data Spreadsheet.xlsx 3 of 3 01/31/2018

24 Appendix D. Speed Regulations

25

26 0 NO SCHOOL STREET---WESTBOUND Beginning at Everett w. Skinner Road and George Street Thence w~sterly on School Street 0.68 miles at 30 miles per hour 0.10 miles at 25 miles per hour 0.39 miles at 30 miles per hour ending at South Street; the total di tance being 1.17 miles. GEORGE STREET---SOUTHBOUND Begir~dr~ at School Street Thence southbound on George Street 0.25 miles at 35 miles per hour 0.10 miles at 30 miles per hour 0.52 miles at 35 miles per hour 0. 1!1 miles at 30 miles per hour ending at Messenger Street; the total distance being 1.01 miles. GEORGE STR~ET---NORTHBOUND Beginnin~ at Messenger Street ~ ~nee northbound on George Street 0.14 miles at 30 miles per hour miles at 35 miles per hour 0.10 miles at 30 miles per hour 0.25 miles at 35 miles per hour ending at School Street ; the total distance being 1.01 miles. EVERETT W. SKINNER ROAD--- NORTHBOUND Beginning at School Street Thence northerly 0.98 miles at 30 miles per hour ending at Wampum Street; the distance being 0.98 miles. EVERETT W. SKIIUIER ROAD---SOUTHBOUUD Beginning at Wampum Street Thence southerly o. 98 miles at 30 miles per hour ending at School Street; the total distance being 0.98 miles. TAUNTON STREET---NORTHBOUND Beginning at Washington Street. (Route 1) Thence northbound on Taunton Street \ I

27

28

29

30

31

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke ROAD SAFETY AUDIT Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke April 29, 2016 Prepared For: MassDOT Highway Division

More information

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015 ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,

More information

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Washington Street (Route 53) at Pleasant Street Town of Pembroke June 26, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data... 1

More information

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT County Street at Hart Street City of Taunton January 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street, 4 th Floor Boston,

More information

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT ROAD SAFETY AUDIT East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton May 11, 2016 Prepared For: MassDOT Prepared By: 101 Walnut Street Watertown, MA Road Safety Audit

More information

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016 ROAD SAFETY AUDIT Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston November 1, 2016 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014 ROAD SAFETY AUDIT Russell Street (Route 9) at North and South Maple Streets Town of Hadley March 2014 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT ROAD SAFETY AUDIT State Road (Route 6) Corridor Town of Dartmouth March 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

ROAD SAFETY AUDIT. Water Street (Route 129) at Vernon Street. Town of Wakefield. September Prepared For: MassDOT

ROAD SAFETY AUDIT. Water Street (Route 129) at Vernon Street. Town of Wakefield. September Prepared For: MassDOT ROAD SAFETY AUDIT Water Street (Route 129) at Vernon Street September 2017 Prepared For: MassDOT Massachusetts Department of Transportation Prepared By: WorldTech Engineering Road Safety Audit Water Street

More information

ROAD SAFETY AUDIT. Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road. Town of Tewksbury. April 5, Prepared For: MassDOT

ROAD SAFETY AUDIT. Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road. Town of Tewksbury. April 5, Prepared For: MassDOT ROAD SAFETY AUDIT Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road Town of Tewksbury April 5, 2017 Prepared For: MassDOT Prepared By: HNTB Corporation 31 St. James Ave Boston, MA

More information

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Mass Pike Interchange 6, I-291 and Burnett Road City of Chicopee November 4, 2013 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data...

More information

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT ROAD SAFETY AUDIT Route 135 at Route 30 January 2016 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Road Safety Audit Route 135 at Route

More information

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT ROAD SAFETY AUDIT Santilli Circle and Sweetser Circle Municipality of Everett Prepared For: MassDOT On Behalf Of: WYNN Design and Development Prepared By: AECOM 250 Apollo Drive Chelmsford, MA Road Safety

More information

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016 ROAD SAFETY AUDIT West Central Street (Route 140) at Franklin Village Drive Town of Franklin February 03, 2016 Prepared for: Massachusetts Department of Transportation Prepared by: Howard Stein Hudson

More information

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT ROAD SAFETY AUDIT Centre Street (Route 123) at Plymouth Street Municipality of Brockton November, 2017 Prepared For: MassDOT On Behalf Of: City of Brockton Prepared By: Old Colony Planning Council 70 School

More information

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby ROAD SAFETY AUDIT Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby March 2013 Prepared for: Massachusetts Department of Transportation

More information

ROAD SAFETY AUDIT. Boston Road (Route 20) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham.

ROAD SAFETY AUDIT. Boston Road (Route 20) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham. ROAD SAFETY AUDIT Boston Road (Route 2) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham October 4, 212 Prepared For: MassDOT Highway Division Prepared By: BETA Group,

More information

Maine Department Of Transportation - Traffic Engineering, Crash Records Section Crash Summary Report Report Selections and Input Parameters

Maine Department Of Transportation - Traffic Engineering, Crash Records Section Crash Summary Report Report Selections and Input Parameters Maine Department Of Transportation - Traffic Engineering, Crash Records Section Crash Summary Report Report Selections and Input Parameters REPORT SELECTIONS Crash Summary I - Single Node REPORT DESCRIPTION

More information

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT ROAD SAFETY AUDIT Route 38 from Route 62 to Woburn Town Line Town of Wilmington April 10, 2017 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite 3, Westford,

More information

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of: ROAD SAFETY AUDIT Neponset Street Rotary/Pendergast Circle Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center Drive

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Auburn Street at Southbridge Street (Route 12) Town of Auburn March 2017 Prepared For: Massachusetts Department of Transportation Prepared By: Vanasse Hangen Brustlin, Inc Union Station

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

Truck Turning Study for Main Street Intersection, Orange

Truck Turning Study for Main Street Intersection, Orange Truck Turning Study for Main Street Intersection, Orange Franklin Regional Council of Governments September 2015 0 Truck Turning Study for Main Street Intersection, Orange September 2015 Prepared by: Franklin

More information

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford ROAD SAFETY AUDIT East Main Street (Route 16) at Medway Road (Route 109), East Main Street (Route 16) at Quarry Square Driveways, East Main Street (Route 16) at Beaver Street/ Fortune Boulevard Town of

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT ROAD SAFETY AUDIT Route 16 at Interstate 395 Town of Webster October 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department ROAD SAFETY AUDIT Falmouth Road (Route 28)/Bearses Way Town of Barnstable May 2009 Prepared for: Massachusetts Highway Department Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA

More information

Hidden Oaks Elementary School

Hidden Oaks Elementary School Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens ROAD SAFETY AUDIT Columbia Road at Dorchester Avenue Dorchester, MA 10/14/2016 Prepared For: MassDOT On Behalf Of: Edens Prepared By: MDM Transportation Consultants, Inc. 28 Lord Road Suite 280 Marlborough,

More information

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014 ROAD SAFETY AUDIT Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater May 14, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

ROAD SAFETY AUDIT. Route 1 at Everett Street & University Avenue. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Route 1 at Everett Street & University Avenue. Town of Norwood. September Prepared For: On Behalf Of: ROAD SAFETY AUDIT Route 1 at Everett Street & University Avenue Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio Road Safety Audit Course Participant Guidebook August 22 & 23, 2017 Cleveland Avenue Columbus, Ohio 1 2 Table of Contents Executive Summary... 5 Cleveland Avenue City of Columbus... 6 Road Location Details...

More information

ROAD SAFETY AUDIT. Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard. City of Brockton. July 24,2013

ROAD SAFETY AUDIT. Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard. City of Brockton. July 24,2013 ROAD SAFETY AUDIT Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard City of Brockton July 24,2013 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

ROAD SAFETY AUDIT. Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell. October 5, Prepared For: MassDOT.

ROAD SAFETY AUDIT. Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell. October 5, Prepared For: MassDOT. ROAD SAFETY AUDIT Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell October, 2017 Prepared For: MassDOT Prepared By: Vanasse Hangen Brustlin, Inc 101 Walnut Street Watertown, MA 02472 Road

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

City of Madison, WI. Crash Report

City of Madison, WI. Crash Report City of Madison, WI 2009 Crash Report 2009 City of Madison, WI Traffic Engineering Division Crash Report Table of Contents Page Annual Crash Overview... 1 Crash Totals... 1 5-Year Graphical Crash History...

More information

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT ROAD SAFETY AUDIT Providence Street (Route 122A) at McKeon Road/Millbury Street City of Worcester July 14, 2016 Prepared For: MassDOT Prepared By: Stantec Consulting Services, Inc. Burlington, Massachusetts

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

Rank #1 Highest Priority Intersection

Rank #1 Highest Priority Intersection Rank #1 Highest Priority Intersection Attachment 3: Proposed Interventions Pedestrian Safety City of Toronto s 10 Priority Intersections Sheppard Avenue East and Ambrose Road/Provost Drive Located in the

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

ROAD SAFETY AUDIT. Needham Street and Highland Avenue Corridor. City of Newton and Town of Needham. March 2014

ROAD SAFETY AUDIT. Needham Street and Highland Avenue Corridor. City of Newton and Town of Needham. March 2014 ROAD SAFETY AUDIT Needham Street and Highland Avenue Corridor City of Newton and Town of Needham March 2014 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

ROAD SAFETY AUDIT. Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street. Towns of Norwood & Westwood

ROAD SAFETY AUDIT. Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street. Towns of Norwood & Westwood ROAD SAFETY AUDIT Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street Towns of Norwood & Westwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings

More information

sm1 CDMth '}lf!j1i!~~!2q[ ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 Prepared For: MassDOT

sm1 CDMth '}lf!j1i!~~!2q[ ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 Prepared For: MassDOT ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 '}lf!j1i!~~!2q[ ~ j ighway Divl.sion Prepared For: MassDOT On Behalf Of: City of New Bedford Massachusetts Prepared By: CDM Smith 260

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street MEMORANDUM Date: June 28, 2012 To: From: Subject: Mr. Joseph Stigliani, Director of Public Works Kenneth J. Petraglia, P.E., PTOE Greg E. Lucas, P.E., PTOE Kingsley Road Stop Sign Warrant Analysis BETA

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

ROAD SAFETY AUDIT. Route 113 (Storey Avenue) at Woodman Way and Low Street. Newburyport, MA. May 27, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 113 (Storey Avenue) at Woodman Way and Low Street. Newburyport, MA. May 27, Prepared For: MassDOT ROAD SAFETY AUDIT Route 113 (Storey Avenue) at Woodman Way and Low Street Newburyport, MA May 27, 2015 Prepared For: MassDOT Prepared By: Bayside Engineering, Inc. 600 Unicorn Park Drive Woburn, MA 01801

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 This page left intentionally blank. Table of Contents 1.0 Introduction... 1 1.1 Crash

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

BELCHERTOWN. Intersection of Federal Steet (Route 9) and Bay Road MAY 2012

BELCHERTOWN. Intersection of Federal Steet (Route 9) and Bay Road MAY 2012 BELCHERTOWN Intersection of Federal Steet (Route 9) and Bay Road MAY 2012 Prepared Under the Direction of Pioneer Valley MPO By: Pioneer Valley Planning Commission 60 Congress Street Springfield 01104-3419

More information

ROAD SAFETY AUDIT. Route 2/Taylor Road/Piper Road. Town of Acton. March 4, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Route 2/Taylor Road/Piper Road. Town of Acton. March 4, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Route 2/Taylor Road/Piper Road Town of Acton March 4, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Tetra Tech, Inc. One Grant Street Framingham, MA 01702

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

ROAD SAFETY AUDIT. Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield. June 9, 2017.

ROAD SAFETY AUDIT. Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield. June 9, 2017. ROAD SAFETY AUDIT Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield June 9, 2017 Prepared for: MassDOT On Behalf of: Vanasse & Associates, Inc. 35 New England Business

More information

Pedestrian Road Safety Audit

Pedestrian Road Safety Audit Pedestrian Road Safety Audit Middlebrook Road From Father Hurley Boulevard to Waring Station Road December 2017 Montgomery County Department of Transportation Table of Contents 1. Introduction... 1 1.1

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team Impact of the New MUTCD on Pedestrians and Bicyclists Bruce Friedman and Scott Wainwright FHWA MUTCD Team Development of the 2009 MUTCD NPA published in the Federal Register on January 2, 2008 Received

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

KIETZKE LANE SAFETY MANAGEMENT PLAN FINAL REPORT August, 2013 Submitted By: Parsons. Submitted to:

KIETZKE LANE SAFETY MANAGEMENT PLAN FINAL REPORT August, 2013 Submitted By: Parsons. Submitted to: KIETZKE LANE SAFETY MANAGEMENT PLAN FINAL REPORT August, 2013 Submitted By: Parsons Submitted to: KIETZKE LANE SAFETY MANAGEMENT PLAN EXECUTIVE SUMMARY The Nevada Department of Transportation (NDOT) has

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Existing Conditions. Log Point 8.16 (SR-14) Log Point 1.49 (CR-55) Figure 1- Study Location of SR-14 & CR-55 Intersection

Existing Conditions. Log Point 8.16 (SR-14) Log Point 1.49 (CR-55) Figure 1- Study Location of SR-14 & CR-55 Intersection Abbreviated Study District: 12 County: Cuyahoga Route: SR 14 Section: 8.16 CUY-14-8.16 2016 HSP # 072 (Urban Intersection) Prepared April 3, 2018 By Drake Brauer Approved By: Keith D. Hamilton, P.E. Date:

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

NY Route 5 Comprehensive Pedestrian Safety Study: A Corridor Perspective CDTC Planning Committee. January 7, 2015

NY Route 5 Comprehensive Pedestrian Safety Study: A Corridor Perspective CDTC Planning Committee. January 7, 2015 NY Route 5 Comprehensive Pedestrian Safety Study: A Corridor Perspective CDTC Planning Committee January 7, 2015 Project Objective Study Scope: Perform an analysis of pedestrian related accidents, An engineering

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

ROAD SAFETY AUDIT. Route 3A from Evans Street to Abigail Adams State Park. Town of Weymouth. October 12, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 3A from Evans Street to Abigail Adams State Park. Town of Weymouth. October 12, Prepared For: MassDOT ROAD SAFETY AUDIT Route 3A from Evans Street to Abigail Adams State Park Town of Weymouth October 12, 2016 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite

More information

August 5, 2013 MEMORANDUM

August 5, 2013 MEMORANDUM August 5, 2013 MEMORANDUM 080513 To: cc: From: Subject: Tracy Fogarty, Connecticut Department of Transportation Michael Milone, Town Manager, Town of Cheshire Timothy Slocum, Town Council Chairman, Town

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Study Area and Location District PSA Ward ANC Phase Description B Existing 2500 Block Naylor Road Southeast Northbound

Study Area and Location District PSA Ward ANC Phase Description B Existing 2500 Block Naylor Road Southeast Northbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 25 Block Naylor Road SE Study Area and Location District PSA Ward ANC Phase Description 7 71 7 7B Existing

More information

ROAD SAFETY AUDIT. Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence. October 14, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence. October 14, Prepared For: MassDOT ROAD SAFETY AUDIT Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence October 14, 2011 Prepared For: MassDOT Prepared By: Merrimack Valley Planning Commission Road Safety Audit Route

More information

Edgemont Village Traffic and Parking Technical Report January 2014

Edgemont Village Traffic and Parking Technical Report January 2014 Edgemont Village Traffic and Parking Technical Report January 2014 In the fall of 2013, the District of North Vancouver engaged consultants to assess existing intersection and parking conditions in Edgemont

More information

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT ROAD SAFETY AUDIT Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst November 15, 2016 Prepared For: MassDOT Prepared By: Greenman-Pedersen, Inc. 181 Ballardvale Street, Suite

More information

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY Preliminary Recommendations October 2018 2014 HDR, Inc., all rights reserved. PROJECT BACKGROUND WALKING AUDIT FINDINGS PROPOSED IMPROVEMENT CONCEPTS

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT ROAD SAFETY AUDIT Route 2/Route 68 Interchange Rotary City of Gardner August 3, 2016 Prepared For: MassDOT Prepared By: Tetra Tech 100 Nickerson Avenue Marlborough, MA 01752 Road Safety Audit Route 2/Route

More information

Truck Tractor Trailer Crash Analysis

Truck Tractor Trailer Crash Analysis Building Tribal Traffic Safety Capacity Truck Tractor Trailer Crash Analysis Arizona Department of Transportation (ADOT) Motor Vehicle Crash (MVC) Data ITCA, Inc. 04/18/06 Truck Tractor Trailer Crash Analysis

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information