ROAD SAFETY AUDIT. Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street. Towns of Norwood & Westwood

Size: px
Start display at page:

Download "ROAD SAFETY AUDIT. Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street. Towns of Norwood & Westwood"

Transcription

1 ROAD SAFETY AUDIT Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street Towns of Norwood & Westwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center Drive Suite 140 Andover, MA

2 Table of Contents Background... 1 Project Data... 1 Project Location and Description...2 Audit Observations & Potential Safety Enhancements...6 Summary of Road Safety Audit...12 List of Appendices Appendix A. Appendix B. Appendix C. RSA Meeting Agenda RSA Audit Team Contact List Detailed Crash Data List of Figures Figure 1. Locus Map...3 Figure 2. Route 1A at Everett Street/Clapboardtree Street and Washington Street/Everett Street Existing Conditions... 4 List of Tables Table 1. Table 2. Participating Audit Team Members... 1 Potential Safety Enhancements Summary... 13

3 Background The combined intersection of Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street was identified as a high crash location in the Metropolitan Area Planning Council (MAPC) based on the 2011 Highway Safety Improvement Program (HSIP) cluster data. Improvements at this intersection, to be constructed as part of the off-site mitigation related to the University Station mixed-use transit-oriented development to be located off of University Avenue in Westwood, are currently under review by the MassDOT Highway Division at the 25% Design Level. The MassDOT Highway Division Traffic and Safety Engineering 25% Design Submission Guidelines require a Road Safety Audit (RSA) be performed for all project-related high crash locations to identify safety issues and enhancements that may be implemented in conjunction with the University Station off-site mitigation project, as well as other measures that could be programmed for implementation by others in the mid-term or long-term timeframes. Project Data The RSA for the subject location was conducted on September 8, 2014 at the Westwood Municipal Building. The RSA Meeting Agenda is provided in Appendix A. Participating audit team members and their affiliation are listed in Table 1; team member contact information is provided in Appendix B. For this modified RSA, team members were encouraged to visit the location prior to the meeting to observe operations and evaluate potential safety issues, using MassDOT s Safety Review Prompt list for guidance. At the meeting, team members were provided with an aerial photograph of the location, and a collision diagram, summary table, and various bar charts analyzing motor vehicle crashes reported within the three year review period ( ). This material was reviewed by the team at the meeting in conjunction with street level views afforded by Google Earth. Table 1. Participating Audit Team Members Audit Team Member Mark Ryan Tony Greeley Bill Brooks Paul Sicard Jeff Bina Lisa Schletzbaum orey O onnor Thomas Rebello Alex Duggan Erin Kinahan Scott Thornton Steve Boudreau Jonathan Rockwell Agency/Affiliation Norwood DPW Norwood Fire Department Norwood Police Department Westwood Police Department Westwood Town Engineer MassDOT Highway Division Safety Section MassDOT Highway Division Safety Section MassDOT Highway Division District 5 Traffic MassDOT Highway Division District 5 Projects MassDOT Highway Division District 6 Planning Vanasse & Associates, Inc. Vanasse & Associates, Inc. Vanasse & Associates, Inc. Page 1

4 Motor vehicle crash data was provided by the Norwood and Westwood Police Departments for the most recent three year review period available ( ). The data provided includes 38 reported crashes, with ten (26%) resulting in personal injury, and no reported fatalities. Twenty (53%) of the crashes were angle or turning movement crashes, ten (27%) were rear-end crashes, five (13%) were sideswipe crashes, one vehicle struck a deer, and one crash involved a pedestrian or bicycle. Twelve (32%) of the crashes occurred on wet pavement, and one in snowy conditions. Thirteen (35%) of the crashes occurred during peak afternoon commuting hours (2 pm to 6 pm), and seven (19%) occurred during the peak morning commute (6 am to 10 am). Project Location and Description Route 1A is typically a four-lane urban minor arterial. North of its intersection with Everett Street and Clapboardtree Street, it is known as Washington Street and is under Town of Westwood jurisdiction; south of this intersection, in Norwood, it is known as Upland Road and is under MassDOT Highway Division jurisdiction, as the Town line bisects the intersection from west to east. Everett Street is a four-lane urban minor arterial and Clapboardtree Street is a two-lane urban collector, both under Town of Norwood jurisdiction. The posted speed limit on Route 1A is 40 miles per hour (mph) northbound and 30 mph southbound; Clapboardtree Street is posted at 30 mph approaching the intersection, and Everett Street is unposted in the westbound direction. Everett Street intersects Route 1A from the east and Clapboardtree Street intersects Route 1A from the west to form a four-way intersection under fully-actuated traffic signal control. Each Route 1A approach consists of an exclusive left turn lane and two through travel lanes. The Everett Street westbound approach consists of an exclusive left turn lane and a through travel lane. The Clapboardtree eastbound approach consists of a shared through/left turn lane. The right turns from each side street are channelized via raised median islands. Median islands are also provided on the Route 1A approaches to separate directions of travel. Approximately 100 feet east of Route 1A, Washington Street (a.k.a. Lower Washington) intersects Everett Street from the south to form a three-legged signalized intersection which operates in conjunction with Route 1A under a single traffic signal controller. A railroad bridge crosses over Everett Street, between the two intersections. Washington Street, south of Everett Street, is typically a two-lane urban collector under Town of Norwood jurisdiction, with a posted speed limit of 30 mph. The Washington Street northbound approach consists of an exclusive left turn lane and an exclusive right turn lane. The Everett Street approaches are each comprised of two general purpose travel lanes. Sidewalks currently exist along both sides of Route 1A north of the intersection, along the west side of Route 1A south of the intersection, along both sides of Everett Street, along the north side of Clapboardtree Street, and along both sides of Washington Street south of the intersection. Curb ramps and a crosswalk are provided across the north leg of the intersection, including the channelized right turn, and across the Washington Street approach to Everett Street. Curb ramps with no corresponding marked crosswalk exist across the Clapboardtree Street approach, including the channelized right turn, on the southeast corner of Route 1A and Everett Street, and on Everett Street opposite Washington Street. Page 2

5 The existing traffic signal phasing provides for protected leading left turns on Route1A northbound and southbound. Everett Street westbound operates with a protected-permissive left turn to Route 1A southbound. The lower Washington Street approach is currently allowed to run during both the protected and permissive portions of the Everett Street westbound movement at Route 1A. Clapboardtree Street runs concurrently with Everett Street. A concurrent pedestrian phase is provided for crossing the Route 1A mainline (excluding the channelized right turn) upon pushbutton actuation. No pedestrian signals are present at the pedestrian crossing of the south leg of Washington Street or at other unmarked crossings where curb ramps are provided. A locus map and aerial photograph of the existing conditions are provided as Figure 1 and 2, respectively. Page 3

6 Source: Google Earth Scale in Feet

7 Road Safety Audit - Route 1A at Everett Street/Clapboardtree Street and Washington Street/Everett Street - Westwood and Norwood, Massachusetts CLAPBOARDTREE STREET EVERETT STREET Source: Google Earth. UPLAND Scale in Feet ROAD WASHINGTON STREET

8 Audit Observations & Potential Safety Enhancements Observations: Signal Visibility It was noted that the mast arm mounted signal head on Everett Street westbound prior to the railroad bridge visually blends with the bridge itself, which is painted green. This could contribute to rear-end, angle, or turning movement crashes if drivers are unsure of the signal indications and proceed without the right of way or brake/stop unnecessarily when they do have the right of way. Also in the westbound direction, it was reported that the optically programmed signal indications on the far side of Route 1A may be visible to drivers on Everett Street beyond the intended limit, which could allow drivers to see a red indication in the foreground (at lower Washington Street) and a conflicting green indication beyond, or vice versa. This could lead to rear-end or turning movement crashes and contribute to red light running. Optically programmed signal heads are also present for Everett Street eastbound on the far side of the railroad bridge. RSA members noted that eastbound drivers approaching lower Washington Street may not expect to encounter another signalized intersection after passing through the Route 1A intersection; this is exacerbated by the bridge and optically programmed signals. The bridge partially obscures the overhead signals and the optically programmed signals are set so that the driver does not see the indication until they are too close to comprehend and react. These issues could lead to rear-end or turning movement crashes; in particular, there were eight reported angle crashes between an eastbound vehicle and a northbound vehicle, with crash reports noting that a vehicle ran the red light or the driver was confused. Page 6

9 Signal Equipment & Operation The signal phasing allows the Clapboardtree Street/Everett Street phase (at Route 1A) to run concurrently with the northbound Washington Street phase. This scheme allows Washington Street northbound traffic to proceed through the Route 1A intersection and minimizes queuing on Everett Street between Route 1A and Washington Street. However, drivers from Clapboardtree Street may assume they will have a green light to continue on Everett Street eastbound, past Washington Street, when that signal is red to allow the Washington Street northbound movement. This is likely the cause of a majority of the rear-end and angle crashes reported at this location. Red-light running was cited as a concern. This could be attributed to a number of factors, including inadequate change and clearance intervals, aggressive driver behavior exacerbated by long delays, vehicles becoming trapped in the intersection due to the concurrent side street phasing, placement of overhead signal equipment, or inadequate visibility of optically programmed signal heads (as mentioned above). Queuing It was noted that Route 1A southbound left turn queues often spill outside the exclusive left turn lane into the adjacent through lane, which causes through drivers to move over to the right-most through lane to avoid. No reported crashes were directly attributable to this condition, however it adds to the long delays. Route 1A southbound queues often extend past Marshall Street, prohibiting vehicles from entering or departing the side street during peak hours and occasionally causing northbound traffic in the left lane to back up to Everett Street behind a vehicle waiting to turn left into Marshall Street. This condition introduces the potential for angle crashes. It should be noted that crashes reported at the intersection of Route 1A and Marshall Street were not included in the study. Geometry It was noted that the horizontal curve in Route 1A southbound approaching the intersection obscures the advance view of the traffic signals; trees on the inside of the curve exacerbate this issue. This could be a factor in rear-end crashes if drivers encounter stopped vehicles before recognizing that the signals are red. Page 7

10 Striping & Signing The Everett Street westbound approach lacks pavement markings and signing to designate the intended lane use. A number of related occurrences were described, including vehicles turning left from both approach lanes at Route 1A, and vehicles attempting to proceed through to Clapboardtree Street from the left lane. This condition is exacerbated by the misalignment of the through lane from Everett Street westbound to Clapboardtree Street, which is offset to accommodate the exclusive left turn lane. This likely contributes to angle and sideswipe crashes (crash #7, for example) as drivers turning from the left lane would not expect a vehicle in the adjacent lane to be turning left as well and, similarly, drivers in the right lane would not expect a vehicle in the left lane to continue through. Also, through vehicles must veer left somewhat through the intersection to continue through during the concurrent side street phase. It was noted that there is a general lack of guide signs and route marker signs approaching the intersection, though this is unlikely to be a significant factor in reported crashes. The angle of entry to Route 1A northbound from the channelized right turn from Everett Street makes it appear as though the turning roadway has a dedicated lane entering Route 1A. Also, no YIELD sign or yield line pavement marking is present. This could be a factor in sideswipe crashes at that location as drivers approaching from Everett Street may mistakenly believe they have the right of way. Vehicles have been observed to make a right turn on red from Route 1A northbound where, during certain phases, they immediately encounter a red light. This could lead to rear-end crashes. However, a No Turn on Red sign is present on the approach, but the visibility/placement is poor. It was suggested that the stop line on the Route 1A southbound approach is set back too far and that moving it forward could serve to increase storage in the short left turn lane. Page 8

11 Pedestrian Accommodation There is significant pedestrian activity due to the proximity of Xaverian Brothers high school on Clapboardtree Street and MBTA bus stops on Route 1A southbound, just prior to Marshall Street, and northbound, opposite Marshall Street. One pedestrian crash was reported during the study period, in which a driver later cited for operating under the influence struck a pedestrian on the grass shoulder of Route 1A northbound, just south of the intersection. It was noted that pedestrian access is generally poor due to limited pedestrian signals and crosswalks, and non-compliant curb ramps. The only signalized crossing is across the northern leg of Route 1A; however the pedestrian signal heads do not meet current standards. Crosswalks are only present across the northern leg of Route 1A and across lower Washington Street. However, the record signal permit also shows a striped crosswalk across Clapboardtree Street, which does not currently exist; noncompliant curb ramps are present for this crossing. It was noted that visibility to pedestrians under the railroad bridge is compromised by shadows. The sidewalk from the south leg of Washington Street continues under the railroad bridge and around the corner to Route 1A, where it terminates abruptly, with no crosswalk provided. Bicycle Accommodation Shoulders on all approaches are inadequate for bicycle travel, though no bicycle crashes were reported. The traffic signal presently has no bicycle detection. Pavement Condition It was observed that a bump is created at the brick paver crosswalk across the north leg of the intersection. This appears to be caused by the pavement settling immediately adjacent to the flush granite curb which borders the pavers. The flush granite curb appears to be in good condition and still retains the pavers adequately. It was noted that the pavement becomes slippery in winter, particularly the Everett Street westbound approach. This could be a contributing factor in numerous crash types, most notably rear-ends, if drivers misjudge braking distance given the conditions. There is significant rutting, particularly on the Route 1A approaches to the intersection. Numerous potholes and utility trench patches also exist on Everett Street, between Route 1A and Washington Street. These may cause drivers to swerve to avoid and could contribute to sideswipe or angle crashes. Page 9

12 Potential Enhancements: 1. Replace existing backplates with new backplates with fluorescent yellow retroreflective borders for all signal heads to improve visibility, particularly on Everett Street westbound against the railroad bridge. 2. Work with bridge owner to paint bridge to provide visually contrasting background for signal heads. 3. Review visibility limits and adjust all optically programmed signal indications as necessary to ensure they are not visible beyond their intended limit, particularly Everett Street westbound. 4. Consider alteration and/or horizontal mounting of signal head(s) on far side of bridge for eastbound traffic to alleviate blocked view of far-side signals by bridge, or other solution to improve advance signal visibility/recognition. 5. Consider installation of signal ahead (W3-3) or L.E.D. Red Signal Ahead warning sign on west side of bridge (possibly on the bridge itself) to provide advance notification of lower Washington Street signal. 6. Review placement of optically programmed signal heads and the need for each green, yellow and red indication to remain optically programmed. This could potentially improve advance recognition of change and clearance intervals and reduce rear-end crashes caused by vehicles stopping abruptly. 7. Consider modifications to signal phasing to prohibit the Lower Washington and Clapboardtree Street phases from occurring simultaneously. This could significantly reduce the number of rear-end and angle crashes caused by eastbound drivers unexpectedly encountering a red indication at Washington Street immediately after crossing Route 1A, and possibly reduce the occurrence of red light running. This change to phasing would likely reduce capacity and increase delays. Opportunities to compensate for the capacity reduction should be explored and implemented if feasible, such as a second southbound left turn lane, an additional lane on the Clapboardtree Street approach and/or an exclusive right turn lane northbound. 8. Consider implementation of flashing yellow arrow operation for the Everett Street approach. This would allow left turn movements and a protected advance phase, which would be expected to reduce the incidents of angle and turning movement crashes within the intersection. 9. Review change/clearance intervals, accounting for approach grades. This will ensure that vehicles are afforded sufficient time to clear the intersection and could reduce red-light running. 10. Install new mast arms at the far side of the intersection approaches, rather than diagonally in the middle, to reduce the red signal violations. 11. Provide internal green clearance to clear eastbound vehicles on Everett Street between Route 1A and lower Washington Street and reduce red-light running and associated crashes. Page 10

13 12. Widen Route1A southbound to extend left turn lane to increase capacity, improve accessibility to the left turn lane, and reduce potential queue spillover into the adjacent through lane. 13. Review location of STOP line on Route 1A southbound and relocate if possible to increase storage capacity on approach and to shorten the width of the intersection, hence reducing the required change and clearance intervals. 14. Install Do Not Block Intersection sign and/or pavement markings on Route 1A at Marshall Street to maintain abutter access and prevent northbound queue backup to Everett Street. 15. Consider addition of a supplemental far left signal head on Route 1A southbound to improve advance visibility and account for the horizontal curve on approach. This could reduce rearend crashes by providing advance notice to drivers of a red light. However, MassDOT District 5 Traffic Operations has requested that this not be implemented, since placement of this signal head to the left of the exclusive left turn lane signal could cause drivers to mistake this for an advance left turn signal. 16. Install lane use pavement markings and signing on Everett Street westbound to clarify intended lane use and improve advance decision-making regarding lane assignment. This measure could reduce angle and sideswipe crashes as vehicles would be less likely to make a conflicting movement from the wrong lane unexpectedly. 17. Implement maintenance program for pavement markings, considering that the alignment/ configuration of the Everett Street approach contributes to accelerated wear. This could help reduce all crash types on the Everett Street approach. 18. Install advance street name ( Next Signal Ahead ) signs on Route 1A approaches to aid drivers in selecting the correct lane in advance of the intersection. 19. Install YIELD sign and YIELD line for the channelized right turn to Route 1A northbound to define the desired yield point and add dotted edge line across the channelized right turn lane. 20. Relocate No Turn on Red sign for Route 1A northbound to improve visibility. 21. Add crosswalks and install pedestrian signals for crossing the south leg of Route 1A, Clapboardtree Street, and Everett Street at Lower Washington to improve pedestrian accessibility and connectivity. 22. Review pedestrian signal phasing and pedestrian volumes to determine if exclusive or concurrent phasing is more appropriate at this location to best balance pedestrian accessibility/safety and intersection operations. 23. Upgrade curb ramps to provide ADA-compliant pedestrian access. 24. Install lighting under bridge to improve visibility of pedestrians. 25. Widen approach roadways to provide 5-foot wide shoulders for bicycle accommodation. Page 11

14 26. Install bicycle detection and associated signs and pavement markings. 27. Evaluate brick paver crosswalk on Route 1A and repair settled pavement immediately adjacent to flush granite curb to improve ride quality. 28. Repave the intersection to remove rutting and improve skid resistance, considering a high-friction pavement mix. This could reduce all crash types during slippery conditions and rear-end crashes during all road conditions. This measure would also serve to correct potholes and trench patches, improving ride quality. It should be noted that MassDOT District 5 and the Town of Westwood have indicated that they do not want a high friction surface treatment applied at this location. Summary of Road Safety Audit Potential safety enhancements that were discussed during the RSA meeting and described in the previous section are summarized in Table 2. For each potential enhancement, an estimate of the safety benefit ( payoff ), approximate timeframe to implement, and cost are noted; the responsible party recommended to implement the enhancement is also identified. Safety payoff estimates are qualitative and categorized as low (<30%), medium (31% to 70%), or high (>71%). The time frame to implement each enhancement is categorized as short-term (<1 year), mid-term (1 to 3 years), or long- term (>3 years). The cost estimates are categorized as low (<$10,000), medium ($10,001 to $50,000), or high (>$50,001). Enhancements where the developer is identified as the responsible agency and marked with an asterisk have already been incorporated into the 25% Design Plans for improvements at this intersection, to be constructed as part of the off-site mitigation related to the University Station mixed-use transit-oriented development to be located off of University Avenue in Westwood, which are currently under review by the MassDOT Highway Division. Page 12

15 Table 2. Potential Safety Enhancement Summary Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Visibility of signal heads 1. Replace backplates with new backplates with retroreflective Low Short-term Low Developer* borders for all signal heads Visibility of signal heads 2. Repaint railroad bridge Low Mid-term Medium RR owner Visibility of signal heads 3. Review and adjust visibility limit of optically programmed Low Short-term Low Developer signals Visibility of signal heads 4. Consider alteration, horizontal mounting or other solution to alleviate bridge blocking view of EB signals at lower Washington St. Medium Short-term Low Developer 5. Consider signal ahead (W3-3) Visibility of signal heads or L.E.D. Red Signal!head warning sign on west side of RR bridge Low/Medium Mid-term Low/Medium MassDOT/RR owner 6. Consider replacement of Visibility of signal heads optically programmed signal Low Mid-term Low Developer indications with standard L.E.D. Non-continuous green 7a. Revise signal phasing to between intersections eliminate Lower Washington Medium Short-term Low Developer during certain phases St/Clapboardtree St phase combination Page 13

16 Table 2. Potential Safety Enhancement Summary (continued) Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Non-continuous green 7b. Add lanes to increase capacity Medium Long-term High MassDOT between intersections Concurrent side street phasing 8. Implement FYA operation on Everett St WB Low Mid-term Medium MassDOT Red-light running 9. Review/adjust Low Short-term Low Developer* change/clearance intervals Red-light running 10. Replace mast arms Low Long-term High MassDOT Red-light running Queuing Queuing Queuing/abutter access Geometry/signal visibility Driver guidance 11. Provide internal green clearance 12. Widen Route 1A SB to extend LTL 13. Relocate STOP line on Route 1A SB 14. Install Do Not lock Intersection sign and/or pavement markings at Marshall St 15. Consider addition of supplemental far-left signal head on Route 1A SB 16. Install lane use pavement markings & signing on Everett St WB Medium Short-term Low Developer Low Long-term High MassDOT Low Short-term Low Developer Low Short-term Low Developer Low Short-term Low Developer Medium Short-term Low Developer* Page 14

17 Table 2. Potential Safety Enhancement Summary (continued) Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency MassDOT/Town of Driver guidance 17. Implement pavement marking Medium Mid-term Low Norwood/Town of maintenance program Westwood Driver guidance Lack of definition of desired yield point 18. Install advance street name signs on Route 1A approaches 19. Install YIELD sign, YIELD line & dotted edge line for channelized RT to Route 1A NB Low Short-term Low Developer Low Short-term Low Developer* Sign visibility Pedestrian accessibility Pedestrian accessibility Pedestrian accessibility 20. Relocate No Turn on Red sign on Route 1A NB 21. Add crosswalks and install pedestrian signals for south leg of Route 1A, Clapboardtree St & Everett St at Lower Washington St 22. Review exclusive vs. concurrent pedestrian phasing and revise if warranted 23. Upgrade curb ramps Low Short-term Low Developer Low Short-term Medium Developer Low Short-term Low Developer Low Short-term Medium Developer* Visibility of pedestrians 24. Install lighting under bridge Low Mid-term High Town of Westwood Bicycle accommodation 25. Widen to provide 5-foot shoulders Low Long-term High MassDOT Page 15

18 Table 2. Potential Safety Enhancement Summary (continued) Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Bicycle accommodation 26. Install bicycle detection, signs & pavement markings Low Short-term Medium Developer* Pavement condition Pavement condition 27. Repair pavement at brick paver crosswalk on Route 1A 28. Repave intersection Low Short-term Low Developer Medium Short-term High Developer* Page 16

19 Appendix A. RSA Meeting Agenda

20 Modified Road Safety Audit Westwood and Norwood MEETING LOCATION: Champagne Meeting Room, Westwood Memorial Building 50 Carby Street, Westwood, MA DATE: 9/8/14 TIME : 9:00 AM 3:00 PM Type of meeting: Attendees: Modified Road Safety Audit Invited Participants to Comprise a Multidisciplinary Team Session I 9:00-10:30 East Street Rotary Westwood/District 6 Crash Summaries and Diagrams provided in advance Review aerial and on-the-ground images Design Plans Session II*10:30 1:30 Route 1 at Everett Street/University Ave & Route 1A at Everett Street/Clapboardtree Street and Washington Street/Everett Street Westwood/Norwood/District 5 Crash Summaries and Diagrams provided in advance Review aerial and on-the-ground images Design Plans *Lunch will be provided during this session* Session III 1:30 3:00 Neponset Rotary/Pendergast Circle Norwood/District 5 Crash Summaries and Diagrams provided in advance Review aerial and on-the-ground images Design Plans G:\6629 Westwood, MA\RSA Presentation Materials\Westwood Norwood\RSA agenda.docx 1

21 Instructions for Participants: Before attending the RSA meeting on 9/8/2014, participants are encouraged to drive through the intersection and complete/consider elements on the RSA Prompt List with a focus on safety. All participants will be actively involved in the process throughout. Participants are encouraged to come with thoughts and ideas, but are reminded that the synergy that develops and respect for others opinions are key elements to the success of the overall RSA process. G:\6629 Westwood, MA\RSA Presentation Materials\Westwood Norwood\RSA agenda.docx 2

22 Appendix B. RSA Audit Team Contact List

23 RSA AUDIT TEAM CONTACT LIST Project: Route 1A at Everett Street/Clapboardtree Street and Washington St/Everett Street Norwood/Westwood Meeting Date: 9/8/14 Facilitator: VAI Place/Room: Name Title Company Phone Scott Thornton Engineer VAI Westwood Municipal Building, Champagne Meeting Room Jonathan Rockwell Engineer VAI Corey O Connor Traffic Safety Eng. MassDOT, Boston corey.oconnor@state.ma.us Lisa Schletzbaum Traffic Safety Eng. MassDOT Safety lisa.schletzbaum@state.ma.us Jeff Bina Town Eng./ Westwood Westwood jbina@townhall.westwood.ma.us Erin Kinahan MassDOT, Dist erin.kinahan@state.ma.us Paul Sicard Sergeant Westwood PD psicard@westwoodpd.org Thomas Rebello District 5 Traffic Ops MassDOT Dist thomas.rebello@state.ma.us Mark Ryan Dir. Public Works Norwood mryan@norwoodma.gov Bill Brooks Police Chief Norwood PD wbrooks@norwoodma.gov Tony Greeley Fire Chief Norwood tgreeley@norwoodma.gov Alex Duggan Engineer MassDOT alex.duggan@state.ma.us Steve Boudreau Engineer VAI sboudreau@rdva.com

24 Appendix C. Detailed Crash Data

25 fi111ctimwl l>e.,igu Report- Unh eni(l' Station De1 elopment- IVe~twood allll Norwood,.lla\.\lldllt\ell\ EVERETT STREET CLAPBOARD TREE STREET t 6,8 ~ 9 4,21, _), ~~L 16 lot ;:;::-""" -,.,.r, l3, f "'":':>-?' 2-25.r- :;;;-- <::::::::::: I t11,14,23,26,28, 32,33,34 ~ I!! ~ 6 :5 a::!s -,'11 t 19,30,31 l) 15 Angle (A) _j CRASH TYPE Turning Movement (TM) -' Rear End (RE) Backing Up (BU) I~. Head On (HO) -~... Lone Change (LC) =-.7. Fixed Object (FO) Side Swipe (SS) 0 ;:;::- ---=:::; Out of Control (OC) Pedest./Bicycle (P /B) ---'(9_,.. I --6 Note: FO collision is a vehicle collision with a deer. \A.I Vanasse & Associates, Inc. Collision Diagram Clapboard Tree Street/ Everett Street and Route 1A; Washington Street/Everett Street R \6629 \5 029 :JC: ~J dw 'J. 8;'!/21J1 4 i 1 :: 5 37 A. r.~ 2009 by VAl. All Rlghto Rooerwd.

26 Motor Vehicle Crashes Clapboardtree Street/Everett Street and Route 1A; Washington Street and Everett Street Crash # Date Day Time Crash type e Injury Status a Road Weather c Lighting d Driver Contribution Comments Surface b 1 1/31/2010 Sunday 5:43 AM REAR END NO INJURY Dry Clear Dark, Lighted Roadway Inattention /5/2010 Friday 3:57 PM SIDESWIPE NO INJURY Dry Cloudy Daylight Confusion /16/2010 Tuesday 8:24 AM ANGLE NO INJURY Snowy Snow Daylight disregarding traffic signs ran through a red light without noticing /26/2010 Friday 7:01 PM ANGLE/TURN.MVMT NO INJURY Wet Cloudy Dark, Lighted Roadway Failure to yield to oncoming traffic Left turn without right of way /19/2010 Friday 9:09 AM REAR END INJURY Dry Clear Daylight Inattention Vehicle rear ended vehicle in front which was taking a left turn /31/2010 Wednesday 1:21 PM REAR END NO INJURY Wet Cloudy Daylight Inattention /7/2010 Friday 2:06 PM SIDESWIPE NO INJURY Dry Clear Daylight Unknown School Bus hit and run after side swiping /30/2010 Wednesday 1:02 PM REAR END NO INJURY Dry Clear Daylight followed too closely heavy vehicle prob going too fast tried to stop and it skidded rear ending the veh in front /25/2010 Wednesday 3:28 PM REAR END NO INJURY Wet Rain Daylight Inattention / /4/2010 Saturday 6:52 AM ANGLE/TURN.MVMT NO INJURY Wet Cloudy Daylight Ran red light Driver looking at wrong signal head /10/2010 Sunday 3:25 PM ANGLE NO INJURY Dry Clear Daylight Ran red Light Driver did not see red light until it was too late /1/2010 Wednesday 4:54 PM ANGLE/TURN.MVMT NO INJURY Wet Rain Dark, Lighted Roadway Failure to yield to oncoming traffic /28/2011 Monday 3:22 PM ANGLE/TURN.MVMT NO INJURY Wet Rain Daylight Unable to stop Vehicle unable to stop for red light, and collided with car which had a green light /13/2011 Wednesday 7:31 PM ANGLE NO INJURY Wet Rain Dark, Lighted Roadway Running a red light Driver did not see red light until it was too late /14/2011 Saturday 6:39 PM FO NO INJURY Dry Clear Dawn No Improper driving Collusion with deer /3/2011 Friday 8:34 PM SIDESWIPE NO INJURY Dry Clear Daylight Failure to yield to oncoming traffic Vehicle drifted into oncoming traffic while travelling straight /14/2012 Saturday 11:34 PM ANGLE INJURY Dry Clear Dark, Lighted Roadway Ran red Light /28/2012 Wednesday 9:10 PM REAR END NO INJURY Dry Clear Dawn Unexpected stopping Sudden stop due to unexpected red light / /23/2012 Monday 4:52 PM REAR END NO INJURY Wet Clear Daylight Inattention /15/2012 Wednesday 8:41 AM SIDESWIPE NO INJURY Wet Rain Daylight Unsafe merging /21/2012 Tuesday 2:56 PM ANGLE/TURN.MVMT NO INJURY Dry Clear Daylight Failure to yield to oncoming traffic Left turn without right of way /16/2012 Friday 7:14 PM ANGLE NO INJURY Dry Clear Dark, Lighted Roadway Ran red/yellow light /22/2010 Sunday 3:58 PM ANGLE INJURY Wet Cloudy Daylight Signal confusion Both drivers claim they had the green light /7/2010 Tuesday 12:29 PM ANGLE/TURN.MVMT INJURY Dry Clear Daylight Failure to yield to oncoming traffic Left turn without right of way /10/2011 Thursday 6:23 PM ANGLE NO INJURY Dry Cloudy Dark, Lighted Roadway Signal confusion Did not recognize light was red /16/2011 Tuesday 8:52 PM (P/B) NO INJURY Dry Clear Dark, Lighted Roadway Inattention /25/2011 Thursday 9:35 AM ANGLE INJURY Dry Clear Daylight Signal confusion Both drivers claim they had the green light /10/2011 Saturday 9:22 PM SIDESWIPE INJURY Dry Clear Dark, Lighted Roadway Inattention /12/2011 Saturday 1:40 PM REAR END INJURY Dry Clear Daylight Inattention 2 N/A /23/2011 Wednesday 1:09 PM REAR END NO INJURY Wet Rain Daylight Inattention /26/2011 Saturday 2:03 PM ANGLE INJURY Dry Clear Daylight Ran red Light Did not recognize light was red /6/2012 Monday 7:52 AM ANGLE INJURY Dry Clear Daylight Signal confusion Both drivers claim they had the green light /3/2012 Tuesday 9:30 AM ANGLE/TURN.MVMT NO INJURY Dry Clear Daylight Ran red Light & Speeding Did not recognize light was red /13/2012 Thursday 2:57 PM ANGLE INJURY Dry Clear Daylight Inattention /28/2012 Friday 6:55 PM REAR END NO INJURY Wet Rain Dark, Lighted Roadway Unexpected Stop Driver was not expecting to stop at the intersection of Everett & Washington /22/2012 Monday 3:45 PM ANGLE/TURN.MVMT NO INJURY Dry Clear Daylight Failure to yield to oncoming traffic Left turn without right of way /6/2012 Thursday 2:59 PM ANGLE/TURN.MVMT NO INJURY Dry Clear Daylight Inattention a PD = Property Damage; PI = Personal Injury b RS = Road Surface c W = Weather d L= Lighting; 1 = Daylight; 2 = Dawn; 3 = Dusk; 4 = Dark, Lighted Roadway; 5 = Dusk, Roadway Not Lighted; 6 = Dark, Unknown Roadway Lighting; 7 = Unknown e A = Angle; RE = Rear End; FO = Fixed Object; (P/B) = Pedestrian/Biker; SS = Sideswipe; HO = Head on # of Vehicles Age of Driver 1 Age of Drivers 2/3 S:\Jobs\6629\clap eve rt1a wash.xlsx Formatted Table 11/13/2014

27 Count of Month 18.00% 16.00% 14.00% 12.00% Monthly Crashes 16.22% 13.51% 13.51% 10.81% 10.81% 10.00% 8.00% 8.11% 8.11% 6.00% 5.41% 5.41% 5.41% 4.00% 2.70% 2.00% 0.00% JAN FEB MAR APR MAY JUN AUG SEP OCT NOV DEC Month Total Count of Day Crash Day of Week 25.00% 20.00% 15.00% 10.00% 5.00% 0.00% 21.62% 13.51% 10.81% 10.81% 18.92% 16.22% 8.11% 0.00% Total Day Count of Time Crash Time of Day 40.00% 35.14% 35.00% 30.00% 27.03% 25.00% 20.00% 18.92% 15.00% 13.51% 10.00% 5.00% 2.70% 2.70% 0.00% 6 10AM 10 2PM 2 6PM 6 10PM 10 2AM 2 6AM Time Total S:\Jobs\6629\clap eve rt1a wash.xlsx charts 11/13/2014

28 Count of Crash typee Crash Type 35.00% 30.00% 25.00% 20.00% 15.00% 10.00% 5.00% 0.00% 2.70% 29.73% 24.32% 2.70% 27.03% 13.51% 0.00% Total Crash typee Count of Lightingd 80.00% 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% Lightingd 67.57% Crash Light Condition 27.03% 5.41% 0.00% Daylight Dark, Lighted Dawn (blank) Roadway Total Count of Weatherc 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% Weatherc Crash Weather 62.16% 16.22% 18.92% 2.70% 0.00% Clear Cloudy Rain Snow (blank) Total S:\Jobs\6629\clap eve rt1a wash.xlsx charts 11/13/2014

29 Count of Surfaceb Crash Surface 70.00% 64.86% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% Surfaceb 32.43% 2.70% Dry Wet Snowy Total Count of driver ages Crash Driver Ages 25.00% 20.00% 15.00% 10.00% 16.22% 18.92% 21.62% 13.51% 10.81% 10.81% Total 5.00% 2.70% 5.41% 0.00% driver ages S:\Jobs\6629\clap eve rt1a wash.xlsx charts 11/13/2014

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of: ROAD SAFETY AUDIT Neponset Street Rotary/Pendergast Circle Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center Drive

More information

ROAD SAFETY AUDIT. Route 1 at Everett Street & University Avenue. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Route 1 at Everett Street & University Avenue. Town of Norwood. September Prepared For: On Behalf Of: ROAD SAFETY AUDIT Route 1 at Everett Street & University Avenue Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center

More information

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT County Street at Hart Street City of Taunton January 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street, 4 th Floor Boston,

More information

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014 ROAD SAFETY AUDIT Russell Street (Route 9) at North and South Maple Streets Town of Hadley March 2014 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015 ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,

More information

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT ROAD SAFETY AUDIT East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton May 11, 2016 Prepared For: MassDOT Prepared By: 101 Walnut Street Watertown, MA Road Safety Audit

More information

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens ROAD SAFETY AUDIT Columbia Road at Dorchester Avenue Dorchester, MA 10/14/2016 Prepared For: MassDOT On Behalf Of: Edens Prepared By: MDM Transportation Consultants, Inc. 28 Lord Road Suite 280 Marlborough,

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT ROAD SAFETY AUDIT Route 38 from Route 62 to Woburn Town Line Town of Wilmington April 10, 2017 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite 3, Westford,

More information

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016 ROAD SAFETY AUDIT Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston November 1, 2016 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Washington Street (Route 53) at Pleasant Street Town of Pembroke June 26, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data... 1

More information

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville.

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville. ROAD SAFETY AUDIT South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville March 15, 2018 Prepared For: MassDOT On Behalf Of: Town of Plainville Prepared By: BETA

More information

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT ROAD SAFETY AUDIT State Road (Route 6) Corridor Town of Dartmouth March 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT ROAD SAFETY AUDIT Santilli Circle and Sweetser Circle Municipality of Everett Prepared For: MassDOT On Behalf Of: WYNN Design and Development Prepared By: AECOM 250 Apollo Drive Chelmsford, MA Road Safety

More information

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016 ROAD SAFETY AUDIT West Central Street (Route 140) at Franklin Village Drive Town of Franklin February 03, 2016 Prepared for: Massachusetts Department of Transportation Prepared by: Howard Stein Hudson

More information

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke ROAD SAFETY AUDIT Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke April 29, 2016 Prepared For: MassDOT Highway Division

More information

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Mass Pike Interchange 6, I-291 and Burnett Road City of Chicopee November 4, 2013 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data...

More information

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT ROAD SAFETY AUDIT Centre Street (Route 123) at Plymouth Street Municipality of Brockton November, 2017 Prepared For: MassDOT On Behalf Of: City of Brockton Prepared By: Old Colony Planning Council 70 School

More information

ROAD SAFETY AUDIT. Route 2/Taylor Road/Piper Road. Town of Acton. March 4, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Route 2/Taylor Road/Piper Road. Town of Acton. March 4, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Route 2/Taylor Road/Piper Road Town of Acton March 4, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Tetra Tech, Inc. One Grant Street Framingham, MA 01702

More information

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT ROAD SAFETY AUDIT Route 135 at Route 30 January 2016 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Road Safety Audit Route 135 at Route

More information

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio Road Safety Audit Course Participant Guidebook August 22 & 23, 2017 Cleveland Avenue Columbus, Ohio 1 2 Table of Contents Executive Summary... 5 Cleveland Avenue City of Columbus... 6 Road Location Details...

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby ROAD SAFETY AUDIT Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby March 2013 Prepared for: Massachusetts Department of Transportation

More information

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Auburn Street at Southbridge Street (Route 12) Town of Auburn March 2017 Prepared For: Massachusetts Department of Transportation Prepared By: Vanasse Hangen Brustlin, Inc Union Station

More information

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT ROAD SAFETY AUDIT Providence Street (Route 122A) at McKeon Road/Millbury Street City of Worcester July 14, 2016 Prepared For: MassDOT Prepared By: Stantec Consulting Services, Inc. Burlington, Massachusetts

More information

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford ROAD SAFETY AUDIT East Main Street (Route 16) at Medway Road (Route 109), East Main Street (Route 16) at Quarry Square Driveways, East Main Street (Route 16) at Beaver Street/ Fortune Boulevard Town of

More information

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT ROAD SAFETY AUDIT Route 16 at Interstate 395 Town of Webster October 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

ROAD SAFETY AUDIT. Route 113 (Storey Avenue) at Woodman Way and Low Street. Newburyport, MA. May 27, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 113 (Storey Avenue) at Woodman Way and Low Street. Newburyport, MA. May 27, Prepared For: MassDOT ROAD SAFETY AUDIT Route 113 (Storey Avenue) at Woodman Way and Low Street Newburyport, MA May 27, 2015 Prepared For: MassDOT Prepared By: Bayside Engineering, Inc. 600 Unicorn Park Drive Woburn, MA 01801

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

ROAD SAFETY AUDIT. Water Street (Route 129) at Vernon Street. Town of Wakefield. September Prepared For: MassDOT

ROAD SAFETY AUDIT. Water Street (Route 129) at Vernon Street. Town of Wakefield. September Prepared For: MassDOT ROAD SAFETY AUDIT Water Street (Route 129) at Vernon Street September 2017 Prepared For: MassDOT Massachusetts Department of Transportation Prepared By: WorldTech Engineering Road Safety Audit Water Street

More information

ROAD SAFETY AUDIT. Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road. Town of Tewksbury. April 5, Prepared For: MassDOT

ROAD SAFETY AUDIT. Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road. Town of Tewksbury. April 5, Prepared For: MassDOT ROAD SAFETY AUDIT Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road Town of Tewksbury April 5, 2017 Prepared For: MassDOT Prepared By: HNTB Corporation 31 St. James Ave Boston, MA

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

sm1 CDMth '}lf!j1i!~~!2q[ ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 Prepared For: MassDOT

sm1 CDMth '}lf!j1i!~~!2q[ ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 Prepared For: MassDOT ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 '}lf!j1i!~~!2q[ ~ j ighway Divl.sion Prepared For: MassDOT On Behalf Of: City of New Bedford Massachusetts Prepared By: CDM Smith 260

More information

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer 8 Toolbox of Countermeasures and Their to Make Intersections Safer Introduction Studies included in the NCHRP 17-18 (3), Guidance for Implementation of the AASHTO Strategic Highway Safety Plan, as well

More information

ROAD SAFETY AUDIT. Boston Road (Route 20) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham.

ROAD SAFETY AUDIT. Boston Road (Route 20) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham. ROAD SAFETY AUDIT Boston Road (Route 2) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham October 4, 212 Prepared For: MassDOT Highway Division Prepared By: BETA Group,

More information

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT ROAD SAFETY AUDIT Route 2/Route 68 Interchange Rotary City of Gardner August 3, 2016 Prepared For: MassDOT Prepared By: Tetra Tech 100 Nickerson Avenue Marlborough, MA 01752 Road Safety Audit Route 2/Route

More information

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department ROAD SAFETY AUDIT Falmouth Road (Route 28)/Bearses Way Town of Barnstable May 2009 Prepared for: Massachusetts Highway Department Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 This page left intentionally blank. Table of Contents 1.0 Introduction... 1 1.1 Crash

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

A plan for improved motor vehicle access on Railroad Avenue in Provincetown A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION

More information

ROAD SAFETY AUDIT. Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard. City of Brockton. July 24,2013

ROAD SAFETY AUDIT. Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard. City of Brockton. July 24,2013 ROAD SAFETY AUDIT Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard City of Brockton July 24,2013 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

ROAD SAFETY AUDIT. Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123. City of Attleboro, MA. September 15, 2015

ROAD SAFETY AUDIT. Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123. City of Attleboro, MA. September 15, 2015 ROAD SAFETY AUDIT Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123 City of Attleboro, MA September 15, 2015 Prepared For: MassDOT On Behalf Of: Prepared By: Fay, Spofford

More information

ROAD SAFETY AUDIT. Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell. October 5, Prepared For: MassDOT.

ROAD SAFETY AUDIT. Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell. October 5, Prepared For: MassDOT. ROAD SAFETY AUDIT Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell October, 2017 Prepared For: MassDOT Prepared By: Vanasse Hangen Brustlin, Inc 101 Walnut Street Watertown, MA 02472 Road

More information

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street MEMORANDUM Date: June 28, 2012 To: From: Subject: Mr. Joseph Stigliani, Director of Public Works Kenneth J. Petraglia, P.E., PTOE Greg E. Lucas, P.E., PTOE Kingsley Road Stop Sign Warrant Analysis BETA

More information

ROAD SAFETY AUDIT. Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield. June 9, 2017.

ROAD SAFETY AUDIT. Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield. June 9, 2017. ROAD SAFETY AUDIT Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield June 9, 2017 Prepared for: MassDOT On Behalf of: Vanasse & Associates, Inc. 35 New England Business

More information

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT ROAD SAFETY AUDIT Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst November 15, 2016 Prepared For: MassDOT Prepared By: Greenman-Pedersen, Inc. 181 Ballardvale Street, Suite

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014 ROAD SAFETY AUDIT Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater May 14, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

MEMORANDUM. Layout Of Study Intersections And Traffic Control

MEMORANDUM. Layout Of Study Intersections And Traffic Control BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Director, MPO Staff DATE November 15, 2012 TO FROM RE Town of

More information

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI

More information

ROAD SAFETY AUDIT. Needham Street and Highland Avenue Corridor. City of Newton and Town of Needham. March 2014

ROAD SAFETY AUDIT. Needham Street and Highland Avenue Corridor. City of Newton and Town of Needham. March 2014 ROAD SAFETY AUDIT Needham Street and Highland Avenue Corridor City of Newton and Town of Needham March 2014 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

Freeway ramp intersection study

Freeway ramp intersection study Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate

More information

SCOPE Application, Design, Operations,

SCOPE Application, Design, Operations, SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

Final Report. Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd. FHWA Experimentation #4-329(E)

Final Report. Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd. FHWA Experimentation #4-329(E) Final Report Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd FHWA Experimentation #4-329(E) Marana, Arizona January 2009 Submitted To: Submitted By: FINAL REPORT EVALUATION

More information

Section 9A.07 Meaning of Standard, Guidance, Option, and Support

Section 9A.07 Meaning of Standard, Guidance, Option, and Support 2012 Edition Page 895 PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES CHAPTER 9A. GENERAL Section 9A.01 Requirements for Bicyclist Traffic Control Devices 01 General information and definitions concerning

More information

Rank #1 Highest Priority Intersection

Rank #1 Highest Priority Intersection Rank #1 Highest Priority Intersection Attachment 3: Proposed Interventions Pedestrian Safety City of Toronto s 10 Priority Intersections Sheppard Avenue East and Ambrose Road/Provost Drive Located in the

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts

Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts Prepared by University of Massachusetts Traffic Safety Research Program Prepared for Massachusetts Highway

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

(This page left intentionally blank)

(This page left intentionally blank) (This page left intentionally blank) 2011 Edition- Revision 2 Page 813 CHAPTER 9A. GENERAL Section 9A.01 Requirements for Bicyclist Traffic Control Devices 01 General information and definitions concerning

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016 Designing for Pedestrian Safety Alabama Department of Transportation Pre-Construction Conference May 2016 1 Designing for Pedestrians Marking Crosswalks at Signalized intersections High Visibility Markings

More information

City of Madison, WI. Crash Report

City of Madison, WI. Crash Report City of Madison, WI 2009 Crash Report 2009 City of Madison, WI Traffic Engineering Division Crash Report Table of Contents Page Annual Crash Overview... 1 Crash Totals... 1 5-Year Graphical Crash History...

More information

ROAD SAFETY AUDIT. Route 3A from Evans Street to Abigail Adams State Park. Town of Weymouth. October 12, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 3A from Evans Street to Abigail Adams State Park. Town of Weymouth. October 12, Prepared For: MassDOT ROAD SAFETY AUDIT Route 3A from Evans Street to Abigail Adams State Park Town of Weymouth October 12, 2016 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite

More information

ROAD SAFETY AUDIT. Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence. October 14, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence. October 14, Prepared For: MassDOT ROAD SAFETY AUDIT Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence October 14, 2011 Prepared For: MassDOT Prepared By: Merrimack Valley Planning Commission Road Safety Audit Route

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

PART 7. TRAFFIC CONTROLS FOR SCHOOL AREAS CHAPTER 7A. GENERAL

PART 7. TRAFFIC CONTROLS FOR SCHOOL AREAS CHAPTER 7A. GENERAL 2012 Edition Page 825 Section 7A.01 Need for Standards January 13, 2012 PART 7. TRAFFIC CONTROLS FOR SCHOOL AREAS CHAPTER 7A. GENERAL 01 Regardless of the school location, the best way to achieve effective

More information

ROAD SAFETY AUDIT. Damon Road. City of Northampton. October Prepared for: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Damon Road. City of Northampton. October Prepared for: Massachusetts Department of Transportation ROAD SAFETY AUDIT Damon Road City of Northampton October 2013 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA 02111 Table

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

Falmouth Road Safety Audit

Falmouth Road Safety Audit Falmouth Road Safety Audit Sandwich Road: Carriage Shop Road to Hatchville Road September 2011 Prepared by the Cape Cod Commission in cooperation with the Town of Falmouth and Massachusetts Department

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

For Information Only. Pedestrian Collisions (2011 to 2015) Resolution. Presented: Monday, Apr 18, Report Date Tuesday, Apr 05, 2016

For Information Only. Pedestrian Collisions (2011 to 2015) Resolution. Presented: Monday, Apr 18, Report Date Tuesday, Apr 05, 2016 Presented To: Operations Committee For Information Only Pedestrian Collisions (0 to 0) Presented: Monday, Apr 8, 06 Report Date Tuesday, Apr 0, 06 Type: Correspondence for Information Only Resolution For

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

TRAFFIC ACCIDENT ANALYSIS

TRAFFIC ACCIDENT ANALYSIS TRAFFIC ACCIDENT ANALYSIS Westheimer at Chimney Rock and Westheimer at Dunvale Prepared for Prepared by Klotz Associates, Inc. 1160 Dairy Ashford, Suite 500 Houston, Texas 77079 The preparation of this

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

ROAD SAFETY AUDIT. I 495/Route 117 Interchange. Town of Bolton. August Prepared for: Massachusetts Department of Transportation Highway Division

ROAD SAFETY AUDIT. I 495/Route 117 Interchange. Town of Bolton. August Prepared for: Massachusetts Department of Transportation Highway Division ROAD SAFETY AUDIT I 495/Route 117 Interchange Town of Bolton August 2013 Prepared for: Massachusetts Department of Transportation Highway Division Prepared by: Green International Affiliates, Inc. TABLE

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA 02630 (508) 362-3828 Fax (508) 362-3136 2006 Transportation Safety Report Bourne: Otis Rotary Harwich: Route 137/Route 39 Orleans: Route

More information

ADA PRESENTATION (CURB RAMPS)

ADA PRESENTATION (CURB RAMPS) ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly

More information