1 ROAD SAFETY AUDIT Route 1 at Everett Street & University Avenue Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center Drive Suite 140 Andover, MA

2 Table of Contents Background... 1 Project Data... 1 Project Location and Description...2 Audit Observations & Potential Safety Enhancements...5 Summary of Road Safety Audit...12 List of Appendices Appendix A. Appendix B. Appendix C. RSA Meeting Agenda RSA Audit Team Contact List Detailed Crash Data List of Figures Figure 1. Figure 2. Locus Map... 3 Route 1 at Everett Street/University Avenue Existing Conditions... 4 List of Tables Table 1. Table 2. Participating Audit Team Members... 1 Potential Safety Enhancements Summary... 13

3 Background The intersection of Route 1 at Everett Street and University Avenue was identified as a high crash location in the Metropolitan Area Planning Council (MAPC) based on the 2010 and 2011 Highway Safety Improvement Program (HSIP) cluster data. Improvements at this intersection, to be constructed as part of the off-site mitigation related to the University Station mixed-use transit-oriented development to be located off of University Avenue in Westwood, are currently under review by the MassDOT Highway Division at the 25% Design Level. The MassDOT Highway Division Traffic and Safety Engineering 25% Design Submission Guidelines require a Road Safety Audit (RSA) be performed for all project-related high crash locations to identify safety issues and enhancements that may be implemented in conjunction with the University Station off-site mitigation project, as well as other measures that could be programmed for implementation by others in the mid-term or long-term timeframes. Project Data The RSA for the subject location was conducted on September 8, 2014 at the Westwood Municipal Building. The RSA Meeting Agenda is provided in Appendix A. Participating audit team members and their affiliation are listed in Table 1; team member contact information is provided in Appendix B. For this modified RSA, team members were encouraged to visit the location prior to the meeting to observe operations and evaluate potential safety issues, using MassDOT s Safety Review Prompt list for guidance. At the meeting, team members were provided with an aerial photograph of the location, and a collision diagram, summary table, and various bar charts analyzing motor vehicle crashes reported within the three year review period ( ). This material was reviewed by the team at the meeting in conjunction with street level views afforded by Google Earth. Table 1. Participating Audit Team Members Audit Team Member Mark Ryan Tony Greeley Bill Brooks Paul Sicard William Scoble Jeff Bina Lisa Schletzbaum Corey O Connor Thomas Rebello Alex Duggan Erin Kinahan Scott Thornton Steve Boudreau Jonathan Rockwell Agency/Affiliation Norwood DPW Norwood Fire Department Norwood Police Department Westwood Police Department Westwood Fire Department Westwood Town Engineer MassDOT Highway Division Safety Section MassDOT Highway Division Safety Section MassDOT Highway Division District 5 Traffic MassDOT Highway Division District 5 Projects MassDOT Highway Division District 6 Planning Vanasse & Associates, Inc. Vanasse & Associates, Inc. Vanasse & Associates, Inc. Page 1

4 Motor vehicle crash data was provided by the Norwood Police Department for the most recent three year review period available ( ). The data provided includes 52 reported crashes, with sixteen (31%) resulting in personal injury, and no reported fatalities. Twenty-five (48%) of the crashes were rear-end crashes, fifteen (28%) were turning movement crashes, seven (13%) were sideswipe crashes, three (6%) were angle crashes, and two vehicles struck fixed objects. Eleven (21%) of the crashes occurred on wet pavement, and one in snowy conditions. Twenty (38%) of the crashes occurred during peak afternoon commuting hours (2 pm to 6 pm), and twelve (23%) occurred during the peak morning commute (6 am to 10 am). Project Location and Description Route 1 (Boston-Providence Turnpike) is typically a four-lane median-divided urban principal arterial under MassDOT Highway Division jurisdiction. Everett Street is a four-lane urban minor arterial under Town of Norwood jurisdiction. University Avenue is typically a three-lane urban minor arterial under Town of Norwood jurisdiction, with two travel lanes eastbound and one travel lane westbound. The posted speed limit on Route 1 is 45 miles per hour (mph); Everett Street and University Avenue are posted at 30 mph and 40 mph, respectively, approaching the intersection. Everett Street intersects Route 1 from the west and University Avenue intersects Route 1 from the east to form a four-way intersection under actuated traffic signal control. Each Route 1 approach consists of an exclusive left turn lane, two through travel lanes, and a channelized exclusive right turn lane. The Everett Street eastbound approach consists of two general purpose travel lanes. The University Avenue westbound approach consists of two general purpose travel lanes and an exclusive right turn lane. The existing traffic signal phasing provides for protected leading left turns on Route 1. The Everett Street and University Avenue phases run concurrently. Concurrent pedestrian phases for crossing Route 1 and University Avenue are activated upon pushbutton actuation. Bicycle detection is provided on the University Avenue approach only. Sidewalks currently exist along both sides of Everett Street and University Avenue, with curb ramps and crosswalks provided across the south, east and west legs of the intersection; the westerly crosswalk is currently unsignalized. A locus map and aerial photograph of the existing conditions are provided as Figure 1 and 2, respectively. Page 2

5 Source: Google Earth Scale in Feet

6 Source: Google Earth Scale in Feet BOSTON-PROVIDENCE UNIVERSITY TECHNOLOGY WAY AVENUE TURNPIKE EVERETT STREET Road Safety Audit - Route 1 at Everett Street & University Avenue - Norwood, Massachusetts GLACIER DRIVE

7 Audit Observations & Potential Safety Enhancements Observations: Congestion/Queuing Queues on Route 1 routinely extend south to the Neponset Street Rotary (1.5 miles) in the morning and north to the Route 1/I-95 interchange (1.25 miles) in the afternoon. This likely increases driver aggressiveness and leads to inattentiveness which, in turn, are likely contributing factors in many of the rear-end and turning movement crashes reported. Everett Street eastbound (to Route 1A) and University Avenue westbound also experience significant queues. Left-turning vehicles often do not yield to through vehicles, which can lead to turning movement and angle crashes. Vehicles have been observed to turn left from the center (through) lane on University Avenue and Everett Street. This is likely due to driver impatience because of the high volume of drivers turning left on a permissive phase through very heavy oncoming traffic. This could also be attributable to the lack of lane-use markings, as drivers may assume a double left is allowed, given the ample receiving width on Route 1 and no signs prohibiting it. This condition could contribute to turning movement or sideswipe crashes within the intersection, since drivers unfamiliar with the intersection would not expect it. Drivers who become impatient in the southbound queue sometimes use the median break at Lambert s, approximately 2,500 feet north of the intersection, to make a U-turn. Vehicles are observed to use the U-turn in all manners, staying to the left or staying to the right. It was observed that no striping exists at this median break to separate vehicles in either direction. No reported crashes were attributable to this condition, but it is a potential safety issue. Previous observations and worn paths in the grass indicate that motorists drive on the median to access the Route 1 southbound left turn lane when through queues extend beyond its entrance. No reported crashes were attributable to this condition. Signal Equipment & Operation The concurrent side street phasing and lack of exclusive left turn lanes were cited as likely causes of angle and turning movement crashes involving eastbound and westbound vehicles reported within the intersection. Red-light running was identified as a frequent occurrence. This could be attributed to a number of factors, including inadequate change and clearance intervals, aggressive driver behavior exacerbated by long delays, or vehicles becoming trapped in the intersection due to the concurrent side street phasing. It was observed that vehicles turning left from University Avenue attempt to beat Everett Street traffic at the start of the concurrent phase, with four to five cars getting through before Everett Street assumes the right of way. This aggressive behavior is likely a cause of turning movement crashes. Page 5

8 There is no emergency preemption system at the intersection. Emergency responders reported that they avoid this intersection and will not cross with lights and sirens on. Signal visibility is generally poor, given that the outdated short mast arms, supplemented by postmounted signals, do not locate signal heads over the lane to which they apply. Each Route 1 approach only has one overhead and one post mounted signal for the through movement. This signal is also isolated from adjacent signals on Route 1, allowing for high approach speeds in which drivers may not be expecting to stop. The mast arm mounted signal heads are mounted free-swinging, which has allowed the left-most signal head facing Everett Street to become misaligned, facing the Burger King driveway. This likely contributes to rear-end crashes, as drivers may not be aware if they have the right of way, then stop abruptly. Wrong Way Drivers Local police described occurrences of drivers that were neither elderly nor impaired turning left from Everett Street onto Route 1 southbound in the wrong direction. After review, it was observed that the lawn on the east side of Route 1 northbound visually blends with the grass median, obscuring the northbound roadway, due to the relative grades of the Everett Street approach and Route 1. The northern median nose also extends south into the intersection, exacerbating the issue by forcing eastbound left turning vehicles to maneuver around it. Abutter Access It was noted that vehicles turning left from Everett Street that intend to turn into Technology Way, approximately 300 feet north of the intersection, have a short distance to weave with vehicles turning right from University Avenue. No reported crashes were attributable to this condition; however, this is due to the proximity of the driveway to the intersection and also an indirect result of the concurrent side street phasing. Page 6

9 Vehicles from Route 1 southbound headed to Burger King often use the Everett Street driveway, cutting across the four lanes of Everett Street, rather than wait in the through queue and access the restaurant via the driveway on Route 1, immediately south of the intersection. This is likely the cause of two crossing maneuver crashes reported within the three-year review period. It was also noted that left turns out of Burger King to Everett Street are dangerous, given the number of lanes to cross, vehicles coming from various directions, and consistent queue of vehicles limiting a driver s visibility; though no reported crashes were directly attributable to this condition. Left turns into Burger King from Everett Street are also of concern. One reported turning movement crash of this manner may have been a courtesy crash, when one lane of traffic stops to allow the left turner through while a vehicle in another lane, unaware of the situation, hits the left turning vehicle. This is common where there are two lanes of traffic to cross. The McDonald s parking lot has the same concern. Three sideswipe crashes were reported on Everett Street westbound at the Burger King Driveway. One was due to a turning vehicle not signaling, and a second likely occurred when a vehicle switched lanes abruptly to bypass a stopped vehicle waiting to turn left into the business. This condition is worsened by the long eastbound queues which block driveways on Everett Street. Traffic sometimes queues onto Route 1 southbound from Irving Gas/Rojo Car Wash, south of the intersection. It was also speculated that short gap acceptance by drivers leaving this business causes traffic on Route 1 to merge to the left lane in this area. No reported crashes were attributable to this condition; however, these issues have been observed to impact Route 1 operations. It was noted that left turns out of the Central Auto dealership driveway to University Avenue are dangerous, given the number of lanes to cross, its proximity to the intersection, and limited sight lines due to cars parked on the corner by the dealership; though no reported crashes were directly attributable to this condition. Striping The intersection is very wide, due to the number of lanes on Route 1 and the width of the median. It was observed that there is no definition within the intersection to guide turning or through traffic, which may contribute to angle, turning movement, and sideswipe crashes. The shoulder striping on Route 1 southbound, north of the intersection, in the vicinity of Glacier Drive, was identified as a concern. Prior to Glacier Drive a shoulder taper is provided, while approximately 300 feet south of Glacier Drive, striping for the right turn lane to Everett Street begins. A right-in/rightout driveway for McDonald s is also located within this area, creating a no man s land that may be confusing to drivers. No reported crashes were located in this immediate vicinity. However, drivers also enter Route 1 in this area thinking that it is a third southbound through lane, which could be related to two sideswipe crashes reported at the intersection. Page 7

10 Pedestrian Accommodation Shrubs within the State Highway Layout, on the northwest corner of the intersection, restrict advance visibility to the pedestrian crossing between McDonald s and the median island within Everett Street. No sidewalks exist on Route 1, although there were no reported pedestrian crashes within the three-year review period. A number of nearby hotels and businesses were noted to generate pedestrian traffic. RSA members noted pedestrians using the paved shoulder and walking through abutting parking lots, which is a safety issue. It should be noted that any crash data in parking lots would not be included in this study. Pedestrians were observed crossing the northern leg of the intersection where there is no crosswalk. Bicycle Accommodation Limited bicycle accommodations exist at the intersection, consisting of bicycle detection on the University Avenue approach only. Maintenance A manhole on Route 1 southbound in the vicinity of Irving Gas/Rojo Car Wash is set too low and causes drivers to swerve to avoid, though no reported crashes were attributable to this. Illegal Turn One reported crash was the result of a vehicle making a left turn at the end of the channelized right turn lane from Route 1 northbound onto University Avenue westbound. There is currently no signage to prohibit this maneuver. Page 8

11 Potential Enhancements: 1. It is recommended that all traffic analysis at this location be calibrated to capture the demand volume rather than the volume processed by the intersection, given the significant peak hour queuing conditions. 2. Widen Route 1, Everett Street and University Avenue to provide additional lanes and/or turn lane storage to increase capacity and reduce queuing and delay. Consider utilizing a portion of the existing wide median on Route 1 for either a second left turn lane, a third through lane, or both, depending on traffic counts. This would reduce queuing which, in turn, should mitigate driver frustration, distracted driving, red-light running, and rear end crashes. This would also, improve accessibility to the left turn lane on Route 1 southbound. 3. Implement protected left turn phasing for the eastbound and westbound approaches. This could reduce angle, turning movement and rear end crashes. 4. Review feasibility of split-phasing eastbound and westbound movements, which would eliminate turning conflicts, but would likely increase already long queues. 5. Review change and clearance intervals to ensure that vehicles are afforded sufficient time to clear the intersection, which should reduce red-light running. 6. Install dilemma zone detection to reduce red-light running. 7. Install lane-use pavement markings and lane designation signs on all approaches to improve guidance and allow advance decision-making regarding lane assignment. 8. Restripe side street approaches to provide exclusive left turn lanes and allow protected left turn phasing to eliminate conflicting movements at the intersection, being careful not to design a lane trap. 9. Install striping at median break on Route 1 near Lambert s to clearly define intended operation. 10. Install advance street name ( Next Signal Ahead ) signs on Route 1 approaches to aid drivers in selecting the correct lane in advance of the intersection. 11. Install emergency preemption (Opticom) system to improve emergency response through the intersection. Provide detectors at a location on all approaches where the back of queue does not limit the timely activation of the system. 12. Replace existing mast arms and post-mounted signals with new mast arms to provide signal indications centered on each lane on the far side and improve signal visibility/recognition. Consider supplemental post mounted signals, given the isolation of this signal and approach speeds. Page 9

12 13. Install retroreflective borders on signal head back plates to improve signal visibility/recognition. 14. Realign eastbound signal head currently pointing at the Burger King driveway. 15. Consider installing concrete or other contrasting surface on the Route 1 median, immediately north of the intersection, to create a visual break between northbound and southbound travel lanes and reduce the occurrence of wrong-way vehicles. 16. Consider/install signs ( Do Not Enter and Wrong Way ) and pavement markings to discourage wrong way vehicles. It should be noted that MUTCD guidelines for signing intersections with divided highways with median widths less than 30 feet at the intersection do not include these signs. 17. Narrow Route 1 median to reduce travel distance for left turns from the side streets and minimize driver confusion regarding where to turn. 18. Pull back the northern median further north so that eastbound left turning vehicles have a clearer path to the northbound lanes. 19. Install larger Keep Right signs and/or delineators on Route 1 median to discourage wrongway turns from the side streets. 20. Consider installation of dotted extension lines to guide left turning vehicles through the intersection and reduce incidences of wrong way vehicles. 21. Review weaving distance between University Avenue and Technology Drive for possible conflict between vehicles having turned left from Everett Street and vehicles turning right from University Avenue. If warranted, revise signal phasing to prohibit those movements from occurring simultaneously. 22. Extend striping at the Everett Street channelized right turn median island to discourage access to Burger King and install No Left Turn or Right Turn Only sign at end of right turn lane. 23. Install signs to prohibit left turns to/from abutting driveways on Everett Street and University Avenue in the immediate vicinity of the intersection (Burger King/McDonald s/central Auto). 24. Install median on Everett Street and University Avenue approaches to prohibit turning movements to/from abutting driveways. 25. Modify the Burger King driveway on Everett Street to allow right-in/right-out only. 26. Evaluate the opportunity to construct an acceleration/deceleration lane or wider shoulder on Route 1 southbound, south of the intersection, to alleviate observed friction between through vehicles and vehicles turning to/from Burger King and Irving Gas/Rojo Car Wash. Page 10

13 27. Review striping and signing on Route 1 southbound in the vicinity of Glacier Road and consider modifying edge line, installation of additional right turn arrows and Right Lane Must Turn Right signs, and extension of the lane line. 28. Add dotted lane extension lines at exclusive turn lanes on all approaches to improve delineation. 29. Trim, remove or replace shrubs on the northwest corner to improve advance visibility to pedestrian crossing between McDonald s and the median island within Everett Street. 30. Install YIELD and pedestrian warning signs at pedestrian crossings of channelized right turn lanes on Route 1 northbound and southbound. 31. Install sidewalks on Route 1 to improve pedestrian accessibility. 32. Install crosswalk across northern leg of intersection to improve pedestrian accessibility. 33. Install and/or reconstruct curb ramps to improve pedestrian accessibility. 34. Install accessible pedestrian signals (APS) with countdown timers to improve pedestrian accessibility. 35. Provide bicycle detection and associated pavement markings. 36. Adjust manhole frame and cover to grade on Route 1 southbound in the vicinity of Irving Gas/Rojo Car Wash. 37. Install No Left Turn sign at end of channelized right turn lane from Route 1 northbound to University Avenue. 38. As part of long term planning and reconstruction efforts, provide grade separation between Route 1 and the two side streets. Page 11

14 Summary of Road Safety Audit Potential safety enhancements that were discussed during the RSA meeting and described in the previous section are summarized in Table 2. For each potential enhancement, an estimate of the safety benefit ( payoff ), approximate timeframe to implement, and cost are noted; the responsible party recommended to implement the enhancement is also identified. Safety payoff estimates are qualitative and categorized as low (<30%), medium (31% to 70%), or high (>71%). The time frame to implement each enhancement is categorized as short-term (<1 year), midterm (1 to 3 years), or long- term (>3 years). The cost estimates are categorized as low (<$10,000), medium ($10,001 to $50,000), or high (>$50,001). Enhancements where the developer is identified as the responsible agency and marked with an asterisk have already been incorporated into the 25% Design Plans for improvements at this intersection, to be constructed as part of the off-site mitigation related to the University Station mixed-use transit-oriented development to be located off of University Avenue in Westwood, which are currently under review by the MassDOT Highway Division. Page 12

15 Table 2. Potential Safety Enhancement Summary Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Congestion; queuing 1. Calibrate traffic analysis N/A N/A Low MassDOT/Consultants Congestion; queuing 2. Widen Route 1, Everett St & University Ave to provide Medium Long-term High MassDOT additional lane capacity Congestion; queuing 3. Implement protected left turn Medium Short-term Medium Developer* phasing EB/WB Turning conflicts 4. Review split-phasing EB/WB Low Mid-term Low MassDOT Red-light running 5. Review change/clearance Low Short-term Low Developer* intervals Red-light running 6. Install dilemma zone detection Low Mid-term Medium MassDOT Driver guidance Congestion; queuing 7. Install lane-use pavement markings & lane designation signs on all approaches 8. Restripe side street approaches to provide exclusive LTL Low Short-term Low Developer Medium Short-term Medium Developer* Driver guidance 9. Install striping at median break Low Mid-term Low MassDOT near Lambert s Driver guidance 10. Install advance street name Low Short-term Low Developer signs on Route 1 approaches Signal operation 11. Install emergency preemption High Short-term Medium Developer Signal head visibility 12. Replace existing mast arms and post mounted signals Medium Long-term High MassDOT Page 13

16 Table 2. Potential Safety Enhancement Summary (continued) Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Signal head visibility 13. Install retroreflective borders Low Short-term Low Developer on signal head backplates Signal head visibility 14. Realign EB signal head pointing Low Short-term Low Developer* at Burger King driveway Wrong-way vehicles 15. Consider installing concrete on Low Mid-term Medium MassDOT Route 1 median (north side) Wrong-way vehicles 16. Consider/install signs and pavement markings to Low Short-term Low MassDOT discourage wrong way vehicles Wrong-way vehicles 17. Narrow Route 1 median Low Long-term High MassDOT Wrong-way vehicles Wrong-way vehicles Wrong-way vehicles Abutter access Abutter access 18. Pull back northern median end 19. Install larger Keep Right signs and/or delineators on Route 1 medians 20. Consider installation of dotted extension lines for turning vehicles through intersection 21. Review weaving distance to Technology Dr and revise signal phasing, if warranted 22. Extend striping at Everett St channelized RT and install No Left Turn or Right Turn Only sign Low Long-term Medium MassDOT Low Short-term Low Developer Medium Short-term Low Developer Low Short-term Low Developer Low Short-term Low Developer Page 14

17 Table 2. Potential Safety Enhancement Summary (continued) Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Abutter access 23. Install signs to prohibit left turns to/from abutting Low Mid-term Low Town driveways Abutter access Abutter access Abutter access Driver guidance Driver guidance Visibility of pedestrian crossings 24. Install median on Everett St & University Ave approaches 25. Modify Burger King driveway on Everett St to rightin/right/out 26. Construct accel/decel lane on Route 1 at Burger King/Irving Gas driveways 27. Modify striping/signing at Glacier Rd intersection 28. Add dotted extension lines at turn lanes 29. Trim, remove or replace shrubs on NW corner Medium Long-term High MassDOT/Town Low Mid-term Medium Town Low Long-term High MassDOT Low Mid-term Low MassDOT Low Short-term Low Developer Low Short-term Low Developer* Visibility of pedestrian crossings 30. Install YIELD and pedestrian warning signs at pedestrian crossings of channelized RT lanes Low Short-term Low Developer* Pedestrian accommodation 31. Install sidewalks on Route 1 Low Long-term High MassDOT Pedestrian accommodation 32. Install crosswalk across northern leg of intersection Low Short-term Medium Developer Page 15

18 Table 2. Potential Safety Enhancement Summary (continued) Safety Issue Potential Safety Enhancement Safety Payoff Time Frame Cost Responsible Agency Pedestrian accommodation 33. Install and/or reconstruct curb ramps Low Short-term Medium Developer Pedestrian accommodation 34. Install accessible pedestrian signals with countdown timers Low Short-term Medium Developer* Bicycle accommodation Maintenance Illegal turn Congestion; queuing 35. Provide bicycle detection and pavement markings 36. Adjust manhole to grade on Route 1 SB near Irving Gas/Rojo Car Wash 37. Install No Left Turn sign at channelized right turn lane from Rte 1 NB to University Ave 38. Provide grade separation at intersection Low Short-term Medium Developer* Low Short-term Low Developer Low Short-term Low Developer High Long-term High MassDOT Page 16

19 Appendix A. RSA Meeting Agenda

20 Modified Road Safety Audit Westwood and Norwood MEETING LOCATION: Champagne Meeting Room, Westwood Memorial Building 50 Carby Street, Westwood, MA DATE: 9/8/14 TIME : 9:00 AM 3:00 PM Type of meeting: Attendees: Modified Road Safety Audit Invited Participants to Comprise a Multidisciplinary Team Session I 9:00-10:30 East Street Rotary Westwood/District 6 Crash Summaries and Diagrams provided in advance Review aerial and on-the-ground images Design Plans Session II*10:30 1:30 Route 1 at Everett Street/University Ave & Route 1A at Everett Street/Clapboardtree Street and Washington Street/Everett Street Westwood/Norwood/District 5 Crash Summaries and Diagrams provided in advance Review aerial and on-the-ground images Design Plans *Lunch will be provided during this session* Session III 1:30 3:00 Neponset Rotary/Pendergast Circle Norwood/District 5 Crash Summaries and Diagrams provided in advance Review aerial and on-the-ground images Design Plans G:\6629 Westwood, MA\RSA Presentation Materials\Westwood Norwood\RSA agenda.docx 1

21 Instructions for Participants: Before attending the RSA meeting on 9/8/2014, participants are encouraged to drive through the intersection and complete/consider elements on the RSA Prompt List with a focus on safety. All participants will be actively involved in the process throughout. Participants are encouraged to come with thoughts and ideas, but are reminded that the synergy that develops and respect for others opinions are key elements to the success of the overall RSA process. G:\6629 Westwood, MA\RSA Presentation Materials\Westwood Norwood\RSA agenda.docx 2

22 Appendix B. RSA Audit Team Contact List

23 RSA AUDIT TEAM CONTACT LIST Project: Route 1 at Everett Street/University Ave Norwood Meeting Date: 9/8/14 Facilitator: VAI Place/Room: Name Title Company Phone Scott Thornton Engineer VAI sthornton@rdva.com Westwood Municipal Building, Champagne Meeting Room Jonathan Rockwell Engineer VAI jrockwell@rdva.com Corey O Connor Traffic Safety Eng. MassDOT, Boston corey.oconnor@state.ma.us Lisa Schletzbaum Traffic Safety Eng. MassDOT Safety lisa.schletzbaum@state.ma.us Jeff Bina Town Eng./ Westwood Westwood jbina@townhall.westwood.ma.us Erin Kinahan MassDOT, Dist erin.kinahan@state.ma.us Paul Sicard Sergeant Westwood PD psicard@westwoodpd.org William Scoble Fire Chief Westwood FD bscoble@townhall.westwood.ma.us Thomas Rebello District 5 Traffic Ops MassDOT Dist thomas.rebello@state.ma.us Mark Ryan Dir. Public Works Norwood mryan@norwoodma.gov Tony Greeley Fire Chief Norwood tgreeley@norwoodma.gov Bill Brooks Police Chief Norwood PD wbrooks@norwoodma.gov Alex Duggan Engineer MassDOT alex.duggan@state.ma.us Steve Boudreau Engineer VAI sboudreau@rdva.com

24 Appendix C. Detailed Crash Data

25 Functional De.\if.:n /leport- Unh ersi~r Sftltion DeJ'e/opment- 1\'orwood, Ma\\aclul\etl\ 51 EVERErj McDONALDS 13,19,27,29 3G:;'i'. 8,9,15,24,30,33, 1 t ~9 ~1 8,42 _) ~ 21,39,52 /~ ~ 23 _;;;; ~ J ,16 36_, :-n., 17 :=l 4~ l UNIVERSITYAVENUE BURGER KING 43l ll 11,31,49 r 4,15o CENTRAL DODGE JEEP CRASH TYPE Angle (A) Turning Movement (TM) s- Rear End (RE) Lone Change (LC) = Head On (HO) - - Out of Control (OC) ---'<JL-- 1 Fixed Object (FO)--o Pedest./Bicycle (P/B) Side Swipe (SS) 7 ~ Not Reported (U) -6 '\A.I Vanasse & Associates, Inc. Collision Diagram Everett Street/University Avenue and Route 1 ~ '5629' 66291J~(..21 d Ng. 8/1/2i)I.J Pt,l 2014 by VAl. All Rlghto R eerved.

26 Motor Vehicle Crashes Route 1 and Everett Street/University Avenue Crash # Crash Day and Date Crash Time Crash Type Severity R/S Weather Driver Contribution* Comments Manner of Collision Lighting #Vehicles Age of Driver 1 Age of Driver 2 1 Saturday, January 09, :41 ANGLE/TURN.MVMT INJURY DRY CLEAR Confusion Malfuncitoning Light Angle DAYLIGHT Thursday, January 28, :44 ANGLE/TURN.MVMT NO INJURY DRY CLEAR Failure to Yield to oncoming traffic Left turn without right of way Angle DAYLIGHT Tuesday, February 02, :10 REAR-END NO INJURY DRY CLOUDY Malfunctioning brakes Rear-end DAYLIGHT Thursday, February 04, :15 REAR-END INJURY DRY CLEAR Inattention Rear-end DAYLIGHT /49/40 5 Wednesday, February 10, :06 FIXED OBJECT NO INJURY SNOWY SNOW Struck Highway Sign Single Vehicle DARK, LIT. RD Tuesday, March 09, :08 SIDESWIPE NO INJURY DRY CLEAR Illegal U-turn Sideswipe, same direction DAYLIGHT Friday, March 19, :03 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield to oncoming traffic Left turn without right of way Angle DAWN Sunday, May 02, :17 REAR-END NO INJURY DRY CLEAR Following too close Rear-end DAYLIGHT Saturday, May 15, :25 REAR-END NO INJURY DRY CLEAR Following too close Rear-end DAYLIGHT Monday, May 31, :25 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield to oncoming traffic Left turn without right of way Angle DAYLIGHT Thursday, June 03, :20 REAR-END NO INJURY DRY CLEAR Foot slipped on brake Rear-end DAYLIGHT /50 12 Thursday, June 24, :05 ANGLE/TURN.MVMT NO INJURY DRY CLEAR Failure to Yield to oncoming traffic Illegal left turn from McDonalds Angle DAYLIGHT Thursday, August 05, :03 REAR-END NO INJURY WET RAIN Slippery Conditions Rear-end DAYLIGHT /61 14 Wednesday, August 18, :43 ANGLE/TURN.MVMT NO INJURY DRY CLEAR Failure to Yield to oncoming traffic Illegal left turn from McDonalds Angle DAYLIGHT Tuesday, August 24, :52 ANGLE NO INJURY WET RAIN Blocked Vision Left turn into Burger King Angle DAYLIGHT a Saturday, September 18, :46 REAR-END NO INJURY DRY CLEAR Left turn without right of way DAYLIGHT Friday, September 24, :15 ANGLE NO INJURY DRY CLEAR Failure to Yield to oncoming traffic Both turning to the same place from opposite directions Angle DAYLIGHT Thursday, September 30, :48 ANGLE/TURN.MVMT NO INJURY DRY CLOUDY Right turn/left turn conflict Angle DAYLIGHT Saturday, October 09, :36 SIDESWIPE NO INJURY DRY CLEAR Unsafe lane change Sideswipe, same direction DAYLIGHT Saturday, October 16, :36 REAR-END INJURY DRY CLEAR Driver Inattention Left turn without right of way Rear-end DAYLIGHT /38 20 Monday, October 25, :42 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield to oncoming traffic Angle DAYLIGHT Friday, October 29, :37 SIDESWIPE NO INJURY DRY CLEAR Inattention/ Unsafe lane change Sideswipe, same direction DAYLIGHT Sunday, October 31, :35 FIXED OBJECT NO INJURY DRY CLEAR Struck Deer Left turn without right of way Single Vehicle DUSK, RD. NOT LIT Wednesday, November 17, :43 ANGLE/TURN.MVMT NO INJURY OTHER UNKNOWN Failure to Yield to oncoming traffic Angle DARK, LIT. RD Wednesday, November 17, :20 REAR-END NO INJURY DRY CLEAR Inattention Rear-end DARK, LIT. RD 2 N/A N/A 25 Monday, April 04, :29 ANGLE NO INJURY WET RAIN Failure to Yield to oncoming traffic Rolled through stop light Angle DAWN Sunday, April 24, :12 ANGLE/TURN.MVMT NO INJURY WET CLOUDY Failure to Yield to oncoming traffic Angle DUSK Wednesday, May 04, :51 REAR-END NO INJURY WET RAIN Following too closely Rear-end DAYLIGHT /45 28 Thursday, May 05, :21 REAR-END INJURY WET RAIN Inattention Rear-end DAYLIGHT Tuesday, May 17, :51 REAR-END/TURN.MVNT INJURY DRY RAIN Rear-end DAYLIGHT /38 30 Wednesday, June 15, :31 REAR-END NO INJURY DRY CLEAR Inattention Rear-end DAYLIGHT 2 71 N/A 31 Wednesday, July 06, :40 REAR-END INJURY DRY CLEAR Inattention Rear-end DAYLIGHT /22 32 Monday, August 29, :22 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield Angle DARK, LIT. RD Friday, September 09, :40 REAR-END NO INJURY DRY CLEAR Uncareful pasideswipeing Rear-end DARK, LIT. RD Friday, October 14, :49 REAR-END INJURY WET RAIN Following too closely Rear-end DARK, LIT. RD Tuesday, October 18, :14 REAR-END NO INJURY DRY CLEAR Following too closely Left turn into Burger King Rear-end DAYLIGHT Thursday, November 10, :14 ANGLE/TURN.MVMT NO INJURY WET RAIN Failure to Yield Angle DAYLIGHT Wednesday, December 07, :46 REAR-END NO INJURY WET RAIN Inattention Left turn without right of way Rear-end DARK, LIT. RD Wednesday, January 04, :17 ANGLE/TURN.MVMT INJURY DRY CLEAR Failure to Yield Passing on right where prohibited Angle DARK, LIT. RD Sunday, January 22, :31 SIDESWIPE NO INJURY DRY CLEAR Driver did not signal turn, other car unable to stop Sideswipe DARK, LIT. RD Tuesday, February 14, :57 ANGLE/TURN.MVMT NO INJURY DRY CLEAR Illegal U-turn Angle DAYLIGHT Thursday, March 08, :05 REAR-END NO INJURY DRY CLEAR Inattention Rear-end DAYLIGHT S:\Jobs\6629\rt1-eve-uni2 Formatted Table 8/21/2014

27 Motor Vehicle Crashes Route 1 and Everett Street/University Avenue Crash # Crash Day and Date Crash Time Crash Type Severity R/S Weather Driver Contribution* Comments Manner of Collision Lighting #Vehicles Age of Driver 1 Age of Driver 2 42 Tuesday, April 24, :28 SIDESWIPE NO INJURY DRY CLOUDY Unsafe lane change Sideswipe, same DAYLIGHT Friday, May 11, :14 SIDESWIPE INJURY DRY CLOUDY Overturned and slid to aviod another vehicle's unsafe lane change Single vehicle crash DAYLIGHT Saturday, May 12, :11 REAR-END INJURY DRY CLEAR Inattention Sudden pedestrian conflict Rear-end DAYLIGHT Friday, June 29, :44 REAR-END NO INJURY DRY CLEAR Sudden stop because pedestrian was in the road U-turn vehicle avoided the accident Rear-end DAYLIGHT Wednesday, July 04, :21 ANGLE/TURN.MVMT INJURY DRY CLOUDY Sudden stop to avoid vehicle which made illegal Uturn Angle DAYLIGHT Monday, August 13, :45 REAR-END NO INJURY DRY CLEAR following too closely Sudden stop due to fire truck Rear-end DAYLIGHT Friday, September 07, :50 REAR-END NO INJURY DRY CLEAR Following too closely Rear-end DAYLIGHT Wednesday, September 12, :23 REAR-END NO INJURY DRY CLEAR following too closely Rear-end DAYLIGHT /22 50 Tuesday, September 25, :08 REAR-END INJURY DRY CLEAR following too closely Rear-end DAYLIGHT Saturday, December 08, :08 REAR-END NO INJURY WET CLEAR Inattention Rear-end DARK, LIT. RD /51/50/42 Sideswipe, same 52 Friday, December 21, :31 SIDESWIPE NO INJURY WET RAIN Cut off other driver direction DAYLIGHT S:\Jobs\6629\rt1-eve-uni2 Formatted Table 8/21/2014

28 Count of Month Crashes by Month 16.00% 15.09% 14.00% 13.21% 13.21% 12.00% 10.00% 9.43% 7.55% 7.55% 7.55% 8.00% 5.66% 5.66% 5.66% 5.66% 6.00% 3.77% 4.00% 2.00% 0.00% JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month Total Count of Day Crashes by Day 25.00% 20.00% 15.00% 15.09% 20.75% 16.98% 16.98% 13.21% 10.00% 9.43% 7.55% Total 5.00% 0.00% Day Monday Tuesday Wednesday Thursday Friday Saturday Sunday 45% 40% Crashes by Time of Day 38% 35% 30% 25% 20% 23% 19% 17% Series1 15% 10% 5% 0% 2% 2 6am 6 10am 10 2pm 2 6pm 6 10pm 10 2am 0% S:\Jobs\6629\rt1-eve-uni2 Charts 8/21/2014

29 Count of Crash Type Crash Type 50.00% 45.00% 40.00% 35.00% 30.00% 25.00% 20.00% 15.00% 10.00% 5.00% 0.00% 5.66% 28.30% 3.77% 47.17% 1.89% 13.21% Total Crash Type Count of Lighting 80.00% 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% Lighting Lighting Conditions 73.58% 18.87% 3.77% 1.89% 1.89% DAYLIGHT DARK, LIT. RD DAWN DUSK, RD. NOT LIT DUSK Total Count of Weather Crash Weather 70.00% 66.04% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% Weather 18.87% 11.32% 1.89% 1.89% CLEAR CLOUDY RAIN SNOW UNKNOWN Total S:\Jobs\6629\rt1-eve-uni2 Charts 8/21/2014

30 Count of R/S 80.00% 70.00% 60.00% 50.00% 40.00% 30.00% 20.00% 10.00% 0.00% R/S Crash Road Surface 75.47% 20.75% 1.89% 1.89% DRY OTHER SNOWY WET Total 30% 25% 24% 24% Crash Driver Ages 20% 15% 15% 13% Series1 10% 7% 9% 7% 5% 2% 0% S:\Jobs\6629\rt1-eve-uni2 Charts 8/21/2014

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of: ROAD SAFETY AUDIT Neponset Street Rotary/Pendergast Circle Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center Drive

More information

ROAD SAFETY AUDIT. Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street. Towns of Norwood & Westwood

ROAD SAFETY AUDIT. Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street. Towns of Norwood & Westwood ROAD SAFETY AUDIT Route 1A at Everett Street & Clapboardtree Street and Washington Street at Everett Street Towns of Norwood & Westwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings

More information

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT ROAD SAFETY AUDIT State Road (Route 6) Corridor Town of Dartmouth March 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015 ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,

More information

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville.

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville. ROAD SAFETY AUDIT South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville March 15, 2018 Prepared For: MassDOT On Behalf Of: Town of Plainville Prepared By: BETA

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014 ROAD SAFETY AUDIT Russell Street (Route 9) at North and South Maple Streets Town of Hadley March 2014 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT ROAD SAFETY AUDIT East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton May 11, 2016 Prepared For: MassDOT Prepared By: 101 Walnut Street Watertown, MA Road Safety Audit

More information

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT County Street at Hart Street City of Taunton January 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street, 4 th Floor Boston,

More information

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016 ROAD SAFETY AUDIT Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston November 1, 2016 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Washington Street (Route 53) at Pleasant Street Town of Pembroke June 26, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data... 1

More information

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT ROAD SAFETY AUDIT Santilli Circle and Sweetser Circle Municipality of Everett Prepared For: MassDOT On Behalf Of: WYNN Design and Development Prepared By: AECOM 250 Apollo Drive Chelmsford, MA Road Safety

More information

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016 ROAD SAFETY AUDIT West Central Street (Route 140) at Franklin Village Drive Town of Franklin February 03, 2016 Prepared for: Massachusetts Department of Transportation Prepared by: Howard Stein Hudson

More information

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby ROAD SAFETY AUDIT Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby March 2013 Prepared for: Massachusetts Department of Transportation

More information

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens ROAD SAFETY AUDIT Columbia Road at Dorchester Avenue Dorchester, MA 10/14/2016 Prepared For: MassDOT On Behalf Of: Edens Prepared By: MDM Transportation Consultants, Inc. 28 Lord Road Suite 280 Marlborough,

More information

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT ROAD SAFETY AUDIT Route 38 from Route 62 to Woburn Town Line Town of Wilmington April 10, 2017 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite 3, Westford,

More information

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT ROAD SAFETY AUDIT Centre Street (Route 123) at Plymouth Street Municipality of Brockton November, 2017 Prepared For: MassDOT On Behalf Of: City of Brockton Prepared By: Old Colony Planning Council 70 School

More information

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford ROAD SAFETY AUDIT East Main Street (Route 16) at Medway Road (Route 109), East Main Street (Route 16) at Quarry Square Driveways, East Main Street (Route 16) at Beaver Street/ Fortune Boulevard Town of

More information

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Mass Pike Interchange 6, I-291 and Burnett Road City of Chicopee November 4, 2013 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data...

More information

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT ROAD SAFETY AUDIT Route 135 at Route 30 January 2016 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Road Safety Audit Route 135 at Route

More information

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke ROAD SAFETY AUDIT Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke April 29, 2016 Prepared For: MassDOT Highway Division

More information

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT ROAD SAFETY AUDIT Route 2/Route 68 Interchange Rotary City of Gardner August 3, 2016 Prepared For: MassDOT Prepared By: Tetra Tech 100 Nickerson Avenue Marlborough, MA 01752 Road Safety Audit Route 2/Route

More information

ROAD SAFETY AUDIT. Route 2/Taylor Road/Piper Road. Town of Acton. March 4, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Route 2/Taylor Road/Piper Road. Town of Acton. March 4, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Route 2/Taylor Road/Piper Road Town of Acton March 4, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Tetra Tech, Inc. One Grant Street Framingham, MA 01702

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

ROAD SAFETY AUDIT. Route 113 (Storey Avenue) at Woodman Way and Low Street. Newburyport, MA. May 27, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 113 (Storey Avenue) at Woodman Way and Low Street. Newburyport, MA. May 27, Prepared For: MassDOT ROAD SAFETY AUDIT Route 113 (Storey Avenue) at Woodman Way and Low Street Newburyport, MA May 27, 2015 Prepared For: MassDOT Prepared By: Bayside Engineering, Inc. 600 Unicorn Park Drive Woburn, MA 01801

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

ROAD SAFETY AUDIT. Boston Road (Route 20) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham.

ROAD SAFETY AUDIT. Boston Road (Route 20) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham. ROAD SAFETY AUDIT Boston Road (Route 2) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham October 4, 212 Prepared For: MassDOT Highway Division Prepared By: BETA Group,

More information

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT ROAD SAFETY AUDIT Route 16 at Interstate 395 Town of Webster October 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio

Road Safety Audit Course Participant Guidebook. August 22 & 23, Cleveland Avenue Columbus, Ohio Road Safety Audit Course Participant Guidebook August 22 & 23, 2017 Cleveland Avenue Columbus, Ohio 1 2 Table of Contents Executive Summary... 5 Cleveland Avenue City of Columbus... 6 Road Location Details...

More information

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Auburn Street at Southbridge Street (Route 12) Town of Auburn March 2017 Prepared For: Massachusetts Department of Transportation Prepared By: Vanasse Hangen Brustlin, Inc Union Station

More information

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT ROAD SAFETY AUDIT Providence Street (Route 122A) at McKeon Road/Millbury Street City of Worcester July 14, 2016 Prepared For: MassDOT Prepared By: Stantec Consulting Services, Inc. Burlington, Massachusetts

More information

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014 ROAD SAFETY AUDIT Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater May 14, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

ROAD SAFETY AUDIT. Needham Street and Highland Avenue Corridor. City of Newton and Town of Needham. March 2014

ROAD SAFETY AUDIT. Needham Street and Highland Avenue Corridor. City of Newton and Town of Needham. March 2014 ROAD SAFETY AUDIT Needham Street and Highland Avenue Corridor City of Newton and Town of Needham March 2014 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA 02630 (508) 362-3828 Fax (508) 362-3136 2006 Transportation Safety Report Bourne: Otis Rotary Harwich: Route 137/Route 39 Orleans: Route

More information

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT ROAD SAFETY AUDIT Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst November 15, 2016 Prepared For: MassDOT Prepared By: Greenman-Pedersen, Inc. 181 Ballardvale Street, Suite

More information

ROAD SAFETY AUDIT. Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard. City of Brockton. July 24,2013

ROAD SAFETY AUDIT. Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard. City of Brockton. July 24,2013 ROAD SAFETY AUDIT Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard City of Brockton July 24,2013 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

ROAD SAFETY AUDIT. Water Street (Route 129) at Vernon Street. Town of Wakefield. September Prepared For: MassDOT

ROAD SAFETY AUDIT. Water Street (Route 129) at Vernon Street. Town of Wakefield. September Prepared For: MassDOT ROAD SAFETY AUDIT Water Street (Route 129) at Vernon Street September 2017 Prepared For: MassDOT Massachusetts Department of Transportation Prepared By: WorldTech Engineering Road Safety Audit Water Street

More information

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department ROAD SAFETY AUDIT Falmouth Road (Route 28)/Bearses Way Town of Barnstable May 2009 Prepared for: Massachusetts Highway Department Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA

More information

ROAD SAFETY AUDIT. Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell. October 5, Prepared For: MassDOT.

ROAD SAFETY AUDIT. Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell. October 5, Prepared For: MassDOT. ROAD SAFETY AUDIT Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell October, 2017 Prepared For: MassDOT Prepared By: Vanasse Hangen Brustlin, Inc 101 Walnut Street Watertown, MA 02472 Road

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

ROAD SAFETY AUDIT. Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123. City of Attleboro, MA. September 15, 2015

ROAD SAFETY AUDIT. Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123. City of Attleboro, MA. September 15, 2015 ROAD SAFETY AUDIT Route 1 at Route 123 Route 1 at Route 1A Route 1 at May Street Route 1A and Route 123 City of Attleboro, MA September 15, 2015 Prepared For: MassDOT On Behalf Of: Prepared By: Fay, Spofford

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

ROAD SAFETY AUDIT. Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road. Town of Tewksbury. April 5, Prepared For: MassDOT

ROAD SAFETY AUDIT. Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road. Town of Tewksbury. April 5, Prepared For: MassDOT ROAD SAFETY AUDIT Main Street (Route 38) at I-495 On/Off Ramps and Clark Relocation Road Town of Tewksbury April 5, 2017 Prepared For: MassDOT Prepared By: HNTB Corporation 31 St. James Ave Boston, MA

More information

ROAD SAFETY AUDIT. Damon Road. City of Northampton. October Prepared for: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Damon Road. City of Northampton. October Prepared for: Massachusetts Department of Transportation ROAD SAFETY AUDIT Damon Road City of Northampton October 2013 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA 02111 Table

More information

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

A plan for improved motor vehicle access on Railroad Avenue in Provincetown A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION

More information

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016 This page left intentionally blank. Table of Contents 1.0 Introduction... 1 1.1 Crash

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

ROAD SAFETY AUDIT. Route 3A from Evans Street to Abigail Adams State Park. Town of Weymouth. October 12, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 3A from Evans Street to Abigail Adams State Park. Town of Weymouth. October 12, Prepared For: MassDOT ROAD SAFETY AUDIT Route 3A from Evans Street to Abigail Adams State Park Town of Weymouth October 12, 2016 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite

More information

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer

Toolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer 8 Toolbox of Countermeasures and Their to Make Intersections Safer Introduction Studies included in the NCHRP 17-18 (3), Guidance for Implementation of the AASHTO Strategic Highway Safety Plan, as well

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

MEMORANDUM. Layout Of Study Intersections And Traffic Control

MEMORANDUM. Layout Of Study Intersections And Traffic Control BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Director, MPO Staff DATE November 15, 2012 TO FROM RE Town of

More information

ROAD SAFETY AUDIT. I 495/Route 117 Interchange. Town of Bolton. August Prepared for: Massachusetts Department of Transportation Highway Division

ROAD SAFETY AUDIT. I 495/Route 117 Interchange. Town of Bolton. August Prepared for: Massachusetts Department of Transportation Highway Division ROAD SAFETY AUDIT I 495/Route 117 Interchange Town of Bolton August 2013 Prepared for: Massachusetts Department of Transportation Highway Division Prepared by: Green International Affiliates, Inc. TABLE

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy MEMORANDUM Date: 9/13/2016 Re: Citywide Crosswalk Policy Foreword Through the s Circulation Element and Complete Streets Policy, it is the City s goal to promote walking trips and provide safe facilities

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Edgemont Village Traffic and Parking Technical Report January 2014

Edgemont Village Traffic and Parking Technical Report January 2014 Edgemont Village Traffic and Parking Technical Report January 2014 In the fall of 2013, the District of North Vancouver engaged consultants to assess existing intersection and parking conditions in Edgemont

More information

ROAD SAFETY AUDIT. Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield. June 9, 2017.

ROAD SAFETY AUDIT. Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield. June 9, 2017. ROAD SAFETY AUDIT Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield June 9, 2017 Prepared for: MassDOT On Behalf of: Vanasse & Associates, Inc. 35 New England Business

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Road Safety Audit Report: Interstate 516

Road Safety Audit Report: Interstate 516 Road Safety Audit Report: Interstate 516 Interstate 516 from Veterans Pkwy to Montgomery St. (State Route 420 from Veterans Pkwy to City Street 115207) Table of Contents Introduction Road Safety Audit

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

CTDOT Pedestrian and Bicycle Safety Initiatives

CTDOT Pedestrian and Bicycle Safety Initiatives CTDOT Pedestrian and Bicycle Safety Initiatives 2017 Northeast Transportation Safety Conference Mark F. Carlino, P.E. Traffic Engineering Division Chief Bureau of Engineering and Construction Connecticut

More information

ROAD SAFETY AUDIT. Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence. October 14, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence. October 14, Prepared For: MassDOT ROAD SAFETY AUDIT Route 114 (Winthrop Av. And Parker St.) at Andover St. City of Lawrence October 14, 2011 Prepared For: MassDOT Prepared By: Merrimack Valley Planning Commission Road Safety Audit Route

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,

More information

sm1 CDMth '}lf!j1i!~~!2q[ ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 Prepared For: MassDOT

sm1 CDMth '}lf!j1i!~~!2q[ ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 Prepared For: MassDOT ROAD SAFETY AUDIT County Street City of New Bedford March 22, 2017 '}lf!j1i!~~!2q[ ~ j ighway Divl.sion Prepared For: MassDOT On Behalf Of: City of New Bedford Massachusetts Prepared By: CDM Smith 260

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

Freeway ramp intersection study

Freeway ramp intersection study Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

Final Report. Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd. FHWA Experimentation #4-329(E)

Final Report. Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd. FHWA Experimentation #4-329(E) Final Report Evaluation of Flashing Yellow Right Turn Arrow at Silverbell Rd and Cortaro Rd FHWA Experimentation #4-329(E) Marana, Arizona January 2009 Submitted To: Submitted By: FINAL REPORT EVALUATION

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM

LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM LAGUNA BEACH POLICE DEPARTMENT MEMORANDUM TO: FROM: Christa Johnson, Assistant City Manager Jason C. Kravetz, Captain DATE: January 16, 2015 SUBJECT: Laguna Canyon Road Collision Analysis Within the last

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

INTERSECTIONS AT GRADE INTERSECTIONS

INTERSECTIONS AT GRADE INTERSECTIONS INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

Traffic Control and Accidents at Rural High-Speed Intersections

Traffic Control and Accidents at Rural High-Speed Intersections 14 TRANSPORTATION RESEARCH RECORD 1160 Traffic Control and Accidents at Rural High-Speed Intersections KENNETH R. AGENT ln many Instances, when rural high-speed highways are constructed, there are a number

More information

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Lee Highway Corridor Analysis

Lee Highway Corridor Analysis Arlington County, Virginia Prepared for: Arlington County Government Transportation Engineering and Operations Division April 6, 2004 Gorove/Slade Associates, Inc. 1140 Connecticut Avenue, Suite 700 1175

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering

More information