Lee Highway Corridor Analysis

Size: px
Start display at page:

Download "Lee Highway Corridor Analysis"

Transcription

1 Arlington County, Virginia Prepared for: Arlington County Government Transportation Engineering and Operations Division April 6, 2004 Gorove/Slade Associates, Inc Connecticut Avenue, Suite Herndon Parkway, Suite 600 Washington, D.C Herndon, Virginia (202) (703)

2 TABLE OF CONTENTS List of Tables... ii List of Figures... ii Executive Summary... iii Introduction...1 Project Scope...1 Existing Conditions...1 Traffic Data...1 Crash Data...2 Meetings with Neighborhood Associations...4 Existing Traffic Simulation...5 Focus Areas...6 Possible Improvement Strategies...7 Signal Timing Updates...7 Signing & Striping Improvements...7 Intersection Traffic Control Changes...7 Roadway Directionality Changes...8 Geometric Changes to Restrict Turning Movements...8 Roadway Improvements within the Existing Right-Of-Way...8 Roadway Improvements Outside of the Existing Right-Of-Way...9 Improvements to Pedestrian and Transit Facilities...10 Recommendations...11 Short-Term Recommendations...11 Mid-Term Recommendations...12 Long-Term Recommendations...13 i

3 LIST OF TABLES Table 1 Summary of Crash Data...3 Table 2 Traffic Simulation Results...6 LIST OF FIGURES Figure 1 Annotated Map of Study Area...14 Figure 2 Peak Hour Turning Movement Traffic Volumes...15 Figure 3 Chart of Daily Corridor Traffic Volumes...16 Figure 4 Summary of Crash Data...17 Figure 5 Areas of Concern Figure 6 Typical Study Area Cross-Section...18 Figure 6 Typical Study Area Cross-Section...19 Figure 7 Short-Term Recommendations...20 Figure 8 Mid-Term Recommendations...21 Figure 9 Left Turn Lane Recommendations...22 Figure 10 Long-Term Recommendations...23 ii

4 EXECUTIVE SUMMARY This report presents the results of a prepared by Gorove/Slade Associates, Inc. at the request of Arlington County, Virginia. This Corridor Analysis identifies specific traffic and pedestrian related areas of concern along the portion of Lee Highway from N. Buchanan to N. Edison Streets, and contains a list of recommended actions. Gorove/Slade collected corridor traffic data, including turning movement counts at intersections and median breaks, analyzed corridor-wide crash data, and met with several neighborhood associations to hear their concerns. In addition, Gorove/Slade simulated the corridor in a traffic model that identified the areas of the corridor in which significant peak period delays occur. As a result of the analyses of these data, Gorove/Slade identified the following as the areas of concern that form the basis for the list of recommended alternatives. Excessive delays during peak periods occur at many locations within the corridor, most notably at the intersections of Lee Highway with N. Edison Street and N. Columbus Street. Travel speeds exceeding the speed limit throughout the corridor. Truck loading and unloading activity occurs on Lee Highway during peak periods. A large amount of unsignalized median breaks occur in the study area, with a corresponding lack of right and left turning lanes to facilitate movement in and out of commercial parcels. A relatively high number of crashes occur at N. Edison Street and N. Cameron Street compared to other locations in the study area. Difficult pedestrian crossings of Lee Highway are located at its intersections with N. Edison Street and N. Buchanan Street. A high amount of cut-through traffic uses N. Edison Street, N. Buchanan Street, and N. Columbus Street to avoid traffic congestion at the intersections of Lee Highway with George Mason Drive and Glebe Road. The crest of a hill located on Lee Highway between its intersections with N. Cameron Street and N. Culpeper Street creates sight distance issues for turning movements at these intersections. The fire station signal on Lee Highway between N. Culpeper Street and N. Columbus Street negatively impacts the turning movements at N. Columbus Street. The intersection of Lee Highway and N. Columbus Street experiences a large amount of unsignalized turning movements and conflicts, including motorists turning into the McDonald s exit drive, and a large amount of U-turns. iii

5 Gorove/Slade compared these problem areas to the various alternatives available to improve the efficiency and safety of the corridor, and developed a list of recommended actions sorted into three categories based on cost and ease of implementation. Short-Term Recommendations Add signs discouraging cut-through traffic to N. Edison, N. Columbus, and N. Buchanan Streets Enhance signs near interaction of Lee Highway at N. Columbus Street Alter signal timings at N. Culpeper Street Re-align crosswalks at N. Culpeper Street Improve pedestrian crossing at N. Buchanan Street Mid-Term Recommendations Construct traffic signal at N. Edison Street (a traffic signal is already designated and under design for this intersection). Close median break at N. Cameron Street Close median break at N. Columbus Street or further study the option of signalization Add left turn bay for McDonald s entrance Long-Term Recommendations Construct two roundabouts within the corridor Widen roadway to accommodate a 5 or 6 lane cross section iv

6 INTRODUCTION This report presents the results of a corridor analysis for Lee Highway in Arlington County, Virginia. Gorove/Slade Associates, Inc. was asked to examine this corridor due to various areas of concern, including delays experienced by commuters, cut-though traffic, and access issues to the commercial sites that line Lee Highway. Steps in this analysis included collecting data and observing conditions throughout the study corridor, analyzing existing conditions, and making recommendations for improvements to the corridor. PROJECT SCOPE Gorove/Slade met with Arlington County staff in January to discuss details of this project. At this meeting, the formal project study area and scope were established. The study area is the section of Lee Highway in North Arlington between the intersections of N. Buchanan Street to the east and N. Edison Street to the west. Intersections included in the study are: Lee Highway at N. Buchanan Street Lee Highway at N. Columbus Street Lee Highway at N. Culpeper Street Lee Highway at N. Cameron Street Lee Highway at N. Dinwiddie Street Lee Highway at N. Edison Street N. Buchanan Street was not originally included in the project scope, and was added at the request of Arlington County at a later date. In addition to these intersections, several commercial site driveways were included in the analyses, most notably the McDonald s entrance and exit drive, the KFC/Pizza Hut/Taco Bell driveway, the 7-11 driveway, and the driveway leading to Dominion Electric Supply Company/Banker s Building. Figure 1, attached to this document, displays an annotated map of the study area. EXISTING CONDITIONS Existing conditions within the corridor were examined to help determine the problem areas within the corridor and to establish a point of comparison for possible recommendations. This included collecting traffic data, researching the study area crash history, meeting with citizens, and assembling a traffic model of the existing Lee Highway corridor. Traffic Data Turning movement counts were conducted for the study intersections from Tuesday February 10 to Thurdsay, February 12, for the AM, lunchtime, and PM peak periods. The turning movement counts for N. Buchanan Street were performed by Arlington County after this intersection was added to the project 1

7 scope. Based on the counts, the peak hours for these periods were found to be 7:15 to 8:15 AM for the morning commuter peak, 12:15 to 1:15 PM for the lunchtime peak, and 5:15 to 6:15 PM for the evening commuter peak. Figure 2 displays the peak hour turning movement counts. In addition to the turning movement counts, automatic tube counts were performed at two spots along Lee Highway in the study corridor, between N. Columbus and N. Buchanan Streets, and a short distance west of N. Edison Street. These counts were used to determine daily and weekly patterns in overall Lee Highway traffic. Figure 3 contains a chart of the daily counts performed between N. Columbus and N. Buchanan Streets. Crash Data Gorove/Slade also collected police crash reports for the study area from the last five years. These crash reports, summarized in Table 1 and Figure 4, were used to help determine safety problems within the study area. Areas of concentration within the study area include the intersection of Lee Highway and N. Edison Street, and the driveway leading to the KFC/Pizza Hut/Taco Bell, across from N. Cameron Street. 2

8 Table 1 Summary of Crash Data Number Date Time Day of Week Road Condition Vehicles Involved Driver Action Collision Type Injury Fatality Property Damage Direction Minor 1 10/29/2003 2:06 PM Wednesday Wet 2 Follow Too Close Rear-End None None Yes EB N. Edison 2 9/19/ :35 AM Friday Dry 2 Driver Inattention Rear-End Yes None No EB 7-11 Driveway 3 9/15/2003 2:27 PM Monday Dry 5 None ( Medical) Angle Yes None No NB N. Edison 4 12/4/2002 1:55 PM Wednesday Dry 2 Did not have right of way Angle None None Yes EB N. Edison 5 10/11/ :00 PM Friday Wet 2 Did not have right of way Angle None None Yes WB N. Edison 6 9/30/2002 6:56 PM Monday Dry 2 Improper Passing Angle None None Yes EB N. Edison 7 8/8/2002 9:00 AM Thursday Dry 2 Did not have right of way Angle None None Yes NB N. Edison 8 7/3/2002 7:51 AM Wednesday Dry 2 Driver Inattention Angle Yes None No EB N. Edison 9 6/18/2002 8:25 AM Tuesday Dry 3 Follow Too Close Rear-End Yes None No EB N. Edison 10 4/4/2002 2:50 PM Thursday Dry 2 Did not have right of way Angle Yes None No EB N. Edison 11 7/31/2001 5:15 PM Friday Dry 2 Did not have right of way Angle Yes None No WB N. Edison 12 2/6/2001 2:06 PM Friday Dry 2 Hit & Run Angle None None Yes WB N. Edison 13 6/7/ :40 AM Thursday Wet 2 Follow Too Close Rear-End Yes None No NB N. Edison 14 4/29/2001 5:30 PM Sunday Dry 2 None Rear-End None None Yes WB N. Edison 15 4/20/ :10 AM Friday Dry 2 Follow Too Close Rear-End Yes None No WB N. Edison 16 7/31/2001 7:42 AM Tuesday Fog 2 Did not have right of way Angle None None Yes NB N. Edison 17 10/25/2000 8:00 AM Wednesday Wet 2 Follow Too Close Rear-End None None Yes EB N. Edison 18 9/23/2000 9:27 AM Monday Wet 2 Follow Too Close Rear-End Yes None No WB N. Edison 19 7/31/2000 3:15 PM Monday Dry 2 Did not have right of way Angle None None Yes NB Driveway 20 1/4/2000 6:54 PM Tuesday Wet 2 Follow Too Close Rear-End Yes None No WB N. Edison 21 7/30/ :51 AM Sunday Dry 3 Follow Too Close Rear-End Yes None No WB N. Edison 22 12/23/1999 5:08 PM Thursday Dry 2 Did not have right of way Head-On None None Yes NB N. Edison 23 10/25/1999 4:04 PM Monday Dry 2 Follow Too Close Rear-End Yes None No EB N. Edison 24 11/4/1999 7:28 PM Thursday Dry 2 Follow Too Close Rear-End Yes None No WB N. Edison 25 8/24/1999 9:50 AM Tuesday Dry 2 Did not have right of way Head-On None None Yes WB N. Edison 26 7/2/1999 7:07 AM Friday Dry 2 Follow Too Close Rear-End None None Yes WB N. Edison 27 4/12/1999 8:21 AM Monday Dry 2 Follow Too Close Rear-End None None Yes WB N. Edison 28 9/27/ :21 PM Friday Dry 2 Follow Too Close Rear-End None None Yes EB N. Dinwiddie St. 29 9/6/2001 7:03 PM Thursday Dry 2 Follow Too Close Rear-End None None Yes EB N. Dinwiddie St /11/2000 7:03 PM Sunday Dry 2 Follow Too Close Rear-End None None Yes EB N. Dinwiddie St. 31 9/21/2003 1:19 PM Sunday Dry 2 Follow Too Close Rear-End None None Yes EB N. Cameron St. 32 5/14/2002 5:00 PM Tuesday Wet 2 Changing Lanes Angle None None Yes EB N. Cameron St /23/ :23 PM Saturday Dry 3 Follow Too Close Rear-End Yes None No WB N. Cameron St. 34 9/16/2001 2:15 AM Sunday Dry 1 Improer Turn Fixed Object Yes None No EB N. Cameron St. 35 5/21/2001 4:06 PM Monday Wet 3 Follow Too Close Rear-End None None Yes EB N. Cameron St. 36 2/7/2001 5:28 PM Wednesday Dry 2 Did not have right of way Angle None None Yes EB N. Cameron St /13/2000 3:49 PM Friday Dry 2 Did not have right of way Angle None None Yes EB N. Cameron St. 38 7/19/2000 1:24 PM Wednesday Dry 4 Follow Too Close Rear-End Yes None No EB N. Cameron St. 39 6/2/2003 4:36 PM Thursday Dry 1 Follow Too Close Fixed Object None None Yes WB N. Culpeper St /28/ :04 PM Monday Wet 2 Did not have right of way Angle None None Yes EB KFC Driveway 41 9/15/2002 1:58 PM Sunday Wet 1 None Pedestrian Yes None No EB N. Culpeper St. 42 4/15/2002 4:24 PM Monday Dry 2 Follow Too Close Rear-End Yes None No EB N. Culpeper St. 43 2/1/2002 9:30 AM Friday Wet 2 Follow Too Close Rear-End Yes None No WB Fire Driveway 44 5/3/2001 8:29 AM Wednesday Dry 2 Disregard Traffic Light Angle Yes None No EB N. Culpeper St. 45 5/24/2001 5:50 PM Thursday Dry 2 Driver Inattention Rear-End None None Yes WB N. Culpeper St. 46 4/6/2001 2:00 PM Friday Wet 2 Follow Too Close Rear-End None None Yes WB N. Culpeper St. 47 9/4/2000 2:48 PM Monday Dry 2 Improper Passing Rear-End None None Yes WB N. Culpeper St. 48 5/27/ :48 AM Saturday Dry 1 Other ( Asleep at Wheel) Fixed Object None None Yes EB N. Culpeper St. 49 5/9/ :45 AM Tuesday Dry 2 Improper Lane Change Fixed Object None None Yes WB N. Culpeper St /17/1999 3:44 PM Wednesday Dry 1 Other Fixed Object None None Yes WB N. Culpeper St. 51 7/3/ :07 PM Saturday Dry 1 Exceeded Speed Limit Fixed Object None None Yes WB N. Culpeper St /23/2003 8:00 AM Thursday Dry 2 Driver Inattention Rear-End None None Yes EB N. Buchanon St. 53 9/18/2002 8:55 AM Wednesday Dry 2 Other Bicyle Yes None No EB N. Buchanon St. 54 1/17/2002 5:27 PM Thursday Dry 2 Did not have right of way Angle Yes None No WB N. Buchanon St. 55 3/2/2000 4:28 PM Thursday Dry 2 Follow Too Close Rear-End None None Yes WB N. Buchanon St. 3

9 Meetings with Neighborhood Associations Gorove/Slade, in coordination with Arlington County staff, met with three neighborhood associations that border the study area; the Langston, Old Dominion, and Yorktown Neighborhood Associations. The purpose of these meetings, which took place on February 18, was to gather concerns and thoughts from the community as to the problem areas and possible solutions in the study area. The following is a list of concerns expressed by community members during the meetings: Corridor-Wide o The amount of truck loading and unloading on Lee Highway during rush hours. o The overall high speeds of through traffic on Lee Highway. North Buchanan o Cut-through traffic avoiding Lee Highway and Glebe Road intersection traveling on N. Buchanan Street. o Pedestrian crossing of Lee Highway is difficult. Traffic Patterns do not provide many gaps for pedestrians (too much turning traffic at intersection of Glebe Road and Lee Highway). North Columbus o Subway parking lot is too small for demand. Patrons park illegally on and off street, and on sidewalk, creating a sight distance problem for vehicles from southbound N. Glebe Rd. accessing Lee Highway. o Cut-through traffic avoiding Lee Highway at N. Glebe Rd. intersection travels on N. Columbus Street. o Bar and restaurant patrons are parking on Columbus Street and crossing Lee Highway, due to lack of parking at these establishments. o There are a high number of U-turns at this intersection from westbound Lee Highway because of the median on Lee Highway eliminating left turn access to many of the bars/restaurants/shops on Lee Highway, such as Domino s. o Drivers turn into the McDonald s exit. o The on-street parking on Columbus can restrict the roadway width, thus limiting capacity on the street. (This was brought up by Yorktown as a problem and Old Dominion/Langston as a possible solution to the cut-through problem). o The fire station signal is close enough to Columbus to create queuing problems in the WB direction. Drivers turning left from McDonald s to Lee Highway often cannot because of WB queues generated by the signal in front of the fire station. North Culpeper o The green times for the northbound and southbound approaches are not sufficient to accommodate the demand, especially when opposing left turns are present. The Heidelberg Pastry Shoppe and the County Re-Fueling Station generate most of this traffic. Also attributing to this problem is community center activity, especially that of the senior center, departing the Langston School and attempting to access Lee Highway. o The skew at this intersection creates long crosswalks. 4

10 o This intersection is located at the crest of a hill, which creates sight distance limitations, including westbound left turns due to the inability to see oncoming traffic. North Cameron o The hill on Lee Highway creates sight distance limitations, leading to difficulty entering and exiting the KFC/Pizza Hut/Taco Bell driveway. Citizens also commented that the driveway and parking lot layout of the KFC/Pizza Hut/Taco Bell is confusing. North Edison o There is a prevalence of cut-through traffic at this intersection generated by drivers avoiding the intersection of Lee Highway and George Mason. It is unclear how the addition of a left turn lane at George Mason and a traffic signal at Edison will affect the amount of cut-through traffic. o Pedestrian crossings here, related to the retail activity and the bus stops, are dangerous. The installation of a traffic signal will help increase the safety of this pedestrian crossing. Existing Traffic Simulation Gorove/Slade assembled an existing analysis of the study corridor using the turning movement counts, observations from the field including existing lane configurations, and information provided by Arlington County staff. The analysis was performed using the Synchro/SimTraffic 6 software package. The results of the analysis included average delay per vehicle at each intersection and the travel times from one end of the study area to the other. Table 2 contains these results. 5

11 Table 2 Traffic Simulation Results Peak Hour* Peak Hour* AM Lunch PM AM Lunch PM Cross Street Approach Movement Delay Delay Delay Cross Street Approach Movement Delay Delay Delay North Edison Eastbound Left North Culpeper Eastbound Left Through Through Right Right Westbound Left Westbound Left Through Through Right Right Northbound Left Northbound Left Through Through Right Right Southbound Left Southbound Left Through Through Right Right Driveway Eastbound Through North Columbus Eastbound Left Right and McDonald's Through Westbound Left Westbound Through Through Right Northbound Left Northbound Left Right Right Dominion Electric Eastbound Left Southbound Left and Bankers Building Through Right Driveway Westbound Through North Buchanan Eastbound Left Right Through Southbound Left Westbound Through Right Right North Dinwiddie Eastbound Left Southbound Left Through Right Westbound Through Right TRAVEL TIMES Eastbound Southbound Left Westbound Right North Cameron Eastbound Left & KFC/Taco Bell Through Right Westbound Left Through Right Northbound Left Right Southbound Left Right * - Average Delay in Seconds Focus Areas Based on the results of the meetings with the neighborhood associations, the simulation analysis, and observations within the field, a list of problem areas within the corridor was assembled. Figure 5 displays these areas of concern. These areas of concern form the basis of generating and comparing the various improvement alternatives. 6

12 POSSIBLE IMPROVEMENT STRATEGIES There are many alternatives to improving the corridor s efficiency and safety. This section lists these alternatives by group and discusses their applications to the study corridor. The following section discusses specific recommended strategies, including figures, based on this group of alternatives. Signal Timing Updates Updating or changing signal timings can help increase intersection capacity and overall corridor throughput. Advanced timing strategies, such as signal coordination, preemption or priority, although sometimes requiring infrastructure improvements, are also viable strategies to increase corridor efficiency. There is only one existing traffic signal within the study area, at the intersection of Lee Highway with N. Culpeper Street. Existing analyses show that altering signal timings at this intersection will not significantly increase capacity in the corridor. Citizens have expressed difficulty on the northbound and southbound approaches due to short green-times. Improved signal coordination between the signal at N. Culpeper and adjacent signals at George Mason Drive and Glebe Road would generate a slight increase in capacity, although increased efficiently along the Lee Highway corridor might negatively impact other corridors. A signal optimization study is presently underway for the Lee Highway corridor. The new traffic signal planned for the intersection of Lee Highway with N. Edison Street is being incorporated into the signal optimization study for the Lee Highway corridor. Signing & Striping Improvements Changing, removing or adding signs and lane markings can help organize or control traffic throughout a corridor. Within the study area, signs could be used to reinforce existing traffic controls, or implement turning restrictions. For example, No Left Turn or No U-Turn signs can be placed at median breaks to limit turn movements. A good location for this improvement could be at the McDonald s exit, across from N. Culpeper Street, where drivers attempt to turn into the exit drive. Signs can also be used at points on side streets to discourage cut-though traffic. Placed after access to commercial sites, signs such as Residential Access Only or similar, can discourage cut-through traffic generated from drivers avoiding delays at nearby signalized intersections. Signing and striping improvements are generally easy to implement, with low cost. Intersection Traffic Control Changes Traffic controls at intersections can sometimes be altered to beneficially change traffic patterns. This includes examining what the best controls are for an intersection, such as a two-way stop sign, an allway stop sign or a traffic signal, and if any changes would help increase efficiency or safety within the corridor. An improvement using this strategy is already in planning with a traffic signal under design for the N. Edison Street intersection. The signal will replace the two-way stop sign control. Four-way stop control intersections would be inappropriate for Lee Highway; they would reduce capacity and possibly increase the number of accidents. 7

13 The installation of a traffic signal has been considered at N. Columbus Street to control traffic movements although it does not appear the traffic volumes will meet the minimum MUTCD warrant criteria. A traffic signal can be warranted due to a high amount of accidents. Although the crash data examined by Gorove/Slade did not show a relatively high number of accidents at this location, citizens expressed concerns about safety at this intersection. A signal at this location appears to have merit. However, further study would be required to fully understand the implications of a signal at this location for fire station emergency access, the impact on the side street traffic patterns and a better understanding of the interaction with the signal at N. Glebe Street. Roadway Directionality Changes Changing a roadway from two-way to one way, or vice-versa, is sometimes a good method to alter traffic patterns in a corridor. Mostly the addition of one-way streets is beneficial due to the creation of one-way pairs or from the desire to eliminate cut-through traffic. In the study area, changing roadways from two-way to one-way is an option for eliminating cut-through traffic. For example, the N. Buchanan and N. Columbus Streets can be changed to one-way northbound for the section of roadway immediately north of Lee Highway. This would eliminate some cut-through on these roadways and reduce conflicts at their intersections with Lee Highway. At the same time, these changes would increase the amount of traffic at the intersection of Glebe Road and Lee Highway and would limit access from residents to Lee Highway. Changing the directionality of a roadway would require further study, although the physical changes needed are easy to implement, and generally low in cost. Geometric Changes to Restrict Turning Movements Restricting turning movements within the study corridor would increase safety by reducing conflicting movements. Signing and lane markings can sometimes be used to restrict turns, but in many cases infrastructure changes to a roadway are necessary, whether through the addition of barriers or the extension of a median. In the study area, there are many median breaks along Lee Highway that are good candidates for closing. Citizens expressed concerns about the left turns into and out of driveways along the corridor, and closing median breaks on Lee Highway would be an easy way to restrict these turning movements. Disadvantages to this approach include fewer paths for drivers to reach their destinations, creating longer trips, more U-turn movements at full access intersections, and encouragement of cut-through traffic along with increased corridor speed. Extending median breaks would require further study and has a moderate cost and implementation time. Roadway Improvements within the Existing Right-Of-Way Most roadway improvements involve widening or adding turn lanes. Capacity on a corridor can often be increased through altering roadway geometry within the existing right-of-way. Within the study area, Lee Highway has no shoulders, a small median (3.5 feet wide), and its paved roadway width of 53 feet is relatively narrow for a four-lane highway. This is due to the history of the roadway and prior widening within the right-of-way. Thus, there are limited options for changing the existing layout of the road. 8

14 One suggestion made by a community member was to change Lee Highway from a four-lane road without turning lanes, to a two-lane roadway with turn lanes. This would eliminate many conflicts that exist within the study area and could increase the efficiency of through traffic. Examining this idea in detail, using simulation software shows that during off peak periods through traffic efficiency is improved. However, this alternative does not work during peak periods as the existing volume of through traffic is above the capacity for one through lane. The lack of a second through lane for the peak hour traffic would cause major delay. Unless peak hour demand can be accommodated elsewhere, this option cannot be recommended. Another option could be to modify the roadway to accommodate a fifth-lane, used for a left turn lane at the major points of congestion. Figure 6 shows the typical cross-section of Lee Highway. The existing curb-to-curb width could accommodate five 10-foot travel lanes not including the 18-inch gutter pans on either side of the roadway. Removing the median and using this fifth lane for left turn storage would help alleviate the impact of left turn queues. Further study would be required to determine if 10-foot lanes are acceptable, but such lane widths are commonly employed in urban areas. Roadway Improvements Outside of the Existing Right-Of-Way Improvements outside of the existing right-of-way include such options as the addition of turn lanes, or widening the road to accommodate more traffic. Though often the most expensive option, these strategies usually provide the largest increase in capacity and safety. In the study area, there are several ways to add transportation infrastructure to increase capacity: 1. Widening Lee Highway to six lanes Increasing the number of through lanes on Lee Highway would require an extensive amount of resources. It would displace many commercial properties and would create a major transportation facility adjacent to residential properties. In addition, higher speeds and longer pedestrian crossing times and distances would likely create greater safety issues. 2. Adding turn lanes at intersections and median breaks Widening Lee Highway at points within the corridor to create left and right turn lanes would be beneficial for several reasons. First, it would help reduce left turning conflicts at intersections or median breaks. Second, it would reduce lane changes required for motorists avoiding queued turning vehicles. Adding left and right turn lanes though would require acquiring property adjacent to Lee Highway. 3. Widening Lee Highway to accommodate two-way left turn lane Accommodating a two-way left turn lane can be accomplished through widening. It was previously mentioned that it is possible to fit five 10-foot lanes through most of the study area, however 10-feet is typically not considered sufficient width for a two-way left turn lane. The benefit to having a multi-purpose turn lane is that through drivers will not be slowed down by left turning vehicles, and there could be a reduction in rear-end collisions due to left turns. Disadvantages to this option include the loss of the median for controlling traffic movements and as a pedestrian refuge, and the large percentage of left turning vehicles and the closely spaced driveways along Lee Highway make this configuration undesirable because there is a strong likelihood for opposing left turns to compete for the turn lane. 9

15 4. Closing all median breaks and adding jug-handles Another method to eliminate turning movements from Lee Highway is to eliminate all median breaks and install jug-handle movements for motorists desiring to turn left. Installing jughandles would involve extending the median to cover all breaks, and creating turn around roadways on either end of the corridor to allow vehicles to make u-turns via side streets to access driveways on the opposite side of the roadway. The main benefit of this option is the elimination of left turns from Lee Highway. Due to the amount of land and construction required, this option would be difficult and costly to implement. 5. Enlarging intersections to accommodate roundabouts Installing roundabouts at intersections is a similar idea to two previously mentioned options: creating jug-handles and installing turn lanes at intersections. Roundabouts would lessen queuing due to turning movements at intersections and slow through traffic on Lee Highway. Another major benefit of roundabouts is their ability to facilitate u-turns, which would allow for the elimination of median breaks, if two roundabouts were provided, one on either end of the corridor. The speed limit of Lee Highway and the number of turning movements on the corridor is ideal for roundabouts, making them a feasible alternative. One disadvantage to this approach is the amount of land required at the intersections. The intersections would need to be enlarged, similar to adding left and or right turn lanes, thus increasing the complexity and cost of this option. Roundabouts can accommodate pedestrians with crosswalks located at approaches, similar to traffic signals. Roundabouts can decrease pedestrian level of service if vehicles fail to give the right of way, and through longer walking distances due to the radius of the roundabout. If all signalized intersections were removed it might be desirable to install a mid-block crossing, including a sensor and lights between the roundabouts, to ease pedestrian crossing of Lee Highway. Improvements to Pedestrian and Transit Facilities Improvements along a corridor to improve pedestrian access include better signing of pedestrian uses, altering or re-locating crosswalks, and installing crosswalks with sensors, lights and/or warning beacons. In a corridor with bus service, improvements include adding bus shelters and pull-outs. Due to the nature of the study corridor with several bus stops, a school and various commercial uses many pedestrians attempt to cross Lee Highway at all times. There are several crossings, two unsignalized at N. Buchanan Street and N. Edison Street, and one signalized at the crosswalks on N. Culpeper Street. The planned traffic signal at N. Edison Street will include pedestrian signal heads and will significantly improve pedestrian access. At N. Buchanan Street many pedestrians cross from on-street parking north of Lee Highway to the commercial establishment on the south side. Many times, there are few gaps in traffic from the nearby Glebe Road traffic signal due to a heavy number of turning vehicles. Improvements to this crossing could include a lighted pathway or a separate pedestrian traffic signal. The crosswalks located at the traffic signal at N. Culpeper Street cross Lee Highway diagonally. Further study and examination of sight distances and traffic signal design should be performed to determine if these crosswalks can be re-aligned perpendicular to the roadway to shorten the crossing distance and pedestrian crossing times. 10

16 Enhancing pedestrian crossing indirectly aids transit in the corridor through improved access to bus stop locations. Further improvements can come in the form of better facilities, either through adding bus shelters or bus pull-outs. Shelters should be placed at stops with a high amount of ridership, or key locations in the corridor. Bus pull-outs will be difficult to implement due to the lack of space throughout the study area. Another option is to implement technological improvements such as signal preemption or signal priority throughout the Lee Highway corridor. Data collected for this analyses is not detailed enough to determine the effectiveness of these technologies on the study area. Further study and construction of pedestrian and transit improvements has a generally low cost timeline. The planned N. Edition traffic signal will incorporate pedestrian movements in its design. RECOMMENDATIONS Based on the areas of concern presented in Figure 5, the strategies listed above, and analyses built upon the existing simulation, Gorove/Slade assembled a list of possible recommendations for the study corridor. These recommendations are split into three sets, based on their cost and ease of implementation. Short-Term Recommendations Illustrated on Figure 7, the short-term recommendations represent ideas that can be implemented with little further study, low cost, and in a short time span. They are as follows: 1. Add signs discouraging cut-through traffic Signs with messages such as Resident Parking Only or No Through Traffic can be placed at strategic spots on cut-through routes to discourage traffic from using these streets. Good candidates for these signs are N. Edison, N. Columbus and N. Buchanan Streets. 2. Enhance signs near intersection of Lee Highway at N. Columbus Street The illegal parking situation on the Subway lot can be mitigated through a combination of improved signing and enforcement. Signing can be improved by adding short term parking signs to N. Columbus Street to encourage parkers to park off-street when parking lots are full. In conjunction with these signs, No Parking signs can be enhanced to discourage people from overflowing into parking spots that decrease sight distance for drivers at this intersection. In addition to these signs, a No Left Turns sign on the median facing westbound traffic can be added to remind motorists that the McDonald s driveway at this location is an exit. 3. Alter signal timings at N. Culpeper Street The traffic signal at N. Culpeper Street will be evaluated during the traffic signal coordination project. This project should incorporate longer northbound and southbound green times to address citizens concerns. 4. Re-align crosswalks at N. Culpeper Street The crosswalks on N. Culpeper Street should be re-aligned perpendicular to Lee Highway, if possible. This will shorten the pedestrian crossing distance and crossing times. 5. Improve pedestrian crossing at N. Buchanan Street The pedestrian crosswalk at N. Buchanan Street can be improved though the addition of sensors, 11

17 blinking pedestrian lights, and/or overhead beacons. Further study and coordination with VDOT would be necessary to approve this recommendation. Mid-Term Recommendations Illustrated on Figure 8, the mid-term recommendations represent ideas that can be implemented with further study, and with a moderate cost and implementation time. They are as follows: 1. Construct traffic signal at N. Edison Street A traffic signal at this location is already under design. Based on the results of this analysis and observations in the field, this report concludes that this signal would be a beneficial addition to the corridor. It will help side street traffic access Lee Highway, help slow through traffic, aid pedestrian crossings, and reduce right-angle crashes. 2. Close median break at N. Cameron Street The median break at N. Cameron Street serves residential areas to the south of Lee Highway and the KFC/Pizza Hut/Taco Bell parcel to the north. Closing the median break accomplishes several goals, (1) it lowers the number of left turns made onto and off of Lee Highway, (2) it eliminates some hazardous turning movements due to the intersection s proximity to the crest of a hill on Lee Highway, and (3) it addresses the high number of crashes at this location by eliminating the conflicts. The residential traffic from the south will experience more difficulty accessing Lee Highway, but they will also be able to use the new traffic signal at N. Edison Street to access Lee Highway westbound. This report recommends that the County discuss with the owner of the KFC/Pizza Hut/Taco Bell property the possibility of altering their N. Culpeper Street driveway configuration to allow exit movements onto N. Culpeper Street, and accessing Lee Highway using the traffic signal located there. 3. Close median break or install traffic signal at N. Columbus Street Closing the median break at N. Columbus Street results in a reduction of conflicting movements at the intersection, mainly left turns. The high number of left turns and U-turns creates an unsafe and confusing intersection. A disadvantage to this recommendation is that drivers making these turns will use nearby intersections instead, most notably N. Buchanan and N. Culpeper Streets. The community does not favor this alternative because although it reduces conflicting movements, it limits access to the community and encourages cut-through traffic. An alternative to closing the median break is to place a traffic signal at this intersection. Closing the median break reduces the number of conflicts at this location, while a traffic signal would permit the same movements as today but would control the timing of conflicting movements. It should be noted that traffic signals do not always increase overall intersection safety. Often there is an increase in the number of rear end collisions with the installation of a new signal. A drawback of a signal is that it is much costlier to implement and maintain when compared to closing the median break. Lastly, given that the Lee Highway corridor is heavily utilized by through commuter traffic, the consideration of a new traffic signal should be approached carefully. The analysis performed for this study regarding a signal at this intersection is not conclusive and further study is necessary to determine the best alternative for the treatment of this intersection. 4. Add left turn bay for McDonald s entrance, and if possible extend to N. Culpeper Street There is limited flexibility due to the lack of right of way and the location of structures near the 12

18 edge of the roadway. However, it appears that the face of curb to face of curb measurement of 53, feet subtracting 3 feet (18 inches x 2) for gutter, would allow for five 10-foot lanes. The center lane could be used to provide a left turn lane for westbound traffic entering McDonald s. This would require removal of a portion of existing median and restriping of traffic lanes. Simulation runs from the traffic model indicate that this would greatly benefit the westbound traffic flows, due to the amount of vehicles entering McDonald s during peak periods. Upon further examination, if it is determined that 10-foot lanes are acceptable, it would be beneficial to extend similar accommodations to include the intersection at N. Culpeper Street. Figure 9 shows this alternative conceptually. Long-Term Recommendations Illustrated on Figure 10, the long-term recommendations represent ideas that cannot be implemented without significant cost and effort. They are as follows: 1. Construct two roundabouts within the corridor Based on the advantages and disadvantages listed in the previous section, combined with the nature of the corridor and the simulation results, a possible long-term option would be to install roundabouts at locations within the corridor to facilitate turning movements, including u-turns. The roundabouts would be located at either end of the corridor, for example N. Edison Street, and possibly N. Columbus Street, although the ideal places for the roundabouts might be outside the study area. This option is preferred due to the low speed limit of Lee Highway, and the primary function of Lee Highway as access for commercial and residential properties compared to its secondary function of serving as an east-west commuter route. As part of this long-term plan, all median breaks could be closed, and the traffic signal at N. Culpeper Street removed. Further studies would be required to determine a preferred way to handle pedestrian and transit activity throughout the corridor, and ingress and egress of emergency vehicles from the Fire Station. 2. Widen roadway to accommodate a 5 or 6 lane cross section If approximately six to twelve feet were added to Lee Highway on either side, turning lanes could be added within the corridor to reduce conflicts and increase capacity. Widening of Lee Highway would be difficult due to the amount of commercial development along the corridor. It is possible that acquiring land for roundabouts at selected locations could be easier than widening the roadway throughout the entire corridor. The first goal of widening the roadway would be to add left turn lanes at signalized intersections and major median breaks, followed by right turning lanes where heavy right turn movements exist. 13

19 N N. Buchanon Street STOP Rte. Rte (Lee (Lee Highway) Highway) Pharmacy Retail Retail Dominion Electric Electric Supply Company Supply Company Medical Medical Building Building Bankers Bankers Office Retail Office Church Pizza Pizza Hut/ Taco Bell KFC Auto Repair Retail/Office McDonald's McDonald's Tatoo Tatoo Parlor Parlor 7-11 Pastry Shoppe Shoppe Subway Subway STOP In Planning N. N. Columbus ColumbusStreetStreet Fire Fire Station B N. N. Culpeper CulpeperStreetStreet B N. Cameron CameronStreetStreet STOP N. Dinwiddie Street STOP Figure 1 Annotated Map of Study Area Dominion B STOP STOP BS N. Edison Street

20 13/45/ /833/856 28/47/45 N 895/866/ /21/58 20/41/34 1/7/15 22/48/ /957/ /903/ /17/42 51/95/36 19/28/26 66/89/42 9/9/17 761/790/1397 0/64/35 16/5/5 4/9/10 36/35/44 7/9/ /879/ /75/51 59/41/54 729/828/1411 8/28/15 36/26/33 4/5/4 77/63/72 6/34/12 3/4/3 5/9/5 3/21/7 1516/914/950 70/49/64 0/46/14 0/0/0 1/74/47 12/5/4 0/1/0 36/32/36 6/3/3 764/887/1446 0/20/35 15/20/25 Figure 2 Peak Hour Traffic Volumes 30/21/12 1/3/3 8/22/8 32/41/52 785/790/ /27/29 24/10/25 14/5/15 2/8/12 39/24/20 6/12/15 2/2/2 1451/961/1003 2/51/ /906/963 5/6/16 AM/Mid-Day/PM Peak Hour Volumes Peak Hours: AM 7:15 to 8:15 AM Mid-Day 12:15 to 1:15 PM PM 5:15 to 6:15 PM 3/2/4 11/2/9 15/16/8 0/4/2 51/97/83

21 3,000 2,500 2,000 1,500 1, Figure 3 Chart of Daily Corridor Traffic Volumes 11:00 AM 2:00 PM 5:00 PM 8:00 PM 11:00 PM 2:00 AM 5:00 AM 8:00 AM 11:00 AM 2:00 PM 5:00 PM 8:00 PM 11:00 PM 2:00 AM 5:00 AM 8:00 AM 11:00 AM 2:00 PM 5:00 PM 8:00 PM 11:00 PM 2:00 AM 5:00 AM 8:00 AM 11:00 AM 2:00 PM 5:00 PM 8:00 PM 11:00 PM 2:00 AM 5:00 AM 8:00 AM 11:00 AM 2:00 PM 5:00 PM 8:00 PM 11:00 PM 2:00 AM 5:00 AM 8:00 AM 11:00 AM 2:00 PM 5:00 PM 8:00 PM 11:00 PM 2:00 AM 5:00 AM 8:00 AM 11:00 AM 2:00 PM 5:00 PM 8:00 PM 11:00 PM Sunday Monday Tuesday Wednesday Thursday Friday Saturday Day/Hour Vehicles/Hour (Both Directions)

22 Figure 4 Summary Study of Crash Area Data N LEGEND Angle Collision Rear-End Collision Head-On Collision Collision with Pedestrian Collision with Object Not in Roadway

23 Figure 5 Areas of Concern Study Area N Cut-through Traffic Cut-through Traffic Insufficient Parking Lot Size Generates Illegal Parking Problem Difficult Pedestrian Crossing Crest of Hill-- Sight Distance Issues Small green time on NB & SB Approaches Difficult Pedestrian Crossing Cut-through Traffic Relatively High Number of Crashes Skewed Intersection Queues from Fire Station Signal Block N. Columbus High Amount of U-Turns Corridor-Wide Concerns Truck loading and unloading on Lee Highway (during peak hours) Speed of through traffic Large amount of unsignalized median breaks Movements that experience excessive delay noted as:

24

25 Figure 7 Short-Term Study Recommendations Area N Add signs discouraging cutthrough traffic Add signs discouraging cutthrough traffic Increase green time to NB & SB approaches Add no parking signs to discourage illegal parking Add pedestrian sensors and lights to crosswalk at N. Buchanan Re-align crosswalks perpendicular to Lee Highway Add no left turn signs, and exit only signs to discourage traffic from entering into McDonald s Exit

26 Figure 8 Mid-Term Study Recommendations Area N Add signs discouraging cutthrough traffic Encourage owner to reconstruct entrance to allow exiting onto N. Culpeper St Add no parking signs to discourage illegal parking Add signs discouraging cutthrough traffic Close median break in front of KFC/Taco Bell/Pizza Hut Driveway Increase green time to NB & SB approaches Add pedestrian sensors and lights to crosswalk at N. Buchanan Add no left turn signs, and exit only signs to discourage traffic from entering into McDonald s Exit Close Median Break at N. Columbus, or Install traffic signal Install traffic signal at N. Edison Re-align crosswalks perpendicular to Lee Highway Build left turn lane for McDonald s Entrance, and possibly to N. Culpeper St

27

28 Figure 10 Mid-Term Study Improvements Long-Term Recommendations Area N Add signs discouraging cutthrough traffic Install roundabout at eastern edge of corridor Encourage owner to reconstruct entrance to allow exiting onto N. Culpeper St Add no parking signs to discourage illegal parking Add signs discouraging cutthrough traffic Close median break in front of KFC/Taco Bell/Pizza Hut Driveway Consider removing traffic signal Increase green time to NB & SB approaches Add pedestrian sensors and lights to crosswalk at N. Buchanan Add no left turn signs, and exit only signs to discourage traffic from entering into McDonald s Exit Close Median Break at N. Columbus Install traffic signal at N. Edison Install roundabout at western edge of corridor Re-align crosswalks perpendicular to Lee Highway Close all unsignalized median breaks within corridor Build left turn lane for McDonald s Entrance

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Albany Shaker Road Corridor Study Public Meeting # 2

Albany Shaker Road Corridor Study Public Meeting # 2 Albany Shaker Road Corridor Study Public Meeting # 2 Scope / Meeting Purpose This project is a CDTC Linkage Study. The Linkage Program is designed to implement the adopted planning and investment principles

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

Access Management in the Vicinity of Intersections

Access Management in the Vicinity of Intersections Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS CITY OF LINWOOD ATLANTIC COUNTY, NEW JERSEY March 30, 2006 PREPARED FOR: City of Linwood 400 Poplar Avenue Linwood,

More information

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas 133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT

More information

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives. TECHNICAL MEMORANDUM Albany - Washington Avenue Traffic Calming Evaluation Matrix of Conceptual Alternatives Date: May 17, 2017 Project #: 17356 To: Aleida Andrino-Chavez From: Laurence Lewis, Sara Muse,

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

NEIGHBORHOOD TRAFFIC CALMING POLICY

NEIGHBORHOOD TRAFFIC CALMING POLICY NEIGHBORHOOD TRAFFIC CALMING POLICY I. PURPOSE The City of Kent continually strives to strengthen and protect its neighborhoods by improving the quality of life in residential areas. Traffic conditions

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

ROUNDABOUTS/TRAFFIC CIRCLES

ROUNDABOUTS/TRAFFIC CIRCLES GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement PROJECT OVERVIEW Project Goal and Description The goal of the Broadway Safety Improvement d St Van Ness Ave Project is to improve safety and comfort for all who Franklin St Hyde St Octavia St Gough St

More information

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue Bus Rapid and Conventional Transit Planning and Design Services City of Saskatoon February 2018 Project Team HDR Corporation

More information

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA VDOT & FHWA Roundabout Workshop September 17, 2013 Chris Tiesler, PE Presentation Outline US 15/US

More information

Focused Traffic Analysis for the 200 Nellen Avenue Project

Focused Traffic Analysis for the 200 Nellen Avenue Project March 13, 2017 Mr. Phil Boyle Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94976-0159 Focused Traffic Analysis for the 200 Nellen Avenue Project Dear Mr. Boyle; W-Trans has completed a focused

More information

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Memorandum. Sunday, July 13, Saturday, July 19, 2014 Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn

More information

MEMORANDUM. Our project study area included the following locations:

MEMORANDUM. Our project study area included the following locations: MEMORANDUM Date: To: From: Subject: Najib O. Habesch Nick M. Fomenko, PE, PTOE Bushnell Park North Traffic Assessment BETA Project #: 4461 As part of our contract to undertake the design of the Bushnell

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

Delaware Avenue Corridor Study

Delaware Avenue Corridor Study Delaware Avenue Corridor Study City of Marysville, Ohio February 19, 2009 ms consultants, inc. engineers, architects, planners 2221 Schrock Road Columbus, Ohio 43229-1547 ms ms consultants, inc. engineers

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy MEMORANDUM Date: 9/13/2016 Re: Citywide Crosswalk Policy Foreword Through the s Circulation Element and Complete Streets Policy, it is the City s goal to promote walking trips and provide safe facilities

More information

Edgemont Village Traffic and Parking Technical Report January 2014

Edgemont Village Traffic and Parking Technical Report January 2014 Edgemont Village Traffic and Parking Technical Report January 2014 In the fall of 2013, the District of North Vancouver engaged consultants to assess existing intersection and parking conditions in Edgemont

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA 02630 (508) 362-3828 Fax (508) 362-3136 2006 Transportation Safety Report Bourne: Otis Rotary Harwich: Route 137/Route 39 Orleans: Route

More information

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016 Designing for Pedestrian Safety Alabama Department of Transportation Pre-Construction Conference May 2016 1 Designing for Pedestrians Marking Crosswalks at Signalized intersections High Visibility Markings

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

City of Seattle Edward B. Murray, Mayor

City of Seattle Edward B. Murray, Mayor City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

Pedestrian & Bicycle Safety Innovations & Applications

Pedestrian & Bicycle Safety Innovations & Applications Pedestrian & Bicycle Safety Innovations & Applications County Engineers Association of Maryland Spring, 2017 Conference May 25, 2017 George Branyan Pedestrian Program Coordinator District Department of

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

180 Grand Avenue, Suite x117 Dowling Associates, Inc. 180 Grand Avenue, Suite 250 510.839.1742 x117 Oakland, CA 94612 510.839.0871 fax www.dowlinginc.com mbowman@dowlinginc.com Dowling Associates, Inc. Date: Memorandum To: CC: From: Ms. Leah Greenblat City

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Edenbrook Hill Drive Traffic Calming Study

Edenbrook Hill Drive Traffic Calming Study WELCOME Public Information Centre Edenbrook Hill Drive Traffic Calming Study Fletchers Meadow Secondary School Wednesday January 20, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Governance and Priorities Committee Report For the July 2, 2015 Meeting CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014 Page: 1 of 8 1 POLICY 1.01 The City shall follow all of the specifications in the Manual of Uniform Traffic Control Devices for Canada, prepared by the National Committee of Uniform Traffic Control, and

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

Station Plan: Penn & 43rd Avenue

Station Plan: Penn & 43rd Avenue Station Plan: Penn & 43rd Avenue This station will serve the northern portion of the Penn Avenue corridor, including the commercial node at 44th Avenue. Ridership and roadway geometry support station siting

More information

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session Intersection Improvement: 1 Welcome WHY IS AN INTERSECTION IMPROVEMENT NEEDED? 2 Traffic volumes for Sturgeon Road, Silver Avenue and Murray Park Road exceed the capacity of the existing 4-way stop controlled

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how

More information

CONTENTS EXECUTIVE SUMMARY 1

CONTENTS EXECUTIVE SUMMARY 1 CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY 1 1 ISSUES AND PURPOSE OF THE ANALYSIS 2 1.1 Background 2 1.2 Analysis Area 2 1.3 Issues and Observations 3 1.4 Project and Public Meetings 3 2 LIST OF PREFERRED

More information

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends:

More information

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Fleur Drive Reconstruction

Fleur Drive Reconstruction Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths

More information

Multimodal Through Corridors and Placemaking Corridors

Multimodal Through Corridors and Placemaking Corridors 68 Multimodal Through Corridors and Placemaking Corridors Corridors have different functions in a region. Some corridors are used to get smoothly and rapidly through a region or to get quickly to major