BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM)

Size: px
Start display at page:

Download "BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM)"

Transcription

1 NOTICE OF PUBLIC MEETING INTERSTATE HIGHWAY 30 (Rockwall) FROM: BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) 2642 CSJs: ; ; Dallas County and Rockwall County, Texas The Texas Department of Transportation (TxDOT) is proposing improvements to IH 30 from Bass Pro Road in Dallas County to west of FM 2642 in Dallas and Rockwall Counties, Texas. Pursuant to Texas Administrative Code, Title 43, Part 1, Chapter 2, Subchapter E, and Code of Federal Regulations, Title 23, Chapter I, Subchapter H, and Title 40, Chapter V, 1506, this notice advises the public that TxDOT will be conducting two public meetings for the public s convenience to discuss and receive public comments on the proposed project. The first meeting will be held on Thursday, April 27, 2017, at Royse City High School (cafeteria), 700 South FM 2642 Royse City, Texas The second meeting will be held on Thursday, May 4, 2017, at the Rockwall County District Courthouse (Liberty Hall), 1111 East Yellow Jacket Lane #401 Rockwall, Texas Representatives from TxDOT and project consultants will be available to answer questions about the proposed project improvements. Both meetings will present the same information, and will be held in an open house format from 5:30 p.m. to 8:00 p.m. with no formal presentation. Proposed improvements to IH 30 would reconstruct and/or widen this highway from Bass Pro Road in Dallas County to west of FM 2642 in Rockwall County, approximately 17 miles through the Cities of Garland, Rowlett, Rockwall, Mobile City, Fate, and Royse City. Transportation improvements are needed on IH 30 to address current and projected traffic demands and facility deficiencies, and to establish a safe and efficient thoroughfare by which to provide goods and services in the eastern portion of Dallas-Fort Worth (DFW). The proposed improvements include widening from 4 to 6 lanes from west of State Highway (SH) 205 to west of FM 2642; widening from 6 to 8 lanes from Bass Pro Drive to west of SH 205; construction of new frontage roads from Bass Pro Drive to Horizon Road (including bridge structures across Lake Ray Hubbard); bicycle and pedestrian facilities across Lake Ray Hubbard; and ramp and interchange construction and reconfiguration in the project corridor. Additional right-of-way is anticipated to be required along this segment of IH 30. Maps showing the proposed project s location and geometric design will be available for viewing at the public meetings. This information will also available for public inspection Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m. at the TxDOT Dallas District Office located at 4777 East Highway 80, Mesquite, Texas 75150; City of Rockwall located at 385 South Goliad Street, Rockwall, Texas 75087; City of Rowlett Public Works located at 4310 Industrial Street Rowlett, TX 75088; City of Fate located at 104 East Fate Main Place, Fate, Texas 75132; City of Royse City located at 305 North Arch Street, Royse City, Texas 75189; City of Garland Municipal Building located at 800 Main Street, Garland, Texas 75040; and TxDOT Kaufman Area Office, 2750 South Washington, Kaufman, TX The information will also be available online at under Upcoming Public Hearing/Meeting. All interested persons are invited to attend the public meeting. Written comments from the public are requested and will be accepted for a period of 15 calendar days following the meeting. Written comments may be submitted either in person at the public meeting, by mail to the TxDOT Dallas District Office, Attention: Ms. Grace Lo, P.E., 4777 E. Highway 80, Mesquite, TX , or by addressed to Grace.Lo@txdot.gov. Written comments must be received or postmarked on or before Friday, May 19, 2017 to be included in the documentation of the public meeting. The public meeting will be conducted in English. Persons interested in attending the meeting who have special communication or accommodation needs, such as the need for an interpreter, are encouraged to contact the TxDOT Dallas District Public Information Office at (214) Requests should be made at least two days prior to the public meeting. Every reasonable effort will be made to accommodate these needs. If you have general questions or concerns regarding the proposed project or the meeting, you may contact the TxDOT IH 30 Rockwall County Project Manager, Ms. Grace Lo, P.E. at or e- mail at: Grace.Lo@txdot.gov. You may also contact the consultant project manager, Mr. Wes McClure, P.E. at (469) or by at WMcClure@bgeinc.com. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

2 Parker Lucas St Paul Lavon Lake Nevada Josephine Caddo Mills Murphy Plano Wylie Lavon Directions To: Richardson Sachse Royse City Rockwall County District Courthouse "Liberty Hall" IH 30 Project Public Meeting / Open House 5:30 P.M, May 4, 2017 Garland PGBT Fate Rowlett Rockwall Lake Ray Hubbard McLendon-Chisholm Heath Union Valley Mesquite Sunnyvale Travis Ranch Forney Terrell Directions: T L Townsend Dr John King Blvd Airport Rd From North take SH 205: head south on SH 205 toward IH 30, turn left onto E Yellow Jacket Ln, the Courthouse is on the right From South take SH 205: head north on SH 205 toward SH 66, turn right onto E Yellow Jacket Ln, the Courthouse is on the right Lake Ray Hubbard Ridge Rd Yellow Jacket Ln Rockwall County Distric Courthouse From West take IH 30: head east on IH 30 E toward SH 205, take exit 68 toward SH 205, turn left onto SH 205, turn right onto E Yellow Jacket Ln, the Courthouse is on the right From East take IH 30: head west on IH 30 W toward SH 205, take exit 69 and merge onto the frontage road, turn right onto T L Townsend Dr, the Courthouse is on the left Rockwall County District Courthouse "Liberty Hall" 1111 E Yellow Jacket Ln # 401 Rockwall, Texas Goliad St W Yellow Jacket Ln E Yellow Jacket Ln T L Townsend Dr Rockwall County Distric Courthouse

3 FM 35 Lucas St Paul Lavon Lake Nevada Josephine Caddo Mills Directions To: Wylie Lavon Royse City Royse City High School Sachse PGBT Fate Union Valley IH 30 Project Public Meeting / Open House Rockwall Rowlett Lake Ray Hubbard 5:30 P.M., April 27, 2017 Heath McLendon-Chisholm Sunnyvale Travis Ranch FM 2642 Directions: FM 2642 FM 2515 Royse City High School From West take IH 30 E: head east on IH 30 E, take exit 79 toward to FM 2642, merge onto IH 30 frontage road turn right at S. FM 2642 Royse City High School is on the left FM 35 From East take IH 30 W: head west on IH 30 W, take exit 79 toward to FM 2642, merge onto IH 30 frontage road turn left at S. FM 2642 Royse City High School is on the left FM 2515 Royse City High School 700 S. FM 2642 Royse City, Texas FM 2642 Royse City High School

4 IH-30 ROCKWALL COUNTY PROJECT IH-30 FROM BASS PRO DRIVE TO HUNT COUNTY LINE(West of FM 2462) Dallas and Rockwall Counties, Texas CSJ: , etc

5 Project Overview Existing 2/2 Mainlanes with 2-Lane Frontage Roads 2040 MTP 3/3 Mainlanes with continuous 2-Lane Frontage Roads BEGIN PROJECT END PROJECT Bayside/Dalrock Interchange Existing 4/4 Mainlanes (Bass Pro Horizon) 3/3 Mainlanes (Horizon SH 205) with no Frontage Roads 2040 MTP 4/4 Mainlanes with continuous 3-Lane Frontage Roads CSJ Limits CSJ CSJ CSJ CSJ CSJ

6 Project Overview Ultimate Schematic - Bass Pro Drive to Horizon Rd 3

7 Project Overview Ultimate Schematic - SH 205 to Hunt C/L 4

8 Project Schedule Value Engineering (VE) Workshop February 7-10, % Schematic April 2017 Public Meeting April / May 2017 Draft EA (Tech Reports) June / July 2017 Schematic Approval (District /FHWA) January 2018 FONSI March

9 Contact Information TxDOT Project Manager Grace Lo, P.E. Texas Department of Transportation 4777 E Highway 80 Mesquite, Texas Phone: (214) grace.lo@txdot.gov Consultant Project Manager Michael H. Garrison, P.E. BGE, Inc Dallas Parkway, Suite 204 Frisco, Texas Phone: (972) mgarrison@bgeinc.com 6

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

GENERAL DESCRIPTION. Page 1 of 5

GENERAL DESCRIPTION. Page 1 of 5 38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190

More information

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME.

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. 1 PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. - SANDRA GREEN, CITY SECRETARY FARMERSVILLE CITY COUNCIL MEETING February

More information

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028 Collin 54005 2351 01 017 FM 2478 FM 1461 to US 380 Collin 54005.1 2351 02 014 FM 2478 Collin 55038 2679 03 015 FM 2514 FM 1461 to North of FM 1461 East of Lavon Parkway to North of Drain Drive Widen two

More information

NCTCOG 16-County Crash and Fatality Data

NCTCOG 16-County Crash and Fatality Data North Central Texas Council of Governments - Traffic Safety Crash and Fatality Statistics NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS (NCTCOG) 2012 Safety Program Performance Measures NCTCOG 16-County Crash

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

NCTCOG 16-County Crash and Fatality Data

NCTCOG 16-County Crash and Fatality Data North Central Texas Council of Governments - Traffic Safety Crash and Fatality Statistics NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS (NCTCOG) 2013 Safety Program Performance Measures NCTCOG 16-County Crash

More information

PROPOSED FARE RESTRUCTURE. Public Meeting Tuesday, July 11 6:00 pm

PROPOSED FARE RESTRUCTURE. Public Meeting Tuesday, July 11 6:00 pm PROPOSED FARE RESTRUCTURE Public Meeting Tuesday, July 11 th @ 6:00 pm Agenda About Types of Service Goal Current Fares Proposed Fare Restructure Timeline 2 About STAR Transit is a public transportation

More information

NCTCOG 16-County Crash and Fatality Data

NCTCOG 16-County Crash and Fatality Data North Central Texas Council of Governments - Traffic Safety Crash and Fatality Statistics NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS (NCTCOG) 2014 Safety Program Performance Measures NCTCOG 16-County Crash

More information

Public Hearing Tarrant County. October 11 th, 2012

Public Hearing Tarrant County. October 11 th, 2012 Public Hearing Tarrant County October 11 th, 2012 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District

More information

BICYCLE PUBLIC HEARING INTRODUCTION. Kathy Kleinschmidt, P.E. Bicycle and Pedestrian Coordinator Dallas District

BICYCLE PUBLIC HEARING INTRODUCTION. Kathy Kleinschmidt, P.E. Bicycle and Pedestrian Coordinator Dallas District BICYCLE PUBLIC HEARING INTRODUCTION Kathy Kleinschmidt, P.E. Bicycle and Pedestrian Coordinator Dallas District Purpose of Public Hearing Texas State Law (Title 43, Subchapter D, 25.55 (b)) affords each

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities. Table of Contents 3.1. Interim vs. Ultimate Configuration for the Remaining Segments of NTE... 1 3.2. Characteristics of Project Segments... 3 3.2.1. All Segments... 5 3.2.2. Segment 2E... 8 3.2.3. Segment

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

connections 2040 the waco metropolitan transportation plan amendment 2

connections 2040 the waco metropolitan transportation plan amendment 2 connections 2040 the waco metropolitan transportation plan amendment 2 developed by the waco metropolitan planning organization in cooperation with the following agencies: Adopted December 14, 2017 amendment

More information

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, 2 0 1 3 B R A Z O S C E N T E R Project Overview Study Goals and Objectives» Improve traffic flow» Reduce delay»

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS I- COMAL COUNTY OPERATIONAL IMPROVEMENTS OPEN HOUSE The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been,

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE APPROVED BY FHWA: JULY 2010 UPDATED: OCTOBER 2011 Section 1 Need for and Purpose of Proposed Action Per Council on Environmental Quality

More information

I-10 AT SCENIC LOOP RD. Open House

I-10 AT SCENIC LOOP RD. Open House I-10 AT SCENIC LOOP RD Open House General Information I-10 At Scenic Loop Rd KENDALL COUNTY OPEN HOUSE June 30, 2015 Currey Creek Baptist Church 35 Cascade Cavern 5:00 7:00 Boerne, TX 78015 2 Public Meeting

More information

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,

More information

Sponsored By: Support From:

Sponsored By: Support From: Sponsored By: Support From: A voluntary association of local governments, H-GAC provides a regional forum for cooperative action. Created by Texas, role defined by State and local governments: Area Agency

More information

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009. Value from &! M East HOU M East HOU M East HOU &! M East HOU &! M East HOU IH 45 0271-14-217 0271-14-218 0271-14-213 0271-14-228 0500-03-462 0500-03-550 0500-03-565 Reconstruct US /IH 610 IC. Construct

More information

I-635 LBJ EAST PROJECT

I-635 LBJ EAST PROJECT 635 I-635 LBJ EAST PROJECT Transportation and Trinity River Project Committee 9 June 2014 TxDOT Dallas District Dallas County, Texas CSJ: 2374-01-137, 2374-02-053 Agenda I-635 LBJ East Project Overview

More information

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department Best Southwest Transportation Committee North Central Texas Council of Governments Transportation Department The The Regional Regional Veloweb Veloweb Review Review NCTCOG Bicycle and Pedestrian Program

More information

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW HPTER 3 STUY RE OPERTIONL OVERVIEW This chapter describes the overall traffic operations within the study area under existing and future conditions and focuses on individual intersections not directly

More information

3.0 Future Conditions

3.0 Future Conditions 3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Characteristics of Fatal Pedestrian Crashes on Freeways. Kay Fitzpatrick Texas A&M Transportation Institute

Characteristics of Fatal Pedestrian Crashes on Freeways. Kay Fitzpatrick Texas A&M Transportation Institute Characteristics of Fatal Pedestrian Crashes on Freeways Kay Fitzpatrick Texas A&M Transportation Institute Transportation Short Course Design Session October 15, 2013 Project Background (0-6702) Motivation:

More information

Proposed Action, Purpose and Need Technical Memorandum

Proposed Action, Purpose and Need Technical Memorandum Proposed Action, Purpose and Need Technical Memorandum MoPac (State Loop 1) Intersections, Austin District From North of Slaughter Lane to South of La Crosse Avenue CSJ: 3136-01-015 Travis County, Texas

More information

DALLAS FORT WORTH. There are several congested sections of road that do not have a logical big fix solution.

DALLAS FORT WORTH. There are several congested sections of road that do not have a logical big fix solution. DALLAS FORT WORTH Several of the worst congested sections of road in the Metroplex are near the two downtowns (Exhibits DFW-1 and DFW-2), which is similar to Austin and Houston. What is different, however,

More information

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017 WELCOME FM 2818 (Harvey Mitchell Parkway) Open House Tuesday, Nov. 14, 2017 Why am I here? Review the planned improvements Provide comments on the proposed project The environmental review, consultation,

More information

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015 AAMPO MOBILITY PROJECT DISCUSSION July/August 2015 Proposition 1 FY 16 & 17 $1.74 billion transferred to State Highway Fund in FY 2015 $147.3 million let in SAT district in FY 2015 US 90, IH 10, IH 410

More information

Welcome to Laredo Metropolitan Transportation Plan First Public Meeting. February 27 th, :30 PM to 7:30 PM. We value your opinion!

Welcome to Laredo Metropolitan Transportation Plan First Public Meeting. February 27 th, :30 PM to 7:30 PM. We value your opinion! Welcome to Laredo 2015-2040 Metropolitan Transportation Plan First Public Meeting February 27 th, 2014-5:30 PM to 7:30 PM We value your opinion! Todays Objectives Initiate the planning exercise for the

More information

North Central Texas Council of Governments - Roadway Safety Program Area

North Central Texas Council of Governments - Roadway Safety Program Area North Central Texas Council of Governments - Roadway Safety Program Area NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS 7 Safety Program Performance Measures Federal Safety Performance Management Requirements

More information

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. MARKET I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT JANUARY 23, 2017 Public Meeting & Open House #2 TODAY S MEETING Purpose:

More information

0.17 Miles West of Josey lane Danieldale Road IH 35E Houston School Road

0.17 Miles West of Josey lane Danieldale Road IH 35E Houston School Road NRSA1-DAL- 8 TxDOT Dallas 11005 Improvement 0918-45-864 Whitlock Road IH 35E Old Denton Road Reconstruct 4 lane undivided to 4 lane divided with left turns $3,802,480 Minor Arterial NRSA1-DAL- 11 TxDOT

More information

PUBLIC COMMENTS REPORT WRITTEN COMMENTS SUBMITTED BY WEBSITE, & SOCIAL MEDIA

PUBLIC COMMENTS REPORT WRITTEN COMMENTS SUBMITTED BY WEBSITE,  & SOCIAL MEDIA PUBLIC COMMENTS REPORT Purpose WRITTEN COMMENTS SUBMITTED BY WEBSITE, EMAIL & SOCIAL MEDIA The public comments report is in accordance with the NCTCOG Transportation Department Public Participation Process,

More information

A: PLANNED P ROJECTS PROJECTS

A: PLANNED P ROJECTS PROJECTS Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

DEPARTMENT OF COMMUNITY PLANNING & BUILDING INTEROFFICE MEMORANDUM

DEPARTMENT OF COMMUNITY PLANNING & BUILDING INTEROFFICE MEMORANDUM DEPARTMENT OF COMMUNITY PLANNING & BUILDING INTEROFFICE MEMORANDUM TO: VIA: VIA: VIA: FROM: DATE: SUBJECT: Board of County Commissioners Terry L. Shannon, County Administrator 11-5 Thomas Barnett, AICP,

More information

SH 68. Meeting with Affected Property Owners September 9, 2014

SH 68. Meeting with Affected Property Owners September 9, 2014 SH 68 Meeting with Affected Property Owners September 9, 2014 SH 68 US 83/I-2 TO US 281/I-69C Meeting with Affected Property Owners (MAPO) September 9, 2014 Agenda Open Meeting with Affected Property Owners

More information

MASTER THOROUGHFARE PLAN

MASTER THOROUGHFARE PLAN MASTER THOROUGHFARE PLAN Master Thoroughfare Plan Update November 2015 Prepared for Town of Northlake AVO 30659 11/11/2015 1201 North Bowser Road Richardson, Texas 75081 Firm Registration No. 312 MASTER

More information

TXDOT LAUNCHES PEDESTRIAN SAFETY CAMPAIGN TO ADDRESS PEDESTRIAN FATALITIES AND INJURIES IN AUSTIN

TXDOT LAUNCHES PEDESTRIAN SAFETY CAMPAIGN TO ADDRESS PEDESTRIAN FATALITIES AND INJURIES IN AUSTIN DECEMBER 2017 E-NEWSLETTER A monthly e-newsletter providing information about Mobility35, a regionwide effort to improve safety and mobility along I-35 in Williamson, Travis, and Hays counties. TXDOT LAUNCHES

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 RECOMMENDED ACTION: Update on the NDDOT US Business 2 Project Programmed for 2019 Matter of the NDDOT US Business

More information

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon I-35 Corridor Segment Committee 4 3500 NW Loop 410 San Antonio, Texas February 11, 2010 9:00 AM to Noon Welcome Nancy Parker Facilitator Committee Work Session Nancy Parker Facilitator Discussion of Proposed

More information

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility Update

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility Update 2015-2018 Transportation Improvement Program Appendix H Non-regionally Significant Arterials in Mobility 2035 2014 Update North Central Texas Council of Governments DFW Metropolitan Planning Organization

More information

Denton County. Thoroughfare Plan. Draft: December

Denton County. Thoroughfare Plan. Draft: December Thoroughfare Plan Draft: December January 19, 2017 Draft: 2015 TABLE OF CONTENTS CHAPTER 1. BASIS FOR THE PLAN... 1 Purpose of the Plan... 1 Current Transportation Plans Influencing... 1 CHAPTER 2. TRANSPORTATION

More information

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7. TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS MOD TIP CODE 2008-274 12175.08, 12416.08, 12417.08, 12418.08, 12419.08, 12420.08, 12421.08, 12422.08 DENTON COUNTY TRANSPORTATION AUTHORITY (DCTA) - FY08 PROGRAM OF S - TRANSIT SECTION 5307 - URBANIZED

More information

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

Mobility Greater Johnson County Transportation Coalition. May 23, 2018 Mobility 2045 Greater Johnson County Transportation Coalition May 23, 2018 Agenda Regional Perspective Mobility Planning Overview Mobility 2045 Draft Recommendations Financial Planning Overview Schedule

More information

Transportation Advisory Board

Transportation Advisory Board C I T Y O F WEATHERFORD Transportation Advisory Board AGENDA REPORT Meeting Date: October 15,2015 Staff Contact: Manny Palacios Jr. Phone: E-mail: 817-598-4296 mpalacios@weatherfordtx.gov SUBJECT: Discuss

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PRESENT Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PROJECT TEAM REPRESENTATIVES Name Organization Celia McAdam Luke McNeel Caird Leo Heuston Judy Matsui

More information

6/14/2013. Welcome. to the US 75 Corridor Study. Public Meeting. US 75 Corridor Study Area

6/14/2013. Welcome. to the US 75 Corridor Study. Public Meeting. US 75 Corridor Study Area Welcome to the US 75 Corridor Study Public Meeting US 75 Corridor Study Area 1 Existing and Future Congestion Levels 2012 2035 A do-nothing approach does not address the severe congestion in the region

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of Texas for: Elimination of a U.S. (Interstate) Route AASHTO Use Only

More information

Bicycle and Pedestrian Plans and Improvements

Bicycle and Pedestrian Plans and Improvements Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review

More information

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. September 7 th, 2007 Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. Acting District Administrator Mr. Morteza Salehi has endorsed

More information

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No. June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide

More information

FM #: ETDM #: 11241

FM #: ETDM #: 11241 SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed for the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No. SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: 432639-1-22-02 ETDM No.: 14308 Newsletter 3 - March 2019 Incluye versión en español

More information

A Vision for Athens: Transportation Plan. By Mac Martin, AICP City Planner

A Vision for Athens: Transportation Plan. By Mac Martin, AICP City Planner A Vision for Athens: Transportation Plan By Mac Martin, AICP City Planner Transportation Plan Introduction Background Existing Conditions The Plan / Implementation Strategy Conclusion Introduction This

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Washington DC Section of ITE Project Briefing

Washington DC Section of ITE Project Briefing Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation

More information

North Texas Real Estate Information System MLS Current Month Summary for: July 2010

North Texas Real Estate Information System MLS Current Month Summary for: July 2010 North Texas Real Estate Information System MLS Current Month Summary for: July 2010 Property Type Single Family 5,143-29% $215,743 11% 77-1% Condos and Townhomes 262-37% $182,880 16% 102 20% Farms and

More information

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility 2045

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility 2045 2019-2022 Transportation Improvement Program Appendix H Non-regionally Significant Arterials in Mobility 2045 North Central Texas Council of Governments DFW Metropolitan Planning Organization Revised June

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia

More information

The Transportation Improvement Program

The Transportation Improvement Program Waco Metropolitan Planning Organization The Transportation Improvement Program Waco Urbanized Area For Fiscal Years 2015 Through 2018 Proposed Amendment 4 FY 2016 PHASE: E COUNTY: McLennan LIMITS FROM:

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

North Central Texas Council of Governments

North Central Texas Council of Governments North Central Texas Council of Governments TO: Peggy Thurin, P.E. DATE: September 25, 2018 Texas Department of Transportation FROM: Jenny Narvaez Program Manager SUBJECT: Transmittal of the Draft Congestion

More information

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018 Turnpike Projects in Palm Beach County Palm Beach TPA Update September 20, 2018 Agenda Background Funded Projects Future Project Status Widenings Interchanges Express Lanes Phasing 2 Background 45 Miles

More information

APPENDIXB. Traffic Operations Technical Memorandum

APPENDIXB. Traffic Operations Technical Memorandum APPENDIXB Traffic Operations Technical Memorandum Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 MEMORANDUM Transportation Jim Kollbaum, PE

More information

STANLEY STREET December 19, 2017

STANLEY STREET December 19, 2017 STANLEY STREET December 19, 2017 Welcome Mike Wiza, Mayor Scott Beduhn, Director of Public Works Agenda 1. Introduction 2. Existing Roadway Conditions 3. Current Alternative Improvements 4. Summary of

More information

Chapter 6 Transportation Plan

Chapter 6 Transportation Plan Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised

More information

FM 1110 (Clint Cutoff Road) Widening & Realignment I-10 to SH 20 (Alameda Avenue)

FM 1110 (Clint Cutoff Road) Widening & Realignment I-10 to SH 20 (Alameda Avenue) La revisión ambiental, consultas y otras acciones requeridas por las leyes ambientales federales aplicables para este proyecto están siendo o han sido, llevado a cabo por TxDOT - en virtud de 23 USC 327

More information

US 69 RELIEF ROUTE STUDY

US 69 RELIEF ROUTE STUDY US 69 RELIEF ROUTE STUDY Jacksonville, Texas PUBLIC MEETING #2 May 29 th, 2018 Welcome to the public meeting for the US 69 Relief Route Study in Jacksonville. This is the second public meeting for this

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY

ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY energycorridor The Energy Corridor A Thriving Business Community 4 Located along Interstate between Kirkwood and Barker

More information

SECTION 8 - INDUSTRIAL PROPERTY AERIAL PHOTOGRAPH: RED OAK INDUSTRIAL PROPERTY INFRASTRUCTURE IMPROVEMENTS (~530 ACRES)

SECTION 8 - INDUSTRIAL PROPERTY AERIAL PHOTOGRAPH: RED OAK INDUSTRIAL PROPERTY INFRASTRUCTURE IMPROVEMENTS (~530 ACRES) TABLE OF CONTENTS SECTION 1 - SUPERIOR LOCATION MAP: STATE OF TEXAS - RED OAK LOCATION DEPICTED AERIAL PHOTOGRAPH: NORTH CENTRAL TEXAS REGION - RED OAK LOCATION DEPICTED MAP: COUNTY OF ELLIS - RED OAK

More information