AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

Size: px
Start display at page:

Download "AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015"

Transcription

1 AAMPO MOBILITY PROJECT DISCUSSION July/August 2015

2 Proposition 1 FY 16 & 17 $1.74 billion transferred to State Highway Fund in FY 2015 $147.3 million let in SAT district in FY 2015 US 90, IH 10, IH 410 (Bexar) SH 97 (Atascosa) Estimated $1.2 billion to be transferred in each of the next two fiscal years 2

3 Estimate of Proposition 1 Distribution ( Combined FY Total) 3

4 Estimate of Proposition 1 Distribution ( Combined FY Total) 4

5 Proposition 7 5

6 Projected Mobility Funding Sources FY FY 2024 Funding Category Type of Funding FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 FY 25 STP-MM Prop 1 Urban mobility (MPO) Urban mobility (MPO) Connectivity (TxDOT) Currently Programmed $31 M $31 M $32 M $32 M $33 M $33 M $53 M $53 M TBD $26 M $26 M TBD Prop 7 MPO Not Available TBD Connectivity Not Available TBD 6

7 SAN ANTONIO DIST. UNFUNDED PROJECTS (STRATEGIC VISION) 7

8 Proposition 1 Project Readiness MPO updated MTP (Long-Range Plan) including $65 Million Per Year for 10 Years in Anticipation of Prop 1 funds 8

9 AAMPO Currently Proposed Managed Lanes Total Cost - $4.4 Billion I-10 West (Future Extension) $120 M US 281 (825 Plan) $532 M I-10 (825 Plan) $200 M I-35 NE $1.5 B Loop 1604 $1.6 B SH 151 $150 M I-10 East $330 M I-37 South $5 M ALAMO AREA MPO MTP PROPOSED MANAGED LANES 9

10 Proposition 1 Project Readiness FY 16 & 17 Projects Ready in FY 2016: IH US 90 Interchange and Operational Improvements ~$70 M IH 10 East (Foster Road to FM 1516) Operational Improvements ~$50 M IH 10 East (FM 1516 to Graytown) Operational Improvements ~$18 M Projects Ready in FY 2017: SH 46 (Esser Road to Amman Road) Expansion to 4 Lanes ~$11 M Loop 337 (River Road to IH 35 South) Expansion to 4 Lanes ~$31 M IH 35 (FM 1103 to Loop 337) Operational Improvements ~$50 M Loop 1604 East (IH 35 to FM 78) Expansion to Expressway ~$40 M IH 10 West (FOR Pkwy to SH 46)Operational Improvements ~$70 M Total projects to be ready for FY 2016/2017 ~$340 M** **Projects are anticipated to be ready at the time noted above, however, this is not an indication of anticipated funding levels for the same timeframe. 10

11 Proposition 1 Project Readiness FY 18 & 19 Projects Ready in FY 2018: SH 46 (Bulverde Rd to FM 3159) Expansion ~$40 M Loop 1604 South (US 90 to IH 35) Expansion to 4 Lanes ~$40 M Loop 1604 South (US 281 to FM 1303) Expansion to 4 Lanes ~$20 M Loop 1604 South (IH 10 E to FM 1346) Expansion to 4 Lanes ~$15 M Projects Ready in FY 2019: Loop 1604 East (FM 78 to IH 10 East) Expansion to Expressway ~$80 M SH 16 (Bandera Road) Expansion/Operational Improvements ~$60 M Total projects to be ready for FY 2018/2019 ~$255 M** **Projects are anticipated to be ready at the timeframe noted above, however, this is not an indication of anticipated funding levels for the same timeframe 11

12 Additional Corridor Improvements Under Development Additional Non-Toll Projects (Ready FY 17-20): Loop 1604 North (Various Locations) Operational Improvements ~ $25 M IH 35 (FM 306 to Comal/Hayes CL) Operational Improvements ~ $50 M IH 10 East (IH 410 to LP 1604) Expansion to 6 Lanes + Interchange IH 410 ~$350 M US 90 (SH 211 to IH 410) Expansion to Expressway + Interchange Loop 1604 ~$100 M Wurzbach Parkway (@ US 281) Interchange Improvements ~ $80 M IH 410 SW (Culebra to US 90) Expansion to 8 &10 Lane Expway +Interchange US 90 and SH 151 ~$395 M IH 410 SW (US 90 to IH 35) Expansion to 6 & 8 Lane Expwy +Interchange IH 35 ~$400 M Total projects (this slide) ~$1,400 M 12

13 Project Readiness FY NON-TOLL PROJECTS Projects Ready in FY 2016: IH US 90 Interchange and Operational Improvements ~$70 M IH 10 East (Foster Road to FM 1516) Operational Improvements ~$50 M IH 10 East (FM 1516 to Graytown) Operational Improvements ~$18 M Projects Ready in FY 2017: SH 46 (Esser Road to Amman Road) Expansion to 4 Lanes ~$11 M Loop 337 (River Road to IH 35 South) Expansion to 4 Lanes ~$31 M IH 35 (FM 1103 to Loop 337) Operational Improvements ~$50 M Loop 1604 East (IH 35 to FM 78) Expansion to Expressway ~$40 M IH 10 West (FOR Pkwy to SH 46)Operational Improvements ~$70 M Loop 1604 North (Various Locations) Operational Improvements ~$25 M Projects Ready in FY 2018: SH 46 (Bulverde Rd to FM 3159) Expansion ~$40 M Loop 1604 South (US 90 to IH 35) Expansion to 4 Lanes ~$40 M Loop 1604 South (US 281 to FM 1303) Expansion to 4 Lanes ~$20 M Loop 1604 South (IH 10 E to FM 1346) Expansion to 4 Lanes ~$15 M IH 35 (FM 306 to Comal/Hayes CL) Operational Improvements ~$50 M IH 10 East (IH 410 to LP 1604) Expansion to 6 Lanes + Interchange IH 410 ~$350 M US 90 (SH 211 to IH 410) Expansion to Expressway + Interchange Loop 1604 ~$100 M Projects Ready in FY 2019: Loop 1604 East (FM 78 to IH 10 East) Expansion to Expressway ~$80 M SH 16 (Bandera Road) Expansion/Operational Improvements ~$60 M Projects Ready in FY 2020: Wurzbach Parkway (@ US 281) Interchange Improvements ~$80 M IH 410 SW (Culebra to US 90) Expansion to 8 &10 Lane Expwy +Interchange US 90 and SH 151 ~$395 M IH 410 SW (US 90 to IH 35) Expansion to 6 & 8 Lane Expwy +Interchange IH 35 ~$400 M Total ~$1,995 M TOLL PROJECTS Projects Ready in FY 2017: US 281 (LP1604 to Stone Oak Pkwy) ~$228 M IH 10 (LP 1604 to FM3351 & DC s) ~$200 M IH 35 (LP 410 S to FM 1103) ~$1500 M LP 1604 (SH16 to IH 35) ~$800 M Projects Ready in FY 2018: US 281 (Stone Oak to Co. Line) ~$304 M Projects Ready in FY 2019: SH 151 (Loop 1604 to IH 410) ~$150 M Total ~$3,182 M Projects are anticipated to be ready at the timeframe noted above, however, this is not an indication of anticipated funding levels for the same timeframe 13

14 Project Readiness FY

15 MAJOR PROJECT ENVIRONMENTAL CLEARANCE IH 35 US

16 $825 M Plan Update 16

17 MPO Approved Plan Scope & Original Estimated Costs US HWY 281 LP 1604 to County Line $458 Million Interstate 10 LP 1604 To Ralph Fair Rd. $180 Million 4 New tolled/managed lanes (2 lanes in each direction) Existing 4 lanes of non-tolled expressway (2 lanes in each direction) to remain Existing 4 lanes of frontage road (2 lanes in each direction) to remain Priority tolled/managed interchange at Loop [US 281 LP 1604 to Stone Oak Parkway - $228 M] New 4-lane non-tolled expressway (2 lanes each direction) Non-tolled northern interchange connectors at Loop additional tolled/managed lanes (1 each direction) Existing 4-6 lanes of frontage road (2-3 lanes in each direction) to remain [US 281 Stone Oak Parkway to County Line - $230 M] 4-New tolled/managed lanes (2 lanes each direction) Existing 4 lanes of frontage road (2 lanes in each direction) to remain LOOP 1604 LOOP LOOP TEXAS LOOP LOOP 1604 Culebra to US 90 $187 Million New 4-lane non-tolled expressway (2 lanes each direction) Existing 4-6 lanes of frontage road (2-3 lanes in each direction) to remain 2 Segments: From FM 471 (Culebra) to FM 1957 (Potranco) From FM 1957 (Potranco) to US LOOP

18 Project Updates US 281 Status & Changes from Current MPO Plan Status: 100% Schematic design Record of Decision on FEIS received July 2015 Investment Grade T&R study has been conducted by ARMA. Financial Analysis is currently underway Critical Path involves the development of and execution of a Project Development Agreement (PDA) with ARMA for Segment 1 (below). County and ARMA have executed resolutions of support for the splitting of the project into 2 segments Changes: Project is anticipated to be split into two phases. A TIP (AAMPO) revision will be necessary to enact this change. Loop 1604 to Stone Oak Parkway (Segment 1) Stone Oak Parkway to Borgfeld (Comal County Line) (Segment 2) New Recent Cost Estimate - $532 Million ($228 M Segment 1, $304 M Segment 2) Original cost estimate based on conceptual schematics and very preliminary ROW 18

19 Project Updates IH 10 Status & Changes from Current MPO Plan Status: 95% schematic design Environmental Assessment under development Environmental Clearance target Spring 2016 Public Meeting held May 19, in attendance Level 2 Traffic and Revenue study completed, financial analysis currently underway (TxDOT) Coordination/Development of Project Development Agreement (PDA) is still needed. These discussions will commence more earnestly once US 281 PDA is executed. Changes: Based on traffic operations and engineering analysis the number of proposed managed lanes to be added has changed from 2 lanes (one in each direction) to 4 Lanes (2 in each direction). A TIP (AAMPO) revision will be necessary due to this change. New Recent Cost Estimate (SPD) - $199 M Original cost estimates were based on conceptual work without engineering drawings. 19

20 Project Updates Loop 1604 Status & Changes from Current MPO Plan Status: Project Development on 2 Segments is proceeding as planned (Design/Bid/Build TxDOT) FM 471 (Culebra) to FM 1957 (Potranco) January 2016 Letting (Segment 1) FM 1957 (Potranco) to US 90 March 2016 Letting (Segment 2) Environmental Documents and PS&E are both under development with anticipated completions in Fall 2015 Funding agreements still needed (ATD funds and ARMA Vehicle Registration funds) Changes: Previously the commitment was Bexar County would issue the debt necessary to cover the ATD funds on both segments. Bexar County asked the ATD board to assist in this role. ATD would like to cover this commitment through a SIB loan with TxDOT (Not part of original SIB loan discussions). ATD board needs to setup a Local Government Corporation (LGC) in order to issue this debt. ATD/VIA staff are in discussions with Bexar County in order to setup this LGC as Bexar County has to take action to set up this corporation. 20

21 Project Development Critical Next Steps US 281 Segment 1 Execute Project Development Agreement (PDA) for US 281 Segment 1. Execute Agreement(s) with VIA/ATD for $100 M (ATD Funds) VIA/ATD planning to submit SIB loan application to cover these funds US 281 Segment 2 and IH 10 Consider funding options for gap funding AAMPO TIP Revisions on I-10 and US 281 LP 1604 Execute Agreement with Alamo RMA for $70 M (Vehicle Registration Funds) for LP 1604 Execute Agreement(s) with VIA/ATD for $100 M (ATD Funds) (same as above on US 281 Segment 1) 21

Alamo RMA VRF Project Update June 2016

Alamo RMA VRF Project Update June 2016 Alamo RMA VRF Project Update June 2016 Vehicle Registration Fee In 2013, the 83 rd Texas Legislature enacted HB 1198 amending Section 502.402 of the Texas Transportation Code authorizing certain counties

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2045 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Bexar Alamo

More information

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program Project Number Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AAMPO Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AAMPO Alamo Area Commute Solutions

More information

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon I-35 Corridor Segment Committee 4 3500 NW Loop 410 San Antonio, Texas February 11, 2010 9:00 AM to Noon Welcome Nancy Parker Facilitator Committee Work Session Nancy Parker Facilitator Discussion of Proposed

More information

"Mobility 2040" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2040 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Alamo Area

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project FM 471 PROJECT OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties January 24, 2018 Project Location 2 Proposed Improvements Improvements include: Expansion of FM 471 from

More information

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018 BOERNE/KENDALL COUNTY TRANSPORTATION FORUM March 22, 2018 Frontage Road Operational Improvements 2 Frontage Roads Under Construction Fair Oaks Pkwy to Dominion I-10 - Fair Oaks Pkwy to FM 3351 Scope: Convert

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

The Transportation Improvement Program

The Transportation Improvement Program Waco Metropolitan Planning Organization The Transportation Improvement Program Waco Urbanized Area For Fiscal Years 2015 Through 2018 Proposed Amendment 4 FY 2016 PHASE: E COUNTY: McLennan LIMITS FROM:

More information

I-10 AT SCENIC LOOP RD. Open House

I-10 AT SCENIC LOOP RD. Open House I-10 AT SCENIC LOOP RD Open House General Information I-10 At Scenic Loop Rd KENDALL COUNTY OPEN HOUSE June 30, 2015 Currey Creek Baptist Church 35 Cascade Cavern 5:00 7:00 Boerne, TX 78015 2 Public Meeting

More information

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS I- COMAL COUNTY OPERATIONAL IMPROVEMENTS OPEN HOUSE The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been,

More information

Public Hearing Tarrant County. October 11 th, 2012

Public Hearing Tarrant County. October 11 th, 2012 Public Hearing Tarrant County October 11 th, 2012 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the

More information

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,

More information

Performance-Based Planning for Safety in a Vision Zero World. AMPO September 27, 2018

Performance-Based Planning for Safety in a Vision Zero World. AMPO September 27, 2018 Performance-Based Planning for Safety in a Vision Zero World AMPO September 27, 2018 AAMPO study area today Kendall Comal 2 million residents 10,000 lane miles Bexar Guadalupe 50 million miles traveled

More information

SH 68. Meeting with Affected Property Owners September 9, 2014

SH 68. Meeting with Affected Property Owners September 9, 2014 SH 68 Meeting with Affected Property Owners September 9, 2014 SH 68 US 83/I-2 TO US 281/I-69C Meeting with Affected Property Owners (MAPO) September 9, 2014 Agenda Open Meeting with Affected Property Owners

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009. Value from &! M East HOU M East HOU M East HOU &! M East HOU &! M East HOU IH 45 0271-14-217 0271-14-218 0271-14-213 0271-14-228 0500-03-462 0500-03-550 0500-03-565 Reconstruct US /IH 610 IC. Construct

More information

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER 2013 14:19 Thursday, June 13, 2013 1 ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR 0034-01-124 US 83 C 34-1-124 5 3.2 P14BM $2,112,500 $3,721,952

More information

GENERAL DESCRIPTION. Page 1 of 5

GENERAL DESCRIPTION. Page 1 of 5 38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190

More information

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council I-25 PEL: CO Springs Denver South Connection Presentation to Castle Rock Town Council June 20, 2017 An Important Corridor to Colorado Links the state s two major metropolitan areas and communities between

More information

Report on the Elimination of Toll Roads. HB 2612, 84th Texas Legislature

Report on the Elimination of Toll Roads. HB 2612, 84th Texas Legislature Report on the Elimination of Toll Roads HB 2612, 84th Texas Legislature Provided to: Legislative Budget Board House Committee on Transportation Senate Committee on Transportation September 1, 2016 Contents

More information

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME.

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. 1 PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. - SANDRA GREEN, CITY SECRETARY FARMERSVILLE CITY COUNCIL MEETING February

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

7. Roadway System. Accomplishments Over the Past Five Years

7. Roadway System. Accomplishments Over the Past Five Years 7. Roadway System Accomplishments Over the Past Five Years Since the update of the Metropolitan Transportation Plan (MTP) in December 2009, several roadway-related developments have progressed. The Alamo

More information

connections 2040 the waco metropolitan transportation plan amendment 2

connections 2040 the waco metropolitan transportation plan amendment 2 connections 2040 the waco metropolitan transportation plan amendment 2 developed by the waco metropolitan planning organization in cooperation with the following agencies: Adopted December 14, 2017 amendment

More information

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011 SUPERSTREETS IN TEXAS ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011 1 Superstreet Corridor Location 2 3 US Highway 281 2007 Looking south above Evans Road, pm peak

More information

FM 471. Open House Public Meeting FM 471

FM 471. Open House Public Meeting FM 471 Open House Public Meeting November 12, 2014 FROM: LP 1604 TO: FM 3487 BEXAR COUNTY OPEN HOUSE PUBLIC MEETING November 12, 2014 H.B. Zachry Middle School 9410 Timber Pass 5:00 7:00 PM San Antonio, TX 78250

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

WALKABLE + BIKEABLE REGIONS TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP

WALKABLE + BIKEABLE REGIONS TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP WALKABLE + BIKEABLE REGIONS 2016 TxAPA Conference Alex Carroll Andrew Pompei, AICP Kelly Porter, AICP How Metropolitan Areas Plan for Walking and Biking Alex Carroll APA Texas Chapter Planning Conference

More information

Route 58 Corridor Development Fund

Route 58 Corridor Development Fund Corridor Development Fund Appropriation Act Item 448 B.3 (2016) Report to the Chairmen of the Committees on Senate Finance and House Appropriations Virginia Department of Transportation 1401 East Broad

More information

Gandy Connector: Travel Demand. Policy Committee August 2013

Gandy Connector: Travel Demand. Policy Committee August 2013 Gandy Connector: Travel Demand Policy Committee August 2013 What options to the Gandy Elevated Lanes exist? What are the current conditions? Who s using Gandy Blvd? What s currently planned? What s been

More information

BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM)

BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) NOTICE OF PUBLIC MEETING INTERSTATE HIGHWAY 30 (Rockwall) FROM: BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) 2642 CSJs: 0009-11-238; 0009-12-215; 0009-12-908 Dallas County and Rockwall County, Texas

More information

Charlotte Region Fast Lanes Study Phase III

Charlotte Region Fast Lanes Study Phase III Charlotte Region Fast Lanes Study Phase III Stakeholder Workshop #3 December 13, 2012 Fast Lanes Study, Phases I and II Performed between 2007 and 2009 Evaluated all types of managed lanes (HOV, HOT, truck-only

More information

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018 Turnpike Projects in Palm Beach County Palm Beach TPA Update September 20, 2018 Agenda Background Funded Projects Future Project Status Widenings Interchanges Express Lanes Phasing 2 Background 45 Miles

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

I-635 LBJ EAST PROJECT

I-635 LBJ EAST PROJECT 635 I-635 LBJ EAST PROJECT Transportation and Trinity River Project Committee 9 June 2014 TxDOT Dallas District Dallas County, Texas CSJ: 2374-01-137, 2374-02-053 Agenda I-635 LBJ East Project Overview

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities. Table of Contents 3.1. Interim vs. Ultimate Configuration for the Remaining Segments of NTE... 1 3.2. Characteristics of Project Segments... 3 3.2.1. All Segments... 5 3.2.2. Segment 2E... 8 3.2.3. Segment

More information

Sponsored By: Support From:

Sponsored By: Support From: Sponsored By: Support From: A voluntary association of local governments, H-GAC provides a regional forum for cooperative action. Created by Texas, role defined by State and local governments: Area Agency

More information

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS MOD TIP CODE 2008-274 12175.08, 12416.08, 12417.08, 12418.08, 12419.08, 12420.08, 12421.08, 12422.08 DENTON COUNTY TRANSPORTATION AUTHORITY (DCTA) - FY08 PROGRAM OF S - TRANSIT SECTION 5307 - URBANIZED

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Project Budget and Schedule Status

Project Budget and Schedule Status Program Management Project Budget and Schedule Status Highway Program Planning & Programming Committee February 20, 2013 Highway Program Project Schedules Project 2010 2011 2012 2013 2015 2016 2017 2018

More information

a 20 year period. separate phases of development with staggered years)

a 20 year period. separate phases of development with staggered years) Proposed: Approximately 2,000 acres located at along SH 130 at FM 973 Mixed Use project consisting of : Residential i Approximately 2,800 single family detached units Approximately 2,000 attached units

More information

US 69 RELIEF ROUTE STUDY

US 69 RELIEF ROUTE STUDY US 69 RELIEF ROUTE STUDY Jacksonville, Texas PUBLIC MEETING #2 May 29 th, 2018 Welcome to the public meeting for the US 69 Relief Route Study in Jacksonville. This is the second public meeting for this

More information

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22,

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22, Program Update Board of Directors Item 16 February 22, 2019 Relationship: RP, RTIP, Budget, POF 2019 2020 2025 2030 2035 2040 2045 2050 Contains ten-year capital program budget 2 Board of Directors Item

More information

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI) Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI) City of Fort Lauderdale ~ Commission Conference July 10, 2012 Page 1 of 15 A Multi-Agency

More information

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary November 14, 2005 Dulles To DC Loop Public-Private Partnership Proposal Executive Summary Virginia Mobility Associates LLC, a newly established single purpose entity, proposes to privately finance the

More information

section 8: recommendations

section 8: recommendations section 8: recommendations The Waco MPO has identified the following strategies in order to make progress towards the guiding principles identified in Section 3. Each of these strategies is constrained

More information

section 8: recommendations

section 8: recommendations section 8: recommendations The Waco MPO has identified the following strategies in order to make progress towards the guiding principles identified in Section 3. Each of these strategies is constrained

More information

Introduction...pg. 1. Study Area...pg. 1. Study Purpose and Need...pg. 2. Study Coordination and Development... pg. 3. Public Involvement...pg.

Introduction...pg. 1. Study Area...pg. 1. Study Purpose and Need...pg. 2. Study Coordination and Development... pg. 3. Public Involvement...pg. Table of Contents Introduction...pg. 1 Study Area...pg. 1 Study Purpose and Need...pg. 2 Study Coordination and Development... pg. 3 Public Involvement...pg. 4 Evaluation of Alternatives...pg. 4 Preferred

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004 Iowa Corridor Management Pilot Project Overview Recommendations For A Corridor Management Program August 2004 Presentation Overview Project goals Pilot project selection process Analysis results Segment

More information

Capital Beltway HOT Lanes - Frequently Asked Questions

Capital Beltway HOT Lanes - Frequently Asked Questions Capital Beltway HOT Lanes - Frequently Asked Questions December 20, 2007 1. What is the cost of the project? The fixed-price design-build cost is approximately $1.4 billion. 2. Why have the project costs

More information

Proposed Action, Purpose and Need Technical Memorandum

Proposed Action, Purpose and Need Technical Memorandum Proposed Action, Purpose and Need Technical Memorandum MoPac (State Loop 1) Intersections, Austin District From North of Slaughter Lane to South of La Crosse Avenue CSJ: 3136-01-015 Travis County, Texas

More information

Diamond Springs Parkway Project

Diamond Springs Parkway Project Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of

More information

Alternatives Public Workshop

Alternatives Public Workshop US 1 Express Lanes Project Development & Environment (PD&E) Study Alternatives Public Workshop August 2013 1 Today s Agenda Project Background and Overview Tier 1 Alternatives Development Tier 2 Decision-Making

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route

AASHTO Use Only Establishment of a U.S. (Interstate) Route IH 69 Action taken by SCOH: Extension of a U.S. (Interstate)Route American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of Texas for: Elimination of a U.S. (Interstate) Route AASHTO Use Only

More information

ACCELERATED CONSTRUCTION STRATEGIES. Selection and Impact

ACCELERATED CONSTRUCTION STRATEGIES. Selection and Impact ACCELERATED CONSTRUCTION STRATEGIES Selection and Impact Accelerated Construction Strategies Why Use Accelerated Construction Strategies? Reduce construction time Promote innovative construction strategies

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Florida Department of TRANSPORTATION 2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has currently

More information

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE 1 Florida Department of Transportation District Four I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE Presentation Outline Overview of Planning and Programming I-95 Interchange

More information

AGENDA. Regional Transportation Council Thursday, April 19, 2018 North Central Texas Council of Governments

AGENDA. Regional Transportation Council Thursday, April 19, 2018 North Central Texas Council of Governments AGENDA Regional Transportation Council Thursday, April 19, 2018 North Central Texas Council of Governments 1:00 pm Full RTC Business Agenda (NCTCOG Guest Secured Wireless Connection Password: rangers!)

More information

P E D E S T R I A N M O B I L I T Y A D V I S O R Y C O M M I T T E E

P E D E S T R I A N M O B I L I T Y A D V I S O R Y C O M M I T T E E Alamo Area MPO PEDESTRIAN MOBILITY ADVISORY COMMITTEE 2017 Annual Report Annual Report Robert Hanley, AIA, Chair American Institute of Architects Annette Prosterman, Vice Chair Alamo Area Council of Governments

More information

Uptown Houston November 2014

Uptown Houston November 2014 Uptown Houston November 2014 City of Houston Leads the Nation in Job Growth Leads the Nation in Exports Record Construction Permits - $ 8 Billion Most Competitive Metro in America - Forbes New Development

More information

Toll Express Lanes for the Research Triangle region Including discussion of possible applications on I-40

Toll Express Lanes for the Research Triangle region Including discussion of possible applications on I-40 Toll Express Lanes for the Research Triangle region Including discussion of possible applications on I-40 Presentation for discussion at Durham-Chapel Hill-Carrboro MPO TAC meeting Wednesday, December

More information

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19 BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19 Project Advisory Committee Meeting January 27, 2016 A JOINT EFFORT OF THE PINELLAS METROPOLITAN PLANNING

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Bicycle and Pedestrian Plans and Improvements

Bicycle and Pedestrian Plans and Improvements Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review

More information

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation

More information

Highway 1 Kamloops to Alberta Four-Laning Program

Highway 1 Kamloops to Alberta Four-Laning Program Highway 1 Kamloops to Alberta Four-Laning Program COMMUNITY ENGAGEMENT DISCUSSION GUIDE AND FEEDBACK FORM February 7 March 1, 2013 www.bchwy1.ca 1 FEEDBACK FORM INSIDE HOW INPUT WILL BE CONSIDERED FAST

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE APPROVED BY FHWA: JULY 2010 UPDATED: OCTOBER 2011 Section 1 Need for and Purpose of Proposed Action Per Council on Environmental Quality

More information

MnPASS System Today and the Future

MnPASS System Today and the Future MnPASS System Today and the Future April 2010 By Nick Thompson Minnesota Department of Transportation Topics Minnesota s Current and Future MnPASS High Occupancy Toll Systems Overview of the MnPASS System

More information

SECTION 8 - INDUSTRIAL PROPERTY AERIAL PHOTOGRAPH: RED OAK INDUSTRIAL PROPERTY INFRASTRUCTURE IMPROVEMENTS (~530 ACRES)

SECTION 8 - INDUSTRIAL PROPERTY AERIAL PHOTOGRAPH: RED OAK INDUSTRIAL PROPERTY INFRASTRUCTURE IMPROVEMENTS (~530 ACRES) TABLE OF CONTENTS SECTION 1 - SUPERIOR LOCATION MAP: STATE OF TEXAS - RED OAK LOCATION DEPICTED AERIAL PHOTOGRAPH: NORTH CENTRAL TEXAS REGION - RED OAK LOCATION DEPICTED MAP: COUNTY OF ELLIS - RED OAK

More information

DRAFT INVESTMENT CORRIDORS

DRAFT INVESTMENT CORRIDORS DRAFT INVESTMENT CORRIDORS Mode Studied ID CORRIDOR / ROADWAY FROM TO EXISTING CMTA ROUTES CORRIDOR TYPE PRIORITY STREET COMMUTER ELECTRIC EXPRESS LIGHT METRO RAPID RIGHT-OF-WAY PRESERVATION SHUTTLE STREETCAR

More information

Light Rail Proposal. June 13, 2016 Presentation for the Joint Sustainability Committee by the Central Austin Community Development Corporation

Light Rail Proposal. June 13, 2016 Presentation for the Joint Sustainability Committee by the Central Austin Community Development Corporation Light Rail Proposal June 13, 2016 Presentation for the Joint Sustainability Committee by the Central Austin Community Development Corporation High Capacity Transit in the Post-Election Period High Capacity

More information

RM 620 FEASIBILITY STUDY

RM 620 FEASIBILITY STUDY RM 620 FEASIBILITY STUDY Sections 5 & 6 December 7, 2015 STUDY PROCESS Study Purpose and Goals The RM 620 Feasibility Study was launched by the Texas Department of Transportation (TxDOT) to analyze transportation

More information

2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017

2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017 Florida Department of TRANSPORTATION 2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has

More information

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028 Collin 54005 2351 01 017 FM 2478 FM 1461 to US 380 Collin 54005.1 2351 02 014 FM 2478 Collin 55038 2679 03 015 FM 2514 FM 1461 to North of FM 1461 East of Lavon Parkway to North of Drain Drive Widen two

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Chapter Table of Contents THE 2017 HOUSTON BIKE PLAN 1-1 HOUSTON BIKEWAYS PROGRAM 1-2 HISTORY OF BICYCLE PLANNING IN HOUSTON 1-3 BICYCLE LEVEL OF COMFORT 1-3 EXISTING PLANS, PROGRAMS

More information

Maryland State Highway Mobility Report. Morteza Tadayon

Maryland State Highway Mobility Report. Morteza Tadayon Maryland State Highway Mobility Report Morteza Tadayon Background Mobility is a Key Performance Area (KPA) in the SHA Business Plan SHA adopts a performance based approach Monitors Highway System to identify

More information

Prepared for. Volume 2: Developing Vision Prepared by. Phase 2 Stakeholder Involvement Summary. with RJ RIVERA Associates, Inc.

Prepared for. Volume 2: Developing Vision Prepared by. Phase 2 Stakeholder Involvement Summary. with RJ RIVERA Associates, Inc. Volume 2: Developing Vision 2040 Phase 2 Stakeholder Involvement Summary November 2016 Prepared for Prepared by with RJ RIVERA Associates, Inc. Table of Contents Executive Summary... 1 Community Outreach...

More information

Safety Impacts: Presentation Overview

Safety Impacts: Presentation Overview Safety Impacts: Presentation Overview The #1 Theme How Access Management Improves Safety Conflict Points The Science of Access Management By Treatment Studies Themes for Texas Access Management Improve

More information

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS 2014 Peer Chacko, AICP, Assistant Director, City of Dallas Dallas Midtown: Strategic growth area Future transit node 2 Peterson Road Study Area Galleria

More information

TRANSPORT AT ION PLAN

TRANSPORT AT ION PLAN MPO for the Miami Urbanized Area TRANSPORT AT ION PLAN DRAFT SOUTH MPClED THE SOUTH AREA The South Area of analysis in Miami-Dade County covers the area to the south of Coral Reef Drivel152 nd Street to

More information

I-69 Corridor Program. Corridor Segment Committee 1 Meeting

I-69 Corridor Program. Corridor Segment Committee 1 Meeting I-69 Corridor Program Corridor Segment Committee Meeting MEMORANDUM OF MEETING SUBJECT: Corridor Segment Committee 1 Meeting DATE: February 19, 2010 LOCATION: Lufkin City Hall, Lufkin, Texas ATTENDING:

More information

WHAT CAN WE DO? SECTION 6

WHAT CAN WE DO? SECTION 6 WHAT CAN WE DO? SECTION 6 SATOMORROW MLTIMODAL TRANSPORTATION PLAN THE MLTIMODAL TRANSPORTATION PLAN What is a Multimodal Transportation Plan? The SA Tomorrow Multimodal Transportation Plan is the first

More information

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop ENERGY SECTOR ROADWAY REPAIR PROJECT August 15, 2013 Industry Workshop Safety Moment Sign-in Sheet Exit Locations Gathering Point Directions from Emergency Responders Signal to re-enter the Building or

More information

2016 MOBILITY BOND PROGRAM

2016 MOBILITY BOND PROGRAM February 22, 2017 2016 MOBILITY BOND PROGRAM $720 million bond proposition for transportation and mobility improvements including planning, designing, engineering, constructing, reconstructing, renovating

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Table of Contents SR-91 IMPLEMENTATION PLAN i

Table of Contents SR-91 IMPLEMENTATION PLAN i Table of Contents TABLE OF CONTENTS... I SECTION 1: 2011 STATUS REPORT AND UPDATE... 1 SECTION 2: IMPLEMENTATION PLAN... 8 BY YEAR 2016... 9 BY YEAR 2025... 16 BY YEAR 2035... 20 SECTION 3: COMPLETED PROJECT

More information

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

Mobility Greater Johnson County Transportation Coalition. May 23, 2018 Mobility 2045 Greater Johnson County Transportation Coalition May 23, 2018 Agenda Regional Perspective Mobility Planning Overview Mobility 2045 Draft Recommendations Financial Planning Overview Schedule

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

Reversible Elevated Express Lanes. A Solution for Urban Traffic Congestion

Reversible Elevated Express Lanes. A Solution for Urban Traffic Congestion Lee Roy Selmon Crosstown Expressway Reversible Elevated Express Lanes A Solution for Urban Traffic Congestion Martin Stone, Ph.D., AICP Director of Planning Tampa-Hillsborough Expressway Authority Pensacola

More information

ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY

ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY ENERGY CORRIDOR DISTRICT UNIFIED TRANSPORTATION PLAN ACHIEVE MOBILITY THROUGH ENERGY energycorridor The Energy Corridor A Thriving Business Community 4 Located along Interstate between Kirkwood and Barker

More information