DEVELOPMENT AND QUALIFICATION OF DEEPEST WATER POWER UMBILICAL

Size: px
Start display at page:

Download "DEVELOPMENT AND QUALIFICATION OF DEEPEST WATER POWER UMBILICAL"

Transcription

1 Clse and Return A th Internatinal Cnference n Insulated Pwer Cables A.7.5 DEVELOPMENT AND QUALIFICATION OF DEEPEST WATER POWER UMBILICAL Arild FIGENSCHOU, Jan Ole DUNSERUD, Aker Slutins, (Nrway), arild.figenschu@akerslutins.cm, jan.le.dunserud@akerslutins.cm Daniel ISUS, Grup General Cable Sistemas S.A., (Spain), disus@generalcable.es Emmanuel BIC, Silec Cable, (France), emmanuel.bic@sileccable.cm ABSTRACT This paper describes the wrld s first umbilical system t deliver substantial pwer at 2700m water depth. The system is develped t deliver pwer t subsea pumps thrugh a dynamic pwer cable hanging frm a mred turret buy in a catenary installatin dwn t the seabed. Attentin is fcused n the develpment, design and qualificatin f the umbilical and its main cmpnents, the pwer cables, perfrmed in clse cperatin between the different cmpanies invlved. KEYWORDS Pwer umbilical, dynamic, submarine, deep water, bsting, pumps INTRODUCTION As the il and gas industry lks fr ways t keep pace with the grwing wrldwide demand fr il, subsea develpments are mving int ever increasing water depths and peratrs are lking twards subsea bsting technlgy as a means f getting the mst ut f their reservirs. The pwer distributin umbilicals, which are needed t supply electrical pwer t the subsea bsting pumps, will be challenged by mre extreme tensin lads due t the deeper waters. This paper presents a technical descriptin f a pwer umbilical t be installed in the area f the central Gulf f Mexic at 2700m water depth; the first f its kind t transmit pwer ver this depth sufficient t pwer subsea bsting pumps. The requirements f the pwer umbilical system required a transmissin f 1.7MVA including tw three-phase supplies and a spare three-phase circuit; therefre, a ttal f nine cables, rated 12/20 kv with a cnductr crss-sectinal area f 150mm 2 each. In additin, due t the lng length f the umbilical cable, including dynamic (that part f the umbilical suspended in water) and static (that part f the umbilical laying n the seabed) sectins, 2 sets f splices were included in static sectin. Attentin is fcused n the develpment and design principles f the umbilical and its main cmpnents, presenting the challenges encuntered, which t date are unique. Als, a thrugh qualificatin prgram is described that has verified the umbilical s ability t survive the rigurs f installatin and peratinal life at the mst extreme cnditins. ULTRA DEEPWATER CHALLENGES The traditinal way t limit the strain in umbilicals is t increase the axial stiffness by adding steel armuring. But fr very deep water applicatins, steel as armuring material des nt wrk efficiently t reduce the strain f an umbilical. If a structural member suspended frm a tp pint is hanging vertically and expsed t its gravity lad nly, the strain clse t the hang-ff pint is prprtinal t the free hanging length and density, but the ppsite applies in relatin t its stiffness. Therefre materials used fr stiffness enhancement lse effectiveness as the water depth grws. At a certain water depth the added weight frm steel armuring increases the strain rather than reducing it. This has made the industry lk fr light but still stiff material fr umbilical stiffness enhancement. As a result f many years f develpment and testing, a carbn fibre rd reinfrced umbilical system has been develped and patented. The carbn fibre rds, which are bundled int the umbilical alngside the ther elements in the umbilical, have abut the same stiffness but nly ne fifth f the density cmpared t steel. This change has eliminated all practical water depth limitatins in terms f strain and stress induced by the gravity lads, and has been used in a number f steel tube umbilicals ver the last several years. The cntrl f strain is particularly imprtant fr high and medium vltage electrical pwer umbilicals. A typical safe lng-term strain limitatin f pwer cables is in the range f 0.15%; this can easily be achieved fr dynamic pwer umbilicals using the carbn fibre rd system. Furthermre, by use f a special hang-ff system described belw (Umbilical mechanical prperties), the cables are free flating in the dynamic bending zne, thus aviding any uncntrlled lads upn the cables in the zne and limiting the strain t that caused by bending nly. Cmparisn f carbn fibre rds vs. steel as armuring material In shallw waters in cmbinatin with a harsh envirnment a high weight t diameter rati is required fr the dynamic umbilicals in rder t perfrm well. This is nt the case fr pwer umbilicals in deep waters. Instead, the primary cncern is t reduce the glbal strain f the umbilical system. The cntrl f glbal strain f an umbilical in deep waters may be achieved by tw methds: reductin f the underwater weight, and/r by increasing the axial stiffness f the umbilical. The fllwing example prvides a cmparisn f steel versus carbn fibre rds as a stiffness enhancement system fr an umbilical: The density f steel is 7850kg/m 3 in air cmpared t 1600kg/m3 fr carbn fibre reinfrced vinylester rds. The stiffness mdulus f steel is MPa cmpared t MPa f a cmpsite carbn fibre reinfrced rd. As the strain is prprtinal t the weight and the inverse applies t the stiffness, reducing strain by the use f

2 Clse and Return A th Internatinal Cnference n Insulated Pwer Cables A.7.5 carbn fibre rds is much mre efficient than using steel. By cmparing the Yung s mdulus t the density fr steel and fr carbn fibre rds, the factr is 8.9, (density f sea water is set t 1025kg/m 3 ): Steel: Carbn fibre rds: Rati f stiffness enhancement efficiency: Wrking example: The fllwing is a cmparisn f a steel reinfrced pwer umbilical t a carbn fibre rd reinfrced pwer umbilical. In this example the calculatin is based n a pwer umbilical with six medium vltage pwer cables, six ½ and ne ¾ steel tube service lines and tw standard signal cables. The stiffness cntributin frm the pwer cables is disregarded due t thermal expansin and creep, thus the pwer cables shuld nt be cnsidered as strength members in peratin. The diagram gives the glbal strain f the umbilical systems as a functin f the amunt f armuring in mm 2, in the crss-sectin f the umbilicals. deepwater umbilicals. POWER UMBILICAL DESIGN The umbilical design is based upn the bundling f the internal elements in a gradual spiral alng the length f the umbilical. The angles f the spiral relative t the centre line f the umbilical range between ne and three degrees nly. This gradual spiral prvides several advantages, such as lw rtatinal frces, and a high capacity t withstand axial cmpressin frces f the umbilical. The internals f the umbilical are held in place and separated by stiff plastic spacers that run alng the length f the umbilical. The spacers are shaped such that when bundled tgether they frm internal lngitudinal vids r cnduits thrugh which the umbilical elements pass. Each cnduit is exactly dimensined t suit the internal elements such as a tube r cable that it will cntain, with an all-rund gap f apprximately 1mm. This prvides the free mvement within the umbilical during handling, and allws the umbilical t be spled and reeled t the respective bending limits f flexibility f the internal elements. The use f plastic spacers als prvides benefits in the distributin f frces thrughut the crss-sectin f the umbilical when it is subjected t high squeeze pressures. Such a benefit is especially advantageus fr deep water installatin, as it helps prevent the caterpillar grip pressures frm causing damage t the umbilical internals. Anther imprtant feature f the umbilical with bundled elements in gradual spiral alng the length f the umbilical is the imprved fatigue life due t lw frictin between the cmpnents. In Figure 2 the crss-sectin f the present umbilical is shwn, including a triad frmatin f three-phase circuits with a ttal f nine cables rated 12/20 kv with a cnductr crss-sectinal area f 150 mm² each. Fig. 1: Umbilical strain versus steel r carbn rd armuring in case f 3,000m water depth The design limit f cpper cnductrs is nrmally in the range f 0.15% strain. As shwn in the graph abve, this can easily be achieved by reinfrcing with carbn fibre rds t achieve glbal strain f 0.15% by including 2750 mm 2 f rds in the example crss-sectin. This crrespnds t abut 83 carbn fibre rds f 6.5mm diameter. The rds can easily be integrated in the crsssectin withut changing the glbal diameter f the umbilical and withut any serius weight impact. T achieve the same glbal strain limit by use f steel reinfrcement it takes in excess f 15000mm 2 f steel t reach a glbal strain f 0.15%. This result is due t the added weight frm the steel. As a further illustratin, if a single steel member is hung free frm the surface 3000 meters vertical int sea water the strain is 0.1% by nly suspending its wn weight. It is therefre clear that steel is nt a suitable material fr reinfrcement f ultra Fig. 2: Pwer umbilical crss-sectin (dynamic sectin sme rds are replaced with plastic fillers in the static sectin)

3 Clse and Return A th Internatinal Cnference n Insulated Pwer Cables A.7.5 cmbinatin f material creep and temperature effects (expansin and cntractin) in the cpper cres makes the evaluatin f the fatigue life very uncertain. Table 1: Table f pwer umbilical cmpnents in Fig. 2 Umbilical electrical prperties There is n transfrmatin f the vltage, s with a mtr vltage f 4.4kV, it is necessary t have an utput vltage frm the variable speed drive f 6.1kV t btain the rated vltage fr the mtr. This crrespnds t a vltage drp f 28% and reduces the air gap trque. This and the vltage increase due t lad reductin were fund t be acceptable fr the peratin. The magnetic field set up by the lad current will induce currents and vltages in nearby cnductive elements. The induced current in the grunded elements such as screens, steel weight elements and carbn fibre rds gives additinal lsses that can be handled by thermal analysis t check if any elements are verheated. The vltage induced int the cres within the same circuit and int the neighburing circuit is mre cmplicated because it affects the peratin f the pump mtr. This negative effect can be cancelled by twisting the circuits within the crss-sectin. That methd wuld increase the required number f splices and the cst dramatically and was rejected. Anther slutin is t have the 3 circuits in different layers with ppsite twisting directin. This wuld increase the uter diameter significantly and a large number f weight elements wuld be required t maintain the weight t diameter rati needed. It was therefre decided t keep the mst efficient design and study mre clsely what impact the induced vltage wuld have n the peratin f the mtr. By use f a Finite Element methd it was fund that the negative sequence vltage was less than 1%. This is acceptable accrding t IEC withut de-rating the mtr. T minimize the fatigue f the cables in the dynamic bending zne, a cncept was develped with the electrical pwer cables free flating in the dynamic bending zne, thus aviding any uncntrlled lads upn the cables in the zne. The carbn fibre rds are anchred at the tp hang-ff, but the electrical cables run thrugh the hang-ff withut any cnstraint and are therefre free t expand and cntract. Instead f a tpside cable terminatin, the cables are hung-ff inside the umbilical with a sft clamp system. This system is basically a vulcanized rubber sheath that is applied t the utside f the cable ver a length f ten metres, increasing the uter diameter and prviding frictin against the inside f the cable cnduit in the umbilical, withut creating a hard pint between the surfaces. This is lcated sme 15 t 20 metres belw the bend stiffener, and becmes the hang-ff pint f the pwer cables. Frm this pint and up thrugh the dynamic bending zne, the cables are free t expand thermally, and are expsed t bending nly, and therefre the frces upn the electrical cables becme highly predictable. Descending belw the hang-ff pint, the pwer cables are secured by frictinal pints in a special pattern ver a length f 2 metres at intervals f 50 metres t cunteract any lng-term creep/defrmatin f the cpper cres. This system prtects the electrical cables frm strain hardening and fatigue failure in the dynamic sectin. Pwer cable design The maximum current required by the pumps was in the rder f 225 A. Due t the length f 22.7 km f ne f the umbilicals and the cnsequent vltage drp, the supply at the hst was at 6 kv apprximately t achieve a vltage required by the mtr terminals f 4.4 kv. These requirements were btained by using a cable with a cnductr crss-sectinal area f 150 mm² and, whereas an insulatin rating f 6/10 kv wuld have been sufficient, 12/20 kv rating was used t achieve a much lwer electrical stress and cnsequently a greater safety factr. A drawing f the pwer cable is shwn in Figure 3. The induced vltage frm the neighburing circuit als causes a variatin in the air gap trque when the pwer frequencies are different. The impact f this was als studied and it was cncluded that the amplitude f the air gap trques was maximum 2.8% and was acceptable because it was within a frequency range that was nt critical fr the peratin. Thermal analysis was als perfrmed t visualize the temperature distributin in the crss-sectin. One f the 3 circuits was spare and it was interesting t knw the temperature difference between the elements as an input t the mechanical analysis. Umbilical mechanical prperties One f the main challenges f designing a safe and reliable high pwer dynamic umbilical fr deep water applicatin is t cntrl the frces and strain in the cpper cres f the cables. The material prperties f cpper make it difficult t predict the frces ver time as the Fig. 3: Pwer cable drawing

4 Clse and Return A th Internatinal Cnference n Insulated Pwer Cables A.7.5 Item Descriptin 1 Cnductr 2 Cnductr screen 3 XLPE Insulatin 4 Insulatin screen (nn metallic) 5 Cpper wires screen 6 Outer sheath Table 2: Table f pwer cable cmpnents in Fig. 3 The cnductr was a multi-stranded Class 2 type design accrding t IEC While fllwing the requirements f the mentined standard, several design parameters can be adapted in rder t achieve the required final cnductr mechanical prperties. Hence, after a prttyping and trial testing prcess, it was f great imprtance t well define and cntrl the material type and the drawing, annealing, stranding and cmpacting prcesses. Electrlytic Tugh Pitch (ETP) was used and every layer f wires was semi-cmpacted; in additin, n single wire weld, due t pssible factry lgistic limitatins r breaks during prductin, was allwed during the whle cnductr lengths manufacturing prcess. The final bjective was t btain prper cnductr behaviur under all expected lads taken during the installatin prcess and peratinal life, while als assuring the cnstant prperties f it in the whle manufactured length. The insulatin system was cnstituted f a semicnductive cnductr screen, Crss-Linked Plyethylene (XLPE) and a semicnductive insulatin screen. The three layers were extruded at the same time by means f a triple extrusin head and the curing and cling prcesses were perfrmed in a dry nitrgen catenary line. Bth semicnductive layer thicknesses were increased cmpared with a standard MV cable design t avid any pssible insulatin damage caused by a cnductr r screen cpper wire embedding int thse layers during the dynamic related mvements. The metallic screen was cnstituted f 60 cpper wires laid up nt the uter semicnductive layer with a ttal crss-sectinal area f 16 mm². This screen design was chsen after several trials, mainly taking int cnsideratin the prper behaviur under bending fatigue and the shear lad capacity between the insulatin system and the uter jacket; this last prperty being crucial in the verall transfer f the cpper cnductr lad thrugh all cable layers t the external umbilical strength members (carbn fibre rds). Other types f screens, including a cpper tape helicidally applied, were tested with unsuccessful results. A High Density Plyethylene (HDPE) uter sheath was applied nt the metallic screen t prtect it mechanically as well as t minimize the water diffusin t the insulatin. strength members were playing an essential rle, limiting mechanical wrking cnditins f pwer cable, the umbilical design was adapted accrding t the pwer cable characteristics established thrugh testing. Subsequently, when pwer cable wrking cnditin limitatins were determined and impsed by the final umbilical strength members design, the secnd imprtant gal was t verify the characteristic cable peratin at thse expected critical wrking cnditins (with an extra safety margin) by means f mechanical testing fllwed by electrical testing. Testing sequences T verify the electrical suitability f the pwer cable during and after the applicatin f an external pressure f 1.5 times the equivalent t the maximum installatin water depth, the fllwing test sequence was made n ne cable sample: Hyperbaric Test at 410 bars fr 24 hurs; applying vltage n the sample while pressurized. Partial Discharge Test accrding t IEC Impulse Vltage Test accrding t IEC Vltage Test accrding t IEC Visual Inspectin (dissectin). The pwer cable stress-strain curve under axial tensile lad was btained fr infrmatin by means f tensile testing. Eventually, multiple samples frm multiple manufacturing batches were tested t find any variatin in batches, using the mst cnservative results t fine-tune the umbilical calculatins. T verify the electrical suitability f the pwer cable after the applicatin f the maximum wrking tensile lad (with an extra safety margin), the fllwing test sequence was made n anther cable sample: Tensile Test up t 0.3% elngatin. Partial Discharge Test accrding t IEC Impulse Vltage Test accrding t IEC Vltage Test accrding t IEC The pwer cable prperties under axial cmpressin lad were als measured. QUALIFICATION TESTING Pwer cable qualificatin testing Due t the specific particularities f the prject (deepness, dynamic behaviur, sea water envirnment ), a specific qualificatin testing plan was designed t simulate the mechanical and electrical cnditins f the applicatin during bth peratin and installatin f the cable. The first imprtant gal f the defined testing sequences was t cllect the mechanical prperties f the cable bth under axial tensile and cmpressin lads. As umbilical Fig. 3: Axial cmpressin testing rig at TECNALIA- Labein

5 Clse and Return A th Internatinal Cnference n Insulated Pwer Cables A.7.5 T verify the electrical suitability f the pwer cable after the applicatin f the maximum wrking cmpressin value (with an extra safety margin) experienced in sme cases due t temperature differences inside the umbilical, the fllwing test sequence was made: Axial cmpressin test up t 0.2% cmpressin strain. Partial Discharge Test accrding t IEC Impulse Vltage Test accrding t IEC Vltage Test accrding t IEC T determine the pwer cable creep behaviur during the peratin f the dynamic umbilical length at bth maximum wrking axial tensile and cmpressin lads and at maximum expected wrking temperature (50ºC), tw creep tests were dne with a ttal duratin f 720 hurs each. See the cnstructed testing rig in Figure 4. Bend testing Lw cycle fatigue testing under tensin t simulate wrst case installatin lads (perfrmed n a similar cable splice fr anther pwer umbilical prject) Electrical testing accrding t IEC Dissectin Umbilical qualificatin testing In additin t standard umbilical testing as defined in ISO , a sample f the cmpleted umbilical was subjected t rigrus mechanical testing. The fllwing tests were perfrmed: Flex fatigue test The purpse f the test was t verify that the umbilical and its bend stiffener wuld prvide sufficient flex fatigue life fr use in a prductin envirnment where the umbilicals are suspended frm a flating platfrm An umbilical sample cmplete with tpside terminatin and bend stiffener and subject t peratinal lads distributed t the varius strength members (see figure 5) survived the flex fatigue test prgram withut mechanical r electrical faults. It fully cmplied with the requirements f Sectin f ISO/FDIS Standard : N tensin lad was applied t the pwer cables, as the hang-ff system described abve under Umbilical mechanical prperties avids any tensin in the cables in the dynamic bending zne. Fig. 4: Axial tensile and cmpressin creep testing rigs at TECNALIA-Labein In additin, the pwer cable was subjected t a cmplete Type Testing accrding t IEC Splice qualificatin testing Ensuring that the cable splices in the static sectin f the umbilical wuld survive the installatin frces at 2700m water depth withut unduly influencing the umbilical design r functin, and withut impsing special installatin requirements was a particular challenge. A prprietary splicing methd was specially develped and qualified fr this applicatin, meeting the gals abve. Qualificatin testing included: Fig. 5: Flex fatigue test setup at TMT Labratries Pull test The purpse f this prprietary test was t determine the frictin capacity f the sft clamp design f the umbilical. Displacement f individual umbilical cmpnents including the pwer cables was measured during pulling t verify that the sft clamp system perfrmed as expected. Tensile testing at the lad crrespnding t the frce induced in the unspliced cable by the glbal strain in the static sectin f the umbilical during installatin, plus a 50% safety factr Hyperbaric testing under nminal vltage

6 Clse and Return A th Internatinal Cnference n Insulated Pwer Cables A.7.5 Fig. 6: Pull test setup at TMT Labratries shwing displacement transducers attached t umbilical cmpnents Additinal testing was perfrmed n a ne meter sample f umbilical, where the sft clamp was applied t all elements and weight was applied t each element, pulling against the plastic prfiles (see Figure 7). This prvided a mre thrugh verificatin f the creep behavir in the sft clamp system, shwing that the extraplated creep ver time was well within the acceptable range fr the system. Figure 7: Creep test rig fr sft clamp system Electrical final acceptance testing (FAT) The cmpleted pwer umbilicals, ne f 22,7km and the ther f 5,6km, each spled t an utdr carusel, were subjected t DC resistance, TDR and HV testing as part f the umbilical final acceptance testing. SUMMARY The unique pwer umbilical design described here cmbines field prven technlgies with new slutins specifically develped in clse cperatin with the invlved cmpanies fr ultra deepwater pwer cable applicatins. This has resulted in the successful qualificatin and manufacturing f the wrld s first umbilical system t deliver substantial pwer at 2700m water depths. The key technlgies enabling this achievement as described here are: Carbn Fibre Rds Sft Clamp system Cable design Splicing Limit glbal strain f the umbilical, including the pwer cables Overcme the limitatins f steel armuring in deep water, allwing fr ptential dynamic applicatins dwn t much greater water depths than therwise practical Eliminate the need fr armuring in the individual pwer cables Prvides a hang-ff pint fr the pwer cables belw the dynamic bending zne, allwing fr free thermal expansin f the cables in the httest area f the umbilical system, and minimizing fatigue in the cables by eliminating the axial lad in the dynamic bending zne Cunteracts the effects f creep n the cables in the full dynamic sectin dwn t the seabed by ensuring sufficient frictinal cntact with the cnduits frmed by the plastic prfiles, effectively transferring frces t the strength members Careful design f the individual pwer cables ensures sufficient shear lad capacity thrughut the layers and int the umbilical Careful design f the cnductr, semicnductive layers and metallic screen ensures prper behaviur under bending fatigue The specially develped static cable splice allws fr safe installatin withut impacting the umbilical design r placing limitatins n the installatin parameters

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work Field Instructin 5.2 Ples Inspectin and Supprt Prir t Cmmencement f Wrk Purpse This instructin utlines the minimum inspectin and supprting requirements fr wrk n ples. Safety Befre cmmencement f wrk, a

More information

Let s go through the mechanics of air resistance that way we can understand why an aero helmet may be a good option for someone.

Let s go through the mechanics of air resistance that way we can understand why an aero helmet may be a good option for someone. Shuld I wear an aer helmet? This is a great questin and ne n hand, the answer is easy: Yes, buy any equipment that will reduce air resistance during cycling. On the ther hand, the answer is mre cmplicated

More information

Users Requirements Statement

Users Requirements Statement Mnday, March 29, 2004 http://www.prjectdevelper.cm Cntents Agreement s Purpse... 2 Applicatin s Descriptin... 2 Applicatin s Input/Output Summary... 4 Business Rules... 8 Applicatin Develpment Cmpletin

More information

Cantilever Beam Bending of Soft Tissue

Cantilever Beam Bending of Soft Tissue Cantilever Beam Bending f Sft Tissue Intrductin Cantilever beam bending is a methd used t determine the mechanical prperties f a material. It is used because it is relatively inexpensive t perfrm and gives

More information

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019 Athletic Australia Selectin Plicy 2019 Wrld Crss Cuntry Champinships ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019 This dcument sets ut the basis

More information

HUS 6 HUS-S 6. Autoclaved aerated concrete. Description Authority / Laboratory No. / date of issue. IBMB, Braunschweig DIBt, Berlin

HUS 6 HUS-S 6. Autoclaved aerated concrete. Description Authority / Laboratory No. / date of issue. IBMB, Braunschweig DIBt, Berlin Screw anchr HUS 6 / HUS-S 6 Screw anchr Anchr versin Benefits HUS 6 HUS-S 6 Carbn steel Cncrete Screw - Quick and easy setting - Lw expansin frces in base materials - Thrugh fastening - Remvable Cncrete

More information

Europak ExeFlexx Variable Speed Booster Sets WRAS Approved Product (Approval Number )

Europak ExeFlexx Variable Speed Booster Sets WRAS Approved Product (Approval Number ) Eurpak ExeFlexx Variable Speed Bster Sets WRAS Apprved Prduct (Apprval Number 1312078) Upt 6 pumps n a single package as standard, custm build sets available Upt 480 m³/hr as standard Main Benefits: Delivered

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins 2. Specificatins and main dimensins 3. Parts included 4. Cntrl bx 5. Installatin 6. Adjusting the strke length f the lift 7. Operatin mdes

More information

DOG AGILITY MASTERS TEAM 2012 Tournament Rules

DOG AGILITY MASTERS TEAM 2012 Tournament Rules DOG AGILITY MASTERS TEAM 2012 Turnament Rules Descriptin: This turnament series is pen t all cmpetitrs with any dg, regardless f cmpetitin level (i.e., starters, advanced and masters). A team may be cmprised

More information

IRATA Safety Bulletin No. 45

IRATA Safety Bulletin No. 45 Page 1 f 7 A safety bulletin prepared by Internatinal (2017) SAFETY BULLETIN NO. 45: FALL FROM HEIGHT: AID CLIMBING A safety bulletin aimed at raising awareness f hazards in the rpe access industry. The

More information

Field Instruction. Covers laid for mechanical protection of cables must always be removed by hand.

Field Instruction. Covers laid for mechanical protection of cables must always be removed by hand. 6.9 Undergrund Cables Purpse This instructin utlines the safe apprach distances (SADs) that must be maintained and the wrking requirements fr undergrund cables. Scpe This instructin utlining the safe apprach

More information

URGENT MEDICAL DEVICE RECALL : /29/ C Z

URGENT MEDICAL DEVICE RECALL : /29/ C Z Custmer Cde Number: ##### Custmer Address City, State, Zip Cuntry Attentin: Risk Management Attentin: Reference: URGENT MEDICAL DEVICE RECALL March 09, 2012 Risk Management, Operating Rm Directr, Operating

More information

MODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations:

MODELS. 2 & 4 Versions. SUITABLE FOR WET LOCATIONS in the following locations or unclassified locations: INSTALLATION AND MAINTENANCE MANUAL Explsin Prf Lw Prfile Linear LED Light EPL-24-50LED Series MODELS 2 & 4 Versins SUITABLE FOR WET LOCATIONS in the fllwing lcatins r unclassified lcatins: Fr Use In:

More information

2016 AWWA/WEA Spring Conference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016

2016 AWWA/WEA Spring Conference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016 2016 AWWA/WEA Spring Cnference ACTUATORS AND VALVE TECHNOLOGY/ ACTUATOR SIZING SCOTT J. OLIVER CAROTEK, INC. APRIL 2016 Gal Discuss in detail the art f actuatrs retrfits fr the Water/Wastewater market

More information

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents Installatin Manual fr VersaScreen Pr and VersaScreen IceBlaster Gutter Prtectin Prducts Table f Cntents VersaScreen/VersaScreen Pr Installatin p. 2-4 VersaScreen IceBlaster p. 5-7 IceBlaster RE p. 5-6

More information

Equipment Strategy For Earthing Transformers Strategy

Equipment Strategy For Earthing Transformers Strategy ASM-STR-A683657 Versin: 2.0 Equipment Strategy Fr Earthing Transfrmers Strategy Equipment Strategy Fr Earthing Transfrmers Strategy Current versin: 28/06/2018 EXTERNAL USE Page 1 f 8 Next revisin due:

More information

Come Back to Ground! 1. Introduction

Come Back to Ground! 1. Introduction Cme Back t Grund! 1. Intrductin Many ships, particularly small tugs and supply bats have used a neutral grunded distributin system fr 120 vlt single phase htel and dmestic lads. This system is identical

More information

CITY OF SACRAMENTO. Regulatory Compliance Program

CITY OF SACRAMENTO. Regulatory Compliance Program CITY OF SACRAMENTO Regulatry Cmpliance Prgram Tpic: Ergnmics Prgram Effective Date: 05/19/09 Frm: T: Human Resurces Department Risk Management Divisin Department Directrs/Divisin Managers Supersedes: 03/03

More information

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad.

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad. Selectin Plicy fr Badmintn Australia Supprt Structure (BASS) and Natinal Squad. Prgram Outline The main purpse f the Badmintn Australia s (BA) High Perfrmance (HP) prgram is t achieve internatinal success.

More information

Gema s OptiColor System

Gema s OptiColor System Gema s OptiClr System The Gema OptiClr system is a simple, lw cst quick clr change slutin fr manual gun users that have multiple hppers set up t spray varius clrs. The OptiClr Manifld allws the user t

More information

Weather Balloon Altitude Control System. Tim Basta, Trevor Clark, Scott Miller Date: 9/15/2014

Weather Balloon Altitude Control System. Tim Basta, Trevor Clark, Scott Miller Date: 9/15/2014 Dcument: Functinal Analysis Prject: Weather Balln Altitude Cntrl System Submitted t: Hngwei Ga Submitted by: Tim Basta, Trevr Clark, Sctt Miller Date: 9/15/2014 Intrductin The fllwing functinal specificatin

More information

Training Teams and Selection Criteria:

Training Teams and Selection Criteria: January 17, 2019 Biathln Canada 2019-2020 Training Selectin Criteria Intrductin: The purpse f this dcument is t define the selectin criteria fr athletes t be selected fr a Training. A Training is a grup

More information

Crusader Senior Girls Summer Workout Program:

Crusader Senior Girls Summer Workout Program: Crusader Senir Girls Summer Wrkut Prgram: #1 Ball Handling: It desn t matter whether yu are a pint guard, pwer frward, center, r shting guard yu must have excellent ball handling skills. Develping gd ball

More information

!! 1st/ 2nd Grade. 3rd Grade

!! 1st/ 2nd Grade. 3rd Grade !! 1st/ 2nd Grade 3rd Grade This is an intrductry prgram. Players are put n teams based n request, their schl r prximity t ther players. At this level caches simply wrk with the players n fundamental skills

More information

GOLDEN VALLEY ELECTRIC ASSOCIATION

GOLDEN VALLEY ELECTRIC ASSOCIATION January 7, 21 GOLDEN VALLEY ELECTRIC ASSOCIATION 27-28 Eva Creek ind Data Tw inute ean ind Speed Analysis Revisin PROJECT NUBER: 11738 PROJECT CONTACT: IKE ALBERT, PE EAIL: ALBERT@POERENG.CO PHONE: 28-788-37

More information

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work. Field Instructin 10.3 Specialised Insulated Plant fr Vegetatin Management Purpse This instructin utlines the minimum requirements and safe apprach distances (SADs) fr specialised insulated plant peratrs

More information

CONCRETE CARBONATION IN ARID CLIMATE

CONCRETE CARBONATION IN ARID CLIMATE CONCRETE CARBONATION IN ARID CLIMATE H. AI-Khaiat*, Kuwait University, Kuwait M. N. Haque, Kuwait University, Kuwait N. Fattuhi, England 29th Cnference n OUR WORLD IN CONCRETE & STRUCTURES: 25-26 August

More information

MYSL Cup Overview. The Michigan Youth Soccer League (MYSL) will administer and govern the MYSL Cup.

MYSL Cup Overview. The Michigan Youth Soccer League (MYSL) will administer and govern the MYSL Cup. MYSL Cup Overview MYSL CUP Overview 2018 The MYSL Cup is a tw-year intra-league cmpetitin that begins each fall fr MYSL - registered U11 teams and cncludes fr thse teams in their U12 Spring seasn. The

More information

Lab rotation on vacuum techniques and thermal imaging

Lab rotation on vacuum techniques and thermal imaging Lab rtatin n vacuum techniques and thermal imaging Objectives Manually perate a high vacuum system thrugh pump dwn and vent rutines. Learn apprpriate vacuum system terminlgy rughing, backing, freline,

More information

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field COLORS Object: Successfully run yur chice f ne f the tw ver-lapping mini-agility curses n the same field Scring: All bstacles must be perfrmed successfully t qualify unless within the faults allwed Levels

More information

Plain Language Summary

Plain Language Summary Pennsylvania Envirnmental Quality Bard New Regulatins fr Oil and Gas Well Casing and Cementing (Amendments t Chapter 78) Plain Language Summary In this dcument, the wrds rules and regulatins have the same

More information

The information in this document supersedes the Pairs Skating Calling Clarifications for Juvenile, Intermediate and Novice.

The information in this document supersedes the Pairs Skating Calling Clarifications for Juvenile, Intermediate and Novice. 2018-19 Pairs Skating Calling Clarificatins fr Juvenile, Intermediate and Nvice The infrmatin in this dcument supersedes the 2017-18 Pairs Skating Calling Clarificatins fr Juvenile, Intermediate and Nvice.

More information

Autoclear Superior 250

Autoclear Superior 250 Nrth America Technical Data Sheet S1.05.22 Descriptin A tw cmpnent VOC cmpliant clearcat, designed fr use ver Autwave. Cnsisting f ne clearcat, ne dedicated hardener and three reducers, designed fr ptimum

More information

Technical Data Sheet EW1 Top coats

Technical Data Sheet EW1 Top coats Tp cats Descriptin Wanda PU 2K HS is a single layer Plyurethane tpcat which ffers gd pacity, high glss, quick dry and gd weather resistance. It is suitable fr repair r verall re-sprays. 4 Wanda PU 2K HS

More information

UPolo COMPETITION InformatioN

UPolo COMPETITION InformatioN UPl LEAGUE INFORMATION UPl COMPETITION InfrmatiN Cntents INTRODUCTION LEAGUES SYSTEM ORGANISING FIXTURES IMPROVING THE STANDARDS OF REFEREEING AND TABLE OFFICIATING RESULTS RULES Imprving the Standards

More information

A template mass rescue operations plan

A template mass rescue operations plan The Internatinal Maritime Rescue Federatin Mass Rescue Operatins Prject: A template mass rescue peratins plan Cntents This paper prvides a template fr a mass rescue peratins plan. 1 Overview 1.1 Fr a general

More information

Development of Fundamental Movement: Locomotor Skills

Development of Fundamental Movement: Locomotor Skills Develpment f Fundamental Mvement: Lcmtr Skills Gallahue, D.L., Ozmun, J.C., Gdway, J.D. (2012). Understanding Mtr Develpment. Bstn: McGraw-Hill. McGraw-Hill/Irwin 2012 McGraw-Hill Cmpanies. All Rights

More information

W R E S T L I N G B C B r i t i s h C o l u m b i a W r e s t l i n g A s s o c i a t i o n

W R E S T L I N G B C B r i t i s h C o l u m b i a W r e s t l i n g A s s o c i a t i o n Athlete/Cach Nminatin Criteria 1 W R E S T L I N G B C B r i t i s h C l u m b i a W r e s t l i n g A s s c i a t i n Canadian Sprt Institute Pacific and BC Wrestling Athlete and Cach Nminatin Criteria

More information

More than one measurement shall be obtained at the 2018 MCAC if either of the following conditions exists:

More than one measurement shall be obtained at the 2018 MCAC if either of the following conditions exists: 2019 IFCS Wrld Team Selectin Rules Cmpetitrs wishing t qualify fr the 2019 IFCS Wrld Team are required t attend the Masters Challenge Agility Cup (MCAC) being held August 23-26, 2018, in Franklin, Tennessee.

More information

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3 Supplement t Plicy 7 - Rep Hckey Date Revised: July 2017 Versin 1.3 1 Table f Cntents Table f Cntents 1 Rep Tryut Prcedure Guidelines 2 Intrductin: 2 Rep Tryut Objectives: 2 Purpse f Player Evaluatin and

More information

RESQ TRAINING INTERNATIONAL. Rev 0 - July 2012 USER INSTRUCTIONS. User Instructions for TED Training Emergency Dummy by RESQ-Gear.

RESQ TRAINING INTERNATIONAL. Rev 0 - July 2012 USER INSTRUCTIONS. User Instructions for TED Training Emergency Dummy by RESQ-Gear. TED Training Emergency Dummy RESQ TRAINING INTERNATIONAL Rev 0 - July 2012 USER INSTRUCTIONS User Instructins fr TED Training Emergency Dummy by RESQ-Gear.cm USER INSTRUCTIONS TED Training Emergency Dummy

More information

Brazed Plate Heat Exchanger Operating & Instruction Manual U K Exchangers Ltd Unit 55, Stilebrook Road Olney Buckinghamshire MK46 5EA

Brazed Plate Heat Exchanger Operating & Instruction Manual U K Exchangers Ltd Unit 55, Stilebrook Road Olney Buckinghamshire MK46 5EA Brazed Plate Heat Exchanger Operating & Instructin Manual U K Exchangers Ltd Unit 55, Stilebrk Rad Olney Buckinghamshire MK46 5EA Tel: (01234) 244320 Fax: (01234) 714978 Email: sales@ukeltd.cm Web: www.uk-exchangers.cm

More information

ANALYSIS AND FORMULATION OF HYDRAULIC JUMPS IN SLOPING RECTANGULAR CLOSED CONDUITS

ANALYSIS AND FORMULATION OF HYDRAULIC JUMPS IN SLOPING RECTANGULAR CLOSED CONDUITS Seventh Internatinal Water Technlgy Cnference Egypt -3 April 003 647 ANALYSIS AN ORMULATION O HYRAULIC JUMPS IN SLOPING RECTANGULAR CLOSE CONUITS Abdel-Azim M. Negm Assciate Prfessr, ept. f Water & Water

More information

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p Exercise 2: Reviewing the Wrkplace Inspectin Checklist (30 min) p. 19-20 Part One: Behaviurs vs. Cnditins (15 min) Wrking individually: Think f 3 r 4 incidents that have ccurred r have the ptential t ccur

More information

NEW Organic Digestion, LLC Safety Management System. Authority: President

NEW Organic Digestion, LLC Safety Management System. Authority: President Next 02/01/2020 Issuing Dept: Safety Page: Page 1 f 14 PURPOSE The purpse f s Prgram is t ensure the safety f ur emplyees by identifying hazards assciated with Cnveyrs and develping prcedures t safeguard

More information

Freshman Baseball Post Season Player Evaluation

Freshman Baseball Post Season Player Evaluation The purpse f this evaluatin is t prvide caches, parents, and players with an idea as t what players shuld be able t d AFTER playing at a particular level and BEFORE entering the next.. At this pint, a

More information

SMALL SIDED FOOTBALL 2012

SMALL SIDED FOOTBALL 2012 Blacktwn Districts Sccer Ftball Assciatin Incrprated. SMALL SIDED FOOTBALL 2012 GUIDELINES FOR CLUB ADMINISTRATORS, SSF CO-ORDINATORS COACH S & REFEREES Nn Cmpetitive & Small Sided Ftball Frmats & Rules

More information

Equipment Strategy for Post Type High Voltage Current Transformers and Metering Units

Equipment Strategy for Post Type High Voltage Current Transformers and Metering Units ASM-STR-A2281256 Versin: 2.0 Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Metering Units Current versin: 20/06/2018

More information

Canadian Sport Institute Pacific and Badminton BC Athlete and Coach Nomination Criteria

Canadian Sport Institute Pacific and Badminton BC Athlete and Coach Nomination Criteria Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and Badmintn BC Athlete and Cach Nminatin Criteria Criteria Apprved March 28 th, 2018 CSI Pacific Representative L. Jennerich Signature

More information

STATE OF NORTH CAROLINA Office of the State Auditor

STATE OF NORTH CAROLINA Office of the State Auditor STATE OF NORTH CAROLINA Office f the State Auditr Beth A. Wd, CPA State Auditr 2 S. Salisbury Street 20601 Mail Service Center Raleigh, NC 27699-0601 Telephne: (919) 807-7500 Fax: (919) 807-7647 Internet

More information

Influence of rudder location on propulsive characteristics of a single screw container ship

Influence of rudder location on propulsive characteristics of a single screw container ship First Internatinal Sympsium n Marine Prpulsrs smp 09, Trndheim, Nrway, June 2009 Influence f rudder lcatin n prpulsive characteristics f a single screw cntainer ship Maciej Reichel Ship esign and Research

More information

Canadian Sport Institute Pacific and Cycling BC Athlete and Coach Nomination Criteria

Canadian Sport Institute Pacific and Cycling BC Athlete and Coach Nomination Criteria Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and Cycling BC Athlete and Cach Nminatin Criteria CSI Pacific Representative Criteria Apprved January 2018: Cycling BC Representative, Tara

More information

IAAF WORLD ATHLETICS CHAMPIONSHIPS DOHA, QAT 27 SEPTEMBER 6 OCTOBER 2019

IAAF WORLD ATHLETICS CHAMPIONSHIPS DOHA, QAT 27 SEPTEMBER 6 OCTOBER 2019 IAAF WORLD ATHLETICS CHAMPIONSHIPS DOHA, QAT 27 SEPTEMBER 6 OCTOBER 2019 QUALIFICATION SYSTEM AND ENTRY STANDARDS (As apprved by the IAAF Cuncil in December 2018) AGE CATEGORIES Under 20 Athletes Under

More information

Canadian Sport Institute Pacific and BC Sailing Athlete and Coach Nomination Criteria

Canadian Sport Institute Pacific and BC Sailing Athlete and Coach Nomination Criteria Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and BC Sailing Athlete and Cach Nminatin Criteria CSI Pacific Representative Criteria Apprved June 12, 2018 Kevin Black Representative Signature

More information

MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION

MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION 1 MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION The Missuri State 4-H Cuncil is an elected bdy f 4-H yuth wh serve fr ne year. Cuncil members help plan and carry ut State 4-H Cngress and

More information

USEFUL POINTS TO REMEMBER

USEFUL POINTS TO REMEMBER Knts COMMON TERMS OF ROPE Wrking End is the rpe end that is used t tie a knt Standing End is the inactive rpe end Lp is rpe frmed int a circle, but withut being crssed ver itself Bight is the enclsed area

More information

Autostore system. Lalesse Europe Accell Nederland BV

Autostore system. Lalesse Europe Accell Nederland BV Autstre system Lalesse Eurpe Accell Nederland BV Custmer details Accell Grup is wrldwide active in middle and higher segments fr bicycles and bicycle parts and accessries Market leader in Eurpe and is

More information

LIGHTING & POWER UNIT TYPE LPU57

LIGHTING & POWER UNIT TYPE LPU57 Title LIGHTING & POWER UNIT TYPE LPU57 USER MANUAL Dcument Number 40-374-12 Issue 03 03 DFCOM1 Added 2017.05.11 MC MC PC 02 Address and Lg Update 2017.03.23 CW CW PC 01 Original issue 2014.02.20 PC PC

More information

Translates into speed...

Translates into speed... Translates int speed... TABLE OF CONTENTS There is N Substitute 1 Vitess Packages 18 Racing n Sunday 2 Cntrl and Pwer Transmissin 19 Be Excellent At Only A Few Things 4 Grund Interface 22 The Right Fit

More information

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full BaseStatin 1000 Irrigatin Cntrller Keeping a Pnd r Cistern Full If yu have a pnd r a cistern that is fed frm an external water surce, yu can use a Baseline bisensr sil misture sensr with yur Baseline cntrller

More information

Girls T20 Smash U16 Playing Conditions

Girls T20 Smash U16 Playing Conditions Girls T20 Smash U16 Playing Cnditins 1. Team Cmpsitin Maximum 9 n the field. Players shuld be Under 16 n 1 September f the current seasn. ACA is lenient n granting dispensatins t allw players t play at

More information

Big Ox Energy Siouxland, LLC Safety Management System. Authority: President

Big Ox Energy Siouxland, LLC Safety Management System. Authority: President Next 8/17/2018 Issuing Dept: Safety Page: Page 1 f 14 PURPOSE The purpse f s Prgram is t ensure the safety f ur emplyees by identifying hazards assciated with Cnveyrs and develping prcedures t safeguard

More information

ROCKAWAY PARK FORMER MANUFACTURED GAS PLANT SITE Rockaway Park, Queens County, New York

ROCKAWAY PARK FORMER MANUFACTURED GAS PLANT SITE Rockaway Park, Queens County, New York WATERLOO BARRIER SYSTEM INSTALLATION REPORT Subsurface Cntainment Barrier Wall Test Demnstratin - Sheet Piling With Sealed Interlcks ROCKAWAY PARK FORMER MANUFACTURED GAS PLANT SITE Rckaway Park, Queens

More information

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems General Industry Tlbx Talks Prviding Excellence in Regulatry Cmpliance Management Systems General Industry Tlbx Talks Table f Cntents Why Safety Meetings are Imprtant...- 3 - Guidelines fr Safety Training

More information

UCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD.

UCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD. FORENSICS OPERATING MANUAL 1 2731 Bartram Rd Bristl, PA 19007 USA POSITIVE PRESSURE MANIFOLD POSITIVE PRESSURE MANIFOLD MANUAL POSITIVE PRESSURE EXTRACTION OPERATION INSTRION Thery f Operatin 2 The Psitive

More information

Topic Sheet No. 2 Near misses: Learning from failure

Topic Sheet No. 2 Near misses: Learning from failure Dc. N.: HS-082ENG Date f Issue: 16/05/17 Issue N.: 001 Page 1 f 5 Tpic Sheet N. 2 Near misses: Learning frm failure A tpic sheet prepared by IRATA Internatinal (2017) SAFETY AND HEALTH TOPIC SHEET NO.

More information

Technical Data Sheet DW1 Undercoats

Technical Data Sheet DW1 Undercoats Descriptin Wanda 8100 2K Primer ffers great filling and sanding prperties, excellent hld ut, fast dry, and gd adhesin n prperly prepared substrates. 4 Wanda 8100 2K Primer Wanda 2K Hardener Std 418.03093

More information

Kennecott Utah Copper Corporation Safety and Health Standards

Kennecott Utah Copper Corporation Safety and Health Standards Revisin N. 3 12/2004 Page 1 f 7 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N.: 16.4 CRANES AND HOISTS 16.4.1 INTRODUCTION 16.4.1.1 The purpse f this standard is t prvide requirements

More information

European Roulette Game Rules

European Roulette Game Rules Eurpean Rulette Game Rules Cntents Game Overview Placing Bets Aut Adjust Bet Bet Types Payuts Favrite Bets Statistics and Billbard Game Functins Game Setting Optins Return t Player Additinal Infrmatin

More information

Autoclear Superior Pack

Autoclear Superior Pack Descriptin A 2 Pack versin f Autclear Superir 250, designed fr use ver Autwave. Cnsisting f tw clearcats and ne dedicated hardener. cvers all sizes f repairs, under all applicatin cnditins, cmbined with

More information

TUTORIAL TB 194

TUTORIAL TB 194 TUTORIAL 21.17 TB 194 Technieken vr cnstructie, leggen en installatie van kabelsystemen 194 Cnstructin, Laying and Installatin techniques Peter van Velzen Engineering Julz Cigre B1-NL Wrking grup 21.17

More information

UCP of Central MN STUCK IN MOTION STATIONARY. bike race. January. 27 Saturday PARTICIPANT PACKET

UCP of Central MN STUCK IN MOTION STATIONARY. bike race. January. 27 Saturday PARTICIPANT PACKET UCP f Central MN STUCK IN MOTION STATIONARY bike race 2018 January 27 Saturday PARTICIPANT PACKET STUCK IN MOTION RIDER Dear Team Member: Thank yu fr jining ur team and supprting UCP s Stuck In Mtin bike

More information

Full Event Package Charity Events

Full Event Package Charity Events Full Event Package Charity Events Pennine Events want t help yu t put n the best pssible event and we are delighted that yu are interested in taking up this ptin. Each year Pennine Events wrk with a number

More information

Canadian Sport Institute Pacific and Cycling BC Athlete and Coach Nomination Criteria

Canadian Sport Institute Pacific and Cycling BC Athlete and Coach Nomination Criteria Athlete/Cach Nminatin Criteria 1 Canadian Sprt Institute Pacific and Cycling BC Athlete and Cach Nminatin Criteria CSI Pacific Representative Criteria Apprved December 5, 2018: Cycling BC Representative,

More information

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4 MEETING SUMMARY Nrth Avenue Recnstructin Prject Cntext Sensitive Slutins Advisry Grup Meeting #4 ATTENDEES: LOCATION: PREPARED BY: COPIES: Sign-in sheet attached Brkfield Library, Snia Bielmeier Cmmunity

More information

The Serve. Take Control.

The Serve. Take Control. The Serve Take Cntrl www.gaahandball.ie THE SERVE Every rally in Handball is initiated with a serve, and thus its imprtance is paramunt. The serve is als the nly time that a player has cmplete cntrl ver

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specificatin Gen DB MF Cnslidatin and Gas Burn Reprt UI/API Dc ID: GNFDMDEHU6BB-46-53 Page 1 f 18 Disclaimer All infrmatin cntained in this draft Business Requirements Specificatin

More information

SPARC Match Rules v1.2

SPARC Match Rules v1.2 SPARC Match Rules v1.2 If an event chses t use nn-standard rules they will make the alteratins clear and publicly available prir t the event. Bt Lad In and Activatin: In arenas where rbt pwer up is pssible

More information

Subsea Pipe Laying Optimization A research for optimization of subsea pipe laying operation systems

Subsea Pipe Laying Optimization A research for optimization of subsea pipe laying operation systems Subsea Pipe Laying Optimizatin A research fr ptimizatin f subsea pipe laying peratin systems Final research reprt 13 Octber 2015 Rtterdam Mainprt University Principal: Manager: Bachelr Maritime Operatins

More information

Jobs in Green and Healthy Transport

Jobs in Green and Healthy Transport Infrmal dcument n. 6 THE PEP Steering Cmmittee, 11th sessin, 27-28 Nvember 2013 Item 7 (c) f the prvisinal agenda Implementing the Amsterdam Declaratin THE PEP Partnerships Implementing the Amsterdam Declaratin

More information

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE Are the emplyees r cntractrs wh wrk in yur facility expsed t cnfined space hazards? Have yu cnducted a thrugh assessment f yur facility

More information

Recreational Sports Racquetball Rules

Recreational Sports Racquetball Rules Recreatinal Sprts Racquetball Rules Mdificatins have been made t suit BYU-Idah Recreatinal Sprts prgrams. Rule 1: Players Racquetball is an individual sprt, as such each team shall cnsist f ne (1) player.

More information

Method statement for the erection of temporary inflatable structures that do not require a Temporary Structure Licence

Method statement for the erection of temporary inflatable structures that do not require a Temporary Structure Licence Methd statement fr the erectin f temprary inflatable structures that d nt require a Temprary Structure Licence The Health and Safety Executive (HSE) have wrked with NIAH t prduce a Safe Practice Guide

More information

2018 Dance Camp Chicago Rules

2018 Dance Camp Chicago Rules 2018 Dance Camp Chicag Rules General All Cmpetitrs must purchase a weekend pass. Cstumes are strngly discuraged (thugh crdinating apparel is allwed), and bts and hats are nt required. Dance Camp will prvide

More information

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS This Infrmatin Sheet prvides guidance n what t cnsider when undertaking an Out f Hurs Wrking risk assessment and deciding the cntrls

More information

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success) ELLERSLIE AFC OPERATIONAL PLAN (Game Develpment and Ftball Success) Ellerslie AFC has a reputatin thrughut the Auckland ftball cmmunity as a family-friendly club that prvides an enjyable and rewarding

More information

Guidelines for Underground Soft Rock Miner Program # Common Core and Specialty Modules

Guidelines for Underground Soft Rock Miner Program # Common Core and Specialty Modules Ministry f Training, Clleges and Universities Ministère de la Frmatin et des Cllèges et Universités Effective: January 1, 2012 Guidelines fr Undergrund Sft Rck Miner Prgram #770130 Cmmn Cre and Specialty

More information

Concept 305 P. Pre-installation Guide IMPORTANT!

Concept 305 P. Pre-installation Guide IMPORTANT! Pre-installatin Guide Cncept 305 P IMPORTANT! Please fllw the instructins in this guide when preparing the installatin site prir t arrival and installatin f the equipment December 8th, 2017 Editin AA,

More information

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff FACILITIES MANAGEMENT Ht Wrk Plicy fr Wrk Perfrmed By University Emplyees 03/13/18 - Last Revisin INTENT: The intended purpse f this Plicy is t prvide a safe wrk/learning envirnment in University buildings

More information

Visit Leader Emergency Action Card

Visit Leader Emergency Action Card Visit Leader Emergency Actin Card If an Establishment decides t adpt this card, it shuld be carried by all staff accmpanying a visit. It is recmmended that this is printed, laminated, and als placed in

More information

Core Measure: Functional Gait Assessment (FGA)

Core Measure: Functional Gait Assessment (FGA) Cre Measure: Functinal Gait Assessment (FGA) Overview The FGA is used t assess pstural stability during walking and assesses an individual's ability t perfrm multiple mtr tasks while walking. The tl is

More information

Stickin Together: Surface Tension, Cohension, and Adhesion

Stickin Together: Surface Tension, Cohension, and Adhesion Stickin Tgether: Surface Tensin, Chensin, and Adhesin FRAMEWORK I. Scientific and Engineering Practices II. Crss-Cutting Cncepts III. Physical Sciences SKILLS/OBJECTIVES Explring water s ability t stick

More information

Population ecology focuses on the numbers and structures in populations. Part of this study involves reproduction strategies in relation to habitat.

Population ecology focuses on the numbers and structures in populations. Part of this study involves reproduction strategies in relation to habitat. Optin G.5 - Ppulatin Eclgy G.5.1 - Distinguish between r-strategies and K-strategies Ppulatin eclgy fcuses n the numbers and structures in ppulatins. Part f this study invlves reprductin strategies in

More information

SOUTH AUSTRALIAN AMATEUR FL

SOUTH AUSTRALIAN AMATEUR FL SOUTH AUSTRALIAN AMATEUR FL 2012 TRIBUNAL REFERENCE MANUAL 1 P a g e SA AMATEUR FOOTBALL LEAGUE INC ORDER OF PROCEEDINGS FOR TRIBUNAL HEARINGS Appintment f Chairman The tribunal shall satisfy itself that

More information

Impact resistance of fiberboard shipping containers

Impact resistance of fiberboard shipping containers T 801 m-94 SUGGESTED METHOD 1944 OFFICIAL STANDARD 1971 OFFICIAL TEST METHOD 1983 REVISED 1988 1994 TAPPI The infrmatin and data cntained in this dcument were prepared by a technical cmmittee f the Assciatin.

More information

Data Sheet CI-IB-DS Insulation Board. with ECOSE Technology

Data Sheet CI-IB-DS Insulation Board. with ECOSE Technology Data Sheet CI-IB-DS 06-15 Insulatin Bard with ECOSE Technlgy Insulatin Bard with ECOSE Technlgy Descriptin Knauf Insulatin Insulatin Bard is a thermal and acustical insulatin prduct bnded with ECOSE Technlgy.

More information

Deer harvest objective for the Deer Plan

Deer harvest objective for the Deer Plan Deer harvest bjective fr the Deer Plan December 12, 2017 Summary and Backgrund fr DMPAC April 2018 NOTE: THIS IS A COPY OF A DOCUMENT DISCUSSED WITH DMPAC IN 2017. IT CONTAINS INFORMATION CONSIDERED BY

More information

Down and Out Mount Assembly & Installation Directions

Down and Out Mount Assembly & Installation Directions Dwn and Out Munt Assembly & Installatin Directins Munting the Dwn and Out Munt crrectly takes a lt f thught and a lt f planning. Please read the directins thrughly and plan ut hw the munt wuld be installed

More information

Lab Exploration #7: Winds and Pressure Patterns

Lab Exploration #7: Winds and Pressure Patterns METR 104: Our Dynamic Weather (w/lab) Lab Explratin #7: Winds and Pressure Patterns Dr. Dave Dempsey Dept. f Gesciences SFSU, Spring 2013 (5 pints) (Lab Sectin 1: Wed., April 24; Lab Sectin 2: Fri, April

More information

SCORING FORMATIONS. Duration of dancing and music. Duration of dancing and music. in finals of Girl Formation Junior and Main Class

SCORING FORMATIONS. Duration of dancing and music. Duration of dancing and music. in finals of Girl Formation Junior and Main Class Age Duratin f dancing and music in finals f Girl Frmatin Junir and Main Class Duratin f dancing and music in all ther runds Speed f music (bars/min) min. number f basic steps Number f acrbatic figures

More information