1 Print This Document Existing Corridor Issues and This document describes the existing issues and preliminary recommendations at 83 locations in the Fairfax County Parkway and Franconia-Springfield Parkway study corridor. This document is interactive. Scroll through each page to review issues and recommendations for locations along the corridor, or click the map pins on the next page to jump to a specific location.

2 Map Navigation Clicking on these pins will take you to the corresponding issues and recommendations summary Back to Map Clicking on this map icon will bring you back to this page UV 28 UV 28 UV 620 UV 267 Clifton UV 657 Centreville Chantilly Sterling Popes Head Rd Herndon UV 654 C Ḅ ". B Ẹ ". UV E Ẹ ". UV West Ox Rd A Ạ A Ạ ". ". Elden St Spring St Braddock Rd Lee Jackson Memorial Hwy Monument Dr 29 Reston Sugarland Rd Lee Hwy UV 655 Leesburg Pike Wiehle Ave Reston Pkwy Sunrise Valley Dr Baron Cameron Ave Great Falls UV 665 UV 193 Fox Mill Rd Sunset Hills Rd Fairfax UV 123 UV 7 Oakton UV 236 UV 267 UV 236 UV 674 UV 677 Clifton UV 28 UV 620 UV 657 Chantilly Centreville Popes Head Rd UV 654 UV West Ox Rd 66 Braddock Rd Lee Jackson Memorial Hwy Monument Dr 29 Lee Hwy UV 655 Fairfax UV 123 UV 665 Fox Mill Rd Oakton UV 236 UV 236 UV 123 Ox Rd Lorton Lee Chapel Rd Hooes Rd UV 286 Huntsman Blvd Gambrill Rd UV 790 Sydenstricker Rd Barta Rd 95 Burke Lake Rd Backlick Rd UV 289 Old Keene Mill Rd UV 638 Rolling Rd UV 644 UV 651 UV 617 Springfield Frontier Dr UV Annandale Chapel Rd UV Chantilly Centreville Rd UV 657 West Ox Rd Ox Rd E Ẹ ". F Ẹ ". A Ạ ". Lee Jackson Memorial Hwy Burke Centre Pkwy Freds Oak Rd Franklin Farm Rd UV 286 B "..C 50 Roberts Pkwy D Ẹ ". Rugby Rd C "..C Lawyers Rd Old Keene Mill Rd Fox Mill Rd UV 673 UV 620 UV 651 Burke Lake Rd UV UV Oakton UV Chapel Rd Ox Rd Burke Centre Pkwy Freds Oak Rd Roberts Pkwy Old Keene Mill Rd UV 620 UV 651 Burke Lake Rd UV 638 UV Fort Belvoir UV 286 UV 286 Richmond Hwy Telegraph Rd John J Kingman Rd UV 235 Beulah St UV 613 Old Old F ". Ḍ ".. Keene Mill Road Note: Cardinal directions assume that Fairfax County Parkway is oriented north-south at all locations and side street approaches are oriented east-west Keene Mill Road

3 1121 Fairfax County Parkway at Richmond Highway (Route 1) Intersection is overcapacity, long queue lengths, and spillover from southbound left-turn lane storage* Vertical curve obstructs sight distance to queued vehicles in southbound direction Poor nighttime visibility along southbound approach * Federal Highway Administration-Eastern Federal Lands Division (FHWA-EFLD) project: FHWA-EFLD project currently under construction along Route 1 future intersection lane configuration shown in red Install advance intersection warning signs feet before stop bar Potential trail extension Install overhead intersection street lighting

4 1321 Fairfax County Parkway at John Kingman Road/Farrar Drive Congestion due to heavy turning traffic to/from John Kingman Road* Install detectable warning surface Northbound right-turn vehicles spill out of the available turn lane No detectable warning surface * Previous FCDOT study is complete. Study contains concept plans, traffic analyses, and cost estimates. Extend rightturn lane Other improvements have been identified by FCDOT Study (see below) County Comprehensive Plan shows an Interchange Previous Fairfax County Study Improvements: FAIRFAX COUNTY PARKWAY (ROUTE 286) FAIRFAX COUNTY PARKWAY (ROUTE 286) FAIRFAX COUNTY PARKWAY (ROUTE 286) FAIRFAX COUNTY PARKWAY (ROUTE 286) Extend southbound left-turn lane storage Widen westbound approach to provide dual left- and dual right-turn lanes Add third southbound left-turn lane and extend storage Add an auxiliary lane along southbound Route 286 to US Route 1

5 1521 Fairfax County Parkway Northbound Ramps at Telegraph Road Substandard pedestrian accommodations on the northeast corner with pedestrian access hazards No detectable warning surface trail No detectable warning surface median refuge Fairfax County Pkwy NB On-Ramp Construct curbed sidewalk, install ADAcompliant curb ramps, and provide barrier devices Telegraph Rd Install detectable warning surface Upgrade curb ramps to be ADA compliant Fairfax County Pkwy NB Off-Ramp

6 1522 Fairfax County Parkway Southbound Ramps at Telegraph Road Long vehicle queues along southbound right turn lane, extending close to Fairfax County Parkway mainline* No detectable warning surface trail Fairfax County Pkwy SB Off-Ramp Install detectable warning surface * Previous Fairfax County study contains concept plans, traffic analyses, and cost estimates. Previous Fairfax County Study Improvements: Fairfax County Pkwy SB On-Ramp TELEGRAPH ROAD Modify southbound right-turn lane to provide freeflow operation. The lighter color yellow represents a relocated shared use trail. Other improvements have been identified by FCDOT Study (see left)

7 1721 Fairfax County Parkway at Terminal Road Long vehicle queues along eastbound approach* Previous Fairfax County Study and VDOT Improvements: Install crosswalk, curb ramps, pedestrian signals, and pushbuttons Congestion along southbound approach Northbound next signal advance signage is only on right side of road and sign is small Install yield bars in advance of crosswalk Upgrade curb ramp to be ADA compliant Volume exceeds capacity during peak period W2-11- W16-7p- Construct third through lane No pedestrian connectivity across Fairfax County Parkway to bus stop (located in island) Relocate bus stop out of channelizing island, install sidewalk connection Bus stop located in channelizing island * Previous Fairfax County study contains concept plans, traffic analyses, and cost estimates. VDOT has identified a safety improvement project (UPC ) to change the southbound right-turn lane into a shared through/right lane; VDOT is waiting for funding to construct improvements. FAIRFAX COUNTY PARKWAY (ROUTE 286) Add left-turn lane along eastbound approach; convert southbound right-turn lane into a through/ right-turn lane Install next signal (D3-2) signs feet before the stop bar D3-2 D3-2 Install retroreflective backplates on all signals

8 1806 I-95 Northbound Off-Ramp to Northbound Fairfax County Parkway VDOT Project (UPC 93033) Concept Plan Forecast volumes to the north are expected to increase due to the extension of Fairfax County Parkway, regional growth, and the BRAC to the Fort Belvoir North Area* * VDOT project (UPC 93033) pending for funding of a directional flyover ramp to replace the existing one-lane loop ramp to accommodate increased traffic volumes and eliminate weaving on I-95 NB. ffx_co_pkwy_flyover.asp

9 1821 Fairfax County Parkway at Loisdale Road Intersection is over capacity, long vehicle queues on all approaches* The rightmost through lane is ineffective at processing traffic given the short storage length of the lane Trail leads into roadway with no receiving accommodations Trail continuity not clearly defined Weaving associated with vehicles heading to I-95 N on Fairfax County Parkway and Loisdale Road Remove asphalt at corner, install trail wayfinding signage * Previous Fairfax County study contains concept plans, traffic analyses, and cost estimates. Fairfax County has collected some developer proffer money for these improvements. Previous Fairfax County Study Improvements: Add southbound left-, westbound left-, and northbound right-turn lanes Install retroreflective backplates on all signals Add I-95 shield pavement markings and lane use/designation guide sign 445 feet before the stop bar Add I-95 shield pavement marking, overhead signage feet before the stop bar Construct full-length through lane FAIRFAX COUNTY PARKWAY (ROUTE 286)

10 2122 Fairfax County Parkway at Rolling Road North leg crosswalk is partially obstructed by raised median* Vertical curve obstructs sight distance for left-turning vehicles from FCP Last-minute weaving caused by southbound driver confusion about Fairfax County Parkway access Trail continuity not clearly defined Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict * Fully funded VDOT project (UPC ) currently under design Proposed intersection improvements by VDOT (UPC ) will provide for protected only left-turn movements Proposed intersection improvements by VDOT (UPC ) will upgrade curb ramps Install wayfinding signage for trail Install advanced guide signs for Fairfax County Parkway feet before stop bar Install retroreflective backplates on all signals W11-15 W11-15p Realign crosswalk, adjust median, and relocate stop bar Protected only left-turns Install pedestrian warning signs and yield bars in advance of crosswalk Upgrade curb ramps to be ADA compliant, install wayfinding signage for trail users

11 2231 Fairfax County Parkway at Stream Way Pedestrian ramp into roadway with no receiving ramp on the other side Narrow sidewalk creates bottleneck for trail system Replace sidewalk with wider trail Remove sidewalk ramp

12 2321 Fairfax County Parkway at Whitlers Creek Drive/Hooes Road Turning movement lane assignments not indicated for eastbound and westbound approaches Missing sidewalk connection to crosswalk and accessible path to pedestrian pushbutton No pedestrian bus stop pad Upgrade curb ramps to be ADA compliant Add pavement markings indicating lane assignments for turning movements Install pedestrian bus stop pad Install sidewalk

13 2421 Fairfax County Parkway Northbound Ramps at Olde Lantern Way No pedestrian signals Inconsistent crosswalk marking for Fairfax County Parkway trail crosswalk Upgrade curb ramps to be ADA compliant, install pedestrian signals and pushbuttons Install high visibility crosswalk

14 2422 Fairfax County Parkway Southbound Ramps at Gambrill Road Pedestrian connectivity not provided across Gambrill Road Inconsistent crosswalk marking for Fairfax County Parkway trail crosswalk No pedestrian signals Missing curb ramp in southwest corner Install high visibility crosswalk Upgrade/install curb ramps to be ADA compliant; install pedestrian signals and pushbuttons

15 2521/2522 Fairfax County Parkway Northbound/ Southbound Ramps at Sydenstricker Road 2521 Crosswalk not aligned in a single direction No pedestrian signals Driver confusion about access to the Sydenstricker park and ride lot Existing curb ramps are non-compliant Missing sidewalk connection across Fairfax County Parkway bridge 2522 Signal displays on eastbound Sydenstricker Road approach are not Manual on Uniform Traffic Control Devices (MUTCD) compliant Existing curb ramps are non-compliant Missing sidewalk connection No pedestrian bus stop pad Upgrade curb ramps to be ADA compliant; install pedestrian signals and pushbuttons Realign crosswalk Update traffic signal displays Provide guide signs to park and ride lot Install sidewalk Install pedestrian bus stop pad Upgrade curb ramps to be ADA compliant

16 2722 Fairfax County Parkway Southbound Ramps at Pohick Road Sight distance limited for eastbound right-turn movement due to grade, roadside structures, and vegetation Poor nighttime visibility along southbound approach Upgrade curb ramps to be ADA compliant Shift stop bar forward, realign crosswalk, relocate curb ramp and pedestrian signal/ pushbutton

17 2723 Fairfax County Parkway Northbound Ramps at Seabrook Lane Pedestrian connectivity not provided across Seabrook Lane to bus stop No pedestrian bus stop pad No pedestrian connectivity across Fairfax County Parkway on bridge Install pedestrian bus stop pad Install crosswalks, curb ramps, pedestrian signals, and pushbuttons Fairfax County Parkway Northbound Ramps at Seabrook Lane Install sidewalk connection to neighborhood Install sidewalk Install sidewalk connecting to bus stop

18 2724 Fairfax County Parkway Southbound Ramps at Seabrook Lane Crosswalk not aligned in a single direction, segmented by a wide median No pedestrian bus stop pad No pedestrian connectivity across Fairfax County Parkway on bridge Upgrade curb ramps/median to be ADA compliant and/or adjust median nose Install sidewalk, crosswalk, curb ramp, pedestrian signals, and pushbuttons Install pedesrian bus stop pad

19 2831 Fairfax County Parkway at Cervantes Lane Upgrade curb ramps to be ADA compliant

20 2931 Fairfax County Parkway at Modisto Lane Missing trail/sidewalk connection No pedestrian bus stop pad Upgrade curb ramps to be ADA compliant Note: Existing crosswalk across Modisto Lane not shown Construct sidewalk connection to bus stop Install pedestrian bus stop pad Install pedestrian bus stop pad

21 3031 Fairfax County Parkway at Huntsman Court No crosswalk across Huntsman Court Upgrade curb ramps to be ADA compliant Install crosswalk

22 3121 Fairfax County Parkway at Huntsman Boulevard No pedestrian signals Inconsistent crosswalks for Fairfax County Parkway trail crossing Pushbutton accessibility issue No pedestrian bus stop pad (two locations) Upgrade curb ramps to be ADA compliant Relocate pushbutton adjacent to curb ramp Install pedestrian signals, pushbuttons, and high visibility crosswalk Install pedestrian bus stop pad

23 3221 Fairfax County Parkway at Reservation Drive No pedestrian signals Crosswalk not adjacent to intersection and inconsistent with Fairfax County Parkway trail crosswalks Move bus stop sign to pedestrian bus stop pad Add pavement markings indicating lane assignments for turning movements Upgrade all curb ramps to be ADA compliant, relocating as necessary Bus stop sign not located near pedestrian bus stop pad Bus stop without pedestrian bus pad Turning movement lane assignments not indicated for westbound approach Install pedestrian signals and pushbuttons for crossing Shift crosswalk closer to Fairfax County Parkway to high and change to high visibility Install pedestrian bus stop pad

24 3321 Fairfax County Parkway at Lee Chapel Road Fairfax County Parkway at Lee Chapel Road Pedestrian sidewalks and ramps in channelizing islands are in poor condition Missing sidewalk connection to bus stop; no pedestrian bus stop pad Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict Pushbutton accessibility issue Eastbound right-turn movement queues block access to the adjacent through lane Install pedestrian warning signs and yield bars in advance of crosswalks W2-11 W16-7p Upgrade curb ramps to be ADA compliant Reconstruct islands and curb ramps Install sidewalk connection to bus stop and install pedestrian bus stop pad Increase storage length W11-15 W11-15p Relocate pushbutton adjacent to curb ramp

25 3431 Fairfax County Parkway at Rolling View Drive/Pilot House Road Inconsistent crosswalks for Fairfax County Parkway trail crossing Upgrade curb ramps to be ADA compliant, relocating as necessary Install median pass through or adjust median nose Install high visibility crosswalk

26 3531 Fairfax County Parkway at Portside Drive/Waterline Drive Inconsistent crosswalks for Fairfax County Parkway trail crossing No detectable warning surface Upgrade curb ramps to be ADA compliant Install detectable warning surface where trail meets the roadway Install high visibility crosswalk

27 3621 Fairfax County Parkway at Old Keene Mill Road Eastbound Old Keene Mill Road lane reduction (east of Fairfax County Parkway) creates merge conflict that queues toward Fairfax County Parkway Trail continuity not clearly defined Widen road to provide adequate lane reduction advance notice and taper (up to 1,300 feet to Burke Woods Drive) Install trail wayfinding signage

28 3721 Fairfax County Parkway at Burke Lake Road No pedestrian signal across west leg Crosswalk not perpendicular to the roadway Trail continuity not clearly defined Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict Pushbutton accessibility issue W11-15 W11-15p Realign crosswalk perpendicular to travel lane Install pedestrian signal Install pedestrian warning sign and yield bar in advance of crosswalk Relocate pushbutton adjacent to curb ramp Install trail wayfinding signage Upgrade curb ramps to be ADA compliant

29 3921 Fairfax County Parkway at Karmich Street/Roberts Parkway Sediment collecting at all sidewalk ramps Pushbutton accessibility issue Upgrade curb ramps to be ADA compliant Upgrade median refuge for pedestrians Relocate pushbutton adjacent to crosswalk Repair intersection drainage

30 4131 Fairfax County Parkway at New Road Unprotected shoulder drop-off and multiuse path in the clear zone Extend guardrail to trail terminus Note: Existing crosswalk across New Road not shown

31 4231 Fairfax County Parkway at Freds Oak Road No detectable warning surface Inconsistent crosswalk marking for Fairfax County Parkway trail crosswalk Install detectable warning surface Install high visibility crosswalk

32 4321 Northbound Fairfax County Parkway at Ox Road Dual left-turn lanes with no channelizing pavement markings through the intersection Pedestrian crossing of channelized right-turn lane Realign crosswalk to be perpendicular to travel lane W4-3 Replace yield sign with added lane (W4-3) sign W11-15 Crosswalks not perpendicular to the roadway No detectable warning surface Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict Install left-turn lane line extension through intersection Install left-side pedestrian warning signs W11-15 W11-15p Install pedestrian warning signs and yield bars in advance of crosswalks W11-15p Upgrade curb ramps to be ADA compliant Install detectable warning where asphalt trail meets the travel lane

33 4322 Southbound Fairfax County Parkway at Ox Road/Robert Carter Road Crosswalks not perpendicular to the roadway across right-turn lane Crosswalks are only 6 feet wide No detectable warning surface Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict Upgrade curb ramps to be ADA compliant Install detectable warning surface where asphalt trail meets travel lane W11-15 W11-15p Widen crosswalks to 10 feet Realign crosswalk perpendicular with vehicle travel W11-15 W11-15p Install pedestrian warning signs and yield bar in advance of crosswalk

34 4421 Fairfax County Parkway at Burke Centre Parkway Sediment collects on curb ramps Southbound U-turn conflict with westbound right-turn Northbound horizontal and vertical curves may obstruct sight distance to queued vehicles Vertical grade in the northbound direction encourages high speeds Low left-turn volume westbound from Burke Centre Parkway interrupts high volume through movements Trail continuity not clearly defined No detectable warning surface Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict Install trail wayfinding signage R10-16 Install detectable warning surface Install signal ahead signs and beacons along intersection approach 800-1,000 feet before the stop sign Install speed feedback (your speed) sign 100 feet prior to the proposed W3-3 signs and warning beacons Repair intersection drainage Install retroreflective backplates on all signals W3-3 Eliminate left-turn movement* Upgrade curb ramps to be ADA compliant *Route Impacts W11-15 W11-15p Install pedestrian warning signs and yield bar in advance of crosswalk - current route 1.9 miles 1.4 miles

35 4531 Fairfax County Parkway at Nomes Court/Ladues End Lane Pedestrian trailhead terminates behind the eastbound stop bar No detectable warning surface Realign trail and crossing to keep pedestrians in front of stop bar Install detectable warning surface

36 4631 Fairfax County Parkway at Colchester Meadow Lane No detectable warning surface Install detectable warning surface

37 4721 Fairfax County Parkway at Popes Head Road Operational and safety issues caused by high volume of left turns Volume of traffic along Fairfax County Parkway exceeds the capacity of the intersection Implement protected only left-turn operations during peak hour R SY SF G Construct acceleration lane for westbound right-turn movement Limited signal visibility due to horizontal curves and dense vegetation High volume of westbound right-turn movements Construct third southbound through lane No detectable warning surface Install supplemental near-side traffic signals Install detectable warning surface

38 4821 Southbound Fairfax County Parkway Ramps at Braddock Road No connectivity is provided to pedestrian facilities on north side of Braddock Road Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict Install pedestrian warning signs and yield bars in advance of crosswalks W2-11 W16-7p Remove crosswalk and curb ramp Upgrade curb ramps to be ADA compliant W11-15 W11-15p

39 4822 Northbound Fairfax County Parkway Ramps/Community Center at Braddock Road No crosswalk provided across Mott Community Center entrance No detectable warning surface Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict Crosswalks are only 6 feet wide Install detectable warning surfaces Widen crosswalks to 10 feet W11-15 W11-15p Install pedestrian warning signs and yield bars in advance of crosswalk Realign crosswalk perpendicular to travel lane Install crosswalk Upgrade curb ramps to be ADA compliant

40 4921 Northbound Fairfax County Parkway at West Ox Road (North) Short distance between signalized intersections limits conspicuity of traffic signal heads Low visibility crosswalk; crosswalk not perpendicular to travel lane Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict W11-15 W11-15p Install high visibility crosswalk and align perpendicular to travel lane W11-15 W11-15p Install pedestrian warning signs and yield bar in advance of crosswalk Upgrade curb ramps to be ADA compliant Install retroreflective backplates on all signals

41 4922 Northbound Fairfax County Parkway at West Ox Road (South) Short distance between signalized intersections limits conspicuity of traffic signal heads No detectable warning surface Install retroreflective backplates on all signals Upgrade curb ramps to be ADA compliant

42 4923 Northbound Fairfax County Parkway Ramps at Route 29 C-D Road (North) Short distance between signalized intersections may limit driver perception-reaction time Short distance between signalized intersections limits conspicuity of traffic signal heads Skewed crosswalk of inconsistent width Install retroreflective backplates on all signals, evaluate signal timings Extend trail and install detectable warning surface Install pedestrian warning signs and yield bars in advance of crosswalk W2-11 W16-7p Realign crosswalk perpendicular to travel lane Upgrade curb ramps to be ADA compliant

43 4924 Northbound Fairfax County Parkway Ramps at Route 29 C-D Road (South) Short distance between signalized intersections limits conspicuity of traffic signal heads Install retroreflective backplates on all signals Upgrade curb ramps to be ADA compliant

44 4925 Southbound Fairfax County Parkway Ramps at Route 29 C-D Road (North) Short distance between signalized intersections limits conspicuity of traffic signal heads Upgrade curb ramps to be ADA compliant Install retroreflective backplates on all signals

45 4926 Southbound Fairfax County Parkway Ramps at Route 29 C-D Road (South) Short distance between signalized intersections limits conspicuity of traffic signal heads Upgrade curb ramps to be ADA compliant Install retroreflective backplates on all signals

46 5000 Fairfax County Parkway at I-66 Interchange Heavy congestion on I-66 ramps during peak travel periods* * VDOT project (UPC ) underway to evaluate new Express Lanes and multimodal solutions for I-66 outside the I-495 Capital Beltway.

47 5321 Fairfax County Parkway at Eastbound Route 50 Scarring on roadway indicates eastbound left-turning vehicles are making contact with the roadway Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict Improve grading and alignment for eastbound left-turn W11-15 W11-15p Install pedestrian warning signs and yield bar in advance of crossing

48 5322 Fairfax County Parkway at Westbound Route 50 Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict W11-15 W11-15p Install pedestrian warning signs and yield bars in advance of crossing W11-15 W11-15p

49 5421 Fairfax County Parkway at Rugby Road Sight distance limited for eastbound right-turn movement due to grade, roadside structures, and vegetation Low visibility crosswalks Heavy westbound left-turn and through volumes opposed by low eastbound volume Operational issues caused by high westbound left-turn volume Fairfax County Parkway at Rugby Road Monitor operations and consider lane assignment and signal operations adjustments Install high visibility crosswalks Improve sight distance for right-turn movement

50 5531 Southbound Fairfax County Parkway at Old Plains Road No stop bar on eastbound approach No crosswalk across Old Plains Road Install crosswalk Upgrade curb ramps to be ADA compliant Install stop bar

51 5621 Fairfax County Parkway at Stringfellow Road/Stringfellow Court Southbound right-turn yield sign not conspicuous Right-turn vehicles driving along the shoulder to access turn lane Inconsistent crosswalk marking for Fairfax County Parkway trail crosswalk No sidewalk along Stringfellow Road between Coralberry Drive and the existing crosswalk across Fairfax County Parkway Increase right- turn storage within existing asphalt limits (pending results of pavement integrity review) Install high visibility crosswalk Improvevisibility of/relocate existing yield sign; install yield bar Install new sidewalk

52 5721 Fairfax County Parkway at Tuckaway Drive/Springhaven Drive Inconsistent crosswalk marking for Fairfax County Parkway trail crosswalk Upgrade curb ramps to be ADA compliant Install high visibility crosswalk

53 5821 Fairfax County Parkway at Franklin Farm Road Eastbound through movement vehicle queues block access to the left-turn lane Northbound and southbound left-turn vehicles spill out of the available turn lanes Eastbound left-turn and southbound right-turn vehicles spill out of the available turn lanes Heavy eastbound right-turn volume No detectable warning surface Increase storage for turn lanes Install detectable warning surface at edge of median Install a right-turn overlap

54 5921 Fairfax County Parkway at West Ox Road Inconsistent signage and markings for channelized right-turn lane/ pedestrian crossing conflict Install pedestrian warning signs and yield bars in advance of crosswalk Upgrade curb ramps to be ADA compliant W11-15 W11-15p

55 6021 Fairfax County Parkway at Fox Mill Road Low visibility crosswalks; inconsistent with corridor Sediment collects on sidewalk ramps Repair intersection drainage Install high visibility crosswalks

56 6121 Fairfax County Parkway at Sunrise Valley Drive Improper signage for a right angle right-turn movement High volume interchange to the north creates significant weaving patterns Inadequate advance signage approaching the intersection Intersection is overcapacity Long vehicle queues along eastbound approach Widen to six through lanes Install overhead signage indicating downstream lane drop for left-turn onto Sunrise Valley Drive Improve guide signage to Route 267 Remove yield sign Install next signal (D3-2) signs 800-1,000 feet before stop bar County Comprehensive Plan shows an interchange at Sunrise Valley Drive

57 6221/6222 Fairfax County Parkway at Dulles Toll Road Ramps Improve guide signage to Route 267 High volume interchange creates significant weaving patterns Heavy congestion No detectable warning surface High speed northbound right-turn movement creates potential conflict with uncontrolled trail crossing on ramp Install for guide Route sign for Route 267 westbound at the signal Optimize signal timings Install detectable warning surface Install guide sign for Route 267 eastbound at the signal

58 6321 Fairfax County Parkway Ramp at Spring Street Inconsistent signage/markings for channelized right-turn lane/ pedestrian crossing conflict Install pedestrian warning signs and yield bars in advance of crosswalk W2-11 W16-7p

59 6421 Fairfax County Parkway at New Dominion Parkway Upgrade ramps to be ADA compliant

60 6521 Fairfax County Parkway at Baron Cameron Avenue Crosswalk not perpendicular to the roadway Inconsistent signage/markings for channelized right-turn lane/ pedestrian crossing conflict Upgrade ramps to be ADA compliant (all corners of the intersection) W2-11 W16-7p Replace crosswalks across channelized turn lanes with high visibility crosswalk markings (all corners of the intersection) Realign crosswalk perpendicular to roadway and relocate stop bar W11-15 W11-15p W2-11 W16-7p Install pedestrian warning signs and yield bars in advance of crosswalks (all corners of the intersection)

61 6721 Fairfax County Parkway at North Walnut Branch Road (North) Upgrade curb ramps to be ADA compliant

62 6821 Fairfax County Parkway at Lake Newport Road No advance notice of Armstrong Elementary School on Lake Newport Road Upgrade curb ramps to be ADA compliant Install School Area sign 250 feet before the stop bar

63 7021 Fairfax County Parkway at Wiehle Avenue Crosswalks not aligned in a single direction Channelized right-turn lane/ pedestrian crossing conflict Upgrade curb ramps to be ADA compliant (all corners), relocating as necessary W11-15 W11-15p Relocate pedestrian signal and pushbutton Realign crosswalks to be perpendicular to travel lanes W11-15 W11-15p Install pedestrian warning signs and yield bars in advance of crosswalk

64 7221 Fairfax County Parkway at Sugarland Road Crosswalk not perpendicular to the roadway Inconsistent signage/markings for channelized right-turn lane/ pedestrian crossing conflict Upgrade curb ramps to be ADA compliant Align crosswalk perpendicular to roadway and relocate stop bar Install pedestrian warning signs and yield bars in advance of crosswalk W11-15 W11-15p

65 7321 Fairfax County Parkway at Leesburg Pike Eastbound Ramps No turns (R3-3) sign displays legend, not graphical information Crosswalk not perpendicular to the roadway Inconsistent signage/markings for channelized right-turn lane/ pedestrian crossing conflict W11-15 W11-15p Install pedestrian warning signs and yield bars in advance of crosswalk Upgrade curb ramps to be ADA compliant R3-2 Replace "no turns" sign with R3-2 sign Add Route 7 shield pavement markings W11-15 W11-15p Align crosswalk perpendicular to roadway

66 7322 Fairfax County Parkway at Leesburg Pike Westbound Ramps Fairfax County Parkway at Leesburg Pike Westbound Ramps No turns (R3-3) sign displays legend, not graphical information Turn-lane storage for upstream intersection may cause confusion Crosswalk not perpendicular to the roadway Inconsistent signage/markings for channelized right-turn lane/ pedestrian crossing conflict Add Route 7 shield pavement marking Replace "no turns" sign with (R3-2) sign W2-11 W16-7p Upgrade curb ramps to be ADA compliant Install pedestrian warning signs and yield bars in advance of crosswalk R3-2 W11-15 W11-15p Upgrade curb ramps to be ADA compliant

67 7521/7531 Franconia-Springfield Parkway at Bonniemill Lane/Spring Village Drive and Bonniemill Lane at Hooes Road Pushbutton accessibility issues Existing curb ramps are non-compliant No crosswalk across Bonniemill Lane No pedestrian signal across north and south legs Inconsistent crosswalk marking for trail crosswalk Missing sidewalk connection to bus stop; no pedestrian bus stop pad Trail continuity not clearly defined Closely spaced intersections with mixed traffic control Missing sidewalk connection along an apparent caddle path Traffic signal displays located more than 150 feet from the stop bar in all directions Existing signal cabinet obstructs visibility for the northbound rightturn traffic and is located within the clear zone Substandard street name signs at the intersection Inadequate advance signage approaching the intersection Existing curb ramps are non-compliant No crosswalks No sidewalk connectivity on the south side of Hooes Road No storage for southbound left-turn onto Hooes Road

68 7521/7531 Franconia-Springfield Parkway at Bonniemill Lane/Spring Village Drive and Bonniemill Lane at Hooes Roadp a Relocate pushbutton to new pedestal pole Install sidewalk to Bethnal Court Upgrade all curb ramps to be ADA compliant Install high visibility crosswalk markings Install pedestrian signals and pushbuttons Install crosswalk and adjust stop bar Install pedestrian bus stop pad and sidewalk Install sidewalk Install crosswalks Install retroreflective backplates on all signals Install W3-3 signs approximately 1,400 feet in advance of the stop bar (eastbound and westbound) with "SIGNAL AHEAD"pavement

69 7621 Backlick Road at Franconia- Springfield Parkway Eastbound Ramps Pushbutton accessibility issues No pedestrian signal across the south leg Driveway apron within the influence area of the signalized intersection Limited visibility of guide signage to Franconia-Springfield Parkway Install 775 feet prior to the stop bar (northbound approach) Install guide signage to eastbound Franconia - Springfield Parkway Install mountable curb to control access at the signal Install at northbound approach stop Install at southbound approach stop Relocate pedestrian pushbuttons adjacent to curb Install pedestrian signal for crossing south leg

70 7622 Backlick Road at Franconia- Springfield Parkway Westbound Ramps Backlick Road at Franconia-Springfield Parkway Westbound Ramps Inconsistent signage/marking for channelized right-turn lane/pedestrian crossing conflict Pedestrian sidewalk and ramps in channelizing island are in poor condition Crosswalk not aligned in a single direction Lack of pedestrian accessibility across Backlick Road between Villa Park Road and the Franconia-Springfield Parkway eastbound off-ramp Limited visibility of guide signage to Franconia-Springfield Parkway Limited visibility of southbound conflicting vehicles from the eastbound right-turn lane Poor visibility of conflicting northbound vehicles from the southbound left-turn lane due to roadway curvature Limited visibility of signal displays due to overhead bridge structures on the northbound approach Intersection lighting is limited, but ample lighting is provided along approaches and in the adjacent park-and-ride lot (potential glare) Evaluate intersection lighting improvements to reduce potential glare Shift stop bar for through and leftturns back 10 feet Install retroreflective backplates on all signals Install pedestrian warning signs and yield bars in advance of crosswalk W2-11 W16-7p Upgrade curb ramps and sidewalk to be ADA compliant Install at southbound approach stop Realign crosswalk Install at northbound approach stop Replace existing protectedpermissive signal display with a protected only signal display Install high visibilty crosswalk, curbramps, pedestrian signals, and pushbuttons Install northbound and southbound guide signage to westbound Franconia- Springfield Parkway (see below signs) Install 775 feet prior to the stop bar (southbound approach)

71 7721 Franconia-Springfield Parkway at I-95 HOV (Express Lanes as of December 2014) Limited visibility of guide signage to Backlick Road Traffic signal displays located more than 110 feet from the stop bar in all directions Inadequate advance signage approaching the intersection Somewhat limited signal visibility on the approach to the intersection in both directions Franconia-Springfield Parkway at I-95 HOV (Express Lanes as of December 2014) Install near-side traffic signal displays at all approaches Install improved guide signage to Backlick Road Install signal ahead signs on right- and left-hand shoulders W3-3

72 7821/7822 Frontier Drive at Franconia- Springfield Parkway Eastbound/Westbound Ramps / Frontier Drive at Franconia-Springfield Parkway Eastbound/Westbound Ramps Existing curb ramps are non-compliant with ADA Pushbutton accessibility issues Limited signal visibility due to horizontal curves and dense vegetation Bike lanes along Frontier Drive do not connect with the Metrorail station 7822 Existing curb ramps are non-compliant with ADA Inconsistent signage/marking for channelized right-turn lane/pedestrian crossing conflict Crosswalk not perpendicular to the roadway Guidance to I-95 general purpose lanes not provided, only to HOV (Express) lanes Realign crosswalk perpendicular to travel lane Provide lane markings to guide bicyclists to/from the Metrorail station Relocate pedestrian pushbuttons adjacent to curb ramp or provide connectivity to existing pushbuttons Install near-side traffic signal displays at northbound approach Install pedestrian warning signs and yield bars in advance of crosswalk W2-11 W16-7p Install guide signage to I-95 with guide signage to Frontier Drive (775 feet from westbound approach stop bar) Upgrade allcurb ramps to be ADA compliant

73 7931 Franconia-Springfield Parkway at Franconia-Springfield Metrorail Station Loop Inconsistent signage/marking for channelized right-turn lane/ pedestrian crossing conflict No crosswalk across ramps No stop bar on southbound approach Install pedestrian warning signs and yield bars in advance of crosswalk W11-15 W11-15p Install stop bar Install pedestrian warning signs and yield bars in advance of crosswalk W11-15 W11-15p Install high visibility crosswalks and upgrade all curb ramps to be ADA compliant W11-15 W11-15p

74 8031 Franconia-Springfield Parkway at Walker Lane No crosswalk across Walker Lane Install high visibility crosswalk and relocate stop bar Upgrade all curb ramps to be ADA compliant

75 8121 Franconia-Springfield Parkway at Beulah Street Existing curb ramps are non-compliant Inconsistent signage/marking for channelized right-turn lane/pedestrian crossing conflict Crosswalk not perpendicular to the roadway Existing pedestrian refuge islands are not ADA compliant and do not provide reasonable safety to pedestrians Eastbound left-turn lane queue spillback Queue spillback from the northbound and southbound left-turn lanes Operational issues caused by high intersection volumes High pedestrian volume conflicting with channelized right-turn lanes, which do not function as controlled pedestrian crosswalks Bike lanes along Beulah Street are not carried through the intersection Challenging pedestrian access from the trail head on the northwest corner across Beulah Street Unclear right-of-way on the westbound departure lanes for through and right-turn traffic Existing advance signal guide signage located too close to the intersection Limited advance guide signage in advance of the traffic signal in the eastbound direction Vertical curvature and peak congestion limits driver reaction to the downstream signal in the eastbound direction Heavy eastbound U-turn volume Traffic signal displays located more than 150 feet from the stop bar in all directions

76 Franconia-Springfield Parkway at Beulah Street Upgrade all curb ramps to be ADA compliant Franconia-Springfield Parkway at Beulah Street Install near-side traffic signal displays at each approach Eliminate channelized rightturn movement Relocate or replace next signal (D3-2) signs to be a minimum 565 feet before the stop bar (southbound, westbound) Realign crosswalk to be perpendicular to roadway, cover all southbound lanes Install advance intersection warning signs 1,500 feet before stop bar, extend mini-skip markings for the right-turn lane, install rightturn pavement markings, and right lane must turn right (R3-7) sign. Install next signal (D3-2) sign on the mast arm. Extend eastbound left-turn lanes W11-15 W11-15p R10-16 Bike lane striping through intersection Install lane control sign to indicate eastbound U-turn is served by left-most lane Reconstruct sidewalk and ramps W11-15 W11-15 W11-15p W11-15p Modify geometry to three northbound turn lanes and three westbound through lanes Install pedestrian warning signs and yield bars in advance of crosswalk

77 8131 Beulah Street at Alforth Avenue Channelizing island does not provide ADA compliant access across Alforth Avenue No crosswalk across Alforth Avenue No stop bar on eastbound approach Install crosswalk Install stop bar Provide median cut to allow for continunous path across Alforth Avenue or upgrade channelizing island Upgrade all curb ramps to be ADA compliant

78 8132 Beulah Street at Lewin Drive/ Shopping Center Upgrade all curb ramps to be ADA compliant

79 8133 Beulah Street at Metro Park Drive/ Charles Arrington Drive No crosswalk across Metro Park Drive Upgrade all curb ramps to be ADA compliant Install crosswalk

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00

More information

APPENDIX L PLANNING LEVEL COST ESTIMATES. Development of Costs Tabular Summary of Planning Level Cost Estimates

APPENDIX L PLANNING LEVEL COST ESTIMATES. Development of Costs Tabular Summary of Planning Level Cost Estimates APPENDIX L PLANNING LEVEL COST ESTIMATES Development of Costs Tabular Summary of Planning Level Cost Estimates DEVELOPMENT OF COSTS FOR NONSTANDARD COMPONENTS This section will detail the process, assumptions,

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017 MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

Route 28 Corridor Safety and Operations Study

Route 28 Corridor Safety and Operations Study Route 28 Corridor Safety and Operations Study Technical Committee Meeting #4 May 22, 2015 1 Agenda Planned Corridor Activities Candidate Improvements Recommendations Immediate Actions & Status Next Steps

More information

Appendix D: Concept Screening

Appendix D: Concept Screening Concept Description Concept #1 Route 288 Roadway Widening This concept consists of constructing a third lane on northbound and southbound Route 288 between Powhite Parkway and US 360. This improvement

More information

Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015

Route 28 Corridor Safety and Operations Study Public Information Meetings. July 20 and 22, 2015 Route 28 Corridor Safety and Operations Study Public Information Meetings July 20 and 22, 2015 1 Study Goals and Objectives Phase 1 Short-term Short-term improvements Ability to implement quickly Cost

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

Giles Run Connector Road

Giles Run Connector Road Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment

More information

Route 28 Corridor Safety and Operations Study

Route 28 Corridor Safety and Operations Study Route 28 Corridor Safety and Operations Study Steering Committee Meeting #5 May 29, 2015 1 Agenda Planned Corridor Activities Candidate Improvements Recommendations Immediate Actions & Status Next Steps

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Huntington Station Metro Zone / North Kings Highway Concept Plan

Huntington Station Metro Zone / North Kings Highway Concept Plan Summary Narrative of Huntington Station Metro Zone / North Kings Highway Concept Plan Located in Fairfax County, Virginia prepared for A.J. Dwoskin & Associates, Inc.. 9302 Lee Highway, Suite 300 Fairfax,

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

Road Safety Assessment

Road Safety Assessment Road Safety Assessment Team Findings Report July 2013 Page 1 of 36 Introduction East Bay Drive from Lake Avenue to Keene Road The Federal Highway Administration s (FHWA) Safety Office established Road

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Hidden Oaks Elementary School

Hidden Oaks Elementary School Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. September 7 th, 2007 Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. Acting District Administrator Mr. Morteza Salehi has endorsed

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT ROAD SAFETY AUDIT Route 38 from Route 62 to Woburn Town Line Town of Wilmington April 10, 2017 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite 3, Westford,

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project New Travel Choices Ahead Capital Beltway HOT Lanes Project Update January 2011 Major Milestones Reached in 2010 Project is 55% complete New bridge spans completed at every interchange; Second phase well

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN

TOWN OF IRONDEQUOIT ACTIVE TRANSPORTATION PLAN TOWN OF IRONDEQUOIT March 2017 FINAL DRAFT: EXECUTIVE SUMMARY PREPARED FOR SUBMITTED BY IN ASSOCIATION WITH Town of Barton & Loguidice, DPC Sprinkle Consulting, Inc. 1280 Titus Avenue Rochester, New York

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

Forest Hills Improvement Initiative

Forest Hills Improvement Initiative Forest Hills Improvement Initiative Transportation Action Plan Short Term Recommendations ONLY Final Draft as of April 30, 2008 For Community Review and Feedback Prepared for: The City of Boston Boston

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the

More information

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford ROAD SAFETY AUDIT East Main Street (Route 16) at Medway Road (Route 109), East Main Street (Route 16) at Quarry Square Driveways, East Main Street (Route 16) at Beaver Street/ Fortune Boulevard Town of

More information

Blair/Williamson Intersection Expressed Needs

Blair/Williamson Intersection Expressed Needs Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS 1 2 3 ATTACHMENT NO. 1 RW No. 1, Jan 2012 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 National Committee on Uniform Traffic Control Devices

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Memorandum. Sunday, July 13, Saturday, July 19, 2014 Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn

More information

Welcome to the first issue of Nuts and Bolts, a monthly overview of VDOT activities for elected officials in Northern Virginia.

Welcome to the first issue of Nuts and Bolts, a monthly overview of VDOT activities for elected officials in Northern Virginia. December 2002 Welcome to the first issue of Nuts and Bolts, a monthly overview of VDOT activities for elected officials in Northern Virginia. Each month, you will receive the latest information on projects

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project Supervisor Cook Announces Final Plans for Braddock Road Improvement Project After more than two years of study and significant community input, I am pleased to announce the final plans for the Braddock

More information

ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)

ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95) ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P. 6.30 to M.P. 1.95) SWNI Meeting November July 18, 2016 19, 2015 Portland, Oregon BARBUR ROAD SAFETY AUDIT FHWA RSA Process

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

May 4, Dear Mr. Thomas and Mr. Snyder,

May 4, Dear Mr. Thomas and Mr. Snyder, Daniel Thomas, Principal Planner Christopher Snyder, County Engineer DuPage County Division of Transportation 421 N County Farm Road Wheaton, IL 60187 May 4, 2016 Dear Mr. Thomas and Mr. Snyder, On behalf

More information

Rank #1 Highest Priority Intersection

Rank #1 Highest Priority Intersection Rank #1 Highest Priority Intersection Attachment 3: Proposed Interventions Pedestrian Safety City of Toronto s 10 Priority Intersections Sheppard Avenue East and Ambrose Road/Provost Drive Located in the

More information

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA VDOT & FHWA Roundabout Workshop September 17, 2013 Chris Tiesler, PE Presentation Outline US 15/US

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

EXHIBIT U THE SCOPE DOCUMENT

EXHIBIT U THE SCOPE DOCUMENT EXHIBIT U THE SCOPE DOCUMENT 1. Introduction 1.1 Purpose of the Scope Document The Scope Document provides an overview of the Route 495 HOT Lanes in Virginia Project as description of the Concessionaire

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

Best Practices for the Design and Operation of Reduced Conflict Intersections

Best Practices for the Design and Operation of Reduced Conflict Intersections Best Practices for the Design and Operation of Reduced Conflict Intersections OCTOBER 2016 Prepared By: Table of Contents INTRODUCTION... 5 Purpose... 5 Definition... 5 Advantages... 6 Disadvantages...

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

COMMUNITY MEETING AGENDA

COMMUNITY MEETING AGENDA COMMUNITY MEETING AGENDA Welcome and Introductions SAFE Presentation Project Presentation Priorities Feedback Next Steps Q&A Santa Cruz Avenue Corridor Study 1 Santa Cruz Avenue Corridor Study Community

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

Maywood Town Hall Meeting. May 4, 2016

Maywood Town Hall Meeting. May 4, 2016 Maywood Town Hall Meeting May 4, 2016 1 AGENDA Overall I-290 Study Background Maywood Advisory Working Group (AWG) findings to date Noise Wall Update Next Steps 2 Questions? Study team members also available

More information

Table of Contents. Introduction. Prompt List Arterials and Streets. Prompt List Interchange. Prompt List Intersections. Prompt List Limited Access

Table of Contents. Introduction. Prompt List Arterials and Streets. Prompt List Interchange. Prompt List Intersections. Prompt List Limited Access Table of Contents Introduction Prompt List Arterials and Streets Prompt List Interchange Prompt List Intersections Prompt List Limited Access Prompt List MOT Prompt List Pedestrian Bicyclist Prompt List

More information

East 12 th Street Bikeway Feasibility Study

East 12 th Street Bikeway Feasibility Study Final Report East 12 th Street Bikeway Feasibility Study Prepared for: City of Oakland Public Works Agency Submitted by: 180 Grand Avenue, Suite 250 Oakland, CA 94612 Phone: (510) 839-1742; Fax: (510)

More information

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

Attachment No. 13. National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

Attachment No. 13. National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS 1 2 3 4 Attachment No. 13 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 RWSTC agenda item IV. 2 June 2011 National Committee on Uniform

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT ROAD SAFETY AUDIT Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst November 15, 2016 Prepared For: MassDOT Prepared By: Greenman-Pedersen, Inc. 181 Ballardvale Street, Suite

More information

Joshua Jester, E.I., Florida Department of Transportation, District One

Joshua Jester, E.I., Florida Department of Transportation, District One MEMORANDUM To: From: Joshua Jester, E.I., Florida Department of Transportation, District One Michael Garau, P.E., Kimley-Horn and Associates, Inc. Date: October 5, 2018 Subject: at Gulfstream Avenue Intersection

More information

Public Meeting #1 Comment Summary

Public Meeting #1 Comment Summary Public Meeting #1 Comment Summary This summary includes comments received on comment forms and during conversations between attendees and project team staff at the February 18, 2016 public open house.

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Development Engineering 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 Engineering Services Division REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Phone: 916-808-8300 Fax: 916-808-1984 Preparation

More information

4.0 TRANSPORTATION SYSTEMS

4.0 TRANSPORTATION SYSTEMS Transportation Systems 4.0 TRANSPORTATION SYSTEMS This chapter examines the impacts of the Central Corridor Extension on existing roadways and traffic operations and discusses the transit service, operations,

More information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information