1 City of Atlanta Approved TSPLOST Purposes and Recommended Projects List Atlanta BeltLine Title Mode, Project Type Atlanta BeltLine/Multi-use Trails Council District Description Length (miles) To From Rev TSPLOST Cost Multiple Right-of-way acquisition of the Atlanta BeltLine loop and spur trails and install lighting. 6.3 () Renew Coordination (5) Studies and Stakeholder $65,900,000, 3, 5, Paving and Resurfacing 9 improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Restripe bike lanes adding buffers and protection as space permits. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate $5,500,000, 3,, 5 5th Street improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Restripe bike lanes adding buffers and protection as space permits. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate 0.7 I-75/5 Myrtle Street $1,530,000, 3,, 5 Euclid Avenue North Avenue improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, and shared lane markings. Install bulb outs, bus shelters, green stormwater infrastructure and electric vehicle charging stations as appropriate Subject to engineering study, remove traffic 0.3 signal at Austin Avenue and replace with traffic circle or stop signs. improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Install median and medianettes as space permits. 0.7 Moreland Avenue Austin Avenue $1,97,377, 3,, 5 Moreland Avenue Bonaventure Avenue $,19,69, 3,, 5 Spring Street improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting and a protected bike lane. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate 1. North Avenue Peachtree Street $3,75,50, 3,, 5 West Peachtree Street improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting and a protected bike lane. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate Project includes complete street improvements at Civic Center MARTA Station bridge. Subject to engineering study, convert from one-way to two way operation segment south of North Avenue.. Peachtree Street NW Peachtree Street (SW) $5,6,76, 3,, 5 Langhorn Street improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate and space permits. Project includes reducing the number of travel lanes. 0.7 Westview Drive ramps R.D. Abernathy Boulevard $,00,000, 3,, 5 Gilmer Street 5 improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, and protected bicycle lanes. Install bulb outs, bus shelters, green stormwater infrastructure and electric vehicle charging stations as appropriate 0.3 Jesse Hill Jr Drive Peachtree Center Avenue $73,567, 3,, 5 City of Atlanta Approved TSPLOST Purposes and Recommended Projects List 1

2 () Renew Coordination (5) Studies and Stakeholder LaFrance St/ Marion Place 5 improvements including resurfacing, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Install bulb outs, bus shelters, green stormwater infrastructure and electric vehicle charging stations as appropriate 0. Marion Pl Arizona Avenue $1,377,96, 3,, 5 Westland Boulevard Cascade Road, 11 improvements including resurfacing, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. improvements including resurfacing, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Install bike lanes and bus shelters as space permits Burton Road M.L. King Jr Drive $55,3, 3,, 5 City Limits Willis Mill Road $3,061,766, 3,, 5 Peachtree Center Avenue Piedmont Avenue, 5, 5 improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, and protected bicycle lanes. Install bulb outs, bus shelters, green stormwater infrastructure and electric vehicle charging stations as appropriate improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, and a protected bicycle lane. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate 0.7 Edgewood Avenue Peachtree Street $3,395,170, 3,, Ponce de Leon Avenue (US-7) J.W. Dobbs Avenue $5,15,5, 3,, 5 North Highland Avenue, 6 improvements including resurfacing, sidewalk repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, and, as space permits, bicycle lanes. Install bulb outs, bus shelters, green stormwater infrastructure and electric vehicle charging stations as appropriate Project includes installation of a PHB/RRFB crossing enhancement at Blue Ridge Avenue. 3.9 Lenox Road Central Park Place $11,607,5, 3,, 5 Chappell Road Campbellton Road s 3, 9, 11, 1 improvements including resurfacing, sidewalk installation and repair, street D.L. Hollowell Parkway 0.6 trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. J.E. Boone Boulevard (US- 7) $99,7, 3,, 5 improvements including resurfacing, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, bus shelters, and. protected bike lanes. Greenbriar Parkway Lee Street $3,709,150, 3,, 5 improvements including resurfacing, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, bus shelters, and protected bike lanes. -, 3, East Side Trolley Trail 5 Construct multi-use trail between Gilliam Park and the Atlanta BeltLine. 0.3 Moreland Avenue Stovall Street $796,75, 3,, 5 East Side Trolley Trail Construct multi-use trail segment between the East Side Trolley Trail in Gilliam Connector 5 Park and Arizona Avenue. 1.6 Trolley Trail Arizona Avenue $500,000, 3,, 5 South Fork Conservancy + PATH 00 Confluence Bridge 6 Construct confluence project pedestrian bridge(s) and appurtenances between Adina Driveive to North and South Fork Trails, Atlanta BeltLine and PATH 00. Adina Dead End Peachtree Creek Confluence $360,000, 3,, 5 PATH 00 6, 7 Construct multi-use trail along GA 00 from Sandy Springs to Lindbergh Center. 5.0 City Limits Piedmont Road $5,000,000, 3,, 5 City of Atlanta Approved TSPLOST Purposes and Recommended Projects List

3 () Renew Coordination (5) Studies and Stakeholder Freedom Parkway Trail to Stone Mount Trail Connector H.E. Holmes Trail Connection, 5 3, Proctor Creek 9 Lionel Hampton Trail Connection 3, Extend the Stone Mountain multi-use trail along the south side of DeKalb Avenue from Rocky Ford Rd/DeKalb Pl to Inman Park/Reynoldstown MARTA Station, the Freedom spur trail, and the Edgewood Avenue bike lanes. Project includes safe bicycle and pedestrian access to the Edgewood/Candler Park and Inman Park/Reynoldstown MARTA Stations. Construct multi-use trail between the Harvel Homes neighborhood to HE Holmes Drive and the HE Holmes MARTA Station. Construct multi-use trail between the Chattahoochee River, Bankhead MARTA Station, and the Atlanta BeltLine Corridor. 6.6 Construct missing L Hampton multi-use trail segment between Mozley Park and Anderson Park Project includes streetscape improvements along Anderson Avenue. 0.6 Inman.3 Park/Reynoldstown MARTA Driveiveway City Limits $,167,05, 3,, 5 H.E. Holmes MARTA 0. Verbena Circle Station $76,371, 3,, 5 Chattahoochee River D.L. Hollowell Parkway -, 3,, 5 Calloway Drive Browning St $639,39, 3,, 5 Westview Cemetery - West Lake Station Trail, Construct multi-use trail connecting Westview and along Ralph David Abernathy with Westwood Avenue/Lionel Hampton Trail by creating a multi-use trail on the southern boundary of Westview Cemetery, including paving Willis Mill Rd at the Lionel Hampton Trail Head 1.1 Larchwood Westview $1,0,000, 3,, 5 Blue Heron Blueway Trail 7, Construct a multi-use trail from Chastain Park to the Blue Heron Nature Preserve via Nancy Creek 1.5 Chastain Park Blue Heron Nature Preserve $1,13,66, 3,, 5 Cascade Nature Preserve Construct a Multi-use trail in the Cascade Nature Preserve -,3 s Multiple Construct s in the City of Atlanta -, 3, 1th Street 3 streetscape improvements including, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Improve safety of tunnel under Buford Hwy Connector. May include one-way to two-way conversion. 0. SCAD W Peachtree St $731,5, 3,, 5 Pedestrian Facilities Sunset Avenue 9 3 streetscape improvements including, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Improve safety of tunnel under Buford Hwy Connector. May include one-way to two-way conversion. $5,500,000, 3,, 5 streetscape improvements including, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate and space 1.1 permits. North Avenue ML King Jr Drive $1,770,7, 3,, 5 Ted Turner Drive streetscape improvements including, sidewalk installation and repair, street trees, 0.6 M.L. King Jr Drive Whitehall St $,1,39, 3,, 5 Cheshire Bridge Road 6 streetscape improvements including, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, and bus shelters. 1.1 Chantilly Drive Wellbourne Drive $3,,96, 3,, 5 City of Atlanta Approved TSPLOST Purposes and Recommended Projects List 3

4 () Renew Coordination (5) Studies and Stakeholder Buckhead Village Sidewalks 7, In the Buckhead Village,.0 miles of sidewalk/streetscape improvements including, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate.0 Buckhead Village $,000,000, 3,, 5 Atlanta Memorial Park Area Pedestrian, Access, and Safety Improvements Construct new bicycle and pedestrian bridge between Dellwood Drive and Colonial Homes over Peachtree Creek. On Woodward Way and Wesley Drive, install sidewalks on the south side of the street and neighborhood greenway improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure. On Northside Drive, install four pedestrian crossing enhancements. 3.0 Atlanta Memorial Park area $,55,0, 3,, 5 Chastain Park Area Pedestrian and Safety Improvements Complete multi-use trail loop around Chastain Park and sidewalk improvements around Chastain Park. On Wieuca Rd between Chastain Park and Roswell Rd, construct sidewalk/streetscape improvements including, sidewalk installation and repair, resurfacing, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. 1.0 Chastain Park Trail Roswell Road $1,670,60, 3,, 5 M.L. King Jr Drive Danforth Road Cleveland Avenue/Metropolitan Pkwy 11 1 Leverage funding for the ML King Jr Drive improvement project. streetscape improvements including, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, bus shelters, and multi-use trail sidepath. 5.5 R.D. Abernathy Boulevard streetscape improvements including, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, and lighting. Completes Danforth Rd 0. streetscape project in its entirety. streetscape improvements including, sidewalk installation and repair, street trees, restored curbing, ADA compliant crosswalks and ramps, lighting, bus shelters, and protected bike lanes..3 City Limits $,000,000, 3,, 5 Cascade Road New Hope Rd $,00,000, 3,, 5 Hapeville/ City Limits Jonesboro Rd $15,073,00, 3,, 5 Browns Mill Road 1 streetscape improvements on the west side including, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, and bus shelters. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate 1.1 Cleveland Avenue Oak Drive $1,67,70, 3, 5 Hutchens Road 1 streetscape improvements including, sidewalk installation and repair, street trees, 1.1 Jonesboro Road Forrest Park Rd $1,71,33, 3,, 5 Dill/Metropolitan, Dill/Sylvan Commercial Node Lakewood Avenue 1 1, 1 Within the Dill Avenue neighborhood commercial area, construct sidewalk/streetscape improvements including, sidewalk installation and repair, street trees, granite curbing, ADA compliant crosswalks and ramps, lighting, and bus shelters. Install bulb outs, green stormwater infrastructure and electric vehicle charging stations as appropriate and space permits. streetscape improvements including, sidewalk installation and repair, street trees, 1.0 Dill/Sylvan and Dill/Metropolitan Hapeville/City Limits $1,0,000, 3,, 5 Southtowne Trail Harriet St $3,376,00, 3,, 5 City of Atlanta Approved TSPLOST Purposes and Recommended Projects List

5 () Renew Coordination (5) Studies and Stakeholder Beecher/Cascade Commercial Node Sidewalk Gap Closure Fund Sidewalks and s, Within the Beecher/Cascade neighborhood commercial area, construct sidewalk/streetscape improvements including, sidewalk installation and repair, street trees, 0. Beecher Street/Cascade Avenue $1,05,60, 3,, 5 Programmatic funds to close gaps in the existing sidewalk network. Funds will be focused on sidewalk construction. $9,000,000, 3, streetscape improvements including, sidewalk installation and repair, street trees, -, 3, th St/Peachtree Place Myrtle Street improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure providing east-west connectivity in Midtown and a connection to the Midtown MARTA Station. May include oneway to two-way conversion. improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the 5th St bike lanes to the th St protected bike lanes Williams Street Myrtle St $,665, 3,, 5 th Street 5th St $1,39, 3,, 5 JP Brawley Drive State Street AUC 3 3 improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the Atlanta University Center to the Vine City Promenade, the Lena St multi-use trail, neighborhoods to the north, and the Jefferson St bike lanes. improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting Georgia Tech, Atlantic Station, and Home Park. improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the Atlanta University Center to the Ashview Heights neighborhood, the Westview Avenue protected bike lanes, and Castleberry Hill M.L. King Jr. Drive Marietta Blvd (by way of Jefferson Street) $5,333, 3,, 5 16th Street th St $113,636, 3,, 5 Agnes Jones Place Chappell St $15,53, 3,, 5 Oglethorpe Avenue Oakview Road Reynoldstown 5 5 improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting West End to 0. the West End MARTA Station and the Atlanta BeltLine multi-use trail on White St. improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the East Side Trolley Trail to the Kirkwood neighborhood commercial area, and the Oakhurst Village. 1.0 improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the Edgewood Retail District to the Inman Park/Reynoldstown MARTA Station and the Atlanta BeltLine Corridor. White Street Lee St $15,1, 3,, 5 Hosea Williams Drive (Kirkwood Village) City Limits (nd Avenue) $0,65, 3,, Flat Shoals Avenue Moreland Avenue $0,, 3,, 5 City of Atlanta Approved TSPLOST Purposes and Recommended Projects List 5

6 () Renew Coordination (5) Studies and Stakeholder input (6) Maintenance Rocky Ford Road 5 improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the Kirkwood neighborhood commercial area to the Stone Mountain multi-use trail and proposed bike lanes on College Avenue. 0.9 College Avenue Oakview Rd $19,39, 3,, 5 Piedmont Heights/Sherwood Forest Larchwood St/Willis Mill Road 6 improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the Midtown business district to the Atlanta BeltLine Corridor and neighborhoods to the east. Project includes modifications to Piedmont Rd/Montgomery Ferry intersection and the N Rock Springs/E Pelham Rd intersection. improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the proposed multi-use trail next to Westview Cemetery to the L Hampton Trail and the HE Holmes MARTA Station West Peachtree Street Piedmont Avenue $560,000, 3,, 5 M.L. King Jr. Drive ML King Jr Drive $196,970, 3,, 5 Oakdale Road/ Whitefoord Avenue, 5, 6 improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the proposed East Side Trolley multi-use trail to the Edgewood/Candler Park MARTA Station and neighborhoods to the north. Project includes resurfacing and updating pavenuement markings at MARTA underpass and construction of neighborhood traffic circle at intersection with LaFrance St. 1.6 Fairview Road Arkwright Pl $73,6, 3,, 5 Hunter Hills 3, improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure along the in-street portion of the L Hampton Trail in the Hunter Hills neighborhood. 0.5 Sharon Street Rockmart Drive $90,909, 3,, 5 Baker Road/North Avenue 3, 9 improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the Center Hill, Grove Park, and Bankhead neighborhoods to the Bankhead MARTA Station, the Proctor Creek, and the Atlanta BeltLine Corridor..6 H.E. Holmes Drive Chappell Rd $511,36, 3,, 5 McDaniel Street, 1 improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure. 1.0 R.D. Abernathy Boulevard University Avenue $06,000, 3,, 5 Cascade Nature Preserve Improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure connecting the Cascade Nature Preserve surrounding neighborhoods -, 3 s improvements including traffic calming, green stormwater infrastructure, street trees, wayfinding, and bicycle infrastructure. -, 3 Phipps Boulevard/Wieuca Road Roundabout 7 New roundabout to improve safety and capacity. Project to include safe accommodation for pedestrians and bicyclists. Phipps Boulevard/ Wieuca Road $3,750,000 1,, 3,, 5 City of Atlanta Approved TSPLOST Purposes and Recommended Projects List 6

7 () Renew Coordination (5) Studies and Stakeholder input (6) Maintenance Piedmont Road Capacity Improvement 7 Widen Piedmont Rd from existing 5/6 lanes to 7 lanes, including intersection improvements at Tower Place and Lenox Rd (SR 11 Connector). Project incorporates elements including a 16 foot multi-use trail from Lenox Rd to Peachtree Rd on south side of the project. 0. Peachtree Road Lenox Rd $,50,000 1,, 3,, 5 Moores Mill Road and Howell Mill Road Construction funding to implement concept developed with Renew Atlanta Bond funding. Project to increase vehicular intersection capacity. Solutions may include introducing turn lanes, signalization, or a roundabout. Project to include ADA compliant crosswalks, ramps, push buttons, and countdown signal heads. Moores Mill Road/Howell Mill Road $,500,000 1,, 3,, 5 Moores Mill Road and West Wesley Road Construction funding to implement concept developed with Renew Atlanta Bond funding. Project to increase vehicular intersection capacity. Solutions may include introducing turn lanes, signalization, or a roundabout, and resurfacing from I-75 to W Wesley Rd. Project to include ADA compliant crosswalks, ramps, push buttons, and countdown signal heads. Moores Mill Road/West Wesley Road $,500,000 1,, 3,, 5 Mt Paran Road, West Conway Road, and Randall Mill Road Construction funding to implement concept developed with Renew Atlanta Bond funding. Project to increase vehicular intersection capacity. Solutions may include introducing turn lanes, signalization, or a roundabout. Project to include ADA compliant crosswalks, ramps, push buttons, and countdown signal heads. Mt Paran Road/West Conway Road/Randall Mill Road $,500,000 1,, 3,, 5 Cascade Road/I-5 Interchange Downtown Connector 17th Street Enhancements Hosea Williams Drive Midtown Protected Pedestrian Crossings Increase vehicular capacity of interchange via diverging diamond interchange and/or other 11 capacity improvements. Include accommodations for pedestrians including ADA compliant Cascade Road/ crosswalks, ramps, push buttons, and countdown signal heads. I-5 Interchange $,000,000 1,, 3,, 5 Streets: Gateway project includes sustainable infrastructure and gateway improvements, Enhancement landscaping and enhancements.0 Brookwood Split I-0 $,000,000, 5 Streets: Enhancement 3 Sidewalk, bike lane, and bus only lane improvements to improve safety and reliability. 0.5 Market Street Peachtree St $50,000 1,, 3,, 5 Streets: Enhancement 5 Install bulbouts on all corners to protect parking and shorten pedestrian crossing distances Moreland Avenue Candler Rd $660,000, 3,, 5 Streets: Install new signals or safe crossings at 15 high-priority locations in the Midtown business Midtown business Enhancement, 3, 6 district to improve pedestrian safety and accessibility. district $,975,000 1,, 3,, 5 Fort McPherson Redevelopment: Northern Gateway Streets: Extension, 1 Extend Oakland Drive into the Fort McPherson Redevelopment Area, connecting the redevelopment area, the Oakland City MARTA Station, and neighborhoods to the north. 0.5 Van Buren Street Fort McPherson redevelopment area $5,000,000 1,, 3,, 5 Mitchell Street/Capitol Square Conversion to Two Way Streets: One Way Conversion Convert street from one-way to two-way operation, including signal modifications and signage. Street reconfiguration to include bike lanes in both directions. Project to repair and enhance additional street elements as funding permits. 0.7 Ted Turner Drive Fraser St $,65,000 1,, 3,, 5 Baker St Conversion to Two Way Streets: One Way Conversion,, 5 Convert street from one-way to two-way operation, including signal modifications and signage. Street reconfiguration to include bikeway improvements between Marietta St and Centennial Olympic Park Drive. Project to repair and enhance additional street elements as funding permits. 0.9 Marietta Street Piedmont Avenue $57,500 1,, 3,, 5 City of Atlanta Approved TSPLOST Purposes and Recommended Projects List 7

8 Street, Capacity, and Vehicular Improvements Street, Capacity, and Vehicular Improvements Construction funding for street capacity and vehicular improvements within the City of Atlanta. () Renew Coordination (5) Studies and Stakeholder input (6) Maintenance - 1,, 3 Atlanta Signal Coordination System and Congestion Management Signal Coordination Leveraging existing investment through Renew Atlanta for state of good repair and select corridor level improvements, the project will support congestion management including enhanced operations and signal modernization, transit signal pre-emption and bike/ped detection as appropriate, fiber and other supporting infrastructure investments that will enable broad enhancement and citywide impact of the City s traffic operations system. Varies $0,000,000 1,, 3,, 5 Concept development/engineering studies for projects on state routes including: (1) RD Abernathy Blvd (SR 139) from Langhorn St to JE Lowery Blvd, () W Wieuca Rd/Roswell Rd intersection, (3) Roswell Rd (SR 9) from the city limits to Peachtree Rd, () Barge Rd and Greenbriar Parkway, (5) Jonesboro Rd, (6) Metropolitan Pkwy, (7) Moreland/I-0, 7,,, 1 interchange () Fairburn Rd and other state routes and intersections as funding permits. Project Scoping and Engineering Studies include survey, concept development, community engagement, coordination with Studies Streets: Studies GDOT, and engineering to to 30%. $,000,000 Project Scoping and Engineering Studies Streets: Studies Concept development/engineering studies for projects on state and local routes - Relay Bike Share. Phase Capital Costs Transportation Project Matching Fund Phase of the Relay Bike Share system allowing the system to double from Phase 1 of 500 Multiple Relay Bike Share to 00 bikes, increasing the reach and density, and equity of the system. Varies $3,000,000 Partnership and Matching Fund Fund for transportation purposes local match against federal, state, and other funds. $0,000,000 Project Total $35,9,61 5% for Program Management $17,91, Subtotal $376,0,13 1% to State of GA $3,76,01 TOTAL $379,966,165 City of Atlanta Approved TSPLOST Purposes and Recommended Projects List

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016 1 City of Atlanta-MARTA Sales Tax Referendum Draft Project List Atlanta City Council Work Session May 19, 2016 2 SB 369 - MARTA Sales tax for up to 0.50% is allowed in the City of Atlanta for MARTA Purpose

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Summary of Comments Public Information Meeting Wieuca Road at Phipps Boulevard Intersection Improvements June 7, 2017

Summary of Comments Public Information Meeting Wieuca Road at Phipps Boulevard Intersection Improvements June 7, 2017 The Public Meeting for the Wieuca Road at Phipps Boulevard Intersection Improvement project was held on at the Wieuca Road Baptist Church, located at 3626 Peachtree Road, Atlanta, GA 30326. There were

More information

DEKALB COUNTY. 22. Priority Projects for DeKalb County

DEKALB COUNTY. 22. Priority Projects for DeKalb County DEKALB COUNTY 2 0 1 4 T R A N S P O R T A T I O N P L A N 22. Priority s for DeKalb County Following the completion of the project prioritization metrics, each project was able to be compared to other

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Edgewood Kirkwood Grant Park Glenwood Park Cabbagetown East Lake Oakhurst Reynoldstown East Atlanta

Edgewood Kirkwood Grant Park Glenwood Park Cabbagetown East Lake Oakhurst Reynoldstown East Atlanta A PA R T N E R S H I P B E T W E E N H O N. N ATA LY N A R C H I B O N G A N D T H E G E O R G I A T E C H S C H O O L O F C I T Y A N D R E G I O N A L P L A N N I N G What We Will Talk About Imagine

More information

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

COWETA HIGH SCHOOL AND EAST HIGHWAY 51 COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to

More information

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING

BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING TRANSPORTATION FOR ALL AGES, ABILITIES & MEANS CHANGING PATTERNS: TRENDING TO WALKING, BIKING, TRANSIT San Francisco s Change in Number of Commuters by Mode

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on CAPITAL Large Category Projects Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on 07-27-18 1 La Mesa University Ave Pedestrian

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017 Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

12/4/2016 VIA  . RE: Grocery Outlet Del Paso (DR16-328) 12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.

More information

Sacramento Grid 2.0. The Downtown Transportation Study

Sacramento Grid 2.0. The Downtown Transportation Study Sacramento Grid 2.0 The Downtown Transportation Study April 20, 2016 The Grid 4.25 square miles Street grid defined at birth of City Lettered and numbered streets spaced every 400 ft East-west alleys halfway

More information

4. Action Plan & Projects

4. Action Plan & Projects 4. Action Plan & Projects 45 46 ACTION PLAN AND PROJECTS The Action Plan organizes the list of transportation projects described in the Mobility Framework Plan section into short-term (0-5 years) and long-term

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Bicycle and Pedestrian Advisory Council May 15, 2015

Bicycle and Pedestrian Advisory Council May 15, 2015 Bicycle and Pedestrian Advisory Council May 15, 2015 Updates Spring Bike/Ped counts took place Tuesday May 12 Thursday, May 14 40 volunteers and locations counted across the region More than double the

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

Complete Streets Training. Georgia Municipal Association June 27, 2016

Complete Streets Training. Georgia Municipal Association June 27, 2016 Complete Streets Training Georgia Municipal Association June 27, 2016 Overview What are CS? GDOT s Policy Case Study 2 What are Complete Streets? According to the National Complete Streets Coalition, complete

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

CITY OF ATLANTA 2017 ANNUAL BICYCLE REPORT

CITY OF ATLANTA 2017 ANNUAL BICYCLE REPORT CITY OF ATLANTA 2017 ANNUAL BICYCLE REPORT Mayor, City of Atlanta Keisha Lance Bottoms ATLANTA CITY COUNCIL Keisha Lance Bottoms, Mayor, City of Atlanta COUNCIL PRESIDENT Council Member Felicia A. Moore

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

STUDY ADVISORY COMMITTEE. October 8, 2015

STUDY ADVISORY COMMITTEE. October 8, 2015 STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

Austell Road Access Management Plan Public Meeting February 17, 2009

Austell Road Access Management Plan Public Meeting February 17, 2009 Austell Road Access Management Plan Public Meeting February 17, 2009 Laraine Vance: Dan Cohen: Cobb DOT Project Manager Pond & Company Planning Director 1 Access Management What is Access Management? The

More information

CITY OF PITTSBURGH. City of Pittsburgh Active Transportation Profile REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA

CITY OF PITTSBURGH. City of Pittsburgh Active Transportation Profile REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA 1 2 ACTIVE TRANSPORTATION AT A GLANCE Trails & Bike Routes 270 miles 28 miles 41 miles 24 miles 3 F A C I L I T I E S Facility Metrics

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

KEARNY MESA COMMUNITY PLAN UPDATE

KEARNY MESA COMMUNITY PLAN UPDATE KEARNY MESA COMMUNITY PLAN UPDATE January 18, 2018 SUBCOMMITTEE MEETING Mobility Concepts and Urban Design Presentation Outline Mobility Concepts: Multimodal Planning Toolbox Presentation and Activities

More information

Long Island Rail Road Expansion Project Floral Park to Hicksville

Long Island Rail Road Expansion Project Floral Park to Hicksville Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017 MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood

More information

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY CITY OF TULSA BICYCLE & PEDESTRIAN INFRASTRUCTURE TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY 31, 2013 CITY OF TULSA ENGINEERING SERVICES DEPARTMENT CITY OF TULSA ADA TRANSITION

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

Howell Mill Road Safety Audit Report, DRAFT

Howell Mill Road Safety Audit Report, DRAFT Howell Mill Road Safety Audit Report, 7-28-2015 DRAFT Present: Jonathan Lewis (City of Atlanta), Forrest Rose (City of Atlanta), Kwesi Nantambu & Jeremy (City of Atlanta Department of Public Works), Matthew

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study City Council October 6, 2014 Presentation Outline Project Initiation & Process Corridor Conditions & Issues Vision & Goals Concept Development - Development/Evaluation Implementation

More information

City of Madison: 2017 Capital Budget Capital Improvement Plan

City of Madison: 2017 Capital Budget Capital Improvement Plan Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction

More information

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT City of San Luis Obispo, News Release DATE: August 1, 2017 RELEASE: Immediate CONTACT: Luke Schwartz (805) 781-7190 Transportation Planner-Engineer, Public Works CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Coweta Community Overview Coweta Coweta, a residential community located in Wagoner County, is a suburb of Tulsa situated southeast of the metropolitan area

More information

Polk Streetscape Project

Polk Streetscape Project What is this project? The Polk Streetscape Project is an effort to improve safety for everyone traveling on Polk Street between Union and McAllister streets. Also included in this project are paving, sewer

More information

STONY PLAIN ROAD STREETSCAPE

STONY PLAIN ROAD STREETSCAPE Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Morristown, NJ Complete Streets Policy

Morristown, NJ Complete Streets Policy Morristown, NJ Complete Streets Policy Introduction A Complete Street is defined as a means to provide safe access for all users by designing and operating a comprehensive, integrated, connected multi-modal

More information

42nd Ave N Reconstruction

42nd Ave N Reconstruction CITY OF MINNEAPOLIS 42nd Ave N Reconstruction Community Meeting #2 May 2016 6:00 7:30 p.m. 5/16/2016 1 Purpose of Meeting Inform: Provide an overview of project, identify anticipated scope of work, and

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

Chapter 3: Multi-Modal Circulation and Streetscapes

Chapter 3: Multi-Modal Circulation and Streetscapes CHAPTER 3: MULTI-MODAL CIRCULATION AND STREETSCAPES Chapter 3: Multi-Modal Circulation and Streetscapes Overview Streetscape improvements have already been completed for Depot Street between Main Avenue

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Urbana Pedestrian Master Plan

Urbana Pedestrian Master Plan Urbana Pedestrian Master Plan Recommendations Gabe Lewis, Transportation Planner Champaign County Regional Planning Commission November 15, 2018 Public Meeting #2 Public Input Round #1 Thank You! 10 public

More information

Physical Implications of Complete Streets Policies

Physical Implications of Complete Streets Policies Presentation Overview Physical Implications of Complete Norm Cox, ASLA, LLA Landscape Architect Ann Arbor, Michigan, 10:45 to Noon What Are Complete Streets? What Matters to Bicyclists and Pedestrians

More information

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

West End Connectivity Master Plan

West End Connectivity Master Plan West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm Renew Atlanta hosted a public meeting to discuss the Marietta Street Resurfacing project at. Councilmember Cleta Winslow attended the public meeting, where over seventy (70) citizens to include representatives

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study Transportation, Energy and Utilities Committee September 10, 2014 Presentation Outline Project Initiation: Why North Avenue? Existing Conditions + Issues Vision + Goals Improvement

More information

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors. Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Lincoln Highway Streetscape Plan Concept Plan

Lincoln Highway Streetscape Plan Concept Plan Lincoln Highway Streetscape Plan Concept Plan November 14, 2014 Introduction This report provides a summary of conceptual transportation, land use, and design recommendations in the Lincoln Highway Streetscape

More information

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose

More information

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff

More information

Lincoln Neighborhood Corridor Plan The LiNC

Lincoln Neighborhood Corridor Plan The LiNC CITY OF SANTA MONICA Lincoln Neighborhood Corridor Plan The LiNC PLANNING COMMISSION September 2, 2015 COMMUNITY DESIGN + ARCHITECTURE TEAM: Community Design + Architecture Iteris Studio 111 Urban Place

More information

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses

Telegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses Telegraph Avenue Complete Streets DRAFT Recommendations Oakland Public Works Department September 11 and 13, 2014 Open Houses Presentation Overview What are complete streets? What problem are we trying

More information

Ocean Park Boulevard Green Street Project Community Workshop

Ocean Park Boulevard Green Street Project Community Workshop Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,

More information

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015 COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland

More information

Bicycle and Pedestrian Plans and Improvements

Bicycle and Pedestrian Plans and Improvements Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review

More information

City of Hyattsville. Citywide Traffic Study and Transportation Plan. Sabra, Wang & Associates. February, 2010

City of Hyattsville. Citywide Traffic Study and Transportation Plan. Sabra, Wang & Associates. February, 2010 City of Hyattsville Citywide Traffic Study and Transportation Plan February, 2010 Outline Existing Conditions Recommendations Future Conditions Traffic Growth Development Capacity and Level of Service

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Glenpool Community Overview Glenpool Glenpool is a city of nearly 12,000 residents located in Tulsa County southwest of Tulsa and Jenks. The city is growing

More information

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010 CONCEPT DESIGN COMMUNITY MEETING 3 JANUARY 28, 2010 AGENDA INTRODUCTION COMMUNITY INPUT ROADWAY STUDIES STREETSCAPE DESIGN STATIONS DISCUSSION SUMMARY AND DISCUSSION NEXT STEPS CLOSE INTRODUCTION SCHEDULE

More information

North Shore Transportation Improvement Strategy

North Shore Transportation Improvement Strategy North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:

More information