TRANSIT TECHNICAL MEMORANDUM FOR RTD SOUTHEAST CORRIDOR EXTENSION PROJECT. January Prepared By Southeast Corridor Extension Project Team

Size: px
Start display at page:

Download "TRANSIT TECHNICAL MEMORANDUM FOR RTD SOUTHEAST CORRIDOR EXTENSION PROJECT. January Prepared By Southeast Corridor Extension Project Team"

Transcription

1 TRANSIT TECHNICAL MEMORANDUM FOR RTD SOUTHEAST CORRIDOR EXTENSION PROJECT Jauary 2010 Prpard By Southast Corridor Extsio Projct Tam I som cass, iformatio i this Eviromtal Tchical Rport may hav b rfid or updatd as prparatio of th Draft EE advacd. I such cass, th iformatio ad coclusios prstd i th Draft EE suprsd all prvious backgroud matrial icludd i this Tchical Rport.

2 TABLE OF CONTENTS 1.0 INTRODUCTION REGULATORY ENVIRONMENT AFFECTED ENVIRONMENT IMPACT EVALUATION AND MITIGATION CORRIDOR LEVEL TRANSIT SERVICE AND RIDERSHIP STATION BOARDINGS STATION ACCESS BY MODE PARKING SUPPLY TRAVEL TIMES MITIGATION REFERENCES... 9 LIST OF FIGURES Figur 1: Projct Locatio Map... 2 Figur 2: No Actio Altrativ, Trasit Srvic ad Facilitis... i

3 1.0 INTRODUCTION This Tchical Mmoradum focuss o iformatio xistig ad futur trasit srvic i th Southast Corridor Light Rail Extsio projct ara (S Figur 1). 1.1 REGULATORY ENVIRONMENT A varity of data ad aalyss is usd to valuat ad compar th altrativs trasportatio impacts. Th DRCOG 2015 ad 2035 Rgioal Travl Dmad Modl, also kow as Compass, provids much of th travl dmad forcastig ad futur trasportatio systm coditios. Th modl rprsts th rgio s fiscally costraid log rag trasportatio pla (2035 Mtro Visio Rgioal Trasportatio Pla), icorporatig rgioally adoptd forcasts for populatio ad mploymt, ad facility improvmts to highway ad trasit tworks. Impacts to parkig ad traffic circulatio ar additioally xamid i th opig yar of th projct usig DRCOG s modl for th 2015 horizo yar. RTD adaptd DRCOG s travl dmad modls to simulat th followig scarios: 2015 Build Altrativ; 2035 No Actio Altrativ; ad 2035 Build Altrativ. 1

4 E F L ui Sa t ss LINCOLN (xistig) Mridia Golf Club Mridia Busiss Park Pa r k Hills Pkwy Mad ows Dr Hritag Hills Pa rk Licol Commos M DOUGLAS COUNTY Licol Av Mad ows Blvd Licol Av S LONE TREE vd Bl CITY OF LONE TREE E Oswgo St SH r i ta g ParkRidg Corporat Ctr ia rid RidgGat Plad Dvlopmt SKY RIDGE Sky Ridg Mdical Ctr LONE TREE CITY CENTER Commowalth Hights Ridg Gat 25 Pk y w Pkwy Cr k Ridg Gat w g t a Fro Cr Rd Ha ppy o Cot t RIDGEGATE PARKWAY ood Ca yo k Schwigr Rach ,000 2,000 Ft Sou rc: South ast Corrid or Ext sio Projct Tam, park--rid Statio without Parkig Southast Light Rail Li Southast Light Rail Extsio Futur Dvlopmt (by othrs) City Boudary Figur 1 Southast Corridor Extsio

5 2.0 AFFECTED ENVIRONMENT Existig trasit srvic i th study ara is a combiatio of light rail, fixd rout bus, ad call-adrid shuttl srvic ctrd o th xistig d-of-li light rail statio at Licol/I-25. Light rail routs E (to Dvr Uio Statio), F (to dowtow Dvr) ad G (to Ni Mil Statio) 1 oprat from Licol Statio. Th statio ara icluds a 1,734-spac park--rid, bus bays ad drop-off aras o ithr sid of I-25, ad a pdstria bridg spaig th Itrstat. Thr fixd rout buss oprat i th ara: Rout #403 cocts Licol Statio to Miral Statio via Highlads Rach; Rout #410 oprats btw Licol Statio ad thr park-ad-rid lots ar Parkr; ad Rout #465 parallls I-25 from Sky Ridg Mdical Ctr i th south to th Dvr Tch Ctr i th orth, makig stops at four Southast Corridor Light Rail statios rout. Furthr, a w fdr bus rout, PRG, will coct Parkr with th Lo Tr City Ctr Statio. Th Lo Tr call--rid shuttl provids curb-to-curb srvic withi a ara boudd by Licol Avu o th south, I-25 o th ast, Couty Li Road o th orth, ad th North-South Trail o th wst. Th shuttl maks hourly stops at Licol Statio wh rsrvatios ar ot cssary; othrwis, usrs must prarrag thir pick-ups. Similarly, th Mridia call--rid srvs th busiss park ast of I-25 ad orth of Licol Avu. This shuttl maks frqut stops at Licol Statio East ad additioally oprats as a flx rout srvic with schduld tim poits o a circular rout through th busiss park. RTD offrs Accss-a-Rid srvic throughout th study ara. Accss-a-Rid provids trasportatio to passgrs with disabilitis who ar uabl to us RTD's rgular lift-quippd fixd rout bus srvic ad who qualify for crtificatio udr th ligibility guidlis stablishd by th Amricas with Disabilitis Act (ADA) of Light rail rout G srvic discotiud i May 2009, but RTD plas to ritroduc th srvic i th futur. 3

6 3.0 IMPACT EVALUATION AND MITIGATION This chaptr xamis ach altrativ s impact o trasit srvic ad ridrship i th corridor, icludig implicatios for statio activity, statio accss, parkig, ad travl tims. Th assssmt icluds thos trasit routs that would itrfac dirctly with th Southast Corridor light rail li, as displayd i Figur CORRIDOR LEVEL TRANSIT SERVICE AND RIDERSHIP Tabl 1 shows th hadways for th xistig corridor trasit srvics, as wll as for thos srvics providd udr th No Actio ad Build Altrativs. Both light rail ad som fixd rout bus srvics would hav improvd hadways i 2035, without a markd diffrc btw altrativs. Th opratios pla will b optimizd as th dsig progrsss such that th projct miimizs opratioal costs whil maximizig ridrship. Th chag to th opratioal pla that is most likly will b th rductio of trai frqucis. Th rductio of trai frqucis would rduc traffic, parkig, ad ois impacts. Thrfor, th trai frqucis of 7.5 miuts durig th pak, ad 10 miuts i th off pak, assumd i this documt, rprst worst cas from a viromtal impact prspctiv. Th Build Altrativ dos itroduc a w fdr bus rout, PRG, which will oprat btw th Southast Corridor Extsio ad th tow of Parkr. Routs 403 ad 465 would b modifid to coct with th Build Altrativ s thr proposd statios. TABLE1: TRANSIT SERVICE FREQUENCY IN THE SOUTHEAST CORRIDOR Trasit Li 2008 Pak/Off-Pak Hadways (Miuts) No Actio Altrativ Build Altrativ Light Rail Li E at Licol Statio 30/15 15/15 15/15 Light Rail Li F at Licol Statio 15/ /15 10/15 Light Rail Li G at Licol Statio 30/- 7.5/10 7.5/10 Rout /120 30/60 30/60 Rout /120 30/120 30/120 Rout / /30 30/30 Rout PRG ot i srvic ot i srvic 30/60 Sourc: RTD 2008 Publishd Schdul; RTD 2035 Travl Dmad Modl. Nots: miut mid-day ad 30-miut vig hadway; miut mid-day ad 60-miut vig hadway; 3. Rout 465 discotiud i May Trasit ridrship i th corridor will icras i futur yars as th ara populatio ad mploymt icras. Corrspodig icrass i trasit srvic lvls i th Build Altrativ will also rsult i trasit patroag icrass. Rout lvl ridrship iformatio is providd i Tabl 2. Th tabl shows ridrship gais i th No Actio Altrativ ar attributd to light rail rout ad bus routs. 4

7 (xistig) E F G L ui Sa t ss Light Rail Li LINCOLN (xistig) Pa r k Hills Pkwy Hadway Frqucy 15 mi 4 /hr F 10 mi 6 /hr G 7.5 mi 8 /hr Mridia E Golf Club Mad ows Dr Hritag Hills Mridia Busiss Park Licol Av Mad ows Blvd Licol Av S DOUGLAS COUNTY 410 CITY OF LONE TREE Pa rk 465 Licol Commos M vd Bl E Oswgo St SH r i ta g ParkRidg Corporat Ctr ia rid RidgGat Plad Dvlopmt LONE TREE 40 3 Commowalth Sky Ridg Mdical Ctr LONE TREE CITY CENTER Hights Ridg Gat Pk y Rout 465od wo g t a Fro Cr Rd Ha ppy o Cot t Pkwy k Ridg Gat Cr Rout 410 w Local Bus Srvic Rout Ca yo k Schwigr Rach ,000 Sou rc: RTD, ,000 Ft park--rid Southast Light Rail Li City Boudary Futur Dvlopmt (by othrs) Figur 2 No Actio Altrativ Trasit Srvic ad Facilitis, 2035

8 TABLE 2: TRANSIT RIDERSHIP IN THE SOUTHEAST CORRIDOR Trasit Li 2008 Avrag Wkday Daily Ridrs No Actio Altrativ Build Altrativ Light Rail Li E 6,592 16,557 20,420 Light Rail Li F 15,918 28,819 30,389 Light Rail Li G ,635 30,813 All Southast Light Rail Lis 23,262 64,011 81,622 Rout ,464 1,245 Rout ,159 1,560 Rout ,417 1,436 Rout PRG ot i srvic ot i srvic 2,443 Systm-wid Likd Trasit Trips 420, ,957 Sourc: RTD Bus ad Light Rail Trasit Ridrship 2008; RTD 2035 Travl Dmad Modl. Not: 1 Light rail rout G srvic discotiud i May 2009, but RTD plas to ritroduc th srvic i th futur. Th Build Altrativ would shift mor markt shar to trasit. Avrag wkday ridrship alog th Southast Corridor Li is projctd to xcd 81,000 i 2035, which is a 17,600-ridr icras ovr th No Actio Altrativ ad a 250 prct icras ovr currt ridrship. Th supportig bus trasit systm i th Build Altrativ would also xpric otabl gais i ridrship. Th modifid routs srvig Lo Tr ad th w light rail statios would xpric modrat chags i ridrship lvls. Th PRG rout, btw Parkr ad Lo Tr City Ctr Statio, would attract arly 2,500 daily ridrs. RTD systm-wid likd trasit trips idicat th total umbr of patros usig trasit. Th forcastd diffrc i likd trasit trips btw th No Actio Altrativ ad Build Altrativ idicat th t gai i trasit ridrs causd by th Southast Corridor Extsio. Th total systm wid likd trasit trips udr th Build Altrativ will xcd thos i th No Actio Altrativ by 16,129 trips, maig th Southast Light Rail Extsio will attract ovr 16,000 w trasit patros. 3.2 STATION BOARDINGS Daily boardig iformatio by statio is projctd for th thr w statios that ar part of th Build Altrativ, as wll as for Licol Statio. Ths data idicat th rlativ attractivss of a trasit statio. Licol Statio is icludd bcaus, as th currt d-of-li statio, it stads to b most affctd by th Build Altrativ. Tabl 3 shows that, i th Build Altrativ, th RidgGat Statio would b th busist of th thr w light rail statios, with mor tha 5,000 avrag daily boardigs. It would b followd by th Lo Tr City Ctr Statio at arly 2,800 boardigs. Boardigs at Licol statio ar lowr by ovr 4,000 i th Build Altrativ, idicatig that th w statios ar mor attractiv to ths pottial usrs. 6

9 TABLE 3: AVERAGE WEEKDAY DAILY BOARDINGS BY STATION Light Rail Statio Light Rail Lis Srvig Statio Avrag Wkday Boardigs No Actio Altrativ Build Altrativ RidgGat Parkway E,F,G 0 0 5,146 Lo Tr City Ctr E,F,G 0 0 2,753 Sky Ridg E,F,G Licol E,F,G 2,001 6,423 2,184 Sourc: RTD 2008 LRT Statio Activity-Wkday; RTD 2035 Travl Dmad Modl. Nots: 1. Boardigs avragd across 12-moth priod from August 2007 to August STATION ACCESS BY MODE Th mod split for accss to ach statio i th Build Altrativ was stimatd for Thr mods of accss ar possibl: driv, bus, ad walk/bik. Driv accss would b icludd oly wh parkig will b availabl at th statio. Th mod splits i Tabl 4 show that drivig would b th prdomiat accss mod for th RidgGat Statio, bus would hav arly a 2/3-shar at th Lo Tr City Ctr Statio, ad almost all patros would accss th Sky Ridg Statio by bicycl or o foot. TABLE 4: STATION MODE OF ACCESS: BUILD ALTERNATIVE, 2035 AVERAGE WEEKDAY Statio Driv Bus Walk/Bik RidgGat Parkway 92% 5% 3% Lo Tr City Ctr 0% 62% 38% Sky Ridg 0% 1% 99% Licol 33% 51% 16% Sourc: RTD 2035 Travl Dmad Modl. 3.4 PARKING SUPPLY Tabl 5 shows th aticipatd chags i park--rid supply i th study ara. Currtly, th Licol Statio park--rid is th oly such facility i th immdiat study ara of th Southast Corridor Extsio. Utilizatio thr is trdig upward, rachig 64 prct of capacity i Sptmbr 2008 ad avragig 50 prct ovr th prvious yar. Th No Actio Altrativ would ot supply w parkig i th study ara. TABLE 5: PARK-AND-RIDE SUPPLY IN THE SOUTHEAST CORRIDOR Park-ad-Rid Existig Coditio (2008) Build Altrativ (2015) No Actio Altrativ Build Altrativ Southast Corridor Li RidgGat Parkway 0 2, ,000 Lo Tr City Ctr 0 No Chag No Chag No Chag Sky Ridg 0 No Chag No Chag No Chag Licol 1,734 No Chag No Chag No Chag 7

10 TABLE 5: PARK-AND-RIDE SUPPLY IN THE SOUTHEAST CORRIDOR Park-ad-Rid Coctig Buss Highlads Rach Tow Ctr Existig Coditio (2008) Build Altrativ (2015) No Actio Altrativ Build Altrativ 177 No Chag No Chag No Chag Parkr 173 No Chag No Chag No Chag Licol/Jorda 102 No Chag No Chag No Chag Sourc: RTD 2008 Data. Th Build Altrativ would add 2,000 additioal parkig spacs at th RidgGat Avu park-- Rid, which would itrcpt most trasit patros from th Lo Tr s RidgGat Plad Dvlopmt ad thos patros travlig from orthboud I-25. Th Build Altrativ s additioal parkig supply also rlivs futur parkig dmad at Licol Statio. 3.5 TRAVEL TIMES Travl tims from th I-25/RidgGat Parkway itrchag to Dvr Uio Statio wr forcast for th yar Automobil ad trasit travl tims ar calculatd udr th No Actio ad Build Altrativ i th morig pak hour ad pak dirctio. Ths travl tims poit to th rlativ attractivss ad viability of a giv mod. Th rsults prstd i Tabl 6 cofirm that worsig cogstio alog th rgio s major highways icrasigly will rdr trasit th mor fficit mod. Whras a trip to Dvr Uio Statio i 2035 would tak a drivr 64 miuts, ridig light rail would rduc th trip tim by 20 miuts (31 prct). TABLE 6: TRAVEL TIME DURING MORNING PEAK HOUR, 2035 AVERAGE WEEKDAY Mod 2005 I-25/RidgGat Parkway to Dvr Uio Statio (Miuts) No Actio Altrativ Build Altrativ Auto Trasit Sourc: RTD 2035 Travl Dmad Modl. 3.6 MITIGATION Basd o th abov aalysis, o mitigatio is warratd. 8

11 4.0 REFERENCES No rfrcs wr citd. 9

SUMMARY Estimated Future Tax Evasion under the Income Tax System and Prospects for Tax Evasion under the FairTax: New Perspectives

SUMMARY Estimated Future Tax Evasion under the Income Tax System and Prospects for Tax Evasion under the FairTax: New Perspectives SUMMARY Estimatd Futur Tax Evasion undr th Incom Tax Systm and Prospcts for Tax Evasion undr th FairTax: Nw Prspctivs By Richard J. Cbula, Ph.D. Fiorntina AngjllariDajci, Ph.D. March 1, 2017 Purpos of

More information

We want to hear from you!

We want to hear from you! Th Rgioal Trasit Futur Pla visios th trasit twork 2 yars from ow ad dscribs th srvics, ifrastructur ad ivstmts that ar dd to gt thr. W wat to har from you! Hwy. Adams LA ry Wifild BLACK MOTAI 2 Lodg Brry

More information

DR. JOHN W. MILLER PRESIDENT POWER HOUSE ROOF REPLACEMENT PROJECT JANUARY 12, 2015 LIST OF DRAWINGS

DR. JOHN W. MILLER PRESIDENT POWER HOUSE ROOF REPLACEMENT PROJECT JANUARY 12, 2015 LIST OF DRAWINGS DR. JOH. MILLR PRIDT DR. RICHARD R. BACHOO CHIF ADMIITRATIV OFFICR MR. AL CITORIO AITAT CHIF ADMIITRATIV OFFICR POR HOU ROOF RPLACMT PROJCT JAUARY, 05 LIT OF DRAIG COVR HT C- COD IFORMATIO HT D- ROOF DMOLITIO

More information

DR. JOHN W. MILLER PRESIDENT POWER HOUSE ROOF REPLACEMENT PROJECT JANUARY 12, 2015 LIST OF DRAWINGS

DR. JOHN W. MILLER PRESIDENT POWER HOUSE ROOF REPLACEMENT PROJECT JANUARY 12, 2015 LIST OF DRAWINGS DR. JOH. MILLR PRIDT DR. RICHARD R. BACHOO CHIF ADMIITRATIV OFFICR MR. AL CITORIO AITAT CHIF ADMIITRATIV OFFICR JAUARY, 05 LIT OF DRAIG COVR HT C- COD IFORMATIO HT D- ROOF DMOLITIO PLA AD RFLCTD CILIG

More information

TRANSPORTATION IMPACT STUDY HYATT PLACE HOTEL EXPANSION AND OLD DAVIS ROAD EXTENSION

TRANSPORTATION IMPACT STUDY HYATT PLACE HOTEL EXPANSION AND OLD DAVIS ROAD EXTENSION TRANSPORTATION IMPACT STUDY HYATT PLACE HOTEL EXPANSION AND OLD DAVIS ROAD EXTENSION Prpard for: Submittd by: 2990 Lava Ridg Ct. Suit 200 Rosvill, CA. 95661 TABLE OF CONTENTS 1. Introduction... 1 Projct

More information

Transportation. Our Parker community. will develop and sustain. a safe, convenient and. efficient transportation. system incorporating

Transportation. Our Parker community. will develop and sustain. a safe, convenient and. efficient transportation. system incorporating VISION Our Parker community will develop and sustain a safe, convenient and efficient transportation system incorporating and integrating various modes of travel including automobiles, public transportation,

More information

Owner s Manual. Model Number: 73654

Owner s Manual. Model Number: 73654 Ownr s Manual Modl Numbr: 73654 Fishr-Pric, Inc., a subsidiary of Mattl, Inc., East Aurora, NY 14052 U.S.A. 2002 Mattl, Inc. All Right Rsrvd. and dsignat U.S. tradmarks of Mattl, Inc. Printd in China.

More information

7.0 Nonmotorized Facilities

7.0 Nonmotorized Facilities 7.0 Nomotorized Facilities 7.1 Sectio Overview This sectio describes the existig coditios ad ay idetified future impacts with the project o omotorized facilities withi the study area. Data were collected

More information

On the decomposition of life expectancy and limits to life

On the decomposition of life expectancy and limits to life On th dcomposition of lif xpctancy and limits to lif Ls Mayhw and David Smith Faculty of Actuarial Scinc Cass Businss School Longvity 10 Sptmbr 2014 Santiago Chil Som ky dmographic issus What do trnds

More information

Exposition Corridor Transit Neighborhood Plan

Exposition Corridor Transit Neighborhood Plan Potntial Strtscap Sgmnts ra to Mo d tson l na tio Na B s Ro 5 s lm Pa d V PALMS 7 on gt rin Cla 6 CULVER CITY d A B nic vd Bl n to ng hi as Cu l r nal tio Na d ra to Mo DR Exposition Light Rail Lin 7 l

More information

Open House #1 PHASE 2

Open House #1 PHASE 2 1 PROJCT TIMLI + SUMMARY Group Chats + Skateboard Competition + Open House #1 Online Survey Online Survey 15 people attended 83 people responded W WSTMISTR SUMMARY OF PHAS 1 the open house The first phase

More information

Theoretical and Numerical Modelling of Creep Crack Growth in a Carbon-Manganese steel

Theoretical and Numerical Modelling of Creep Crack Growth in a Carbon-Manganese steel Thortical ad Numrical Modllig o Crp Crack Growth i a Carbo-Magas stl Yatomi, M. 1, Nikbi, K. M. 2, O Dowd, N.P. 2 ad Wbstr, G. A. 2 1 Rsarch Laboratory, Ishikawajima-Harima Havy Idustris Co. Ltd, 1 Shiakahara-cho,

More information

HAWTHORNE AVIATION MOBIL HANGAR HANGAR HANGAR RED LOT UNITED FLIGHT KITCHEN NOT TO SCALE DETAIL "A" SCALE

HAWTHORNE AVIATION MOBIL HANGAR HANGAR HANGAR RED LOT UNITED FLIGHT KITCHEN NOT TO SCALE DETAIL A SCALE CSW CSW CSW CSW MH MH B RISR C DI MH D 615 274.84 DI DI DI DI DI DI DI 118 F G DI DI DI DI DI H J1 DI DI GAT J2 J3 J4 J5 J6 J7 J8 J9 J1 J11 J12 J13 J14 J15 J16 J17 J18 K1 K2 RAMP Q COTRACTOR'S STAGIG ARA

More information

Selection Protocol BC Snowboard Provincial Freestyle Team July 15, 2015

Selection Protocol BC Snowboard Provincial Freestyle Team July 15, 2015 Slction Protocol 2015-2016 BC Snowboard Provincial Frstyl Tam July 15, 2015 Background Th BC Snowboard Provincial Frstyl Tam Slction Protocol is dsignd to outlin tam slction for th rstructurd BC Snowboard

More information

Jupiter Farms Shopping Center. Jupiter, FL

Jupiter Farms Shopping Center. Jupiter, FL Jupitr Farms Shopping Cntr Jupitr, FL Jupitr Farms Shopping Cntr 10142 INDIANTOWN ROAD JUPITER, FL 33478 VISIT THE PROPERTY WEBSITE DDESANTIS@STRATEGICREALTY.COM FOR LEASING CONTACT: DOUGLAS L. DESANTIS,

More information

2018 FIFA WORLD CUP RUSSIA

2018 FIFA WORLD CUP RUSSIA 2018 FIFA WORLD CUP RUSSIA GROUP MATCHES & FINAL ROUND SERIES PACKAGES Wondrful Russia will b th warm Host of th 21st dition of th FIFA World Cup for a tournamnt which promiss to b uncomparabl. From 14th

More information

On the decomposition of life expectancy and limits to life

On the decomposition of life expectancy and limits to life On th dcomposition of lif xpctancy and limits to lif Ls Mayhw and David Smith Faculty of Actuarial Scinc Cass Businss School ARC Confrnc 2014 Santa Barbara Som ky dmographic issus What do trnds in lif

More information

CONTACT US. NOW LEASING Crossings at El Dorado NEW SHOPPING CENTER DEVELOPMENT PADS AVAILABLE. Phase II. Phase III

CONTACT US. NOW LEASING Crossings at El Dorado NEW SHOPPING CENTER DEVELOPMENT PADS AVAILABLE. Phase II. Phase III 11 4 10 33 23 7 Jan. Mn L Suit A 2,900 s.f. Suit B 2,700 s.f. NEW SHOPPING CENTER DEVELOPMENT PADS AVAILABLE 5 k H a i n g t o n at El Dorao 0 60' 200' 20 k 115 stalls 100 ALLS P-2 PAD BLDG'S ALLS Driv

More information

Bedford Springs / Koon Lake

Bedford Springs / Koon Lake Bdford Springs / Koon Lak Bdford Springs Start Starting at th Bdford Springs, this bik loop is approximatly 42 mils long with th highlight bing Lak Koon and Lak Gordon Ths two watr rsrvoirs, about 2 mils

More information

Appendix B. Public Life Public Space - Cycling Findings

Appendix B. Public Life Public Space - Cycling Findings Appndix B. Public Lif Public Spac - Cycling Findings No: Th cycling findings ar incorporad ino Chapr 2.3 Mulimodal Opraions: Bicycl. Th full rpor on cycling, as prpard by Ghl Archics, is providd hrin.

More information

Existing Land Use Designations

Existing Land Use Designations COSMOS W MPAULA AV SAPAGO ST TLPO AST ST D ST Commuity Facility CLL AV AST ST AV VIOLTA ST Commuity Facility City of Vetura GLS AV ALLIA AV MPAULA AV D W Commuity Facility OT SUFLOW ST XTSIO AV JACIT GLS

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Kids Sea Camp. Please see the Kids Sea Camp dive agenda attached.

Kids Sea Camp. Please see the Kids Sea Camp dive agenda attached. Wlcom to Kids Sa Camp Thank you for choosing to di with Scuba St. Lucia. Th following information is about our oprating procdurs and schdul. Bfor diving with us, plas rviw this pamphlt thoroughly. Fill

More information

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES:

WELCOME! We want to hear from you! CAMBIE BRIDGE INTERIM IMPROVEMENTS KEY OBJECTIVES: WELCOME! CAMBIE BRIDGE ITERIM IMPROVEMETS The City of Vancouver is planning to make interim improvements to Cambie Bridge to make it safer and more comfortable for people of all ages and abilities to walk

More information

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal.

This report presents an assessment of existing and future parking & traffic requirements, for the site based on the current development proposal. CR166916b02 20 Jue 2017 Melida Dodso Melida Dodso Architects PO Box 5635 Hughes ACT 2605 Email: mdodso@melidadodsoarchitects.com.au Dear Melida, Project: Dickso Apartmets Lowrie St Re: Statemet o Parkig

More information

19th Avenue Park Presidio Neighborhood Transportation Plan

19th Avenue Park Presidio Neighborhood Transportation Plan SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 9th Aveue Park Presidio Neighborhood Trasportatio Pla DRAFT FINAL REPORT Holloway Aveue with Ehacemets trasportatio cosultig Holloway Aveue Thumbail BUS STOP

More information

Bicycle and Pedestrian School Safety Review Study:

Bicycle and Pedestrian School Safety Review Study: Bicycl ad Pdstria School Safty Rviw Study: Assssmt & Implmtatio Rport Hritag Middl School Dltoa, FL March 7, 2011 Volusia Couty Trasportatio Plaig Orgaizatio Bicycl ad Pdstria School Safty Rviw Study Assssmt

More information

LOOFF CARROUSEL FACILITY

LOOFF CARROUSEL FACILITY CITY OF SPOKA S & RCRATIO DPARTMT LOOFF CARROUSL FACILITY SATTL SPOKA SPOKA, WA VICIITY MAP Scale: TS LOCATIO MAP Scale: TS WASHIGTO STAT PROJCT LOCATIO OWR CITY OF SPOKA S & RCRATIO DPARTMT 808 W SPOKA

More information

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT Agenda Item #4.2 EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT VTA BOARD WORKSHOP MAY 1, 2015 ABOUT THIS PRESENTATION CONTEXT Existing conditions and planning for growth WHAT IS THE PROJECT? Project alternatives

More information

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study US 9 Pedestrian and Bicycle Safe Access to Transit Corridor Study DRAFT Technical Memorandum #2 US 9 Pedestrian and Bicycle Crash Diagram Summary August 26 Prepared for: FLORIDA DEPARTMET OF TRASPORTATIO

More information

Central Connecticut State University

Central Connecticut State University - CT RAL COCT I CUT T A T U I VRI T Y DR. ZULMA R. TORO PRIDT DR. RICHARD R. BACHOO CHIF ADMIITRATIV OFFICR MR. AL CITORIO AITAT CHIF ADMIITRATIV OFFICR RGY CTR ROOF RPLACMT AD AOCIATD ORK eptember 1,

More information

The current document is revised based on the comments received on:

The current document is revised based on the comments received on: General Overview 1 Introduction Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current

More information

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation HAMPTON ROADSOADS CONGESTION MANAGEMENT SYSTEMYSTEM Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation Presented by: Dwight Farmer, PE Deputy Executive Director, Transportation April

More information

Kewanee ee Way. Byrd Ave N (0.6 Mile) Bassett t Creek Dr. Crestview Ave. Rice Lake. Nature Area. Wasatch La. Mary Hills. Bonnie La.

Kewanee ee Way. Byrd Ave N (0.6 Mile) Bassett t Creek Dr. Crestview Ave. Rice Lake. Nature Area. Wasatch La. Mary Hills. Bonnie La. Y Zenith Ae N M Abbott Fr 26th 1/2 Ae N Wirth Pkwy 26th Ae N Terrace La Meridian Dr iew Bld Mc Nair Dr Vista Dr Manor Dr Dresden La Byrd Ae N Kewanee ee Way Crestiew Ae Bassett t Dr Mcnair A 21st Ae Glenwood

More information

1 Welcome. Ways to Participate: Welcome to the first open house for Regina s new Transportation Master Plan

1 Welcome. Ways to Participate: Welcome to the first open house for Regina s new Transportation Master Plan 1 Welcome Welcome to the first open house for Regina s new Transportation Master Plan We re here today to: Introduce the study Present and receive feedback on the draft Transportation Directions Hear from

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current Existing and Future Conditions

More information

Policy sensitivity analysis of Karachi commuters

Policy sensitivity analysis of Karachi commuters Policy sesitivity aalysis of Karachi commuters A. Q. Memo 1 & K. Sao 2 1 Departmet of Civil Egieerig, NED Uiversity of Egieerig ad Techology, Karachi, Pakista 2 Departmet of Civil ad Evirometal Egieerig,

More information

Chapter 6 Transportation Plan

Chapter 6 Transportation Plan Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised

More information

Rail Station Fact Sheet CityLine/Bush Station

Rail Station Fact Sheet CityLine/Bush Station Rail Station Fact Sheet CityLine/Bush Station Station Overview CityLine/Bush Station is located just south of the President George Bush Turnpike and east of US 75 in Richardson. The station opened in 00

More information

quebec open 2011 djudo competition din 2010 several countries participated: October 8th and 9th Centre Pierre-Charbonneau Montreal

quebec open 2011 djudo competition din 2010 several countries participated: October 8th and 9th Centre Pierre-Charbonneau Montreal qubc opn 2011 Octobr 8th and 9th Cntr Pirr-Charbonnau Montral djudo comptition U15, U17, U20, snior and mastrs din 2010 svral countris participatd: V rs i n ón n l vrd s int pa r n ño ior l USA, Franc,

More information

PHASE 5 SEPARATORY LINER SYSTEM CONSTRUCTION PLANS

PHASE 5 SEPARATORY LINER SYSTEM CONSTRUCTION PLANS COLLIS RILY T-87 C- O T- RIHL C-40 T T- T-57A T- T-57 L. T- W BURLIGTO BLACHSTR FAYTTVILL CLARKSVILL CLARKSVILL BLACHSTR S. T-80 0 HAL 0 C-6 T-7 MUD C-7 T-8 W WST CHAMPLI T-7 T-0A WST AST CHAMPLI C-47

More information

2) What s the Purpose of Your Project?

2) What s the Purpose of Your Project? Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs Overview: Tools ad Strategies to Predict ad Documet Bicyclig ad Walkig Rates 1) Why Documet the Need for

More information

Uniform illumination for slim, shallow box signs

Uniform illumination for slim, shallow box signs Uniform illumination for slim, shallow box signs Koldo Affinium postrbox s (LPM300), spcially dsignd for shallow box signs Uniform illumination for slim, shallow box signs Koldo Affinium postrbox s (LPM300)

More information

3.8 TRANSPORTATION/TRAFFIC

3.8 TRANSPORTATION/TRAFFIC 3.8 TRANSPORTATION/TRAFFIC This sction dscribs th xisting transportation and traffic stting for th projct sit and vicinity, as wll as th various rlvant rgulations and policis that govrn transportation

More information

Inland waters, rivers

Inland waters, rivers Ilad watrs, rivrs Eglish vrsi SOSI stadard 4.0 Ilad watrs, rivrs rwgia Mappig Author grd.mardal@statkart.o rwgia Mappig Author Ju 009 Pag of 33 Ilad watrs, rivrs Eglish vrsi SOSI stadard 4.0 Tabl of ctts.

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project DRCOG Congestion Mitigation Program White Paper 07-1 (February 16, 2007) On time and under budget! Festivities

More information

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher Senior Transportation Planner Santa Clara Valley Transportation Authority San Jose, CA How

More information

n Mix of public, private and NGO respondents Overview n Understanding Walking & Biking Trips n Informing Project Development through:

n Mix of public, private and NGO respondents Overview n Understanding Walking & Biking Trips n Informing Project Development through: Creatig Walkable, Bikeable Commuities Developig Effective Active Trasportatio Projects ad Programs ATP Needs & Challeges Survey Mix of public, private ad NGO respodets 96% from orgaizatios/agecies servig

More information

3.8 TRANSPORTATION/TRAFFIC

3.8 TRANSPORTATION/TRAFFIC 3.8 TRANSPORTATION/TRAFFIC This sction dscribs th xisting transportation and traffic stting for th projct sit and vicinity, as wll as th various rlvant rgulations and policis that govrn transportation

More information

Power Supply in Package (PSiP) Power Supply on Chip (PwrSoC) Update 2010

Power Supply in Package (PSiP) Power Supply on Chip (PwrSoC) Update 2010 Powr Supply in Packag (PSiP) Powr Supply on Chip (PwrSoC) Updat 2010 Controllr Protction Drivr Drivr By Arnold Aldrman, Anagnsis, Inc. And Cian O Mathuna, Tyndall National Institut Controllr Outlin 1.

More information

Think outside the box!

Think outside the box! Thik outsid th box! Idas from th Itrt : www.ralsimpl.com Frot pag photo my ow 12 Novmbr 2009 Volum 4 Issu 9 by ALMA PRETORIUS alma@xctricidas.co.za www.xctricidas.co.za B d Vaity Tray Rpurpos a old fram

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

Other nature information

Other nature information Othr natur information English vrsion SOSI standard 4.0 Othr natur information Draft rwgian Mapping Author grd.mardal@statkart.no rwgian Mapping Author Jun 009 Pag of Othr natur information English vrsion

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

(This page intentionally left blank.)

(This page intentionally left blank.) (This page intentionally left blank.) LYNX 2030 VISION FINAL Technical Memorandum #5: Supporting and Circulator Networks Prepared for Central Florida Regional Transportation Authority (LYNX) 455 N. Garland

More information

Community Task Force July 25, 2017

Community Task Force July 25, 2017 Community Task Force July 25, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

Technical Working Group November 15, 2017

Technical Working Group November 15, 2017 Technical Working Group November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

RICHMOND VIRGINIA ABBREVIATION LEGEND PROJECT DIRECTORY LOCATION MAP 3152 CARY COURT, SUITE 3124 RICHMOND, VA CONSULTANTS: PROJECT MANAGER:

RICHMOND VIRGINIA ABBREVIATION LEGEND PROJECT DIRECTORY LOCATION MAP 3152 CARY COURT, SUITE 3124 RICHMOND, VA CONSULTANTS: PROJECT MANAGER: ABBRVIATIO LGD COSULTATS: GRAL PROJCT OTS DRAWIG LIST PROJCT MAAGR:. ILLIOIS ST., SUIT 600 PROJCT DIRCTORY LOCATIO MAP OT: ALL IQUIRIS TO PROJCT MAAGR OLY TAT: PROJCT MAAGR: JFF CARDOSI PAPR-SOURC 40 ORTH

More information

Transit Development Plan December 2011

Transit Development Plan December 2011 Trasit Developmet Pla December 2011 Table of Cotets Chapter Oe - Ivetory Itroductio... 1-1 Data Sources... 1-1 Settig the Stage... 1-2 Service Area... 1-3 Fixed Route Service Routes... 1-4 Overall Ridership

More information

Set of plans containing details for game day operations of the Ballpark. Plans set forth the responsibilities and the specific actions of:

Set of plans containing details for game day operations of the Ballpark. Plans set forth the responsibilities and the specific actions of: What is the TOPP? Set of plans containing details for game day operations of the Ballpark. Plans set forth the responsibilities and the specific actions of: Ballpark management, District Department of

More information

Rail Station Fact Sheet Buckner Station

Rail Station Fact Sheet Buckner Station Rail Station Fact Sheet Buckner Station Station Overview Buckner Station is located at the intersection of Buckner Boulevard and Elam Road in Dallas. The station opened in 2010 and currently serves as

More information

TRANSIT. WATS Transit Routes. Regular Fixed Route Service

TRANSIT. WATS Transit Routes. Regular Fixed Route Service TRANSIT The Wausau Area Trasit System (WATS) provides public trasportatio services i the Wausau area. WATS is the oly itra-city trasit service available to the geeral public withi the MPA. WATS is owed

More information

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION)

CONCEPT ALTERNATIVE 1 (BICYCLE BOULEVARD ON BROAD WITH TRAFFIC DIVERSION) RAMOA FOOTHILL MEIECKE MILL 1" = 350' TRAFFIC DIVERTER MEIECKE BETO MURRAY SATA ROSA SERRAO MISSIO CETER WEST VEABLE MISSIO MISSIO ALMOD MOUTAI VIEW CETER LICOL CETER LICOL COCEPT ALTERATIVE 1 ( O WITH

More information

Rail Station Fact Sheet North Side Station* (*station under construction with anticipated start of service in late 2018)

Rail Station Fact Sheet North Side Station* (*station under construction with anticipated start of service in late 2018) Rail Station Fact Sheet North Side Station* (*station under construction with anticipated start of service in late 018) Station Overview North Side Station will be located near the intersection of North

More information

Lesson Plans Unit 1 Assessment Focus

Lesson Plans Unit 1 Assessment Focus g E n P i l n r a a c r al l dn i v r al r l a n o ti o m, f i y l c a d r n a t i t l r l po ca i S s, y E h P p n i th hiv n r ac ld i o h t c ll ls l a i k g s n k u. Givi hinking o c t. n t d pm an

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

Instrumental Hendrickson High School Vocal, String & Twirling Kelly Lane MS (adjacent to HHS)

Instrumental Hendrickson High School Vocal, String & Twirling Kelly Lane MS (adjacent to HHS) TXAS STAT SOLO-NSMBL CONTST May 27, 28 & 29, 2017 Hendrickson High School, Pflugerville ISD Instrumental vents @ Hendrickson High School Vocal, String & Twirling vents @ Kelly Lane MS (adjacent to HHS)

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

2019 Development Charge Study: Historical Service Standards. Development Charges Stakeholders Sub-Committee City of Hamilton September 13, 2018

2019 Development Charge Study: Historical Service Standards. Development Charges Stakeholders Sub-Committee City of Hamilton September 13, 2018 2019 Development Charge Study: Historical Service Standards Development Charges Stakeholders Sub-Committee City of Hamilton September 13, 2018 Agenda Service Standards Service Standards Service Standard

More information

MAIN ROADS LEGEND START HERE

MAIN ROADS LEGEND START HERE MAI ROAD weet Rd - - tart at corner of County Route 7 and Mollison treet heading, plow to light, on weet Rd, right on est nd to stop sign, turn around and go back to right on Dr, around Circle, right on

More information

May 20, 2014 LINCOLN CORRIDOR DESIGN SEGMENTS

May 20, 2014 LINCOLN CORRIDOR DESIGN SEGMENTS LICOL CORRIDOR DESIG SEGMETS LICOL CORRIDOR LA Lincoln Corridor West lan Enhancements to Willow Street art of Future roject Buckingham ark Interim Median End to Accommodate Truck Turning Movements into

More information

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one

More information

ST. JAMES PLANTATION BICYCLE ROUTES. A seatown, a hometown, a timeless way of life.

ST. JAMES PLANTATION BICYCLE ROUTES. A seatown, a hometown, a timeless way of life. ST. JAMES PLANTATION BICYCLE ROUTES A satown, a homtown, a timlss way of lif. 6 Bicycling Tips War your hlmt. Follow this simpl rul and rduc your risk of srious injury by as much as 85 prcnt. Plan ahad

More information

Held under the sanction of USA Swimming, issued by North Carolina Swimming, Inc. Sanction No. NC11117

Held under the sanction of USA Swimming, issued by North Carolina Swimming, Inc. Sanction No. NC11117 The Greesboro Swimmig Associatio's 2011 Joh Gordo Dewey Ivitatioal Swim Meet November 19-20, 2011 The Greesboro Aquatic Ceter 1921 West Lee Street, Greesboro, NC 27403 SANCTION: HOST: FACILITY: Held uder

More information

ACTIVITY SHAPING THE TALLEST PEAK ON EARTH

ACTIVITY SHAPING THE TALLEST PEAK ON EARTH gography standards 1, 4, 7, 17; scinc standard d-3; social studis standard 3 ACTIVITY SHAPIG THE TALLEST PEAK O EARTH 1H MOUT EVEREST, PART OF THE HIMALAYA MOUTAI RAGE, was cratd 30 to 50 million yars

More information

Figure shows the existing roadway network in Daly City.

Figure shows the existing roadway network in Daly City. The following section presents a description of various transportation system components within Daly City. Interstate 280 (I-280), State oute (S-), Skyline Boulevard (S-) and Mission Street (S-82) all

More information

Intermodal Connections with Light Rail in Phoenix, AZ Wulf Grote, P.E. Director, Planning & Development

Intermodal Connections with Light Rail in Phoenix, AZ Wulf Grote, P.E. Director, Planning & Development Intermodal Connections with Light Rail in Phoenix, AZ Wulf Grote, P.E. Director, Planning & Development 12th National LRT Conference Salt Lake City, UT November 12, 2012 Outline METRO Light Rail Overview

More information

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter

More information

Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING

Welcome. Public Meeting. Heading 1. Heading 2. DeMers Ave. Columbia Rd. Washington St. 42nd St. 32nd Ave. Heading 3 HEADING Heading 1 Heading 2 Heading 3 HADING Welcome 4 Heading 5 Normal Normal Less Spacing Public Meeting Normal No Spacing Strong mphasis Intense mphasis To Do List ullet List ullet Last List ullet 2 CÞ List

More information

TRANSPORTATION IMPACT ANALYSIS

TRANSPORTATION IMPACT ANALYSIS TRANSPORTATION IMPACT ANALYSIS CAROLINA NORTH DEVELOPMENT May 7, 2009 Kumar Neppalli Engineering Services Manager Town of Chapel Hill Christopher Conklin, PE Principal VHB/Vanasse Hangen Brustlin, Inc.

More information

Community Task Force November 15, 2017

Community Task Force November 15, 2017 Community Task Force November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

Product Reliability Qualification Report

Product Reliability Qualification Report Product Rliability Rport Family : PEX8605-AB50NI G PEX8603-AB50NI G USB3382-AB50NI G USB3380-AB50NI G USB2380-AB50NI G Sptmbr 14, 2012 Prpard and Rviwd By: Thoma Huang Quality and Rliability Enginr Approvd

More information

Community Task Force March 14, 2018

Community Task Force March 14, 2018 Community Task Force March 14, 2018 Welcome and Introductions Project Partners Regional Transportation District (RTD) City of Aurora Colorado Department of Transportation (CDOT) Denver Regional Council

More information

Rail Station Fact Sheet Downtown Carrollton Station

Rail Station Fact Sheet Downtown Carrollton Station Rail Station Fact Sheet Downtown Carrollton Station Station Overview Downtown Carrollton Station is located at East Belt Line Road and Broadway Street near the historic Downtown Carrollton Square. The

More information

Capital Metro Monthly Ridership Report January 2018 (Fiscal Year 2018)

Capital Metro Monthly Ridership Report January 2018 (Fiscal Year 2018) Capital Metro Monthly Ridership Report January 2018 (Fiscal Year 2018) Page 1 of 5 Ridership Summary This is a summary of Capital Metro system-wide ridership statistics for the month of January 2018 by

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012 Scottsdale Road/Rural Road Alternatives Analysis (AA) Study Arizona ITE/IMSA Spring Conference March 7, 2012 Study Location and Duration Primary Study Corridor (major focus of effort) Rural Road and Scottsdale

More information

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview Project Mobility - Route 3 South Express Toll Lanes Industry Day Overview October 15, 2014 Today s Agenda Project Mobility Overview Design Alternatives and Construction Estimates Existing Traffic Congestion/Project

More information

A District Council of the Urban Land Institute

A District Council of the Urban Land Institute A District Council of the Urban Land Institute Thank you to our sponsors! A District Council of the Urban Land Institute Thank you to our Community Partners! A District Council of the Urban Land Institute

More information

Rail Station Fact Sheet CentrePort/DFW Airport Station

Rail Station Fact Sheet CentrePort/DFW Airport Station Rail Station Fact Sheet CentrePort/DFW Airport Station Station Overview CentrePort/DFW Airport Station is located by Statler Boulevard at Breezewood Drive in Fort Worth. Free shuttles connect the station

More information

Countywide Transportation Plan. Countywide Transportation Plan

Countywide Transportation Plan. Countywide Transportation Plan Countywide Transportation Plan A Cooperative Effort of Jefferson County Arvada Broomfield Golden Lakewood Westminster Wheat Ridge, Colorado Published by Jefferson County Highways and Transportation Department

More information

NEED FOR ADDITIONAL FUNDING

NEED FOR ADDITIONAL FUNDING Measure B BACKGROUND 2013: Vision for a supplement to Measure A that prioritizes local roads & regional capital projects Plan developed by Professional Advisory Group Consensus recently built on RT O&M

More information

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study Public Involvement Meeting Tuesday, June 13, 2017 Albany Shaker Road Corridor Study Agenda / Meeting Outline 1. Introduce the project 2. Complete Streets 3. Share/confirm our findings 4. Your Opinion 5.

More information

Aurora Corridor to E Line

Aurora Corridor to E Line Aurora Corridor to E Line Jack Whisner Transit Planner, Service Development King County Metro Transit Seattle, Washington jack.whisner@kingcounty.gov 206-477-5847 King County Metro Transit Part of general

More information

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations. The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

City of Bartow Comprehensive Plan. Transportation Element

City of Bartow Comprehensive Plan. Transportation Element City of Bartow 2030 Comprehensive Plan Amended through January 7, 2013 TRANSPORTATION ELEMENT GOAL: IT SHALL BE A GOAL OF THE CITY OF BARTOW TO PROVIDE A SAFE AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM

More information

East San Fernando Valley Transit Corridor. Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017

East San Fernando Valley Transit Corridor. Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017 East San Fernando Valley Transit Corridor Draft EIS/EIR Public Hearing (September 1 thru October 16, 2017 1 Public Comments Release of Draft EIS/EIR September 1, 2017 through October 16, 2017 45-day Public

More information